HomeMy WebLinkAbout2004/01/20 - Agenda Packet•
DESIGN REVIEW COMMITTEE MEETING
TUESDAY JANUARY 20, 2004 7:00 P.M.
RANCHO CUCAMONGA CIVIC CENTER
RAINS ROOM
10500 CIVIC CENTER DRIVE
RANCHO CUCAMONGA
ACTION AGENDA
u
Committee Members: Cristine McPhail Pam Stewart Nancy Fong
Alternates: Rich Macias Richard Fletcher Larry McNiel
CONSENT CALENDAR
The following items are expected to be routine and non-controversial. Typically they are items such as
plan revisions prepared in response to discussions at a previous meeting.
7:OO p.m.
(Donald/gene) ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMITDRC2003-00719
- PACIFIC GLOBE LLC. -The development of a 2,947 square foot gas station and
convenience store and 2,504 square foot fast food restaurant on 1.48 acres of land in the
Village Commercial District, located at the northeast corner of Day Creek Boulevard and
Highland Avenue -APN: 1089-121-OS and 1089-401-66. Related files: Preliminary
Review DRC2003-00063 and Pre-Application Review DRC2003-00064.
PROJECT REVIEW ITEMS
This is the time and place for the Committee to discuss and provide direction to an applicant regarding
their development application. The following items do not legally require any public testimony, although
the Committee may open the meeting for public input.
7:10 p.m.
(Debra/Willie) ENVIRONMENTAL IMPACT REPORT AND TENTATIVE TRACT .SUBTT16324 -
HENDERSONCREEK PROPERTIES, LLC. -The proposed subdivision of 62.50 acres
into 121 lots for single-family development, within the Very Low Residential District (0.1-2
dwelling units per acre) of the Etiwanda North Specific Plan, located at the northerly end
of Wardman-Bullock Road. APN: 0225-084-04, 0226-081-09 and 10, and 0226-082-29.
Related Files: DRC2003-00749, DRC2003-00750, DRC2003-00751 and
DRC2003-00753.
7:30 p.m.
(Donald/Cam) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2003-00987 -
OASIS COMMERCIAL DEVELOPMENT - A request to construct a 16,448 square foot
office building on 1.2 acres of land in the Industrial Park District (Subarea 7), located at
the northeast corner of Red Oak Avenue and Laurel Street-APN: 0208-352-11. Staff has
prepared a Mitigated Negative Declaration of environmental impacts for consideration.
•
DRC ACTION AGENDA
January 20, 2004
Page 2
• 7:50 p.m.
(Donald/Cam) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEWDRC2003-00988-
OASIS COMMERCIAL DEVELOPMENT - A request to construct two buildings totaling
23,762 square feet consisting of office, medical and retail use on 2.27 acres of land in the
Industrial Park District (Subarea 7), located on the north side of Laurel Street, west of Red
Oak Avenue -APN: 0208-352-91. Staff has prepared a Mitigated Negative Declaration of
environmental impacts for consideration.
8:10 p.m.
(Doug/Mark) ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMITDRC2003-00048
- CHARLES JOSEPH ASSOCIATES - A request to construct a recreational vehicle
storage facility on 9.87 acres of land in the Low Residential District (2-4 dwelling units per
acre) located at the southwest corner interchange of the 210 and 15 Interstate
~ interchange -APN: 0228-011-31
8:30 p.m.
(Warren/Mark) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEWDRC2003-00847-
FUSCOE ENGINEERING - (TUSCANY VILLAS AT REDHILL) -The design review of
building elevations and detailed site plan for 92 condominiums consisting of 4 and 6 unit
clusters on 6.90 acres of land in the Foothill Boulevard-Cucamonga Channel Mixed Use
area within Subarea 1 of the Foothill Districts, located on the north side of~Foothill
Boulevard, west of the Cucamonga Channel -APN: 0207-101-32, 33, and 50. Related
Files: Pre-Application Review DRC2002-00441, Tentative Tract MapSUBTT16651,
Variance DRC2003-00848, and Tree Removal Permit DRC2003-00849.
VARIANCE DRC2003-00848 - FUSCOE ENGINEERING - (TUSCANY VILLAS AT
REDHILL) - A request to increase the maximum building height and maximum retaining
wall height permitted in the hillside area, for a proposed 92 condominium development on
6.90 acres of land in the Foothill Boulevard-Cucamonga Channel Mixed Use area within
Subarea 1 of the Foothill Districts, located on the north side of Foothill Boulevard, west of
the Cucamonga Channel -APN: 0207-101-32, 33, and 50. Related Files: Pre-Application
Review DRC2002-00441, Tentative Tract Map SUBTT16651, Development Review
DRC2003-00847, and Tree Removal Permit DRC2003-00849.
ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT MAP SUBTT16651 -
FUSCOEENGINEERING -(TUSCANY VILLAS AT REDHILL)-Aresidentialsubdivision
for condominium purposes on 6.90 acres of land in the Foothill Boulevard-Cucamonga
Channel Mixed Use area within Subarea 1 of the Foothill Districts, located on the north
side of Foothill Boulevard, west of the Cucamonga Channel -APN: 0207-101-32, 33, and
50. Related Files: Pre-Application Review DRC2002-00441, Development Review
DRC2003-00847, Variance DRC2003-00848, and Tree Removal Permit DRC2003-00849.
(Eng-Mark)
PUBLIC COMMENTS
This is the time and place for the general public to address the Committee. State law prohibits the
Committee from addressing any issue not previously included on the Agenda. The Committee may
receive testimony and set the matter for a subsequent meeting. Comments are limited to five minutes per
individual.
ADJOURNMENT
DESIGN REVIEW COMMENTS
•
CONSENT CALENDAR
7:00 P.M. Donald Granger January 20, 2004
r~
L
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT DRC2003-00719- PACIFIC
GLOBE LLC. -The development of a 2,947 square foot gas station and convenience store and
2,504 square foot fast food restaurant on 1.48 acres of land in the Village Commercial District,
located at the northeast corner of Day Creek Boulevard and Highland Avenue - APN: 1089-121-08
and 1089-401-66. Related files: Preliminary Review DRC2003-00063 and Pre-Application Review
DRC2003-00064.
At the January 6, 2004, DRC meeting the applicant presented revised drawings which satisfied
several of the Major and Secondary Issues. The Committee (McPhail, Stewart, Fong) reviewed the
project and recommend approval with conditions (see attached action comments). The Committee
requested that the applicant make the revised changes and that the project be scheduled for review
on Consent Calendar at the January 20, 2004 Design Review Meeting. The applicant agreed to
make the requested changes. REVISED PLANS WILL BE AVAILABLE AT THE MEETING.
Staff Recommendation: Staff recommends that the Committee recommend approval to the
Planning Commission.
Design Review Committee Action:
Members~Present: Cristine McPhail, Rich Fletcher, Nancy Fong
Staff Planner: Donald Granger
At the meeting, staff presented revised drawings, which satisfied the Major, Secondary, and
additional issues the Design Review Committee raised at its January 6, 2004, meeting. The
Committee reviewed the project and recommend approval.
L~
• DESIGN REVIEW COMMENTS
7:10 P.M. Debra Meier January 20, 2004
ENVIRONMENTAL IMPACT REPORT AND TENTATIVE TRACT SUBTT16324 - HENDERSON
CREEK PROPERTIES, LLC. - The proposed subdivision of 62.50 acres into 121 lots for single-
family development, within the Very Low Residential District (0.1-2 dwelling units per acre) of the
Etiwanda North Specific Plan, located at the northerly end of Wardman-Bullock Road.
APN: 0225-084-04, 0226-081-09 and 10, and 0226-082-29. Related Files: DRC2003-00749,
DRC2003-00750, DRC2003-00751 and DRC2003-00753.
Design Parameters: The proposed project will consist of the Tentative Tract Map, as well as the
related Development Agreement, and General Plan and Etiwanda North Specific Plan Amendments
from Very Low Residential to Low Residential. The annexation area will encompass 100 acres, and
the proposed subdivision includes 62.5 acres of a 90.4 acre parcel. The remaining 28 acres of the
property are within Flood Control and Utility Corridor easements and are not proposed for
development.
The proposed General Plan and Etiwanda North Specific Plan Amendments are both intended to
modify the land use designation from Very Low Residential (0.1 to 2 dwelling units per acre) to Low
Residential (2-4 dwelling units per acre). Although the gross density of the project at 1.3 dwelling
units per acre is consistent with the current Very Low Residential land use designation, the
individual lot areas range from approximately 14,000 square feet to over 35,000 square feet, with an
• average lot area of approximately 18,000 square feet, therefore, the Low Residential land use
designation is necessary to allow the proposed lot sizes.
The site is situated on the Etiwanda Fan at the terminus of Wardman Bullock Road and Colonbero
Road. The north boundary of the project site is formed by two parallel transmission lines for SCE
and LADWP; and, the western and southern boundaries of the site area is formed by San
Bernardino County Flood Control District property that is associated with Etiwanda Creek.
Therefore, no development can occur along the north, south, or west boundaries of the site due to
the use and ownership of the surrounding lands. The eastern site boundary is adjacent to
W ardman-Bullock Road and the Brentwood Estates/Sheridan Estates project that was annexed to
the City some years ago. The proposed project will meet and/or exceed the average lot size of the
Brentwood Estates project at over 18,000 square feet of average lot area.
An Environmental Impact Report (EIR) is being prepared that will address the anticipated
environmental impacts of the proposed project and all associated actions. The EIR will address the
following areas of environmental impact in detail: Air Quality, Biological Resources, Cultural
Resources, Geology and Soils, Hydrology and Water Quality, Land Use, Noise, Public Health and
Safety, Public Services, Transportation and Circulation, and Utilities/Services.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion. Staff has worked with the applicant since submittal of the project to develop a design
that addresses design and circulation issues surrounding the proposed project. Therefore, there are
no staff comments .
Access is provided from within this subdivision to the north, where several private property owners
have homes which lie north of the power corridors. Two means of access have been provided from
• both the east and west sides of the site. The proposed access has been coordinated with the
property owners north of the site, as well as the County Planning and Engineering Land
Development staff.
DRC ACTION COMMENTS
SUBTT16324 - HENDERSON CREEK PROPERTIES, LLC
January 20, 2004
• Page 2
The proposed subdivision design incorporates a row of equestrian-sized lots along the northern
boundary of the project site. Access to the rear of the lots is served by the standard 15-foot private
equestrian easement that extends from Colonbero Road along the north boundary to the proposed
public street near the west boundary. The four lots along Street "I"are also proposed asequestrian-
sized lots.
The following issues will be the focus of.Trails Advisory Committee discussion regarding
this project:
Within the equestrian-sized lots, the site should be graded in a manner that would allow a
horse corral to be located at the same level as the proposed local equestrian trail.
2. Develop access from the Local Equestrian trails to the nearby Regional trails located within
the power corridor north of the site and/or the levee along Henderson Creek.
Staff Recommendation: Staff recommends that the Committee review the project and provide any
further comments for consideration in the completion of the project review and environmental
analysis. The project will be forwarded to the Planning Commission upon completion of the
Environmental Impact Report.
Design Review Committee Action:
• Members Present: Cristine McPhail, Rich Fletcher, Nancy Fong
Staff Planner: Debra Meier
The Committee recommended approval of the project with no further comments or modifications to
the design of the Tentative Tract Map.
•
• DESIGN REVIEW COMMENTS
7:30 P.M. Donald Granger January 20, 2004
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2003-00987 -OASIS
COMMERCIAL DEVELOPMENT - A request to construct a 16,448 square foot office building on 1.2
acres of land in the Industrial Park District (Subarea 7), located at the northeast corner of Red Oak
Avenue and Laurel Street - APN: 0208-352-11.
Design Parameters: The project site is located at the northeast corner of Red Oak Avenue and
Laurel Street. The site is surrounded by buildings of varying architectural styles and materials. The
project site is located within the Industrial Park Haven Overlay District, which strives for high
employment density and a high level of architectural quality. Site planning must incorporate
elements of apedestrian-oriented, campus-like setting with generous amounts of landscaping.
Paseos, esplanades and courtyards are highly encouraged.
The applicant is proposing to construct atwo-story, 16,448 square foot office building. The project
site has been designed with a covered, outdoor employee eating area that includes tables and
benches. The building has strong articulation in all wall planes, five balconies, and a courtyard at
the entrance of the building with a fountain. The exterior materials consist of stucco with granite the
accent squares, decorative cornice, and a 3 to 5-foot high stone ledge base. Horizontal and vertical
fry reglets provide additional relief to the wall planes. The vacant property to the west is
• concurrently being proposed for development of two office/medical buildings totaling 23,762 square
feet (DRC2003-00988).
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Maior Issues: The following broad design issues will be the focus of Committee discussion
regarding this project.
A pedestrian sidewalk should be provided to connect the building to the other buildings in this
block. A continuous sidewalk was intended along the south side of the main east-west spine
driveway (along the north side of project site). Also, a sidewalk connection should be provided
from the building to link with the continuous sidewalk system.
2. To improve circulation and minimize potential vehicle conflicts at this "T"intersection, the most
northerly drive aisle opening near the western property Tine should be closed off with a
landscaped planter. A drive aisle opening near the north property line, aligned with the
existing drive aisle opening at the Chinese restaurant, should be installed.
3. The use of stone ledge is a departure from the surrounding buildings that were recently
constructed (Chipolte and Starbucks) and does not promote design continuity. Brick should
replace stone ledge as a primary material, and be used in substantially larger amounts. Avoid
using brick only as a base treatment. Brick should be used in substantially larger amounts to
emphasize the office/professional use of the project and to fulfill the requirement of two
primary materials. Staff suggests the following:
• Brick should be applied to selected portions on the wall planes on the north, east, and
west elevations. Staff suggests adding brick to the inset areas of the wall planes and
pilasters in order to frame the 6 by 6-foot windows.
DRC ACTION COMMENTS
DRC2003-00987 -OASIS COMMERCIAL DEVELOPMENT
January 20, 2004
. Page 2
Brick should be added to the columns and wall plane up to the second floor under all
balconies.
4. At the south and west elevations, the square granite file accents and fry reglets do not provide
adequate visual interest and variation to the large wall plane at the stairwells. The square
granite accents and fry reglets should be eliminated and the wall plane should be redesigned
with large amounts of framed, sprandel glass.
5. At the north, east, and west elevations, the vertical elements on either side of the 6 by 6-foot
windows should extend, or "pop-out," in order to provide relief and shadow. The vertical
elements should extend 18 inches from the wall plane.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues.
1. The covered outdoor employee eating area should consist of a wood trellis, utilizing large
member lumber sizes (8 by 8-inch posts, 4 by 10-inch beams, 2 by 6-inch lattice) and beams
with decorative ends. Posts should be placed on a 2 by 2-foot brick base that is a minimum of
4 feet high in order to complement the building design.
3. Colored concrete or 24 by 24-inch scored concrete should be used in the first nine spaces in
front of the buildings (carpool and handicap) and in the courtyard at the main entrance at the
• south elevation. Colored/scored concrete will define the buildings entrances and enhance
the architecture of the building.
Policy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion.
Outdoor furniture shall be provided in the outdoor employee eating area.
2. Xeriscape principles should be followed in the landscape.
3. The project will require review and approval of a Uniform Sign Program.
Staff Recommendation: Staff recommends that the project be revised and return to the Design
Review Committee prior to being scheduled for Planning Commission.
Design Review Committee Action:
Members Present: Cristine McPhail, Rich Fletcher, Nancy Fong
Staff Planner: Donald Granger
The Committee reviewed the project and did not recommend approval. The Committee requested
that the project return to the Design Review Committee as a regular item, and provided the following
comments and direction to the applicant:
• 1. The site plan should be revised to provide a pedestrian sidewalk that connects to the other
buildings in this block. A continuous sidewalk was intended along the south side of the main
east-west spine driveway (along the north side of project site). Also, a sidewalk connection
should be provided from the building to link with the continuous sidewalk system.
DRC ACTION COMMENTS
DRC2003-00987 -OASIS COMMERCIAL DEVELOPMENT
January 20, 2004
• Page 3
2. The offset "T" intersection should be eliminated in order to minimize potential vehicle conflicts.
The Committee indicated that a drive aisle opening near the north property line, aligned with
the existing drive aisle opening at the Chinese restaurant, was the most feasible solution. The
Committee indicated that they would be willing to review alternative solutions.
3. The Committee indicated that stone ledge is a departure from the surrounding buildings that
were recently constructed (Chipolte and Starbucks) and does not promote design continuity.
The Committee strongly encouraged the applicant to replace the stone ledge with brick and to
apply it in larger portions on the wall planes. The Committee indicated that it was not
completely opposed to the use of stone ledge, and would consider the use of stone ledge,
provided it was applied in larger amounts and complemented the adjacent buildings.
4. At the stair wells on the south and west elevations, the wall plane needs additional treatment
to break up the large expanse and provide visual interest.
5. The covered outdoor employee should be redesigned to provide a logical, attached
connection to the building. The Committee suggested the use of a decorative wood overhead
trellis. Large member lumber sizes (8 by 8-inch posts, 8 by 10-inch beams, 2 by 6-inch lattice)
and beams with decorative ends should be utilized.
6. Colored concrete or 24 by 24-inch scored concrete should be used in the first nine spaces in
front of the buildings (carpool and handicap) and in the courtyard at the main entrance at the
• south elevation.
7. The courtyard atthe primary entrance (north elevation) of the building should be redesigned to
include landscaping.
8. The landscape palette of the project should be redesigned to provide more color. The
Committee encouraged the applicant to make use of a plant palette that will enhance and
provide vibrancy to the project.
•
• DESIGN REVIEW COMMENTS
7:50 P.M. Donald Granger January 20, 2004
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2003-00988 -OASIS
COMMERCIAL DEVELOPMENT - A request to construct two buildings totaling 23,762 square feet
consisting of office, medical and retail use on 2.27 acres of land in the Industrial Park District
(Subarea 7), located on the north side of Laurel Street, west of Red Oak Avenue -
APN: 0208-352-91.
Design Parameters: The project site is located at the northeast corner of Red Oak Avenue and
Laurel Street. The site is surrounded by buildings of varying architectural styles and materials. The
project site is located within the Industrial Park Haven Overlay District, which strives for high
employment density and a high level of architectural quality. Site planning must incorporate
elements of apedestrian-oriented, campus-like setting with generous amounts of landscaping.
Paseos, esplanades, and courtyards are highly encouraged.
The applicant is proposing to construct two buildings totaling 23,762 square feet consisting of office,
medical, and retail uses. The project site has been with designed with a paseo centered between
the buildings that include stamped concrete, brick pavers, water fountain, concrete benches, and
two wood overhead trellis. The exterior materials consist of stucco and red brick. Horizontal and
vertical fry reglets provide additional relief to the wall planes. The vacant property to the east is
• concurrently being proposed for development of a two-story office building totaling 16,448 square
feet (DRC2003-00987).
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Maior Issues: The following broad design issues will be the focus of Committee discussion
regarding this project.
A pedestrian sidewalk should be provided to connect the buildings to the other buildings in this
block. A continuous sidewalk was intended along the south side of the main east-west spine
driveway. Also, a sidewalk connection should be provided from the northwest corner of west
building to link with the continuous sidewalk system. Lastly, the sidewalk along the west side
of the east drive entrance should continue north to link with the continuous sidewalk system.
2. Avoid using brick only as a base treatment. Brick should be used in substantially larger
amounts to emphasize the office/professional use of the project. Staff suggests the following:
• On the north elevation, brick should be applied to the entire wall plane and pilasters, up
to the cornice, on Units 3-5 and 10-12.
• On the south elevation, brick should be applied to the entire wall plane and pilasters, up
to the cornice, on Units 3-5 and 10-12.
• On the south elevation, brick should extend from the base to the cornice on the pilasters
on Units 1, 7, 8, and 14.
• On the west elevation of Unit 1, brick should extend from the base to the cornice on the
• 3 pilasters.
• On the east elevation of Unit 14, brick should extend from the base to the cornice on the
2 pilasters and the electrical room.
DRC ACTION COMMENTS
DRC2003-00988 -OASIS COMMERCIAL DEVELOPMENT
January 20, 2004
• Page 2
On the north elevation, brick should extend from the base to the cornice on the 2
pilasters at the corner of Units 1 and 14.
3. The tower elements, with the brick ribbons and cornice, are awkward and do not create a
strong and complementing focal point. The tower should be redesigned. Staff suggest the
following modifications:
Add a hip roof and eliminate the vertical and horizontal brick ribbons.
The towers should be redesigned with brick extending from the base to the cornice.
The tower should also contain additional elements and forms, such as arches with brick
soldier courses, recessed windows with ledges and keystones, in order to provide
variation and visual interest.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues.
Landscape planter should be provided along the west elevation of the west building.
2. Trellis members should be heftier, with the smallest member being 4 by 6 inches.
Policy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion.
• 1. The project will require review and approval of a Uniform Sign Program.
2. Xeriscape principles should be followed in the landscape.
Staff Recommendation: Staff recommends approval subject to the above revisions prior to being
scheduled for Planning Commission.
Design Review Committee Action:
Members Present: Cristine McPhail, Rich Fletcher, Nancy Fong
Staff Planner: Donald Granger
The Committee reviewed the project and did not recommend approval. The Committee requested
that the project return to the Design Review Committee as a regular item, and provided the following
comments and direction to the applicant:
1. A pedestrian sidewalk should be provided to connect the buildings to the other buildings in this
block. A continuous sidewalk was intended along the south side of the main east-west spine
drive aisle. The Committee stated a meandering sidewalk was preferred on the south side of
the east-west spine drive aisle. Also, a sidewalk connection should be provided from the
northwest corner of west building to link with the continuous sidewalk system. Lastly, the
sidewalk along the west side of the east drive entrance should continue north to link with the
continuous sidewalk system.
• 2. The revised building elevations incorporating additional brick as outlined in Major Issue #2 and
the tower features with a metal hip roof introduced by the applicant were acceptable, provided
the tower feature is lowered slightly.
DRC ACTION COMMENTS
DRC2003-00988 -OASIS COMMERCIAL DEVELOPMENT
• January 20, 2004
Page 3
3. The Committee directed the applicant to rotate the site plan and building footprints, following
the natural curve of the east-west drive aisle. Rotating the site plan on its axis will align the
courtyard with the primary entrance and provide a focal point.
4. The landscape palette of the project should be redesigned to provide more color. The
Committee encouraged the applicant to make use of a plant palette that will enhance and
provide vibrancy to the project.
5. A landscape planter should be provided along the west elevation of the west building.
6. Trellis members should be heftier, with the smallest member being 4 by 6 inches.
•
•
• DESIGN REVIEW COMMENTS
8:10 P.M. Doug Fenn January 20, 2004
CONDITIONAL USE PERMIT DRC2003-00048 -CHARLES JOSEPH ASSOCIATES - A request to
construct a recreational vehicle and boat storage facility including a caretaker's quarters on 9.87
acres of land in the Low Residential District (2-4 dwelling units per acre), located at the southwest
corner interchange of the 210 and 15 Interstate interchange - APN:0228-011-31.
Background: This project was review by DRC on July 15, 2003 and recommended for revisions.
Attached are the July 15, 2003 DRC Action Comments. The applicant was instructed to work with
Staff and return the project to DRC as a Consent Item. However, Issues still remain and staff is of
the opinion that progress on this project has been with a minimalist approach. Because of this,
Staff is not returning the project as a Consent Item and the below referenced items must be fully
addressed:
Staff Comments:
Maior Issues: The following broad design issues will be the focus of Committee discussion
regarding this project:
1. The covered R.V. storage buildings should strongly "reflect" the architectural "elements" of
the caretaker's residence.
2. The building wall along the south property boundary needs to be architecturally treated to
break up the monotonous design or provide a 20-foot landscape area.
3. Provide a Conceptual Landscape Plan showing the density of trees at the north side of the site
as required by the Planning Commission at the Pre-application meeting. Provide sight line
studies and illustrative sections to prove that the area is screened from freeway view.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
1. Provide decorative pavement within drive entry throats (outside public right-of-way).
2. Access gates shall be opaque.
3. Provide the river rock columns to the Detailed Shop.
4. Delete six parking spaces to the west of the project across the manager's office because of
conflict with the entry area.
5. No outdoor lighting shall spill over unto neighboring residential neighborhoods.
6. The applicant shall apply for a Uniform Sign Program.
Staff Recommendation: Staff recommends that the Committee address major and secondary
issues and return before the Committee for review.
Design Review Committee Action:
• Members Present: Cristine McPhail, Rich Fletcher, Nancy Fong
DRC ACTION COMMENTS
DRC2003-00048 -CHARLES JOSEPH ASSOCIATES
• January 20, 2004
Page 2
Staff Planner: Doug Fenn
The applicant presented some of the changes to their project as recommended by staff. However,
the Committee had instructed that additional pilasters should be developed at the end of the
buildings and the height increased by at least three feet. Staff also recommended moving the
arched decorative elements to be clustered as four in a row, all facing the 210 Freeway on-ramp as
it merges into the I-15 Freeway. The Committee stated that the Landscape Plans have not been
revised to address the previous Committee comments. The Committee also directed the applicant
to provide landscaping along the entire south border of the project, and to revise the project and
bring it back for full Committee review.
U
DESIGN REVIEW COMMENTS
• 8:30 P.M. Warren Morelion January 20, 2004
ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT 16651 - FUSCOE ENGINEERING
(TUSCANY VILLAS AT REDHILL) - A residential subdivision for condominium purposes on 6.90
acres of land in the Foothill Boulevard-Cucamonga Channel Mixed Use area within Subarea 1 of the
Foothill Districts, located on the north side of Foothill Boulevard, west of the Cucamonga Channel -
APN: 207-101-32, 33, 50. Related Files: Pre-Application Review DRC2002-00441, Development
Review DRC2003-00847, Variance DRC2003-00848, and Tree Removal Permit DRC2003-00849.
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2003-00847 - FUSCOE
ENGINEERING (TUSCANY VILLAS AT REDHILL) -The design review of building elevations and
detailed site plan for 92 condominiums consisting of 4 and 6 unit clusters on 6.90 acres of land in
the Foothill Boulevard-Cucamonga Channel Mixed Use area within Subarea 1 of the Foothill
Districts, located on the north side of Foothill Boulevard, west of the Cucamonga Channel -
APN: 207-101-32, 33, 50.
VARIANCE DRC2003-00848 - FUSCOE ENGINEERING (TUSCANY VILLAS AT REDHILL) - A
request to increase the maximum building height and maximum retaining wall height permitted in
the hillside area, for a proposed 92 condominiums on 6.90 acres of land in the Foothill Boulevard-
Cucamonga Channel Mixed Use area within Subarea 1 of the Foothill Districts, located on the north
side of Foothill Boulevard, west of the Cucamonga Channel - APN: 207-101-32, 33, 50.
Background: At the January 6, 2004, DRC meeting, the Committee reviewed the project and
• recommended it return to the next meeting with corrections. The Committee asked the developer to
revise the project to reflect the attached action comments. The Committee requested revised plans
be presented at this meeting for review.
PLANS AVAILABLE AT MEETING
Staff Recommendation: Staff recommends the Design Review Committee forward the project to
the Planning Commission for approval subject to addressing all of the issues outlined in the
attached January 6, 2004, DRC Action Comments.
Design Review Committee Action:
Members Present: Cristine McPhail, Rich Fletcher, Nancy Fong
Staff Planner: Warren Morelion
The Design Review Committee reviewed the project again and was satisfied with all of the
applicant's revisions. The applicant redesigned the project to incorporate a more "Tuscany:
architectural design by adding additional stone treatment, shutters, window trim, iron elements, a
softer color palette, and landscaping around the buildings. In addition, the pool house was
redesigned to include an enhanced entry, additional stone, shutters, and iron elements. The parking
issue was addressed by adding an additional seven guest parking spaces to the site. Two of the
spaces were added near the pool house in a parallel parking design. A staircase was also added
between Buildings 15 and 16 to allow better pedestrian access to the pool area. The applicant
• agreed to continue to work with the adjacent property owner to incorporate the vacant property in
front of the site into the project design. The Committee recommended the project be forwarded to
the Planning Commission for approval with no additional comments or corrections.
DESIGN REVIEW COMMENTS
• January 20, 2004
PUBLIC COMMENTS
There were no public comments at this time.
ADJOURNMENT
The meeting adjourned at 9:45 p.m.
Respecttull submitted,
~,
Brad Buller
Secretary
r1
LJ
•
. DESIGN REVIEW COMMITTEE MEETING
TUESDAY JANUARY 20, 2004 7:00 P.M.
RANCHO CUCAMONGA CIVIC CENTER
RAINS ROOM
10500 CIVIC CENTER DRIVE
RANCHO CUCAMONGA
•
•
Committee Members: Cristine McPhail Pam Stewart
Alternates: Rich Macias Richard Fletcher
CONSENT CALENDAR
Nancy Fong
Larry McNiel
The following items are expected to be routine and non-controversial. Typically they are items such
as plan revisions prepared in response to discussions at a previous meeting.
7:00 p.m.
(Donald/gene) ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT DRC2003-
00719 -PACIFIC GLOBE LLC. -The development of a 2,947 square foot gas
station and convenience store and 2,504 square foot fast food restaurant on 1.48
.acres of land in the Village Commercial District, located at the northeast corner of
Day Creek Boulevard and Highland Avenue -APN: 1089-121-08 and 1089-401-66.
Related files: Preliminary Review DRC2003-00063 and Pre-Application Review
DRC2003-00064.
PROJECT REVIEW ITEMS
This is the time and place for the Committee to discuss and provide direction to an applicant
regarding their development application. The following items do not legally require any public
testimony, although the Committee may open the meeting for public input.
7:10 p.m.
(Debra/Willie) ENVIRONMENTAL IMPACT REPORT AND TENTATIVE TRACT SUBTT16324 -
HENDERSON CREEK PROPERTIES, LLC. -The proposed subdivision of 62.50
acres into 121 lots for single-family development, within the Very Low Residential
District (0.1-2 dwelling units per acre) of the Etiwanda North Specific Plan, located
at the northerly end of Wardman-Bullock Road. APN: 0225-084-04, 0226-081-09
and 10, and 0226-082-29. Related Files: DRC2003-00749, DRC2003-00750,
DRC2003-00751 and DRC2003-00753.
7:30 p.m
(Donald/Cam) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW
DRC2003-00987 -OASIS COMMERCIAL DEV ELOPMENT - A request to construct
a 16,448 square foot office building on 1.2 acres of land in the Industrial Park
District (Subarea 7), located at the northeast corner of Red Oak Avenue and Laurel
Street -APN: 0208-352-11. Staff has prepared a Mitigated Negative Declaration of
environmental impacts for consideration.
DRC AGENDA
January 20, 2004
Page 2
•
7:50 p.m.
(Donald/Cam) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW
DRC2003-00988 -OASIS COMMERCIAL DEVELOPMENT - A requestto construct
. two buildings totaling 23,762 square feet consisting of office, medical and retail use
on 2.27 acres of land in the Industrial Park District (Subarea 7), located on the north
side of Laurel Street, west of Red Oak Avenue -APN: 0208-352-91. Staff has
prepared a Mitigated Negative Declaration of environmental impacts for
consideration.
8:10 p.m.
(Doug/Mark) ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT
DRC2003-00048 -CHARLES JOSEPH ASSOCIATES - A request to construct a
recreational vehicle storage facility on 9.87 acres of land in the Low Residential
District (2-4 dwelling units per acre) located at the southwest corner interchange of
the 210 and 15 Interstate interchange -APN: 0228-011-31
8:30 p.m
(Warren/Mark) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW
DRC2003-00847 - FUSCOE ENGINEERING - (TUSCANY VILLAS ATREDHILL) -
Thedesign review of building elevations and detailed site plan for 92 condominiums
consisting of 4 and 6 unit clusters on 6.90 acres of land in the Foothill Boulevard-
Cucamonga Channel Mixed Use area within Subarea 1 of the Foothill Districts,
located on the north side of Foothill Boulevard, west of the Cucamonga Channel -
APN: 0207-101-32, 33, and 50. Related Files: Pre-Application Review
DRC2002-00441, Tentative Tract MapSUBTT16651, Variance DRC2003-00848,
and Tree Removal Permit DRC2003-00849.
VARIANCE DRC2003-00848 - FUSCOE ENGINEERING - (TUSCANY VILLAS AT
REDHILL) - A request to increase the maximum building height and maximum
retaining wall height permitted in the hillside area, for a proposed 92 condominium
development on 6.90 acres of land in the Foothill Boulevard-Cucamonga Channel
Mixed Use area within Subarea 1 of the Foothill Districts, located on the north side
of Foothill Boulevard, west of the Cucamonga Channel -APN: 0207-101-32, 33,
and 50. Related Files: Pre-Application Review DRC2002-00441, Tentative Tract
Map SUBTT16651, Development Review DRC2003-00847, and Tree Removal
Permit DRC2003-00849.
ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT MAP SUBTT16651 -
FUSCOE ENGINEERING - (TUSCANY VILLAS AT REDHILL) - A residential
subdivision for condominium purposes on 6.90 acres of land in the Foothill
Boulevard-Cucamonga Channel Mixed Use area within Subarea 1 of the Foothill
Districts, located on the north side of Foothill Boulevard, west of the Cucamonga
Channel -APN: 0207-101-32, 33, and 50. Related Files: Pre-Application Review
DRC2002-00441, Development Review DRC2003-00847, Variance
DRC2003-00848, and Tree Removal Permit DRC2003-00849. (Eng-Mark)
PUBLIC COMMENTS
This is the time and place for the general public to address the Committee. State law prohibits the
Committee from addressing any issue not previously included on the Agenda. The Committee may
receive testimony and set the matter for a subsequent meeting. Comments are limited to five
minutes per individual.
DRC AGENDA
January 20, 2004
Page 3
LJ
ADJOURNMENT
I, Melissa Andrewin, Office Specialist I I for the City of Rancho Cucamonga, hereby certify that a true,
accurate copy of the foregoing agenda was posted on January 15, 2004, at least 72 hours prior to
the meeting per Government Code Section 54954.2 at 10500 Civic Center Drive, Rancho
Cucamonga.
•
•
• DESIGN REVIEW COMMENTS _
7:00 P.M. Donald Granger January 20, 2004
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT DRC2003-00719 -PACIFIC
GLOBE LLC. -The development of a 2,947 square foot gas station and convenience store and
2,504 square foot fast food restaurant on 1.48 acres of land in the Village Commercial District,
located at the northeast corner of Day Creek Boulevard and Highland Avenue - APN: 1089-121-08
and 1089-401-66. Related files: Preliminary Review DRC2003-00063 and Pre-Application Review
DRC2003-00064.
At the January 6, 2004, DRC meeting the applicant presented revised drawings which satisfied
several of the Major and Secondary Issues. The Committee (McPhail, Stewart, Fong) reviewed the
project and recommend approval with conditions (see attached action comments). The Committee
requested that the applicant make the revised changes and that the project be scheduled for review
on Consent Calendar at the January 20, 2004 Design Review Meeting. The applicant agreed to
make the requested changes. REVISED PLANS WILL BE AVAILABLE AT THE MEETING.
Staff Recommendation: Staff recommends that the Committee recommend approval to the
Planning Commission.
Design Review Committee Action:
Members Present:
Staff Planner: Donald Granger
•
DESIGN REVIEW COMMENTS
• 7:10 p.m. Donald Granger January 6, 2004
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT DRC2003-00719 -PACIFIC
GLOBE LLC. -The development of a 2,947 square foot gas station and convenience store and
2,504 square foot fast food restaurant on 1.48 acres of land in the Village Commercial District,
located at the northeast corner of Day Creek Boulevard and Highland Avenue - APN: 1089-121-OS
and 1089-401-66. Related files: Preliminary Review DRC2003-00063 and Pre-Application Review
DRC2003-00064.
Background: On February 12, 2002, the Planning Commission conducted a workshop on the
proposed gas station, convenience store and fast food restaurant. At the workshop, the
Commission directed the applicant to modify the proposed project to be highly sensitive to the
neighborhood to the south, and that the project was overbuilt. The Commission emphasized the
importance of good on-site circulation, the requirement of outstanding architectural design, and the
need to prevent glare on the residences to the south. In response to the Commission's comments,
the applicant has scaled down the square footages of the buildings and designed the site with good
circulation.
Design Parameters: The project site is located at the northeast corner of Day Creek Boulevard and
Highland Avenue, on a triangular parcel created by the realignment of Highland Avenue and the
210 Freeway. The site has an average grade of approximately 10 percent, sloping from north to
south, and some areas have grades approaching 50 percent on existing, manufactured slopes. The
site has 20 feet of fall from the northwest corner of the parcel to the southwest corner of the parcel.
The site is constrained by the shape, and the existing topography. The project has been designed
. with a stacked stone base, tower feature and wood trellis feature with posts mounted on stacked
stdne bases in the drive-thru lane. Decorative concrete is used at both driveway entrances, for a
pedestrian connection and at the Handicap parking stall.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Maior Issues: The following broad design issues will be the focus of Committee discussion
regarding this project.
1. Grading of the project is critical to minimize the impact on the existing single-family homes to
the south. The proposed pad of the gas station and convenience store is approximately 2 to 9
feet higher than the Highland Avenue street elevation. The proposed pad should be lowered
several feet and be elevated only what is necessary to accomplish adequate drainage. The
applicant should revise the grading design to minimize the impact of the project, even if
retaining walls are necessary.
2. The battered, tapered architectural wall planes are typical and create awkward geometry in the
form of the building. Staff does not encourage the uses of battered wall planes. Strong
consideration should be given to eliminating the battered wall planes and using traditional
shapes that fit with overall building form.
3. At the east elevation, the tower feature has an extensive amount of vertical wall plane that is
void of enhancement. The tower'feature should be redesigned, with elements that provide
variation, such as arches or porticos.
4. All aluminum awnings should be eliminated on the west and east elevations, and replaced with
suspended, large-member, decorative wood trellis that projects from the wall plane a minimum
of 2 Yz feet.
DRC COMMENTS
DRC2003-00719-PACIFIC GLOBE LLC.
January 6, 2004
• Page 2
5. The south and north elevations should receive some additional architectural enhancement,
such as suspended wood trellis, quatrefoils, or accent file framed by a contrasting stucco
surround.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues.
1. Additional stacked stone should be added to the convenience store/fast food building. The
2-foot high stacked stone base is too small to provide a materials contrast from the stucco
wall plane. The stacked base should be raised to a minimum height of 3 Yz feet. On the east
elevation, stacked stone should be added to completely cover the trapezoidal wall plane over
the entrance to Jack in Box.
2. Colored concrete and enhanced paving should be used at the following locations:
• Colored terracotta concrete should be used under the pump island.
• Eliminate stamped concrete at the driveways and at the pedestrian connection and
replace with colored concrete with score lines.
3. The six columns supporting the pump island canopy should have a stacked stone, and a
decorative cap, thereby matching the architecture of the convenience store and fast food
restaurant. Stacked stone should extend from the base of columns up to a minimum of 8 feet.
4. The columns supporting the wood trellis should be enlarged in order to make a greater
architectural statement and presence. Staff suggests the following dimensions: 2 feet by
• 2 feet base with stacked stone carried to the bottom of the posts, and 12 inches by 12 inches
wood posts.
5. The monument signs should blend into the grades and berms.
Policy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion.
The project will require review and approval of a Uniform Sign Program.
Undulating berms in the landscaped setback areas shall be provided to provided to create to
visual interest and to screen parking areas.
3. All lighting, whether mounted on the building or on freestanding poles, shall be designed a
confine the light canopy to the site boundaries.
4. All lighting, whether mounted on the building or on freestanding poles, shall be architecturally
compatible with the building design.
5. The project shall conform to the Day Creek Boulevard Master Plan and shall have 10-foot
sidewalk, matching the projects to the north and south.
Staff Recommendation: Staff recommends that the project be revised and return to Design
Review Committee prior to being scheduled for Planning Commission.
Design Review Committee Action:
Members Present: Cristine McPhail, Pam Stewart, Nancy Fong
Staff Planner: Donald Granger
DRC COMMENTS
DRC2003-00719 -PACIFIC GLOBE LLC.
January 6, 2004
• Page 3
At the meeting the applicant presented revised drawings which satisfied several of the Major and
Secondary Issues. The Committee reviewed the project and recommend approval with the following
conditions:
The proposed pad shall be lowered several feet and be elevated only what is necessary to
accomplish adequate drainage.
2. The battered, tapered architectural wall planes shall be eliminated and replaced with square
wall planes.
3. At the east elevation, the tower feature shall include an arch. The Committee supported the
revision made by the applicant, but indicated the tower need additional enhancement, such as
accent file framed by a stucco surround.
4. All aluminum awnings shall be eliminated on the east and west elevations and replaced with
suspended, large-member, decorative wood trellis that projects from the wall plane a minimum
of 2 Yz feet. If necessary, the wood trellis shall be suspended by wood, not cables.
5. The south and north elevations shall receive additional architectural enhancement, in the form
of score lines, matching the east elevation.
6. Additional stacked stone shall be added to the convenience store/fast food building. The
stacked base should be raised to a minimum height of 3 Yz feet. On the east elevation,
. stacked stone shall be added to completely cover the wall plane over the entrance to Jack in
Box.
6. Black concrete shall be used under the pump island. The stamped concrete at the driveways
and at the pedestrian connection shall be eliminated and replaced with colored concrete with
score lines.
7. The six columns supporting the pump island canopy shall have a stacked stone, and a
decorative cap, thereby, matching the architecture of the convenience store and fast food
restaurant. Stacked stone shall extend from the base of the columns up a minimum of 8 feet.
8. The columns supporting the wood trellis shall be enlarged in order to make a greater
architectural statement and presence. The following dimensions shall be used: 2 by 2-foot
base with stacked stone carried to the bottom of the posts and 12 by 12-inch wood posts.
9. The monument signs shall blend into the grades and berms. Final design shall be subject to
City Planner review and approval.
10. All cornices shall have finished ends and wrap around where the wall plane returns 90
degrees.
11. The pumps island canopy shall have a mansard roof with tile.
12. The project will have a decorative concrete and a plaza, matching the project at the northwest
corner of Day Creek Boulevard and Highland Avenue.
The Committee requested that the applicant make the revised changes and that the project be
scheduled for review on Consent Calendar at the January 20, 2004, Design Review Meeting. The
applicant agreed to make the requested changes.
• DESIGN REVIEW COMMENTS
7:10 P.M. Debra Meier January 20, 2004
ENVIRONMENTAL IMPACT REPORT AND TENTATIVE TRACT SUBTT16324 - HENDERSON
CREEK PROPERTIES, LLC. - The proposed subdivision of 62.50 acres into 121 lots for single-
familydevelopment, within the Very Low Residential District (0.1-2 dwelling units per acre) of the
Etiwanda North Specific Plan, located at the northerly end of Wardman-Bullock Road.
APN: 0225-084-04, 0226-081-09 and 10, and 0226-082-29. Related Files: DRC2003-00749,
DRC2003-00750, DRC2003-00751 and DRC2003-00753.
Design Parameters: The proposed project will consist of the Tentative Tract Map, as well as the
related Development Agreement, and General Plan and Etiwanda North Specific Plan Amendments
from Very Low Residential to Low Residential. The annexation area will encompass'100 acres, and
the proposed subdivision includes 62.5 acres of a 90.4 acre parcel. The remaining 28 acres of the
property are within Flood Control and Utility Corridor easements and are not proposed for
development.
The proposed General Plan and Etiwanda North Specific Plan Amendments are both intended to
modify the land use designation from Very Low Residential (0.1 to 2 dwelling units per acre) to Low
Residential (2-4 dwelling units per acre). Although the gross density of the project at 1.3 dwelling
units per acre is consistent with the current Very Low Residential land use designation, the
individual lot areas range from approximately 14,000 square feet to over 35,000 square feet, with an
average lot area of approximately 18,000 square feet, therefore, the Low Residential land use
. designation is necessary to allow the proposed lot sizes.
The site is situated on the Etiwanda Fan at the terminus of Wardman Bullock Road and Colonbero
Road. The north boundary of the project site is formed by two parallel transmission lines for SCE
and LADW P; and, the western and southern boundaries of the site area is formed by San
Bernardino County Flood Control District property that is associated with Etiwanda Creek.
Therefore, no development can occur along the north, south, or west boundaries of the site due to
the use and ownership of the surrounding lands. The eastern site boundary is adjacent to
Wardman-Bullock Road and the Brentwood Estates/Sheridan Estates project that was annexed to
the City some years ago. The proposed project will meet and/or exceed the average lot size of the
Brentwood Estates project at over 18,000 square feet of average lot area.
An Environmental Impact Report (EIR) is being prepared that will address the anticipated
environmental impacts of the proposed project and all associated actions. The EIR will address the
following areas of environmental impact in detail: Air Quality, Biological Resources, Cultural
Resources, Geology and Soils, Hydrology and Water Quality, Land Use, Noise, Public Health and
Safety, Public Services, Transportation and Circulation, and Utilities/Services.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion. Staff has worked with the applicant since submittal of the project to develop a design
that addresses design and circulation issues surrounding the proposed project. Therefore, there are
no staff comments .
Access is provided from within this subdivision to the north, where several private property owners
have homes which lie north of the power corridors. Two means of access have been provided from
both the east and west sides of the site. The proposed access has been coordinated with the
property owners .north of the site, as well as the County Planning and Engineering Land
Development staff.
The proposed subdivision design incorporates a row of equestrian-sized lots along the northern
boundary of the project site. Access to the rear of the lots is served by the standard 15-foot private
equestrian easement that extends from Colonbero Road along the north boundaryto the proposed
• public street nearthe west boundary. The four lots along Street "I"are also proposed as equestrian-
sized lots.
The following issues will be the focus of Trails Advisory Committee discussion regarding
this project:
Within the equestrian-sized lots, the site should be graded in a manner that would allow a
horse corral to be located at the same level as the proposed local equestrian trail.
2. Develop access from the Local Equestrian trails to the nearby Regional trails located within
the power corridor north of the site and/or the levee along Henderson Creek.
Staff Recommendation: Staff recommends that the Committee review the project and provide any
further comments for consideration in the completion of the project review and environmental
analysis. The project will be forwarded to the Planning Commission upon completion of the
Environmental Impact Report.
Design Review Committee Action:
Members Present:
Staff Planner: Debra Meier
•
. DESIGN REVIEW COMMENTS
7:30 P.M. Donald Granger January 20, 2004
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2003-00987 -OASIS
COMMERCIAL DEVELOPMENT - A request to construct a 16,448 square foot office building on 1.2
acres of land in the Industrial Park District (Subarea 7), located at the northeast corner of Red Oak
Avenue and Laurel Street - APN: 0208-352-11.
Design Parameters: The project site is located at the northeast corner of Red Oak Avenue and
Laurel Street. The site is surrounded by buildings of varying architectural styles and materials. The
project site is located within the Industrial Park Haven Overlay District, which strives for high
employment density and a high level of architectural quality. Site planning must incorporate
elements of apedestrian-oriented, campus-like setting with generous amounts of landscaping.
Paseos, esplanades and courtyards are highly encouraged.
The applicant is proposing to construct atwo-story, 16,448 square foot office building. The project
site has been designed with a covered, outdoor employee eating area that includes tables and
benches. The building has strong articulation in all wall planes, five balconies, and a courtyard at
the entrance of the building with a fountain. The exterior materials consist of stucco with granite the
accent squares, decorative cornice, and a 3 to 5-foot high stone ledge base. Horizontal and vertical
fry reglets provide additional relief to the wall planes. The vacant property to the west is
concurrently being proposed for development of two office/medical buildings totaling 23,762 square
feet (DRC2003-00988).
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Maior Issues: The following broad design issues will be the focus of Committee discussion
regarding this project.
A pedestrian sidewalk should be provided to connect the building to the other buildings in this
block. A continuous sidewalk was intended along the south side of the main east-west spine
driveway (along the north side of project site). Also, a sidewalk connection should be provided
from the building to link with the continuous sidewalk system.
2. To improve circulation and minimize potential vehicle conflicts at this "T"intersection, the most
northerly drive aisle opening near the western property line should be closed off with a
landscaped planter. A drive aisle opening near the north property line, aligned with the
existing drive aisle opening at the Chinese restaurant, should be installed.
3. The use of stone ledge is a departure from the surrounding buildings that were recently
constructed (Chipolte and Starbucks) and does not promote design continuity. Brick should
replace stone ledge as a primary material, and be used in substantially larger amounts. Avoid
using brick only as a base treatment. Brick should be used in substantially larger amounts to
emphasize the office/professional use of the project and to fulfill the requirement of two
primary materials. Staff suggests the following:
• Brick should be applied to selected portions on the wall planes on the north, east, and
. west elevations. Staff suggests adding brick to the inset areas of the wall planes and
pilasters in order to frame the 6 by 6-foot windows.
• Brick should be added to the columns and wall plane up to the second floor under all
balconies.
4. At the south and west elevations, the square granite file accents and fry reglets do not provide
adequate visual interest and variation to the large wall plane at the stairwells. The square
granite accents and fry reglets should be eliminated and the wall plane should be redesigned
with large amounts of framed, sprandel glass.
5. At the north, east, and west elevations, the vertical elements on either side of the 6 by 6-foot
windows should extend, or "pop-out," in order to provide relief and shadow. The vertical
elements should extend 18 inches from the wall plane.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues.
The covered outdoor employee eating area should consist of a wood trellis, utilizing large
member lumber sizes (8 by 8-inch posts, 4 by 10-inch beams, 2 by 6-inch lattice) and beams
with decorative ends. Posts should be placed on a 2 by 2-foot brick base that is a minimum of
4 feet high in order to complement the building design.
3. Colored concrete or 24 by 24-inch scored concrete should be used in the first nine spaces in
front of the buildings (carpool and handicap) and in the courtyard at the main entrance at the
south elevation. Colored/scored concrete will define the buildings entrances and enhance
the architecture of the building.
Policy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion.
Outdoor furniture shall be provided in the outdoor employee eating area.
2. Xeriscape principles should be followed in the landscape.
• 3. The project will require review and approval of a Uniform Sign Program.
Staff Recommendation: Staff recommends that the project be revised and return to the Design
Review Committee prior to being scheduled for Planning Commission.
Design Review Committee Action:
Members Present:
Staff Planner: Donald Granger
• DESIGN REVIEW COMMENTS
7:50 P.M. Donald Granger January 20, 2004
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2003-00988 -OASIS
COMMERCIAL DEVELOPMENT - A request to construct two buildings totaling 23,762 square feet
consisting of office, medical and retail use on 2.27 acres of land in the Industrial Park District
(Subarea 7), located on the north side of Laurel Street, west of Red Oak Avenue -
APN: 0208-352-91.
Design Parameters: The project site is located at the northeast corner of Red Oak Avenue and
Laurel Street. The site is surrounded by buildings of varying architectural styles and materials. The
project site is located within the Industrial Park Haven Overlay District, which strives for high
employment density and a high level of architectural quality. Site planning must incorporate
elements of apedestrian-oriented, campus-like setting with generous amounts of landscaping.
Paseos, esplanades, and courtyards are highly encouraged.
The applicant is proposing to construct two buildings totaling 23,762 square feet consisting of office,
medical, and retail uses. The project site has been with designed with a paseo centered between
the buildings that include stamped concrete, brick pavers, water fountain, concrete benches, and
two wood overhead trellis. The exterior materials consist of stucco and red brick. Horizontal and
vertical fry reglets provide additional relief to the wall planes. The vacant property to the east is
concurrently being proposed for development of atwo-story office building totaling 16,448 square
feet (DRC2003-00987).
• Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Maior Issues: The following broad design issues will be the focus of Committee discussion
regarding this project.
A pedestrian sidewalk should be provided to connect the buildings to the other buildings in this
block. A continuous sidewalk was intended along the south side of the main east-west spine
driveway. Also, a sidewalk connection should be provided from the northwest corner of west
building to link with the continuous sidewalk system. Lastly, the sidewalk along the west side
of the east drive entrance should continue north to link with the continuous sidewalk system.
2. Avoid using brick only as a base treatment. Brick should be used in substantially larger
amounts to emphasize the office/professional use of the project. Staff suggests the following:
• On the north elevation, brick should be applied to the entire wall plane and pilasters, up
to the cornice, on Units 3-5 and 10-12.
• On the south elevation, brick should be applied to the entire wall plane and pilasters, up
to the cornice, on Units 3-5 and 10-12.
• On the south elevation, brick should extend from the base to the cornice on the pilasters
on Units 1, 7, 8, and 14.
• On the west elevation of Unit 1, brick should extend from the base to the cornice on the
3 pilasters.
• On the east elevation of Unit 14, brick should extend from the base to the cornice on the
• 2 pilasters and the electrical room.
• On the north elevation, brick should extend from the base to the cornice on the 2
pilasters at the corner of Units 1 and 14.
• 3. The tower elements, with the brick ribbons and cornice, are awkward and do not create a
strong and complementing focal point. The tower should be redesigned. Staff suggest the
following modifications:
Add a hip roof and eliminate the vertical and horizontal brick ribbons.
The towers should be redesigned with brick extending from the base to the cornice.
The tower should also contain additional elements and forms, such as arches with brick
soldier courses, recessed windows with ledges and keystones, in order to provide
variation and visual interest.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues.
Landscape planter should be provided along the west elevation of the west building.
Trellis members should be heftier, with the smallest member being 4 by 6 inches.
Policy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion.
The project will require review and approval of a Uniform Sign Program.
Xeriscape principles should be followed in the landscape.
Staff Recommendation: Staff recommends approval subject to the above revisions prior to being
scheduled for Planning Commission.
• Design Review Committee Action:
Members Present:
Staff Planner: Donald Granger
•
• DESIGN REVIEW COMMENTS
8:30 P.M. Warren Morelion January 20, 2004
ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT 16651 - FUSCOE ENGINEERING
(TUSCANY VILLAS AT REDHILL) - A residential subdivision for condominium purposes on 6.90
acres of land in the Foothill Boulevard-Cucamonga Channel Mixed Use area within Subarea 1 of the
Foothill Districts, located on the north side of Foothill Boulevard, west of the Cucamonga Channel -
APN: 207-101-32, 33, 50. Related Files: Pre-Application Review DRC2002-00441, Development
Review DRC2003-00847, Variance DRC2003-00848, and Tree Removal Permit DRC2003-00849.
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2003-00847 - FUSCOE
ENGINEERING (TUSCANY VILLAS AT REDHILL) -The design review of building elevations and
detailed site plan for 92 condominiums consisting of 4 and 6 unit clusters on 6.90 acres of land in
the Foothill Boulevard-Cucamonga Channel Mixed Use area within Subarea 1 of the Foothill
Districts, located on the north side of Foothill Boulevard, west of the Cucamonga Channel -
APN: 207-101-32, 33, 50.
VARIANCE DRC2003-00848 - FUSCOE ENGINEERING (TUSCANY VILLAS AT REDHILL) - A
request to increase the maximum building height and maximum retaining wall height permitted in
the hillside area, for a proposed 92 condominiums on 6.90 acres of land in the Foothill Boulevard-
CucamongaChannel Mixed Use area within Subarea 1 of the Foothill Districts, located on the north
side of Foothill Boulevard, west of the Cucamonga Channel - APN: 207-101-32, 33, 50.
Background: At the January 6, 2004, DRC meeting, the Committee reviewed the project and
• recommended it return to the next meeting with corrections. The Committee asked the developerto
revise the projectto reflecttheattached action comments. The Committee requested revised plans
be presented at this meeting for review.
PLANS AVAILABLE AT MEETING
Staff Recommendation: Staff recommends the Design Review Committee forward the project to
the Planning Commission for approval subject to addressing all of the issues outlined in the
attached January 6, 2004, DRC Action Comments.
Design Review Committee Action:
Staff Planner: Warren Morelion
Members Present:
•
• DESIGN REVIEW COMMENTS
7:30 p.m. Warren Morelion January 6, 2004
ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT 16651 - FUSCOE ENGINEERING
(TUSCANY VILLAS AT REDHILL) - A residential subdivision for condominium purposes on 6.90
acres of land in the Foothill Boulevard-Cucamonga Channel Mixed Use area within Subarea 1 of the
Foothill Districts, located on the north side of Foothill Boulevard, west of the Cucamonga Channel -
APN: 207-101-32, 33, 50. Related Files: Pre-Application Review DRC2002-00441, Development
Review DRC2003-00847, Variance DRC2003-00848, and Tree Removal Permit DRC2003-00849.
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2003-00847 - FUSCOE
ENGINEERING (TUSCANY VILLAS AT REDHILL) -The design review of building elevations and
detailed site plan for 92 condominiums consisting of 4 and 6 unit clusters on 6.90 acres of land in
the Foothill Boulevard-Cucamonga Channel Mixed Use area within Subarea 1 of the Foothill
Districts, located on the north side of Foothill Boulevard, west of the Cucamonga Channel -
APN: 207-101-32, 33, 50.
VARIANCE DRC2003-00848 - FUSCOE ENGINEERING (TUSCANY VILLAS AT REDHILL) - A
request to increase the maximum building height and maximum retaining wall height permitted in
the hillside area, for a proposed 92 condominiums on 6.90 acres of land in the Foothill Boulevard-
CucamongaChannel Mixed Use area within Subarea 1 of the Foothill Districts, located on the north
side of Foothill Boulevard, west of the Cucamonga Channel - APN: 207-101-32, 33, 50.
• Background: On March 19, 2003, the City Council approved General Plan Amendment
DRC2002-00001, Development District Amendment DRC2002-00001, and Development Code
Amendment DRC2002-00001, to change the land use and zoning of the site from Office to Mixed
Use to allow for Office and/or Medium Residential (8-14 dwelling units per acre). Underthe Medium
Residential component (100 percent of the site) up to 96 units maybe permitted. The applicant is
proposing 92 attached condominiums on the site.
Design Parameters: The 6.9 acre site is vacant and slopes southerly an average of approximately
4-5 percent, with the exception of an area at the northeast portion of the site where the slopes
exceed 25 percent. The site is triangular in shape with several scattered mature trees and a
Eucalyptus windrow at the southwest end. The site has been cleared under a previous demolition
permit of two vacant structures that were located near Foothill Boulevard. The structures have been
deemed non-historic. The site is bordered by the Pacific Electric Inland Empire Trail and vacant
land to the north, Foothill Boulevard and vacant land followed bysingle-family development and a
trailer park to the south, the Cucamonga Channel followed by Vineyard Town Center to the east,
and vacant land to the west. Access into the site is from Foothill Boulevard. At aPre-Application
review meeting dated May 28, 2003, the Planning Commission stressed to the applicant that it was
important that the vacant land between the site and Foothill Boulevard be incorporated in the overall
project design even though the property is off-site.
The applicant is proposing to develop 92 attached condominiums on the site. The project will
include two 4-plexs, fourteen 6-plexs, and a recreation center with a pool and spa for use by
residents of the propped private community. The condominiums will be comprised of an "uphill" and
"flat" building product, each with two separate floor plans. The "uphill" product will include 1,650 and
• 1,923 square foot units with 228 and 349 square foot courtyards, respectively. The "flat" building
product will include 1,406 and 1,857 square foot units with 244 and 225 square foot courtyards,
respectively. The larger units are proposed at the ends of each building product. The 6-plex "flat"
product is proposed with a 442 square foot third story loft option. The condominiums and recreation
DRC ACTION AGENDA
TT16651 - FUSCOE ENGINEERING
January 6, 2004
• Page 2
center building are designed with stucco and stone veneer exterior. The stone veneer is
incorporated as a wainscot treatment on parts of the buildings and around the building entries. The
"flat" building product incorporates substantially less stone veneer on the building exterior than the
"uphill" product. Other elements on the buildings include stucco trim, shutters, corbels, and wrought
iron railings.
The design of the buildings exceed the 30-foot maximum building height allowed in the hillside
district. As proposed, the "uphill" product will exceed the height on a small portion of the roofline on
the downhill (garage) side of the buildings, and the "flat" will exceed the height on a small section
along the ridgeline for those buildings that include the loft option. The applicant has submitted a
variance application requesting relief from the 30-foot maximum building height requirement.
Because of the location and limited amount of areas of the buildings that exceed the height
limitations, staff does not feel the building design would have a negative visual impact. Included in
the variance request is a request to extend the maximum retaining wall height from 4 feet to
approximately 12 feet to accommodate a wall at the northeast corner of the site. The applicant is
requesting to use a "Vendura" retaining wall system design.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Maior Issues: The following broad design issues will be the focus of Committee discussion
regarding this project:
• 1. Building Architecture -The building architecture should be enhanced to a level that would
warrant the location of the project along Foothill Boulevard. To do so, the building architecture
should be enhance by incorporating additional shutters, wrought iron trellis and otherfeatures,
and additional decorative treatments to create a 360-degree architectural theme. In addition,
a substantial amount of rock treatment should be added to the buildings, especially the "uphill"
building product which has substantially less stone in its design than the "flat" building product.
Those buildings fronting Foothill Boulevard should be especially enhanced above the
rest of the infill buildings because of their location.
2. Parking -The project exceeds the City's minimum guest parking spaces by 2 spaces;
however, recently completed comparable multi-family projects in the City have found that the
City's minimum standards do not provide enough surface parking and created overspill illegal
parking onto public streets. (Note: The number of guest spaces provided in Parking Summary
Table on Site Plan is incorrect. The correct number is 25 spaces provided versus 23 required).
3. The western half of the project site is setback from an existing Foothill Boulevard right-of-way
and vacant parcel (APN: 0207-101-13) that fronts on Foothill Boulevard. Per the direction of
the Planning Commission from the May 28, 2003, Pre-Application Workshop, the adjoining
property along Foothill Boulevard should be incorporated into the project design as
landscaping. The Committee and staff feel that if the vacant land were left to be undeveloped
in front of the project site, it would diminish the visual appearance of the overall project. Staff
has been working with the applicant and the adjoining landowner regarding this issue.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
. Committee will discuss the following secondary design issues:
1. Cabana Architecture -The architectural design of the cabana is very plain and should be
revised to incorporate many of the design elements and architectural features of the other
buildings. This would include a defined entry on the north side of the building, and possibly a
DRC ACTION AGENDA
TT16651 - FUSCOE ENGINEERING
January 6, 2004
Page 3
fake entry or enhanced design on the south side of the building for appearance purposes, in
addition to the other features mentioned above. Additionally, the proposed fence on the south
side of the building should be designed not to obstruct the building as it is viewed from the
south. Therefore, suggest ending the fence at the southwest and southeast corners of the
building.
2. Route 66 -The streetscape of the project should include elements celebrating the historic
Route 66 pursuant to the design concepts of the Foothill Boulevard Historic Route 66 Visual
Improvement Plan for suburban parkways, including meandering sidewalk and informal drifts
of London Planes, California Sycamores, and Purple Plum trees (not Canary Island Pine and
African Sumac). See attached for a copy outlining the typical suburban parkway design.
3. Landscaping -Provide planters between garage doors and functional pot shelves on some
upstairs windows to soften the 3-story Rear Elevations.
4. Design interior private open space areas so they are enclosed by solid decorative block. In
the areas along Foothill Boulevard and Red Hill Country Club Drive, the walls may have to be
designed for sound attenuation. The final design of the walls shall be to the satisfaction of the
City Planner.
5. Stone pilasters used on the perimeter, the wrought iron fence, and entry monument shall be a
minimum of 30 inches by 30 inches in size.
• 6. Stone pilasters used on the courtyard fencing, pool fencing, and retaining seat walls shall be a
minimum of 24 inches by 24 inches in size.
7. Windows should be provided in all garage doors to allow the Homeowner's Association to
quickly ascertain whether garages are being used for storage instead of vehicle parking. This
is an important component of parking enforcement.
Policv Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion:
Mail kiosks should be provided throughout project or centralized in the Cabana. If detached,
they should be designed in the same architectural style.
Garage door designs should vary, such as in pairs.
Design Review Committee Action:
Members Present: Pam Steward, Cristine McPhail, Nancy Fong
Staff Planner: Warren Morelion
The Design Review Committee reviewed the project and recommended it return to the
January 20, 2004, meeting after it has been revised to address the Committee's comments. The
Committee stressed to the applicant the location of the site and the importance of a quality project.
• The Committee believed that the proposed building design should be revised to represent a true
"Tuscany" architectural style. The building design should include elements such as, but not limited
to, the following:
DRC ACTION AGENDA
TT16651 - FUSCOE ENGINEERING
January 6, 2004
• Page 4
Architecture
Provide a substantial amount of additional stone treatment to all building elevations. The
buildings visible from Foothill Boulevard should especially be enhanced with stone.
2. Revise stucco color so it has a softer color pallete.
3. Replace proposed wrought iron balcony and courtyard railings with railings that are more
consistent with a "Tuscany" architectural theme/style.
4. Provide grill work on windows.
5. Add additional shutters and other architectural elements consistent with a "Tuscany"
architectural theme/style.
6. Enhance architecture on the rear (garage side) of those buildings (Building 1 and 2) that are
visible from Foothill Boulevard.
7. Enhance cabana architectural design so it has the same quality of design (revised) as the
condominium buildings.
• In addition, the Committee agreed with staff that there was insufficient amount of visitor parking on
the site. The Committee explained that although the project meets the amount of visitor parking
required, the location of the project does not allow for any off-site parking overflow because it is
isolated and adjacent to Foothill Boulevard. The Committee explained that they wanted to make
sure that there would be no parking issues for the project in the future. The committee
recommended the following:
Parking
Provide additional visitor parking. Suggest a minimum of 1 space for every 3 condominium
units.
2. Provide visitor parking closer to the pool and area.
Lastly, the Committee also asked the developer to work with the adjacent property owner to
resolve the vacant property issue in front of the project site.
•
DESIGN REVIEW COMMENTS
8:10 P.M. Doug Fenn January 20, 2004
CONDITIONAL USE PERMIT DRC2003-00048 -CHARLES JOSEPH ASSOCIATES-A requestto
construct a recreational vehicle and boat storage facility including a caretaker's quarters on 9.87
acres of land in the Low Residential District (2-4 dwelling units per acre), located at the southwest
corner interchange of the 210 and 15 Interstate interchange - APN:0228-011-31.
Background: This project was review by DRC on July 15, 2003 and recommended for revisions.
Attached are the July 15, 2003 DRC Action Comments. The applicant was instructed to work with
Staff and return the project to DRC as a Consent Item. However, Issues still remain and staff is of
the opinion that progress on this project has been with a minimalist approach. Because of this,
Staff is not returning the project as a Consent Item and the below referenced items must be fully
addressed:
Staff Comments:
Maior Issues: The following broad design issues will be the focus of Committee discussion
regarding this project:
1. The covered R.V. storage buildings should stronolV "reflect" the architectural "elements" of
the caretaker's residence.
2. The building wall along the south property boundary needs to be architecturally treated to
break up the monotonous design or provide a 20-foot landscape area.
3. Provide a Conceptual Landscape Plan showing the density of trees at the north side of the site
as required by the Planning Commission at the Pre-application meeting. Provide sight line
studies and illustrative sections to prove that the area is screened from freeway view.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
1. Provide decorative pavement within drive entry throats (outside public right-of-way).
2. Access gates shall be opaque.
3. Provide the river rock columns to the Detailed Shop.
4. Delete six parking spaces to the west of the project across the manager's office because of
conflict with the entry area.
5. No outdoor lighting shall spill over unto neighboring residential neighborhoods.
6. The applicant shall apply for a Uniform Sign Program.
Staff Recommendation: Staff recommends that the Committee address major and secondary
issues and return before the Committee for review.
C~
DESIGN REVIEW COMMENTS
a 8:00 p.m. Doug Fenn July 15, 2003
CONDITIONAL USE PERMIT DRC2003-00048 PRE APPLICATION REVIEW DRC2002-00544-
CHARLES JOSEPH ASSOCIATES - A request to construct a recreational vehicle storage facility
including a caretaker's quarters on 9.87 acres of land in the Low Residential District (2-4 dwelling
units per acre), located at the southwest corner interchange of the 210 and I-15 interstate
interchange - APN: 0228-011-31.
Design Parameters: The project is a single phased development. Phase two is located south of the
project site and is a master plan concept for future development. The project, a recreational vehicle
and boat storage facility, contains165 covered storage spaces, 278 open spaces, a 1,200 square
foot office and caretaker residence, and a 1,800 square foot detail area for recreational vehicles and
boats.
Access to the site will be via Victoria Avenue. No off site signage will be allowed and staff is
recommending that a Uniform Sign Program be implemented because of the proximity of the
freeways and single-family residences to the south.
Staff Comments:
Major Issues: The following broad design issues will be the focus of Committee discussion
regarding this project:
1. The office and caretaker unit has a colonnade on the west and south sides with some dry
stack vertical elements. Because the site is within the Etiwanda Specific Plan area, the
building design should reflect a historic craftsman/bungalow style. Provide decorative
treatment and elements such as but not limited to battered shape river rock columns,
dormers, rafter tails, triangular braced supports, sidings, molding trim around windows, river
rock wainscot around the unit, and other residential elements to compliment the neighboring
residences to the west. Use flat file for the roof instead of metal.
2. The covered R.V storage buildings should better reflect the architectural elements of the
caretaker's residence. The proposed surface material treatment next to the 4-foot recessed
area should wrap to the recessed area. The material should be of river rock. Provide the
same river rock columns treatment to the ends of each covered storage building.
3. The building wall along the south property boundary needs to be architecturally treated to
break up the monotonous design or provide a 20-foot landscape area.
4. Provide a Conceptual Landscape Plan showing the density of trees at the north side of the
site as required by the Planning Commission at the Pre-application meeting. Provide sight
line studies and illustrative sections to proof that the area is screened from freeway view.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
1. Provide decorative pavement within drive entry throats (outside public right-of-way).
• 2. Access gates shall be opaque.
3. Provide the river rock columns to the Detailed Shop.
DRC COMMENTS
DRC2003-00048 -CHARLES JOSEPH ASSOCIATES
• July 15, 2003
Page 2
4. Delete 6 parking spaces to the west of the project across the manager's office because of
conflict with entry area.
5. No outdoor lighting shall spill over unto neighboring residential neighborhoods.
6. Applicant shall apply for a Uniform Sign Program.
Staff Recommendation: Staff recommends that the Committee address major and secondary
issues and come back before the Committee for review.
Design Review Committee Action:
Members Present: Pam Stewart, Christine McPhail, Nancy Fong
Staff Planner: Doug Fenn
The applicant agreed to address the identified major and secondary design issues of the staff
comments. Staff stated in the meeting that item no. 6 of the secondary issues would betaken care
of as a condition of approval. The Committee asked the applicant to provide a vertical element
treatment to the recessed area for the covered RV storage building. The Committee directed the
applicant to work with staff in revising the plans to address all the identified issues. Once staff
determined that the revised plans have satisfactorily addressed the identified issues, then the
• project could be forwarded back as a Consent Item.
DESIGN REVIEW COMMITTEE MEETING
• . TUESDAY JANUARY 6, 2004 7:00 P.M.
RANCHO CUCAMONGA CIVIC CENTER
RAINS ROOM
10500 CIVIC CENTER DRIVE
RANCHO CUCAMONGA
ACTION AGENDA
•
•
Committee Members: Cristine McPhail Pam Stewart
Alternates: Rich Macias Richard Fletcher
CONSENT CALENDAR
Nancy Fong
Larry McNiel
The following items are expected to be routine and non-controversial. Typically they are items such
as plan revisions prepared in response to discussions at a previous meeting.
7:00 p.m.
(Mike/Shelley) DEVELOPMENT REVIEW DRC2003-01131 - LEW IS RETAIL CENTERS: The
development of a 6,400 square foot retail building within an existing commercial
center on an existing building pad of 0.35 acre in the Office Park District of the
Terra Vista Community Plan, at the southwest corner of Base Line Road and
Milliken Avenue - APN:1077-672-40.
PROJECT REVIEW ITEMS
This is the time and place for the Committee to discuss and provide direction to an applicant
regarding their development application. The following items do not legally require any public
testimony, although the Committee may open the meeting for public input.
7:10 p.m.
(Donald/gene) ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT
DRC2003-00719 -PACIFIC GLOBE LLC. -The development of a 2,407 square
foot gas station and convenience store and 2,282 square foot fast food
restaurant on 1.48 acres of land in the Village Commercial District, located at the
northeast corner of Day Creek Boulevard and Highland Avenue -
APN: 1089-121-OS and 1089-401-66. Related files: Preliminary Review
DRC2003-00063 and Pre-Application Review DRC2003-00064. Staff has
prepared a Mitigated Negative Declaration of environmental impacts for
consideration.
7:40 p.m.
(Warren/Mark) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW
DRC2003-00847 - FUSCOE ENGINEERING - (TUSCANY VILLAS AT
REDHILL) -The design review of building elevations and detailed site plan for
92 condominiums consisting of 4 and 6 unit clusters on 6.90 acres of land in the
Foothill Boulevard-Cucamonga Channel Mixed Use area within Subarea 1 of the
Foothill Districts, located on the north side of Foothill Boulevard, west of the
Cucamonga Channel - APN:207-101-32, 33, 50. Related Files: Pre-Application
Review DRC2002-00441, Tentative Tract SUBTT16651, Variance DRC2003-
00848, and Tree Removal Permit DRC2003-00849.
DRC AGENDA
January 6, 2004
Page 2
ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT 16651 - FUSCOE
ENGINEERING - (TUSCANY VILLAS AT REDHILL) - A residential subdivision
for condominium purposes on 6.90 acres of land in the Foothill Boulevard-
Cucamonga Channel Mixed Use area within Subarea 1 of the Foothill Districts,
located on the north side of Foothill Boulevard, west of the Cucamonga Channel
- APN: 207-101-32, 33, 50. Related Files: Pre-Application Review
DRC2002-00441, Development Review DRC2003-00847, Variance
DRC2003-00848, and Tree Removal Permit DRC2003-00849.
VARIANCE DRC2003-00848 - FUSCOE ENGINEERING - (TUSCANY VILLAS
AT REDHILL) - A request to allow up to a 12 high retaining wall at the northeast
corner of the site, where a maximum 4-foot wall height is permitted in the hillside
area, and increase the building height on downhill units to 37 feet, where 30 feet
is the permitted maximum building height in the hillside area, for a proposed 92
condominiums on 6.90 acres of land in the Foothill Boulevard-Cucamonga
Channel Mixed Use area within Subarea 1 of the Foothill Districts, located on the
north side of Foothill Boulevard, west of the Cucamonga Channel -
APN: 207-101-32, 33, 50. Related Files: Pre-Application Review
DRC2002-0044'1, Tentative Tract SUBTT16651, Development Review
DRC2003-00847, and Tree Removal Permit DRC2003-00849.
PUBLIC COMMENTS
This is the time and place for the general public to address the Committee. State law prohibits the
Committee from addressing any issue not previously included on the Agenda. The Committee may
receive testimony and set the matter for a subsequent meeting. Comments are limited to five
minutes per individual.
ADJOURNMENT
DESIGN REVIEW COMMENTS
7:00 p.m.. Mike Smith January 6, 2004
DEVELOPMENT REVIEW DRC2003-01131 - LEW IS RETAIL CENTERS: The development of a
6,400 square foot retail building within an existing commercial center on an existing building pad of
0.35 acre in the Office Park District of the Terra Vista Community Plan, at the southwest corner of
Base Line Road and Milliken Avenue - APN:1077-672-40.
Background: The proposed project is the final, build-out component of MillikenCourt, a commercial
complex of about 3.45 acres located at the southwest corner of Milliken Avenue and Base Line
Road. The master plan for this complex was approved on June 11, 199, (related file: Conditional
Use Permit 96-27 and Parcel Map 14001) and at that time an office/retail building was anticipated
for the subject location. The complex is comprised of a Kindercare preschool/day care center
(related file: Development Review DRC2001-00695), a Shell gas station with a convenience market,
and adrive-thru Del Taco restaurant.
Design Parameters: The proposed primary entrance and store front of the building will be located
on the north side facing Base Line Road and the existing gas station. The overall architecture of the
proposed building will match the existing buildings on-site including the Mission style roof, parapets,
tower elements, and columns. Detail treatments including cornices, wainscots, plaster control joints,
and raised plaster trim will also match that of the existing buildings.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
• Design Issues: The following broad design issues will be the focus of Committee discussion
regarding this project.
1. The tower at the southwest corner of the new building should have arches that match the
tower at its northeast corner.
2. Additional spandrel glass windows should be provided on the east elevation. Also, all
windows should have raised plaster trim and mullions to match those at the Kindercare
building.
3. The decorative inserts (medallions) in the towers of the new building should match the size
and design of those on the existing towers.
Policy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion.
1. All roof-mounted equipment shall be completely screened by the parapet.
2. All colors, materials, and textures shall match the established architectural theme of Milliken
Court.
Staff Recommendation: Staff recommends that the project be approved subject to the above
comments.
Design Review Committee Action:
Members Present: Cristine McPhail, Pam Stewart, Nancy Fong
. Staff Planner: Mike Smith
The Committee recommended approval to the City Planner with no additional comments.
DESIGN REVIEW COMMENTS
7:10 p.m. Donald Granger January 6, 2004
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT DRC2003-00719- PACIFIC
GLOBE LLC. -The development of a 2,947 square foot gas station and convenience store and
2,504 square foot fast food restaurant on 1.48 acres of land in the Village Commercial District,
located at the northeast corner of Day Creek Boulevard and Highland Avenue - APN: 1089-121-08
and 1089-401-66. Related files: Preliminary Review DRC2003-00063 and Pre-Application Review
DRC2003-00064.
Background: On February 12, 2002, the Planning Commission conducted a workshop on the
proposed gas station, convenience store and fast food restaurant. At the workshop, the
Commission directed the applicant to modify the proposed project to be highly sensitive to the
neighborhood to the south, and that the project was overbuilt. The Commission emphasized the
importance of good on-site circulation, the requirement of outstanding architectural design, and the
need to prevent glare on the residences to the south. In response to the Commission's comments,
the applicant has scaled down the square footages of the buildings and designed the site with good
circulation.
Design Parameters: The project site is located at the northeast corner of Day Creek Boulevard and
Highland Avenue, on a triangular parcel created by the realignment of Highland Avenue and the
210 Freeway. The site has an average grade of approximately 10 percent, sloping from north to
south, and some areas have grades approaching 50 percent on existing, manufactured slopes. The
site has 20 feet of fall from the northwest corner of the parcel to the southwest corner of the parcel.
The site is constrained by the shape, and the existing topography. The project has been designed
with a stacked stone base, tower feature and wood trellis feature with posts mounted on stacked
stone bases in the drive-thru lane. Decorative concrete is used at both driveway entrances, for a
pedestrian connection and at the Handicap parking stall.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Maior Issues: The following broad design issues will be the focus of Committee discussion
regarding this project.
Grading of the project is critical to minimize the impact on the existing single-family homes to
the south. The proposed pad of the gas station and convenience store is approximately 2 to 9
feet higher than the Highland Avenue street elevation. The proposed pad should be lowered
several feet and be elevated only what is necessary to accomplish adequate drainage. The
applicant should revise the grading design to minimize the impact of the project, even if
retaining walls are necessary.
2. The battered, tapered architectural wall planes are typical and create awkward geometry in the
form of the building. Staff does not encourage the uses of battered wall planes. Strong
consideration should be given to eliminating the battered wall planes and using traditional
shapes that fit with overall building form.
3. At the east elevation, the tower feature has an extensive amount of vertical wall plane that is
void of enhancement. The tower feature should be redesigned, with elements that provide
variation, such as arches or porticos.
DRC ACTION AGENDA
DRC2003-00719 -PACIFIC GLOBE LLC.
• January 6, 2004
Page 2
4. All aluminum awnings should be eliminated on the west and east elevations, and replaced with
suspended, large-member, decorative wood trellis that projects from the wall plane a minimum
of 2 ~/z feet.
5. The south and north elevations should receive some additional architectural enhancement,
such as suspended wood trellis, quatrefoils, or accent file framed by a contrasting stucco
surround.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues.
1. Additional stacked stone should be added to the convenience store/fast food building. The
2-foot high stacked stone base is too small to provide a materials contrast from the stucco
wall plane. The stacked base should be raised to a minimum height of 3 Yz feet. On the east
elevation, stacked stone should be added to completely cover the trapezoidal wall plane over
the entrance to Jack in Box.
2. Colored concrete and enhanced paving should be used at the following locations
• Colored terracotta concrete should be used under the pump island.
• Eliminate stamped concrete at the driveways and at the pedestrian connection and
replace with colored concrete with score lines.
3. The six columns supporting the pump island canopy should have a stacked stone, and a
decorative cap, thereby matching the architecture of the convenience store and fast food
restaurant. Stacked stone should extend from the base of columns up to a minimum of 8 feet.
4. The columns supporting the wood trellis should be enlarged in order to make a greater
architectural statement and presence. Staff suggests the following dimensions: 2 feet by
2 feet base with stacked stone carried to the bottom of the posts, and 12 inches by 12 inches
wood posts.
5. The monument signs should blend into the grades and berms.
Poficy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion.
The project will require review and approval of a Uniform Sign Program.
2. Undulating berms in the landscaped setback areas shall be provided to provided to create to
visual interest and to screen parking areas.
3. All lighting, whether mounted on the building or on freestanding poles, shall be designed a
confine the light canopy to the site boundaries.
4. All lighting, whether mounted on the building or on freestanding poles, shall be architecturally
compatible with the building design.
• 5. The project shall conform to the Day Creek Boulevard Master Plan and shall have 10-foot
sidewalk, matching the projects to the north and south.
I
DRC ACTION AGENDA
DRC2003-00719 -PACIFIC GLOBE LLC. '
• January 6, 2004
Page 3
Staff Recommendation: Staff recommends that the project be revised and return to Design
Review Committee prior to being scheduled for Planning Commission.
Design Review Committee Action:
Members Present: Cristine McPhail, Pam Stewart, Nancy Fong
Staff Planner: Donald Granger
At the meeting the applicant presented revised drawings which satisfied several of the Major and
Secondary Issues. The Committee reviewed the project and recommend approval with the following
conditions:
1. The proposed pad shall be lowered several feet and be elevated only what is necessary to
accomplish adequate drainage.
2. The battered, tapered architectural wall planes shall be eliminated and replaced with square
wall planes.
3. At the east elevation, the tower feature shall include an arch. The Committee supported the
revision made by the applicant, but indicated the tower need additional enhancement, such as
accent file framed by a stucco surround.
4. All aluminum awnings shall be eliminated on the east and west elevations and replaced with
suspended, large-member, decorative wood trellis that projects from the wall plane a minimum
of 2 Yz feet. If necessary, the wood trellis shall be suspended by wood, not cables.
5. The south and north elevations shall receive additional architectural enhancement, in the form
of score lines, matching the east elevation.
6. Additional stacked stone shall be added to the convenience store/fast food building. The
stacked base should be raised to a minimum height of 3 Yz feet. On the east elevation,
stacked stone shall be added to completely cover the wall plane over the entrance to Jack in
Box.
7. Black concrete shall be used under the pump island. The stamped concrete at the driveways
and at the pedestrian connection shall be eliminated and replaced with colored concrete with
score lines.
8. The six columns supporting the pump island canopy shall have a stacked stone, and a
decorative cap, thereby, matching the architecture of the convenience store and fast food
restaurant. Stacked stone shall extend from the base of the columns up a minimum of 8 feet.
9. The columns supporting the wood trellis shall be enlarged in order to make a greater
architectural statement and presence. The following dimensions shall be used: 2 by 2-foot
base with stacked stone carried to the bottom of the posts and 12 by 12-inch wood posts.
• 10. The monument signs shall blend into the grades and berms. Final design shall be subject to
City Planner review and approval.
11. All cornices shall have finished ends and wrap around where the wall plane returns 90
degrees.
I
DRC ACTION AGENDA
DRC2003-00719 -PACIFIC GLOBE LLC.
• January 6, 2004
Page 4
12. The pumps island canopy shall have a mansard roof with tile.
13. The project will have a decorative concrete and a plaza, matching the project at the northwest
corner of Day Creek Boulevard and Highland Avenue.
The Committee requested that the applicant make the revised changes and that the project be
scheduled for review on Consent Calendar at the January 20, 2004, Design Review Meeting. The
applicant agreed to make the requested changes.
i
•
• DESIGN REVIEW COMMENTS
7:30 p.m. Warren Morelion January 6, 2004
ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT 16651 - FUSCOE ENGINEERING
(TUSCANY VILLAS AT REDHILL) - A residential subdivision for condominium purposes on 6.90
acres of land in the Foothill Boulevard-Cucamonga Channel Mixed Use area within Subarea 1 of the
Foothill Districts, located on the north side of Foothill Boulevard, west of the Cucamonga Channel -
APN: 207-101-32, 33, 50. Related Files: Pre-Application Review DRC2002-00441, Development
Review DRC2003-00847, Variance DRC2003-00848, and Tree Removal Permit DRC2003-00849.
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2003-00847 - FUSCOE
ENGINEERING (TUSCANY VILLAS AT REDHILL) -The design review of building elevations and
detailed site plan for 92 condominiums consisting of 4 and 6 unit clusters on 6.90 acres of land in
the Foothill Boulevard-Cucamonga Channel Mixed Use area within Subarea 1 of the Foothill
Districts, located on the north side of Foothill Boulevard, west of the Cucamonga Channel -
APN: 207-101-32, 33, 50.
VARIANCE DRC2003-00848 - FUSCOE ENGINEERING (TUSCANY VILLAS AT REDHILL) - A
request to increase the maximum building height and maximum retaining wall height permitted in
the hillside area, for a proposed 92 condominiums on 6.90 acres of land in the Foothill Boulevard-
Cucamonga Channel Mixed Use area within Subarea 1 of the Foothill Districts, located on the north
side of Foothill Boulevard, west of the Cucamonga Channel - APN: 207-101-32, 33, 50.
• Background: On March 19, 2003, the City Council approved General Plan Amendment
DRC2002-00001, Development District Amendment DRC2002-00001, and Development Code
Amendment DRC2002-00001, to change the land use and zoning of the site from Office to Mixed
Use to allow for Office and/or Medium Residential (8-14 dwelling units peracre). Underthe Medium
Residential component (100 percent of the site) up to 96 units maybe permitted. The applicant is
proposing 92 attached condominiums on the site.
Design Parameters: The 6.9 acre site is vacant and slopes southerly an average of approximately
4-5 percent, with the exception of an area at the northeast portion of the site where the slopes
exceed 25 percent. The site is triangular in shape with several scattered mature trees and a
Eucalyptus windrow at the southwest end. The site has been cleared under a previous demolition
permit of two vacant structures that were located near Foothill Boulevard. The structures have been
deemed non-historic. The site is bordered by the Pacific Electric Inland Empire Trail and vacant
land to the north, Foothill Boulevard and vacant land followed bysingle-family development and a
trailer park to the south, the Cucamonga Channel followed by Vineyard Town Center to the east,
and vacant land to the west. Access into the site is from Foothill Boulevard. At aPre-Application
review meeting dated May 28, 2003, the Planning Commission stressed to the applicant that it was
important that the vacant land between the site and Foothill Boulevard be incorporated in the overall
project design even though the property is off-site.
The applicant is proposing to develop 92 attached condominiums on the site. The project will
include two 4-plexs, fourteen 6-plexs, and a recreation center with a pool and spa for use by
residents of the propped private community. The condominiums will be comprised of an "uphill" and
"flat" building product, each with two separate floor plans. The "uphill"productwillinclude 1,650 and
• 1,923 square foot units with 228 and 349 square foot courtyards, respectively. The "flat" building
product will include 1,406 and 1,857 square foot units with 244 and 225 square foot courtyards,
respectively. The larger units are proposed at the ends of each building product. The 6-plex "flat"
product is proposed with a 442 square foot third story loft option. The condominiums and recreation
DRC ACTION AGENDA
TT16651 - FUSCOE ENGINEERING
• January 6, 2004
Page 2
center building are designed with stucco and stone veneer exterior. The stone veneer is
incorporated as a wainscot treatment on parts of the buildings and.around the building entries. The
"flat" building productincorporates substantially less stone veneer on the building exterior than the
"uphill" product. Other elements on the buildings include stucco trim, shutters, corbels, and wrought
iron railings.
The design of the buildings exceed the 30-foot maximum building height allowed in the hillside
district. As proposed, the "uphill" product will exceed the height on a small portion of the roofline on
the downhill (garage) side of the buildings, and the "flat" will exceed the height on a small section
along the ridgeline for those buildings that include the loft option. The applicant has submitted a
variance application requesting relief from the 30-foot maximum building height requirement.
Because of the location and limited amount of areas of the buildings that exceed the height
limitations, staff does not feel the building design would have a negative visual impact. Included in
the variance request is a request to extend the maximum retaining wall height from 4 feet to
approximately 12 feet to accommodate a wall at the northeast corner of the site. The applicant is
requesting to use a "Vendura" retaining wall system design.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Maior Issues: The following broad design issues will be the focus of Committee discussion
regarding this project:
• 1. Building Architecture -The building architecture should be enhanced to a level that would
warrant the location of the project along Foothill Boulevard. To do so, the building architecture
should be enhance by incorporating additional shutters, wrought iron trellis and other features,
and additional decorative treatments to create a 360-degree architectural theme. In addition,
a substantial amount of rock treatment should be added to the buildings, especially the "uphill"
building product which has substantially less stone in its design than the "flat" building product.
Those buildings fronting Foothill Boulevard should be especially enhanced above the
rest of the infill buildings because of their location.
2. Parking -The project exceeds the City's minimum guest parking spaces by 2 spaces;
however, recently completed comparable multi-family projects in the City have found that the
City's minimum standards do not provide enough surface parking and created overspill illegal
parking onto public streets. (Note: The number of guest spaces provided in Parking Summary
Table on Site Plan is incorrect. The correct number is 25 spaces provided versus 23 required).
3. The western half of the project site is setback from an existing Foothill Boulevard right-of-way
and vacant parcel (APN: 0207-101-13) that fronts on Foothill Boulevard. Per the direction of
the Planning Commission from the May 28, 2003, Pre-Application Workshop, the adjoining
property along Foothill Boulevard should be incorporated into the project design as
landscaping. The Committee and staff feel that if the vacant land were left to be undeveloped
in front of the project site, it would diminish the visual appearance of the overall project. Staff
has been working with the applicant and the adjoining landowner regarding this issue.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
1. Cabana Architecture -The architectural design of the cabana is very plain and should be
revised to incorporate many of the design elements and architectural features of the other
buildings. This would include a defined entry on the north side of the building, and possibly a
DRC ACTION AGENDA
TT16651 - FUSCOE ENGINEERING
• January 6, 2004 ,
Page 3
fake entry or enhanced design on the south side of the building for appearance purposes, in
addition to the other features mentioned above. Additionally, the proposed fence on the south
side of the building should be designed not to obstruct the building as it is viewed from the
south. Therefore, suggest ending the fence at the southwest and southeast corners of the
building.
2. Route 66 -The streetscape of the project should include elements celebrating the historic
Route 66 pursuant to the design concepts of the Foothill Boulevard Historic Route 66 Visual
Improvement Plan for suburban parkways, including meandering sidewalk and informal drifts
of London Planes, California Sycamores, and Purple Plum trees (not Canary Island Pine and
African Sumac). See attached for a copy outlining the typical suburban parkway design.
3. Landscaping -Provide planters between garage doors and functional pot shelves on some
upstairs windows to soften the 3-story Rear Elevations.
4. Design interior private open space areas so they are enclosed by solid decorative block. In
the areas along Foothill Boulevard and Red Hill Country Club Drive, the walls may have to be
designed for sound attenuation. The final design of the walls shall be to the satisfaction of the
City Planner.
5. Stone pilasters used on the perimeter, the wrought iron fence, and entry monument shall be a
minimum of 30 inches by 30 inches in size.
• 6. Stone pilasters used on the courtyard fencing, pool fencing, and retaining seat walls shall be a
minimum of 24 inches by 24 inches in size.
7. Windows should be provided in all garage doors to allow the Homeowner's Association to
quickly ascertain whether garages are being used for storage instead of vehicle parking. This
is an important component of parking enforcement.
Policv Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion:
Mail kiosks should be provided throughout project or centralized in the Cabana. If detached,
they should be designed in the same architectural style.
2. Garage door designs should vary, such as in pairs.
Design Review Committee Action:
Members Present: Cristine McPhail, Pam Stewart, Nancy Fong
Staff Planner: Warren Morelion
The Design Review Committee reviewed the project and recommended it return to the
January 20, 2004, meeting after it has been revised to address the Committee's comments. The
Committee stressed to the applicant the location of the site and the importance of a quality project.
• The Committee believed that the proposed building design should be revised to represent a true
"Tuscany" architectural style. The building design should include elements such as, but not limited
to, the following:
DRC ACTION AGENDA
TT16651 - FUSCOE ENGINEERING
January 6, 2004
Page 4
Architecture
Provide a substantial amount of additional stone treatment to all building elevations. The
buildings visible from Foothill Boulevard should especially be enhanced with stone.
g. Revise stucco color so it has a softer color pallete.
3. Replace proposed wrought iron balcony and courtyard railings with railings that are more
consistent with a "Tuscany" architectural theme/style.
4. Provide grill work on windows.
5. Add additional shutters and other architectural elements consistent with a "Tuscany"
architectural theme/style.
6. Enhance architecture on the rear (garage side) of those buildings (Building 1 and 2) that are
visible from Foothill Boulevard.
7. Enhance cabana architectural design so it has the same quality of design (revised) as the
condominium buildings.
• In addition, the Committee agreed with staff that there was insufficient amount of visitor parking on
the site. The Committee explained that although the project meets the amount of visitor parking
required, the location of the project does not allow for any off-site parking overflow because it is
isolated and adjacent to Foothill Boulevard. The Committee explained that they wanted to make
sure that there would be no parking issues for the project in the future. The committee
recommended the following:
Parking
Provide additional visitor parking. Suggest a minimum of 1 space for every 3 condominium
units.
2. Provide visitor parking closer to the pool and area.
Lastly, the Committee also asked the developer to work with the adjacent property owner to
resolve the vacant property issue in front of the project site.
C~
DESIGN REVIEW COMMENTS
January 6, 2003
PUBLIC COMMENTS
There were no public comments at this time.
ADJOURNMENT
The meeting adjourned at 8:50 p.m.
Respectfully submitted,
i
Brad Buller
Secretary
CJ
•
DESIGN REVIEW COMMITTEE MEETING.
• TUESDAY JANUARY 6, 2004 7:00 P.M.
RANCHO CUCAMONGA CIVIC CENTER
RAINS ROOM
10500 CIVIC CENTER DRIVE
RANCHO CUCAMONGA
Committee Members: Cristine McPhail Pam Stewart
Alternates: Rich Macias Richard Fletcher
CONSENT CALENDAR
Nancy Fong
Larry McNiel
The following items are expected to be routine and non-controversial. Typically they are items such
as plan revisions prepared in response to discussions at a previous meeting.
7:00 p.m.
(Mike/Shelley) DEVELOPMENT REVIEW DRC2003-01131 - LEW IS RETAIL CENTERS: The
development of a 6,400 square foot retail building within an existing commercial
center on an existing building pad of 0.35 acre in the Office Park District of the
Terra Vista Community Plan, at the southwest corner of Base Line Road and
Milliken Avenue - APN:1077-672-40.
u
PROJECT REVIEW ITEMS
This is the time and place for the Committee to discuss and provide direction to an applicant
regarding their development application. The following items do not legally require any public
testimony, although the Committee may open the meeting for public input.
7:10 p.m.
(Donald/gene) ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT
DRC2003-00719 -PACIFIC GLOBE LLC. -The development of a 2,407 square
foot gas station and convenience store and 2,282 square foot fast food
restaurant on 1.48 acres of land in the Village Commercial District, located at the
northeast corner of Day Creek Boulevard and Highland Avenue -
APN: 1089-121-08 and 1089-401-66. Related files: Preliminary Review
DRC2003-00063 and Pre-Application Review DRC2003-00064. Staff has
prepared a Mitigated Negative Declaration of-environmental impacts for
consideration.
7:40 p.m.
(Warren/Mark) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW
DRC2003-00847 - FUSCOE ENGINEERING - (TUSCANY VILLAS AT
REDHILL) -The design review of building elevations and detailed site plan for
92 condominiums consisting of 4 and 6 unit clusters on 6.90 acres of land in the
Foothill Boulevard-Cucamonga Channel Mixed Use area within Subarea 1 of the
Foothill Districts, located on the north side of Foothill Boulevard, west of the
• Cucamonga Channel - APN:207-101-32, 33, 50. Related Files: Pre-Application
Review DRC2002-00441, Tentative Tract SUBTT16651, Variance DRC2003-
00848, and Tree Removal Permit DRC2003-00849.
DRC AGENDA
• January 6, 2004
Page 2
ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT 16651 - FUSCOE
ENGINEERING - (TUSCANY VILLAS ATREDHILL) - A residential subdivision
for condominium purposes on 6.90 acres of land in the Foothill Boulevard-
Cucamonga Channel Mixed Use area within Subarea 1 of the Foothill Districts,
located on the north side of Foothill Boulevard, west of the Cucamonga Channel
- APN: 207-101-32, 33, 50. Related Files: Pre-Application Review
DRC2002-00441, Development Review DRC2003-00847, Variance
DRC2003-00848, and Tree Removal Permit DRC2003-00849.
VARIANCE DRC2003-00848 - FUSCOE ENGINEERING - (TUSCANY VILLAS
AT REDHILL) - A request to allow up to a 12 high retaining wall at the northeast
corner of the site, where a maximum 4-foot wall height is permitted in the hillside
area, and increase the building height on downhill units to 37 feet, where 30 feet
is the permitted maximum building height in the hillside area, for a proposed 92
condominiums on 6.90 acres of land in the Foothill Boulevard-Cucamonga
Channel Mixed Use area within Subarea 1 of the Foothill Districts, located on the
north side of Foothill Boulevard, west of the Cucamonga Channel -
APN: 207-101-32, 33, 50. Related Files: Pre-Application Review
DRC2002-00441, Tentative Tract SUBTT16651, Development Review
DRC2003-00847, and Tree Removal Permit DRC2003-00849.
PUBLIC COMMENTS
This is the time and place for the general public to address the Committee. State law prohibits the
Committee from addressing any issue not previously included on the Agenda. The Committee may
receive testimony and set the matter for a subsequent meeting. Comments are limited to five
minutes per individual. .
ADJOURNMENT
1, Melissa Andrewin, Office Specialist II for the City of Rancho Cucamonga, hereby certify that a true,
accurate copy of the foregoing agenda was posted on December 31, 2003, at least 72 hours prior to
the meeting per Government Code Section 54954.2 at 10500 Civic Center Drive, Rancho
Cucamonga. ~~ ~~,~~ ~
•
• DESIGN REVIEW COMMENTS
7:00 p.m. Mike Smith January 6, 2004
DEVELOPMENT REVIEW DRC2003-01131 - LEWIS RETAIL CENTERS: The development of a
6,400 square foot retail building within an existing commercial center on an existing building pad of
0.35 acre in the Office Park District of the Terra Vista Community Plan, at the southwest corner of
Base Line Road and Milliken Avenue - APN: 1077-672-40.
Background: The proposed project is the final, build-out component of MillikenCourt, a commercial
complex of about 3.45 acres located at the southwest corner of Milliken Avenue and Base Line
Road. The master plan for this complex was approved on June 11, 199, (related file: Conditional
Use Permit 96-27 and Parcel Map 14001) and at that time an office/retail building was anticipated
for the subject location. The complex is comprised of a Kindercare preschool/day care center
(related file: Development Review DRC2001-00695), a Shell gas station with a convenience market,
and adrive-thru Del Taco restaurant.
Design Parameters: The proposed primary entrance and store front of the building will be located
on the north side facing Base Line Road and the existing gas station. The overall architecture of the
proposed building will match the existing buildings on-site including the Mission style roof, parapets,
tower elements, and columns. Detail treatments including cornices, wainscots, plaster control joints,
and raised plaster trim will also match that of the existing buildings.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Design Issues: The following broad design issues will be the focus of Committee discussion
regarding this project.
1. The tower at the southwest corner of the new building should have arches that match the tower
at its northeast corner.
2. Additional spandrel glass windows should be provided on the east elevation. Also, all windows
should have raised plaster trim and mullions to match those at the Kindercare building.
3. The decorative inserts (medallions) in the towers of the new building should match the size and
design of those on the existing towers.
Policy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion.
1. All roof-mounted equipment shall be completely screened by the parapet.
2. All colors, materials, and textures shall match the established architectural theme of Milliken
Court.
Staff Recommendation: Staff recommends that the project be approved subject to the above
comments.
Design Review Committee Action:
• Staff Planner: Mike Smith
Members Present:
DESIGN REVIEW COMMENTS
• 7:10 p.m. Donald Granger January 6, 2004
ENVIRONMENTAL ASSESSMENTAND CONDITIONAL USE PERMIT DRC2003-00719-PACIFIC
GLOBE LLC. -The development of a 2,947 square foot gas station and convenience store and
2,504 square foot fast food restaurant on 1.48 acres of land in the Village Commercial District,
located at the northeast corner of Day Creek Boulevard and Highland Avenue - APN: 1089-121-08
and 1089-401-66. Related files: Preliminary Review DRC2003-00063 and Pre-Application Review
DRC2003-00064.
Background: On February 12, 2002, the Planning Commission conducted a workshop on the
proposed gas station, convenience store and fast food restaurant. At the workshop, the
Commission directed the applicant to modify the proposed project to be highly sensitive to the
neighborhood to the south, and that the project was overbuilt. The Commission emphasized the
importance of good on-site circulation, the requirement of outstanding architectural design, and the
need to prevent glare on the residences to the south. In response to the Commission's comments,
the applicant has scaled down the square footages of the buildings and designed the site with good
circulation.
Design Parameters: The project site is located at the northeast corner of Day Creek Boulevard and
Highland Avenue, on a triangular parcel created by the realignment of Highland Avenue and the
210 Freeway. The site has an average grade of approximately 10 percent, sloping from north to
south, and some areas have grades approaching 50 percent on existing, manufactured slopes. The
site has 20 feet of fall from the northwest corner of the parcel to the southwest corner of the parcel.
The site is constrained by the shape, and the existing topography. The project has been designed
• with a stacked stone base, tower feature and wood trellis feature with posts mounted on stacked
stone bases in the drive-thru lane. Decorative concrete is used at both driveway entrances, for a
pedestrian connection and at the Handicap parking stall.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Maior Issues: The following broad design issues will be the focus of Committee discussion
regarding this project.
1. Grading of the project is critical to minimize the impact on the existing single-family homes to
the south. The proposed pad of the gas station and convenience store is approximately 2 to 9
feet higher than the Highland Avenue street elevation. The proposed pad should be lowered
several feet and be elevated only what is necessary to accomplish adequate drainage. The
applicant should revise the grading design to minimize the impact of the project, even if
retaining walls are necessary.
2. The battered, tapered architectural wall planes are typical and create awkward geometry in the
form of the building. Staff does not encourage the uses of battered wall planes. Strong
consideration should be given to eliminating the battered wall planes and using traditional
shapes that fit with overall building form.
3. At the east elevation, the tower feature has an extensive amount of vertical wall plane that is
void of enhancement. The tower feature should be redesigned, with elements that provide
variation, such as arches or porticos.
. 4. - All aluminum awnings should be eliminated on the west and east elevations, and replaced with
suspended, large-member, decorative wood trellis that projects from the wall plane a minimum
of 2 ~/z feet.
DRC COMMENTS
DRC2003-00719 -PACIFIC GLOBE LLC.
January 6, 2004
• Page 2
5. The south and north elevations should receive some additional architectural enhancement,
such as suspended wood trellis, quatrefoils, or accent file framed by a contrasting stucco
surround.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues.
Additional stacked stone should be added to the convenience store/fast food building. The
2-foot high stacked stone base is too small to provide a materials contrast from the stucco
wall plane. The stacked base should be raised to a minimum height of 3 Yz feet. On the east
elevation, stacked stone should be added to completely cover the trapezoidal wall plane over
the entrance to Jack in Box.
Colored concrete and enhanced paving should be used at the following locations:
• Colored terracotta concrete should be used under the pump island.
Eliminate stamped concrete at the driveways and at the pedestrian connection and
replace with colored concrete with score lines. '
3. The six columns supporting the pump island canopy should have a stacked stone, and a
decorative cap, thereby matching the architecture of the convenience store and fast food
restaurant. Stacked stone should extend from the base of columns up to a minimum of 8 feet.
4. The columns supporting the wood trellis should be enlarged in order to make a greater
• architectural statement and presence. Staff suggests the following dimensions: 2 feet by
2 feet base with stacked stone carried to the bottom of the posts, and 12 inches by 12 inches
wood posts.
5. The monument signs should blend into the grades and berms.
Policy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion.
1. The project will require review and approval of a Uniform Sign Program.
2. Undulating berms in the landscaped setback areas shall be provided to provided to create to
visual interest and to screen parking areas.
3. All lighting, whether mounted on the building or on freestanding poles, shall be designed a
confine the light canopy to the site boundaries.
4. All lighting, whether mounted on the building or on freestanding poles, shall be architecturally
compatible with the building design.
5. The project shall conform to the Day Creek Boulevard Master Plan and shall have 10-foot
sidewalk, matching the projects to the north and south.
Staff Recommendation: Staff recommends that the project be revised and return to Design
Review Committee prior to being scheduled for Planning Commission.
• Design Review Committee Action:
Staff Planner: Donald Granger
Members Present:
• DESIGN REVIEW COMMENTS
7:30 p.m. Warren Morelion January 6, 2004
ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT 16651 - FUSCOE ENGINEERING
(TUSCANY VILLAS AT REDHILL) - A residential subdivision for condominium purposes on 6.90
acres of land in the Foothill Boulevard-Cucamonga Channel Mixed Use area within Subarea 1 of the
Foothill Districts, located on the north side of Foothill Boulevard, west of the Cucamonga Channel -
APN: 207-101-32, 33, 50. Related Files: Pre-Application Review DRC2002-00441, Development
Review DRC2003-00847, Variance DRC2003-00848, and Tree Removal Permit DRC2003-00849.
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2003-00847 - FUSCOE
ENGINEERING (TUSCANY VILLAS AT REDHILL) -The design review of building elevations and
detailed site plan for 92 condominiums consisting of 4 and 6 unit clusters on 6.90 acres of land in
the Foothill Boulevard-Cucamonga Channel Mixed Use area within Subarea 1 of the Foothill
Districts, located on the north side of Foothill Boulevard, west of the Cucamonga Channel -
APN: 207-101-32, 33, 50.
VARIANCE DRC2003-00848 - FUSCOE ENGINEERING (TUSCANY VILLAS AT REDHILL) - A
request to increase the maximum building height and maximum retaining wall height permitted in
the hillside area, for a proposed 92 condominiums on 6.90 acres of land in the Foothill Boulevard-
CucamongaChannel Mixed Use area within Subarea 1 of the Foothill Districts, located on the north
side of Foothill Boulevard, west of the Cucamonga Channel - APN: 207-101-32, 33, 50.
Background: On March 19, 2003, the City Council approved General Plan Amendment
• DRC2002-00001, Development District Amendment DRC2002-00001, and Development Code
Amendment DRC2002-00001, to change the land use and zoning of the site from Office to Mixed
Use to allow for Office and/or Medium Residential (8-14 dwelling units peracre). Underthe Medium
Residential component (100 percent of the site) up to 96 units maybe permitted. The applicant is
proposing 92 attached condominiums on the site.
Design Parameters: The 6.9 acre site is vacant and slopes southerly an average of approximately
4-5 percent, with the exception of an area at the northeast portion of the site where the slopes
exceed 25 percent. The site is triangular in shape with several scattered mature trees and a
Eucalyptus windrow at the southwest end. The site has been cleared under a previous demolition
permit of two vacant structures that were located near Foothill Boulevard. The structures have been
deemed non-historic. The site is bordered by the Pacific Electric Inland Empire Trail and vacant
land to the north, Foothill Boulevard and vacant land followed bysingle-family development and a
trailer park to the south, the Cucamonga Channel followed by Vineyard Town Center to the east,
and vacant land to the west. Access into the site is from Foothill Boulevard. At aPre-Application
review meeting dated May 28, 2003, the Planning Commission stressed to the applicant that it was
important that the vacant land between the site and Foothill Boulevard be incorporated in the overall
project design even though the property is off-site.
The applicant is proposing to develop 92 attached condominiums on the site. The project will
include two 4-plexs, fourteen 6-plexs, and a recreation center with a pool and spa for use by
residents of the propped private community. The condominiums will be comprised of an "uphill" and
"flat" building product, each with two separate floor plans. The "uphill" product will include 1,650 and
1,923 square foot units with 228 and 349 square foot courtyards, respectively. The "flat" building
product will include 1,406 and 1,857 square foot units with 244 and 225 square foot courtyards,
• respectively. The larger units are proposed at the ends of each building product. The 6-plex "flat"
product is proposed with a 442 square foot third story loft option. The condominiums and recreation
center building are designed with stucco and stone veneer exterior. The stone veneer is
incorporated as a wainscot treatment on parts of the buildings and around the building entries. The
DRC COMMENTS
TT16551, DRC2003-00847
• January 6, 2003
Page 2
DRC2003-00848 - FUSCOE ENGINEERING
"flat" building product incorporates substantially less stone veneer on the building exterior than the
"uphill" product. Other elements on the buildings include stucco trim, shutters, corbels, and wrought
iron railings.
The design of the buildings exceed the 30-foot maximum building height allowed in the hillside
district. As proposed, the "uphill" product will exceed the height on a small portion of the roofline on
the downhill (garage) side of the buildings, and the "flat" will exceed the height on a small section
along the ridgeline for those buildings that include the loft option. The applicant has submitted a
variance application requesting relief from the 30-foot maximum building height requirement.
Because of the location and limited amount of areas of the buildings that exceed the height
limitations, staff does not feel the building design would have a negative visual impact. Included in
the variance request is a request to extend the maximum retaining wall height from 4 feet to
approximately 12 feet to accommodate a wall at the northeast corner of the site. The applicant is
requesting to use a "Vendura" retaining wall system design.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Maior Issues: The following broad design issues will be the focus of Committee discussion
regarding this project:
1. Building Architecture -The building architecture should be enhanced to a level that
• would warrant the location of the project along Foothill Boulevard. To do so, the building
architecture should be enhance by incorporating additional shutters, wrought iron trellis
and other features, and additional decorative treatments to create a 360-degree
architectural theme. In addition, a substantial amount of rock treatment should be added
to the buildings, especially the "uphill" building product which has substantially less
stone in its design than the "flat" building product. Those buildings fronting Foothill
Boulevard should be especially enhanced above the rest of the infill buildings
because of their location.
2. Parking - The project exceeds the City's minimum guest parking spaces by 2 spaces;
however, recently completed comparable multi-family projects in the City have found that
the City's minimum standards do not provide enough surface parking and created
overspill illegal parking onto public streets. (Note: The number of guest spaces provided
in Parking Summary Table on Site Plan is incorrect. The correct number is 25 spaces
provided versus 23 required).
3. The western half of the project site is setback from an existing Foothill Boulevard
right-of-way and vacant parcel (APN: 0207-101-13) that fronts on Foothill Boulevard.
Per the direction of the Planning Commission from the May 28, 2003, Pre-Application
Workshop, the adjoining property along Foothill Boulevard should be incorporated into
the project design as landscaping. The Committee and staff feel that if the vacant land
were left to be undeveloped in front of the project site, it would diminish the visual
appearance of the overall project. Staff has been working with the applicant and the
adjoining landowner regarding this issue.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
• Committee will discuss the following secondary design issues:
1. Cabana Architecture -The architectural design of the cabana is very plain and should
be revised to incorporate many of the design elements and architectural features of the
DRC COMMENTS
TT16551, DRC2003-00847, DRC2003-00848 - FUSCOE ENGINEERING
• January 6, 2003
Page 3
other buildings. This would include a defined entry on the north side of the building, and
possibly a fake entry or enhanced design on the south side of the building for
appearance purposes, in addition to the other features mentioned above. Additionally,
the proposed fence on the south side of the building should be designed not to obstruct
the building as it is viewed from the south. Therefore, suggest ending the fence at the
southwest and southeast corners of the building.
2. Route 66 -The streetscape of the project should include elements celebrating the
historic Route 66 pursuant to the design concepts of the Foothill Boulevard Historic
Route 66 Visual Improvement Plan for suburban parkways, including meandering
sidewalk and informal drifts of London Planes, California Sycamores, and Purple Plum
trees (not Canary Island Pine and African Sumac). See attached for a copy outlining the
typical suburban parkway design.
3. Landscaping -Provide planters between garage doors and functional pot shelves on
some upstairs windows to soften the 3-story Rear Elevations.
4. Design interior private open space areas so they are enclosed by solid decorative block.
In the areas along Foothill Boulevard and Red Hill Country Club Drive, the walls may
have to be designed for sound attenuation. The final design of the walls shall be to the
satisfaction of the City Planner.
• 5. Stone pilasters used on the perimeter, the wrought iron fence, and entry monument shall
be a minimum of 30 inches by 30 inches in size.
6. Stone pilasters used on the courtyard fencing, pool fencing, and retaining seat walls
shall be a minimum of 24 inches by 24 inches in size.
7. W indows should be provided in all garage doors to allow the Homeowner's Association
to quickly ascertain whether garages are being used for storage instead of vehicle
parking. This is an important component of parking enforcement.
Policv Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion:
Mail kiosks should be provided throughout project or centralized in the Cabana. If
detached, they should be designed in the same architectural style.
2. Garage door designs should vary, such as in pairs.
Staff Recommendation: Staff recommends the project be revised and come back to the Design
Review Committee for further review.
Staff Planner: Warren Morelion
Members Present:
r~
U
VISUAL IMPROVEMENT PLAN
FOOTHILL BOULEVARD-HISTORIC ROUTE 66
C. Suburban Parkways.
The typical suburban parkway design for Foothill Boulevard should follow the
guidelines set forth in the Foothill Boulevard Specific Plan. The parkway
characteristics include rolling turf berms, meandering sidewalks, and informal drifts .
of London Planes, California Sycamores, and Purple Plum trees. (See the Typical
Suburban Parkway Plan View and Elevation)
Located at various locations within the suburban parkways are many opportunities
for enhancement areas that provide additional focal points to celebrate the Route 66
theme. The approximate locations for these proposed enhancement areas are
shown on the location map, and should occur as part of any new development of
vacant parcels, or redevelopment within the locations takes place.
The enhanced features of these areas include replacing a 45' section of the typical
parkway planting/sidewalk area as well as the roadway pavement and median, with
special treatments of pavement materials artwork/icon placement and accent tree
plantings. All are shown in detail on the Suburban Parkway Enhancement Area
Prototype Plan View and Elevation on the following pages.
CITY OF RANCHO CUCAMONGA PAGE iS
~ 3.
Y
~ ~
~ a
~ z
a;C
07
~
p)
w
N V
~
h ~
= v
~ a
r
...a ~ =
`
o =
> -
~ i
`
O ~ ~
~
M
r
O
I
•
t I
F=
-01
T ~'
iu
H
- L
V
s c
~m
.I
z
> -
N
- ~ c
y ~
V c
5 r
i
- ~ 2
N
V ~ ~
~=
~~
J
m
J_
LL
~_
C ~
J J
S ~.
y V
z z
u
t U
m 'o
~ S
U
`^ v
_~~
'^ o
o`
o
2
o Q
U ti
v ~,
~ co
~ ~
i L ~
Y L
d i .
v
o - ,~ F
m y .1
~ o y ex;
w O t
N pp i +rv
_~v
ate
R ~ L
CN C
C V V
v V N
C Q
v O d Q
~ z
c
~ ¢ ti
3
W
z
Q
d
,~
~1
z' _ _ i
Y =C
H
_ ~ ~ g
_ '2 L
C J
N
J ~
3
5 V
2 C
J
C
C J
Z
V ,
„'1
y
~ _
3 i
u -
` ~,
t_
C O y
-
~~ V
f
C
< J
L .~ C t ~
C ¢ ri H
u ~ 11
_ =` 2
r C
U x
C
~ <
V ~ 2 L
c u
0
w
vY ~
~ - __
3~=
;, _
~ L _
J L
2
z
c
a
J
W
u
4
v
z ti 1
3v
~o ~ i c
J =
L
_^ ..4i.