HomeMy WebLinkAbout11-112 - Resolutions RESOLUTION NO. 11-112
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
RANCHO CUCAMONGA AMENDING ELECTRIC RATES,
FEES AND CHARGES PURSUANT TO THE REQUIREMENTS
AND AUTHORITY OF CHAPTER 3.46 OF TITLE 3 OF THE
RANCHO CUCAMONGA MUNICIPAL CODE
A. Recitals.
1. The City Council of the City of Rancho Cucamonga has previously adopted Chapter
3.46 of Title 3 of the Rancho Cucamonga Municipal Code establishing Electricity
Service Rules and Regulations and authorizing that the rates, fees and charges
arising, directly or indirectly, under said legislation be adopted pursuant to resolution,
and thereafter, be amended from time to time by resolution.
2. City staff has prepared a comprehensive schedule of the rates, fees and charges
that reflect the reasonable and prudent costs relating to the acquisition and
distribution of electric power to retail customers and are recommending that the City
Council adopt the recommended fees. These rates do not present the City an
opportunity to achieve profits or to impose charges in excess of the costs reasonably
related to the development, maintenance and expansion of a municipal electric
distribution system. The City Council has directed City staff to regularly review the
operations of the City's electric utility to ensure that the rates are sufficient to cover
all prudent business costs, reserves and capital equipment acquisition but not
exceeding the amount necessary for the same. The rates, fees and charges reflect
the reasonable costs to the City system only and do not reflect any excess rates,
fees, or charges that are in excess of the reasonable costs of providing the electrical
services as set forth hereinafter.
3. The City Council has reviewed the adoption of this Resolution pursuant to the
requirements of the California Environmental Quality Act of 1970, as amended, and
has determined that the adoption of the Electric Rules and Regulations has no
foreseeable potential to a result in a significant impact upon the environment and is
exempt from CEQA review pursuant to State CEQA Guidelines Section 15061(b)(3).
Further, the City Council has determined that the adoption of the fees is exempt from
substantive environmental review under Section 15273 of the State CEQA
Guidelines as no capital projects for system expansion are included in the proposed
action.
4. All legal prerequisites to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, the City Council of the City of Rancho Cucamonga does hereby find
and resolve as follows:
Section 1. The facts set forth in the Recitals, Part A of this Resolution, are true and
correct.
Section 2. The rates, fees and charges assessed under Chapter 3.46 of Title 3 shall
be as set forth on Attachment 1 hereto and incorporated by reference as if fully set forth herein.
Section 3. The City Clerk shall certify to the adoption of this Resolution.
Please see the following page
for formal adoption,certification and signatures
PASSED, APPROVED, AND ADOPTED this 6'h day of July 2011.
AYES: Alexander, Buquet, Michael, Spagnolo, Williams
NOES: None
ABSENT: None
ABSTAINED: None
L. Dennis Michael, Mayor
ATTEST:
lx� d-, 40
nice C. Reynolds, Cify Clerk
I, JANICE C. REYNOLDS, CITY CLERK of the City of Rancho Cucamonga,
California, do hereby certify that the foregoing Resolution was duly passed, approved and
adopted by the City Council of the City of Rancho Cucamonga, California, at a Regular Meeting
of said City Council held on the 6'h day of July 2011.
Executed this 7th day of July 2011, at Rancho Cucamonga, California.
� e' A �—
J ice C. Reynolds, Cil Clerk
Resolution No. 11-112 - Pane 2 of 32
Rancho Cucamonga Municipal Utility
Current Rate Current Rate
as of as of
513112011 6130/2011
Customer Classification
Wood Avg Rate Wgted Avg Rate Wgted Avg Rate
Summer Winter Summer Winter Summer Winter
sn-pil Commerual
E nergy Charge(MWn) 0.18309 0.13378 0.16863 0.12555 -7.89% -6.15%
C uslomer Charge(Study) 0.72800 0.72800 0.73300 0733W 0.69% 059%
Thee Phase Service($)day) 0.03200 0.03200 0.03200 0.03200 000% 0.00%
Medium Commercial
Energy Charge($BWh)
Non-TOU 008862 0.07509 008170 0.06973 -7.81% 7,14%
T0U
Summer On-Peak 0.13279 0.12080 -9.03%
Summer Mid-Peak 0.08937 0.08236 -7.84%
Summer Off-Peak 0,06557 0.06130 -6.51%
Writer Mid-Peak 0.08663 007994 -7.73%
Wider Off-Peak 006286 0.05891 -6.29%
Demand Charge(S/ItW)
Facilities Related 12.25 12.25 12.15 12.15 -0.82% -0.82%
Time Related Non TOO-Summ 19.26 - 17.05 - -11.47%
Time Related TOO-Summ On 16.86 - 14.94 - -11.49%
iime Related TOO-Salmon Mid 5.16 - 4.57 - -11 43%
Customer Charge(S)Meter/Month) 133.19 133.19 134.17 134.17 0.74% 0,74%
Medvm Commerical(TOO)
Energy Charge($/),Wh)
Summer On-Peak 0.11791 0.10714 -9.13%
Summer Mid-Peak 0.09015 0.08262 -836%
Summer OffPeak006915 0.06406 -7.36%
ydnter MidPeak007281 0.06730 -7,57%
Writer Off-Peak 005981 0.05581 -6.69%
Demand Charge(SAM
Facilities Related 13.24 13.24 13.19 13.19 -0.38% -038%
Time Related-On-Peak 14.67 - 12.96 -11.66%
Time Related-Mid-Peak 349 - 3.08 - -1175%
Power Factor Adjustment($IKVA) 0.27 0.27 0.27 0.27 0.00% 000%
Customer Charge(S/Meter)Month) 469.00 46900 47244 472.44 073% 0.73%
Large Commercial
Energy Charge($/kWh)
Summer On-Peak 0.13458 0.12253 -8.95%
Summer Md-Peak 0.09285 0.08504 -841%
Summer Off-Peak 0,06650 0.06154 -746%
Winter Mid-Peak 0.08427 0.07722 -8.36%
Winter Off-Peak 0.06360 0.05898 -726%
Demand Charge($/kVV)
Facilities Related 12.62 12.62 12.56 12.56 -048% -048%
Time Related OnPeak18.22 - 16.08 -11]5%
Time Related-Mid-Peak 5.13 - 4.53 - -11.70%
Power Factor Adjustment($)RVA) 0.27 027 0.27 0.27 000% 000%
Customer Charge($IMeter)Month) 573.02 573.02 577.22 577.22 0.73% 073%
Outside Lighting
Energy Charge(SBWh) 0.07235 007235 0.06451 0.06451 -1084% -1084%
Customer Charge($IMeter/Manch) 1405 14.05 14.15 14.15 0.71% 071%
Street Lighting
150 Wattage
Energy Charge($/kWhAamp) 0.07980 007980 007202 0.07202 -976% -976%
Lamp Charge(S/Lamp/Month) 9.24 9.24 9.39 9,39 1.62% 1.62%
250 Wattage
Energy Charge($reWnbamp) 0.07980 0.07980 007202 0.07202 -9.76% -976%
Lamp Charge($ILamp/Month) 994 994 10.10 1010 1.61% 161%
Traffic Control
Energy Charge($)kWn) 0.11761 0.11761 0.10961 0.10961 -6.81% -681%
Customer Chance($/day) 0.51500 0.51500 0.51900 0.51900 0.78% 0.78%
Irrigation System
Energy Charge(SII W10 0.18309 0.13378 0 16863 0.12555 7 89% -615%
Customer Charge(S/day) 0.72800 072800 0.73300 0.733D0 0.69% 0,69%
W1R
Fixed Energy Charge S/DevirelMonth 70.65 70.65 66.65 66.65 -5.67% 567%
Customer Charge S/Momh 17.29 17.29 17.29 17.29 0.00% 000%
Inspection Charge-$/Device/Month 12.60 12.60 12.60 12.60 0.00% O.DO%
ThreePhaseService-$/Oay 003 003 0.03 003 0.00% 0.00%
Initialization of Service Charge 6.79 679 679 6.79 0.00% 000%
'Rates were calculated using the May 31.2011 DWR percentage of 27.050 for comparison purposes
Resolution No. 11-112 - Page 3 of 32
Table of Contents
Electric Rates and Tariffs
SMALL COMMERCIAL 1
MEDIUM COMMERCIAL 3
MEDIUM COMMERCIAL (TIME-OF-USE) 6
LARGE COMMERCIAL 9
STREET LIGHTING 13
TRAFFIC CONTROL 16
OUTDOOR AREA LIGHTING 18
IRRIGATION SYSTEMS 21
WIRELESS TECHNOLOGY 23
NET ENERGY METERING 25
SERVICE ESTABLISHMENT CHARGE 27
ELECTRIC CHARGES AND FEES SCHEDULE 28
Resolution No. 11-112 - Page 4 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
SMALL COMMERCIAL
A. Applicability.
Applicable to single and three-phase general service including lighting and power
Customers, except for the Customer whose monthly Maximum Demand, in the opinion
of the Utility, is expected to exceed 20 kW or has exceeded 20 kW in any three (3)
months during the preceding twelve (12) months is ineligible for service under this
Schedule. Effective with the date of ineligibility of any Customer served under this
Schedule, the Customer's account shall be transferred to another applicable Rate
Schedule.
B. Territory.
Within the entire territory served.
C. Rates.
Energy Charge $/kWh/Meter/Month
Summer Current Rate Schedule is
Winter available at
www.CityofRC.us/RCMU
Customer Charge- $/Meter/Day 0.733
Three Phase Service - $/Day 0.032
1. The energy charge is calculated each month by using the current State Department
of Water Resources (DWR) percentage. This percentage will be adjusted monthly
to reflect actual energy purchases.
D. Special Conditions.
1. Summer and Winter Seasons are defined as follows:
The Summer Season shall commence at 12:00 a.m. on June 1st and continue until
12:00 a.m. on October I" of each year. The Winter Season shall commence at
12:00 a.m. on October I" of each year and continue until 12:00 a.m. on June 1st of
the following year. A pro rata computation will be made for seasonal billing
purposes.
2. Voltage. Service will be supplied at one (1) standard voltage.
3. Three-Phase Service. Where the Utility provides three-phase service, the billing
will be increased by the amount shown in the Rates section above.
4. Temporary Discontinuance of Service.
I Effective Date:lune 1,2011
Resolution No. 11-112 - Page 5 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
Where the use of energy is seasonal or intermittent, no adjustments will be made
for a temporary discontinuance of service. Any Customer, prior to resuming
service within twelve (12) months after such service was discontinued, will be
required to pay all charges which would have been billed if service had not been
discontinued.
5. Customer-Owned Electrical Generating Facilities.
Upon written approval by the Utility, momentary parallel operation may be
permitted to allow the Customer to test the auxiliary/emergency generating
facilities.
6. Installation of Demand Meters.
Where a Customer's usage exceeds an average of 4,500 kWh per month in the
preceding 12-month period, the Utility may, at its sole option, install a demand
Meter on the account at the Utility's expense.
7. Billing Calculation.
A Customer's bill is calculated according to the rates and conditions above. The
charges are calculated by applying the Rate Charges when applicable to the actual
billing determinants (kilowatt hours [kWh], demand [kW], etc.).
8. Power Cost Adjustment Factor (PCAF).
The rates above are subject to an adjustment as provided in Rule 12, Section E.
9. Change of Law Adjustment Factor(CLAF).
The rates above are subject to an adjustment as provided in Rule 12, Section F.
10. State Mandated Public Purpose Programs Charge.
State law requires all California electric utilities to establish a public purpose
programs charge of 2.85% of electric retail revenues to fund qualifying energy
efficiency programs, renewable energy resources, research and demonstration
projects, and services for low-income electricity customers.
2 Effective Date:June 1,2011
Resolution No. 11-112 - Page 6 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
MEDIUM COMMERCIAL
A. Applicability.
Applicable to single and three-phase service including lighting and power Customers
whose monthly Maximum Demand registers, or in the opinion of the Utility is expected
to register, above 20 kW and below 200 kW. The Customer whose monthly Maximum
Demand, in the opinion of the Utility, is expected to reach 200 kW or has reached 200
kW for any three (3) months during the preceding twelve (12) months is ineligible for
service under this Schedule. Effective with the date of ineligibility, such Customer's
account shall be transferred to another applicable Rate Schedule. Further, any Customer
served under this Schedule whose monthly Maximum Demand has registered 20 kW or
less for twelve (12) consecutive months is eligible for service under another applicable
Rate Schedule.
B. Territory.
Within the entire territory served.
C. Rates.
Energy Charge - $/kWh/Meter/Month
Non TOU Pricing Option
Summer Season
Winter Season Current Rate Schedule is
TOU Pricing Option available at
Summer Season—On-Peak www.CityolRC.us/RCMU
Mid-Peak
Off-Peak
Winter Season—Mid-Peak
Off-Peak
Customer Charge - $/Meter/Month 134.17
Demand Charge - $/kW of Billing Demand/Meter/Month
Facilities Related 12.15
Time Related —Non TOU Summer 17.05
Time Related - TOU Summer—On-Peak 14.94
Summer—Off-Peak 4.57
TOU Option Meter Charge - $/Meter/Month RTEM 94.18
1. The energy charge is calculated each month by using the current State Department
of Water Resources (DWR) percentage. This percentage will be adjusted monthly
to reflect actual energy purchases.
3 Effective Date'.lune I,2011
Resolution No. 11-112 - Page 7 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES d TARIFFS
D. Special Conditions.
1. Time periods are defined as follows:
On-Peak: Noon to 6:00 p.m. summer weekdays except holidays.
Mid-Peak: 8:00 a.m. to noon and 6:00 p.m. to 11:00 p.m. summer weekdays
except holidays.
8:00 a.m. to 9:00 p.m. winter weekdays except holidays.
Off-Peak: All other hours.
Holidays are New Year's Day (January 1), Washington's Birthday (third Monday
in February), Memorial Day (last Monday in May), Independence Day (July 4),
Labor Day (first Monday in September), Veteran's Day (November 11),
Thanksgiving Day (fourth Thursday in November), and Christmas (December
25).
When any holiday listed above falls on Sunday, the following Monday will be
recognized as an off-peak period. No change will be made for holidays falling on
Saturday.
The Summer Season shall commence at 12:00 a.m. on June 1st and continue until
12:00 a.m. on October I'a of each year. The Winter Season shall commence at
12:00 a.m. on October I" of each year and continue until 12:00 a.m. on June I"of
the following year. A pro rata computation will be made for seasonal billing
purposes.
2. RTEM Metering. Customers may elect a Real Time Energy Metering (RTEM)
meter and shall pay the monthly charges, as indicated in the Rates section of this
Rate Schedule.
3. Voltage.
Service will be supplied at one (1) standard voltage.
4. Billing Demand.
The Billing Demand shall be the kilowatts of Maximum Demand, determined to
the nearest kW. The Demand Charge shall include the following billing
components. The Time Related Component shall be for the kilowatts of
Maximum Demand recorded during (or established for) the monthly billing
period. The Facilities Related Component shall be for the kilowatts of Maximum
Demand recorded during (or established for) the monthly billing period.
However, when the Utility determines the Customer's Meter will record little or
no energy use for extended periods of time or when the Customer's Meter has not
recorded a Maximum Demand in the preceding eleven (11) months, the Facilities
Related Component of the Demand Charge may be established at fifty percent
(50%) of the Customer's Connected Load.
4 Effective Date:June I,2011
Resolution No. 11-112 - Page 8 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
5. Maximum Demand.
The Maximum Demand in any month shall be the measured maximum average
kilowatt input, indicated or recorded by instruments, during any 15-minute
metered interval in the month, but, where applicable, shall not be less than the
diversified resistance welder load computed in accordance with the section
designated Welder Service in Rule 2. Where the demand is intermittent or subject
to violent fluctuations, a 5-minute interval may be used.
6. Temporary Discontinuance of Service.
Where the use of energy is seasonal or intermittent, no adjustments will be made
for a temporary discontinuance of service. Any Customer resuming service
within twelve (12) months after such service was discontinued will be required to
pay all charges which would have been billed if service had not been
discontinued.
7. Customer-Owned Electrical Generating Facilities.
Upon written approval by the Utility, momentary parallel operation may be
permitted to allow the Customer to test the auxiliary/emergency generating
facilities.
S. Billing Calculation.
A Customer's bill is calculated according to the rates and conditions above. The
charges are calculated by applying the Rate Charges when applicable to the actual
billing determinants (kilowatt hours [kWh], demand [k W], etc.).
9. Power Cost Adjustment Factor(PCAF).
The rates above are subject to an adjustment as provided in Rule 12, Section E.
10. Change of Law Adjustment Factor (CLAF).
The rates above are subject to an adjustment as provided in Rule 12, Section F.
11. State Mandated Public Purpose Programs Charge.
State law requires all California electric utilities to establish a public purpose
programs charge of 2.85% of electric retail revenues to fund qualifying energy
efficiency programs, renewable energy resources, research and demonstration
projects, and services for low-income electricity customers.
5 Effective Date:lune I,2011
Resolution No. 11-112 - Page 9 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
MEDIUM COMMERCIAL (TIME-OF-USE)
A. Applicability.
Applicable to single and three-phase service including lighting and power Customers
whose monthly Maximum Demand registers, or in the opinion of the Utility is expected
to register 200 kW through 500 kW. The customer whose monthly Maximum Demand,
in the opinion of the Utility, is expected to exceed 500 kW or has exceeded 500 kW for
any three (3) months during the preceding twelve (12) months is ineligible for service
under this Schedule and effective with the date of ineligibility, such Customer's account
shall be transferred to Large Commercial. Further, any Customer served under this
Schedule whose monthly Maximum Demand has registered below 200 kW for twelve
(12) consecutive months is ineligible for service under this Rate Schedule, and shall be
transferred to another applicable Rate Schedule.
B. Territory.
Within the entire territory served.
C. Rates.
Energy Charge - $/kWh/Meter/Month
Summer Season—On-Peak
Mid-Peak Current Rate Schedule is
Off-Peak available at
Winter Season—Mid-Peak www.CitvofRC.us/RC1v1U
Off-Peak
Customer Charge - $/Meter/Month 472.44
Demand Charge - $/kW of Billing Demand/Meter/Month
Facilities Related 13.19
Time Related
Summer Season— On-Peak 12.96
Mid-Peak 3.08
Power Factor Adjustment- $/KVA 0.27
1. The energy charge is calculated each month by using the current State Department
of Water Resources (DWR) percentage. This percentage will be adjusted monthly
to reflect actual energy purchases.
D. Special Conditions.
I. Time periods are defined as follows:
On-Peak: Noon to 6:00 p.m. summer weekdays except holidays.
Mid-Peak: 8:00 a.m. to noon and 6:00 p.m. to 11:00 p.m. summer weekdays
except holidays.
8:00 a.m. to 9:00 p.m. winter weekdays except holidays.
Off-Peak: All other hours
6 Effective Date:June 1,2011
Resolution No. 11-112 - Page 10 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
Holidays are New Year's Day (January 1), Washington's Birthday (third Monday
in February), Memorial Day (last Monday in May), Independence Day (July 4),
Labor Day (first Monday in September), Veteran's Day (November 11),
Thanksgiving Day (fourth Thursday in November), and Christmas (December
25).
When any holiday listed above falls on Sunday, the following Monday will be
recognized as an off-peak period. No change will be made for holidays falling on
Saturday.
The Summer Season shall commence at 12:00 a.m. on June 1st and continue until
12:00 a.m. on October I" of each year. The Winter Season shall commence at
12:00 a.m. on October I't of each year and continue until 12:00 a.m. on June 1't of
the following year. A pro rata computation will be made for seasonal billing
purposes.
2. Voltage.
Service will be supplied at one (1) standard voltage.
3. Billing Demand.
The Billing Demand shall be the kilowatts of Maximum Demand, determined to
the nearest kW. The Demand Charge shall include the following billing
components. The Time Related Component shall be for the kilowatts of
Maximum Demand recorded during (or established for) the monthly billing
period. The Facilities Related Component shall be for the kilowatts of Maximum
Demand recorded during (or established for) the monthly billing period.
However, when the Utility determines the Customer's Meter will record little or
no energy use for extended periods of time or when the Customer's Meter has not
recorded a Maximum Demand in the preceding eleven (11) months, the Facilities
Related Component of the Demand Charge may be established at fifty percent
(50%) of the Customer's Connected Load.
4. Maximum Demand.
Maximum Demand shall be established for the On-Peak, Mid-Peak, and Off-Peak
periods. The Maximum Demand in any month shall be the measured maximum
average kilowatt input, indicated or recorded by instruments, during any 15-
minute metered interval in the month, but, where applicable, shall not be less than
the diversified resistance welder load computed in accordance with the section
designated Welder Service in Rule 2. Where the demand is intermittent or subject
to violent fluctuations, a 5-minute interval may be used.
5. Power Factor Adjustment.
7 Effective Date:June I,2011
Resolution No. 11-112 - Page 11 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
The Customer's bill will be increased each month for power factor by the amount
shown in the Rates section above for service metered and delivered at the
applicable voltage level, based on the per kilovar of maximum reactive demand
imposed by the Utility.
The maximum reactive demand shall be the highest measured maximum average
kilovar demand indicated or recorded by metering during any 15 minute interval
in the month. The kilovars shall be determined to the nearest unit. A device will
be installed on each kilovar meter to prevent reverse operation of the meter.
6. Temporary Discontinuance of Service.
Where the use of energy is seasonal or intermittent, no adjustments will be made
for a temporary discontinuance of service. Any Customer resuming service
within twelve (12) months after such service was discontinued will be required to
pay all charges which would have been billed if service had not been
discontinued.
7. Customer-Owned Electrical Generating Facilities.
Upon written approval by the Utility, momentary parallel operation may be
permitted to allow the Customer to test the auxiliary/emergency generating
facilities.
8. Billing Calculation.
A Customer's bill is calculated according to the rates and conditions above. The
charges are calculated by applying the Rate Charges when applicable to the actual
billing determinants (kilowatt hours [kWh], demand [kW], kilovar [kVa], etc.).
9. Power Cost Adjustment Factor (PCAF).
The rates above are subject to an adjustment as provided in Rule 12, Section E.
10. Change of Law Adjustment Factor (CLAF).
The rates above are subject to an adjustment as provided in Rule 12, Section F.
11. State Mandated Public Purpose Programs Charge.
State law requires all California electric utilities to establish a public purpose
programs charge of 2.85% of electric retail revenues to fund qualifying energy
efficiency programs, renewable energy resources, research and demonstration
projects, and services for low-income electricity customers.
8 Effective nate:lune 1,2011
Resolution No. 11-112 - Page 12 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
LARGE COMMERCIAL
A. Applicability.
Applicable to general services including lighting and power Customers. This Schedule is
applicable to and mandatory for all Customers whose monthly Maximum Demand, in the
opinion of the Utility, is expected to exceed 500 kW or has exceeded 500 kW in any three
(3) months during the preceding twelve (12) months. Any existing Customer on this
Schedule whose monthly Maximum Demand has registered 500 kW or less for twelve
(12) consecutive months is ineligible for service under this Schedule and shall be
transferred to another applicable Rate Schedule. Service under this Schedule is subject to
Meter availability.
B. Territory.
Within the entire territory served.
C. Rates.
Energy Charge - $/kWh/Meter/Month
Summer Season—On-Peak Current Rate Schedule is
Mid-Peak available at
Off-Peak ww.CitvofRC.us/RCMU
Winter Season— Mid-Peak
Off-Peak
Customer Charge - $/Meter/Month 577.22
Demand Charge - $/kW of Billing
Demand/Meter/Month
Facilities Related 12.56
Time Related
Summer Season —On-Peak 16.08
Mid-Peak 4.53
Power Factor Adjustment - $/KVA 0.27
1. The energy charge is calculated each month by using the current State Department
of Water Resources (DWR) percentage. This percentage will be adjusted monthly
to reflect actual energy purchases.
9 Effective Date:June I,2011
Resolution No. 11-112 - Page 13 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES d TARIFFS
D. Special Conditions.
1. Time periods are defined as follows:
On-Peak: Noon to 6:00 p.m. summer weekdays except holidays.
Mid-Peak: 8:00 a.m. to noon and 6:00 p.m. to 11:00 p.m. summer weekdays
except holidays.
8:00 a.m. to 9:00 p.m. winter weekdays except holidays.
Off-Peak: All other hours.
Holidays are New Year's Day (January 1), Washington's Birthday (third Monday
in February), Memorial Day (last Monday in May), Independence Day (July 4),
Labor Day (first Monday in September), Veteran's Day (November 11),
Thanksgiving Day (fourth Thursday in November), and Christmas (December
25).
When any holiday listed above falls on Sunday, the following Monday will be
recognized as an off-peak period. No change will be made for holidays falling on
Saturday.
The Summer Season shall commence at 12:00 a.m. on June 1'l and continue until
12:00 a.m. on October I" of each year. The Winter Season shall commence at
12:00 a.m. on October 151 of each year and continue until 12:00 a.m. on June ]sl of
the following year. A pro rata computation will be made for seasonal billing
purposes.
2. Voltage.
Service will be supplied at one standard voltage.
3. Maximum Demand.
Maximum Demands shall be established for the On-Peak, Mid-Peak, and Off-
Peak periods. The Maximum Demand for each period shall be the measured
maximum average kilowatt input indicated or recorded by instruments, during any
15-minute metered interval, but, where applicable, not less than the diversified
resistance welder load computed in accordance with the section designated
Welder Service in Rule 2. Where the demand is intermittent or subject to violent
fluctuations, a 5-minute interval may be used.
4. Billing Demand.
The Billing Demand shall be the kilowatts of Maximum Demand, determined to
the nearest kW. The Demand Charge shall include the following billing
components. The Time Related Component shall be for the kilowatts of
Maximum Demand recorded during (or established for) the monthly billing period
for each of the On-Peak, Mid-Peak, and Off-Peak Time Periods. The Facilities
Related Component shall be for the kilowatts of Maximum Demand recorded
during (or established for) the monthly billing period. However, when the Utility
10 Effective Dale:June 1,2011
Resolution No. 11-112 - Page 14 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
determines the Customer's Meter will record little or no energy use for extended
periods of time or when the Customer's Meter has not recorded a Maximum
Demand in the preceding eleven (11) months, the Facilities Related Component of
the Demand Charge may be established at fifty percent (50%) of the Customer's
Connected Load. Separate Demand Charge(s) for the On-Peak, Mid-Peak, and
Off-Peak Time Periods shall be established for each monthly billing period. The
Demand Charge for each time period shall be based on the Maximum Demand for
that time period occurring during the respective monthly billing period.
5. Power Factor Adjustment.
The Customer's bill will be increased each month for power factor by the amount
shown in the Rates section above for service metered and delivered at the
applicable voltage level, based on the per kilovar of maximum reactive demand
imposed by the Utility.
The maximum reactive demand shall be the highest measured maximum average
kilovar demand indicated or recorded by metering during any 15 minute metered
interval in the month. The kilovars shall be determined to the nearest unit. A
device will be installed on each kilovar Meter to prevent reverse operation of the
Meter.
6. Temporary Discontinuance of Service.
Where the use of energy is seasonal or intermittent, no adjustments will be made
for a temporary discontinuance of service. Any Customer, prior to resuming
service within twelve (12) months after such service was discontinued, will be
required to pay all charges which would have been billed if service had not been
discontinued.
7. Customer-Owned Electrical Generating Facilities.
Upon written approval by the Utility, momentary parallel operation may be
permitted to allow the Customer to test the auxiliary/emergency generating
facilities.
8. Contracts.
An initial three-year facilities contract may be required where Applicant requires
new or added serving capacity exceeding 2,000 kVA.
9. Billing Calculation.
A Customer's bill is calculated according to the rates and conditions above. The
charges are calculated by applying the Rate Charges when applicable to the actual
billing determinants (kilowatt hours [kWh], demand [kW], kilovar [kVa], etc.).
10. Power Cost Adjustment Factor(PCAF).
I I Effective Date:June 1,2011
Resolution No. 11-112 - Page 15 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
The rates above are subject to an adjustment as provided in Rule 12, Section E.
11. Change of Law Adjustment Factor(CLAF).
The rates above are subject to an adjustment as provided in Rule 12, Section F.
12. State Mandated Public Purpose Programs Charge.
State law requires all California electric utilities to establish a public purpose
programs charge of 2.85% of electric retail revenues to fund qualifying energy
efficiency programs, renewable energy resources, research and demonstration
projects, and services for low-income electricity customers.
12 Effective DateJune 1,2011
Resolution No. 11-112 - Page 16 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
STREET LIGHTING
A. Applicability.
Applicable to meter for the lighting of streets, and publicly-owned and publicly-operated
automobile parking lots which are opened to the general public where the City owns and
maintains the street lighting equipment and associated facilities included under this Schedule.
B. Territory.
Within the entire territory served.
C. Rates
High Pressure Sodium Vapor Lamps—All Night Service
Lamp Wattage Initial Lumens S/Lam /Month
Current Rate Schedule is
150 16,000 available at
250 27,500 www.CitvotRC.us/RCMU
1. The energy charge is calculated each month by using the current State Department
of Water Resources (DWR) percentage. This percentage will be adjusted monthly
to reflect actual energy purchases.
D. Special Conditions
1. The Applicant shall install streetlights that will be served by the Utility. These
streetlights must be installed in accordance with the Utility's specifications and
the developer will deed such facilities to the City.
2. Requirements and Restrictions.
a. The Applicant for street light service shall specify the type of service,
lamp size, and location of street lights.
b. Service shall not be furnished under this Schedule where location,
mounting height, and/or other considerations are unacceptable to the
Utility.
C. The installation of street lighting equipment and facilities hereunder is
contingent upon the utility obtaining easements, and rights of way, as may
be required, satisfactory to the Utility for the required poles, lines,
equipment, and facilities.
d. Should the Applicant not commence using the street lighting in a bona fide
manner within ninety (90) days after date of completion and installation of
13 Effective Date:June I,2011
Resolution No. 11-112 - Page 17 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
a street light or street lighting system requested by the Applicant, the
Utility will bill, and the Applicant shall pay, the applicable lamp
charges(s).
3. Hours of Service.
Under the Utility's standard all night operating schedule, approximately
4,140 hours of service per year will be famished.
4. Maintenance.
The Utility shall exercise reasonable care and diligence in maintaining its
street light facilities or Utility-owned attachments thereto. Where the
Utility experiences, or expects to experience, maintenance costs exceeding
its normal maintenance expense resulting from, but not limited to,
vandalism, the Utility may require the customer to pay the excess
maintenance expense.
5. Liability of the Utility.
The Utility shall not, by taking action pursuant to its tariffs, be liable for
any loss, damage, or injury, established or alleged, which may result, or be
claimed to result, therefrom.
6. Removal, Relocation or Modification of Facilities.
Where street lighting service and facilities are ordered removed by a customer,
the customer shall pay to the Utility a nonrefundable amount equal to the total
estimated cost installed less any Customer contribution, plus the estimated cost of
removal less the estimated net salvage value of the facilities.
Where street lighting service and facilities were ordered removed by a Customer
and such service and facilities, or their equivalent are ordered reinstalled within
thirty-six (36) months from the date of the order to remove, the Customer shall
pay to the Utility in advance of reinstallation a nonrefundable amount equal to the
cost of removal of the prior facilities and the estimated cost of such reinstallation.
Where street lighting facilities are ordered modified and /or relocated by a
Customer, the Customer shall pay to the Utility, in advance of such modification
and/or relocation, a nonrefundable amount equal to the estimated cost of such
modification and/or relocation. This includes facilities that now serve street light
load only, but that may have been installed originally to serve other than street
light load.
Utility-owned facilities removed or installed remain the sole property of the
Utility.
7. Billing Calculation.
14 Effective Date:June 1,2011
Resolution No. 11-112 - Page 18 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
A Customer's bill is calculated according to the rates and conditions above.
8. Power Cost Adjustment Factor (PCAF).
The rates above are subject to an adjustment as provided in Rule 12, Section E.
9. Change of Law Adjustment Factor(CLAF).
The rates above are subject to an adjustment as provided in Rule 12, Section F.
10. State Mandated Public Purpose Programs Charge.
State law requires all California electric utilities to establish a public purpose
programs charge of 2.85% of electric retail revenues to fund qualifying energy
efficiency programs, renewable energy resources, research and demonstration
projects, and services for low-income electricity customers.
15 Effective Date:June I,2011
Resolution No. 11-112 - Page 19 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
TRAFFIC CONTROL
A. Applicability.
Applicable to single and three-phase service for traffic directional signs or traffic signal
systems located on streets, highways and other public thoroughfares and to railway
crossing and track signals; for public thoroughfare lighting that is utilized twenty-four
(24) hours per day or is not controlled by switching equipment, such as tunnel or
underpass lighting; and, to public authorities for the illumination of bus stop shelters
located in the dedicated road right-of-way where such service is combined with other
traffic control service as defined above.
B. Territory.
The entire territory served.
C. Rates.
$/Traffic Signal/Month Current Rate Schedule is
Customer Charge/Day $0.519 available at
www.CitvofRC.LIS/RCMU
L The energy charge is calculated each month by using the current State Department
of Water Resources (DWR) percentage. This percentage will be adjusted monthly
to reflect actual energy purchases.
D. Special Conditions
1. Voltage.
Service will be supplied at one (1) standard voltage not in excess of 240 volts or,
at the option of the Utility, at 240/480 volts, three wire, single-phase.
2. Billing Calculation.
A Customer's bill is calculated according to the rate and conditions above.
3. Power Cost Adjustment Factor(PCAF).
The rate above is subject to an adjustment as provided in Rule 12, Section E.
4. Change of Law Adjustment Factor(CLAF).
The rate above is subject to an adjustment as provided in Rule 12, Section F.
5. State Mandated Public Purpose Programs Charge.
State law requires all California electric utilities to establish a public purpose
programs charge of 2.85% of electric retail revenues to fund qualifying energy
efficiency programs, renewable energy resources, research and demonstration
16 Effective Date:June 1,2011
Resolution No. 11-112 - Page 20 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES R TARIFFS
projects, and services for low-income electricity customers.
17 Effective Date:June I,2011
Resolution No. 11-112 - Page 21 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
OUTDOOR AREA LIGHTING
A. Applicability.
Applicable to single-phase service for metered outdoor area lighting load, controlled for
dusk to dawn operation and used for purposes other than street and highway lighting such
as, but not limited to parking lots, pedestrian walkways, billboards, building exteriors,
security, sports and recreation areas, monuments, decorative areas. and bus shelters.
B. Territory.
Within the entire territory served.
C. Rates.
FEnergy Charge - $/kWh/Meter/Month Current Rate Schedule is
Customer Charge- $/Meter/Month available at
$14.15 1 www.CitvofRC.us/RCMU
1. The energy charge is calculated each month by using the current State Department
of Water Resources (DWR) percentage. This percentage will be adjusted monthly
to reflect actual energy purchases.
D. Special Conditions
1. Voltage.
Service will be provided at one (1) standard voltage.
2. Three-Phase Service.
Where, in the sole opinion of the Utility, it is impractical to provide single-phase
service under this Schedule, three-phase service will be provided.
3. Separate Point of Delivery.
When requested by the Applicant or Customer, and agreed upon by the Utility, an
additional Point of Delivery may be provided, separate from any other Point of
Delivery provided under any other applicable Rate Schedule. Customers so
served shall not be permitted to have an electrical interconnection beyond the
Utility's Point of Delivery between the separately metered loads except upon
written approval of the Utility.
18 Effective Date:June I,2011
Resolution No. 11-112 - Page 22 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
A change from this Schedule to any other Rate Schedule will be permitted if the
additional Point of Delivery is removed. Any such removal shall be at the
Customer's expense.
Any rearrangement of facilities required to provide the additional Point of
Delivery shall be at the expense of the requesting Applicant or Customer.
4. Controlled Operation.
Service under this Schedule requires the control of lamps in a manner acceptable
to the Utility so that lamps will not be lighted daily from dawn to dusk. Customer
shall install, own, operate, and maintain the control device. The Utility shall have
the right to periodically inspect the control device to ensure its correct operation
and maintenance.
5. Distribution Line Extension.
Distribution Line Extensions to reach an outdoor area light or area lighting system
shall be in accordance with Rule 15.
6. Services.
Services shall be installed and maintained as provided in Rule 16.
7. Incidental Loads.
Incidental, non-lighting loads may be served under this Schedule only where such
Connected Loads do not exceed fifteen percent (15) of the Customer's total
Connected Load. Incidental Loads must also be controlled for dusk to dawn
operation exclusively.
8. Billing Calculation.
A Customer's bill is calculated according to the rates and conditions above. The
charges are calculated by applying the Rate Charges when applicable to the actual
billing determinants (kilowatt hours [kWh], demand [kW], etc.).
9. Power Cost Adjustment Factor (PCAF).
The rates above are subject to an adjustment as provided in Rule 12, Section E.
10. Change of Law Adjustment Factor(CLAF).
The rates above are subject to an adjustment as provided in Rule 12, Section F.
11. State Mandated Public Purpose Programs Charge.
State law requires all California electric utilities to establish a public purpose
programs charge of 2.85% of electric retail revenues to fund qualifying energy
19 Effective Dale'.June 1,2011
Resolution No. 11-112 - Page 23 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES d TARIFFS
efficiency programs, renewable energy resources, research and demonstration
projects, and services for low-income electricity customers.
20 Effective Date June I,2011
Resolution No. 11-112 - Page 24 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
IRRIGATION SYSTEMS
A. Applicability.
Applicable where the Utility determines that 100% of the customer's electrical usage is
for limited irrigation service except for the Customer whose monthly Maximum Demand,
in the opinion of the Utility, is expected to exceed 20 kW or has exceeded 20 kW in any
three (3) months during the preceding twelve (12) months is ineligible for service under
this Schedule. Effective with the date of ineligibility of any Customer served under this
Schedule, the Customer's account shall be transferred to another applicable Rate
Schedule.
B. Territory.
The entire territory served.
C. Rates.
$/Irrigation System/Month Current Rate Schedule is
Customer Charge/Day $0.733 available at
www.Cit ofRC.us/RCMU
1. The energy charge is calculated each month by using the current State Department
of Water Resources (DWR) percentage. This percentage will be adjusted monthly
to reflect actual energy purchases.
D. Special Condition
1. Voltage.
Service will be supplied at one (1) standard voltage not in excess of 240 volts or,
at the option of the Utility, at 240/480 volts, three wire, single-phase.
2. Billing Calculation.
A Customer's bill is calculated according to the rate and conditions above.
3. Power Cost Adjustment Factor(PCAF).
The rate above is subject to an adjustment as provided in Rule 12, Section E.
4. Change of Law Adjustment Factor (CLAF).
The rate above is subject to an adjustment as provided in Rule 12, Section F.
5. State Mandated Public Purpose Programs Charge.
State law requires all California electric utilities to establish a public purpose
programs charge of 2.85% of electric retail revenues to fund qualifying energy
21 Effective Date:June I,2011
Resolution No. 11-112 - Page 25 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
efficiency programs, renewable energy resources, research and demonstration
projects, and services for low-income electricity customers.
22 Effective Date:June 1,2011
Resolution No. 11-112 - Page 26 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
WIRELESS TECHNOLOGY
A. Applicability.
Applicable to single-phase service for wireless technology industries that require electric
service to operate radio repeaters or similar devices (wireless communication devices)
that are mounted on existing City facilities, or other facilities approved by the Utility and
are unmetered. This Schedule excludes Wi-Fi devices on "looped" (served by 120/240
volts) streetlight facilities. Customers must execute an application/contract with the
Utility for service under this Schedule, and must execute an applicable agreement when
devices are attached to City facilities. The monthly kilowatt-hour (kWh) usage of each
device shall not exceed 500 kWh. Effective with the date of ineligibility of any Customer
served under this Schedule, the Customer's account shall be transferred to another
applicable Rate Schedule. If the Customer's account cannot be transferred to another
applicable Rate Schedule, the account will be closed, the Utility's service will be
removed and the Customer must remove its device and equipment form the applicable
City facility.
B. Territory.
Within the entire territory served.
C. Rates.
Fixed Energy Charge - $/Device/Month Current Rate Schedule is available at
www.CitvofRC.us/RCMU
Customer Charge - $/Month 17.29
Inspection Charge - $/Device/Month 12.60
Three-Phase Service - $/Day 0.03
Initialization of Service Charge—One-time
charge 6.79
1. The energy charge is calculated each month by using the current State Department
of Water Resources (DWR) percentage. This percentage will be adjusted monthly
to reflect actual energy purchases.
D. Special Conditions.
1. Contract. An approved City contract is required for service under this Rate
Schedule.
2. Voltage. Service will be supplied at one (1) standard voltage not in excess of 240
volts.
3. Three-Phase Service. Where the Utility provides three-phase service, the billing
will be increased by the amount shown in the Rates section above.
4. Maximum Wattage. The maximum watts/connected load/name plate is 746 watts.
23 Effective Date:lune 1,2011
Resolution No. 11-112 - Page 27 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
5. Installation. The device(s) shall be installed on City facilities or other facilities
approved by the Utility. When the devices are installed on City facilities, the
installation and removal of such device(s) will be performed by the Customer, and
at the Customer's expense. Device installation shall not be performed under this
Rate Schedule, where location, mounting height, and/or other considerations are
not acceptable to the Utility. Unless approved by the Utility, all wireless
communication devices must be visible to the Utility.
7. Modification of Facilities. No modifications can be made to the Customer-owned
wireless communications devices unless approved by the Utility. Where the
Customer requests a modification of City facilities, and such modifications are
acceptable to the City, the City will perform the requested modifications at the
Customer's expense.
8. Maintenance. The Utility shall exercise reasonable care and diligence in
maintaining its facilities. Upon installation of the device(s), where the Utility
experiences, or expects to experience, maintenance costs exceeding its normal
maintenance expense resulting from, but not limited to, vandalism, the Utility
may require the Customer to pay the excess maintenance expense.
9. Liability of the Utility. The Utility shall not, by taking action pursuant to its
tariffs, be liable for any loss, damage, or injury, established or alleged, which may
result, or be claimed to result, there from.
10. Initialization of Service Charge. A one-time charge, as shown in the Rates
section of this Rate Schedule, is applied to each service account provided service
under this Rate Schedule to recover the costs of a lock and spare fuse which are
required with the initialization of service.
1 l. Power Cost Adjustment Factor(PCAF).
The rates above are subject to an adjustment as provided in Rule 12, Section E.
12. Change of Law Adjustment Factor (CLAF).
The rates above are subject to an adjustment as provided in Rule 12, Section F.
13. State Mandated Public Purpose Programs Charge.
State law requires all California electric utilities to establish a public purpose
programs charge of 2.85% of electric retail revenues to fund qualifying energy
efficiency programs, renewable energy resources, research and demonstration
projects, and services for low-income electricity customers.
24 Effective Date-lune I,2011
Resolution No. 11-112 - Page 28 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
NET ENERGY METERING
A. Applicability
Applicable to a customer who operates a solar generating facility that is located on the
customer's premises with a capacity of not more than 1 MW that is interconnected and
operates in parallel with the City's electric system, intended primarily to offset part or all
of the customer's own electrical requirements, and meets all the applicable safety and
performance standards. This Schedule shall be closed to new customers once the
combined nameplate rated generating capacity, for all customers served under this
Schedule exceed two and one-half percent (2.5%) of the City's peak demand.
B. Territory
The entire territory served.
C. Rates
1. As determined in each billing period, when a customer consumes more energy
than generated at the premises, the net consumed energy will be used in the
calculation of all applicable energy charges, calculated by multiplying the net
amount consumed by the applicable energy rate components of the customer's
OAT.
2. As determined in each billing period, when a customer generates more energy
than is consumed by the customer, the net kilowatt-hours of production will be
carried forward into the next billing period.
3. Customers who are Net Surplus Electricity producers may elect to either carry
over annual Net Surplus Energy production (in kilowatt hours) as a credit that will
be applied to kilowatt hours subsequently supplied to Customer by RCMU or
Customer may elect to receive payment for annual Net Surplus Electricity
production and be compensated for each kilowatt-hour of Net Surplus Electricity
production at a rate equivalent to the highest hourly rate that was charged for
consumption in their OAT during the year prior to the Customer's Annual Billing
Date.
D. Special Condition
I. An executed Net Energy Metering and Generating Facility Interconnection
Agreement is required prior to receiving service under this Schedule.
2. Metering Requirements - If the customer's existing meter is not capable of
measuring the flow of energy in two directions, an appropriate meter shall be
provided at the expense of the customer. The City may elect to install an
additional meter or meters, at the City's expense to provide the information
necessary to accurately bill or credit the customer.
25 Effective Date:June I,2011
Resolution No. 11-112 - Page 29 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
3. Billing
a. City shall provide all customers served under this Schedule with net energy
consumption information and/or net energy export information with each
monthly bill.
b. Customers served under this Schedule shall pay both energy and non-energy
charges on a monthly basis, in accordance with the customer's OAT except as
otherwise allowed by State law. The value of net energy production will be
used to offset only energy related charges in subsequent billing periods.
4. Definitions
a. Net energy metering measures the difference between the electricity supplied
through the electric grid and the electricity generated on the customer's
premises and fed back to the electric grid.
b. Otherwise Applicable Tariff (OAT) is the customer's regularly filed rate
schedule under which service is rendered.
c. Net Surplus Electricity is the electricity generated by an eligible customer-
generator measured in kilowatt hours over a 12-month period that exceeds the
amount of electricity consumed by that eligible customer-generator.
26 Effective Date:June 1,2011
F6solution No. 11-112 - Page 30 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
SERVICE ESTABLISHMENT CHARGE
A. Applicability.
Applicable to General Service and Domestic Service customers.
B. Territory.
Within the entire territory served.
C. Rates.
For each establishment of electric service.................................... $15.00
D. Special Conditions.
1. The service establishment charge provided for herein is in addition to the charges
calculated in accordance with the applicable schedule and may be made each time an
account is established. As used herein, establishment means each time an account is
opened, including a turn on of electric service or a change of name which requires a
meter reading.
2. In case the customer requests that electric service be established on the day of his
request or outside of regular hours, an additional charge of$11.00 may be made.
27 Effective Date:June 1,2011
Resolution No. 11-112 - Page 31 of 32
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
Electric Fees and Charges Schedule
Applicability
Applicable to all classes of service as provided in accordance with the Electric Rules and
Regulations. Does not supersede any fees and charges listed in the rules which are not included
on this schedule.
Description Fee Amount
Minimum Deposit Greater of twice estimated average
monthly bill or $100
Minimum Deposit/Reconnection Greater of three times the estimated
average monthly bill or$100
Service Tum-on Charge $20 next day
$35 same day
$50 after hours
Special Appointment Turn-On Charge added to applicable $10
fee (Does not apply to the normal 4-hour window
appointment)
Return Check Charge In accordance with City of Rancho
Cucamonga Ordinance
Fund Verification Fee $5.00
Trip charge for additional field visits (cut-off for non $15.00
payment, etc.)
Meter Test/Second Request Within One Year Period $100 paid in advance (if error is
found, fee will be refunded)
Re-Read/second request within six months $25 (if error is found fee will be
refunded)
Appointment based meter reads $25
Monthly rental of Remote Metering to resolve access issues $2.50 per month
Temporary Tum On or Turn Off of electric service for $95 per hour or faction thereof
repair(normal working hours) first aggregate hour is free
Temporary Tum On or Turn Off of electric service for $130 per hour or faction thereof
repair (after normal hours)
Cost to investigate energy diversion Higher of$150 plus material or time
and material
Generating Facility Interconnection Plan Check and $150 per hour
Inspection Rate
28 Effective Date'.June I,2011
Resolution No. 11-112 - Page 32 of 32