HomeMy WebLinkAbout2008/05/06 - Agenda Packet ACTION AGENDA
DESIGN REVIEW COMMITTEE MEETING
TUESDAY MAY 6, 2008 7:00 P.M.
RANCHO CUCAMONGA CIVIC CENTER
RAINS ROOM
10500 CIVIC CENTER DRIVE
RANCHO CUCAMONGA
Committee Members: Lou Munoz Pam Stewart Corky Nicholson
Alternates: Richard Fletcher Frances Howdyshell Ray Wimberly
CONSENT CALENDAR
7:00 p.m.
(Adam/Cam) DEVELOPMENT REVIEW DRC2008-00064 - MERITAGE HOMES, LLC. - The design
review of building elevations and detailed site plan for 55 single-family lots on 14.5 acres
of land in the Low Residential District (2-4 dwelling units per acre) in the Etiwanda North
Specific Plan, located on the north side of Day Creek Boulevard, east of the Southern
California Edison Corridor - APN: 0225-071-47. Related files: Tentative Tract Map
SUBTT16227 and Development Review DRC2005-00986. Staff has found the project to
be within the scope of the project covered by a prior Environmental Impact Report (State
Clearinghouse #88082915 and #98121091 certified by the City Council on
August 1, 2001) and does not raise or create new environmental impacts not already
considered in that Environmental Impact Report.
PROJECT REVIEW ITEMS
7:10 p.m.
(Tabe/Mark) DEVELOPMENT REVIEW DRC2006-01012 - CARTER REDISH - Site plan and design
review of 29,700 square foot warehouse/office building and associated parking on
approximately 1.39 acre of land in the General Industrial District (Subarea 13), located at
the northeast corner of 6th Street and Charles Smith Avenue - APN: 0229-283-06 and
0229-271-33.
PUBLIC COMMENTS
There were no public comments.
ADJOURNMENT
The meeting adjourned at 7:45 p.m.
CONSENT CALENDAR
DESIGN REVIEW COMMENTS
7:00 p.m. Adam Collier May 6, 2008
DEVELOPMENT REVIEW DRC2008-00064 - MERITAGE HOMES, LLC. - The design review of building
elevations and detailed site plan for 55 single-family lots on 14.5 acres of land in the Low Residential
District (2-4 dwelling units per acre) in the Etiwanda North Specific Plan, located on the north side of Day
Creek Boulevard, east of the Southern California Edison Corridor - APN: 0225-071-47. Related files:
Tentative Tract Map SUBTT16227 and Development -Review DRC2005-00986. Staff has found the
project to be within the scope of the project covered by a prior Environmental Impact Report (State
Clearinghouse #88082915 and #98121091 certified by the City Council on August 1, 2001) and does not
raise or create new environmental impacts not already considered in that Environmental Impact Report.
Background: On February 22, 2006, the Planning Commission approved Development Review
DRC2005-00986 for the development of 145 homes on a 52.54-acre site within the 632-unit Master
Planned Community of Rancho Etiwanda Estates. Because of a shifting demand in the housing market,
the applicant, Meritage Homes, is requesting modifications of their previously approved building
elevations, site plan, and plan sizes for 55 of their 145 home sites. The applicant is required to develop
within substantial compliance with the Etiwanda North Specific Plan (ENSP), incorporating the
architecture and design details of the Etiwanda area. Requirements include side-on garages, recessed
garages, exterior siding, and specific architectural styles.
A Development Agreement was approved in 2001 which required the Low Residential standards for all
lots within this tract. The property was rough graded in June of 2004. The area was mass graded and
infrastructure was installed. The master developer has installed the main access of the gated
community, as well as the slope landscaping and decorative perimeter walls. These walls will be
consistent throughout the entire master planned community. The site is bordered by vacant land to the
north and west; by Day Creek Boulevard to the south;'and by a portion of Tract 16227, being built by
K. Hovnanian, to the east.
Design Parameters: The project site is located within the "Upper Etiwanda" neighborhood which has its
own unique architectural design guidelines per the ENSP. The ENSP requires that a mix of the following
primary architectural styles be used for at least two-thirds of the units: Bungalow, Ranch, Monterey, or
San Juan. Up to one-third of the units may use these styles: Country, Victorian, or Santa Barbara
Revival.
The proposed modifications are consistent with the required architectural styles and include downsized
floor plans and larger yard areas to meet the demand of the current housing market. The new plans are
a combination of one- and two-story homes and range in size from 2,194 square feet to 2,704 square
feet of livable area. A total of 13 (23 percent) of the proposed house product will be single-story. The
two-story plans have been designed with two floor plans and four architectural styles. The proposed
architectural styles are San Juan, Santa Barbara Revival, Monterey, and Ranch. The San Juan
elevation incorporates wrought iron details, recessed windows, decorative shutters, and arched
patio/entryway. The Santa Barbara Revival incorporates built-up eaves, louvered shutters, and recessed
windows. The Monterey style incorporates oversized rafter tails, brick veneer elements, hardboard
detailing, and recessed tile features. The Ranch style incorporates board and batt siding, louvered
shutters, wood kickers, and louvered hardboard details.
DRC ACTION AGENDA
DRC2008-00064 — MERITAGE HOMES, LLC
May 6, 2008
Page 2
All four sides of all homes have articulation and incorporate decorative garage doors and optional
chimneys to match the architectural style of the home. Each of the four plans feature covered porch
entries which range in size dependent upon the style. The developer is proposing to construct the
55 homes in nine phases.
Staff Comments: The following comments are intended to provide an outline for Committee discussion.
Major Issues: The following broad design issues will be the focus of Committee discussion regarding this
project:
1. The applicant has worked diligently with staff. Together with the Development Agreement and
discussions with staff, there are no major issues.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
1. The applicant has worked diligently with staff. Together with the Development Agreement and
discussions with staff, there are no secondary issues.
Policy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion:
1. Boulders from the project site shall be utilized and integrated as part of the front yard Landscape
Plan, per the Master Plan Resolution of Approval.
2. Driveways shall be colored and scored in a diagonal pattern for additional entryway detail.
3. Submit a detail of the tile work accents proposed on the San Juan style Plan Three prior to
submitting construction drawings.
Staff Recommendation: Staff recommends that the Design Review Committee recommend approval of
the project subject to the above revisions.
Design Review Committee Action:
Members Present: Munoz, Stewart, Nicholson
Staff Planner: Adam Collier
The Committee reviewed the project and recommend approval with no additional conditions.
DESIGN REVIEW COMMENTS
7:10 p.m. Tabe van der Zwagg May 6, 2008
DEVELOPMENT REVIEW DRC2006-01012 - CARTER REDISH - Site plan and design review of
29,700 square foot warehouse/office building and associated parking on approximately 1.39 acre of land
in the General Industrial District (Subarea 13), located at the northeast corner of 6th Street and Charles
Smith Avenue -APN: 0229-283-06 and 0229-271-33.
Design Parameters: The subject site is located at the northeast corner of 6th Street and Charles Smith
Avenue (between 6th Street and Rochester Avenue). The site is approximately 1.39 acre in size, slopes
roughly from the north to south, and is adjacent (east side) to the 1-15 Freeway. The site is surrounded
by other industrial developments with a number of buildings of similar size and type of construction.
The proposed warehouse building will be approximately 29,700 square feet in size, will include
approximately 1,000 square feet of office area, and will have a loading dock/ramp for one truck. Overall
height for the building is 30 feet (33 feet to top of the screen around roof-mounted mechanical
equipment). The entry/office area for the building is located on the northwest corner of the building
facing Charles Smith Avenue and will be adjacent to the parking area for the building. Twenty-nine
on-site parking spaces are provided (29 required). Ari employee outdoor eating area is located on the
northeast corner of the site and has 8-foot high walls along two sides to block the eating area from
freeway noise.
The design of the tilt-up building is straightforward and characteristic of industrial warehouse type
buildings. All sides of the building have been appropriately treated with architectural detail including the
side of the building which faces the freeway. The concrete tilt-up walls feature horizontal and vertical
score lines and have a combination of smooth, fluted, and sandblasted finishes. More specifically, each
building elevation is broken up and accented by decorative vertical design elements (located where there
is a slight recess in the wall plane) that have a "fluted" finish, a reflective window, and blue color tone.
Staff believes the overall design of the building is appropriate and visually interesting.
Staff Comments: The following comments are intended to provide an outline for Committee discussion.
Major Issues: The following broad design issues will be the focus of Committee discussion regarding this
project:
1. None.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
1. Maintenance of the freeway side of the building may be problematic because of the zero setback
from the freeway right-of-way. The applicant has been informed that he must obtain a letter from
Caltrans permitting him to access their property during the construction of the building and for
future maintenance purposes.
2. The Commissioners may want to have a Condition of Approval that states that no signs will be
allowed on the freeway side of the building.
DRC ACTION AGENDA
DRC2006-01012 — CARTER REDISH
May 6, 2008
Page 2
3. The site is parked at the minimum number of parking spaces permitted under the Development
Code. Future tenants of the site will not be able to increase the office portion of the building or
increase the intensity of use for the warehouse portion of the building.
4. The shade structure over the outdoor eating area is very minimalist with metal support beams and
a metal roof. Staff recommends that the applicant be required to use wood support beams, give
the structure a wood fascia, and to add a trash receptacle.
5. The front access gate should be painted to match the adjacent wall.
Policy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion:
1. All wall-mounted light fixtures shall be shielded to prevent glare and have a maximum height of
25 feet.
2. Show on plans the location of all ground- and roof-mounted equipment including required
transformers, standpipes, and/or large sized backflow preventer equipment. All such equipment
shall be located and screened from view in an architecturally compatible manner and/or by
landscaping to the satisfaction of the Planning Director.
3. No external downspouts or roof drains shall be permitted. All roof drains/downspouts/gutters shall
be incorporated into the structure of the exterior wall or placed entirely within the interior area of the
building.
Staff Recommendation: Staff recommends that the Committee, with the changes outlined above, find
the project to be acceptable for referral to the Planning Commission for final review.
Design Review Committee Action:
Members Present: Munoz, Stewart, Nicholson
Staff Planner: Tabe van der Zwaag
The Committee continued this item to a later date, which will be determined by staff, to provide the
applicant the opportunity to complete the following revisions as requested by the Committee prior to
Planning Commission hearing:
1. Revise zero setback along the freeway right-of-way to provide sufficient access for future building
maintenance.
2. The Committee members want a Condition of Approval that states that no signs will be allowed on
the freeway side of the building.
3. Consider increasing the proposed number of parking spaces to anticipate the possibility of future
expansion.
4. Revise the proposed shade structure to include wood support beams, wood fascia, and addition of
a trash receptacle.
DESIGN REVIEW COMMENTS
May 6, 2008
ADJOURNMENT
The meeting adjourned at 7:45 p.m.
Respectfully submitted,
O'k. I . '4t'-L
Corky Nicholson
Assistant Planning Director