No preview available
HomeMy WebLinkAbout99-006 - ResolutionsRESOLUTION NO. FD 99-006 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE RANCHO CUCAMONGA FIRE PROTECTION DISTRICT ESTABLISHING A NEW FEE SCHEDULE FOR PERMITS AND SERVICES BY MODIFYING CERTAIN FEES ESTABLISHED IN RESOLUTION NO. FD97-019 A= RECITALS. (i) The Government Code Section requires that prior to levying a new fee or increasing an existing fee or service charge, local agencies shall hold a public meeting at which oral or written presentations may be made; and (ii) Notice of the time and place of the hearing has been properly provided; and (iii)No valid request for mailed notice is on file with the City; and (iv) Copies of the required data were made available to the public in the City Clerk's office May 28, 1999; and (v) All legal prerequisites to adoption of this Resolution have occurred. B. RESOLUTION. NOW, THEREFORE, THE City Council of the City of Rancho Cucamonga does hereby resolve that the following fees are established: SECTION 6: FIRE PROTECTION DISTRICT FEES 6.1 Plans Checking Fees Includes Plan Review and two Inspections. Does NOT include Fee for any required Fire District Permits. Start-up Fee for Commercial, Industrial or Multi-family Dwelling Units, paid prior to TRC Plan Review Fees 1. 2. 3. 4. $82.® Single Family Residence ....................... $132?0 Single Family Residential Tract, per Phase ......... $132.® Multi-Family Residential, per Building ............. $677.® Commercial and Industrial Development, per Building $677.® Resolution No. FD99-006 Page 2 5. Water Plan/Underground Water Supply ........... $132.® 6. Conditional Use Permit ........................ $1327~ 7. Minor Development Review .................... $1327° 8. Parcel Map Review ........................... $1327~ 9. Tenant Improvement, per hour, one hour minimum ... $877~ 10. Special Events Review ......................... $877~ 11. Accessory Plans Review: Aisles, Access, Seating, Etc ..................... $667~ 12. Alternate Method Approval ...................... $927~ 13. Revision to existing Plan (e.g., As-Builts, Excluding TI Plans) ............... $927~ 14. New Fire Sprinkler Systems, Standpipes or over ten heads ................... $1647~ 15. Fire Sprinkler Alteration, ten heads or less .......... $92.® 16. Pre-Engineered Fire Protection Systems .......... $1477~ 17. Fire Detection and Alarm Systems ............... $154.® 18. Flammable Finishes Spray Booth, per booth ........ $1647 19. LPG Tank Installation Review, per tank ........... $1477~ 20. Underground Storage Tank Removal Review, per tank .................................... $1477~ 21. Flammable & Combustible Liquid, Tank & Piping .... $1477~ 22. Failure to keep Appointment, one hour minimum ..... $667~ 23. Microfilm Charges, per page ...................... $1.°° 24. Minor Plan Review not requiring a District Inspection No Fee Inspection Fees Per hour, one hour minimum 1. Field Inspection required after the Initial and Follow-Up Inspection ...................... $1107~ 2. Failure to keep an Inspection Appointment .......... $667~ 3. Field Inspection of Self Inspection Occupancies, Failure to Comply ............................. $667" 4. Fire Flow Test, Witness Test ..................... $877° 5. Unscheduled Field Inspection or Investigation ....... $667~ 6. Same Day, Shod Notice Inspection ................ $877~ Resolution No. FD99-006 Page 3 6.2 Permit Fees [Initial Permit and subsequent renewal of Permit unless otherwise indicated (e.g. one time only Permit activity)] A. Permits 1. General Use Permit ............................ $82?0 2. Access Control .............................. No Fee 3. Aerosol Products (more than 500 lbs. of Level 2 or 3) $131.°° 4. Aircraft Refueling Vehicles ...................... $95.® 5. Aircraft Repair Hangar ......................... $84.® 6. Automobile Wrecking Yard ...................... $82.® 7. Asbestos Removal ........................... $132.® 8. Bowling Pin or Alley Refinishing involving Flammable Finishes .................... $82?0 9. Candles and Open Flames in Assembly Areas .. Not Permitted 10. Carnivals and Fairs (see also 6.2E) .............. $132.® 11. Cellulose Nitrate Film .......................... $82.® 12. Cellulose Nitrate Storage, more than 25 lbs .............................. $84.® 13. Combustible Fiber Storage, more than 100 cubic feet ........................ $82?0 14. Combustible Material Storage, more than 2,500 cubic feet ..................... $115.oo 15. Compressed Gases: a. Corrosive, 200 cubic feet or more .............. $95?0 b. Flammable, 200 cubic feet or more ............. $84?0 c. Highly Toxic, any amount .................... $95.® d. Inert/Simple Asphyxiant, 6,000 cubic feet or more . $85.® e. Irritant, 200 cubic feet or more ................ $84.® f. Other Health Hazards, 650 cubic feet or more .... $84.® g. Oxidizing (includes Oxygen), 504 cubic feet or more $84.® h. Pyrophoric, any amount ..................... $95.® i. Radioactive, any amount ..................... $98.® j. Sensitizer, 200 cubic feet or more .............. $95.® k. Toxic, any amount .......................... $95.® I. Unstable (Reactive), any amount ............. $132.® 16. Commercial Rubbish-Handling Operations .......... $84.® Resolution No. FD99-006 Page 4 17. 18. 19. 20. 21. 22. 23. 24. f. g. h. i. j. Cryogens: Corrosive -- Inside, over 1 gallon ............... $95.® Corrosive -- Outside, over 1 gallon ............ $95.® Flammable -- Inside, over 1 gallon ............. $84?0 Flammable -- Outside, 60 gallons or more ....... $84.® Highly toxic -- Inside, over 1 gallon ............. $95.® Highly toxic -- Outside, over 1 gallon ............ $95.® Nonflammable -- Inside, 60 gallons or more ...... $95.® Nonflammable -- Outside, 500 gallons or more .... $84.® Oxidize -- Inside, 50 gallons or more ............ $84.® Oxidizer-- Outside, 50 gallons or more .......... $84.® Dry Cleaning Plants .......................... $132.® Dust-Producing Operations ...................... $84.® Explosives or Blasting Agents: a. Storage, Manufacture, Process or Sell .......... $84.® b. Use .................................... $150.® Fire Hydrants and Water-Control Valves, use for other purposes ........................ $ 84.® Fire Protection Systems and Equipment, per building . No Fee Fireworks: a. Retail Sales ......................... Not Permitted b. Aerial Displays (see also 6.2E) ................ $84.® Flammable or Combustible Liquids: a. Pipeline, to Use, Operate, Repair or modify a Pipeline .................. $132.® b. Class I Liquids, more than 5 gallons Inside a Building ........... $84.® c. Class l Liquids, more than 10 gallons Outside a Building ......... $84.® Exceptions to b. & c.: 1. Storage or use of Class I Liquids in Vehicle, Vessel, Aircraft or Equipment Fuel Tanks. 2. Storage or use of Paints, Oils, Varnishes, or Similar Mixtures for Maintenance, Painting or Similar Purposes for less than 30 days. d. Class II or II-A Liquids, more than 25 Gallons Inside a Building ......... $ 84.® Resolution No. FD99-006 Page 5 25. 26. 27. Class II or III-A Liquids, more than 60 gallons Outside of a Building ...... $ 84?0 To remove Class I or II Liquids from an UST by other than Normal Operation .... $ 95.® Installation, Construction, Alteration or Operation where Flammable or Combustible Liquids are Produced, Processed, Transported, Stored, Dispensed or Used in any of the following: Tank Vehicles .................... $95.® Equipment ...................... $105.® Tanks, per tank .................. $121 .oo Plants .......................... $132.® 32.® 84.® Terminals ....................... $1 Wells, per well ................... $ Fuel-Dispensing Stations (Single and/or Multiple pump Stations) ............ $ 95.® Refineries ....................... $132.® Distilleries ...................... $132.® h. Installation, Alteration, Removal, Abandon, Place Temporarily out of Service or otherwise Dispose of a tank which contained Flammable or Combustible Liquid .................................. $132.® i. To change the type of contents in a Flammable or Combustible Liquid ........................ $132.® Fruit Ripening ............................... $105.® Fumigation or Thermal Insecticidal Fogging ........ $121.0o Hazardous Materials: (see also other Permit Sections) For multiple Permits within this Section 25, the Fee will be the total of all related Permits to a maximum of $400.00 or Actual Costs, whichever is greater. a. Carcinogens, 10 lbs. or more ................ $132.® b. Corrosive Liquids, 55 gallons or more ........... $84.® c. Corrosive Solids, 500 lbs. or more .............. $95.® d. Flammable Solids, 100 lbs. or more ............ $95.® e. Highly Toxic Liquids and Solids, any amount ...... $95.® f. Irritant Liquids, 55 gallons or more ............. $84.® g. Irritant Solids, 500 lbs. or more ................ $84.® Resolution No. FD99-006 Page 6 h. Oxidizing Liquids: Class 4, any amount Class Class Class i. Oxidizing Solids: Class Class Class ............... $84.oo 3, 10 lbs. or more ............. $84.® 2, 100 lbs. or more ............ $84.® 1,500 lbs. or more ............ $84.® 4, any amount ............... 3, 10 lbs. or more ............. 2, 100 lbs. or more ............ Class 1,500 lbs. or more ............ j. Organic Peroxide Liquids and Solids: Class 1, any amount ............... Class 2, any amount .. Class 3, 10 lbs. or more Class 4, 20 lbs. or more k. Other Health Hazards: $84.® $84.® $84.® $84.°° $95.°° ........ $95.® ........ $95.® ........... $95.® Liquids, 55 gallons or more .......... $84.® Solids, 500 lbs. or more ............. $84.°° I. Pyrophoric Liquids, any amount ............... $95.°° m. Pyrophoric Solids, any amount ................ $95?0 n. Sensitizer Liquids, 55 gallons or more ........... $95?0 o. Sensitizer Solids, 500 lbs. or more ............. $95.® p. Toxic Liquids, 10 gallons or more .............. $95.® q. Toxic Solids, 100 lbs. or more ................. $95.® r. Unstable (Reactive) Liquids: Class 4, any amount .............. $132.® Class 3, Class 2, Class 1, any amount .............. $132.® 5 gallons or more .......... $132.® 10 gallons or more ......... $132.® Unstable (Reactive) Solids: Class 4, any amount Class 3, Class 2, Class 1, .............. $132.00 any amount ..............$132.® 50 lbs. or more ............ $132.°° 100 lbs. or more ........... $132.® Resolution No. FD99-006 Page 7 t. Water-Reactive Liquids: Class 3, any amount ............... $95.® Class 2, 5 gallons or more ........... $95.® Class 1, 10 gallons or more .......... $95.® u. Water-Reactive Solids: Class 3, any amount ............... $95.® Class 2, 50 lbs. or more ............. $95.® Class 1,100 lbs. or more ............ $95.® 28. Hazardous Production Materials for H-6 Occupancies .......................... $132.® 29. High Piled Combustible Storage .................. $99?0 30. Liquefied Petroleum Bases; Store, Use, Handle or Dispense .................. $84.® 31. Liquid or Gas-Fueled Vehicles or Equipment in Assembly Buildings .............. $105.® 32. Lumber Yards ..................................... $84.® 33. Magnesium Workings ............................... $121.00 34. Mall, Covered (see also 6.211D4) .................. $84.® 35. Motor Vehicle Fuel-Dispensing Stations ........... $100.® 36. Open Burning ............................... No Fee 37. Organic Coatings ............................ $132.® 38. Ovens: Industrial Baking or Drying ................ $84.® 39. Pallet Storage ................................ $84.® 40. Places of Assembly: a. A-4 Stadiums, Reviewing Stands and Amusement Park ......... $84.® b. A-3 Occupant Load of 50 to 299 without a Stage .................. $95.® c. A-2.1, Occupant Load of 300 or more without a Stage ............... $147.® d. A-2 Occupant Load of less than 1000 with a Stage ............... $169.® e. A-1 Occupant Load of 1000 or more with a Stage ................ $225.® 41. Pyrotechnical Special Effects Material (see also 6.2E) $84.® 42. Radioactive Materials ......................... $132.® Resolution No. FD99-006 Page 8 43. Refrigeration Equipment ....................... $115.00 44. Repair Garages ............................... $84.00 45. Spraying or Dipping ............................ $84.00 46. Tents, Canopies and Temporary Membrane Structures: a. 201 to 400 square feet ...................... $84.~° b. 401 to 1500 square feet .................... $110.® c. 1501 to 15,000 square feet .................. $147.® d. 15,001 to 30,000 square feet ................. $1787 e. Over 30,000 square feet .................... $210.® 47. Tire Storage ................................ $132.00 48. Welding and Cutting Operations ................. $ 84.® Special Services Excessive or Malicious False Alarms causing Response of Fire Apparatus. 1. Response due to "Failure to Notify" the Fire Department when working on or testing Sprinkler or Fire Alarm System. $1537 per hour per piece of Emergency Apparatus responding 1/2 hour, minimum charge. Malicious False Alarms. $1537o per hour per piece of Emergency Apparatus responding with 1/2 hour, minimum charge. Response Due to Alarm Malfunction. $153.°° per hour per piece of Emergency Apparatus responding to all False Alarms in excess of two (2) False Alarms in 30 days with 1/2 hour, minimum charge. o Response to False Alarms due to negligence, tampering with the system, construction or modification of the building. $153.00 per hour per piece of Emergency Apparatus responding with 112 hour, minimum charge. Resolution No. FD99-006 Page 9 Response to False Alarm by Battalion Chief and/or Fire Inspector. $50.00 per hourwith 1/2 hour, minimum charge. Response to Fire Setter Incidents (Juvenile or Adutt) and "DUI" Callouts: 1. Cost Recovery for Emergency Apparatus responding. $2.50 per minute per piece of Equipment. 2. Cost Recovery for Personnel responding. $ .83 per minute per Person. 3. Cost Recovery for Battalion Chief or Fire Investigator responding. $ .45 per minute. Response to mitigate Extended Hazardous Chemical and Material Incidents beyond Normal Service requires (this includes response to railroad properties, freeways, and aircraft crashes). 1. Hazardous Incident, Overhead and Command, per hour. $273.00 per hour per piece of Apparatus 2. Apparatus and Crews assigned to the Incident, per hour. $170.00 per hour per piece of Equipment Specialized Resources - HAZMAT Crews and Equipment. Actual Costs 4. Materials and Supplies used for the Incident. Actual Costs Special Activities - Apparatus and Crews assigned to activities that require the services, at Permittees expense, of one or more standby Firefighters. $15370 per hour per piece of Apparatus $ 30.00 per hour, two hour minimum per District employee, two hour minimum charge. Resolution No. FD99-006 Page 10 Fm Accelerant Detection Canine Team, Use of Arson K-9 Team by other Agencies. Fire Scene Examinations: $50.°° per hour, two hour minimum charge Hourly Travel Rate: $25.00 per hour, one hour minimum, to and from Search Area Mileage, round trip .......................... $ .35 mile Administrative Reports .................. $25.00 per hour Mounted Photographs ....................... $1.5° each G. Board of Appeals Requiring a Special Meeting .................... $245,°° PASSED, APPROVED, AND ADOPTED this 16th day of June, 1999. AYES: Alexander, Biane, Curatalo, Dutton, Williams NOES: None ABSENT: None ABSTAINED: None ATTEST: · Debra J. Ada" ,~Se William resident I, DEBRA J. ADAMS, SECRETARY of the Rancho Cucamonga Fire Protection District, do hereby certify that the foregoing Resolution was duly passed, approved, and adopted by the Board of Directors of the Rancho Cucamonga Fire Protection District, at a regular meeting of said Board held on the 15th day of September, 1999. Executed this 16th day of September, 1999, at Rancho Cucamonga, California. ~De~ j~. Ad~a ' ,~Secret~a~~'~'~'~ Resolution No. FD99-006 Page 11 RANCHO CU(l~l~I!~~ION DISTRICT DATE: 5/18~99 TO: Joan A. Kruse, Purchasing Manager FROM: Ralph E. Crane, Battalion Chief/Fire Marshal SUBJECT: Fee Justification I received your "1999 Comprehensive Fee Schedule" for review on 5/13/99. I forwarded comments to you on 5/I 3/99. Included herein is the fee validation information you have subsequently requested. Service Description' Current Fee Proposed Fee %Change Explanation Permit- Permit & FP Systems Inspection $0 $35 100% UFC Adoption Requires new Permit for tracking fire protections systems which require cyclical inspections. Fee is Cost recovery Pennit-Pallets Pennit/Insp $84 $84 O% UFC Adoption Clarifies permit separately from existing permit for finished lumber product c: Dennis Michael, Fire Chief EXHIBIT