HomeMy WebLinkAbout01-21 - Resolutions RESOLUTION NO. 01-21 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT REVIEW 00-17 FOR A RECREATIONAL VEHICLE AND BOAT STORAGE FACILITY, ON 3.7 ACRES OF LAND IN THE GENERAL INDUSTRIAL DISTRICT, LOCATED ON THE NORTH SIDE OF ARROW ROUTE, IN THE SOUTHERN CALIFORNIA EDISON POWER LINE EASEMENT,ADJACENT AND WEST OF THE DAY CREEK CHANNEL AND MAKING FINDINGS IN SUPPORT THEREOF - APN: 229-021-47. A. Recitals. 1. Rancho Cucamonga RV and Boat Storage filed an application for the approval of Development Review 00-17 as described in the title of this Resolution. Hereinafter in this Resolution, the subject design review request is referred to as "the application." 2. On the 28th day of February, 2001, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved bythe Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above- referenced public hearing on February 28, 2001, including written and oral staff reports,togetherwith public testimony, this Commission hereby specifically finds as follows: a. The application applies to location north of Arrow Route, east of the Day Creek Channel and generally west of Rochester Avenue. The site is currently used as a container plant nursery; and b. The property to the north of the subject site is used as a container plant nursery. To the east is Day Creek Channel, and 1-15 Freeway. To the south across Arrow Route is the Watson I- 15 Business Center. To the west is the Stadium Self-Storage facility; and C. Storm drain improvements necessary to accommodate the project are not in excess of that provided by the Master Plan of storm drainage; and d. The proposed project, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. PLANNING COMMISSION RESOLUTION NO. 01-21 DEVELOPMENT REVIEW 00-17 — RANCHO CUCAMONGA RV AND BOAT STORAGE February 28, 2001 Page 2 e. The project will provide self-storage for boats, and recreational vehicles for the convenience of the residents of Rancho Cucamonga and other surrounding communities. 3. Based upon the substantial evidence presented to this Commission during the above- referenced public hearing and upon the specific findings of facts set forth in paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. That the development review is consistent with the General Plan, Development Code, and any applicable specific plans; and b. The design or improvements of the project is consistent with the General Plan, Development Code, and any applicable specific plans; and C. The site is physically suitable for the type of development proposed; and d. The design of the project is not likely to cause substantial environmental damage and avoidable injury to humans and wildlife, or their habitat; and e. The design of the project will not conflict with any easement acquired by the public at large, now of record, for access through or use of the property. 4. Based upon the facts and information contained in the proposed Mitigated Negative Declaration, together with all written and oral reports included for the environmental assessment for the application, the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment, and adopts a Mitigated Negative Declaration and Monitoring Program attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. That the Mitigated Negative Declaration has been prepared in compliance with the California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared therefore reflect the independent judgment of the Planning Commission; and further, this Commission has reviewed and considered the information contained in said Mitigated Negative Declaration with regard to the application. b. Although the Mitigated Negative Declaration identifies certain significant environmental effects that will result if the project is approved, all significant effects have been reduced to an acceptable level by imposition of mitigation measures on the project,which are listed below as Conditions of Approval. C. Pursuant to the provisions of Section 753.5(c) of Title 14 of the California Code of Regulations, the Planning Commission finds as follows: In considering the record as a whole, the Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the proposed project will have potential for an adverse impact upon wildlife resources orthe habitat upon which wildlife depends. Further, based upon the substantial evidence contained in the Mitigated Negative Declaration, the staff reports and exhibits, and the information provided to the Planning Commission during the public hearing, the Planning Commission hereby rebuts the presumption of adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code of Regulations. PLANNING COMMISSION RESOLUTION NO. 01-21 DEVELOPMENT REVIEW 00-17 — RANCHO CUCAMONGA RV AND BOAT STORAGE February 28, 2001 Page 3 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. Planning Division: 1) Provide additional berming along Arrow Route and the future Jack Benny Drive. Berms shall be undulated and have an average height of 3 feet (maximum slope not to exceed 3.5:1). 2) Access gates shall be opaque. 3) No wall shall exceed an exposed height of 8 feet as viewed from adjacent properties and streets. 4) No chain link fencing is permitted. 5) Provide significant landscaping with landscape setbacks along the street and future street frontages. 6) All equipment, both ground and roof mounted, shall be completely screened and architecturally compatible with the elevation design from view of surrounding properties and public right-of-ways. Engineering Division: 1) Prepare an alignment study for the future centerline of Jack Benny Drive, between Rochester Avenue and Day Creek Channel showing all related parcel lines. The alignment study shall be prepared by a Licensed Surveyor or authorized Registered Civil Engineer, and submitted to and approved by the City Engineer. a) Indicate the origin and/or the reason for use of the individual bearings and distances by use of distinctive symbols, i.e. brackets, parenthesis double brackets, or notes at each dimension as applicable. b) Indicate the relationship with dimensions between the future centerline of Jack Benny Drive and the common property line between the assessors parcels numbered(APN):APN's 229-021- 53 & 55 on the north, and APN's 229-021-34 &47, and a portion of 20 on the south. Indicate if the proposed centerline is parallel with, along, or adjacent to the east/west property lines. c) Show the complete bridge and dimension of all the improvements at the flood control channel with relationship to the proposed street centerline and adjacent property lines. d) Show the northerly property line of APN: 229-021-62 (east of the channel) and its location relative to the existing bridge. PLANNING COMMISSION RESOLUTION NO. 01-21 DEVELOPMENT REVIEW 00-17 — RANCHO CUCAMONGA RV AND BOAT STORAGE February 28, 2001 Page 4 2) The property owner shall offer to dedicate an easement for the ultimate street right-of-way of Jack Benny Drive/Day Creek Boulevard based on the results of the alignment study. The easement shall be along the northerly portion of the project site and across the whole width of the site. 3) An in-lieu fee as contribution to the future construction of Jack Benny Drive/Day Creek Boulevard shall be paid to the City prior to the issuance of building permits. The fee shall be based on the estimated cost of constructing the south half of the street across the northerly frontage of the project site from the west boundary to the Flood Control District Channel and based on the results of the alignment study. The construction cost shall include sidewalk, one drive approach, parkway trees, streetlights, and the one-half(1/2) street pavement with concrete curb and gutters. 4) Arrow Route public right-of-way improvements fronting the project site and crossing the Flood Control District (FCD) right-of-way(R/W) shall be protected in place and replaced as required. Provide parkway curbside drain, parkway trees (fronting the site and crossing the FCD R/W), curvilinear sidewalk, two (2) streetlights, traffic striping and signage, R26 "NO PARKING' signs and drive approaches per City Standard Drawings and to the satisfaction of the City Engineer. 5) Only one drive approach will be allowed on Arrow Route, at least 300 feet from an existing one to the west. If the Fire Safety Division requires a secondary emergency access, provide limited access curb in that location. Gates shall be at least 50 feet from the curb along Arrow Route. Environmental Mitigation Air Quality 1) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and RWQCB) daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403. 2) Arrow Route shall be swept according to a schedule established by the City to reduce PM10 emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon time of year of construction. 3) Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PM10 emissions from the site during such episodes. 4) Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be applied to all inactive construction areas that remain inactive for 96-hours or more to reduce PM10 emissions. PLANNING COMMISSION RESOLUTION NO. 01-21 DEVELOPMENT REVIEW 00-17— RANCHO CUCAMONGA RV AND BOAT STORAGE February 28, 2001 Page 5 5) The contractor shall select the construction equipment used on-site based on low-emission factors and high-energy efficiency. The construction contractor shall ensure the construction grading plans include a statement that all construction equipment will be tuned and maintained in accordance with the manufacture's specifications. 6) The construction contractor shall utilize electric or clean alternative fuel-powered equipment where feasible. 7) Grading plans shall include a statement that work crews will shut off equipment when not in use. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 28TH DAY OF FEBRUARY 2001. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: �C w Larry T. Nib], Chairman ATTEST: Bradman creta I, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 28th day of February 2001, by the following vote-to-wit: AYES: COMMISSIONERS: MACIAS, MANNERINO, MCNIEL, STEWART, TOLSTOY NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: NONE City of Rancho Cucamonga MITIGATION MONITORING PROGRAM Project File No.: Development Review 00-17 This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation measures identified in the Mitigated Negative Declaration for the above-listed project. This program has been prepared in compliance with State law to ensure that adopted mitigation measures are implemented (Section 21081.6 of the Public Resources Code). Program Components - This MMP contains the following elements: 1. Conditions of approval that act as impact mitigation measures are recorded with the action and the procedure necessary to ensure compliance.The mitigation measure conditions of approval are contained in the adopted Resolution of Approval for the project. 2. A procedure of compliance and verification has been outlined for each action necessary. This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported. 3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring progresses, changes to compliance procedures may be necessary based upon recommendations by those responsible for the program. Program Management - The MMP will be in place through all phases of the project. The project planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly and proper action is taken on each mitigation. Each City department shall ensure compliance of the conditions (mitigation) that relate to that department. Procedures - The following steps will be followed by the City of Rancho Cucamonga. 1. A fee covering all costs and expenses, including any consultants'fees, incurred by the City in performing monitoring or reporting programs shall be charged to the applicant. 2. An MMP Reporting Form will be prepared for each potentially significant impact and its corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached hereto. This procedure designates who will take action,what action will be taken and when,and to whom and when compliance will be reported. All monitoring and reporting documentation will be kept in the project file with the department having the original authority for processing the project. Reports will be available from the City upon request at the following address: City of Rancho Cucamonga - Lead Agency . Planning Division 10500 Civic Center Drive Rancho Cucamonga, CA 91730 Mitigation Monitoring Program DEVELOPMENT REVIEW 00-17— RANCHO CUCAMONGA RV AND BOAT STORAGE Page 2 3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,as determined by the project planner or responsible City department,to monitor specific mitigation activities and provide appropriate written approvals to the project planner. 4. The project planner or responsible City department will approve, by signature and date, the completion of each action item that was identified on the MMP Reporting Form. After each measure is verified for compliance, no further action is required for the specific phase of development. 5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off as completed by the project planner or responsible City department at the bottom of the MMP Reporting Form. 6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation measures. The project planner is responsible for approving any such refinements or additions. An MMP Reporting Form will be completed by the project planner or responsible City department and a copy.provided to the appropriate design, construction, or operational personnel. 7. The project planner or responsible City department has the authority to stop the work of construction contractors if compliance with any aspects of the MMP is not occurring after written notification has been issued. The project planner or responsible City department also has the authority to hold certificates of occupancies if compliance with a mitigation measure attached hereto is not occurring.The project planner or responsible City department has the authority to hold issuance of a business license until all mitigation measures are implemented. 8. Any conditions (mitigation) that require monitoring after project completion shall be the responsibility of the City of Rancho Cucamonga Community Development Department. The Department shall require the applicant to post any necessary funds(or otherforms of guarantee) with the City. These funds shall be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measure for the required period of time. 9. In those instances requiring long-term project monitoring, the applicant shall provide the City with a plan for monitoring the mitigation activities at the project site and reporting the monitoring results to the City. Said plan shall identify the reporter as an individual qualified to know whether the particular mitigation measure has been implemented. The monitoring/reporting plan shall conform to the City's MMP and shall be approved by the Community Development Director prior to the issuance of building permits. MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III) Project File No.: DR 00-17 Applicant: _Rancho Cucamonga RV and Storage Initial Study Prepared by: _ Nancy Ferguson Date: May 18. 2000 MonitoringMitigation Measures No. Responsible Monitoring Timing of Method of Verif ied Sanctions for Implementing Action for , Air Quaht The site shall be treated with water or other soil stabilizing CP C Review of plans A/C 2 agent) approved by SCAQMD and RWQCB)daily to reduce P1010 emission,in accordance with SCAQMD Rule 403. - Arrow Rouote shall be swept according to a schedule CP C Review of plans A/C 2 established by the City to reduce PMIo emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon time of year of construction. Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PMio emissions from the site CP C Review of plans A/C 2 during such episodes. Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be applied to all inactive construction areas CP C Review of plans A/C 2 that remain inactive for 96 hours or more to reduce PM,o emissions. The construction contractor shall select the construction equipment used on-site based on low emission factors and CP B/C Review of plans A/C 2 high-energy efficiency. The construction contractor shall ensure the construction grading plans include a statement that all construction equipment will be tuned and maintained in accordance with the manufacturer's specifications. The construction contractor shall utilize electric or clean alternative fuel powered equipment where feasible. CP B/C Review of plans A/C 2 The construction contractor shall ensure that construction- grading plans include a statement that work crews will shut off equipment when not in use. CP/CE B Review of plans C 2 Key to Checklist Abbreviations ReSponSible Person' MF' = Frequency .' ` Mettiod'of Verification s , '" ` = SanctionsCDD-Community Development Director ch New Development A-On-site Inspection 1 -Withhold Recordation of Final Map CP-City Planner or designee Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit CE-City Engineer or designee out Construction C-Plan Check 3-Withhold Certificate of Occupancy SO-Building Official or designee pletion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order PO-Police Captain or designee ng 5-Retain Deposit or Bonds FC-Fire Chief or designee 6-Revoke CUP I:\PLANNING\Doug\DR's (2000)\DR 00-17\New Folder\MMCHKLST-DR 00-17.doc COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT#: DEVELOPMENT REVIEW 00-17 SUBJECT: RANCHO CUCAMONGA RV & BOAT STORAGE APPLICANT: SECURED EQUITIES CORPORATION LOCATION: NORTH OF ARROW ROUTE, EAST OF DAY CREEK CHANNEL & 1-15 ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DIVISION, (909) 477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents, officers, or employees, because of the issuance of such approval, or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. A copy of the signed Resolution of Approval and all Standard Conditions, shall be included in legible form on the grading plans, building and construction plans, and landscape and irrigation plans submitted for plan check. B. Time Limits 1. Conditional Use Permit, Variance, or Development/Design Review approval shall expire if building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans, architectural elevations, exterior materials and colors, landscaping, sign program, and grading on file in the Planning Division, the conditions contained herein, Development Code regulations. 2. Prior to any use of the project site or business activity being commenced thereon, all Conditions of Approval shall be completed to the satisfaction of the City Planner. SC-12-00 1 Project No.DR 00-17 Completion Date 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Division to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for City Planner review and approval prior to the issuance of building permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 7. A detailed on-site lighting plan, including a photometric diagram, shall be reviewed and approved by the City Planner and Police Department (477-2800) prior to the issuance of building permits. Such plan shall indicate style, illumination, location, height, and method of shielding so as not to adversely affect adjacent properties. 8. Trash receptacle(s) are required and shall meet City standards. The final design, locations, and the number of trash receptacles shall be subject to City Planner review and approval prior to the issuance of building permits. 9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping to the satisfaction of the City Planner. For single family residential developments, transformers shall be placed in underground vaults. 10. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination. 11. All parkways, open areas, and landscaping shall be permanently maintained by the property owner, homeowners' association, or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for City Planner and City Engineer review and approved prior to the issuance of building permits. D. Shopping Centers 1. The lighting fixture design shall compliment the architectural program. It shall include the plaza area lighting fixtures, building lighting fixtures (exterior), and parking lot lighting fixtures. E. Building Design 1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections, shall be shielded from view and the sound buffered from adjacent properties and streets as required by the Planning Division. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the City Planner. Details shall be included in building plans. 2. For commercial and industrial projects, paint roll-up doors and service doors to match main building colors. SC-12-00 2 Project No.DR 00-17 Completion Date F. Parking and Vehicular Access (indicate details on building plans) 1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet wide. 2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall contain a 12-inch walk adjacent to the parking stall (including curb). 3. All parking spaces shall be double striped per City standards and all driveway aisles, entrances, and exits shall be striped per City standards. 4. Plans for any security gates shall be submitted for the City Planner, City Engineer, and Rancho _/_J_ Cucamonga Fire Protection District review and approval prior to issuance of building permits. For residential development, private gated entrances shall provide adequate turn-around space in front of the gate and a separate visitor lane with call box to avoid cars stacking into the public right-of-way. G. Landscaping 1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for City Planner review and approval prior to the issuance of building permits or prior final map approval in the case of a custom lot subdivision. 2. Existing trees required to be preserved in place shall be protected with a construction barrier in accordance with the Municipal Code Section 19.08.110, and so noted on the grading plans. The location of those trees to be preserved in place and new locations for transplanted trees shall be shown on the detailed landscape plans. The applicant shall follow all of the arborist's recommendations regarding preservation, transplanting, and trimming methods. 3. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within commercial and office projects, shall be specimen size trees -24-inch box or larger. 4. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking stalls, sufficient to shade 50% of the parking area at solar noon on August 21. 5. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one tree per 30 linear feet of building. 6. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope, but less than 2:1 slope, shall be, at minimum, irrigated and landscaped with appropriate ground cover for erosion control. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 7. The final design of the perimeter parkways, walls, landscaping, and sidewalksshall be included in the required landscape plans and shall be subject to City Planner review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Division. 8. Special landscape features such as mounding, alluvial rock, specimen size trees, meandering sidewalks (with horizontal change), and intensified landscaping, is required along Arrow Route. 9. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 10. All walls shall be provided with decorative treatment. If located in public maintenance areas, the design shall be coordinated with the Engineering Division. SC-12-00 3 Project No.DR 00-17 Completion Date 11. Landscaping and irrigation shall be designed to conserve water through the principles of Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code. 12. New windrow planting of Eucalyptus Maculata (Spotted Gum) is required at a ratio of 50 linear feet per acre. The size, spacing, staking, and irrigation of these trees shall comply with the City's Tree Preservation Ordinance (RCMC 19.08.100). H. Signs 1. The signs indicated on the submitted plans are conceptual only and not a part of this approval. Any signs proposed for this development shall comply with the Sign Ordinance and shall require separate application and approval by the Planning Division prior to installation of any signs. I. Environmental 1. Mitigation measures are required for the project. The applicant is responsible for the cost of implementing said measures, including monitoring and reporting. Applicant shall be required to post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the amount of $ 719.00 prior to the issuance of building permits, guaranteeing satisfactory performance and completion of all mitigation measures. These funds may be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete all actions required by the approved environmental documents shall be considered grounds for forfeit. J. Other Agencies 1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location of mailboxes. Multi-family residential developments shall provide a solid overhead structure for mailboxes with adequate lighting. The final location of the mail boxes and the design of the overhead structure shall be subject to City Planner review and approval prior to the issuance of building permits. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION, (909) 477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: K. General Requirements 1. Submit five complete sets of plans including the following: a. Site/Plot Plan; b. Foundation Plan; c. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; f. Plumbing and Sewer Plans, including isometrics, underground diagrams, water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Division Project Number (i.e., TT #, CUP It, DR #, etc.) clearly identified on the outside of all plans. SC-12-00 4 Project No.DR 00-17 Completion Date 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet"signature are required prior to plan check submittal. 3. Separate permits are required for fencing and/or walls. 4. Contractors must show proof of State and City licenses and Workers' Compensation coverage to the City prior to permit issuance. 5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the Building and Safety Division. L. Site Development 1. . Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number (i.e., CUP 98-01). The applicant shall comply with the latest adopted Uniform Building Code, Uniform Mechanical Code, Uniform Plumbing Code, National Electric Code, Title 24 Accessibility requirements, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Please contact the Building and Safety Division for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new commercial or industrial development or addition to an existing development, the applicant shall pay development fees at the established rate. Such fees may include, but are not limited to: Transportation Development Fee, Drainage Fee, School Fees, Permit and Plan Checking Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Division prior to permit issuance. 3. Street addresses shall be provided by the Building Official, after tract/parcel map recordation and prior to issuance of building permits. 4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. 5. Construct trash enclosure(s) per City Standard (available at the Planning Division's public counter). 6. The following is required for side yard use for increase in allowable area: a. Provide a reduced site plan (8 Y2" x 11") which indicates the non-buildable easement. b. Recorded "Covenant and Agreement for the Maintenance of a Non-Buildable Easement," which is signed by the appropriate property owner(s). c. Sample document is available from the Building and Safety Division. M. New Structures 1. Provide compliance with the Uniform Building Code for the property line clearances considering use, area, and fire-resistiveness. 2. Provide compliance with the Uniform Building Code for required occupancy separation(s). 3. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with UBC Table 5-A. 4. Exterior walls shall be constructed of the required fire rating in accordance with UBC Table 5-A SC-12-00 5 Project No.DR 00-17 Completion Date N. Grading 1. Grading of the subject property shall be in accordance with the Uniform Building Code, City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the time of application for grading plan check. 4. The final grading plans shall be completed and approved prior to issuance of building permits. 5. A separate grading plan check submittal is required for all new construction projects and for __J_ J_ existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The Grading Plan shall be prepared, stamped, and signed by a California Registered Civil Engineer. APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: O. Dedication and Vehicular Access 1. Dedication shall be made of the following rights-of-way on the perimeter streets (measured from street centerline): 46—59 total feet on Jack Benny Drive 2. Easements for public sidewalks and/or street trees placed outside the public right-of-way shall be dedicated to the City. P. Street Improvements 1. Construct the following perimeter street improvements including, but not limited to: Street Name Curb& A.C. Side- Drive Street Street Comm Median Bike Other Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Arrow Route I I C X X X Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be provided for this item 2. Improvement Plans and Construction: a. Street improvement plans, including street trees, street lights, and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements, prior to final map approval or the issuance of building permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the City Engineer's Office in addition to any other permits required. c. Pavement striping, marking, traffic signing, street name signing, traffic signal conduit, and _/_ J_ interconnect conduit shall be installed to the satisfaction of the City Engineer. SC-12-00 6 Project No.DR 00-17 Completion Date d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer Notes: (1) Pull boxes shall be No. 6 at intersections and No. 5 along streets, a maximum of 200 feet apart, unless otherwise specified by the City Engineer. (2) Conduit shall be 3-inch (at intersections) or 2-inch (along streets) galvanized steel with pull rope or as specified. e. Handicapped access ramps shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. I. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving, which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single family residential lots. h. Street names shall be approved by the City Planner prior to submittal for first plan check. 3. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. 4. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with adopted policy. On collector or larger streets, lines of sight shall, be plotted for all project intersections, including driveways. Local residential street intersections and commercial or industrial driveways may have lines of sight plotted as required. Q. Public Maintenance Areas 1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the City Engineer prior to final map approval or issuance of building permits whichever occurs first. Formation costs shall be borne by the developer. R. General Requirements and Approvals 1. A non-refundable deposit shall be paid to the City, covering the estimated operating costs for all new street lights for the first six months of operation, prior to final map approval or prior to building permit issuance if no map is involved. APPLICANT SHALL CONTACT THE FIRE PREVENTION/NEW CONSTRUCTION UNIT, (909)477-2730, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: S. General Fire Protection Conditions 1. Mello Roos Community Facilities District requirements shall apply to this project. The developer shall commence, participate in, and consummate or cause to be commenced, participated in, or consummated, a Mello-Roos Community Facilities District(CFD) for the Rancho Cucamonga Fire Protection District to finance construction and/or maintenance of a fire station to serve the development. The CFD shall be formed by the District and the developer by the time recordation of the final map occurs. SC-12-00 7 Project No.DR 00-17 Completion Date 2. Fire flow requirement shall be 4250 gallons per minute: .OR- X A fire flow shall be conducted by the builder/developer and witnessed by fire department personnel prior to water plan approval. X For the purpose of final acceptance, an additional fire flow test of the on-site hydrants shall be conducted by the builder/developer and witnessed by fire department personnel after construction and prior to occupancy. 3. Fire hydrants are required. All required public or on-site fire hydrants shall be installed, flushed, and operable prior to delivery of any combustible building materials on site (i.e., lumber, roofing materials, etc.). Hydrants flushing shall be witnessed by fire department personnel. 4. Existing fire hydrant locations shall be provided prior to water plan approval. Required hydrants, if any, will be determined by the Fire District. Fire District standards require a 6-inch riser with a 4-inch and a 2-1/2-inch outlet. Substandard hydrants shall be upgraded to meet this standard. Contact the Fire Safety Division for specifications on approved brands and model numbers. 5. Prior to the issuance of building permits for combustible construction, evidence shall be submitted to the Fire District that an approved temporary water supply for fire protection is available, pending completion of the required fire protection system. 6. Hydrant reflective markers (blue dots) shall be required for all hydrants and installed prior to final inspection. 7. An automatic fire extinguishing system(s) will be required as noted below: X Per Rancho Cucamonga Fire Protection District Ordinance 15. X Other: UBC. Note: Special sprinkler densities are required for such hazardous operations as woodworking, plastics manufacturing, spray painting, flammable liquids storage, high piled stock, etc. Contact the Fire Safety Division to determine if the sprinkler system is adequate for proposed operations. 8. Sprinkler system monitoring shall be installed and operational immediately upon completion of sprinkler system. 9. Roadways within project shall comply with the Fire District's fire lane standards, as noted: X All roadways per Rancho Cucamonga Fire Protection District Ordinance 32. X Other: Amend to comply with Rancho Cucamonga Fire District Standards. 10. Fire department access shall be amended to facilitate emergency apparatus. 11. Emergency access, a minimum of 26 feet wide, shall be provided, and maintained free and clear of obstructions at all times during construction, in accordance with Fire District requirements. 12. All trees and shrubs planted in any median shall be kept trimmed to a minimum of 14 feet, 6 inches from the ground up, so as not to impede fire apparatus. 13. A building directory shall be required, as noted below: X Lighted directory within 20 feet of main entrance(s). 14. A Knox rapid entry key vault shall be installed prior to final inspection. Proof of purchase shall be submitted prior to final building plan approval. Contact the Fire Safety Division for specific details and ordering information. 15. Gated/restricted entry(s) require installation of a Knox rapid entry key system. Contact the Fire _J_/_ Safety Division for specific details and ordering information. SC-12-00 8 Project No.DR 00-17 Completion Date 16. Fire District feels), plus a $1 per "plan page"microfilm fee will be due to the Rancho Cucamonga Fire Protection District as follows: X $132 for CCWD Water Plan review/underground water supply. X $677 for New Commercial and Industrial Development (per new building)." "Note: Separate plan check fees for Tenant Improvement work, fire protection systems (sprinklers, hood systems, alarms, etc.) and/or any consultant reviews will be assessed upon submittal of plans. 17. Plans shall be submitted and approved prior to construction in accordance with 1997 UBC, UFC, _/_/_ UPC, UMC, and RCFD Standards 32 and 15 and 1996 NEC. T. Special Permits 1. Special permits may be required, depending on intended use, as noted below: a. Liquefied petroleum gas (storage, handling, transport, or use exceeding more than 120 gallons). NOTE: SEPARATE PLAN CHECK FEES FOR TENANT IMPROVEMENTS, FIRE PROTECTION SYSTEMS (SPRINKLERS, HOOD SYSTEMS, ALARMS, ETC.), AND/OR ANY CONSULTANT REVIEWS WILL BE ASSESSED UPON SUBMITTAL OF PLANS. NOTE: A SEPARATE GRADING PLAN CHECK SUBMITTAL IS REQUIRED FOR ALL NEW CONSTRUCTION PROJECTS AND FOR EXISTING BUILDINGS WHERE IMPROVEMENTS BEING PROPOSED WILL GENERATE 50 CUBIC YARDS OR MORE OF COMBINED CUT AND FILL. THE GRADING PLAN SHALL BE PREPARED, STAMPED AND SIGNED BY A CALIFORNIA REGISTERED CIVIL ENGINEER. APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: U. Security Lighting 1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power. These areas should be lighted from sunset to sunrise and on photo sensored cell. 2. Lighting in exterior areas shall be in vandal-resistant fixtures. V. Security Fencing 1. All businesses or residential communities with security fencing and gates will provide the police with a keypad access and a unique code. The initial code is to be submitted to the Police Crime Prevention Unit along with plans. If this code is changed due to a change in personnel or for any other reason, the new code must be supplied to the Police via the 24-hour dispatch center at (909) 941-1488 or by contacting the Crime Prevention Unit at (909) 477-2800 extension 2474 or 2475. SC-12-00 9