THURSDAY, APRIL 30, 1987 7:00 P.M.
SPECIAL PUBLIC HEARING
L
PLEDGrE ,9F ALLEGIANCE
I
ROLT* CALL
Commissioner Chitiea Commissioner MelliIal,^
Commissioner Emerick_; Commissioner Tolstoy ,_'
III.
Fd Ai. d BOULEV"M SPEC''MCC P !,
A, OVERVIEW OF PRIMARY POLICY ISSUES
Staff Presentation:
o Overall Corridor Design Concept
Activity Centers
Suburban Parkway Transitions
Gateways
o Overall Land Use,Tconomie Concept
Existing Land Use
Current Land Use Plans _
o Ovc,aall Traffic System
Median islands
Median Openings
Access Limitations
Intersection Improvements
Public Input: The Commission will take brief comments on those
general itet:s discussed so far. However, comments relating to
specific areas, problems or issues should be reserved for later on when
rr- ore specific items are discussed.
AMY p01G`1ISSS
$. 4y�gV18
of 58GG�D
esentatiun:
pT o
Stott ,,mO
o A eh, n u c►it9 Z'� e � ti eas en
s
m
nemae
nt
a se $ su e
O L e n H'Gb
d S 1ecCo s o
O 0. eeis Oa'
O son O d � l t
O eraA O aBeTn� enue
p e�
o SanD'e si 'Cie flan
AM
pub �InFu {'
R�stG e -U`Ln AT � IQTA s be
god
s AZtD
ST � tmi°"'
G. ede
n$ tt►e
L
GaTY V1i 1RrAN�nV CUlalu+lONGA
ST kFF REPORT
nATr- A-1 4n ii3a,7
s
TO: Chairman and Members of the Planning Commission
FROM, Brad Buller, City Planner
BY: Otto Kroutil Senior Planner
Aran barren, Associate Planner
SUBJECT: FQOTHILL BOULEVARD SPECIFIC PLAN - A public hearing and
wor s op to cons er a prov sfons of the Draft Foothill
Boulevard Specific Plan.
This meeting bagins the formal public hearing process on the 'Draft
Foothill Roulevard Specific Plan which is. the result of an extensive
study ant' - analysis by the Plan Consultant (FORMA- Planning Network), City
staff and .'k City Council appointed AO!iisory Committee.. The result is
a document which Contains the following major parts;
o Part I, Community Background:
o Part II, Development framework;
o Part III, Development Standards;
o Pat IV, Implementation
The document format is designed for convenient use and the issues,
answers, and implementation methods are interwoven throughout the
text. This staff report will attempt to separate the major and minor
issues in a logical format to aid the Commissioners in their
deliberations.
I
A suggested "road map" for the review is depicted on Exhibit "A". 'the
review process will be through a series of issue papers which address
the three major concepts (Community Design, Land Use /Economics, and
Traffic). Each issue paper contains 'key information, describing:
L. What the plan does;
2. What the issues are; and
3. Staff position.
Subarea i
> 14 to
b
M .r
Foothill
Sugaxea L I j
a
4
s
These subareas will be referred to frequantty in the text as part of
special design guidelines and development standards.
PLANNLN1j COMISSZON STAFF REPORT
Foothill Boulevard. Specific Plan
April 30, 1987
Page 2
It is suggested the reviaw process be conducted in the fallowing manner:
1. Review all primary "big picture" issues in the area
of design, land use, and circulatio,�l, then;
„
2. Review all secondary issues withvtn each major plan
� area, then;,
r 3. Review of specific design guidelines and development
standards.
In an effort to better identify the varying aspkt3 of the boulevard and
address their unique needs, the plan divided the cor-^idor Into four
geographlt ,subareas as follows:
Subarea 1: From Grove Avenue easterly to Vineyard
Avenue.
Subarea 2: Frmvl 9ineyard Avenue easterly to Hellman
Aven('e.
1
1111
Subarea 3: From 4eilman Avenue easterly t� Haven Avenue.
Subarea 4: The 1-15 Freeway easterly to Eaat Avenue,,
i
i
Subarea i
> 14 to
b
M .r
Foothill
Sugaxea L I j
a
4
s
These subareas will be referred to frequantty in the text as part of
special design guidelines and development standards.
�l
a. In addition, there is a lot �onsoiidation program_ as part of the
development standards and all implementation part Which will be revised
and expanded substantially as a result of Planning Commission
determinations on moor portions of the document.
Pinxtly, the whole process wi111r include review 'of a f6tused
environmental impact report to consider any significant impacts which
may result from the p ect. This 'document will be forwarded to the �
Planning Co6wission for iiubiic hearictg review during the review of the
Draft Specific Pl"�n.
Y Recaasendation:
It is recommended that the Planning- t.ommissioaers r¢View the entire
document in preparation for the first meeting. Staff anticizates that
we will t' -.3 able to complete reviews of the "bia picture" items and work
well : - ,.,,nto the secon6r issues at primary first meiting. Ifissues�atisthis
completes their revie�,.: of the
meeting, staff wood re waend that we proceed into the discussion of
the itandards)Regiclatiun!'. �krtion of the review process.
4
4R8spe �futly submitted,
Brad But er
City Planner
BS:OK:te
Attachments: Exhibit I - Specific Plan Review Process Chart +
Issue Papers on Design, Land Use and Circulation
Under Separate Cover - Foothill Boulevard Specific Plan
I
CWHITY DESIGN:
A. COWDOR DESIGN CONCEPT
The most significant physical feature of the Plan is the
proposed design method to visually unify the project area.
This aspect of the project was stated as a primary goal in the
Foothill Corridor Interim Policies which states in part, to
establish a high quality, attractive, and unifying design image
reflective of community heritage ". The acceptance of the
Plan's concept will set the stage for general design of the
Corridor and this feature should be adaptable to changes in
other significant ele-aents of the Plan (i.e. land Use,
Circulation, etc.).
Discussion: The Plan calls for a series of highly identifiable
activity canters and gateway features which are linked by o
unifying suburban parkway design as follows:
1. Activity Centers:
Actibily Centees are points of interest generally
located at major intersections and/or landmarks along
the Corridor. They are to provide individual
identity by concentrating commercial activity at the
following areas:
o Foothill at Dear Gulch
o Foothill at Vineyard Avenue
o Foothill at Archibald Avenue
o Foothill at Turner Avenue
o Foothill at Etiwanda Avenue
4: Activity Centers
Gatevays
s
w
These nodes will generally exhibit more formal urban
design characteristics. Specific criteria is
developed for each node in the Subarea 'Design
Guidelines sections 8.2 through 8.5.
2. Suburban Parkway Transitions:
i
Thit- feature links the' activity nodes with a less
formal streetscape design - to include
meandering /undulating sidewalks with informal
landscaping.
Issue: The Planning Cmiissirn should *%- termine the
appropriateness' of this concept in attafaing a unique and
unifying design for Foothill Boulevard.
Staff Analysis: Staff believes this concept has great
potential for providing identity to the Rancho Cucamonga
portion of Foothill Boulevard. ke visualize an interesting
exrerience of entering the City through high visibility
gateways and being led by stretches of informal parkways to
high interest commercial centers which` exhibit an urban
atmospheve.
pedestrian
B.1 0482ALL COPiMIJY DUIM CONCEPT (Sectlan 7.6)
This section contains specific design guidelines which
implement the objectives of the activity center /suburban
parkway concept. The components of this section as noted on
Pages 7 -5 through 7 -8 contain the following components:
o Subarea StructarE
u Activity Center
o Suburban Parkway
o Overall Architectural Concept
o Overall Landscape Architectural Concept
Issue: The Planning Commission should determine the
appropriateness of these design components within the overall
design concept for the corridor.
r
toi
r-
P
I
0:2 ARCHIS'iaCil➢RAl MUMS
One of the more recognizable aspects of a community design
image is that of its arcMtectural atyle. The Advisory
Committee deliberated extensively on what architectural style
should be encouraged as an aspect of community identity. The
importance of this issue is exemplified by the plans Overall
Statement. "Goal. To create a dynamic concourse ", that, is
attractive and of high mality With -a unifying design image
reflective of cccxxmnity heritage and identity...."
Discus;siont Concern was voiced early on that the comeGnity
does not have a single identifiable architectural themme, but
exhibits a diversity of styles which were identified as winery,
'fission, California barn. 1930`s Route 66, agricultural
heritage, etc.
The Committee resolved not to limit a -ecM, e$ure to a single
theme or style. Rather, it was' decide -that architecture
should borrow ce.tain elements from histori:Cal styles found in
Rancho Cucamonga. This view resulted in an architectural
concept (Rancho Cucamonga Heritage) which:
I. Encourages thn use of elements from these types
along the Corridor with provisions for design
compatibility.
2. The use of a single style of rrchitectural
element is not a part of this plan.
3. Encoaragement of design themes on a site-by-site
basis is encouraged and provided For at activity _
centers and key features (Section 8,2 - 8.41,.
Issue: Pill an architectural program made up of different
distinct styles be able to form a unifying design concept for
the Corridor?
Staff Analysis: Staff bell4ves the Advisory Committee's
recommendation has definite potential within the overall design
framework so long as distinct architectural styles /themes are
implemented at each activity center. In this (manner,
compatible architectural diversity can act as a unifying
element in the suburban parkway streetsrape while maintaining
distinct architectural styles at key activity nodes /centers.
i
c�
? As an alternative! the Planning Ca"ion may wish to consider
narrowing the band of architectural styles to he designated
along tie entire length of tie boui'ovard.
C. i1MCM 6U1DELMESISfAlitiW:
'these standards contain tht imrtementation features for the
objectives of the special design areas.
Issue: 7he Piaaini g T,oWssion should review all of the
guidelines to dotavine if the desired design objectives can be I
achieved. I
i
4RF
Aim USE:
A.
OVERAM LAND USE/ECONMC S RAV! f
The lard Use goal is to "develop a specific-'plan which is
sensitive to community, land use, and, physical needs". As a
major component of this statement, the Advisory Committee =Et
the tone for the land use /economic planning along Foothill
through thz foli,owing objectives: "Maximize the economic
po lt!nnn of Foothill Corridor commercial activities, capturing
neighbor hood and subregional demand.'
This objective strongly influences the ultimate scope of
commercial activity and character of the corridor and the
following discubsion focuses on potential result of such an
aggressive commercial vee.ure.
Discussion: As part of the fact finding portion of the Plan
study, an economic analysts was performed by the consulting
tease. The results of the economic consultants' study are as
follows:
o The City is experiencing a loss of sales tax
revenue by °sales potential leakage" in excess of
$200 million annually to othe< r; aunities due to
lack of significant high sales voles - ;businesses.
o Within the planning area, only a little more than
half of the commercial land is currently being
used by retail, service, and office businesses.
The O*ainant use for all land use categories
along �the'Corridor is vacant land (277- bcres).
a Based -;on projected population at buildout and
1,.14 acres of General Plan commercially
designated land, the City has an unrealistically
high allocation of commercial land for future
needs when compared to "comparable cities".
o Residential dev,lopment along and adjacent to the
corridor would help to improve commercial
viability along the boulevard.
9
r 1
The sales leakage is not the result of the rack of commercially
zoned land; commercial growth normally lags behind residential
development in all growing areas. As new commercial uses
develop along with new shopping patterns, new cities beliry -to
capture a greater proportion of the sales. Powewer, overly
ambitious commercial zoning can have a negative impact, on the
many vacant and currently underutilized parcels along the
western portion of Foothill.
The Advisory Committee did not feel that additional commercial
lance would result in tiny negative impacts if other previsions
and implementation programs of the Plan aggressively promoted
commercial activity, As a result, the p,lai calls for
signif 'Mant additional commercial acreage along the corridor,
with the intent of capturi--g a portion of the regional
traffic. Conversely, the number of acres available for
residential growth would be reduced.
The statistical land use breakdown is as follows-
Present Draft
General Plan Specific Plart Difference
Commercial /Office 262 369 acres + 107 acres
Residential 226 157 acres - 69 acres
Industrial Park 63 0 acres - 63 acres
Other 7 32 acres + 25 acres
Issue: Should Vie cowwrc9al /offi'ce acreage along the corridor
ba increased from 262 acres to approximmately 369 acres.
Staff Analysis: The key to a successful land use plan is
balance. We concur with the Committees' recommendation In that
Foothill Boulevard does '%ve a tremendous commercial potential
with regional commercial opportunities. This is true
particularly in the eastern portion of the City, where large
parcels of land are available for regional commercial use, with
easy access aid visibility from the I -15 freeway, relationship
to the regional mall, and a main gateway to the western portion
of Fontana.
However, staff has some concerns with the western portion of
the corridor. If excessive amounts of commercial acreage are
available, significant commercial areas may,' remain
undeveloped. This could have a negative effect on the
viability and dasirability of the area for quality commercial
services and would limit the potential for the upgrading or
reconstruction of exitptirg nen- conforming- structures or uses.
Dr the other fiand, the Commission should be aware that the only
viaWte alOarnative to commercial or office, uses along: the
corridor is residertial land use, The. corri6r:wM not be an
envi ronment conducive to single4amily residential uses, and
�Io�vwatibilityl
multiple-family projects create traffic,
other problems of their own,,
Staff WWd suggest the Commission review the -overall land ;,,ze
'conr
concept with these erns in mind,.recognizihg thatthere may
not be a clear cut, ideal solution availahle for each parcel of
land in the study area.
B.1 UM USE CAMMIES:
In an effort to tailor the plan to unique opportunities and
constrains of selected areas, special land use cw(t�'----Ions
'The
were developed. following discussion desoibaz� and
analyzes each case.
1. Re0onally Related Cammercial (RC)
This category is locatod imedtately adjacent to the
east side of the I-1S Freeway and was proposed to
take advantage of the land"s freeway exposure and
close proximity to the future mall.
Discussion: The main issues in this land use
category are as followst
o What ac6unt of land area should be reserved for
this activity? On the south side of Foothill,
the zone extends to EtiNanda Avenue.
o The extent of commercial activity allowed within
this category was extensively discussed. Some
concern was voiced that only reqional related
commercial uses which would not compete for space
or business with the future mall should be
allowed. The alternative view which was
recommended is that there should be little or no
restriction to competition with the mall for
space or busines$.
I
Issue: Should the regionally relai*d, COMWC141 One allow
for businesses which trill not only coolem t but toy also
Compete with the business types anticipated for the future
loll?
Staff Analysis; Staff believes the level of City
commitment to the mall and its importance to the
community's plan warrants some consideration to limit the
uses in the immediate rrea so as not to compete but
complement the mall busiirdbs activities.
�. Specially Commercial (SC)
This designation was incorporated into the Plan, to
facilitate the specialized development of landmark
and activity centers of the Corridor. The location
of this designation is at the intersections and
entries to the City as follows:
o Grove Avenue to thr, Bear Gulch Area
o Vineyard,Avenue Intersection (northeast
corner)
o Archibald Intersection
Discussion: The land use and deve7opment provisions
of this zone provides for zWlal standards to
encourage the redevelopment and retention of existing
features unique to the boulevard. Towards this goal,
the allowed activities have iJe" tailored to those
business types which would lend support to the
establishment of theme oriented activity centers. A
sample of authorized uses include: Antique shops,
bed and breakfa =t, book, gift and stationery stores,
cafes, Jewelry, luggage shops, art galleries, travel
agencies.
Activities which rpay not lend themselves to this
special character development are not authorized and
include: Supermarkets, nurseries, garden supplies,
television and stereo sales, hardware stores, auto
service, laundries,.
In this matter, the restricted activities help to
keep the development character within the interi4ed
specialized design of the high interest area,
it
Issue: Does the special commercial designation
provide sufficient activity ailoaances and
appropria" Tisitatioks to : ensure specialized
development of key points of interest and landmarks?
Staff f alusis: Staff concurs with the use
limitations to help' ensure developments of unique
character. Uses which do not lend themselves to this
specialized character should locate in the community
commercial or other districts.
3. Nixed Use /Retail'INUMi
The large block bordered by Hillman Avenue, San
8ernalydino Road, Klusm+an Avenue, and Foothill
Boulevard presented a number of potential
difficulties as follows:
o [Many small substandard lots in
fragmented ownership
o Excessive depth of the block to San
Bernardino Road
o A desire to limit the number of vehicle
access: points to Foothill Boulevard
o Residents to the north requesting
limited access from Foothill
developments onto San Bernardino Road
o Variety of residential (mobile home
parks) and transition commercial uses
within the block.
The consultant and Advisory Committee recommendation
was to provide a land use category which:.
a. Allow for multiple family developments
from 8 to 14 dwelling units per acre,
and;
b. Coupled with an establishment of
convenience usas and services tailored
to the residential needs, and;
Y
c. Keyed to a mixed use concept is the
requirement of a master plan for the
entire M/R area which would a
accommodate rmedies to circulation J
concerns.
This laiid uie designation is also proposed for a
similarly „ized area at the northeast corner of
Foothill a';d''Etiwanda Avenue.>
Issue: JCan a co mwercial (residential mixed use
scenario be ;alarmed and developed successf-glly under
a master plan concept? if so, mat spe -lfic uses
would be appropriate within this land use category?
Note: The Advisory Committee hearer a regwest from a
property owner to include motel uses as an afshorized
activity in the category. The Committee 4telt there
could be conflicts between the residential activity
of multiple family uses and the more transient
boarding activities of motels.
Staff Analysis: The mixed use designation presents
both potential to innovative solutions but can alse
result in incompatibilities if not adequately
planned. Staff concurs with the Advisory Committee
recommendation that master planning of the entire
area so designated is a must if the varying uses are
to work well together.
B..2 SITE SPECIFIC ISSijES:
Issue: Should automotive related us,", be eliminated along the
Corridor? The proposed plan permlts Lutomotive related uses in
portions of the area. However, concerns were voiced that
automobile services may not be appropriate along a revitalized
Foothill Boulevard and that such uses s�kould be located in the
Industrial Area.
Issue: Should the community coumercial extend northerly an
additional 300 meet along the northwest corner of Foothill and
Etiwanda? Staff has concerns on the appropriateness of
extending commercial activity northerly into the predominantly
rer.4iential Etiwanda Specific Plan.
MW
r
Issue: Showld the south side of Foothill Boulevard opposite
the $Ycaxwe Inn be included in the Specialty Coal -rcial
Sill ,- District? Staff has concerns on the viability of suc;,4 large
area designated solely for Specialty Coeamerciai uses.
,Staff will geeo the Comission's direction in these areas,
C DID, TLOPMEidi' S? DS
MY4 Planning Commission, should review the permitted uses in
III of the Devclopment Standards for all land'' use
4,'atdOories.
f
. r
'µz .
I
CIRCilLATICIM:
. -.. -. _...... .
A. OVER&L TRAFFIC SYSTEM
A major cokern to which the Plan must 00vide solutions is
that of &t6re traffic congestion. The traffic analysis as
part o? the,;, background report preuicted avPs1age daily traffic
counts of up'ta,86.000 without the Route,. d Freeway. With the
i
new freekey, s"sumed in all our plans,.the volumes of traffic
on Foothill would decrease to 50,000 - 60,000 ,MT's but
projec },ed levels of service will still remain unsatisfactory.
The pr!otosed traffic control system is discussed belows:
Discussion: The overall traffic system utilizes synchronized
traffic signalization and the followinS =
1. Continuous median islands with cuts limited to
-aWor intersections, an6 specified locations
only.
2. Selected access points on Foothill Boulevard
based on existing City police for driveway
locations.
3. Multiple left -turn lanes apd separate right -turn
lanes at critical intersections.
Even with these measures, the traffic consultant predicts poor
levels of service at major intersections. While this problem
has been expected without a specific plan study, it is also
recognized that the increase in the amount of cripercial land
will add incrementally to the overall traffic volumes.
Issue: fire the traffic control measures appropriate to ensure
a safe circulation system while providing adequate access for
the viability of commercial davelapments?
Staff Analysis: The UVortance of adequate control measures
and timely impiementation cannot be overemphasized. It should
be recognized that the corridor is an integral part of the
City -wide and regional circulation system and that all traffic
control measures must work in concert with one another. The
desire to provide additional median openings or points of
access to localized areas must be weighed against the
Boulevard's ability to carry the projected volumes of traffic
as a crucial component of an overall system:
44
B. SELECTEl1r CIRCMATION ISBNs
Red Hill Country Club raali t• The alignment of Red 4111
�"
Country Clu r_ve was s g *elation .to*
I. Its awkward intersection with Foothill ,Mulevar '
and inadequate distance to Grove Avenue causing
safety and circulation problems at bath
intersections,
2. Its inappropriate use as -a shortcut to Base line
Road, thereby increasing traffic through the
residential neighborhood on Red Hill.
The Committee considered the following alternatives (p. 6_1):.
2. Alternative I calls for realignment southerly to
a 90 degree "T" intersection, easterly of the
present location.
2. Alternative 2 c411S for the road to be real=igned
westerly to Grove Avenue with two possible
routes. Route 2 8 was recommended to divide the
effected parcel into two developable pieces.
4
Issue: lime Planning GoWssion should consider the
`
appropriateness of tM racoeeltdad a5Vinent versus the outer
alternatives.
Staff Analysis: Staff concurs with the recommensation of the
Advisory Comittee.
E tension. rangy Estacia Avenue: Residents on the north side of
n Ber nar no Roa een Hellman Avenue and Ki usman Avenue
expressed concern over potential excessive traffic generated by
future develgprmnt on the south side of San Bernardino Road.
This concern resulted in a request to prohibit any access
points from this area onto San Bernardino Road. The Advisory
Committee generally concurred with their and
.;4oncerns
recommends against any significant access northerly to this
street.
In order to provide sufficient access into this large block,
the fallowing measures were included in the Plan,
i. Extension of Estacia Avenue westerly into the
area,
i
2. The location of two major access points apposite
Malachite and Helms northerly into the block.
The Malachite access extension would be an
appropriate location for a signalized
intersection.
3. An inta for circulation system of public or
private drives linking the extension of Estacia
with th6 access points off Foothill Boulevard.
Issues: l
i
1. Should access be prohibfted or severely lialted to Sari
Bernardino Road ?'
2. If so,,- ;#could access i' _ttm area be as proposed?
Staff Analysis; Staff recognizes the valid concerns of the
neighboring residents but must point out that San 3ernardino
Road has be&i planned as a collector roadway to service the
properties on both side, of it. Therefore, some consideration
should be give!: - to al,14* limited access to this street. If
not, alternate access must be provided. Staff believes that
the scenario provided is the only logical alternative to the
use of San Bernardino oad.
San Bernardino Road Reuli t: The Plan calls for the
adjustment of n Bernardino Road intersection opposite the
Sycamore Inn by closing off the easterly extension of the "Y
intersection.
I
Staff Analysis: Staff concurs with the recd mendations of them
Advisory Committee and recommends approval by the Planning
Commission.
San Diego Avenue Reali P tt The Advisory Committee
re
cons id reques s `fro`m t -e —Planning Commission and City
Council regarding potential realignment of San Diego Avenue.
The options considered incline:
1. Move the roadway westerl;,f to border the
realignment of the Cucdmonga Creek Channel, or,,
i
2. Abandon the roadway, or;
3. Leave the street as presently c,pifigured with no
cut i,a the proposed median islar,d on Foothill.
- I
.,, The Advisory t:owmittee felt ttere way no evidence to justify,
the first two options.
Staff Analysis. The retention of San, Diego Aven -.to in its
present,---al tgnment is acceptable,' *ith no median upeni,igs, until
further development of the area.
C. R MOWAY CM10t 73A1q'
The Planning Commission should review and reco3 approval of
final roadway configuratignc throughput the corrirM'