HomeMy WebLinkAbout11-090 - Resolutions - (Item removed from 6-15-11 Agenda) "ITEM REMOVED FROM 6-15-11 AGENDA"
RESOLUTION NO. 11-090
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING THE
RENEWAL OF AGREEMENTS WITH NINYO & MOORE, SALEM
ENGINEERING GROUP, INC. AND LEIGHTON CONSULTING,
INC. FOR ANNUAL SOILS AND MATERIALS TESTING
SERVICES FOR FY 2011/2012 FOR PROPOSED CAPITAL
IMPROVEMENT PROJECTS THROUGHOUT THE CITY
WHEREAS, Ninyo & Moore, Salem Engineering Group, Inc. and Leighton Consulting,
Inc„ Contract No. 10-077, 10-078 and 10-079, respectively, were approved by City Council in
Fiscal Year 2010/2011; and
WHEREAS, the contracts may be extended for additional one-year periods, up to an
additional two years, with mutual agreement of both parties; and
WHEREAS, this is the first renewal year; and
WHEREAS, Ninyo & Moore, Salem Engineering Group and Leighton Consulting, Inc.,
have requested renewal of their contracts; and
WHEREAS, Salem Engineering Group and Leighton Consulting have requested an
amendment to their contracts to include their current fee schedule, labeled Exhibit "C1" attached
hereto, to increase the hourly rate for supported fees that reflect a reasonable cost-of-living
increase.
NOW, THEREFORE, the City Council of the City of Rancho Cucamonga, California,
hereby resolves that said contracts are hereby renewed as amended, and the Mayor is
authorized to sign this resolution.
Please see the following page
for formal adoption,certification and signatures
PASSED, APPROVED, AND ADOPTED this 15`h day of June 2011.
AYES: -------------------------
NOES: -------------------------
ABSENT: -------------------------
ABSTAINED: -------------------------
L. Dennis Michael, Mayor
ATTEST:
Janice C. Reynolds, City Clerk
I, JANICE C. REYNOLDS, CITY CLERK of the City of Rancho Cucamonga,
California, do hereby certify that the foregoing Resolution was duly passed, approved and
adopted by the City Council of the City of Rancho Cucamonga, California, at a Regular Meeting
of said City Council held on the 15`h day of June 2011.
Executed this 16`h day of June 2011, at Rancho Cucamonga, California.
Janice C. Reynolds, City Clerk
Resolution No. 11-090 — ITEM REMOVED FROM AGENDA - Page 2 of 21
410
EXHIBIT "CV"
L Ighton
2011 PROFESSIONAL FEE SCHEDULE*
MSCOUNTED FOR CITY EBF RANCHO CUCAE tOhttt(GA.
PROFESSIONAL SERVICES
Technical Staff Hourly Rate
Special Inspection/Technician-Materials..................................................................................................$68
Special Inspection/Technician-Materials—Welding, Masonry& Fabrication ............................................72
Special Inspection/Technician-Materials (Prevailing Wage).......................................................................77
Special InspectionfTechnician-Materials—Welding, Masonry& Fabrication (Prevailing Wage)...............81
Technician1................................................................................................................................................72
Technician11...............................................................................................................................................77
SeniorTechnician......................................................................................................................................81
Soil/Field Technician(Prevailing Wage).....................................................................................................84
Remediation System Operation & Maintenance Specialist........................................................................89
Materials Inspection Manager....................................................................................................................95
Staff Engineer/Geologist/Scientist/Field Supervisor................................................................................. 106
Senior Staff Engineer/Geologist/Scientist................................................................................................119
Project Engineer/Geologist/Scientist/Operations Manager......................................................................136
Senior Project Engineer/Geologist/Scientist.............................................................................................153
Associate.................................................................................................................................................170
Principal...................................................................................................................................................183
SeniorPrincipal........................................................................................................................................221
Technical Support Staff Hourly Rate
Project Administrator/Word Processor........................................................... .....................................$66
InformationSpecialist.................................................................................................................................89
CADOperator............................................................................................................................................95
GISSpecialist .......................................................................................................................................... 106
Miscellaneous Hourly Rate
Vehicleusage ..........................................................................................................................................$15
Effective at least through June 30, 2012, after which remaining work will be billed at then-current rates.
Resolution No. 11-090 — ITEM REMOVED FROM AGENDA - Page 3 of 21
EXHIBIT "CI"
Leighton 2011 Fee Schedule
FIELD EQUIPMENT LIST
Task Equipment, Supplies and Materials Unit Rate
8200 Box of 10 soil drive-sample rings $25 per day
9511 Mileage(current published IRS rate) IRS ratelmile
9512 Service Vehicle Usage 150 per day
9516 Brass Sample Tubes 10 each
9594 Caution Tape (1000-foot roll) 20 each
9575 Combination Lock or Padlock 11 each
9533 Consumables(gloves, rope, soap, tape, etc.) 35 per day
9564 Core Sample Boxes 11 each
9565 Cutoff Saws, reciprocating, electric(Saws-All) 75 per day
9566 D.C. Purging Pump, 3 gpm 30 per day
9517 Disposable Bailers 12 each
9567 Dissolved Oxygen Meter 45 per day
9555 DOT 55-gallon Containment Drum with lid 65 each
9597 Double-Ring Infiltrometer(ASTM D 3385-09)equipment 350 per day
9599 Electrical Resistivity Meter(Wenner array for in-situ measurements from the surface 80 per day
9569 Four Gas Meter 110 per day
9537 Generator, portable gasoline fueled, 3,500 watts 90 per day
9590 GPS Trimble Unit 75 per day
9531 Hand Auger 90 per day
9540 High-resolution Global Positioning System (GPS) unit(Trimble(D) 80 per day
9538 In-Situ Level Troll 500(each) 90 per day
9539 In-Situ Troll 9500 Low Flow Water Sampling Equipment 150 per day
9543 Level B Protection (per person) 400 per day
9544 Level C Protection (per person) 200 per day
9574 Magnahelic Gauges, each 15 per day
9547 Nitrile Gloves 20 per pair
9535 Nuclear Moisture and Density Gauge (licensed, calibrated,swipe tested) 88 per day
9522 pH/Conductivity/Temperature Meter 55 per day
9562 Photo-Ionization Detector(PID) 110 per day
9557 Pump,Typhoon 2 or 4 Stage 50 per day
9581 Slip/Threaded Cap, 2-inch or 4-inch diameter, PVC Schedule 40 15 each
9593 Safety Fence(100-foot roll) 50 per day
9525 Stainless Steel Bailer 40 per day
9526 Submersible Pump, 10 gpm, high powered Grunfos 2-inch with controller 160 per day
9527 Submersible Sump/Transfer Pump, 10-25 gpm 50 per day
9595 Survey/Fence Stakes 5 each
9585 TedlarOO Bags 18 each
9586 Traffic Cones(5525)/Barricades (single lane) 50 per day
9556 Tubing, clear vinyl 3/8-inch diameter .55¢ per foot
9528 Turbidity Meter 70 per day
9548 TyvekOO Suit(each) 18 each
9529 Vapor Sampling Box 45 per day
9588 Visqueen,6-mil, 20 feet x100 feet roll, 6-mil 75 per roll
9536 Water Level Indicator(electronic well sounder) 5300 feet deep well 60 per day
9598 Water Level Indicator Dual Phase 80 per day
9601 Manometer(Floor level measuring device using contained water) 80 per day
9602 Specialized Geotechnical Testing & Monitoring Equipment (site specific) Quote Upon Request
9600 SVE Thermal Oxidizer Quote Upon Request
Resolution No. 11-090 — ITEM REMOVED FROM AGENDA- Page 4 of 21 �
EXHIBIT "Cl"
Leighton 12011 Fee Schedule
UNIT RATE GEOTECHNICAL (SOILS) LABORATORY TESTING
Task Classification and Index Properties Method Per Test
8002 Moisture Content ASTM D 2216 $20
8003 Moisture and Density(Ring Samples) ASTM D 2937 30
8004 Moisture Content& Density (Shelby tube or requires cutting) ASTM D 2937 40
8005 Atterberg Limits (3 points) ASTM D 4318 150
8006 Single Point/Non-plastic ASTM D 4318 84
8024 Atterberg Limits (Organic) ASTM D 2487 14318 182
8007 Visual classification of point as non-plastic ASTM D 2488 11
8008 Particle Size: Sieve ONLY(1 Y2-inch to#200) ASTM D 422 110
8023 Large Sieve(6-inch to#200) ASTM D 422/C136 175
8009 Hydrometer ONLY ASTM D 422 110
8010 Sieve + Hydrometer(53-inch sieve) ASTM D 422 185
8011 Dispersive Characteristics of Clay Soil (Double Hydrometer) ASTM D 4221 69
8012 Specific Gravity: Fine(passing#4) - ASTM D 854/CTM 207 125
8013 Coarse (retained on#4) ASTM C 127/CTM 206 100
8014 Total Porosity — On Shelby tube sample calculated from density&specific gravity 137
8015 Total Porosity — On other sample 105
8016 Photograph of sample 11
8017 Shrinkage Limits (Wax Method) ASTM D 4943 126
8018 Pinhole Dispersion ASTM D 4647 210
8020 Percent Passing#200 Sieve wash ONLY ASTM D1140 70
8021 As-Received Moisture and Density("chunk"or carved samples) 58
8022 Sand Equivalent(SE) ASTM D 2419/CTM 217 105
Soil Chemistry and Corrosivity Method Per Test
8050 pH CTM CA Test 532/643 $42
8051 Electrical Resistivity—single point—in-situ moisture 42
8052 Minimum Resistivity (>!3 moisture content points) CTM CA Test 532/643 89
8053 pH +Minimum Resistivity CTM CA Test 532/643 131
8054 Sulfate Content- Gravimetric CTM CA Test 417 Part II 68
8055 Sulfate Screen HACH kit 32
8056 Chloride Content CTM CA Test 422 68
8057 Corrosion Suite:pH, Chloride, Minimum Resistivity & Sulfate(gravimetric) CTM CA Test 532/643 245
8058 Organic Matter Content ASTM 2974 63
Shear Strength Method Per Test
8070 Pocket Penetrometer $16
8072 Direct Shear(3 points) Consolidated Undrained-0.05 in./min. ASTM D 3080 mod. 285
8073 Direct Shear(3 points) Consolidated Drained- <0.05 in./miry. ASTM D 3080 345
8074 Residual Shear(price per each additional pass after shear) EM 1110-2-1906-IXA 50
8075 Remolding or Hand Trimming of specimens (3 points) 90
8076 Oriented or Block Hand Trimming (per hour) 65/hour
8077 Daily equipment usage rate (after 2 days) 35/day
8079 Single Point Shear 105
8080 Torsional Shear 820
Compaction and Pavement Subgrade Tests Method Per Test
8094 Standard Proctor Compaction (Maximum Density), 4 points ASTM D 698
8092 4 inch diameter mold Methods A and B $182
8093 6 inch diameter mold Method C 215
Modified Proctor Compaction (Maximum Density),4 points ASTM D 1557-07
8100 4 inch diameter mold Methods A and B 220
8101 6 inch diameter mold Method C 245
8102 Check Point per point 65
N
Resolution No. 11-090— ITEM REMOVED FROM AGENDA- Page 5 of 21
EXHIBIT 4cC175
Leighton 12011 Fee Schedule
UNIT RATE GEOTECHNICAL (SOILS) LABORATORY TESTING (Continued)
Task Compaction and Pavement Subgrade Tests (Continued) Method Per Test
8000 Relative Compaction of Untreated&Treated Soils&Aggregates CTM 216 S250
(Caltrans CTM 216: Caltrans wet density compaction curve)
8103 Relative Density(0.1 cubic foot mold) ASTM D 4253, D 4254 236
8104 California Bearing Ratio (CBR)—3 pointASTM D 1883 500
8105 — 1 point' 184
'Compaction (Maximum Density) should also be performed—not included in above prices
8090 R-Value—Untreated CTM 301 310
8091 R-Value—Lime or cement treated soils(<7%additive) CTM 301 338
Triaxial Tests Method Per Test
8120 Unconfined Compression Strength of Cohesive Soil (with stress/strain plot) ASTM D 2166 $135
8121 Unconsolidated Undrained Triaxial Compression Test on Cohesive Soils ASTM D 2850 16S
(USACE Q test) (per confining stress)
8122 Consolidated Undrained Triaxial Compression Test for Cohesive Soils (CU, ASTM D 4767 375
USACE R-bar test)with Back Pressure Saturation & Pore Water Pressure
Measurement(per confining stress)
-- Consolidated Drained Triaxial Compression Test(CD, USACE S test)with EM 1110-2-1906(X)
Volume Change Measurement(Price per soil type below)
8123 • Sand or silty sand soils (per confining stress) 375
8124 • Silt or clayey sand soils(per confining stress) 500
8125 • Clay soils (per confining stress) 705
8117 • Three-stage Triaxial Tests (sand or silty sand soils) 656
8118 • Three-stage Triaxial Tests (silt or clayey sand soils) 875
8119 • Three-stage Triaxial Tests (clay soils) 1,234
8169 Remolding of Test Specimens 65
Consolidation and Expansion/Swell Tests Method Per Test
8140 Consolidation (11 loads up to 16 ksf&unload to 0.25 with strain vs. ASTM D 2435 $195
load curve and one time-rate-of-consolidation curve)
8141 Each additional Time Curve 45
8142 Each additional load/unload w/o Time Reading 42
8143 Expansion Index(EI) ASTM D 4829-08 131
8145 Swell/Collapse Test—Method A (Up to 10 load/unloads w10 time curves) ASTM D 4546-A 289
8146 Single Load Swell/Collapse Test- Method B (Seat,load, and inundate only) ASTM D 4546-B 105
8148 Collapse Potential of Soils ASTM D 5333 220
Hydraulic Tests Method Per Test
8162 Triaxial Permeability in Flexible-Wall Permeameter with Backpressure EPA 9100/ASTM D 5084 $310
Saturation (at One Effective Stress) (Falling Head Method C)
8163 - Each Additional Effective Stress 121
8164 - Hand Trimming of Soil Samples for Horizontal K 58
8169 Remolding of Test Specimens 65
8174 Permeability of Granular Soils(Constant Head) ASTM D 2434 $135
Soil-Cement Method Per Test
8106 Moisture-Density Relations of Soil-Cement Mixtures ASTM D 558 $240
8107 Wet-Dry Durability of Soil-Cement Mixtures' ASTM D 559 1,205
8130 Compressive Strength of Molded Soil-Cement Cylinders' (per cylinder) ASTM D 1633 60
8161 Soil-Cement Remolded Specimen' (for shear strength, consolidation, etc.) 236
"Compaction (ASTM D 558 maximum density)should also be performed—not induded in above price
Resolution No. 11-090— ITEM REMOVED FROM AGENDA - Page 6 of 21
EXHIBIT "Cl"
Leighton 12011 Fee Schedule
MATERIALS TESTING AND INSPECTION SCHEDULE OF SERVICES
Task Technician Services Prevailing Wage" Non-Prevailing
6236 In-situ surface Wenner soil resistance test (including equipment) Quote upon request, site specific
6237 Pull-out Test on Embedded Bolts,Anchors and Dowels (including equipment) Quote upon request, site specific
6238 Earth Anchor Hold Down Test(4 hour, full load application with 5 tests minimum) Quote upon request, site-specific
6239 Earth Anchor Hold Down Test (Prelude/short term with full load) Quote upon request, site-specific
6240 Coring concrete, masonry or asphalt in the field Quote upon request, site-specific
6241 Sawing concrete, masonry or asphalt in the field Quote upon request, site-specific
6242 Pick-up and Delivery-(weekdays, per trip, <50 mile radius from Leighton office) 80
6232 Coring and Sizing (in house, at Leighton laboratories) 80
Task Concrete Strength Characteristics Method Per Test
7200 Concrete Cylinders (6-inch by 12-inch)- Compression ASTM C39 $25
7201 Gunite/Shotcrete Cores(laboratory coring and testing only) ASTM C 42 60
7202 Lightweight Fill Concrete (3-inch by 6-inch) ASTM C 495 30
7203 Compression, Concrete or Masonry Cores (testing only) <-6-inch diameter ASTM C 42 40
7220 Trimming concrete cores(per core) 20
7204 Splitting Tensile-6-inch by 12-inch cylinder ASTM C 496 50
7205 Flexural Strength of Concrete (Simple Beam with 3rd pt. Loading) ASTM C 78 65
7206 Mix Design, Determination of Proportions 250
7207 Mix Design, Review of Existing 150
7208 Laboratory Trial Batch with Slump, Unit Weight&Air Content ASTM C 192 457
7209 6-inch by 12-inch Cylinder, Make and Test(lab trial batch) ASTM C 192 25
7210 3-inch by 6-inch Grout Prisms, Make and Test(lab trial batch) ASTM C 192 25
7211 6-inch by 6-inch Flexural Beams, Make and Test(lab trial batch) ASTM C 192 65
7213 Cylinder molds,6-inch by 12-inch,2-inch by 4-inch when not used with testing 3
7214 Unit Weight of Hardened Light weight Concrete ASTM C 567 50
7215 Rapid Cure Concrete Cylinders (Boil Method) ASTM C 684 50
7216 Drying Shrinkage (Four Readings, up to 90 days, 3 bars) ASTM C157 400
7217 Modulus of Elasticity/Poisson's Ratio 3-inch by 6-inch cores ASTM C 469 350
7376 Flexural Strength of Concrete(simple beam w/center point loading)t CTM 523 65
Task Aggregate Properties Method Per Test
7240 Sieve Analysis of Fine and Coarse Aggregate ASTM C 136 $135
7241 Sieve Analysis-Finer than#200 (Wash) ASTM C 117 90
7242 LA Rattler-Smaller Coarse Aggregate< ASTM C 131 165
7243 LA Rattler-Larger Coarse Aggregate> ASTM C 535 190
7244 Soundness Magnesium ASTM C 88 225
7249 Soundness Sodium 650
7245 Organic Impurities ASTM C40 90
7246 Clay Lumps, Friable Particles ASTM C 142 175
7370 Soil&Aggregate Preparation& Sieve(Fine & Coarse Aggregate))K CTM 201 & 202 265
7373 Grading& Specific Gravity Calculation t CTM 105 80
7247 Durability Index CTM 229 200
7248 Cleanness Value of Coarse Aggregate CTM 227 210
7250 Unit Weight of Aggregate CTM 212 (modified 5/10) 50
Resolution No. 11-090 — ITEM REMOVED FROM AGENDA - Page 7 of 21 " '/
EXHIBIT "c l"
Leighton 2011 Fee Schedule
MATERIALS TESTING AND INSPECTION SCHEDULE OF SERVICES (Continued)
Task Masonry Method Per Test
7260 Mortar Cylinders(2-inch by 4-inch) ASTM C 780 $25
7261 Mortar Cubes (2-inch by 2-inch) ASTM C 109 25
7262 Grout Prisms(3-inch by 6-inch) ASTM C 1019 25
7263 Concrete or Masonry Cores Compression,56-inch diameter(Testing Only) ASTM C 42 40
7264 CMU Compression (3 required)to size 8-inch by 8-inch by 16-inch ASTM C 140 45
7265 CMU Compression (3 required)greater than 8-inch by 8-inch by 16-inch ASTM C 140 50
7266 CMU Moisture Content,Absorption& Unit Weight (6 required) ASTM C 140 40.
7267 Masonry efflorescence (5 required) ASTM C 67 40
7268 CMU Linear Drying Shrinkage ASTM C 426 175
7269 CMU Grouted Prisms (compression test<-8 inch by 8-inch by 16-inch) ASTM E 447 180
7280 CMU Grouted Prisms (compression test>8-inch by 8-inch by 16-inch) ASTM E 447 250
7281 Masonry Core-Shear Title 24 (fest Only) 70
7283 Specimen Prep(Sample by others) 50
7284 CMU width, depth and face shell measurements 40
Task Brick Method Per Test
7290 Compression (5 required) ASTM C 67 $40
7291 Modulus of Rupture(5 required) ASTM C67 40
7292 Absorption, Soak(5 required) ASTM C67 40
7293 Absorption, Boil (5 required) ASTM C 67 50
7294 Absorption, Saturation Coefficient(5 required) ASTM C 67 50
7295 Initial Rate of Absorption(5 required) ASTM C 67 40
7296 Efflorescence(5 required) ASTM C 67 55
7297 Efflorescence with Mortar(5 required) ASTM C 67 65
Task Steel Reinforcement Method Per Test
7300 Tensile Test, Up to No. 10 ASTM A 370 $45
7301 Tensile Test, No. 11 and over ASTM A 370 100
7302 Bend Test, Up to No. 11 ASTM A 370 45
Task Structural Steel Method Per Test
7310 Tensile Strength, 5100,000 pounds axial load ASTM A 370 $45
7311 Tensile Strength, 100,000 to 200,000 pounds axial load ASTM A 370 60
7312 Bend Test - ASTM A 370 40
7313 Pipe Flattening Test ASTM A 370 Quote
7314 Machining and Preparation of Samples ASTM A 370 Quote
7315 Brinell&Rockwell Hardness Test ASTM A 370 55
7316 Chemical Analysis, Carbon and Low Alloy Steel Quote
Task Pre-stressing Method Per Test
7320 Prestressing Wire, Tension (stress vs. strain plot) ASTM A 416 $150
7321 Sample Preparation (cutting) 50
7322 Prestressing cable, 7 wire (Breaking strength/Modulus of Elasticity) ASTM A 416 190
Task Weld Procedure and Welder Qualifications Rate
7330 Weld Tensile Test 50 each
7331 Weld Bend Test 40 each
7332 Weld Macro-Etch 60 each
7333 Bolt Tensile Test 50 each
7334 Bolt, Nut or Washer Hardness Test 50 each
7335 Bold Elastic Proof Load Test 50 each
Task Fireproofing Method Per Test
7340 Unit Weight(Density) ASTM E 605-93 $60
Resolution No. 11-090 — ITEM REMOVED FROM AGENDA - Page 8 of 21
EXHIBIT "CI"
Leighton 12011 Fee Schedule
MATERIALS TESTING AND INSPECTION SCHEDULE OF SERVICES (Continued)
Task Asphalt Concrete, Specimen Testing Method Per Test
.7350 Extraction, Percent Asphalt and Gradation, Centrifuge ASTM D 2172/C 136 $195
7351 Extraction &Percent Asphalt(only), Centrifuge - - ASTM D 2172 155
7355 Extraction and Gradation Only, Centrifuge ASTM D 21721C 136 175
7358 Extraction by ignition oven, percent asphalt and gradation CTM 382/CTM 202 200
7352 Bulk Specific Gravity-Molded Specimen or Cores ASTM D 1188 55
7353 Maximum Density -Hveem CTM 308 125
7359 Theoretical Maximum Density and Specific Gravity of HMA ("Rice') CTM 309 (10/2010) 130
7354 Stabilometer Value CTM 366 - 265
7357 Bituminous Mixture Preparation CTM 304 80
7377 Moisture Content of Asphalt t CTM 370 60
7378 Sampling Highway Materials/Products (Roadway Structural Sections) t CTM 125 Quote
7379 Extraction by Ignition Oven CTM 382 (8/2003) 150
Rubberized Asphalt add 25%
Task Mix Design/Control Method Per Test
7350 Mix Design-Hveem Including Aggregate Tests per Design -ASTM D 1560/CTM 366 Quote
7361 Mix Design-Marshall Including Aggregate Tests per Design - ASTM D 1559 Quote
7362 Field Mix- Hveem Stability per point ASTM D 1560/CTM 366 $200
7363 Field Mix- Marshall Stability per point ASTM D 1559 200
Task Moisture Vapor Emission Rate (MVER)Test Method Per Test
6325 Moisture Test Kit(excludes labor to perform test) ASTM E 1907 $60
Task Other Services Method Rate
6260 Non-Destructive Testing (NDT) ANSI $92 hour
6259 Radiographic Testing Quote
6270 ProjectCloseout 215/hour
T soil t material xc soil &materials "
Resolution No. 11-090 — ITEM REMOVED FROM AGENDA- Page 9 of 21 «/
EXHIBIT "Cl"
Leighton 12011 Fee Schedule
TERMS AND CONDITIONS
Overtime: Overtime for field personnel will be charged at 1.5 times basic hourly rates when exceeding 8
hours up to 12 hours per 24 hour interval, and 2 times basic hourly rates when exceeding 12 hours in 24
hours or on Sunday, and 3 times basic hourly rates on California official holidays.
Expert Witness Time: Expert witness deposition and testimony will be charged at 2 times hourly rates listed
on the previous pages, with a minimum charge of four hours per day.
Minimum Hourly Charges for Geotechnical and Environmental Technicians (field time only).
1. Monday-Friday.......................................................................................................... 2 hours
2. Saturday and Sunday........................... ............ ...................................................... 4 hours
Minimum Hourly Charges for Special Inspectors or Material Testing Field Services (field time only):
1. Cancellation of inspections not canceled by 4:00 p.m. on preceding day".............. 2 hours
2. One-half working day or less except as No. 3 (below) applies................................. 4 hours
3. Over one-half working day, or begins before noon and extends into afternoon ...... 8 hours
'No charge if cancellation is made before 4:00 p.m. of the preceding work day.
Outside Direct Costs (ODCs): Heavy equipment, subcontractor fees and expenses, project-specific permits
and/or licenses, project-specific supplemental insurance, travel, subsistence, project-specific parking charges,
shipping, reproduction, and other reimbursable expenses will be invoiced at cost plus 20%, unless billed
directly to and paid by client.
insurance and Limitation of Liability: These rates are predicated on standard insurance coverage and a
limit of Leighton's liability equal to our total fees for a given project.
Invoicing: Invoices are rendered monthly, payable upon receipt in United States dollars. A service charge of
11,/z-percent per month will be charged for late payment.
Proposal Expiration: Proposals are valid for at least 30 days, subject to chane after 30 days; unless
otherwise stated in the attached proposal. Fees are subject to change on January 1s. of every year.
Client Disclosures: Client agrees to provide all information in Client's possession about actual or possible
presence of buried utilities and hazardous materials on the project site, prior to fieldwork, and agrees to
reimburse Leighton for all costs related to unanticipated discovery of utilities and/or hazardous materials.
Client is also responsible for providing safe and legal access to the project site for all Leighton field personnel.
Earth Material Samples: Quoted testing unit rates are for soil and/or rock (earth) samples free of hazardous
materials. Additional costs will accrue beyond these standard testing unit rates for handling, testing and/or
disposing of soil and/or rock containing hazardous materials. Hazardous materials will be returned to the site
or the site owner's designated representative at additional cost not included in listed unit rates. Standard
turn-around time for geotechnical-laboratory test results is 10 working days. Samples will be stored for 2
months, after which they will be discarded. Prior documented notification is required if samples need to be
stored for a longer time. A monthly storage fee of $10 per bag and $5 per sleeve or tube will be applied.
Quoted unit rates are only for earth materials sampled in the United States. There may be additional cost for
handling imported samples.
Construction Material Samples: After all designated 28-day breaks for a given set meet specified
compressive or other client-designated strength, all "hold" cylinders or specimens will be automatically
disposed of, unless specified in writing prior to the 28-day break. All other construction materials will be
disposed of after completion of testing and reporting.
Resolution No. 11-090 — ITEM REMOVED FROM AGENDA - Page 10 of 21
EXHIBIT "C I"
SALEM ENGINEERING GROUP, INC.
2011 Prevailing Wage
Fee Schedule
Resolution No. 11-090 — ITEM REMOVED FROM AGENDA - Page 11 of 21
EXHIBIT "CIO'
PREVAILING WAGE FEE SCHEDULE FOR
PROFESSIONAL & TECHNICAL SERVICES
Professional
PrincipalEngineer...................................................................................................................$125.00/hr.
Registered Senior Engineer...................................................................................................... 115.00/hr.
RegisteredGeologist................................................................................................................. 105.00/hr.
Certified Asbestos Inspector/Manager.....................................................................................95.00/hr.
Project Engineer/Manager..........................................................................................................95.00/hr.
ProjectGeologist..........................................................................................................................95.00/hr.
Chemist.........................................................................................................................................90.00/hr.
Environmental Specialist............................................................................................................90.00/hr.
Project Administration & Analysis...........................................................................................75.00/hr.
Field Engineer/Inspector............................................................................................................85.00/hr.
FieldGeologist.............................................................................................................................85.00/hr.
Technical
Engineering Technician............................................................................................................$69.00/hr.
Environmental Technician.........................................................................................................69.00/hr.
AutoCad/Engineering Technician ............................................................................................65.00/hr.
Support
Clerical ................................................................................................................................$45.00/Report
Subsistence .............................................................................................................................. $85.00/day
Expert Witness
DocumentReview ..................................................................................................................$175.00/hr.
Expert Witness Testimony/Deposition ...............................................................................$225.00/hr.
Resolution No. 11-090 — ITEM REMOVED FROM AGENDA - Page 12 of 21
EXHIBIT "CP
ENVIlEC)NJ IE>t�TAL SERN710ES
Asbestos Consultation and Analysis
Asbestos Project Manager......................................................................................................$I10.00/hr.
AsbestosTechnician....................................................................................................................85.00/hr.
Analyze for Asbestos per EPA (PLM) Procedures......................................................... 35.00/sample
Consult for Asbestos Abatement.............................................................................................By Quote
Wells
Groundwater Monitoring Well Installations .........................................................................By Quote
Groundwater Extraction Well..................................................................................................By Quote
Vapor Monitoring Well Installation........................................................................................By Quote
VaporPoint Installation............................................................................................................By Quote
VaporExtraction Well ...............................................................................................................By Quote
Environmental Drilling, Exploration, Travel
Light Duty Drilling (continuous flight auger by Mobile Drill
Minutemanor Giddings) ...........................................................................................$155.00/hr.
Drilling (continuous flight, hollow stem auger or rotary wash, w/2 operators)
CME 45 Drill Rig (truck mounted) ............................................................................. 175.00/hr.
CME 55 Drill Rig (truck mounted) ............................................................................. 185.00/hr.
Mobile Drill B-61/HDX Drill Rig (truck mounted)................................................... 185.00/hr.
Mileage (support vehicles)............................................................................................ 00.50/mi.
Mileage (drill rig) ........................................................................................................... 00.80/mi.
Other Equipment & Services Rates
Sample Container Charge:
Stainless Steel Tube (including caps, Teflon/aluminum foil, labels, etc.) .............$10.00/ea.
6" Brass Sleeves (including caps, Teflon/aluminum foil, labels, etc.)........................5.00/ea.
PersonalProtective Equipment................................................................................................By Quote
Hydropunch I1 Screen/Points/Seals.........................................................................................By Quote
Moss Wire Line Continuous Core Soil Sampler................................................................. 300.00/day
Steam Cleaner or Pressure Washer....................................................................................... 125.00/day
MagneticCable Locator.............................................................................................................By Quote
PhotoionizationDetector ....................................................................................................... 100.00/day
Hermit 2000 Datalogger Aquifer Testing Equipment...........................................................By Quote
Magnetometer.............................................................................................................................By Quote
Electromagnetometer.................................................................................................................By Quote
Clean-up/Remedial Equipment ...............................................................................................By Quote
Chemical Analysis of Soil and Groundwater Samples.........................................................By Quote
Resolution No. 11-090 — ITEM REMOVED FROM AGENDA - Page 13 of 21
GEOTECHNICAL SERVICES EXHIBIT "CI?.
Soils - Foundations - Geology
Exploratory Drilling, Sampling, and Travel
Light Duty Drilling (continuous flight auger by Mobile Drill
Minuteman or Giddings operator only) ...........................$155.00/hr.
Drilling (continuous flight, hollow stem auger or rotary wash, w/2 operators)
CME 45 Drill Rig (truck mounted) ............................................................................. 175.00/hr.
CME 55 Drill Rig truck mounted .................................................... 185.00/hr.
Mobile Drill B-61/HDX Drill Rig (truck mounted)................................................... 185.00/hr.
Mileage (support vehicles)............................................................................................ 00.50/mi.
Mileage drill rig) .................................................................. 00.80/mi.
Laboratory Tests
Sieve Analysis, Coarse, ASTM C 136 ...................................................................................$160.00/ea.
Fine (including wash), ASTM C 137, C 177...........................................................................95.00/ea.
Hydrometer Analysis, ASTM D 422.........................................................................................90.00/ea.
Specific Gravity, Bulk SSD, Coarse, ASTM C 127, C 117..................................................... 115.00/ea.
Fine, ASTM C 128.................................................................................................................... 195.00/ea.
Atterberg Limits, ASTM D 4318.............................................................................................. 160.00/ea.
Moisture-Density Relations of Soils, ASTM D 698, D 1557, State 216............................... 175.00/ea.
Consolidation Test ASTM D 2435...........................................................................................225.00/ea.
Triaxial Compression Test, ASTM D 2850
Unconsolidated, Undrained ........................................................................................235.00/ea.
Consolidated, Undrained.............................................................................................325.00/ea.
Consolidated, Undrained with Pore Pressure ..........................................................500.00/ea.
Unconfined Compression Test, ASTM D 2166 .......................................................................85.00/ea.
ExpansionIndex, UBC-29-2..................................................................................................... 195.00/ea.
Direct Shear Test, ASTM D 3080
Consolidated, Drained, 3 points .................................................................................215.00/ea.
Permeability, Constant Falling Head, ASTM 2434...............................................................225.00/ea.
Permeability, Falling Head/Flexible Wall (ASTM D5084), 1.4"-4.. .................................... 325.00 ea.
Permeability, Falling Head/Flexible Wall (ASTM D5084), 6.. ............................................ 450.00 ea.
Permeability, Falling Head/Flexible Wall (ASTM D5084), 12.. .......................................... 750.00 ea.
PermeabilitySample Remold.................................................................................................... 40.00 ea.
SulfateContent............................................................................................................................40.00/ea.
"R" (Resistance) Value, Cal. 301, ASTM D 2844....................................................................240.00/ea.
"R" (Resistance) Value, Lime Treated or Requiring Recombining.....................................280.00/ea.
California Bearing Ratio, ASTM D 1883 ................................................................................650.00/ea.
Plate Bearing Test, ASTM D 1195, D 1196..............................................................................By Quote
IndexTests not Listed................................................................................................................By Quote
Resolution No. 11-090 — ITEM REMOVED FROM AGENDA- Page 14 of 21
EXHIBIT -C I„
CONSTRUCTION TESTING kND INSPECTION SERVICES
Administrative
EngineeringReviecv................................................................................................................$115.00/hr.
ReportPreparation................................................................................................................45.00/report
job Site Inspection
SoilCompaction ........................................................................................................................$69.00/hr.
Masonry, Concrete, Gunite, Epoxy...........................................................................................69.00/hr.
Structural Steel, Welding, Bolt Torque.....................................................................................69.00/hr.
Pile Driving, Soldier Beams, Shoring, Caissons..................................................................$110.00/hr.
Build-up Roofing, Fire Proofing................................................................................................69.00/hr.
Plant Inspection
Structural Steel Fabrication......................................................................................................$69.00/hr.
ConcreteBatch Plant...................................................................................................................69.00/hr.
Pipe Plant (Reinforced Concrete, Clay, etc).............................................................................69.00/hr.
Glue-Laminated Fabrication (Local).........................................................................................69.00/hr.
AsphaltBatch Plant.................................................................4...................................................69.00/hr.
Nondestructive Examination
Ultrasonic, Magnetic Particle, Dye Penetrant........................................................................By Quote
Radiographic..............................................................................................................:................By Quote
Pachometer..................................................................................................................................By Quote
SchmidtHammer.......................................................................................................................By Quote
Coring
Technicianand Equipment....................................................................................................$130.00/hr.
BitCharge.................................................................................................................................... 7.00/inch
Resolution No. 11-090 — ITEM REMOVED FROM AGENDA- Page 15 of 21
EXHIBIT "CI,S
Concrete
Cylinder, Beams S Cores
Compression Test, 6" x 12" Cvlinders, Including Hold, ASTM C 39 (set of 4)...............$100.00/set
Compression Test, Cores, ASTM C 42 (Does Not Include Special Prep. time)..................50.00/ea.
Core Cutting (In Laboratory).....................................................................................................40.00/ea.
Flexure Test, 6" x 6" Beams, ASTM C 78 ..................................................................................95.00/ea.
Splitting Tensile, 6" x 12" Cylinders, .ASTM C 496 .................................................................50.00/ea.
Modules of Elasticity Test - Static, ASTM C 469.....................................................................85.00/ea.
Unit Weight Determination.......................................................................................................25.00/ea.
Shrinkage
Length Change (3 Beams, 4 Readings, Up to 90 Days), ASTM C 157 Modified.................. $260.00
Additional Reading...............................................................................................30.00/3 bar set
Storage Over 90 days, Per set of 3 Beams .........................................................................20.00/month
Mix Design
Aggregate Tests for Concrete Mix Designs Only, Including Sieve Analysis, Specific Gravity,
No. 200 Wash, Organic Impurities, Weight Per Cubic Foot,
PerAggregate Size......................................................................................................$400.00/ea.
Review of Mix Design Prepared by Others...........................................................................130.00/ea.
TrialBatch, ASTM C192 ...........................................................................................................900.00/ea.
Reinforcement
Reinforcing Steel ASTM A 615
Tensile Test, No. 11 Bar or Smaller........................................................................................ $50.00/ea.
Bend Test, No. 11 Bar or Smaller ..............................................................................................45.00/ea.
TensileTest, No. 14 Bar..............................................................................................................70.00/ea.
TensileTest, No. 18 Bar..............................................................................................................80.00/ea.
Receive and Distribute Mill Certificates ..................................................................................10.00/ea.
Welded Specimens
Tensile Test, Welded, No. 11 Bar or Smaller.........................................................................$50.00/ea.
Tensile Test, Welded, No. 14 Bar..............................................................................................80.00/ea.
Tensile Test, Welded, No. 18 Bar..............................................................................................80.00/ea.
Tensile Test, Mechanically Spliced Bar..................................................................................115.00/ea.
Nick Break, Welded Re-Bar.......................................................................................................30.00/ea.
Prestress (Attachments To Be Furnished by Client)
Tensile Test and Elongation In 24" for Prestress Strand, ASTM A 416 .............................$95.00/ea.
Tensile Test and Elongation In 10" for Prestressing Wire, ASTM A 421.............................50.00/ea.
Modules of Elasticity (Prestressing Wire)..............................................................................110.00/ea.
Resolution No. 11-090 — ITEM REMOVED FROM AGENDA - Page 16 of 21
EXHIBIT "C I
Aoloxmates
Basic Tests
Sieve Analysis - Processed (Each Sze), ASTM C 136 -......................................................$100.00/ea.
Sieve Analysis - Pit Run ........................................................................................................... 165.00/ea.
Specific Gravity, Coarse, ASTM C 127.....................................................................................95.00/ea.
Specific Gravity, Fine, ASTM C 128..........................................................................................95.00/ea.
Absorption, ASTM C 127, 128 ...................................................................................................50.00/ea.
Unit Weight Per Cubic Foot, ASTM C 29 ................................................................................55.00/ea.
Deleterious Materials
OrganicImpurities, ASTM C 40..............................................................................................$80.00/ea.
Clay Lumps and Friable Particles, ASTM C 142...................................................................115.00/ea.
Material Finer than No. 200 Sieve, ASTM C 117 ....................................................................65.00/ea.
Coal and Lignite, ASTM C 123................................................................................................115.00/ea.
SoftParticles, ASTM C 235.........................................................................................................80.00/ea.
AcidSolubility.............................................................................................................................40.00/ea.
Physical Properties
Soundness -Sodium or Magnesium (5 cycle), ASTM C 88...............................................$390.00/ea.
Abrasion (L.A. Rattler 100 & 500 cycles), ASTM C 131 .......................................................225.00/ea.
Potential Reactivity (Chemical Method 3 Determinations), ASTM C 289........................450.00/ea.
Potential Reactivity (Mortar Bar Method, ASTM C 227......................................................500.00/ea.
Percent Flat or Elongated Particles, CRD C 119.................................................................... 130.00/ea.
Percent Crushed Particles, Calif. 205...................................................................................... 105.00/ea.
State Tests
CleannessValue, CAL. 227....................................................................................................$130.00/ea.
DurabilityIndex,CAL. 229......................................................................................................195.00/ea.
Sand Equivalent (Average of 3), CAL. 217.........:....................................................................95.00/ea.
Clay by Hydrometer Methods, ASTM D 422....................
.....................:................................90.00/ea.
"R" (Resistance) Value, CAL. 301, ASTM D 2844..................................................................240.00/ea.
"R" (Resistance) Value, Lime Treated or Requiring Recombining.....................................280.00/ea.
Resolution No. 11-090— ITEM REMOVED FROM AGENDA- Page 17 of 21
EXHIBIT "Cl',
Asphaltic Concrete
Stability Tests
Hveem, Pre-Mixed, CAL. 304....................................................................................$290.00/ca.
Hveem, Lab-Mixed, CAL. 304.....................................................................................400.00/ea.
Marshall, Pre-Mixed, ASTM D 1,559...........................................................................290.00/ea.
Marshall, Lab-Mixed, ASTM D 1559..........................................................................400.00/ea.
Maximum Density
Hveem, Pre-Mixed, CAL. 304......................................................................................290.00/ea.
Hveem, Lab-Mixed, CAL. 304.....................................................................................400.00/ea.
Marshall, Pre-Mixed, ASTM D 1559...........................................................................290.00/ea.
Marshall, Lab-Mixed, ASTM D 1559..........................................................................400.00/ea.
Gradation on Extracted Sample (Including Wash) ..............................................................180.00/ea.
Maximum Theoretical Unit Weight (Rice Gravity) ASTM 204..........................................250.00/ea.
Complete Asphalt Concrete Mix Design (Hveem or Marshall)..........................................By Quote
Extraction, % Asphalt, ASTM D 2172 (Method B) or CAL.310
Excluding Ash Correction............................................................................................160.00/ea.
PenetrationASTM D ................................................................................................................720.00/ea.
AsphaltCore Density .................................................................................................................35.00/ea.
ACContent, CAL 382...............................................................................................................160.00/ea.
Masonry and Related Materials
Brick ASTM C 67
Modules of Rapture (Flexure) .................................................................................................$65.00/ea.
CompressiveStrength ................................................................................................................40.00/ea.
Absorption - 5 Hour or 24 Hour ...............................................................................................50.00/ea.
Boil, 1, 2 or 5 Hour ......................................................................................................................50.00/ea.
Initial Rate of Absorption...........................................................................................................40.00/ea.
Efflorescence ................................................................................................................................50.00/ea.
Dimensions, Overall, Coring, Shell and Web Thickness...................................................16.00/brick
Coefficient of Friction (Slip Test) ..............................................................................................30.00/ea.
Cores, Compression....................................................................................................................40.00/ea.
Cores, Shear, 6" and 8" Diameter, 2 Faces..............................................................................60.00/core
Concrete Block ASTM C 140
Moisture Content as Received.................................................................................................$40.00/ea.
Absorption....................................................................................................................................65.00/ea.
Compression................................................................................................................................70.00/ea.
Resolution No. 11-090 — ITEM REMOVED FROM AGENDA - Page 18 of 21
EXHIBIT «0155
Tension........................... .................................................... .........................................130.00/ea.
Shrinkage, Modified British, ASTIf C 426 ............................................................................ 100'.00,/ea.
Compression, 4,/6/8 Cores .........................................................................................................65.00/ea.
Masonry Prisms ASTM E 447
Compression Test, Grouted Prisms......................................................................................$150.00/ea.
CuttingPrisms ............................................................................................................................By Quote
Unreinforced Masonry Building Tests
In-Place Shear (Push) Tests.......................................................................................................By Quote
15 Degree Core Shear Tests.......................................................................................................By Quote
WallAnchors ..............................................................................................................................By Quote.
Mortar & Grout UBC Standard 24-22
Compression, 2" x 4" Mortar Cylinder...................................................................................$25.00/ea.
Compression, 3" x 6" Grout Prisms...........................................................................................25.00/ea.
Compression Test, 2" Cubes, ASTM C 109..............................................................................30.00/ea.
Gypsum Roof Fill ASTM C 495
CompressionTest......................................................................................................................$16.00/ea.
Density..........................................................................................................................................25.00/ea.
Gunite
Compression, 2, 4, 6" Cores, ASTM C 42...............................................................................$40.00/ea.
Roofing Tile
Roofing Tile Breaking Strength per U.B.C.............................................................................S25.00/ea.
RoofingTile Absorption.............................................................................................................40.00/ea.
Roofing Tile Additional/Special Tests.....................................................................................By Quote
Slate
Modules of Rupture.......................................................................:..........................................$50.00/ea.
Modulesof Elasticity ................................................................................................................ 130.00/ea.
WaterAbsorption........................................................................................................................ 50.00/ea.
Weathering................................................................................................................................... 65.00/ea.
Fireproofing Tests
Field Sampling by Technician .................................................................................................$75.00/hr.
OvenDry Density ............................................................................................................... 40.00/sample
Resolution No. 11-090— ITEM REMOVED FROM AGENDA- Page 19 of 21
EXHIBIT "Cl"
Miscellaneous and Speciait1l Testing
Testing Machines
Testing Machine with Operator in Laboratory
60,000 to 250,000 Machine (Compression Only)
30 Minutes including set-up time, Minimum ............................................................... $110.00
60 Minutes including set-up time, Minimum ................................................................. 160.00
400,000 Pound Machine (Universal)
30 Minutes including set-up time, Minimum ................................................................. 160.00
60 Minutes including set-up time, Minimum .................................................................225.00
LoadTests........................................................................................................................By Quote
Calibration of Skidmore-Wilhelm Device & Torque Wrench
Calibration of Skidmore-Wilhelm Device, in Lab...................................................................... $70.00
Calibration of Torque Wrench, each bolt size (3 Required)........................................................ 60.00
Calibration of Hydraulic Jacks
FirstJack ...........................................................................................................................................$70.00
Each Additional Jack (same time)....................................................................................... 60.00
Preparation of Electrical System for Test, each......................................................................By Quote
Note: Extra handling charges will be made on any ram or pump too heavy or
bulky for one man to safely lift.
API Gauge Calibration.............................................................................................................$90.00/ea.
HydrostaticTests.......................................................................................................................By Quote
Manhole Cover Tests
1-3 ..............................................................................................................................................$100.00/ea.
Morethan 3 ..................................................................................................................................85.00/ea.
Mechanical Testing Services
Tensile Test - No Strain Measurement, Yield by Halt of Dial
Upto 100,000 lb. ............................................................................................................$30.00/ea.
100,001 to 200,000 lb........................................................................................................45.00/ea.
Over200,000 lb., each ....................................................................................................By Quote
Tensile Test - Mechanical Non-Printout Extensometer for Strain .......................................30.00/ea.
Tensile Test - Electronic Extensometer with Recorded Printout.........................................50.00/test
Morethan 1 test..........................................................................................................................By Quote
Resolution No. 11-090— ITEM REMOVED FROM AGENDA- Page 20 of 21
EXHIBIT "Cl"
Load Tests, Flexural, Bend, Impact, Axial, Racking..............................................................By Quote
StrainGauge Testing..................................................................................................................By Quote
BendTest ......................................................................................................................................30.00/ea.
Note: Sockets furnished by client
Salt Spray
Set Up$195.00
24 Hours, per panel...........................................................................................................................40.00
Multi-Channel Computer Aided Data Acquisition of:
Acceleration ................................................................................................................................By Quote
Vibration......................................................................................................................................By Quote
Movements (1.0001 inch)...........................................................................................................By Quote
Pressure........................................................................................................................................By Quote
MachineControl Movement.....................................................................................................By Quote
Temperature................................................................................................................................By Quote
StrainGauge................................................................................................................................By Quote
StressAnalysis............................................................................................................................By Quote
Metals
Weld Procedure Qualification and Welder Qualification
WeldTensile Test......................................................................................................................$60.00/ea.
WeldBend Test............................................................................................................................33.00/ea.
Machining for Weld Test, 1/2" thickness and less..................................................................32.00/ea.
Machining for Weld Test, over 1/2" thickness.........................................................................47.00/ea.
Weld-Macro Etch.........................................................................................................................52.00/ea.
Weld-Fracture Test......................................................................................................................33.00/ea.
Weld-Radiographic....................................................................................................................By Quote
ReportCharge .............................................................................................................................45.00/ea.
Weld Procedures Qualifications ..............................................................................................By Quote
Resolution No. 11-090— ITEM REMOVED FROM AGENDA - Page 21 of 21