Loading...
HomeMy WebLinkAbout11-090 - Resolutions - (Item removed from 6-15-11 Agenda) "ITEM REMOVED FROM 6-15-11 AGENDA" RESOLUTION NO. 11-090 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING THE RENEWAL OF AGREEMENTS WITH NINYO & MOORE, SALEM ENGINEERING GROUP, INC. AND LEIGHTON CONSULTING, INC. FOR ANNUAL SOILS AND MATERIALS TESTING SERVICES FOR FY 2011/2012 FOR PROPOSED CAPITAL IMPROVEMENT PROJECTS THROUGHOUT THE CITY WHEREAS, Ninyo & Moore, Salem Engineering Group, Inc. and Leighton Consulting, Inc„ Contract No. 10-077, 10-078 and 10-079, respectively, were approved by City Council in Fiscal Year 2010/2011; and WHEREAS, the contracts may be extended for additional one-year periods, up to an additional two years, with mutual agreement of both parties; and WHEREAS, this is the first renewal year; and WHEREAS, Ninyo & Moore, Salem Engineering Group and Leighton Consulting, Inc., have requested renewal of their contracts; and WHEREAS, Salem Engineering Group and Leighton Consulting have requested an amendment to their contracts to include their current fee schedule, labeled Exhibit "C1" attached hereto, to increase the hourly rate for supported fees that reflect a reasonable cost-of-living increase. NOW, THEREFORE, the City Council of the City of Rancho Cucamonga, California, hereby resolves that said contracts are hereby renewed as amended, and the Mayor is authorized to sign this resolution. Please see the following page for formal adoption,certification and signatures PASSED, APPROVED, AND ADOPTED this 15`h day of June 2011. AYES: ------------------------- NOES: ------------------------- ABSENT: ------------------------- ABSTAINED: ------------------------- L. Dennis Michael, Mayor ATTEST: Janice C. Reynolds, City Clerk I, JANICE C. REYNOLDS, CITY CLERK of the City of Rancho Cucamonga, California, do hereby certify that the foregoing Resolution was duly passed, approved and adopted by the City Council of the City of Rancho Cucamonga, California, at a Regular Meeting of said City Council held on the 15`h day of June 2011. Executed this 16`h day of June 2011, at Rancho Cucamonga, California. Janice C. Reynolds, City Clerk Resolution No. 11-090 — ITEM REMOVED FROM AGENDA - Page 2 of 21 410 EXHIBIT "CV" L Ighton 2011 PROFESSIONAL FEE SCHEDULE* MSCOUNTED FOR CITY EBF RANCHO CUCAE tOhttt(GA. PROFESSIONAL SERVICES Technical Staff Hourly Rate Special Inspection/Technician-Materials..................................................................................................$68 Special Inspection/Technician-Materials—Welding, Masonry& Fabrication ............................................72 Special Inspection/Technician-Materials (Prevailing Wage).......................................................................77 Special InspectionfTechnician-Materials—Welding, Masonry& Fabrication (Prevailing Wage)...............81 Technician1................................................................................................................................................72 Technician11...............................................................................................................................................77 SeniorTechnician......................................................................................................................................81 Soil/Field Technician(Prevailing Wage).....................................................................................................84 Remediation System Operation & Maintenance Specialist........................................................................89 Materials Inspection Manager....................................................................................................................95 Staff Engineer/Geologist/Scientist/Field Supervisor................................................................................. 106 Senior Staff Engineer/Geologist/Scientist................................................................................................119 Project Engineer/Geologist/Scientist/Operations Manager......................................................................136 Senior Project Engineer/Geologist/Scientist.............................................................................................153 Associate.................................................................................................................................................170 Principal...................................................................................................................................................183 SeniorPrincipal........................................................................................................................................221 Technical Support Staff Hourly Rate Project Administrator/Word Processor........................................................... .....................................$66 InformationSpecialist.................................................................................................................................89 CADOperator............................................................................................................................................95 GISSpecialist .......................................................................................................................................... 106 Miscellaneous Hourly Rate Vehicleusage ..........................................................................................................................................$15 Effective at least through June 30, 2012, after which remaining work will be billed at then-current rates. Resolution No. 11-090 — ITEM REMOVED FROM AGENDA - Page 3 of 21 EXHIBIT "CI" Leighton 2011 Fee Schedule FIELD EQUIPMENT LIST Task Equipment, Supplies and Materials Unit Rate 8200 Box of 10 soil drive-sample rings $25 per day 9511 Mileage(current published IRS rate) IRS ratelmile 9512 Service Vehicle Usage 150 per day 9516 Brass Sample Tubes 10 each 9594 Caution Tape (1000-foot roll) 20 each 9575 Combination Lock or Padlock 11 each 9533 Consumables(gloves, rope, soap, tape, etc.) 35 per day 9564 Core Sample Boxes 11 each 9565 Cutoff Saws, reciprocating, electric(Saws-All) 75 per day 9566 D.C. Purging Pump, 3 gpm 30 per day 9517 Disposable Bailers 12 each 9567 Dissolved Oxygen Meter 45 per day 9555 DOT 55-gallon Containment Drum with lid 65 each 9597 Double-Ring Infiltrometer(ASTM D 3385-09)equipment 350 per day 9599 Electrical Resistivity Meter(Wenner array for in-situ measurements from the surface 80 per day 9569 Four Gas Meter 110 per day 9537 Generator, portable gasoline fueled, 3,500 watts 90 per day 9590 GPS Trimble Unit 75 per day 9531 Hand Auger 90 per day 9540 High-resolution Global Positioning System (GPS) unit(Trimble(D) 80 per day 9538 In-Situ Level Troll 500(each) 90 per day 9539 In-Situ Troll 9500 Low Flow Water Sampling Equipment 150 per day 9543 Level B Protection (per person) 400 per day 9544 Level C Protection (per person) 200 per day 9574 Magnahelic Gauges, each 15 per day 9547 Nitrile Gloves 20 per pair 9535 Nuclear Moisture and Density Gauge (licensed, calibrated,swipe tested) 88 per day 9522 pH/Conductivity/Temperature Meter 55 per day 9562 Photo-Ionization Detector(PID) 110 per day 9557 Pump,Typhoon 2 or 4 Stage 50 per day 9581 Slip/Threaded Cap, 2-inch or 4-inch diameter, PVC Schedule 40 15 each 9593 Safety Fence(100-foot roll) 50 per day 9525 Stainless Steel Bailer 40 per day 9526 Submersible Pump, 10 gpm, high powered Grunfos 2-inch with controller 160 per day 9527 Submersible Sump/Transfer Pump, 10-25 gpm 50 per day 9595 Survey/Fence Stakes 5 each 9585 TedlarOO Bags 18 each 9586 Traffic Cones(5525)/Barricades (single lane) 50 per day 9556 Tubing, clear vinyl 3/8-inch diameter .55¢ per foot 9528 Turbidity Meter 70 per day 9548 TyvekOO Suit(each) 18 each 9529 Vapor Sampling Box 45 per day 9588 Visqueen,6-mil, 20 feet x100 feet roll, 6-mil 75 per roll 9536 Water Level Indicator(electronic well sounder) 5300 feet deep well 60 per day 9598 Water Level Indicator Dual Phase 80 per day 9601 Manometer(Floor level measuring device using contained water) 80 per day 9602 Specialized Geotechnical Testing & Monitoring Equipment (site specific) Quote Upon Request 9600 SVE Thermal Oxidizer Quote Upon Request Resolution No. 11-090 — ITEM REMOVED FROM AGENDA- Page 4 of 21 � EXHIBIT "Cl" Leighton 12011 Fee Schedule UNIT RATE GEOTECHNICAL (SOILS) LABORATORY TESTING Task Classification and Index Properties Method Per Test 8002 Moisture Content ASTM D 2216 $20 8003 Moisture and Density(Ring Samples) ASTM D 2937 30 8004 Moisture Content& Density (Shelby tube or requires cutting) ASTM D 2937 40 8005 Atterberg Limits (3 points) ASTM D 4318 150 8006 Single Point/Non-plastic ASTM D 4318 84 8024 Atterberg Limits (Organic) ASTM D 2487 14318 182 8007 Visual classification of point as non-plastic ASTM D 2488 11 8008 Particle Size: Sieve ONLY(1 Y2-inch to#200) ASTM D 422 110 8023 Large Sieve(6-inch to#200) ASTM D 422/C136 175 8009 Hydrometer ONLY ASTM D 422 110 8010 Sieve + Hydrometer(53-inch sieve) ASTM D 422 185 8011 Dispersive Characteristics of Clay Soil (Double Hydrometer) ASTM D 4221 69 8012 Specific Gravity: Fine(passing#4) - ASTM D 854/CTM 207 125 8013 Coarse (retained on#4) ASTM C 127/CTM 206 100 8014 Total Porosity — On Shelby tube sample calculated from density&specific gravity 137 8015 Total Porosity — On other sample 105 8016 Photograph of sample 11 8017 Shrinkage Limits (Wax Method) ASTM D 4943 126 8018 Pinhole Dispersion ASTM D 4647 210 8020 Percent Passing#200 Sieve wash ONLY ASTM D1140 70 8021 As-Received Moisture and Density("chunk"or carved samples) 58 8022 Sand Equivalent(SE) ASTM D 2419/CTM 217 105 Soil Chemistry and Corrosivity Method Per Test 8050 pH CTM CA Test 532/643 $42 8051 Electrical Resistivity—single point—in-situ moisture 42 8052 Minimum Resistivity (>!3 moisture content points) CTM CA Test 532/643 89 8053 pH +Minimum Resistivity CTM CA Test 532/643 131 8054 Sulfate Content- Gravimetric CTM CA Test 417 Part II 68 8055 Sulfate Screen HACH kit 32 8056 Chloride Content CTM CA Test 422 68 8057 Corrosion Suite:pH, Chloride, Minimum Resistivity & Sulfate(gravimetric) CTM CA Test 532/643 245 8058 Organic Matter Content ASTM 2974 63 Shear Strength Method Per Test 8070 Pocket Penetrometer $16 8072 Direct Shear(3 points) Consolidated Undrained-0.05 in./min. ASTM D 3080 mod. 285 8073 Direct Shear(3 points) Consolidated Drained- <0.05 in./miry. ASTM D 3080 345 8074 Residual Shear(price per each additional pass after shear) EM 1110-2-1906-IXA 50 8075 Remolding or Hand Trimming of specimens (3 points) 90 8076 Oriented or Block Hand Trimming (per hour) 65/hour 8077 Daily equipment usage rate (after 2 days) 35/day 8079 Single Point Shear 105 8080 Torsional Shear 820 Compaction and Pavement Subgrade Tests Method Per Test 8094 Standard Proctor Compaction (Maximum Density), 4 points ASTM D 698 8092 4 inch diameter mold Methods A and B $182 8093 6 inch diameter mold Method C 215 Modified Proctor Compaction (Maximum Density),4 points ASTM D 1557-07 8100 4 inch diameter mold Methods A and B 220 8101 6 inch diameter mold Method C 245 8102 Check Point per point 65 N Resolution No. 11-090— ITEM REMOVED FROM AGENDA- Page 5 of 21 EXHIBIT 4cC175 Leighton 12011 Fee Schedule UNIT RATE GEOTECHNICAL (SOILS) LABORATORY TESTING (Continued) Task Compaction and Pavement Subgrade Tests (Continued) Method Per Test 8000 Relative Compaction of Untreated&Treated Soils&Aggregates CTM 216 S250 (Caltrans CTM 216: Caltrans wet density compaction curve) 8103 Relative Density(0.1 cubic foot mold) ASTM D 4253, D 4254 236 8104 California Bearing Ratio (CBR)—3 pointASTM D 1883 500 8105 — 1 point' 184 'Compaction (Maximum Density) should also be performed—not included in above prices 8090 R-Value—Untreated CTM 301 310 8091 R-Value—Lime or cement treated soils(<7%additive) CTM 301 338 Triaxial Tests Method Per Test 8120 Unconfined Compression Strength of Cohesive Soil (with stress/strain plot) ASTM D 2166 $135 8121 Unconsolidated Undrained Triaxial Compression Test on Cohesive Soils ASTM D 2850 16S (USACE Q test) (per confining stress) 8122 Consolidated Undrained Triaxial Compression Test for Cohesive Soils (CU, ASTM D 4767 375 USACE R-bar test)with Back Pressure Saturation & Pore Water Pressure Measurement(per confining stress) -- Consolidated Drained Triaxial Compression Test(CD, USACE S test)with EM 1110-2-1906(X) Volume Change Measurement(Price per soil type below) 8123 • Sand or silty sand soils (per confining stress) 375 8124 • Silt or clayey sand soils(per confining stress) 500 8125 • Clay soils (per confining stress) 705 8117 • Three-stage Triaxial Tests (sand or silty sand soils) 656 8118 • Three-stage Triaxial Tests (silt or clayey sand soils) 875 8119 • Three-stage Triaxial Tests (clay soils) 1,234 8169 Remolding of Test Specimens 65 Consolidation and Expansion/Swell Tests Method Per Test 8140 Consolidation (11 loads up to 16 ksf&unload to 0.25 with strain vs. ASTM D 2435 $195 load curve and one time-rate-of-consolidation curve) 8141 Each additional Time Curve 45 8142 Each additional load/unload w/o Time Reading 42 8143 Expansion Index(EI) ASTM D 4829-08 131 8145 Swell/Collapse Test—Method A (Up to 10 load/unloads w10 time curves) ASTM D 4546-A 289 8146 Single Load Swell/Collapse Test- Method B (Seat,load, and inundate only) ASTM D 4546-B 105 8148 Collapse Potential of Soils ASTM D 5333 220 Hydraulic Tests Method Per Test 8162 Triaxial Permeability in Flexible-Wall Permeameter with Backpressure EPA 9100/ASTM D 5084 $310 Saturation (at One Effective Stress) (Falling Head Method C) 8163 - Each Additional Effective Stress 121 8164 - Hand Trimming of Soil Samples for Horizontal K 58 8169 Remolding of Test Specimens 65 8174 Permeability of Granular Soils(Constant Head) ASTM D 2434 $135 Soil-Cement Method Per Test 8106 Moisture-Density Relations of Soil-Cement Mixtures ASTM D 558 $240 8107 Wet-Dry Durability of Soil-Cement Mixtures' ASTM D 559 1,205 8130 Compressive Strength of Molded Soil-Cement Cylinders' (per cylinder) ASTM D 1633 60 8161 Soil-Cement Remolded Specimen' (for shear strength, consolidation, etc.) 236 "Compaction (ASTM D 558 maximum density)should also be performed—not induded in above price Resolution No. 11-090— ITEM REMOVED FROM AGENDA - Page 6 of 21 EXHIBIT "Cl" Leighton 12011 Fee Schedule MATERIALS TESTING AND INSPECTION SCHEDULE OF SERVICES Task Technician Services Prevailing Wage" Non-Prevailing 6236 In-situ surface Wenner soil resistance test (including equipment) Quote upon request, site specific 6237 Pull-out Test on Embedded Bolts,Anchors and Dowels (including equipment) Quote upon request, site specific 6238 Earth Anchor Hold Down Test(4 hour, full load application with 5 tests minimum) Quote upon request, site-specific 6239 Earth Anchor Hold Down Test (Prelude/short term with full load) Quote upon request, site-specific 6240 Coring concrete, masonry or asphalt in the field Quote upon request, site-specific 6241 Sawing concrete, masonry or asphalt in the field Quote upon request, site-specific 6242 Pick-up and Delivery-(weekdays, per trip, <50 mile radius from Leighton office) 80 6232 Coring and Sizing (in house, at Leighton laboratories) 80 Task Concrete Strength Characteristics Method Per Test 7200 Concrete Cylinders (6-inch by 12-inch)- Compression ASTM C39 $25 7201 Gunite/Shotcrete Cores(laboratory coring and testing only) ASTM C 42 60 7202 Lightweight Fill Concrete (3-inch by 6-inch) ASTM C 495 30 7203 Compression, Concrete or Masonry Cores (testing only) <-6-inch diameter ASTM C 42 40 7220 Trimming concrete cores(per core) 20 7204 Splitting Tensile-6-inch by 12-inch cylinder ASTM C 496 50 7205 Flexural Strength of Concrete (Simple Beam with 3rd pt. Loading) ASTM C 78 65 7206 Mix Design, Determination of Proportions 250 7207 Mix Design, Review of Existing 150 7208 Laboratory Trial Batch with Slump, Unit Weight&Air Content ASTM C 192 457 7209 6-inch by 12-inch Cylinder, Make and Test(lab trial batch) ASTM C 192 25 7210 3-inch by 6-inch Grout Prisms, Make and Test(lab trial batch) ASTM C 192 25 7211 6-inch by 6-inch Flexural Beams, Make and Test(lab trial batch) ASTM C 192 65 7213 Cylinder molds,6-inch by 12-inch,2-inch by 4-inch when not used with testing 3 7214 Unit Weight of Hardened Light weight Concrete ASTM C 567 50 7215 Rapid Cure Concrete Cylinders (Boil Method) ASTM C 684 50 7216 Drying Shrinkage (Four Readings, up to 90 days, 3 bars) ASTM C157 400 7217 Modulus of Elasticity/Poisson's Ratio 3-inch by 6-inch cores ASTM C 469 350 7376 Flexural Strength of Concrete(simple beam w/center point loading)t CTM 523 65 Task Aggregate Properties Method Per Test 7240 Sieve Analysis of Fine and Coarse Aggregate ASTM C 136 $135 7241 Sieve Analysis-Finer than#200 (Wash) ASTM C 117 90 7242 LA Rattler-Smaller Coarse Aggregate< ASTM C 131 165 7243 LA Rattler-Larger Coarse Aggregate> ASTM C 535 190 7244 Soundness Magnesium ASTM C 88 225 7249 Soundness Sodium 650 7245 Organic Impurities ASTM C40 90 7246 Clay Lumps, Friable Particles ASTM C 142 175 7370 Soil&Aggregate Preparation& Sieve(Fine & Coarse Aggregate))K CTM 201 & 202 265 7373 Grading& Specific Gravity Calculation t CTM 105 80 7247 Durability Index CTM 229 200 7248 Cleanness Value of Coarse Aggregate CTM 227 210 7250 Unit Weight of Aggregate CTM 212 (modified 5/10) 50 Resolution No. 11-090 — ITEM REMOVED FROM AGENDA - Page 7 of 21 " '/ EXHIBIT "c l" Leighton 2011 Fee Schedule MATERIALS TESTING AND INSPECTION SCHEDULE OF SERVICES (Continued) Task Masonry Method Per Test 7260 Mortar Cylinders(2-inch by 4-inch) ASTM C 780 $25 7261 Mortar Cubes (2-inch by 2-inch) ASTM C 109 25 7262 Grout Prisms(3-inch by 6-inch) ASTM C 1019 25 7263 Concrete or Masonry Cores Compression,56-inch diameter(Testing Only) ASTM C 42 40 7264 CMU Compression (3 required)to size 8-inch by 8-inch by 16-inch ASTM C 140 45 7265 CMU Compression (3 required)greater than 8-inch by 8-inch by 16-inch ASTM C 140 50 7266 CMU Moisture Content,Absorption& Unit Weight (6 required) ASTM C 140 40. 7267 Masonry efflorescence (5 required) ASTM C 67 40 7268 CMU Linear Drying Shrinkage ASTM C 426 175 7269 CMU Grouted Prisms (compression test<-8 inch by 8-inch by 16-inch) ASTM E 447 180 7280 CMU Grouted Prisms (compression test>8-inch by 8-inch by 16-inch) ASTM E 447 250 7281 Masonry Core-Shear Title 24 (fest Only) 70 7283 Specimen Prep(Sample by others) 50 7284 CMU width, depth and face shell measurements 40 Task Brick Method Per Test 7290 Compression (5 required) ASTM C 67 $40 7291 Modulus of Rupture(5 required) ASTM C67 40 7292 Absorption, Soak(5 required) ASTM C67 40 7293 Absorption, Boil (5 required) ASTM C 67 50 7294 Absorption, Saturation Coefficient(5 required) ASTM C 67 50 7295 Initial Rate of Absorption(5 required) ASTM C 67 40 7296 Efflorescence(5 required) ASTM C 67 55 7297 Efflorescence with Mortar(5 required) ASTM C 67 65 Task Steel Reinforcement Method Per Test 7300 Tensile Test, Up to No. 10 ASTM A 370 $45 7301 Tensile Test, No. 11 and over ASTM A 370 100 7302 Bend Test, Up to No. 11 ASTM A 370 45 Task Structural Steel Method Per Test 7310 Tensile Strength, 5100,000 pounds axial load ASTM A 370 $45 7311 Tensile Strength, 100,000 to 200,000 pounds axial load ASTM A 370 60 7312 Bend Test - ASTM A 370 40 7313 Pipe Flattening Test ASTM A 370 Quote 7314 Machining and Preparation of Samples ASTM A 370 Quote 7315 Brinell&Rockwell Hardness Test ASTM A 370 55 7316 Chemical Analysis, Carbon and Low Alloy Steel Quote Task Pre-stressing Method Per Test 7320 Prestressing Wire, Tension (stress vs. strain plot) ASTM A 416 $150 7321 Sample Preparation (cutting) 50 7322 Prestressing cable, 7 wire (Breaking strength/Modulus of Elasticity) ASTM A 416 190 Task Weld Procedure and Welder Qualifications Rate 7330 Weld Tensile Test 50 each 7331 Weld Bend Test 40 each 7332 Weld Macro-Etch 60 each 7333 Bolt Tensile Test 50 each 7334 Bolt, Nut or Washer Hardness Test 50 each 7335 Bold Elastic Proof Load Test 50 each Task Fireproofing Method Per Test 7340 Unit Weight(Density) ASTM E 605-93 $60 Resolution No. 11-090 — ITEM REMOVED FROM AGENDA - Page 8 of 21 EXHIBIT "CI" Leighton 12011 Fee Schedule MATERIALS TESTING AND INSPECTION SCHEDULE OF SERVICES (Continued) Task Asphalt Concrete, Specimen Testing Method Per Test .7350 Extraction, Percent Asphalt and Gradation, Centrifuge ASTM D 2172/C 136 $195 7351 Extraction &Percent Asphalt(only), Centrifuge - - ASTM D 2172 155 7355 Extraction and Gradation Only, Centrifuge ASTM D 21721C 136 175 7358 Extraction by ignition oven, percent asphalt and gradation CTM 382/CTM 202 200 7352 Bulk Specific Gravity-Molded Specimen or Cores ASTM D 1188 55 7353 Maximum Density -Hveem CTM 308 125 7359 Theoretical Maximum Density and Specific Gravity of HMA ("Rice') CTM 309 (10/2010) 130 7354 Stabilometer Value CTM 366 - 265 7357 Bituminous Mixture Preparation CTM 304 80 7377 Moisture Content of Asphalt t CTM 370 60 7378 Sampling Highway Materials/Products (Roadway Structural Sections) t CTM 125 Quote 7379 Extraction by Ignition Oven CTM 382 (8/2003) 150 Rubberized Asphalt add 25% Task Mix Design/Control Method Per Test 7350 Mix Design-Hveem Including Aggregate Tests per Design -ASTM D 1560/CTM 366 Quote 7361 Mix Design-Marshall Including Aggregate Tests per Design - ASTM D 1559 Quote 7362 Field Mix- Hveem Stability per point ASTM D 1560/CTM 366 $200 7363 Field Mix- Marshall Stability per point ASTM D 1559 200 Task Moisture Vapor Emission Rate (MVER)Test Method Per Test 6325 Moisture Test Kit(excludes labor to perform test) ASTM E 1907 $60 Task Other Services Method Rate 6260 Non-Destructive Testing (NDT) ANSI $92 hour 6259 Radiographic Testing Quote 6270 ProjectCloseout 215/hour T soil t material xc soil &materials " Resolution No. 11-090 — ITEM REMOVED FROM AGENDA- Page 9 of 21 «/ EXHIBIT "Cl" Leighton 12011 Fee Schedule TERMS AND CONDITIONS Overtime: Overtime for field personnel will be charged at 1.5 times basic hourly rates when exceeding 8 hours up to 12 hours per 24 hour interval, and 2 times basic hourly rates when exceeding 12 hours in 24 hours or on Sunday, and 3 times basic hourly rates on California official holidays. Expert Witness Time: Expert witness deposition and testimony will be charged at 2 times hourly rates listed on the previous pages, with a minimum charge of four hours per day. Minimum Hourly Charges for Geotechnical and Environmental Technicians (field time only). 1. Monday-Friday.......................................................................................................... 2 hours 2. Saturday and Sunday........................... ............ ...................................................... 4 hours Minimum Hourly Charges for Special Inspectors or Material Testing Field Services (field time only): 1. Cancellation of inspections not canceled by 4:00 p.m. on preceding day".............. 2 hours 2. One-half working day or less except as No. 3 (below) applies................................. 4 hours 3. Over one-half working day, or begins before noon and extends into afternoon ...... 8 hours 'No charge if cancellation is made before 4:00 p.m. of the preceding work day. Outside Direct Costs (ODCs): Heavy equipment, subcontractor fees and expenses, project-specific permits and/or licenses, project-specific supplemental insurance, travel, subsistence, project-specific parking charges, shipping, reproduction, and other reimbursable expenses will be invoiced at cost plus 20%, unless billed directly to and paid by client. insurance and Limitation of Liability: These rates are predicated on standard insurance coverage and a limit of Leighton's liability equal to our total fees for a given project. Invoicing: Invoices are rendered monthly, payable upon receipt in United States dollars. A service charge of 11,/z-percent per month will be charged for late payment. Proposal Expiration: Proposals are valid for at least 30 days, subject to chane after 30 days; unless otherwise stated in the attached proposal. Fees are subject to change on January 1s. of every year. Client Disclosures: Client agrees to provide all information in Client's possession about actual or possible presence of buried utilities and hazardous materials on the project site, prior to fieldwork, and agrees to reimburse Leighton for all costs related to unanticipated discovery of utilities and/or hazardous materials. Client is also responsible for providing safe and legal access to the project site for all Leighton field personnel. Earth Material Samples: Quoted testing unit rates are for soil and/or rock (earth) samples free of hazardous materials. Additional costs will accrue beyond these standard testing unit rates for handling, testing and/or disposing of soil and/or rock containing hazardous materials. Hazardous materials will be returned to the site or the site owner's designated representative at additional cost not included in listed unit rates. Standard turn-around time for geotechnical-laboratory test results is 10 working days. Samples will be stored for 2 months, after which they will be discarded. Prior documented notification is required if samples need to be stored for a longer time. A monthly storage fee of $10 per bag and $5 per sleeve or tube will be applied. Quoted unit rates are only for earth materials sampled in the United States. There may be additional cost for handling imported samples. Construction Material Samples: After all designated 28-day breaks for a given set meet specified compressive or other client-designated strength, all "hold" cylinders or specimens will be automatically disposed of, unless specified in writing prior to the 28-day break. All other construction materials will be disposed of after completion of testing and reporting. Resolution No. 11-090 — ITEM REMOVED FROM AGENDA - Page 10 of 21 EXHIBIT "C I" SALEM ENGINEERING GROUP, INC. 2011 Prevailing Wage Fee Schedule Resolution No. 11-090 — ITEM REMOVED FROM AGENDA - Page 11 of 21 EXHIBIT "CIO' PREVAILING WAGE FEE SCHEDULE FOR PROFESSIONAL & TECHNICAL SERVICES Professional PrincipalEngineer...................................................................................................................$125.00/hr. Registered Senior Engineer...................................................................................................... 115.00/hr. RegisteredGeologist................................................................................................................. 105.00/hr. Certified Asbestos Inspector/Manager.....................................................................................95.00/hr. Project Engineer/Manager..........................................................................................................95.00/hr. ProjectGeologist..........................................................................................................................95.00/hr. Chemist.........................................................................................................................................90.00/hr. Environmental Specialist............................................................................................................90.00/hr. Project Administration & Analysis...........................................................................................75.00/hr. Field Engineer/Inspector............................................................................................................85.00/hr. FieldGeologist.............................................................................................................................85.00/hr. Technical Engineering Technician............................................................................................................$69.00/hr. Environmental Technician.........................................................................................................69.00/hr. AutoCad/Engineering Technician ............................................................................................65.00/hr. Support Clerical ................................................................................................................................$45.00/Report Subsistence .............................................................................................................................. $85.00/day Expert Witness DocumentReview ..................................................................................................................$175.00/hr. Expert Witness Testimony/Deposition ...............................................................................$225.00/hr. Resolution No. 11-090 — ITEM REMOVED FROM AGENDA - Page 12 of 21 EXHIBIT "CP ENVIlEC)NJ IE>t�TAL SERN710ES Asbestos Consultation and Analysis Asbestos Project Manager......................................................................................................$I10.00/hr. AsbestosTechnician....................................................................................................................85.00/hr. Analyze for Asbestos per EPA (PLM) Procedures......................................................... 35.00/sample Consult for Asbestos Abatement.............................................................................................By Quote Wells Groundwater Monitoring Well Installations .........................................................................By Quote Groundwater Extraction Well..................................................................................................By Quote Vapor Monitoring Well Installation........................................................................................By Quote VaporPoint Installation............................................................................................................By Quote VaporExtraction Well ...............................................................................................................By Quote Environmental Drilling, Exploration, Travel Light Duty Drilling (continuous flight auger by Mobile Drill Minutemanor Giddings) ...........................................................................................$155.00/hr. Drilling (continuous flight, hollow stem auger or rotary wash, w/2 operators) CME 45 Drill Rig (truck mounted) ............................................................................. 175.00/hr. CME 55 Drill Rig (truck mounted) ............................................................................. 185.00/hr. Mobile Drill B-61/HDX Drill Rig (truck mounted)................................................... 185.00/hr. Mileage (support vehicles)............................................................................................ 00.50/mi. Mileage (drill rig) ........................................................................................................... 00.80/mi. Other Equipment & Services Rates Sample Container Charge: Stainless Steel Tube (including caps, Teflon/aluminum foil, labels, etc.) .............$10.00/ea. 6" Brass Sleeves (including caps, Teflon/aluminum foil, labels, etc.)........................5.00/ea. PersonalProtective Equipment................................................................................................By Quote Hydropunch I1 Screen/Points/Seals.........................................................................................By Quote Moss Wire Line Continuous Core Soil Sampler................................................................. 300.00/day Steam Cleaner or Pressure Washer....................................................................................... 125.00/day MagneticCable Locator.............................................................................................................By Quote PhotoionizationDetector ....................................................................................................... 100.00/day Hermit 2000 Datalogger Aquifer Testing Equipment...........................................................By Quote Magnetometer.............................................................................................................................By Quote Electromagnetometer.................................................................................................................By Quote Clean-up/Remedial Equipment ...............................................................................................By Quote Chemical Analysis of Soil and Groundwater Samples.........................................................By Quote Resolution No. 11-090 — ITEM REMOVED FROM AGENDA - Page 13 of 21 GEOTECHNICAL SERVICES EXHIBIT "CI?. Soils - Foundations - Geology Exploratory Drilling, Sampling, and Travel Light Duty Drilling (continuous flight auger by Mobile Drill Minuteman or Giddings operator only) ...........................$155.00/hr. Drilling (continuous flight, hollow stem auger or rotary wash, w/2 operators) CME 45 Drill Rig (truck mounted) ............................................................................. 175.00/hr. CME 55 Drill Rig truck mounted .................................................... 185.00/hr. Mobile Drill B-61/HDX Drill Rig (truck mounted)................................................... 185.00/hr. Mileage (support vehicles)............................................................................................ 00.50/mi. Mileage drill rig) .................................................................. 00.80/mi. Laboratory Tests Sieve Analysis, Coarse, ASTM C 136 ...................................................................................$160.00/ea. Fine (including wash), ASTM C 137, C 177...........................................................................95.00/ea. Hydrometer Analysis, ASTM D 422.........................................................................................90.00/ea. Specific Gravity, Bulk SSD, Coarse, ASTM C 127, C 117..................................................... 115.00/ea. Fine, ASTM C 128.................................................................................................................... 195.00/ea. Atterberg Limits, ASTM D 4318.............................................................................................. 160.00/ea. Moisture-Density Relations of Soils, ASTM D 698, D 1557, State 216............................... 175.00/ea. Consolidation Test ASTM D 2435...........................................................................................225.00/ea. Triaxial Compression Test, ASTM D 2850 Unconsolidated, Undrained ........................................................................................235.00/ea. Consolidated, Undrained.............................................................................................325.00/ea. Consolidated, Undrained with Pore Pressure ..........................................................500.00/ea. Unconfined Compression Test, ASTM D 2166 .......................................................................85.00/ea. ExpansionIndex, UBC-29-2..................................................................................................... 195.00/ea. Direct Shear Test, ASTM D 3080 Consolidated, Drained, 3 points .................................................................................215.00/ea. Permeability, Constant Falling Head, ASTM 2434...............................................................225.00/ea. Permeability, Falling Head/Flexible Wall (ASTM D5084), 1.4"-4.. .................................... 325.00 ea. Permeability, Falling Head/Flexible Wall (ASTM D5084), 6.. ............................................ 450.00 ea. Permeability, Falling Head/Flexible Wall (ASTM D5084), 12.. .......................................... 750.00 ea. PermeabilitySample Remold.................................................................................................... 40.00 ea. SulfateContent............................................................................................................................40.00/ea. "R" (Resistance) Value, Cal. 301, ASTM D 2844....................................................................240.00/ea. "R" (Resistance) Value, Lime Treated or Requiring Recombining.....................................280.00/ea. California Bearing Ratio, ASTM D 1883 ................................................................................650.00/ea. Plate Bearing Test, ASTM D 1195, D 1196..............................................................................By Quote IndexTests not Listed................................................................................................................By Quote Resolution No. 11-090 — ITEM REMOVED FROM AGENDA- Page 14 of 21 EXHIBIT -C I„ CONSTRUCTION TESTING kND INSPECTION SERVICES Administrative EngineeringReviecv................................................................................................................$115.00/hr. ReportPreparation................................................................................................................45.00/report job Site Inspection SoilCompaction ........................................................................................................................$69.00/hr. Masonry, Concrete, Gunite, Epoxy...........................................................................................69.00/hr. Structural Steel, Welding, Bolt Torque.....................................................................................69.00/hr. Pile Driving, Soldier Beams, Shoring, Caissons..................................................................$110.00/hr. Build-up Roofing, Fire Proofing................................................................................................69.00/hr. Plant Inspection Structural Steel Fabrication......................................................................................................$69.00/hr. ConcreteBatch Plant...................................................................................................................69.00/hr. Pipe Plant (Reinforced Concrete, Clay, etc).............................................................................69.00/hr. Glue-Laminated Fabrication (Local).........................................................................................69.00/hr. AsphaltBatch Plant.................................................................4...................................................69.00/hr. Nondestructive Examination Ultrasonic, Magnetic Particle, Dye Penetrant........................................................................By Quote Radiographic..............................................................................................................:................By Quote Pachometer..................................................................................................................................By Quote SchmidtHammer.......................................................................................................................By Quote Coring Technicianand Equipment....................................................................................................$130.00/hr. BitCharge.................................................................................................................................... 7.00/inch Resolution No. 11-090 — ITEM REMOVED FROM AGENDA- Page 15 of 21 EXHIBIT "CI,S Concrete Cylinder, Beams S Cores Compression Test, 6" x 12" Cvlinders, Including Hold, ASTM C 39 (set of 4)...............$100.00/set Compression Test, Cores, ASTM C 42 (Does Not Include Special Prep. time)..................50.00/ea. Core Cutting (In Laboratory).....................................................................................................40.00/ea. Flexure Test, 6" x 6" Beams, ASTM C 78 ..................................................................................95.00/ea. Splitting Tensile, 6" x 12" Cylinders, .ASTM C 496 .................................................................50.00/ea. Modules of Elasticity Test - Static, ASTM C 469.....................................................................85.00/ea. Unit Weight Determination.......................................................................................................25.00/ea. Shrinkage Length Change (3 Beams, 4 Readings, Up to 90 Days), ASTM C 157 Modified.................. $260.00 Additional Reading...............................................................................................30.00/3 bar set Storage Over 90 days, Per set of 3 Beams .........................................................................20.00/month Mix Design Aggregate Tests for Concrete Mix Designs Only, Including Sieve Analysis, Specific Gravity, No. 200 Wash, Organic Impurities, Weight Per Cubic Foot, PerAggregate Size......................................................................................................$400.00/ea. Review of Mix Design Prepared by Others...........................................................................130.00/ea. TrialBatch, ASTM C192 ...........................................................................................................900.00/ea. Reinforcement Reinforcing Steel ASTM A 615 Tensile Test, No. 11 Bar or Smaller........................................................................................ $50.00/ea. Bend Test, No. 11 Bar or Smaller ..............................................................................................45.00/ea. TensileTest, No. 14 Bar..............................................................................................................70.00/ea. TensileTest, No. 18 Bar..............................................................................................................80.00/ea. Receive and Distribute Mill Certificates ..................................................................................10.00/ea. Welded Specimens Tensile Test, Welded, No. 11 Bar or Smaller.........................................................................$50.00/ea. Tensile Test, Welded, No. 14 Bar..............................................................................................80.00/ea. Tensile Test, Welded, No. 18 Bar..............................................................................................80.00/ea. Tensile Test, Mechanically Spliced Bar..................................................................................115.00/ea. Nick Break, Welded Re-Bar.......................................................................................................30.00/ea. Prestress (Attachments To Be Furnished by Client) Tensile Test and Elongation In 24" for Prestress Strand, ASTM A 416 .............................$95.00/ea. Tensile Test and Elongation In 10" for Prestressing Wire, ASTM A 421.............................50.00/ea. Modules of Elasticity (Prestressing Wire)..............................................................................110.00/ea. Resolution No. 11-090 — ITEM REMOVED FROM AGENDA - Page 16 of 21 EXHIBIT "C I Aoloxmates Basic Tests Sieve Analysis - Processed (Each Sze), ASTM C 136 -......................................................$100.00/ea. Sieve Analysis - Pit Run ........................................................................................................... 165.00/ea. Specific Gravity, Coarse, ASTM C 127.....................................................................................95.00/ea. Specific Gravity, Fine, ASTM C 128..........................................................................................95.00/ea. Absorption, ASTM C 127, 128 ...................................................................................................50.00/ea. Unit Weight Per Cubic Foot, ASTM C 29 ................................................................................55.00/ea. Deleterious Materials OrganicImpurities, ASTM C 40..............................................................................................$80.00/ea. Clay Lumps and Friable Particles, ASTM C 142...................................................................115.00/ea. Material Finer than No. 200 Sieve, ASTM C 117 ....................................................................65.00/ea. Coal and Lignite, ASTM C 123................................................................................................115.00/ea. SoftParticles, ASTM C 235.........................................................................................................80.00/ea. AcidSolubility.............................................................................................................................40.00/ea. Physical Properties Soundness -Sodium or Magnesium (5 cycle), ASTM C 88...............................................$390.00/ea. Abrasion (L.A. Rattler 100 & 500 cycles), ASTM C 131 .......................................................225.00/ea. Potential Reactivity (Chemical Method 3 Determinations), ASTM C 289........................450.00/ea. Potential Reactivity (Mortar Bar Method, ASTM C 227......................................................500.00/ea. Percent Flat or Elongated Particles, CRD C 119.................................................................... 130.00/ea. Percent Crushed Particles, Calif. 205...................................................................................... 105.00/ea. State Tests CleannessValue, CAL. 227....................................................................................................$130.00/ea. DurabilityIndex,CAL. 229......................................................................................................195.00/ea. Sand Equivalent (Average of 3), CAL. 217.........:....................................................................95.00/ea. Clay by Hydrometer Methods, ASTM D 422.................... .....................:................................90.00/ea. "R" (Resistance) Value, CAL. 301, ASTM D 2844..................................................................240.00/ea. "R" (Resistance) Value, Lime Treated or Requiring Recombining.....................................280.00/ea. Resolution No. 11-090— ITEM REMOVED FROM AGENDA- Page 17 of 21 EXHIBIT "Cl', Asphaltic Concrete Stability Tests Hveem, Pre-Mixed, CAL. 304....................................................................................$290.00/ca. Hveem, Lab-Mixed, CAL. 304.....................................................................................400.00/ea. Marshall, Pre-Mixed, ASTM D 1,559...........................................................................290.00/ea. Marshall, Lab-Mixed, ASTM D 1559..........................................................................400.00/ea. Maximum Density Hveem, Pre-Mixed, CAL. 304......................................................................................290.00/ea. Hveem, Lab-Mixed, CAL. 304.....................................................................................400.00/ea. Marshall, Pre-Mixed, ASTM D 1559...........................................................................290.00/ea. Marshall, Lab-Mixed, ASTM D 1559..........................................................................400.00/ea. Gradation on Extracted Sample (Including Wash) ..............................................................180.00/ea. Maximum Theoretical Unit Weight (Rice Gravity) ASTM 204..........................................250.00/ea. Complete Asphalt Concrete Mix Design (Hveem or Marshall)..........................................By Quote Extraction, % Asphalt, ASTM D 2172 (Method B) or CAL.310 Excluding Ash Correction............................................................................................160.00/ea. PenetrationASTM D ................................................................................................................720.00/ea. AsphaltCore Density .................................................................................................................35.00/ea. ACContent, CAL 382...............................................................................................................160.00/ea. Masonry and Related Materials Brick ASTM C 67 Modules of Rapture (Flexure) .................................................................................................$65.00/ea. CompressiveStrength ................................................................................................................40.00/ea. Absorption - 5 Hour or 24 Hour ...............................................................................................50.00/ea. Boil, 1, 2 or 5 Hour ......................................................................................................................50.00/ea. Initial Rate of Absorption...........................................................................................................40.00/ea. Efflorescence ................................................................................................................................50.00/ea. Dimensions, Overall, Coring, Shell and Web Thickness...................................................16.00/brick Coefficient of Friction (Slip Test) ..............................................................................................30.00/ea. Cores, Compression....................................................................................................................40.00/ea. Cores, Shear, 6" and 8" Diameter, 2 Faces..............................................................................60.00/core Concrete Block ASTM C 140 Moisture Content as Received.................................................................................................$40.00/ea. Absorption....................................................................................................................................65.00/ea. Compression................................................................................................................................70.00/ea. Resolution No. 11-090 — ITEM REMOVED FROM AGENDA - Page 18 of 21 EXHIBIT «0155 Tension........................... .................................................... .........................................130.00/ea. Shrinkage, Modified British, ASTIf C 426 ............................................................................ 100'.00,/ea. Compression, 4,/6/8 Cores .........................................................................................................65.00/ea. Masonry Prisms ASTM E 447 Compression Test, Grouted Prisms......................................................................................$150.00/ea. CuttingPrisms ............................................................................................................................By Quote Unreinforced Masonry Building Tests In-Place Shear (Push) Tests.......................................................................................................By Quote 15 Degree Core Shear Tests.......................................................................................................By Quote WallAnchors ..............................................................................................................................By Quote. Mortar & Grout UBC Standard 24-22 Compression, 2" x 4" Mortar Cylinder...................................................................................$25.00/ea. Compression, 3" x 6" Grout Prisms...........................................................................................25.00/ea. Compression Test, 2" Cubes, ASTM C 109..............................................................................30.00/ea. Gypsum Roof Fill ASTM C 495 CompressionTest......................................................................................................................$16.00/ea. Density..........................................................................................................................................25.00/ea. Gunite Compression, 2, 4, 6" Cores, ASTM C 42...............................................................................$40.00/ea. Roofing Tile Roofing Tile Breaking Strength per U.B.C.............................................................................S25.00/ea. RoofingTile Absorption.............................................................................................................40.00/ea. Roofing Tile Additional/Special Tests.....................................................................................By Quote Slate Modules of Rupture.......................................................................:..........................................$50.00/ea. Modulesof Elasticity ................................................................................................................ 130.00/ea. WaterAbsorption........................................................................................................................ 50.00/ea. Weathering................................................................................................................................... 65.00/ea. Fireproofing Tests Field Sampling by Technician .................................................................................................$75.00/hr. OvenDry Density ............................................................................................................... 40.00/sample Resolution No. 11-090— ITEM REMOVED FROM AGENDA- Page 19 of 21 EXHIBIT "Cl" Miscellaneous and Speciait1l Testing Testing Machines Testing Machine with Operator in Laboratory 60,000 to 250,000 Machine (Compression Only) 30 Minutes including set-up time, Minimum ............................................................... $110.00 60 Minutes including set-up time, Minimum ................................................................. 160.00 400,000 Pound Machine (Universal) 30 Minutes including set-up time, Minimum ................................................................. 160.00 60 Minutes including set-up time, Minimum .................................................................225.00 LoadTests........................................................................................................................By Quote Calibration of Skidmore-Wilhelm Device & Torque Wrench Calibration of Skidmore-Wilhelm Device, in Lab...................................................................... $70.00 Calibration of Torque Wrench, each bolt size (3 Required)........................................................ 60.00 Calibration of Hydraulic Jacks FirstJack ...........................................................................................................................................$70.00 Each Additional Jack (same time)....................................................................................... 60.00 Preparation of Electrical System for Test, each......................................................................By Quote Note: Extra handling charges will be made on any ram or pump too heavy or bulky for one man to safely lift. API Gauge Calibration.............................................................................................................$90.00/ea. HydrostaticTests.......................................................................................................................By Quote Manhole Cover Tests 1-3 ..............................................................................................................................................$100.00/ea. Morethan 3 ..................................................................................................................................85.00/ea. Mechanical Testing Services Tensile Test - No Strain Measurement, Yield by Halt of Dial Upto 100,000 lb. ............................................................................................................$30.00/ea. 100,001 to 200,000 lb........................................................................................................45.00/ea. Over200,000 lb., each ....................................................................................................By Quote Tensile Test - Mechanical Non-Printout Extensometer for Strain .......................................30.00/ea. Tensile Test - Electronic Extensometer with Recorded Printout.........................................50.00/test Morethan 1 test..........................................................................................................................By Quote Resolution No. 11-090— ITEM REMOVED FROM AGENDA- Page 20 of 21 EXHIBIT "Cl" Load Tests, Flexural, Bend, Impact, Axial, Racking..............................................................By Quote StrainGauge Testing..................................................................................................................By Quote BendTest ......................................................................................................................................30.00/ea. Note: Sockets furnished by client Salt Spray Set Up$195.00 24 Hours, per panel...........................................................................................................................40.00 Multi-Channel Computer Aided Data Acquisition of: Acceleration ................................................................................................................................By Quote Vibration......................................................................................................................................By Quote Movements (1.0001 inch)...........................................................................................................By Quote Pressure........................................................................................................................................By Quote MachineControl Movement.....................................................................................................By Quote Temperature................................................................................................................................By Quote StrainGauge................................................................................................................................By Quote StressAnalysis............................................................................................................................By Quote Metals Weld Procedure Qualification and Welder Qualification WeldTensile Test......................................................................................................................$60.00/ea. WeldBend Test............................................................................................................................33.00/ea. Machining for Weld Test, 1/2" thickness and less..................................................................32.00/ea. Machining for Weld Test, over 1/2" thickness.........................................................................47.00/ea. Weld-Macro Etch.........................................................................................................................52.00/ea. Weld-Fracture Test......................................................................................................................33.00/ea. Weld-Radiographic....................................................................................................................By Quote ReportCharge .............................................................................................................................45.00/ea. Weld Procedures Qualifications ..............................................................................................By Quote Resolution No. 11-090— ITEM REMOVED FROM AGENDA - Page 21 of 21