Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout99-006 - ResolutionsRESOLUTION NO. FD 99-006
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE
RANCHO CUCAMONGA FIRE PROTECTION DISTRICT
ESTABLISHING A NEW FEE SCHEDULE FOR PERMITS AND
SERVICES BY MODIFYING CERTAIN FEES ESTABLISHED IN
RESOLUTION NO. FD97-019
A=
RECITALS.
(i)
The Government Code Section requires that prior to levying a new fee or
increasing an existing fee or service charge, local agencies shall hold a public
meeting at which oral or written presentations may be made; and
(ii) Notice of the time and place of the hearing has been properly provided; and
(iii)No valid request for mailed notice is on file with the City; and
(iv) Copies of the required data were made available to the public in the City Clerk's
office May 28, 1999; and
(v) All legal prerequisites to adoption of this Resolution have occurred.
B. RESOLUTION.
NOW, THEREFORE, THE City Council of the City of Rancho Cucamonga does
hereby resolve that the following fees are established:
SECTION 6: FIRE PROTECTION DISTRICT FEES
6.1
Plans Checking Fees
Includes Plan Review and two Inspections.
Does NOT include Fee for any required Fire District Permits.
Start-up Fee for Commercial,
Industrial or Multi-family Dwelling Units, paid prior to TRC
Plan Review Fees
1.
2.
3.
4.
$82.®
Single Family Residence ....................... $132?0
Single Family Residential Tract, per Phase ......... $132.®
Multi-Family Residential, per Building ............. $677.®
Commercial and Industrial Development, per Building $677.®
Resolution No. FD99-006
Page 2
5. Water Plan/Underground Water Supply ........... $132.®
6. Conditional Use Permit ........................ $1327~
7. Minor Development Review .................... $1327°
8. Parcel Map Review ........................... $1327~
9. Tenant Improvement, per hour, one hour minimum ... $877~
10. Special Events Review ......................... $877~
11. Accessory Plans Review:
Aisles, Access, Seating, Etc ..................... $667~
12. Alternate Method Approval ...................... $927~
13. Revision to existing Plan
(e.g., As-Builts, Excluding TI Plans) ............... $927~
14. New Fire Sprinkler Systems,
Standpipes or over ten heads ................... $1647~
15. Fire Sprinkler Alteration, ten heads or less .......... $92.®
16. Pre-Engineered Fire Protection Systems .......... $1477~
17. Fire Detection and Alarm Systems ............... $154.®
18. Flammable Finishes Spray Booth, per booth ........ $1647
19. LPG Tank Installation Review, per tank ........... $1477~
20. Underground Storage Tank Removal Review,
per tank .................................... $1477~
21. Flammable & Combustible Liquid, Tank & Piping .... $1477~
22. Failure to keep Appointment, one hour minimum ..... $667~
23. Microfilm Charges, per page ...................... $1.°°
24. Minor Plan Review not requiring a District Inspection No Fee
Inspection Fees
Per hour, one hour minimum
1. Field Inspection required after the Initial
and Follow-Up Inspection ...................... $1107~
2. Failure to keep an Inspection Appointment .......... $667~
3. Field Inspection of Self Inspection Occupancies,
Failure to Comply ............................. $667"
4. Fire Flow Test, Witness Test ..................... $877°
5. Unscheduled Field Inspection or Investigation ....... $667~
6. Same Day, Shod Notice Inspection ................ $877~
Resolution No. FD99-006
Page 3
6.2
Permit Fees
[Initial Permit and subsequent renewal of Permit unless
otherwise indicated (e.g. one time only Permit activity)]
A. Permits
1. General Use Permit ............................ $82?0
2. Access Control .............................. No Fee
3. Aerosol Products (more than 500 lbs. of Level 2 or 3) $131.°°
4. Aircraft Refueling Vehicles ...................... $95.®
5. Aircraft Repair Hangar ......................... $84.®
6. Automobile Wrecking Yard ...................... $82.®
7. Asbestos Removal ........................... $132.®
8. Bowling Pin or Alley Refinishing
involving Flammable Finishes .................... $82?0
9. Candles and Open Flames in Assembly Areas .. Not Permitted
10. Carnivals and Fairs (see also 6.2E) .............. $132.®
11. Cellulose Nitrate Film .......................... $82.®
12. Cellulose Nitrate Storage,
more than 25 lbs .............................. $84.®
13. Combustible Fiber Storage,
more than 100 cubic feet ........................ $82?0
14. Combustible Material Storage,
more than 2,500 cubic feet ..................... $115.oo
15. Compressed Gases:
a. Corrosive, 200 cubic feet or more .............. $95?0
b. Flammable, 200 cubic feet or more ............. $84?0
c. Highly Toxic, any amount .................... $95.®
d. Inert/Simple Asphyxiant, 6,000 cubic feet or more . $85.®
e. Irritant, 200 cubic feet or more ................ $84.®
f. Other Health Hazards, 650 cubic feet or more .... $84.®
g. Oxidizing (includes Oxygen), 504 cubic feet or more $84.®
h. Pyrophoric, any amount ..................... $95.®
i. Radioactive, any amount ..................... $98.®
j. Sensitizer, 200 cubic feet or more .............. $95.®
k. Toxic, any amount .......................... $95.®
I. Unstable (Reactive), any amount ............. $132.®
16. Commercial Rubbish-Handling Operations .......... $84.®
Resolution No. FD99-006
Page 4
17.
18.
19.
20.
21.
22.
23.
24.
f.
g.
h.
i.
j.
Cryogens:
Corrosive -- Inside, over 1 gallon ............... $95.®
Corrosive -- Outside, over 1 gallon ............ $95.®
Flammable -- Inside, over 1 gallon ............. $84?0
Flammable -- Outside, 60 gallons or more ....... $84.®
Highly toxic -- Inside, over 1 gallon ............. $95.®
Highly toxic -- Outside, over 1 gallon ............ $95.®
Nonflammable -- Inside, 60 gallons or more ...... $95.®
Nonflammable -- Outside, 500 gallons or more .... $84.®
Oxidize -- Inside, 50 gallons or more ............ $84.®
Oxidizer-- Outside, 50 gallons or more .......... $84.®
Dry Cleaning Plants .......................... $132.®
Dust-Producing Operations ...................... $84.®
Explosives or Blasting Agents:
a. Storage, Manufacture, Process or Sell .......... $84.®
b. Use .................................... $150.®
Fire Hydrants and Water-Control Valves,
use for other purposes ........................ $ 84.®
Fire Protection Systems and Equipment, per building . No Fee
Fireworks:
a. Retail Sales ......................... Not Permitted
b. Aerial Displays (see also 6.2E) ................ $84.®
Flammable or Combustible Liquids:
a. Pipeline, to Use, Operate,
Repair or modify a Pipeline .................. $132.®
b. Class I Liquids,
more than 5 gallons Inside a Building ........... $84.®
c. Class l Liquids,
more than 10 gallons Outside a Building ......... $84.®
Exceptions to b. & c.:
1. Storage or use of Class I Liquids in
Vehicle, Vessel, Aircraft or Equipment
Fuel Tanks.
2. Storage or use of Paints, Oils,
Varnishes, or Similar Mixtures for
Maintenance, Painting or Similar
Purposes for less than 30 days.
d. Class II or II-A Liquids,
more than 25 Gallons Inside a Building ......... $ 84.®
Resolution No. FD99-006
Page 5
25.
26.
27.
Class II or III-A Liquids,
more than 60 gallons Outside of a Building ...... $ 84?0
To remove Class I or II Liquids
from an UST by other than Normal Operation .... $ 95.®
Installation, Construction, Alteration or Operation
where Flammable or Combustible Liquids are
Produced, Processed, Transported, Stored, Dispensed
or Used in any of the following:
Tank Vehicles .................... $95.®
Equipment ...................... $105.®
Tanks, per tank .................. $121 .oo
Plants .......................... $132.®
32.®
84.®
Terminals ....................... $1
Wells, per well ................... $
Fuel-Dispensing Stations (Single and/or
Multiple pump Stations) ............ $ 95.®
Refineries ....................... $132.®
Distilleries ...................... $132.®
h. Installation, Alteration, Removal, Abandon, Place
Temporarily out of Service or otherwise Dispose of a
tank which contained Flammable or Combustible
Liquid .................................. $132.®
i. To change the type of contents in a Flammable or
Combustible Liquid ........................ $132.®
Fruit Ripening ............................... $105.®
Fumigation or Thermal Insecticidal Fogging ........ $121.0o
Hazardous Materials: (see also other Permit Sections)
For multiple Permits within this Section 25, the Fee will
be the total of all related Permits to a maximum of
$400.00 or Actual Costs, whichever is greater.
a. Carcinogens, 10 lbs. or more ................ $132.®
b. Corrosive Liquids, 55 gallons or more ........... $84.®
c. Corrosive Solids, 500 lbs. or more .............. $95.®
d. Flammable Solids, 100 lbs. or more ............ $95.®
e. Highly Toxic Liquids and Solids, any amount ...... $95.®
f. Irritant Liquids, 55 gallons or more ............. $84.®
g. Irritant Solids, 500 lbs. or more ................ $84.®
Resolution No. FD99-006
Page 6
h. Oxidizing Liquids:
Class 4, any amount
Class
Class
Class
i. Oxidizing Solids:
Class
Class
Class
............... $84.oo
3, 10 lbs. or more ............. $84.®
2, 100 lbs. or more ............ $84.®
1,500 lbs. or more ............ $84.®
4, any amount ...............
3, 10 lbs. or more .............
2, 100 lbs. or more ............
Class 1,500 lbs. or more ............
j. Organic Peroxide Liquids and Solids:
Class 1, any amount ...............
Class 2, any amount ..
Class 3, 10 lbs. or more
Class 4, 20 lbs. or more
k. Other Health Hazards:
$84.®
$84.®
$84.®
$84.°°
$95.°°
........ $95.®
........ $95.®
........... $95.®
Liquids, 55 gallons or more .......... $84.®
Solids, 500 lbs. or more ............. $84.°°
I. Pyrophoric Liquids, any amount ............... $95.°°
m. Pyrophoric Solids, any amount ................ $95?0
n. Sensitizer Liquids, 55 gallons or more ........... $95?0
o. Sensitizer Solids, 500 lbs. or more ............. $95.®
p. Toxic Liquids, 10 gallons or more .............. $95.®
q. Toxic Solids, 100 lbs. or more ................. $95.®
r. Unstable (Reactive) Liquids:
Class 4, any amount .............. $132.®
Class 3,
Class 2,
Class 1,
any amount .............. $132.®
5 gallons or more .......... $132.®
10 gallons or more ......... $132.®
Unstable (Reactive) Solids:
Class 4, any amount
Class 3,
Class 2,
Class 1,
.............. $132.00
any amount ..............$132.®
50 lbs. or more ............ $132.°°
100 lbs. or more ........... $132.®
Resolution No. FD99-006
Page 7
t. Water-Reactive Liquids:
Class 3, any amount ............... $95.®
Class 2, 5 gallons or more ........... $95.®
Class 1, 10 gallons or more .......... $95.®
u. Water-Reactive Solids:
Class 3, any amount ............... $95.®
Class 2, 50 lbs. or more ............. $95.®
Class 1,100 lbs. or more ............ $95.®
28. Hazardous Production Materials
for H-6 Occupancies .......................... $132.®
29. High Piled Combustible Storage .................. $99?0
30. Liquefied Petroleum Bases;
Store, Use, Handle or Dispense .................. $84.®
31. Liquid or Gas-Fueled Vehicles
or Equipment in Assembly Buildings .............. $105.®
32. Lumber Yards .....................................
$84.®
33. Magnesium Workings ...............................
$121.00
34. Mall, Covered (see also 6.211D4) .................. $84.®
35. Motor Vehicle Fuel-Dispensing Stations ........... $100.®
36. Open Burning ............................... No Fee
37. Organic Coatings ............................ $132.®
38. Ovens: Industrial Baking or Drying ................ $84.®
39. Pallet Storage ................................ $84.®
40. Places of Assembly:
a. A-4 Stadiums,
Reviewing Stands and Amusement Park ......... $84.®
b. A-3 Occupant Load
of 50 to 299 without a Stage .................. $95.®
c. A-2.1, Occupant Load
of 300 or more without a Stage ............... $147.®
d. A-2 Occupant Load
of less than 1000 with a Stage ............... $169.®
e. A-1 Occupant Load
of 1000 or more with a Stage ................ $225.®
41. Pyrotechnical Special Effects Material (see also 6.2E) $84.®
42. Radioactive Materials ......................... $132.®
Resolution No. FD99-006
Page 8
43. Refrigeration Equipment ....................... $115.00
44. Repair Garages ............................... $84.00
45. Spraying or Dipping ............................ $84.00
46. Tents, Canopies and Temporary Membrane Structures:
a. 201 to 400 square feet ...................... $84.~°
b. 401 to 1500 square feet .................... $110.®
c. 1501 to 15,000 square feet .................. $147.®
d. 15,001 to 30,000 square feet ................. $1787
e. Over 30,000 square feet .................... $210.®
47. Tire Storage ................................ $132.00
48. Welding and Cutting Operations ................. $ 84.®
Special Services
Excessive or Malicious False Alarms causing Response
of Fire Apparatus.
1. Response due to "Failure to Notify" the Fire
Department when working on or testing Sprinkler or
Fire Alarm System.
$1537 per hour per piece of Emergency
Apparatus responding 1/2 hour, minimum
charge.
Malicious False Alarms.
$1537o per hour per piece of Emergency
Apparatus responding with 1/2 hour, minimum
charge.
Response Due to Alarm Malfunction.
$153.°° per hour per piece of Emergency
Apparatus responding to all False Alarms in
excess of two (2) False Alarms in 30 days with
1/2 hour, minimum charge.
o
Response to False Alarms due to negligence,
tampering with the system, construction or
modification of the building.
$153.00 per hour per piece of Emergency
Apparatus responding with 112 hour, minimum
charge.
Resolution No. FD99-006
Page 9
Response to False Alarm by Battalion Chief and/or
Fire Inspector.
$50.00 per hourwith 1/2 hour, minimum charge.
Response to Fire Setter Incidents (Juvenile or Adutt) and
"DUI" Callouts:
1. Cost Recovery for Emergency Apparatus responding.
$2.50 per minute per piece of Equipment.
2. Cost Recovery for Personnel responding.
$ .83 per minute per Person.
3. Cost Recovery for Battalion Chief or Fire Investigator
responding.
$ .45 per minute.
Response to mitigate Extended Hazardous Chemical and
Material Incidents beyond Normal Service requires (this
includes response to railroad properties, freeways, and
aircraft crashes).
1. Hazardous Incident,
Overhead and Command, per hour.
$273.00 per hour per piece of Apparatus
2. Apparatus and Crews
assigned to the Incident, per hour.
$170.00 per hour per piece of Equipment
Specialized Resources - HAZMAT Crews and
Equipment.
Actual Costs
4. Materials and Supplies used for the Incident.
Actual Costs
Special Activities - Apparatus and Crews assigned to
activities that require the services, at Permittees
expense, of one or more standby Firefighters.
$15370 per hour per piece of Apparatus
$ 30.00 per hour, two hour minimum per
District employee, two hour minimum charge.
Resolution No. FD99-006
Page 10
Fm
Accelerant Detection Canine Team,
Use of Arson K-9 Team by other Agencies.
Fire Scene Examinations:
$50.°° per hour,
two hour minimum charge
Hourly Travel Rate:
$25.00 per hour, one hour minimum,
to and from Search Area
Mileage, round trip .......................... $ .35 mile
Administrative Reports .................. $25.00 per hour
Mounted Photographs ....................... $1.5° each
G. Board of Appeals
Requiring a Special Meeting .................... $245,°°
PASSED, APPROVED, AND ADOPTED this 16th day of June, 1999.
AYES: Alexander, Biane, Curatalo, Dutton, Williams
NOES: None
ABSENT: None
ABSTAINED: None
ATTEST:
·
Debra J. Ada" ,~Se
William resident
I, DEBRA J. ADAMS, SECRETARY of the Rancho Cucamonga Fire Protection District, do hereby
certify that the foregoing Resolution was duly passed, approved, and adopted by the
Board of Directors of the Rancho Cucamonga Fire Protection District, at a regular
meeting of said Board held on the 15th day of September, 1999.
Executed this 16th day of September, 1999, at Rancho Cucamonga, California.
~De~ j~. Ad~a ' ,~Secret~a~~'~'~'~
Resolution No. FD99-006
Page 11
RANCHO CU(l~l~I!~~ION DISTRICT
DATE: 5/18~99
TO:
Joan A. Kruse, Purchasing Manager
FROM:
Ralph E. Crane, Battalion Chief/Fire Marshal
SUBJECT: Fee Justification
I received your "1999 Comprehensive Fee Schedule" for review on 5/13/99. I forwarded
comments to you on 5/I 3/99. Included herein is the fee validation information you have
subsequently requested.
Service Description'
Current Fee Proposed Fee %Change Explanation
Permit- Permit &
FP Systems Inspection $0 $35 100%
UFC Adoption
Requires new
Permit for
tracking fire
protections
systems which
require
cyclical
inspections.
Fee is
Cost recovery
Pennit-Pallets Pennit/Insp
$84 $84 O%
UFC Adoption
Clarifies
permit
separately
from existing
permit for
finished
lumber
product
c: Dennis Michael, Fire Chief
EXHIBIT