HomeMy WebLinkAbout1999/01/19 - Agenda Packet DESIGN REVIEW COMMITTEE MEETING
ACTION AGENDA AND MINUTES
TUESDAY JANUARY 19, 1999 7:00 P.M.
RANCHO CUCAMONGA CIVIC CENTER
RAINS ROOM
10500 CIVIC CENTER DRIVE
RANCHO CUCAMONGA
Committee Members: John Mannerino Rich Macias Larry Henderson
Alternates: Peter Tolstoy Larry McNiel Pam Stewart
PROJECT REVIEW ITEMS
This is the time and place for the Committee to discuss and provide direction to an applicant regarding
their development application. The following items do not legally require any public testimony,although
the Committee may open the meeting for public input.
7:00 p.m.
(Brent) ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 98-25 -
CHEVRON-A request to demolish an existing Chevron service station and build a new
2,167 square foot service station/mini market, keeping the pump island and pump
island canopy in-place, on 0.74 acres of land in the Neighborhood Commercial District,
located at 8687 Base Line Road - APN: 207-022-041.
CONSENT CALENDAR
The following items are expected to be routine and non-controversial. Typically they are items such
as plan revisions prepared in response to discussions at a previous meeting.
7:40 p.m.
(Cecilia) DEVELOPMENT REVIEW 97-23(DESIGN REVIEW FOR TENTATIVE TRACT 13564)
- STANDARD PACIFIC - The design review of the detailed site plan and building
elevations for a previously County approved residential subdivision of 182 lots on 117
acres of land in the Very Low Residential District (less than 2 dwelling units per acre),
located between Wardman Bullock Road and the San Savaine Wash -APN: 226-082-
30 and 58 through 63.
PUBLIC COMMENTS
This is the time and place for the general public to address the Committee. State law prohibits the
Committee from addressing any issue not previously included on the Agenda. The Committee may
receive testimony and set the matter for a subsequent meeting. Comments are limited to five minutes
per individual.
ADJOURNMENT
DESIGN REVIEW COMMENTS
7:00 p.m. Brent Le Count January 19, 1999
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 98-25 - CHEVRON - A
request to demolish an existing Chevron service station and build a new 2,167 square foot service
station/mini market, keeping the pump island and pump island canopy in-place, on 0.74 acres of land
in the Neighborhood Commercial District, located at 8687 Base Line Road - APN: 207-022-041.
The Committee (Macias, Mannerino, Henderson) reviewed the project at the December 15, 1998
meeting and directed the applicant to redesign the project and bring it back for further review. The
applicant requested a continuance to January 19, 1999. Revised plans are not yet available and will
be presented with staff comments at the meeting.
Design Review Committee Action:
Members Present: Pam Stewart
Staff Planner: Brent Le Count
The Committee (Stewart) reviewed the project and requested that the applicant redesign the project
and bring it back for further review based upon the following:
1. Restudy front elevation of building to avoid flatness. Consider greater changes of plane, color
change for cornice treatment, raising/projecting tower element, adding trellises, and introducing
another material.
2. Box out existing canopy and provide stucco and cornice treatment to match the building.
3. Box out columns of canopy to match the basic dimensions of columns on the building.
4. Provide wall mounted trellises within archway indents to provide visual interest.
5. Provide revised Site Plan and Landscape Plan to address layout issues identified at
December 15, 1998, Design Review Committee meeting.
CONSENT CALENDAR COMMENTS
7:40 p.m. Cecilia Williams January 19, 1999
DEVELOPMENT REVIEW 97-23(DESIGN REVIEW FOR TENTATIVE TRACT 13564) -STANDARD
PACIFIC -The design review of the detailed site plan and building elevations for a previously County
approved residential subdivision of 182 lots on 117 acres of land in the Very Low Residential District
(less than 2 dwelling units per acre), located between Wardman Bullock Road and the San Savaine
Wash - APN: 226-082-30 and 58 through 63.
Design Review Committee Action:
Members Present: Pam Stewart
Staff Planner: Cecilia Williams
The Committee did not recommend approval of the revised plans for the rear yard slope areas. The
Committee stated that the applicant had not sufficiently addressed the Committee's comments. The
Committee stated that they had hoped to see more substantial changes and full details for the slopes
that included terracing, with flat bench areas, pathways from the steps to the flat bench areas, and
drainage information. The Committee did not like the railroad tie steps, and recommended that steps
be built into the retaining walls. The applicant was directed to revise plans to incorporate the
Committee's comments from the December 15th, Design Review Committee Meeting.
DESIGN REVIEW COMMENTS
January 19, 1999
PUBLIC COMMENTS
There were no public comments at this time.
ADJOURNMENT
The meeting adjourned at 8:20 p.m.
Respectfully submitted,
Buller
Secretary