Loading...
HomeMy WebLinkAbout2000/08/01 - Agenda Packet DESIGN REVIEW COMMITTEE MEETING ACTION AGENDA AND MINUTES TUESDAY AUGUST 1, 2000 7:00 P.M. RANCHO CUCAMONGA CIVIC CENTER RAINS ROOM 10500 CIVIC CENTER DRIVE RANCHO CUCAMONGA Committee Members: Larry McNiel Pam Stewart Dan Coleman Alternates: Peter Tolstoy Rich Macias John Mannerino PROJECT REVIEW ITEMS This is the time and place for the Committee to discuss and provide .direction to an applicant regarding their development application. The following items do not legally require any public testimony, although the Committee may open the meeting for public input. 7:00 p.m. (Warren) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 00-24—DARRYL L. HANN The development of a multi-tenant office/warehouse building totaling 34,493 square feet on 2.17 acres of land in Subarea 7 of the Industrial Area Specific Plan, located on east side of Elm Avenue,just north of White Birch Drive—APN: 208- 961-23. 7:30 p.m. (Warren) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 00-25—STEFAN A. SMITH The development of two multi-tenant office/warehouse buildings totaling 27,000 square feet on 1.74 acres of land in Subarea 8 of the Industrial Area Specific Plan, located at the northeast corner of Elm Avenue and White Birch Drive — APN: 208-961-23 CONSENT CALENDAR The following items are expected to be routine and non-controversial. Typically they are items such as plan revisions prepared in response to discussions at a previous meeting. 8:00 p.m. (Warren) ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 00-12 — TOMRA PACIFIC, INC.—A request to expand an existing recycling facility from 2.49 acres to 4.79 acres of land in Subarea 5 of the Industrial Area Specific Plan, located at 9910 East 6th Street—APN: 209-211-42,43. Related files: Conditional Use Permit 99-42. 8:10 p.m. (Doug) DEVELOPMENT REVIEW 00-35 — KAUFMAN AND BROAD — Design review of building elevations and site plan for two new single family plans for Tract 15875, located east of Day Creek Boulevard, between Highland Avenue and Base Line Road —APN: 227-351-65; 227-393-01 and 02; 227-401-78; and 227-091-41. r DRC AGENDA August 1, 2000 Page 2 PUBLIC COMMENTS This is the time and place for the general public to address the Committee. State law prohibits the Committee from addressing any issue not previously included on the Agenda. The Committee may receive testimony and set the matter for a subsequent meeting. Comments are limited to five minutes per individual. ADJOURNMENT DESIGN REVIEW COMMENTS 7:00 p.m. Warren Morelion August 1, 2000 ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 00-24 — DARRYL L. HANN The development of a multi-tenant office/warehouse building totaling 34,493 square feet on 2.17 acres of land in Subarea 7 of the Industrial Area Specific Plan, located on east side of Elm Avenue, just north of White Birch Drive—APN: 208-961-23. Design Parameters: The 2.17 acre site is vacant and slopes south at approximately 2 percent. The site is surrounded to the north and east by existing industrial development, and to the south and west by vacant land. The property to the south is currently being proposed for development (Development Review 00-25). The site has a street frontage along Elm Avenue with two proposed drive approaches. Truck loading is proposed on the south side of the building away from the street frontage. The building is architecturally designed to fit the rectangular shape of the site and is consistent with surrounding industrial development. A number of trees exist at the west portion of the property along Elm Avenue. Staff Comments: The following comments are intended to provide an outline for Committee discussion. Major Issues: The following broad design issues will be the focus of Committee discussion regarding this project: 1. Articulate building elevations to eliminate long continuous plane and flat roofline. Design the office portion as the architectural focus point of the building by providing vertical variation between it and the warehouse portion of the building. 2. Redesign west elevation to eliminate large expanse of fluted area in center of building design.To make the elevation more architecturally compatible with the north elevation,the applicant should design the area between storefronts the same. Secondary Issues: Once all of the major issues have been addressed, and time permitting, the Committee will discuss the following secondary design issues: 1. Relocate the drainage swale near north drive approach so it does not interfere with the decorative driveway paving design. 2. Provide landscape berms in front landscape areas to provide visual interest and further screen loading areas from public view. Staff Recommendation: Staff recommends that the project be revised in terms of the above comments and brought back for review under consent calendar. Design Review Committee Action: Members Present: Larry McNiel, Pam Stewart, Dan Coleman Staff Planner: Warren Morelion The Committee recommended approval of the project subject to the following: J 1. Redesign west elevation to match design of north elevation (i.e., add glazing). DRC COMMENTS DR 00-24— DARRYL L. HANN August 1, 2000 Page 2 2. Relocate drainage swale so it does not interfere with decorative driveway paving design. 3. Provide landscape berms in front landscape areas. 4. Enhance employee-eating area by adding lunch tables. 5. Revise 12-inch color stripe/treatment on building so it is. complimentary with color stripes/treatments on proposed building to the south. DESIGN REVIEW COMMENTS 7:30 p.m. Warren Morelion August 1, 2000 ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 00-25—STEFAN A. SMITH The development of two multi-tenant office/warehouse buildings totaling 27,000 square feet on 1.74 acres of land in Subarea 8 of the Industrial Area Specific Plan, located at the northeast corner of Elm Avenue and White Birch Drive—APN: 208-961-23. The 1.74-acre site is vacant and slopes south at approximately 1 percent. The site is surrounded to the south and east by existing industrial development,and to the north and west by vacant land.The property to the north is currently being proposed for development (Development Review 00-24). There are two buildings proposed on the site. One building is 12,800 square feet and the other building is 14,200 square feet. Street frontage for the project is along Elm Avenue and White Birch Drive. There are two drive approaches proposed on White Birch Drive with truck loading areas away from the street frontage. The buildings are architecturally designed to fit the shape of the site and are consistent with surrounding industrial development. A number of trees exist at the west and south portion of the property along Elm Avenue and White Birch Drive. Staff Comments: The following comments are intended to provide an outline for Committee discussion. Major Issues: The following broad design issues will be the focus of Committee discussion regarding this project: 1. Articulate building elevations to eliminate long continuous plane and flat roofline. Design the office portion as the architectural focus point of the buildings by providing more glass treatment and by providing vertical variation between them and the warehouse portion of the buildings. 2. Incorporate sandblasted concrete treatment on all building elevations. Secondary Issues: Once all of the major issues have been addressed, and time permitting, the Committee will discuss the following secondary design issues: 1. Provide landscape berms in front landscape areas to provide visual interest and further screen loading areas from public view. Staff Recommendation: Staff recommends that the project be revised in terms at the above comments and brought back for review under consent calendar. Design Review Committee Action: Members Present: Larry McNiel, Pam Stewart, Dan Coleman Staff Planner: Warren Morelion The Committee recommended approval of the project subject to the following: 1. Incorporate sandblasted concrete treatment on all building elevations. 2. Provide landscape berms in front landscape areas. 3. Enhance employee-eating area by adding lunch tables. 4. Revise 12-inch color stripe/treatment on building so it is complimentary with color stripes/treatments on proposed buildings to the north. CONSENT CALENDAR COMMENTS 8:00 p.m. Warren Morelion August 1, 2000 ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 00-12—TOMRA PACIFIC INC. — A request to expand an existing recycling facility from 2.49 acres to 4.79 acres of land in Subarea 5 of the Industrial Area Specific Plan, located at 9910 East 6th Street—APN: 209-211-42, 43. Related file: Conditional Use Permit 99-42. Design Review Committee Action: Members Present: Larry McNiel, Pam Stewart, Dan Coleman Staff Planner: Warren Morelion The Committee reviewed the project and recommended approval. CONSENT CALENDAR COMMENTS 8:10 p.m. Douglas Fenn August 1, 2000 DEVELOPMENT REVIEW 00-35—KAUFMAN AND BROAD—Design review of building elevations and site plan for two new single family plans for Tract 15875, located east of Day Creek Boulevard, between Highland Avenue and Base Line Road—APN: 227-351-65;227-393-01 and 02;227-401- 78; and 227-091-41. Design Review Committee Action: Members Present: Larry McNiel, Pam Stewart, Dan Coleman Staff Planner: Douglas Fenn The Committee reviewed the project and recommended approval. DESIGN REVIEW COMMENTS AUGUST 1, 2000 PUBLIC COMMENTS There were no public comments at this time. ADJOURNMENT The meeting adjourned at 7:50 p.m. Respectfully submitted, i Brad Buller Secretary