HomeMy WebLinkAbout12-196 - Resolutions RESOLUTION NO. 12-196
A RESOLUTION OF THE CITY COUNCIL OF RANCHO
CUCAMONGA, CALIFORNIA, ADOPTING AN UPDATED FEE
SCHEDULE FOR APPLICABLE TO COMMUNITY
DEVELOPMENT AND OTHER VARIOUS MUNICIPAL
SERVICES, AMENDING RESOLUTION NO. 06-032 AND
REPEALING RESOLUTIONS 04-293, 06-283 AND 12-101.
A. Recitals.
1. The California Government Code allows the City to establish fees and charges for
municipal services, provided such fees and charges do not exceed the estimated reasonable
cost to the City in providing the service to which the fee or charge applies.
2. Data indicating the estimated or actual cost to provide each service, for which the
fees and charges set forth herein apply, was made available to the public at least ten (10) days
prior to the date of the public hearing.
3. On December 19, 2012, City Council of the City of Rancho Cucamonga conducted a
duly noticed public hearing on the amendment.
4. All legal prerequisites prior to the adoption of this Ordinance have occurred.
B. Resolution.
The City Council of the City of Rancho Cucamonga finds and resolves as follows:
SECTION 1: The City Council hereby specifically finds that all of the facts set forth in the
Recitals, Part A, of this Ordinance are true and correct.
SECTION 2: The City Council hereby specifically finds that the fees and charges set forth
in Sections 3, 4, 5 and 6 for do not exceed the estimated reasonable cost of providing the
service for which the fee or charge be levied.
SECTION 3: The City hereby adopts the following fees for photocopy services.
Copy Type Copy Charge
Black and White, all standard sizes $0.10 per page
Color, all standard sizes $0.23 per page
SECTION 4: The City Council hereby adopts the following fees for services performed by
the Building and Safety Department, including a technology fee of 4.5%.
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 2
MISCELLANEOUS FIRE PERMIT FEES
Current
Work Item Unit Fee New Fee
1 Standard Hourly Rate $118.63 $132.60
Fire Sprinkler Systems
2 1-20 Heads per floor ors stem $137.78 $150.69
3 21-100 Heads per floor ors stem $308.77 $337.54
4 101-200 Heads per floor ors stem $419.03 $458.08
5 201 -350 Heads per floor ors stem $474.17 $518.34
6 351 + per floor ors stem $584.44 $638.89
Fire Sprinkler-Tenant Improvements:
7 1-4 Heads per floor ors stem $143.49 $156.75
8 5-20 Heads per floor ors stem $198.49 $216.94
9 21-100 Heads per floor ors stem $258.26 $282.33
10 101-200 Heads per floor ors stem $474.17 $518.32
11 201 -350 Heads per floor ors stem $474.17 $518.32
12 351 + per floor ors stem $584.44 $638.89
Additional Fire Sprinkler Review Items
13 Hydraulic Calculation Per remote area $143.36 $156.75
14 Antifreeze S tem persystem $88.22 $96.45
15 Dry Pipe Valve per valve $88.22 $96.45
16 Deluge/ Preaction per valve $88.22 $96.45
17 Fire Cycle persystem $33.08 $36.16
18 Pressure Reducing Station per valve $88.22 $96.45
19 Fire Pump per pump $253.63 $277.26
Water Storage Tank
20 Gravity pertank $143.36 $156.75
21 Pressure pertank $33.08 $36.16
Fire Standpipe System
22 Class I, II, III &Article 81 per outlet $143.35 $156.75
Fire Alarm System
23 0-15 Devices' persystem $143.36 $156.75
24 16-50 Devices persystem $198.49 $216.32
25 51-100 Devices persystem $308.77 $337.54
26 101-500 Devices persystem $308.77 $337.54
27 for each additional 25 devices up to 1,000 per system $88.22 $96.45
28 1001+ persystem $727.78 $795.60
29 for each additional 100 devices) per system $88.22 $96.45
` Devices = All Initiating and indicating appliances
Additional Fire Alarm Review Items
30 Dampers each $88.22 $96.45
31 Hi/ Lo Alarms each $88.22 $96.45
32 Low air/temp Alarms each $88.22 $96.45
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 3
MISCELLANEOUS FIRE PERMIT FEES
Current
Work Item Unit Fee New Fee
33 Graphic Annunciator Review each $88.22 $96.45
34 Hazardous activities or uses
35 Installation Permits
36 Clean Agent Gas Systems each $253.63 $277.26
37 Dry Chemical Systems each $198.49 $216.97
38 Wet Chemical/Kitchen Hood each $363.89 $397.80
39 Foam Systems each $474.17 $518.32
40 Paint Spray Booth each $308.77 $337.54
41 Vehicle Access Gate each $143.36 $156.75
42 Monitoring each $474.20 $518.32
43 Propane Tank LPG each $253.63 $277.26
Above Ground - Flammable/Combustibule Liquid
44 Tank Wor Pie per site $474.17 $518.32
Under Ground - Flammable/Combustibule Liquid
45 Tank Wor Pie per site $474.17 $518.32
46 Fuel Dispensing System Complete per site $474.17 $518.32
47 High Piled/ Rack/Shelf Storage each $474.17 $518.32
48 Smoke Control UFC Article 81 each $308.77 $337.54
49 Smoke Control IBC Chapter 9 each $308.77 $337.54
50 Nurse Call $143.36 $156.75
51 Medical Gas Alarms $251.58 $275.02
Medical Gas Level 1 (Hospital) $0.00
52 1-36 outlets group $363.89 $397.80
53 each additional 36 group $363.89 $0.00
Medical Gas Level 2 Dental w/oxygen) $0.00
54 1-36 outlets group $363.89 $397.80
55 each additional 36 group $363.89
Medical Gas Level 3 Dentalper system $143.36 $156.75
56 Refrigerant System each $251.58 $277.26
57 Refrigerant Monitoring System each $143.36
Renewable Permits
58 Aerosol products a.1per permit $363.89 $397.80
59 Aircraft refueling vehicles a.2per permit $253.63 $277.26
60 Aircraft repair hanger a.3per permit $253.63 $277.26
61 Automobile wrecking and a.5per permit $253.63 $277.26
62 Battery system b.1per permit $143.36 $156.75
63 Candles and open flames in assembly areas c.1per permit $143.36 $156.75
64 Cellulose nitrate film c.3per permit $143.36 $156.75
65 Cellulose nitrate storage c.4per permit $143.36 $156.75
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 4
MISCELLANEOUS FIRE PERMIT FEES
Current
Work Item Unit Fee New Fee
66 Cellulose fiber storage c.5per permit $143.36 $156.75
67 Combustible material storage c.6per permit $143.36 $156.75
68 Compressed gases c.7per permit $198.49 $216.94
69 Commercial rubbish-hand ling operation c.8per permit $253.63 $277.26
70 Cryogens c.9per permit $253.63 $277.26
71 Dry cleaning plants d.1per permit $198.49 $216.94
72 Dust-producing operations d.2per permit $426.75
Exposives or blasting agenst, use or
73 transportation e.1per permit $446.56 $488.17
74 Fire; manufacture, compound, store, sale f.2per permit $253.63 $277.26
Flammable or combustibule liquids; pipelines,
75 store, handle, use f.3per permit $446.56 $488.17
76 Fruit ripening f.4per permit $198.49 $216.94
77 Fumigation or thermal insecticide fogging f.5per permit $143.36 $156.75
Hazardous materials; store, transport on site,
78 -dispense, use, handle h.1per permit $474.17 $488.17
79 High-piled combustible storage h.2per permit $530.11 $579.50
80 Hot-works operations h.3per permit $253.63 $277.26
Liquefied petroleum gases, store, use, handle,
81 -dispense 1.1per permit $253.63 $277.26
82 Lumber yards 1.3per permit $198.49 $216.94
83 Magnesium working m.1per permit $198.49 $216.94
84 Motor vehicle fuel-dispensing stations m.3per permit $363.89 $397.80
85 Organic coatings o.2per permit $253.63 $277.26
86 Places of assembly .2per permit $446.56 $488.17
87 Radioactive materials r.1per permit $363.89 $397.80
88 Refrigeration equipment; o erate r.2per permit $253.63 $277.26
89 Repair garages r.3per permit $412.01 $458.08
90 Spraying or dipping s.1per permit $412.01 $458.08
91 Tire storage t.2per permit $253.63 $277.26
92 Wood products w.1per permit $426.75 $437.57
Activity Permits(Single Event-One Time
93 Bowling in or alley refinishing b.2per permit $253.63 $277.26
94 Candles and open flames in assembly areas b.2per permit $143.36 $156.75
95 Carnivals and fairs c.2per permit $253.63 $277.26
96 Explosive or blasting agents; use, dispose e.1per permit $426.75 $437.57
97 Fireworks; displays f.2per permit $253.63 $277.26
98 Hot work operations h.3per permit $253.63 $277.26
99 Liquefied petroleum asses; install containers 1.1per permit $198.49 $216.94
Liquid-or gas-fueled vehicles or equipment in
100 -assembly buildings 1.2per permit $198.49 $216.94
101 Mall, covered m.2per permit $694.70 $759.42
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 5
MISCELLANEOUS FIRE PERMIT FEES
Current
Work Item Unit Fee New Fee
102 Oen burning o.1 er permit $143.36 $156.75
103 Parade floats .1per permit $143.36 $156.75
104 Pyrotechnical special effects material .3per permit $198.49 $216.94
Temporary membrane structures, tents, and
105 -canopies t.1per permit $121.30 $277.26
Reports
106 Life Safety Report per hour $121.30 $132.60
107 Hazardous Material Inventory Statement per hour $121.30 $132.60
108 Hazardous Material Management Plan per hour $121.30 $132.60
Other Fire Fees:
109 Hydrants/Underground Fire Service Plan Check each $481.96
110 Hydrant Flow Test(existing hydrants) each $121.30 $132.60
111 Fire Plans Examiner Special each $121.30 $132.60
112 Reinspection Fee perhour $33.08 $132.60
Note: The above fees cover typical projects. Fees for certain unique or similar projects will be determined
on a case-by-case basis by the Building and Safety Director. It will be based on the overhead hourly rate
and the time of service provided.
MECHANICAL, ELECTRICAL, AND PLUMBING FEES
Current
Fee Types Fee Description Fees New Fee
Stand Alone Mechanical Stand Alone Mechanical Plan Check
1 Plan Check hour) rate hour) rate $118.63 $132.60
UNIT FEES:
Install/Relocate forced air or gravity-type
furnace or burner(including attached ducts
and vents) up to and including 100,000
2 A/C, Residential each Btu/h each $95.16 $99.44
Install/Relocate forced air or gravity-type
furnace or burner(including attached ducts
and vents) over 100,000 Btu/h each $95.16 $99.44
Instal/Relocate floor furnace, including
3 Floor furnace vent each $95.16 $99.44
Install/Relocate suspended heater,
recessed wall heater, or floor-mounted unit
4 Unit Heaters heater each $95.16 $99.44
Install/Relocate/Replace appliance vent
installed and not included in an appliance
5 Appliance Vent permit each $95.16 $99.44
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 6
MECHANICAL, ELECTRICAL, AND PLUMBING FEES
Current
Fee Types Fee Description Fees New Fee
Repair/Alter/Add heating appliance,
refrigeration unit, cooling unit, absorption
unit, or each heating, cooling, absorption,
or evaporative cooling system, including
6 Refrigeration Unit installation of controls each $95.16 $99.44
Install/Relocate boiler or compressor, up to
and including 3HP, or absorption system
7 Boiler<3hp up to and including 100,000 Btu/h (each) $95.16 $99.44
Install/Relocate boiler or compressor, over
3HP and up to and including 15 HP, or
absorption system over 100,000 Btu/h and
8 Boiler>3hp>16hp up to and including 500,000 Btu/h each $95.16 $99.44
Install/Relocate boiler or compressor, over
15HP and up to and including 30 HP, or
absorption system over 500,000 Btu/h and
9 Boiler 16 <30hp up to and including 1,000,000 Btu/h each $95.16 $99.44
Install/Relocate boiler or compressor, over
30HP and up to and including 50 HP, or
absorption system over 1,000,000 Btu/h
and up to and including 1,750,000 Btu/h
10 Boiler 30 <50h each $95.16 $99.44
Install/Relocate boiler or compressor, over
50HP or absorption system over 1,750,000
11 >50h Btu/h each $95.16 $99.44
Air-handling unit, including attached ducts.
(Note: this fee shall not apply to an air-
handling unit that is a portion of a factory-
assembled appliance, cooling unit,
evaporative cooler, or absorption unit for
which a permit is required elsewhere)
12 Air Handling Units <10K each $95.16 $99.44
13 Air Handling Units >10K Air-handling over 10,000 CFM each $95.16 $99.44
Moisture Exhaust Duct
14 Clothes Dryer) Clothes Dryers Exhaust Ducts $95.16 $99.44
Evaporative Cooler other
15 than portable type Evaporative Cooler $95.16 $99.44
Ventilation fan connected to a single duct
16 Vent Fan, Single Duct each each $95.16 $99.44
Ventilation system that is not a portion of
any heating or air-conditioning system
17 Vent System authorized by a permit(each) $95.17 $99.45
Hood installation that is served by
Exhaust Hood and Duct mechanical exhaust, including the ducts
18 (Residential) for such hood (each) $95.17 $99.45
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 7
MECHANICAL, ELECTRICAL, AND PLUMBING FEES
Current
Fee Types Fee Description Fees New Fee
Exhaust Hood, Type 1
19 Commercial Grease Hood Grease Hoods $95.17 $99.45
Exhaust Hood, Type II
20 Commercial Steam Hood Steam Hoods $95.17 $99.45
OTHER FEES:
Other Mechanical
21 Inspections (per hour Other Mechanical Inspections(per hour $126.89 $132.60
Stand Alone Plumbing Plan Stand Alone Plumbing Plan Check (hourly
22 Check hour) rate rate) $126.89 $132.60
UNIT FEES:
Plumbing fixture or trap or set of fixtures
on one trap, including water, drainage
23 Plumbing Fixtures each) piping, and backflow protection each $95.17
24 Gas System $95.17 $99.45
First Outlet Gas System $95.17 $99.45
Each Additional Outlet $63.44 $66.30
25 Building Sewer Building or Trailer park sewer each $126.89 $132.60
Private sewage disposal Septic tanks and seepage pits or pits
26 system each and/or drainfield $222.05 $232.04
Industrial waste pretreatment interceptor,
including its trap and vent, excepting
kitchen-type grease interceptors
27 Grease Trap functioning as fixture traps each $95.17 $99.45
28 Water Heater Water Heater and/or vent each $95.17 $99.45
Industrial waste pretreatment interceptor,
including its trap and vent, excepting
kitchen-type grease interceptors
29 Grease Inceptor functioning as fixture traps each $95.17 $99.45
30 Water Piping
Install/Alter/Repair water piping and/or
First 5 fixtures water treating equipment each $95.17 $99.45
Repair/Alter drainage or vent piping (each
Each after the First 5 fixture) $95.17 $99.45
Roof Drain-Rainwater Rainwater system inside building (per
31 System drain) $95.17 $99.45
Lawn sprinkler system on any one meter,
including backflow protection devices
32 Lawn S rinkers therefore each $126.89 $132.60
Backflow devices not included in other fee
services, e.g., building/trailer park sewer
33 Water Heater each $95.17 $99.45
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 8
MECHANICAL, ELECTRICAL, AND PLUMBING FEES
Current
Fee Types Fee Description Fees New Fee
Atmospheric-type vacuum breakers no
included in other fee service, ie:
34 Backflow Preventer build in /trailer park sewer 1-5 units $95.17 $99.45
Atmospheric-type vacuum breakers no
included in other fee service, ie:
35 Backflow Preventer build in /trailer park sewer over 5 units $126.89 $132.60
Water Pipe
36 Repair/Replacement For repair or replacement of water piping $95.17 $99.45
For repair or replacement of drainage/vent
37 Drain-Vent Repair/Alterations piping $95.17 $99.45
Solar panels, tanks, water treatment
38 Solar Water System Fixtures equipment $190.33 $198.90
Graywater Systems(per
39 hour) $158.61 $165.75
Medical Gas System (Each
40 Outlet) $95.17 $99.45
Tankless water heater unit and/or vent
41 Tankless waterheater each $63.44 $66.29
OTHER FEES:
Other Plumbing and Gas Other Plumbing and Gas Inspections (per
42 Inspections(per hour hour) $126.89 $132.60
Stand Alone Electrical Plan Stand Alone Electrical Plan Check (hourly
43 Check hour) rate rate) $132.60
SYSTEM FEES:
Private, Residential, In-
ground Swimming Pools
each new $95.17 $99.45
Includes a complete system of necessary
branch circuit wiring, bonding, grounding,
underwater lighting, water pumping, and
other similar electrical equipment directly
related to the operation of a swimming
44 Residential Swimming Pools pool $95.17 $99.45
For all other types of swimming pools,
therapeutic whirlpools, spas, hot tubs and
45 Sas and Hot Tubs alterations to existing swimming pools $95.17 $99.45
Outdoor Events
Carnivals, circuses, or other traveling
shows or exhibitions utilizing
transportable-type rides, booths, displays,
46 Carnival Rides and attractions $95.17 $99.45
Electric generator and electrically-driven
47 Electrical Generators rides each $95.17 $99.45
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 9
MECHANICAL, ELECTRICAL,AND PLUMBING FEES
Current
Fee Types Fee Description Fees New Fee
Mechanically-driven rides and walk-
through attractions or displays having
48 Walk-thru attractions electric lighting each
49 Booth Lighting System of area and booth lighting each
Temporary Service power pole or
pedestal, including all pole or pedestal-
mounted receptacle outlets and
50 Temporary Service each appurtenances $158.61 $165.75
Temporary distribution system and
temporary lighting and receptacle outlets
for constructions sites, decorative light,
Christmas tree sales lots, firework stands,
51 Temporary Pole each sales booths, additional poles, etc. $158.61 $165.75
Branch circuit fees apply to new branch
circuit wiring and the lighting fixtures
switches and receptacles which are
supplied by these branch circuit, including
BRANCH CIRCUIT FEES their outlets
52 First 10 or portion thereof) First 10 or portion thereof) $63.44 $66.30
Each additional 10 (or
53 portion thereof) Each additional 10 or portion thereof) $63.44 $66.30
NOTE: (For multi-outlet assemblies, each
5 feet or fraction thereof may be
considered as one outlet
UNIT FEES:
Receptacle, switch, lighting, or other
outlets at which current is used or
Receptacle, Switch, and controlled, except services, feeders, and
Lighting Outlets meters
15 or 20 amp, first 10 circuits
54 each First 10 or portion thereoD $63.44 $66.29
15 or 20 amp, next 90
55 circuits each Each additional 10 or portion thereof) $63.44 $66.29
15 or 20 amp, over 100
56 circuits each Each additional 10 or portion thereof) $63.44 $66.29
(For multi-outlet assemblies, each 5 feet or
fraction thereof may be considered as one
outlet
57 25 to 40 amp circuits each 25 to 40 amp circuits each $63.44 $66.29
58 50 to 175 amp circuits each 50 to 175 amp circuits each $63.44 $66.29
200 amp and larger circuits
59 each 200 amp and larger circuits each $63.44 $66.29
Lighting Fixtures, sockets, or other[amp-
Lighting Fixtures holding devices
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 10
MECHANICAL, ELECTRICAL,AND PLUMBING FEES
Current
Fee Types Fee Description Fees New Fee
60 25 to 40 amp circuits each First 10 $63.44 $66.29
61 Each additional 10 $63.44 $66.29
62 50 to 175 amp circuits each First 10 $63.44 $66.29
63 Each additional 10 $63.44 $66.29
Pole or platform-mounted lighting fixtures
64 Pole Lights each $63.44 $66.29
Theatrical-type lighting fixtures or
65 Theater Lighting assemblies each $63.44 $66.29
Fixed residential appliances or receptacle
outlets for same, including wall-mounted
electric ovens, counter mounted cooking
tops; electric ranges; self-contained room
console or through-wall air conditioners;
space heaters, food waste grinders;
66 Residential Appliances dishwasher $63.44 $66.29
For any appliance installed in a non-
residential occupancy and not exceeding
three (3) horsepower(HP), kilowatt(KW),
or kiovolt-ampere (KVA) in rating, including
medical and dental devices, food,
beverage, and ice cream cabinets,
67 Nonresidential Appliances illuminated showcases, $63.44 $66.29
Motors, generators, transformers,
rectifiers, synchronous converters,
capacitors, industrial heating, air
conditioners and heat pumps, cooking or
baking equipment, and other apparatus.
Rating in horsepower(HP), kilowatts(kW),
Power Apparatus or kilovolt-amperes (kVA),
68 Up to and including 1 each Up to and including 1 each $105.74 $110.50
Over 1 and not over 10
69 each Over 1 and not over 10 each $105.74 $110.50
Over 10 and not over 50
70 each Over 10 and not over 50 each $105.74 $110.50
Over 50 and not over 100
71 each Over 50 and not over 100 each $105.74 $110.50
72 Over 100 each Over 100 each $105.74 $110.50
NOTE: For equipment or appliances
having more than one motor, transformer,
heater, etc. the sum of the combined
rating may be used. These fees include all
switches, circuit breakers, contactors,
thermostats, relays, and other directly
related control e u
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 11
MECHANICAL, ELECTRICAL, AND PLUMBING FEES
Current
Fee Types Fee Description Fees New Fee
Trolley and plug-in-type busways-each
73 Busways 100 or fraction thereof $105.74 $110.50
NOTE: An additioinal fee will be required
for lighting fixtures, motors, and other
appliances and are connected to trolley
and plug-in-type busways. No fee is
required for portable tools.
Signs, Outline Lighting, and Signs, Outline Lighting, or Marquees
74 Marquees supplied from one branch circuit each $126.89 $132.60
Additional branch circuits within the same
sign, outline lighting system, or marquee
75 each $31.72 $33.15
Services of 600 volts or less, up to 399
76 Services amperes in rating each $63.44 $66.29
Services of 600 volts or less, 400 to 1000
77 amperes in rating each $63.44 $66.29
Services over 600 volts or over 1000
78 amperes in rating each $63.44 $66.29
Electrical apparatus, conduits, and
Miscellaneous Apparatus, conductors for which a permit is required,
79 Conduits, and Conductors but for which no fee is herein set forth $63.44 $66.29
(This fee is not applicable when a fee is
paid for one or more services, outlets,
fixtures, appliances, power apparatus,
busways, signs, or other equipment)
Photovoltaic Systems (each)
80 -u to 10kw Residential $183.90 $192.18
Photovoltaic Systems(each)
81 - up to 10kw Commercial $183.90 $192.18
systems above 10kw will be
charged an hourly rate of
82 $126.89
OTHER FEES:
Other Electrical Inspections
83 (per hour Other Electrical Inspections(per hour $126.89 $132.60
Inspections outside of normal
business hours, 0-2 hours Inspections outside of normal business
84 minimum charge) hours, 0-2 hours minimum charge) $190.33 $198.89
85 Reinspection Fee(per hour Reinspection Fee (per hour $126.89 $132.60
Inspections for which no fee
is specifically indicated, per Inspections for which no fee is specifically
hour(minimum charge= 1/2 indicated - per hour(minimum charge =
86 hour) 1/2 hour) $126.89 $132.60
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 12
MECHANICAL, ELECTRICAL, AND PLUMBING FEES
Current
Fee Types Fee Description Fees New Fee
Additional Plan Review
required by changes, Additional Plan Review required by
additions, or revisions to changes, additions, or revisions to
approved plans, per hour approved plans, per hour(minimum
87 minimum charge = 1/2 hour charge = 1/2 hour) $63.44 $66.30
Note: The above fees cover typical projects. Fees for certain unique or similar projects will be determined
on a case-by-case basis by the Building and Safety Director. It will be based on the overhead hourly rate
and the time of service provided.
MISCELLANEOUS ITEMS PERMIT FEES
Current
Work Item Unit Fee New Fee
1 Standard Hourly Rate $118.63 $132.60
Antenna Structure
2 • Equipment Container each $121.30 $132.60
3 • 0-30 ft antenna each $121.30 $132.60
4 • 31+ft antenna each $121.30 $132.60
Cellular/Mobile Phone,tower, free-
5 standing each $121.30 $132.60
6 Cellular Tower with Equipment Shelter each $1,632.01 $1,127.09
7 Tent/Awning or Canopy over 120s ft each $90.42 $98.75
8 Balcony addition up to 1000s ft each $196.29 $213.07
9 Carport without calc. each $90.42 $98.75
10 Carport with Calcs each $241.50 $243.10
11 Change of Occupancy no T.I. each $1,510.72 $508.30
12 Close Existing Openings $175.07 $187.85
13 Interior wall new each $302.15 $243.10
14 Exterior wall new each $242.60 $265.20
15 Commercial Coach (per unit each unit $302.15 $327.50
16 Com liance Inspections each $121.30 $132.60
17 Deck wood -(City handout each $121.30 $132.60
18 Deck wood with Calcs each $302.15 $309.40
19 Demolition each $90.42 $99.38
20 Demolition -MultiFamil /Commercial each $121.30 $132.60
• Pre-Demolition Inspection first hour each $0.00 $0.00
• Pre-Demolition Ins each add'I hour hourly rate $0.00
Door
21 • New door non structural each $151.06 $165.11
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 13
MISCELLANEOUS ITEMS PERMIT FEES
Current
Work Item Unit Fee New Fee
-New door(structural shear
22 wall/mason each $151.06 $165.11
Fence Wall non-mason -w/Calcs
23 • 3 - 10 feet in height $180.85 $196.25
24 • Each additional 50 If each 50 I.f. $60.64 $65.84
25 • Over 10 feet in height $262.78 $287.30
Fence or Freestanding Wall mason
• Masonry, (3-10 feet high) include
26 pilaster $186.82 $204.22
27 • Each additional 501 If- include pilaster each 50 I.f. $60.64 $65.84
-Masonry, Special Design (3'-10' high)
28 w/pilaster per 50 I.f. $186.82 $204.22
29 -Each additional 50 If include pilaster each 50 I.f. $151.07 $165.75
-Masonry, Special Design (over 10' high)
30 w/pilaster up to 50 I.f. $242.60 $265.20
31 -Each additional 50 If w/pilaster each 501.f. $60.64 $65.84
Fireplace
32 • Mason w/city handout each $151.06 $132.60
33 • Mason with Calcs each $151.06 $165.75
34 • Pre-Fabricated /Metal ICC model each $151.06 $132.60
35 Flag pole over 20 feet in height) each $121.30 $132.60
36 Garage(detached or attached
37 • Wood frame up to 1,000 s.f. each $302.15 $331.49
38 • Masonry up to 1,000 s.f. or other material each $302.15 $397.80
39 • > 1,000 s.f. wood or masonry or others each $302.15 $331.49
Gradin Cut and Fill
• 0-50 Cubic Yards (Cut and Fill) -
40 Exempted $0.00 $0.00
• 51-100 CY - SWPPP/EC/SOILS/AS-
41 BUILT/DUST SIGN $302.15 $331.49
42 • Each Add'I 100 CY or portion thereof $60.64 $232.05
• 1,000 CY (minimum) -
43 SWPPP/EC/SOILS/AS-BUILT/DUST SIGN $967.08 $784.54
44 • Each Add'I 1,000 CY or portion thereof $36.39 $232.05
• 10,000 CY(minimum)-
45 SWPPP/EC/SOILS/AS-BUILT/DUST SIGN $1,329.87 $1,149.19
46 • Each Add'I 10,000 CY or portion thereof $73.89 $320.45
• 100,000 CY (minimum) -
47 SWPPP/EC/SOILS/AS-BUILT/DUST SIGN $1,993.70 $1,745.89
48 • Each Add'I 100,000 CY or portion thereof $73.89 $486.20
Private Street improvement
49 • Water& Sewer: 1-10 homes per tract $241.48 $26520
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 14
MISCELLANEOUS ITEMS PERMIT FEES
Current
Work Item Unit Fee New Fee
50 • Water& Sewer: 15 lots $848.00 $927.00
-Water& Sewer: 5 acre
51 retail/commercial/Industrial $241.48 $265.20
52 -Water& Sewer: 5 acres or more site $756.75 $828.75
Hydrology/hydraulic Report: single
53 custom lot $241.49 $198.90
Hydrology/hydraulic Report: 1-5 ac.
54 Multi. Res. Home $604.28 $331.50
Hydrology/hydraulic Report: 5 acres or
55 more site residential $121.30 $132.60
Hydrology/hydraulic Report: 5 acres
56 comm./industrial $725.58 $331.50
Hydrology/hydraulic Report:: 5 acres or
57 more comm./indus. $725.58 $464.10
Water Quality Management Plan:
58 • 1-5 acres all development) $362.79 $397.80
59 • every additional 5 acres sites $121.30 $132.60
60 Greenhouse noncommercial structure each $121.30 $132.60
Greenhouse(noncommercial)(with
61 Calcs) each $121.30 $132.60
62 • Lighting ole each $156.07 $132.60
63 • each add'I pole each $156.07 $33.15
64 Mobile Home each $186.82 $204.20
65 Mobile Home,double wide each $186.82 $204.20
Partition -Commercial, Interior(up to
66 100 I.f.) up to 100 I.f. $302.15 $221.00
67 •Additional partition up to 100 If each 100 I.f. $81.29 $88.40
• Partition - Residential, Interior(up to
68 100 I.f.) up to 100 I.f. $302.15 $221.00
69 •Additional partition up to 100 If each 100 I.f. $40.63 $44.20
70 Patio Cover/Porch or similar $121.30
71 •Wood frame (City handout up to 500 s.f. $302.15 $209.95
72 •Wood frame with Calcs up to 500 s.f. $302.15 $243.10
73 • Metal frame up to 500 s.f. $302.15 $243.10
74 • Other framing material up to 500 s.f. $302.15 $243.10
75 • Additional patio up to 500 s.f. $141.91 $154.70
76 Enclosed patio up to 500 s.f. $725.59 $221.00
77 • Enclosed, wood frame with Calcs up to 500 s.f. $725.59 $309.40
78 • Enclosed, metal frame up to 500 s.f. $725.59 $243.10
79 • Enclosed, metal frame with Calcs up to 500 s.f. $725.59 $309.40
80 • Enclosed, other framing material up to 500 s.f. $121.30 $243.10
81 • Additional enclosed patio up to 500 s.f. $141.90 $154.70
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 15
MISCELLANEOUS ITEMS PERMIT FEES
Current
Work Item Unit Fee New Fee
Photovoltaic System
82 (residential)/(Commercial) per KWh $585.00 $640.90
Private Sewage Disposal Plan Review-
83 Septic $149.43 $165.75
84 • Pre-Plan Inspection each add'I hour hourly rate $60.64 $66.29
85 Stucco Applications re-stucco up to 1500 s.f. $90.42 $99.45
86 • Additional Stucco Application each 1500 s.f. $90.42 $99.45
87 • Relocated Building each $576.18 $640.90
Retaining Wall concrete or mason
88 • First 100 If (city handout up to 100 If $211.72 $232.04
89 • Additional retaining wall each 100 If $60.64 $66.31
90 • Special Desi n, 3-10' hi h (up to 100 10 up to 100 If $302.15 $331.49
91 •Additional retaining wall each 100 If $60:64 $66.31
• Special Design, over 10' high (up to 100
92 10 up to 100 If $467.57 $511.13
93 • Additional retaining wall each 100 If. $60.64 $66.31
94 • Gravity/Crib Wall - First 100 If up to 100 If. $438.72 $375.70
95 • Additional Gravity/Crib Wall each 100 If $60.64 $66.31
• Gravity/Crib Wall, over 10' high (up to
96 100 Iq up to 100 If $467.57 $442.00
97 • Additional Gravity/Crib Wall each 100 If $60.64 $66.31
Remodel -Residential
98 • 500 s.f. Single Story up to 500 s.f. $845.77 $861.89
99 • Additional remodel each 500 s.f. $242.33 $265.20
Re-roofing
100 • Tile/Shake-first 500 sf up to 500 s.f. $696.90 $397.80
101 • Each additional 500 s.f. each 500 s.f. $606.49 $99.45
102 • Com /Metal-first 500 s.f. up to 500 s.f.. $90.42 $99.44
103 • Each additional 500 s.f. each 500 s.f. $90.42 $99.44
Roof Structure Replacement up to 500 s.f. $845.78 $685.09
104 • Additional roof structure replacement each 500 s.f.. $422.88 $375.70
Room Addition -First Story
105 • Up to 1000 s.f. without calcs up to 1000 s.f. $845.78 $802.14
106 • Up to 1000 s.f. with Calcs up to 1000 s.f. $845.78 $934.75
• Additional room addition (over 1000
107 s.f.) each 1000 s.f. $845.78 $265.20
• Additional room addition (over 1000 s.f.
108 with Calcs) each 1000 s.f. $363.90 $397.80
Room Addition - Multi-story
109 • Up to 1000 s.f. without calcs up to 1000 s.f. $967.08 $926.30
110 • Up to 1000 s.f. with Calcs u to 1000 s.f. $967.08 $1,988.98
111 • Additional room addition aver 500 s.f. each 1000 s.f. $967.08 $1,988.98
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 16
MISCELLANEOUS ITEMS PERMIT FEES
Current
Work Item Unit Fee New Fee
• Additional room addition (over 500 s.f.
112 with Calcs) each 1000 s.f. $967.08 $397.80
113 Sauna -steam each $444.68 $486.20
Siding
• Stone and Brick Veneer(interior or
114 exterior) up to 400 s.f. $90.42 $99.44
115 • All Others up to 400 s.f. $90.42 $99.44
116 • Additional siding each 400 s.f. $90.42 $99.45
Signs
117 • Permanent each $90.42 $99.44
118 • Tempora each $90.42 $99.44
119 • Directional each $60.64 $66.29
120 • Each additional Directional Sin each $60.64 $66.30
121 • Freeway sin each $967.08 $1,060.80
122 • Freeway sign with Master Plan each $967.08 $1,060.80
123 • Ground / Roof/Projecting Signs each $186.82 $204.22
124 Master Plan Sign Check each $0.00
125 Replacement-Permit Sticker each $0.00
126 Rework of any existing Ground Sin each $186.82 $204.22
127 Subdivision Directional Sin each $186.82 $204.22
128 Wall/Awning Sign, Non-Electric each $121.30 $132.60
129 Wall Sign, Electric each $156.07 $165.75
Skylight
130 •Less than 10 sf each $60.64 $66.29
131 • Greater than 10 sf w/structural remodel each $358.38 $198.89
132 Spa or Hot Tub Pre-fabricated each $90.42 $99.44
133 Stairs - First Stair first flight $211.71 $232.04
134 • Each additional stair per flight $211.71 $66.30
Storage Racks
135 • 6-10' high (up to 100 10 first 100 If $1,269.22 $817.69
136 • each additional 100 If each 100 If $1,269.22 $662.99
137 • over 10' high (up to 100 10 first 100 If $1,269.22 $817.69
138 • each additional 1001f each 100 If $1,269.22 $331.50
Swimming Pool/Spa Residential
139 • Vinyl-lined (up to 1000 s.f. each $241.48 $265.20
140 • Fiberglass each $241.48 $265.20
• Gunite (up to 1000 s.f.) -Custom and to
141 establish master each $467.57 $676.64
142 • Pool over 1000 s.f. each 100 s.f. $467.57 $676.64
143 • Commercial pool (up to 1000 so each $643.70 $676.64
144 •Commercial pool over 1000 s $643.70 $676.64
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 17
MISCELLANEOUS ITEMS PERMIT FEES
Current
Work Item Unit Fee New Fee
Temporary Utility Connection or
145 Occupancy $60.64 $66.31
Window or Sliding Glass Door(new)
146 non-structural $151.06 $116.26
147 • Replacement each $151.06 $116.26
New window(structural shear
148 wall/mason each $151.06 $116.26
149 Bay Window structural each $211.72 $232.04
ALTERNATE METHODS AND
150 MATERIALS $101.44 $0.00
• Category 1 (repeats and minimal
151 complexity) each $167.69 $55.25
152 • Category 2 moderate complexity) each $223.93 $55.25
153 • Category 3 (complex issues each $280.16 $55.25
154 • Category 4 (highly complex) each $336.40 $55.25
OTHER MISCELLANEOUS FEES:
-Additional plan check fee after(2)
155 rechecks hourIv rates $182.00 $132.60
156 • Fire Protection Engineer(hourly) hourly $182.00 $132.60
157 • Research first 1/2 hour up to 1/2 hour $182.00 $66.30
• Each additional 1/2 hour(or portion
158 thereof) each 1/2 hour $182.00 $66.30
Note: The above fees cover typical projects. Fees for certain unique or similar projects
will be determined on a case-by-case basis by the Building and Safety Director. It will
be based on the overhead hourly rate and the time of service provided.
PLAN CHECK& INSPECTION FEES
Each
Project Size Additional
IBC Class IBC/CBC Occupancy Type Threshold Current Fees New Fee 100 sf'
A-1 Assembly-Fixed Seating 2,000 $3,755.00 $4,135.07 $21.62
Theater, Concert Hall 10,000 $4,683.00 $5,864.54 $13.25
20,000 $5,784.00 $7,189.60 $9.49
40,000 $7,357.00 $9,087.32 $3.39
100,000 $10,250.00 $11,118.80 $2.40
200,000 $16,035.00 $13,522.30 $6.76
A-2 Assembly-Food & Drink 500 $2,555.00 $2,710.73 $56.64
Restaurant, Night Club, Bar 2,500 $5,475.00 $3,843.51 $34.40
5,000 $6,079.00 $4,703.55 $24.87
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 18
PLAN CHECK& INSPECTION FEES
Each
Project Size Additional
IBC Class IBC/CBC Occupancy Type Threshold Current Fees New Fee 100 sf"
- 10,000 $7,638.00 $5,947.10 $8.86
- 25,000 $9,430.00 $7,276.34 $6.30
- 50,000 $12,592.00 $8,851.15 $17.70
A-3 Assembl -Chruch 1,000 $3,963.00 $3,418.20 $35.74
- 5,000 $4,741.00 $4,847.76 $21.86
- 10,000 $5,653.00 $5,940.83 $15.69
- 20,000 $7,131.00 $7,509.37 $5.60
- 50,000 $8,822.00 $9,190.78 $3.98
- 100,000 $12,487.00 $11,181.50 $11.18
A-3 Assembly-Auditorium 1,000 $3,197.00 $3,418.20 $35.74
- 5,000 $3,755.00 $4,847.76 $21.86
- 10,000 $4,693.00 $5,940.83 $12.49
- 20,000 $5,784.00 $7,189.60 $6.67
- 50,000 $7,357.00 $9,190.78 $3.98
- 100,000 $10,250.00 $11,181.50 $11.18
A-3 Assembly-Small Assembly Bldgs 100 n/a n/a N/A
- 500 n/a n/a N/A
- 1,000 $3,197.00 $3,233.23 $85.69
- 2,000 $3,476.00 $4,090.13 $25.25
- 5,000 $3,755.00 $4,847.76 $24.79
- 10,000 $4,693.00 $6,087.13 $60.87
A-3 Bowling Alley 1,000 $4,353.00 $3,454.77 $36.13
5,000 $5,172.00 $4,900.01 $22.13
- 10,000 $6,529.00 $6,006.66 $15.86
- 20,000 $8,050.00 $7,592.97 $5.66
- 50,000 $10,707.00 $9,290.05 $4.03
- 100,000 $15,551.00 $11,306.90 $11.31
A-3 Library/Museum 1,000 $4,542.00 $3,415.06 $35.74
- 5,000 $5,376.00 $4,844.62 $21.92
- 10,000 $5,747.00 $5,940.83 $15.66
- 20,000 $8,334.00 $7,507.28 $5.59
- 50,000 $10,988.00 $9,185.55 $3.99
- 100,000 $15,818.00 $11,181.50 $11.18
B Business-Bank 1,000 $3,685.00 $3,193.52 $33.36
5,000 $4,421.00 $4,527.99 $20.29
- 10,000 $5,572.00 $5,542.68 $4.22
- 20,000 $6,851.00 $5,964.86 $8.70
- 50,000 $9,208.00 $8,574.23 $3.71
- 100,000 $13,490.00 $10,429.10 $10.43
B Business-Laundromat 100 n/a n/a N/A
- 500 $3,931.00 $2,701.33 $119.55
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 19
PLAN CHECK & INSPECTION FEES
Each
Project Size Additional
IBC Class IBC/CBC Occupancy Type Threshold Current Fees New Fee 100 sf'
1,000 $4,921.00 $3,299.07 $87.57
2,000 $6,049.00 $4,174.78 $22.43
5,000 $7,890.00 $4,847.76 $27.32
10,000 $11,257.00 $6,213.57 $62.14
B Business-Medical Office 1,000 $3,943.00 $3,311.61 $34.59
- 5,000 $4,728.00 $4,695.19 $20.92
- 10,000 $5,994.00 $5,741.23 $15.22
- 20,000 $7,375.00 $7,262.75 $5.40
- 50,000 $10,007.00 $8,882.50 $3.85
- 100,000 $14,807.00 $10,805.30 $10.81
B Business-Professional Office 1,000 $6,387.00 $3,299.07 $34.54
- 5,000 $8,772.00 $4,680.56 $21.21
- 10,000 $10,011.00 $5,741.23 $15.13
- 20,000 $11,519.00 $7,254.39 $5.41
- 50,000 $13,857.00 $8,877.28 $3.86
- 100,000 $17,116.00 $10,805.30 $10.81
B Business-High Rise Office 1,000 $3,504.00 $3,488.21 $36.52
- 5,000 $3,930.00 $4,949.12 $22.49
- 10,000 $4,686.00 $6,073.54 $15.99
- 20,000 $5,826.00 $7,672.39 $5.72
- 50,000 $6,189.00 $9,389.33 $4.07
- 100,000 $6,977.00 $11,421.85 $11.42
B Occupancy Tenant
B Improvements 500 $1,120.00 $1,096.21 $22.15
- 2,500 $1,434.00 $1,539.29 $21.57
- 5,000 $1,742.00 $2,078.51 $8.99
- 10,000 $2,092.00 $2,527.86 $4.56
- 25,000 $2,794.00 $3,211.29 $4.47
- 50,000 $4,040.00 $4,329.44 $8.66
E Educational-GroupOccupancy 500 $2,758.00 $2,637.58 $55.07
- 6+ persons, up to the 12th Grade 2,500 $3,120.00 $3,739.01 $33.27
- 5,000 $3,639.00 $4,570.83 $21.23
- 10,000 $4,549.00 $5,632.55 $9.60
- 25,000 $4,946.00 $7,072.56 $6.13
- 50,000 $5,720.00 $8,605.58 $17.21
E Educational-Day Care 100 n/a n/a N/A
- 5+ children, older than 2 1/2 yrs 500 $3,311.00 $2,613.55 $117.25
1,000 $4,016.00 $3,199.79 $35.53
2,000 $4,979.00 $3,555.09 $46.50
5,000 $6,080.00 $4,950.17 $21.46
10,000 $8,107.00 $6,023.38 $60.23
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 20
PLAN CHECK& INSPECTION FEES
Each
Project Size Additional
IBC Class IBC/CBC Occupancy Type Threshold Current Fees New Fee 100 sf
Factory Industrial-Moderate
F-1 Hazard 1,000 $4,118.00 $3,268.76 $34.18
- 5,000 $4,858.00 $4,636.14 $20.79
- 10,000 $6,010.00 $5,675.40 $15.02
- 20,000 $7,452.00 $7,177.06 $5.34
- 50,000 $9,716.00 $8,778.00 $3.80
- 100,000 $13,835.00 $10,679.90 $10.68
F-1 Factory Industrial-Woodworking 500 $2,910.00 $2,547.66 $53.35
- 2,500 $3,399.00 $3,614.66 $32.92
- 5,000 $4,178.00 $4,437.59 $23.38
- 10,000 $5,174.00 $5,606.43 $8.38
- 25,000 $6,456.00 $6,863.56 $5.11
- 50,000 $8,817.00 $8,140.55 $16.28
Factory Industrial-
F-1 Industrial/Manufacturing 4,000 $5,793.00 $4,386.91 $11.50
- 20,000 $8,960.00 $6,226.11 $7.14
- 40,000 $11,044.00 $7,653.58 $5.03
- 80,000 $17,036.00 $9,664.16 $1.80
- 200,000 $23,697.00 $11,829.40 $1.27
- 400,000 $40,008.00 $14,379.20 $3.59
F-2 Factory Industrial-Low Hazard 4,000 $5,794.00 $4,386.91 $11.50
20,000 $8,961.00 $6,226.11 $7.14
- 40,000 $11,044.00 $7,653.58 $5.03
- 80,000 $17,036.00 $9,664.16 $1.80
- 200,000 $23,697.00 $11,829.40 $1.27
- 400,000 $40,008.00 $14,379.20 $3.59
H-2 High Hazard Group H-2 200 n/a n/a n/a
- Moderate Explosion Hazards 1,000 $5,073.00 $3,346.09 $74.93
- 2,000 $6,264.00 $4,095.36 $54.18
- 4,000 $7,736.00 $5,179.02 $19.26
- 10,000 $9,373.00 $6,334.79 $13.73
- 20,000 $12,439.00 $7,707.92 $38.54
High Hazard Group H-4- Repair
H-4 Garage 1,000 $3,559.00 $3,444.32 $35.97
- Pose health hazards 5,000 $5,300.00 $4,883.29 $21.80
- 10,000 $6,700.00 $5,973.22 $15.82
- 20,000 $8,256.00 $7,555.35 $5.63
- 50,000 $11,048.00 $9,243.03 $4.00
- 100,000 $16,146.00 $11,244.20 $11.24
Institutional-- 6+ persons, non-
1-2 ambulatory 1,000 $3,733.00 $3,500.02 $36.59
- Assisted Living/Nursing Living/NursingHome 5,000 $4,368.00 $4,963.75 $22.20
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 21
PLAN CHECK & INSPECTION FEES
Each
Project Size Additional
IBC Class IBC/CBC Occupancy Type Threshold Current Fees New Fee 100 sf
- 10,000 $5,411.00 $6,073.54 $16.07
- 20,000 $6,701.00 $7,680.75 $5.71
- 50,000 $8,519.00 $9,394.55 $4.08
- 100,000 $11,859.00 $11,432.30 $11.43
Mercantile-Retail or wholesale
M store 1,000 $3,362.00 $3,406.70 $26.87
- 5,000 $3,954.00 $4,481.48 $20.56
- 10,000 $4,892.00 $5,509.24 $13.83
- 20,000 $6,040.00 $6,891.78 $5.65
- 50,000 $7,687.00 $8,585.72 $4.69
- 100,000 $10,303.00 $10,930.70 $10.93
Mercantile-Retail Tenant
M Improvements 200 $1,120.00 $1,315.13 $58.72
- 1,000 $1,434.00 $1,784.86 $39.29
- 2,000 $1,741.00 $2,177.78 $25.94
- 4,000 $2,092.00 $2,696.62 $12.07
- 10,000 $2,792.00 $3,420.81 $13.55
- 20,000 $4,040.00 $4,775.65 $23.88
R-1 Residential-Transient 1,000 $5,327.00 $3,435.96 $35.84
- Boarding Houses, Hotels, Motels 5,000 $6,233.00 $4,869.70 $21.42
- 10,000 $7,702.00 $5,940.83 $15.79
- 20,000 $9,565.00 $7,519.82 $5.59
- 50,000 $12,289.00 $9,196.00 $3.99
100,000 $17,260.00 $11,191.95 $11.19
Residential-Permanent, 2+
R-2 Dwellings 1,000 $5,969.00 $3,435.96 $35.84
- Apartment, Dormitory, Timeshare 5,000 $7,705.00 $4,869.70 $21.42
- 10,000 $8,938.00 $5,940.83 $15.79
- 20,000 $10,609.00 $7,519.82 $5.59
- 50,000 $12,762.00 $9,196.00 $3.99
- 100,000 $16,544.00 $11,191.95 $11.19
R-3 Dwellings-Custom Homes 1,000 $1,733.00 $1,712.76 $28.74
models 2,000 $2,198.00 $2,000.13 $24.35
3,000 $2,343.00 $2,243.62 $38.98
4,000 $2,870.00 $2,633.40 $33.96
5,000 $3,052.00 $2,973.03 $15.68
10,000 $4,175.00 $3,756.78 $33.01
R-3 Dwellings-Production Phase 1,000 $1,075.00 $785.84 $9.09
of Master Plan (repeats) 2,000 $1,295.00 $876.76 $14.00
3,000 $1,355.00 $1,016.79 $16.72
4,000 $1,464.00 $1,183.99 $13.90
5,000 $1,563.00 $1,322.97 $6.73
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 22
PLAN CHECK& INSPECTION FEES
Each
Project Size Additional
IBC Class IBC/CBC Occupancy Type Threshold Current Fees New Fee 100 sf'
10,000 $1,978.00 $1,659.46 $15.11
Residential-Assisted Living (6-16
R-4persons) 1,500 $3,296.00 $3,307.43 $22.97
- Non-Ambulatory 7,500 $5,001.00 $4,685.78 $13.64
- 15,000 $6,746.00 $5,708.84 $10.14
- 30,000 $9,554.00 $7,229.31 $3.58
- 75,000 $17,980.00 $8,840.70 -$11.79
- 150,000 n/a $0.00 n/a
Residential-Assisted Living (6-16
R-4persons) 1,000 $3,634.00 $2,960.49 $30.91
- Ambulatory 5,000 $5,491.00 $4,196.72 $18.52
- 10,000 $6,735.00 $5,122.59 $13.61
- 20,000 $9,035.00 $6,483.18 $4.81
- 50,000 $13,640.00 $7,926.33 $3.44
- 100,000 $0.00 $9,645.35 $9.65
S-1 Storage-Moderate Hazard 1,000 $3,105.00 $3,233.23 $36.03
- 5,000 $4,571.00 $4,674.29 $18.68
- 10,000 $5,641.00 $5,608.52 $15.46
- 20,000 $6,997.00 $7,154.07 $7.13
- 50,000 $9,088.00 $9,292.14 $7.79
- 100,000 $12,895.00 $13,185.81 $13.19
S-1 Storage-Mini Storage 500 $1,424.00 $1,195.48 $110.30
- 2,500 $3,317.00 $3,401.48 $30.39
5,000 $4,052.00 $4,161.19 $22.05
- 10,000 $5,066.00 $5,263.67 $7.82
- 25,000 $6,282.00 $6,437.20 $5.58
- 50,000 $7,771.00 $7,832.28 $15.66
Storage-Moderate Hazard, Repair
S-1 Garage 200 n/a $0.00 n/a
not High Hazard 1,000 $3,105.00 $3,081.71 $68.24
- 2,000 $3,880.00 $3,764.09 $49.95
- 4,000 $4,571.00 $4,763.11 $17.68
- 10,000 $5,641.00 $5,823.79 $12.63
- 20,000 $6,997.00 $7,087.19 $35.44
Storage-Motor Vehicle Fuel
S-1 Dispensing 100 n/a $0.00 n/a
- 500 $3,167.00 $2,672.07 $121.01
- 1,000 $3,689.00 $3,277.12 $86.53
- 2,000 $4,538.00 $4,142.38 $30.88
- 5,000 $5,599.00 $5,068.77 $21.96
- 10,000 $6,807.00 $6,166.55 $61.67
S-2 Storage-Warehouse 10,000 $4,626.00 $4,898.96 $5.14
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 23
PLAN CHECK & INSPECTION FEES
Each
Project Size Additional
IBC Class IBC/CBC Occupancy Type Threshold Current Fees New Fee 100 sf'
- 50,000 $5,874.00 $6,954.48 $3.19
- 100,000 $8,696.19 $8,548.10 $2.24
- 200,000 $10,168.00 $10,784.40 $0.81
- 500,000 $15,374.00 $13,219.25 $2.38
Storage-Low Hazard, Parking
S-2 Garages 500 $1,783.00 $1,316.70 $48.44
- Oen or Enclosed 2,500 $3,817.00 $2,285.42 $71.52
- 5,000 $4,234.00 $4,073.41 $21.57
- 10,000 $5,289.00 $5,151.85 $7.66
- 25,000 $7,058.00 $6,301.35 $5.48
50,000 $8,735.00 $7,670.30 $15.34
U Accessory-Agricultural Building 500 $1,660.00 $1,316.22 $86.43
2,500 $3,545.00 $3,044.89 $27.89
5,000 $3,931.00 $3,742.15 $19.65
10,000 $4,935.00 $4,724.45 $7.06
25,000 $6,393.00 $5,784.08 $5.02
50,000 $7,963.00 $7,038.08 $14.08
Fire Stations 1,000 $3,670.00 $3,697.21 $38.69
5,000 $5,594.00 $5,244.86 $23.64
10,000 $7,151.00 $6,426.75 $16.97
20,000 $8,809.00 $8,123.83 $6.06
50,000 $13,443.00 $9,943.18 $4.29
100,000 $18,974.00 $12,090.65 $12.09
Public Building -Office 1,000 $4,397.00 $3,700.35 $38.69
5,000 $5,228.00 $5,247.99 $23.58
10,000 $6,575.00 $6,426.75 $16.99
20,000 $8,121.00 $8,125.92 $6.06
50,000 $10,884.00 $9,943.18 $4.29
100,000 $15,904.00 $12,090.65 $12.09
Public Building - Police 1,000 $4,462.00 $3,700.35 $38.69
- 5,000 $5,299.00 $5,247.99 $23.58
- 10,000 $6,651.00 $6,426.75 $16.99
- 20,000 $8,220.00 $8,125.92 $6.06
- 50,000 $10,983.00 $9,943.18 $4.29
- 100,000 $15,992.00 $12,090.65 $12.09
- Public Building - Recreation 1,000 $3,569.00 $3,700.35 $38.69
- 5,000 $4,240.00 $5,247.99 $23.58
- 10,000 $5,321.00 $6,426.75 $16.99
- 20,000 $6,575.00 $8,125.92 $6.06
- 50,000 $8,784.00 $9,943.18 $4.29
- 100,000 $12,796.00 $12,090.65 $12.09
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 24
PLAN CHECK & INSPECTION FEES
Each
Project Size Additional
IBC Class IBC/CBC Occupancy Type Threshold Current Fees New Fee 100 sf`
- Public Building - Miscellaneous 1,000 $3,569.00 $3,700.35 $38.69
- 5,000 $4,240.00 $5,247.99 $23.58
- 10,000 $5,321.00 $6,426.75 $16.99
- 20,000 $6,575.00 $8,125.92 $6.06
- 50,000 $8,784.00 $9,943.18 $4.29
- 100,000 $12,796.00 $12,090.65 $12.09
SHELL
BUILDINGS
- All Shell Buildings 1,000 $3,701.00 $2,816.27 $31.74
- 5,000 $4,389.00 $4,085.95 $18.45
- 10,000 $5,533.00 $5,008.68 $13.61
- 20,000 $6,823.00 $6,369.27 $4.59
- 50,000 $9,037.00 $7,745.54 $3.36
- 100,000 $13,083.00 $9,423.81 $9.42
A-2 Shell: Assembly-Food & Drink 500 $4,040.00 $2,447.35 $51.15
- 2,500 $4,351.00 $3,470.44 $31.27
- 5,000 $4,869.00 $4,252.10 $22.47
- 10,000 $6,215.00 $5,375.48 $8.02
- 25,000 $8,167.00 $6,578.27 $5.85
50,000 $10,707.00 $8,041.27 $16.08
B Shell: Business-Medical Offices 1,000 $3,355.00 $2,816.27 $29.47
- 5,000 $3,998.00 $3,995.03 $17.89
- 10,000 $4,988.00 $4,889.55 $16.47
- 20,000 $7,375.00 $6,536.47 $3.42
- 50,000 $8,382.00 $7,561.62 $3.27
- 100,000 $12,355.00 $9,198.09 $9.20
Shell: Business-Professional
B Office 1,000 $3,642.00 $2,849.71 $29.86
- 5,000 $4,319.00 $4,044.15 $18.31
- 10,000 $5,411.00 $4,959.52 $12.97
- 20,000 $6,692.00 $6,256.41 $4.66
- 50,000 $8,899.00 $7,655.67 $3.31
- 100,000 $12,917.00 $9,310.95 $9.31
- Lab/R&D 1,000 $3,161.00 $3,361.24 $26.16
- 5,000 $3,796.00
- 10,000 $4,807.00 13.70
- 20,000 $5,925.00 $6.63
- 50,000 $8,129.00 $4.65
- 100,000 $12,123.00 !a2l.37
11.16
'Each additional 100 square feet, or portion thereof, up to the next highest project size threshold.
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 25
PLAN CHECK & INSPECTION FEES
Each
Project Size Additional
IBC Class IBC/CBC Occupancy Type Threshold Current Fees New Fee 100 sf`
Note: The above fees cover typical projects. Fees for certain unique or similar projects will
be determined on a case-by-case basis by the Building and Safety Director. It will be
based on the overhead hourly rate and the time of service provided.
SECTION 5: The City Council hereby adopts the following fees for services performed by
the Planning Department, including a technology fee of 4.5%.
Current New
Fee Name Fee Fee
1 Adult Entertainment Zoning Permit $2,354.00 $2,459.93
2 Annexation $9,864.00 $12,017.50
3 Appeal of a PC decision $2,379.00 $2,486.06
4 Appeal of Planning Director decision $2,095.00 $1,306.25
5 Certificate of Appropriateness $2,087.00 $2,180.92
6 Conditional Use Permit $2,692.00 $2,978.25
7 Conditional Use Permit- Modification Fee $1,346.00 $1,489.13
8 Design Review-Commercial/Industrial $11,629.00 $9,823.00
9 Design Review-Commercial/Industrial- Modification $5,814.00 $4,911.50
10 Design Review- Res. 4 du or less $6,775.00 $7,079.88
11 Design Review- Res. 4 du or less - Modification $3,387.00 $3,539.42
12 Design Review- Residential $12,076.00 $10,450.00
13 Design Review- Residential - Modification $6,038.00 $5,225.00
14 Development Areement $11,887.00 $13,062.50
15 Development Agreement-Modification $5,943.50 $6,531.25
16 Development Code Amendment $1,633.00 $6,270.00
17 Entertainment Permit $4,870.00 $5,089.15
18 Entertainment Permit- Modification $2,435.00 $2,544.58
19 Entertainment Permit-Annual Renewal $75.00 $156.75
20 Environmental Impact Report EIR - Preparation $30,167.00 $36,575.00
21 Environmental Impact Report EIR - Review Only $3,934.00 $5,747.50
22 Film Permit $162.00 $169.29
23 General Plan Amendment $12,227.00 $11,913.00
24 Hillside Development Review <4 dwelling units $6,120.00 $2,090.00
25 Hillside Development Review >5 dwelling units $6,715.00 $3,239.50
26 Home Occupation Permit $126.00 $52.25
27 Initial Study $1,796.00 $2,664.75
28 Land Use Verification Report $85.00 $125.40
29 Landmark Application $3,447.00 $3,602.12
30 Large Day Care Permit $541.00 $565.35
31 Mills Act Application $1,347.00 $1,407.62
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 26
Current New
Fee Name Fee Fee
32 Minor Design Review $2,591.00 $2,090.00
33 Minor Design Review- Modification Fee $1,296.00 $1,045.00
34 Minor Exception $479.00 $500.56
35 Mitigation Plan -Simple $594.00 $715.83
36 Pre Application Review- Planning Commission $5,553.00 $2,090.00
37 Preliminary Review $4,979.00 $2,090.00
38 Public Convenience or Necessity ABC License $947.00 $1,201.75
39 Sign Permit $88.00 $120.18
40 Similar Use Determination $1,838.00 $1,463.00
41 Site Development Review $100/hour $100/hour
42 Specific/Community/Master Plan - New $10,702.00 $12,540.00
43 Specific/Community/Master Plan Amendment $3,369.00 $4,180.00
44 Street Name Chane $5,597.00 $4,493.50
45 Temporary Use Permit $140.00 $177.65
46 Temporary Use Permit-Model Home $125.00 $177.65
47 Tentative Parcel Ma $7,370.00 $7,701.65
48 Tentative Parcel Ma - Review for Substantial Conformance $3,685.00 $3,850.83
49 Tentative Tract Ma $13,542.00 $14,151.39
50 Tentative Tract Ma - Review for Substantial Conformance $6,771.00 $7,075.70
51 Time Extension $540.00 $679.25
52 Trail Easement Vacation $5,413.00 $5,656.59
53 Tree Removal -Multi-family/Commercial/industrial $503.00 $418.00
54 Tree Removal - New Development $739.00 $772.26
55 Tree Removal -Single Family Residential $503.00 $104.50
56 Uniform Sign Pro ram $1,954.00 $2,041.93
57 Uniform Sin Program Modification $977.00 $1,020.97
58 Variance $2,216.00 $2,315.72
59 Zoning Map Amendment $8,500.00 $8,882.50
SECTION 6: The City Council hereby amends Resolution 06-032 and adopts the
following fees for services performed by the Engineering Services Department, including a
technology fee of 4.5%.
Fee Type Current Fee New Fee
APPLICATIONS
1 Amending Ma $1,880.00 $1,964.60
2 Bond Substitution $2,222.00 $2,321.99
3 Certificate of Compliance $2,420.00 $2,528.90
4 Certificate of Correction $1,460.00 $1,525.70
Lot Line Adjustment($1,380.00 for each
5 additionalparcel) $1,940.00 $2,027.30
6 Private Street Designation $3,370.00 $3,521.65
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 27
Fee Type Current Fee New Fee
Reapportionment Maps (two sheet
parcel/tract map; $30.00 each additional
7 sheet) $1,750.00 $1,828.75
8 Reimbursement Agreement-Storm Drain $5,140.00 $5,371.30
Reimbursement Agreement- Street and
9 Utilities $5,830.00 $6,092.35
10 Release of Lien Agreement $1,160.00 $1,212.20
11 Standard Agreement/Document Processing $1,100.00 $1,149.50
12 Street Vacation $3,950.00 $4,127.75
13 Traffic Study Review(Development Project $221.00 $230.95
MAP AND IMPROVEMENT PLAN
CHECKING
14 Property Legal Description $1,380.00 $1,442.10
15 Residential Parcel Ma +$240 perparcel) $4,350.00 $4,545.75
$5298.15
Tract Maps and Non-Residential Parcel $5,070 (+$290.00 per (+$290.00 per
16 Maps over ten 10 lots parcel or lotparcel or lot
Tract Maps and Non-Residential Parcel
17 Maps of ten 10 lots or less $5,480.00 $5,726.60
$35.53 per map
18 Map Printing as adopted by Count $34.00 per map sheet sheet
$0.69 per LF +
$0.66 per LF + sheet sheet charge for
19 Widening of Existing Streets charge for interior streets interior streets
20 Interior Streets- 1 sheet $3,660.00 LS $3824.7 LS
21 Interior Streets-2 streets $4,430.00 LS $4629.35 LS
22 Interior Streets-3 and 4 $1,260.00 each $1316.70 each
23Interior Streets-5 sheets $7,950.00 LS $8307.75 LS
24 Interior Streets-6 through 9 $1,260.00 each $1316.7 each
25 Interior Streets- 10 sheets $14,960.00 LS $15,633.20 LS
26 Interior Streets-Sheets 11 and more $1,260.00 each $1316.7 each
Same as for Interior Same as for Interior
27 Storm Drain Plans Streets Streets
28 Landscaped and Irrigation Plans for
29 City-Maintained Areas $1,290.00 each 1348.05 each
30 Hydrology Study Drainage Areas u
31 to 150 acres $3,230.00 $3,375.35
32 Hydrology Study Drainage Areas
33reater than 150 acres $4,410.00 $4,608.45
PUBLIC WORKS CONSTRUCTION PERMIT CPI
Inspection: Drainage Catch Basin W=4', Tor
34 21' 1 69.45 each 72.58 each
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 28
Fee Type Current Fee New Fee
35 Inspection: Drainage Collar Pipe PCC $23.15 each 24.19 each
36 Inspection: Drainage Headwall 48"Win $46.29 each 48.37 each
Inspection: Drainage Junction Structure w/o
37 Manhole $30.86 each 32.25 each
Inspection: Drainage Junction Structure with
38 Manhole $30.86 each 32.25 each
39 Inspection: Drainage RCP 18" thru 54" $13.88 LF $14.50 LF
40 Inspection: Drainage RCP 60" thru 96" $23.15 LF $24.19 LF
41 Inspection: V-Ditch $4.63 LF $4.84 LF
Inspection: Landscape
Cobblestone/Boulders 1st 2,000 SF + $92.61
42 each addl 1,000 SF $368.49 $385.07
43 Inspection: Landscape Concrete Header $1.54 LF $1.61 LF
$96.77 per
$92.60 per inspection inspection
44 Inspection: Landscape Decomposed Granite Occurrence Occurrence
45 Inspection: Landscape Fence Tubular Steel $6.16 LF $6.44 LF
46 Inspection: Landscape Gates Tubular Steel $15.42 each $16.11 each
47 Inspection: Landscape Irrigation System $2.30 LF $2.40 LF
48 Inspection: Landscape Maintenance 180 Da $739.17 each 772.43 each
Inspection: Landscape Masonry Column/
49 Pilaster $12.34 each $12.90 each
50 Inspection: Landscape Mulch Shredded 4" $3.24 CY $3.39 CY
51 Inspection: Landscape Pavers $3.07 SF $3.21 SF
52 Inspection: Landscape Shrub 1 and 5 gallon $1.54 each $1.61 each
$0.80 SF (Jute
53 Inspection: Landscape Slope Erosion Control $0.77 SF Jute Matting) Matting)
Inspection: Landscape Trail Fence PVC 2-
54 rail and 3-rail $6.16 LF $6.44 LF
55 Inspection: Landscape Trail Gate $92.60 each $96.77 each
56 Inspection: Landscape Tree 5 and 15 Gallon $13.88 each $14.50 each
57 Inspection: Landscape Tree 24" Box $18.51 each $19.34 each
58 Inspection: Landscape Tree Palm $30.86 each 32.25 each
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 29
Fee Type Current Fee New Fee
59 Inspection: Landscape Vine 5 Gallon $1.54 each $1.61 each
60 Inspection: Landscape Wall Garden 6' $12.34 LF $12.90 LF
61 Inspection: Landscape Wall Retaining 3' $12.34 LF $12.90 LF
62 Inspection: Landscape Wall Retaining Drain $7.71 LF $8.06 LF
Inspection: Landscape Removal Clear and
63 Grub $69.45 each $72.58 each
64 Inspection: Removal of AC Berm $0.77 LF $0.80 LF
65 Inspection: Removal of PCC Curb $0.73 LF $0.76 LF
66 Inspection: Removal of PCC Sidewalk $0.37 SF $0.39 SF
67 Inspection: Removal Tree $33.89 each $35.42 each
68 Inspection: Street AC 1,000 LF Paved Lane $69.45 each $72.58 each
69 Inspection: Street Access Ram $30.86 each $32.25 each
Inspection: Street Adjust Manhole and
70 Valves/CO to Grade $7.71 each $8.06 each
Inspection: Street Aggregate Base (per 1,000
71 LF) $69.45 each $72.58 each
72 Inspection: Street Barricades $1.54 LF $1.61 LF
73 Inspection: Street Berm AC $1.54 LF $1.61 LF
74 Ins ection: Street Cross-gutter $0.46 SF $0.48 SF
75 Inspection: Street Curb & Gutter 6" $0.27 LF $0.28 LF
76 Inspection: Street Curb &Gutter 8" $0.32 LF 0.33 LF
77 Inspection: Street Curb & Gutter 12" $0.37 LF 0.39 LF
78 Inspection: Street Curb&Gutter Cobble $2.30 LF $2.40 LF
79 Inspection: Street Curb Core $46.29 each $48.37 each
80 Inspection: Street Curb Only $0.38 LF $0.40 LF
81 Inspection: Street Curb Rolled $0.77 LF $0.80 LF
Inspection: Street Curbside Drain STD 107-
82 A, B &C $138.18 each $144.4 each
$72.58 per
Inspection: Street Drive Approach $69.45 per inspection inspection
83 Commercial occurrence occurrence
$35.52 per
Inspection: Street Drive Approach $33.99 per inspection inspection
84 Residential occurrence occurrence
Inspection: Street Light/Signal Interconnect
85 Conduit $0.55 LF $0.57 LF
86 Inspection: Street Lights $7.71 each $8.06 each
Inspection: Street Right Turn Lane/Busbay
87 PCC 8" $461.70 each $482.48 each
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 30
Fee Type Current Fee New Fee
88 Inspection: Street Sidewalk PCC 4" $0.16 SF $0.17 SF
Inspection: Street Subgrade Preparation/Fine
89 Grading $0.18 LF $0.19 LF
90 Inspection: Traffic Pavement Markings $0.77 each $0.80 each
$192.53 per
$184.24 per inspection inspection
91 Inspection: Traffic Pavement Striping occurrence occurrence
$48.37 per
$46.29 per inspection inspection
92 Inspection: Traffic Reflectors and Posts occurrence occurrence
93 Inspection: Traffic Signal $4,691.62 each $4902.74 each
94 Inspection: Traffic Signal Modification $2,314.00 each $2418.13 each
95 Inspection: Traffic Street Sin $7.71 each $8.06 each
Inspection: Utility Fiber Optic Conduit&
96 Trench $2.30 LF $2.40 LF
Inspection: Utility Underground Existing
97 Electrical $2.30 LF $2.40 LF
Inspection: Utility Underground Existing
98 Telecom $2.30 LF $2.40 LF
Inspection: Miscellaneous; Construction items not listed above will be charged based upon an
estimated hourly inspection need at the rate of$92.60 per hour(OT-$138.90)
Minimum Public Works Construction Permit Fee is $50.00
SECTION 7: The City Council hereby repeals Resolutions 04-293, 06-283 and 12-101
which previously set fees for the Building and Safety and Planning Departments effective 60
days from the effective date of this Resolution.
SECTION 8: The fees set forth in section 3 of this Resolution shall take immediate effect.
SECTION 9: Subject to the provisions of Section 10, in accordance with California
Government Code Section 66017, those fees and charges set forth in Sections 4, 5 and 6, that
constitute "a fee or charge...upon a development project...which applies to the filing, accepting,
reviewing, approving, or issuing of an application, permit, or entitlement to use" shall become
effective and payable sixty (60) days from the date of adoption of this Resolution.
SECTION 10: Each fee set forth in Sections 4 and 5 shall be adjusted annually,
commencing on July 1, 2014, and each year thereafter, without further action of the City
Council, based on the Employee Cost Index for State and Local Government Employees, Total
Compensation, during the 12 month period ending on December 31st of the immediately
preceding year, as released by the U.S. Department of Labor's Bureau of Labor Statistics and
rounded to the nearest whole dollar. If this index is discontinued, a replacement index, as
determined by the City Council, shall be utilized.
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 31
SECTION 11: Section 7(a) of Resolution 06-032 is hereby amended to read as follows:
Application Fees, Public Works Construction Permit Fees and Map and Improvement Plan
Checking Fees shall be adjusted annually, commencing on July 1, 2014, and each year
thereafter, without further action of the City Council, based on the Employee Cost Index for
State and Local Government Employees, Total Compensation, during the 12 month period
ending on December 31st of the immediately preceding year, as released by the U.S.
Department of Labor's Bureau of Labor Statistics and rounded to the nearest whole dollar. If
this index is discontinued, a replacement index, as determined by the City Council, shall be
utilized.
SECTION 12: The City Clerk shall certify to the adoption of this Resolution.
please see the following page
for formal adoption,certification and signatures
CITY COUNCIL RESOLUTION NO.12-196
FEES FOR COMMUNITY DEVELOPMENT AND CITY CLERK
December 19, 2012
Page 32
PASSED, APPROVED, AND ADOPTED this 19'" day of December 2012.
AYES: Alexander, Michael, Spagnolo, Steinorth, Williams
NOES: None
ABSENT: None
ABSTAINED: None
' 1s
L. Dennis Michael, Mayor
ATTEST:
nice C. Reynolds, Cit Jerk
I, JANICE C. REYNOLDS, CITY CLERK of the City of Rancho Cucamonga,
California, do hereby certify that the foregoing Resolution was duly passed, approved and
adopted by the City Council of the City of Rancho Cucamonga, California, at a Regular Meeting
of said City Council held on the 19'" day of December 2012.
Executed this 20`h day of December 2012, at Rancho Cucamonga, California.
ice C. Reynolds, Cit Clerk