HomeMy WebLinkAbout2000/01/18 - Agenda Packet - (2) DESIGN REVIEW COMMITTEE MEETING
ACTION AGENDA AND MINUTES
TUESDAY JANUARY 18, 2000 7:00 P.M.
RANCHO CUCAMONGA CIVIC CENTER
RAINS ROOM
10500 CIVIC CENTER DRIVE
RANCHO CUCAMONGA
Committee Members: Larry McNiel Pam Stewart Dan Coleman
Alternates: Peter Tolstoy Rich Macias John Mannerino
CONSENT CALENDAR
The following items are expected to be routine and non-controversial. Typically they are items such
as plan revisions prepared in response to discussions at a previous meeting.
7:00 p.m.
(Doug) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-59 —
PANATONNI DEVELOPMENT — The development of a 180,000 +/- square foot
industrial building on 7.95 acres of land in General Industrial District (Subarea 10) of
the Industrial Area Specific Plan located at the northwest corner of 7th Street and
Toronto Avenue -APN: 209-401-21.
7:10 p.m. _
(Brent) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-60 —
CARPENTER'S TECHNOLOGY—The development of a 56,200 square foot industrial
building on 4 acres of land in Subarea 7 (Industrial Park) of the Industrial Area specific
Plan, located on the west side of Milliken Avenue south of Foothill Boulevard —APN:
229-011-031.
PROJECT REVIEW ITEMS
This is the time and place for the Committee to discuss and provide direction to an applicant
regarding their development application. The following items do not legally require any public
testimony, although the Committee may open the meeting for public input.
7:20 p.m.
(Debra) ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 99-49 —
EVERGREEN/DEVCO-The development of a drugstore with a drive-through window
for prescription orders consisting of a 13,813 square foot building on a 1.52 acre
parcel in the Office Professional (OP) District, located at the northwest corner of
Haven Avenue and Alta Loma Drive. —APN: 01-262-37. Related file: Tree Removal
Permit 99-37.
8:00 p.m.
(Debra) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-70—MASTER
DEVELOPMENT CORPORATION - The request for approval of a rail served
distribution building comprised of 847,828 square feet located at 12167Arrow Route,
on a 39.2 acre parcel in Subarea 15 of the Industrial Development Districts (Heavy
Industrial). —APN: 229-121-15.
DRC AGENDA
January 18, 2000
Page 2
8:40 p.m.
(Doug) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-69—ROBERT
GIBBS DEVELOPMENT CO. — The development of a 19,326 square foot industrial
building on 1.32 acres of land in General Industrial District (Subarea 3) of the
Industrial Area Specific Plan located at the north east corner of 9th Street and
Hellman Avenue -APN: 209-022-20.
9:20 p.m.
(Rudy) . DEVELOPMENT- REVIEW 99-57 — LEWIS RETAIL - A request to remodel and
upgrade the facade to the existing buildings within the shopping center, Alta Loma
Square, in the Neighborhood Commercial District, located at the northeast corner of
19th Street and Carnelian Avenue - APN: 201-221-45
PUBLIC COMMENTS
This is the time and place for the general public to address the Committee. State law prohibits the
Committee from addressing any issue not previously included on the Agenda. The Committee may
receive testimony and set the matter for a subsequent meeting. Comments are limited to five
minutes per individual.
ADJOURNMENT
r
CONSENT CALENDAR COMMENTS
7:00 p.m. Doug Fenn January 18, 2000
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-59 — PANATONNI
DEVELOPMENT—The development of a 180,000 +/- square foot industrial building on 7.95 acres
of land in General Industrial District (Subarea 10) of the Industrial Area Specific Plan located at the
north west corner of 7th Street and Toronto Avenue - APN: 209-401-21.
Design Review Committee Action:
Members Present: Larry McNiel, Pam Stewart, Dan Coleman
Staff Planner: Doug Fenn
The Committee approved the applicant's revision of the south elevation.
CONSENT CALENDAR COMMENTS
7:10 p.m. Brent Le Count January 18, 2000
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-60 — CARPENTER'S
TECHNOLOGY—The development of a 56,200 square foot industrial building on 4 acres of land
in Subarea 7 (Industrial Park) of the Industrial Area specific Plan, located on the west side of
Milliken Avenue south of Foothill Boulevard —APN: 229-011-031.
Design Review Committee Action:
Members Present: Larry McNiel, Pam Stewart, Dan Coleman
Staff Planner: Brent Le Count
The Committee reviewed the revised design. The applicant shall provide a written description of
the maintenance activity associated with the at-grade loading door n the east wall of the building.
If the activity level is anticipated to be of short duration and of an infrequent nature than the
Committee will accept the free-standing panel design shown.
DESIGN REVIEW COMMENTS
7:20 p.m. Debra Meier January 18, 2000
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 99-49 —
EVERGREEN/DEVCO - The development of a drugstore with a drive-through window for
prescription orders consisting of a 13,813 square foot building on a 1.52 acre parcel in the Office
Professional (OP) District, located at the northwest corner of Haven Avenue and Alta Loma Drive.
—APN: 01-262-37. Related file: Tree Removal Permit 99-37.
Design Parameters: The Committee (McNiel and Fong) reviewed this project at their November6,
1999 meeting. A copy of the Design Review Committee Action is attached for reference. The
Committee was particularly concerned with a variety of Site Plan issues related to circulation and
truck delivery patterns on the site, and the proximity of the loading area to the existing
condominiums. The Committee also expressed concerns pertaining to the proposed foundation
planters along the building face, the design of the pedestrian level space and building design. The
applicant has been working diligently with staff to address the design issues. At this time, the
applicant has attempted to address the identified site issues. The applicant has indicated that they
will continue to work with staff on resolving the other identified issues pertaining to landscaping and
building design. Therefore, the focus of the Committee's review tonight is the Site Plan issues
related to the circulation and truck delivery.
Staff Comments: The following comments are intended to provide a focus for Committee
discussion regarding this project:
Site Plan
1. The circulation at the rear of the building provides access to the drive-thru pharmacy. The
drive-thru patrons will proceed through the order window and then U-turn to exit the site.
2. The truck unloading zone is now completely separate from the drive-thru circulation. The
delivery trucks will back into the delivery zone, as indicated on the Site Plan. In conjunction
with the modifications to the delivery zone, the applicant has modified the perimeter wall to
allow for the preservation of several trees that are at or near the property line. Staff believes
that this is an acceptable solution.
3. The trash enclosure has been relocated to the north end of the delivery zone, including a
trash compactor, which is completely screened and gated. This is an acceptable solution.
4. Eliminate a parking space in front of the tower at the southeast corner of the building to
expand the plaza area.
Landscaping
1. The proposal to provide vines on building mounted trellis, as an alternative to landscaping
along the building face, has not been modified from plans previously reviewed by the
Committee.
2. Provide tree planters at northeast corner of building and along north side of drive-thru.
3. West property boundary should have the following design improvement: change the tree
species from Quercus Virginana (Live Oak) to Pinus Elderica and planted at 10 feet on
center; provide double row of shrubs for a distance of 60 feet from the delivery entry; single
row of shrubs from the end of the double row to the gate, double row of shrubs from the gate
to the north property boundary, and all shrubs to be planted at 3 feet on center. This can
be conditioned.
DRC COMMENTS
CUP 99-49— EVERGREEN/DEVCO
January 18, 2000
Page 2
4. Modify streetscape along Haven Avenue to be consistent with the established theme for the
street. Tree species should include a mix of Sycamore, Pines and Magnolia. Add a flowing
stream of river-rock and boulders along Haven Avenue and wrap around the same
treatment along Alta Loma Drive. Appropriate shrubs should be provided within the bed of
river rock. This can be conditioned.
5. Project entries should have specimen size and accent trees.
6. Building entry and plaza area should have tree wells. A suggested tree species is Palm tree.
7. Provide a continuous landscape strip along the east elevation.
8. Mounding should be provided along Haven Avenue instead of screen wall. This can be
conditioned.
9. Provide a row of shrubs in front of the screen wall along Alta Loma Drive. This can be
conditioned.
Architecture/Building Design
1. The delivery zone is indicated on the Site Plan as "covered loading area," however, the
elevations do not show any cover element. Further, the Development Code would require
a 20-foot building setback. Even a trellis would require a 17-foot minimum setback (not 10
feet as shown on Site Plan).
2. The Committee had raised design issues as listed in the attached November 16, 1999
Design Review Committee Action. The applicant is willing to continue to work with staff in
resolving them and they may have revised elevation for Committee's review at January 18
meeting.
Staff Recommendation: Review these and any other issues identified by the Committee; suggest
modifications as necessary. Any unresolved issues pertaining to landscaping and architecture
should be scheduled to return for Committee review at a subsequent meeting.
Attachment
Design Review Committee Action:
Members Present: Larry McNiel, Pam Stewart, Dan Coleman
Staff Planner: Debra Meier
The Committee reviewed the issues identified by staff in areas of Site Plan, landscaping, and
building architecture, and made the following recommendations:.
Site Plan
The applicant presented revised Site Plans for the Committees discussion and consideration (dated
January 10, 2000). The revisions made to the circulation through the drive-thru pharmacy were
found to be acceptable, including the relocation of the trash enclosure/compactor and the gated
loading area. The Committee continues to express concerns about the potential to generate
excessive noise in the loading and trash compactor area. However, the Committee recommended
approval of the Site Plan subject to the following conditions:
DRC COMMENTS
CUP 99-49 — EVERGREEN/DEVCO
January 18, 2000
Page 3
1. The applicant shall pursue with the noise consultant whether the use of noise absorption
material can or should be added to the building wall to eliminate the "vibration" of sound
between the wall and the building.
2. The planters that direct traffic into the drive-thru pharmacy shall be expanded, and more
pronounced, in order to direct traffic into the drive-thru lane, as well as provide additional
landscaping in this location at the rear of the building.
Landscaping
The Committee recommended approval of the landscape concept subject to the following
conditions:
1. The wall along the west boundary shall be designed using split face block, which is
consistent with the block used on the building wainscot. The pilasters shall be designed
using fluted block of the same integral color.
2. The landscaping along the west property line shall be designed to not only to preserve the
existing trees, but also to supplement the landscaping for buffering and screening purposes.
The density of landscaping shall be as follows Pinus Elderica at 10-feet on center; a double
row of shrubs for a distance of 60 feet south of the delivery gate; a single row of shrubs from
the delivery gate north to the maintenance access gate; a double row of shrubs from the
maintenance gate to the north property boundary; all shrubs shall be planted 3-feet on
center or as recommended based on the chosen species.
3. Vines shall be placed on the west side (facing the condominium project) of the west
boundary wall. _
4. The Haven Avenue streetscape is a Special Boulevard which must include the following
design elements: undulating mounding along with the use of river rock and/or boulders; and
informal massing of shrubbery which can be used to screen the parking lot. The street tree
shall be Magnolia Grandiflora "Majestic Beauty" (used within the street right-of-way). The
background tree (used behind the right-of-way) shall be informal grouping of Brachychiton
Populneus (Bottle Tree).
5. The trees used along Alta Loma Drive shall be Lagerstroemia Indica "Catawba" (Crape
Myrtle) at approximately 20-feet on center.
6. Accent trees shall be used at project entries, and entry and building plaza areas. The
recommended accent tree is a palm species.
Architecture/Building Design
Following preparation of the comments for Committee discussion, staff determined that the loading
area can not be covered, due to building setback restrictions from the property line. The applicant
has addressed the building design along the east elevation through incorporating the arcade along
the entire elevation, wrapping the north side of the building. In doing so, the foundation planters
have been removed, and tree wells have been added in front of the colonnade columns. The
Committee approved this revision, however, recommended that the applicant work with staff to
resolve any remaining design details prior to being forwarded to the Planning Commission for
review and approval:
1. Incorporate additional trim on the arches along the colonnades.
2. Incorporate additional the accent elements and vary the color patterns for additional variety.
DESIGN REVIEW COMMENTS
8:00 p.m. Debra Meier January 18, 2000
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-70 — MASTER
DEVELOPMENT CORPORATION - The request for approval of a rail served distribution building
comprised of 847,828 square feet located at 12167Arrow Route, on a 39.2 acre parcel in Subarea
15 of the Industrial Development Districts (Heavy Industrial). —APN: 229-121-15.
Design Parameters: The site is that of the former AMPAC concrete pipe manufacturing facility. All
existing structures and pavement will be removed for the proposed development of the Origen Rail
Center, with the exception of the perimeter fences and walls, and driveways on Arrow Route.
Immediately adjacent to the site on Arrow Route is an exiting alcohol distillery; the west boundary
parallels an Edison corridor with exiting transmission towers. The proposed project is intended to
be rail served from the Santa Fe Rail line along the southerly boundary. The street frontage was
fully improved by AMPAC.
The facility includes approximately 10,000 square feet of office space and 837,828 square feet of
warehouse space. The building incorporates 88 dock high doors and 2 grade level doors along the
west elevation, and 16 rail service dock doors on the east elevation.
The structure incorporates a creative use of concrete panels and "sky turrets" to accent the building
and provide a visual distraction along the freeway corridor. Primary building materials include
concrete panels in a variety of machine grid patterns and finishes, and sand blasted concrete (south
and east elevations only). The concrete panels are proposed to include a combination of painted,
plastered, and DRIVIT finishes to provide the distinctive variety at the building entries. Secondary
materials include "solarcool" bronze reflective glass, the sky turret is comprised on KAL-WALL with
a metal frame.
The truck dock area on the west elevation is screened from 1-15 freeway by a dense planting of
Canary Island Pine, London Plane, and White-Alder, in combination with the existing Leyland
Cypress trees. This planted screen will continue along the south site boundary and around to a
portion of the eastern boundary to provide screening from view from the Metrolink commuter rail
line.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion:
Architecture
1. The applicant has proposed the use of concrete panels with varying finishes at the building
entry elevations, and has incorporated sandblasted concrete accent bands on the south and
east elevations. The applicant has taken a very creative approach to the building design
elements, including the entry focal elements and the use of the sky turrets; however, these
elements are essentially all concrete panels. The Committee should consider whether the
proposal of varying finishes of the concrete surface, the use of DRIVIT on the concrete
panels, and sandblasted concrete on the south and east elevations, fully satisfies the
industrial building material policy requiring two primary exterior building materials.
2. The applicant is keeping the existing 8-foot walls along the street frontage. The walls should
be coated or painted to match the finish and color of the proposed building.
Site Planning
The site should be designed to direct truck access through the middle driveway from Arrow Route,
and customer and employee parking should be directed through the easterly and westerly
driveways. In order to more fully take advantage of this concept (refer to Exhibit A):
e
y�V
r:tom
,�rri I1/
.MMIY:M
•i �r r
•. •r:�!lSCSt
. / t�'•T�•�1�..j� '�:::.�•:.'+::' `�.'��i3Yit��.:•G'i�.� •� �—'' =!�.MSI'.Fm:•y�i.» s`,.F_�,,�li�('•,��::� •• e+
i i� j +a,u"1,�_1�••_.:c•..r.��.+.�+•r+..rrd'."a.p'�.sl C•�. .t.•..;tvJtS:r,�afr�r..,,Tn.Ttvs�sl.••nw.C'rrr:-:��.::«.rw.
_•' t ..
oil
mw
dim
lie
,� --- AI®ID
g .: w
a NO � i j,W4
�. �11`-�
i
i
DRC COMMENTS
DR 99-70 — MASTER DEVELOPMENT CORP.
January 18, 2000
Page 2
1. The west parking area should be redesigned to circulate internally with only one opening to
the truck access path, and eliminate the ability to use the westerly driveway to directly
access the truck access path from Arrow Route
2. The opening to the east parking area from the truck access path (south of Arrow Route)
should be eliminated.
3. Incorporate enhanced pavement across the drive aisle leading from the parking areas to the
entry plaza.
Staff Recommendation: Staff recommends that the Committee review and address the issues
identified above, and recommend that the project be forwarded for Planning Commission review and
approval.
Attachment
Design Review Committee Action:
Member Present: Dan Coleman, Larry McNiel, Pam Stewart
Staff Planner: Debra Meier
The Committee complemented the applicants on the creative approach to architectural solutions
to such a large facility. They approved the architectural concept, including the material sample
board as presented by the applicant. Materials include concrete panels (scored and painted),
sandblast finish on upper panel along the south and east elevations, metal-work storefront
overhang, "Kalwall" construction "sky turrets," and bronze glazing.
The Committee recommended that the project be forwarded to the Planning Commission for review
and approval, subject to the following conditions:
1. The landscaping along Arrow Route street frontage shall be supplemented with clusters of
shrubbery, and vines on the existing slump stone wall.
2. The concrete pipe sections, which surround the trees in the landscape setback area, shall be
removed.
3. Due to comments from Engineering Department staff, the most easterly driveway is to be used
for emergency access only. Therefore, vehicular entry into the easterly parking lot will be via
the central driveway. The Committee asked the applicant to analyze the parking area located
on the westerly boundary to take into consideration separation of vehicular and truck traffic
to the extent feasible, provide fence between parking lot and central driveway to control
pedestrian access, and the logical route that employees will be taking in crossing the parking
area to the building entry. The Committee stated that this issue should be resolved with staff
prior to Planning Commission consideration
DESIGN REVIEW COMMENTS
8:40 p.m. Doug Fenn January 18, 2000
r
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-69 — ROBERT GIBBS
DEVELOPMENT CO.—The development of a 19,326 square foot industrial building on 1.32 acres
of land in General Industrial:District (Subarea 3) of the Industrial Area Specific Plan located at the
north east corner of 9th Street and Hellman Avenue -APN: 209-022-20.
Design Parameters: The site is a 1.32 acre vacant parcel. There are several existing Eucalyptus
trees at the northwest corner of the site, which will not be removed. The site slopes from north to
south at an approximately 1 percent. The site is surrounded by the Department of Motor Vehicles
(DMV) to the north and to the east are industrial buildings. Across 9th Street to the south are
industrial buildings and across the Hellman Avenue to the west is an industrial building. The
proposed building will be used for dual tenants' general industrial type activities (one of the tenants
is MAACO, an automobile painting company).
The overall building design is oriented to face the northeast corner intersection of 9th street and
Hellman Avenue. The office portion(s) of the building will front the public right-of-ways of 9th Street
and Hellman Avenue. The storage and loading areas are behind the building and are not clearly
visible of the street right-of-ways. The building design features a stucco cornice with a raised 4-foot
high parapet over the office entryways and another raised 4-foot high parapet on the eastside of the
building to blend in with the design of the facility. The facility has 360 degree architecture with
strong articulation, color variation, of a "harbor grey" and "winter sky" color scheme on a
sandblasted concrete and concrete tilt-up fagade with greylite reflective colored glazing accents.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Major Issues: The following broad design issues_will be the focus of Committee discussion
regarding this project:
1. Delete gate at southeastern corner of property because vehicles waiting to enter will block
north-south access to DMV.
Secondary Issues: Once of all the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
1. Provide screen wall, minimum 6 feet high, between outdoor employee eating area and
"delivery area.
Policy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion:
1. Provide tables and chairs for outdoor employee eating area.
2. The screen gates should be automated to ensure that the gate is open the minimum time
necessary to allow trucks in and out of the loading area.
Staff Recommendation: Staff recommends that the Design Review Committee approve the project
subject to the modification as recommend above.
DRC COMMENTS
DR 99-69— ROBERT GIBBS DEV. CO.
January 18, 2000
Page 2
Design Review Committee Action:
Members Present: Larry McNiel, Pam Stewart, Dan Coleman
Staff Planner: Doug Fenn
The Committee recommended that additional architectural detailing be incorporated along the south
face of the building. The Committee also recommended that the access on the east side of the
property be redesigned to accommodate .an acceptable queuing of vehicles. The Committee
instructed the applicant to work these items with staff, and once the items had been addressed, then
to proceed with the development process.
DESIGN REVIEW COMMENTS
9:20 p.m. Rudy Zeledon January 18, 2000
DEVELOPMENT REVIEW 99-57— LEWIS RETAIL-A request to remodel and upgrade the facade
to the existing buildings within the shopping center, Alta Loma Square, in the Neighborhood
Commercial District, located at the northeast corner of 19th Street and Carnelian Avenue
APN: 201-221-45.
Design Parameters: The center was constructed before the City's incorporation in 1977. The
project proposes to remodel and upgrade the facades of Building "A." Building "B," and Rite Aid.
The existing Vons store is not part of this Development Review application. The applicant has
indicted that Vons will submit a separate Development Review application for the remodel and
expansion of the store, at later time. Currently, the Washington Mutual building is under
construction undergoing a facade upgrade. The upgrade will be architecturally compatible with the
proposed design upgrade of the center. In addition, the proposed design concept for the remodel
and upgrade of center will compatible with the Blockbuster building, which was constructed in 1998.
Recently, the center's parking lot was resurfaced and re-striped to a 90-degree angle design.
Staff Comments: The following comments are intended to provide ant outline for Committee
discussion:
Major Issues: The following broad issues will be on the focus of Committee discussion regarding
this project:
The applicant proposes to remodel and upgrade the facades of Building "A," Building "B," and Rite
Aida The applicant has indicated that Vons will not receive an upgrade at this time. According to the
applicant, Vonsvill submit a separate application for the their facade upgrade and expansion at a
later time. However, staff believes that a conceptual design of a facade upgrade for Vons should
be included with this application so that staff could assure proper transition and interface with the
proposed center facelift. In addition, staff is requesting that the applicant provide a time frame for
the facade upgrade and expansion of Vons. In the event that Vons does not submit an application,
staff would like to have the assurance that the upgrade then would be done by the applicant within
a reasonable time frame.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
1. The proposed towers, which will be the dominant architectural feature throughout the center,
should have additional architectural enhancement. The architectural enhancement may
included, but not limited to the following detail:
a. Provide a different color shade to the tower's facade.
b. Continue cornice treatment along top of the tower parapet.
C. Increase the thickness of the cornice detail between the tower parapet and archway
entrance (south elevation building "A").
d. The tile patters on the tower shall be recessed and the tile detail shall vary in color and
pattern work.
DRC COMMENTS
DR 99-57 — LEWIS RETAIL
January 18, 2000
Page 2
2. Provide either concrete or stucco surrounds (high-density foam) to all tile elements along
the storefront facades.
3. Provide tree wells (4-foot by 4-foot inside dimension) along the outer edge of the walkway
on the south elevation for Building "A." Either Crape myrtle or Palm trees shall be planted
within the tree wells.
4. Provide additional tree planters between parking stalls, consistent with the exiting planters
within the parking area.
5. Currently the light standards, within the parking area, are not in compliance with the
Development Code Standards. Staff recommends the lighting be brought up to Code
Standards and redesigned to be compatible with the proposed design concept of the center.
6. The elevations show the proposed sign height to be of 24 inches. Staff believes that the sign
height is not in proportion to the height of the building fascia. The proposed sign height
should be reduced to 18 inches.
Staff Recommendations: Staff recommends that the project be revised per the above comments
and be brought back for further review.
Design Review Committee Action:
Members Present: Larry McNiel, Pam Stewart, Dan Coleman
Staff Planner: Rudy Zeledon
The Committee reviewed the project and recommended approval subject to staffs above comments
with the following changes:
1. A conceptual design for the facade upgrade of Vons storefront is not needed with this
application. The applicant explained that they have been in discussions with Vons for
several years regarding a facade upgrade; however, Vons has not made a decision. Under
the terms of their lease, Lewis cannot alter the Vons facade without their approval.
However, the Committee directed the applicant to continue to work with Vons in their efforts
to go upgrade the facade to their storefront.
2. Provide tree wells (4-foot by 4-foot inside dimension) along the outer edge of the walkway
on the south elevation for Building "A," where possible, subject to City Planner approval.
3. Existing light standards, within the parking area, do not have to be brought up to Code
Standards at this time. The Committee recommended that the applicant make a good faith
effort to address the lighting issue at a later time.
DESIGN REVIEW COMMENTS
January 18, 2000
PUBLIC COMMENTS
There were no public comments at this time.
ADJOURNMENT
The meeting adjourned at 9:30 p.m.
Respectfully submitted,
Brad
Secretary
i