HomeMy WebLinkAbout1997/02/18 - Agenda Packet DESIGN REVIEW COMMITTEE MEETING
TUESDAY FEBRUARY 18, 1997 6:00 P.M.
RANCHO CUCAMONGA CIVIC CENTER
RAINS ROOM
10500 CIVIC CENTER DRIVE
RANCHO CUCAMONGA
Committee Members: William Bethel Rich Macias Dan Coleman
Alternates: Peter Tolstoy Dave Barker Larry McNiel
CONSENT CALENDAR
The following items are expected to be routine and non-controversial. Typically they are items such
a plan revisions prepared in response to discussions at a previous meeting.
NO ITEMS HAVE BEEN SUBMITTED
PROJECT REVIEW ITEMS
This is the time and place for the Committee to discuss and provide direction to an applicant regarding
their development application. The following items do not legally require any public testimony,
although the Committee may open the meeting for public input.
6:00 p.m.
(Tom) DEVELOPMENT REVIEW 96-27 - MASTERCRAFT HOMES - A review of the
detailed Site Plan and building elevations for Phase 1 of Tract 14380, consisting of 25
single family lots in the Low Residential designation(2-4 dwelling units per acre) of the
Etiwanda North Specific Plan, located on the west side of Etiwanda Avenue,to the north
and south of North Overlook Drive - APN: 225-451-39 to 58 and 225-461-57 to 60.
6:40 p.m.
(Steve) ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 95-25 -
RODRIGUEZ-A request to construct a 2,900 square foot drive-thru facility and a 5,548
square foot restaurant on 3.7 acres of land in the Community Commercial designation
of the Foothill Boulevard Specific Plan, located at the southwest comer of Foothill
Boulevard and Vineyard Avenue - APN: 207-211-12 and 13.
PUBLIC COMMENTS
This is the time and place for the general public to address the Committee. State law prohibits the
Committee from addressing any issue not previously included on the Agenda. The Committee may
receive testimony and set the matter for a subsequent meeting. Comments are limited to five minutes
per individual.
DRC AGENDA
February 18, 1997
Page 2
ADJOURNMENT
1, Mary Lou Gragg, Office Specialist Hfor the City of Rancho Cucamonga, hereby certify that a trite,
accurate copy of the foregoing agenda was posted on February 6, 1997, at least 72 hours prior to the
meeting per Government Code Section 54954.2 at 10500 Civic Center Drive, Rancho Cucamonga.
DESIGN REVIEW COMMENTS
6:00 p.m. Tom Grahn February 18, 1997
DEVELOPMENT REVIEW 96-27 - MASTERCRAFT HOMES - A review of the detailed Site Plan
and building elevations for Phase 1 of Tract 14380, consisting of 25 single family lots in the Low
Residential designation (2-4 dwelling units per acre) of the Etiwanda North Specific Plan, located on
the west side of Etiwanda Avenue, to the north and south of North Overlook Drive - APN: 225-451-39
to 58 and 225-461-57 to 60.
Project History:
This project was previously reviewed by the Design Review Committee on three separate occasions and
approved by the Planning Commission on January 22, 1997. At the initial Design Review Committee
meeting, the applicant was directed to revise the elevations by incorporating additional design elements
(e.g., shutters, exposed rafter tails, break up roof lines, etc.) and to provide additional siding on the side
and rear elevations when siding is used as a significant element on the front elevation. The applicant
revised their elevations to incorporate additional design features, but did not significantly revise the use
of siding. At the following Committee meetings the applicant was directed to revise their use of siding
based upon previous comments, but prior to the Planning Commission meeting the use of siding was
eliminated from the selected elevations. Based upon previous direction by the Committee, staff
included a condition of approval to provide additional siding on.selected elevations. This condition
requires the Committee's review and approval prior to issuance of building permits. The condition was
not appealed.
The elevations have not been revised since the project was reviewed by the Planning Commission. The
applicant will be prepared to discuss their project to justify how the elevations were revised through the
design process and to demonstrate how their project meets City policy.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Major Issues: The staff report for the January 22, 1997, Planning Commission meeting identified that
the use of siding should be included on the front, side, and rear elevations of the following plans so that
siding appears as a primary architectural feature. The following elevations were recommended for
revision:
Plan I "Ranch"
Plan 2 "Country"
Plan 3 "Ranch"
Plan 4 "Ranch"
Staff Recommendation:
Staff recommends that additional siding be provided per the condition of approval.
DRC AGENDA
DR 96-27 - MASTERCRAFT HOMES
February 18, 1997
Page 2
Design Review Committee Action:
Members Present:
Staff Planner: Tom Grahn
DESIGN REVIEW COMMENTS
6:40 p.m. Steve Hayes February 18, 1997
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 95-25 - RODRIGUEZ -
A request to construct a 2900 square foot drive-thru facility and a 5548 square foot restaurant on 3.7
acres of land in the Community Commercial designation of the Foothill Boulevard Specific Plan,
located at the southwest comer of Foothill Boulevard and Vineyard Avenue - APN: 207-211-12 and 13.
Background:
The Design Review Committee last reviewed the project on February 4, 1997, where the Committee
directed the applicant to have a specific roof plan and possible architectural enhancements for the
proposed roof parapet available for review at the next meeting.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion:
At the time of comment preparation, the requested roof plan had not yet been received by staff. An oral
presentation will be provided at the meeting.
Staff Recommendation:
Staff recommends that the Committee forward the project to the Planning Commission for their
consideration at the February 26, 1997 meeting.
Design Review Committee Action:
Members Present:
Staff Planner: Steve Hayes
Attachment
DESIGN REVIEW COMMENTS
8:30 p.m. Steve Hayes February 4, 1997
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 95-25 - RODRIGUEZ -
A request to construct a 2900 square foot drive-thru facility and a 5548 square foot restaurant on 3.7 acres
of land in the Community Commercial designation of the Foothill Boulevard Specific Plan, located at
the southwest comer of Foothill Boulevard and Vineyard Avenue - APN: 207-211-12 and 13.
Background:
The Design Review Committee last reviewed the project on December 30, 1996, where the Committee
directed the applicant to work with staff to resolve site planning and architectural issues associated with
the Burger King and Zendejas restaurants. The item was then scheduled for the January 14, 1997 meeting
with the understanding that the plans could be revised in a timely manner to allow staff and the
Committee ample opportunity to review the revised plans prior to the meeting. Given that the plans did
not arrive until after an item on the meeting had already started, the Committee did not have time to
review the plans and therefore; did not formally review the project on January 14th. Comments from
these most recent Design Review Committee meetings have been attached for your convenience.
Staff Comments: The following comments are intended to provide an outline for Committee discussion:
I. The revised plans should be reviewed to determine if the direction from the two most recent
Design Review Committee meetings has been adequately followed by the applicant. Specific
issues are as follows:
a. Signage for the Burger King has been reduced in size to be consistent with the new Jack in
the Box at Foothill Boulevard and Masi Drive, but the location of the sign should be
removed from the proposed roof screen element;
b. The roof screen on the Burger King has been changed from a wood sided to a stucco element
to be more consistent with the building architecture;
C. No information regarding the roof equipment and plan has been submitted to staff at the time
of preparation of these comments. An oral update regarding this issue will be discussed at
the meeting;
d. Street dimensions still require correction as deemed necessary by the Engineering Division;
and
e. Revised grading plans had not yet been submitted the time of comment preparation, any oral
comments regarding the grading plan will be discussed at the meeting.
Staff Recommendation:
Staff recommends that, if the Committee generally finds the revised site plan and building elevations
consistent with the direction given to the applicant at the previous meetings, then staff would recommend
that the Design Review Committee recommend approval of the project to the Planning Commission with
Conditions.
Attachment
DRC AGENDA
CUP 95-25 - RODRIGUEZ
February 4, 1997
Page 2
Design Review Committee Action:
Members Present: William Bethel, Rich Macias, Dan Coleman
Staff Planner: Steve Hayes
The Design Review Committee directed the applicant to return to the Committee on February 18, 1997
with a specific roof plan that show all of the necessary roof mounted mechanical equipment and a more
detailed solution for the roof screen parapet. The Committee also recommended that all other items
included in the above comments as well as previously referenced comments from past design reviews
that have not yet been resolved will be incorporated as recommended Conditions of Approval for the
project.