Loading...
HomeMy WebLinkAbout01-88 - Resolutions RESOLUTION NO. 01-88 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING CONDITIONAL USE PERMIT DRC2001-00082 FOR THE DEVELOPMENT OF A CHURCH MASTER PLAN, INCLUDING A 18,260 SQUARE FOOT SANCTUARY, STORAGE, AND CLASSROOMS ON 5 ACRES OF LAND IN THE LOW RESIDENTIAL DISTRICT, LOCATED AT 9101 19TH STREET AND MAKING FINDINGS IN SUPPORT THEREOF - APN: 202-041-41. A. Recitals. 1. The Northkirk Presbyterian Church filed an application for the issuance of Conditional Use Permit DRC2001-00082, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Conditional Use Permit request is referred to as "the application." 2. On the 26th day of September 2001, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above- referenced public hearing on September 26, 2001, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a) The application applies to the development of 18,260 square feet of building area with sanctuary, storage, and classrooms of an existing church for Sunday school programs on 5 acres of land in the Low Residential District, located at 9101 19th Street, which is presently developed with a sanctuary and parking lot, and contains 11 mature trees; and b) The property to the north, south, east, and west of the subject site is zoned Low Residential (2-4 dwelling units per acre); and c) The application contemplates the immediate construction of 3,400 square feet of classroom space on-site and master planned future development of another 14,860 square feet of building space for use as a sanctuary, classrooms and Boy Scout clubhouse; and d) The applicant is currently using existing facilities Monday through Friday for office hours, group worship, and prayer services on Saturday and Sunday. 3. Based upon the substantial evidence presented to this Commission during the above- referenced public hearing and upon the specific findings of facts set forth in paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: PLANNING COMMISSION RESOLUTION NO. 01-88 DRC2001-00082 — NORTHKIRK PRESBYTERIAN CHURCH September 26, 2001 Page 2 a. The proposed use is in accord with the General Plan, the objectives of the Development Code, and the purposes of the district in which the site is located. b. The proposed use, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. C. The proposed use complies with each of the applicable provisions of the Development Code. 4. Based upon the facts and information contained in the proposed Mitigated Negative Declaration together with all written and oral reports included for the environmental assessment for the application, the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and Monitoring Program attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. That the Mitigated Negative Declaration has been prepared in compliance with the California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines promulgated thereunder; that said Mitigated Negative Declaration and Initial Study prepared therefore reflect the independent judgment of the Planning Commission; and, further, this Commission has reviewed and considered the information contained in said Mitigated Negative Declaration with regard to the application. b. Although the Mitigated Negative Declaration identifies certain significant environmental effects that will result if the project is approved, all significant effects have been reduced to an acceptable level by imposition of mitigation measures on the project,which are listed below as conditions of approval. C. Pursuant to the provisions of Section 753.5(c) of Title 14 of the California Code of Regulations, the Planning Commission finds as follows: In considering the record as a whole, the Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the proposed project will have potential for an adverse impact upon wildlife resources orthe habitat upon which wildlife depends. Further, based upon substantial evidence contained in the Negative Declaration, the staff reports and exhibits, and the information provided to the Planning Commission during the public hearing, the Planning Commission hereby rebuts the presumption of adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code of Regulations. 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. Planning Division 1) Light fixtures shall be constructed at a maximum height of 15 feet (to include pedestal) and shall be shielded and directed away from residential areas. A detailed lighting plan, including a photometric diagram, shall be prepared prior to issuance of building permits to provide proper shielding of light sources from adjoining properties. PLANNING COMMISSION RESOLUTION NO. 01-88 DRC2001-00082 — NORTHKIRK PRESBYTERIAN CHURCH September 26, 2001 Page 3 2) Additional landscaping and trees shall be provided at the north end of the property from the northwest comer to the identified Alta Loma Channel to screen the existing parking area in Phase 1, to the satisfaction of the City Planner. 3) All future building pads and parking areas shall be seeded and irrigated for erosion control. Detailed plans shall be included in the landscape and irrigation plans to be submitted for Planning Division approval prior to the issuance of building permits. 4) Approval of this request shall not waive compliance with any sections of the Development Code, State Fire Marshal's regulations, Uniform Building Code, or any other City Ordinances. 5) If operation of the facility causes adverse effects upon adjacent businesses or residences, the Conditional Use Permit shall be brought before the City Planner for consideration and possible termination of the use. 6) Any signs proposed for the facility shall be designed in conformance with the City's Sign Ordinance and shall require review and approval by the City Planner, prior to installation. 7) The Master Plan is approved in concept only. Future development for each building proposed in Phases 2 and 3 shall be subject to separate Development Review process for Planning Commission approval. 8) The "Multipurpose Building" identified in Phase 3 shall not be used for prayer/mass services concurrent with the main sanctuary proposed in Phase 3. 9) All landscaped areas shall be kept free from weeds and debris and maintained in a healthy growing condition, and shall receive regular pruning, fertilizing, mowing, and trimming. 10) This approval is for the operation of a church and does not include a daycare or private K-12 school. 11) Construction or grading shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. Engineering Division 1) In Phase 2, the existing overhead utilities (telecommunications and electrical) on the project side of Beryl Street shall be undergrounded from the first pole on the north side of Beryl Street to the first pole off-site south of the south project boundary, prior to public improvement acceptance or occupancy, whichever occurs first. All services crossing Beryl Street shall be undergrounded at the same time. The developer PLANNING COMMISSION RESOLUTION NO. 01-88 DRC2001-00082 — NORTHKIRK PRESBYTERIAN CHURCH September 26, 2001 Page 4 may request a reimbursement agreement to recover one-half the City adopted cost for undergrounding from future development (redevelopment) as it occurs on the opposite side of the street. If the developer fails to submit for said reimbursement agreement within 6 months of the public improvements being accepted by the City, all rights of the developer to reimbursement shall terminate. 2) In Phase 3, an in-lieu fee as contribution to the future undergrounding of the existing overhead utilities(telecommunications and electrical)on the opposite side of 19th Street shall be paid to the City prior to the issuance of building permits. The fee shall be one-half the City adopted unit amount times the length from the centerline of Beryl Street to the east project boundary (scaled distance from the site plan is 695 feet). 3) In Phase 2, Beryl Street frontage improvements shall be protected in-place and/or constructed per City Standards along the project frontage including but not limited to; a) Provide street trees as required. b) Provide two (2) 5800 lumen HPSV street lights. c) Provide R26 "NO PARKING" signs and striping as required. d) Protect all existing street improvements or replace/repair as required. 4) In Phase 3, 19th Street frontage improvements shall be protected in place and/or constructed per City Standards along the project frontage including but not limited to; a) Provide street trees to comply with the 19th Street beautification Master Plan. b) Protect all existing street improvements or replace/repair as required. c) Protect R26 "NO PARKING" signs and striping as required. 5) A permit from Caltrans will be required for any work within the 19th Street right-of-way. 6) Process quitclaim of excess right-of-way for Alta Loma Channel. 7) Conveyance of site drainage runoff and storm drain connections to the City's flood control channel facility shall be made to the satisfaction of the Building and Safety Division and the City Engineer during plan check of the precise grading plan. PLANNING COMMISSION RESOLUTION NO. 01-88 DRC2001-00082 — NORTHKIRK PRESBYTERIAN CHURCH September 26, 2001 Page 5 Environmental Mitigation Noise 1) An acoustical study shall be prepared prior to issuance of permits to determine appropriate sound attenuation measures to reduce exterior noise levels at or below 60 dBA and interior noise levels to 45 dBA Air Quality 1) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and RWQCB) daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403. 2) Beryl and 19th Streets shall be swept according to a schedule established by the City to reduce PM10 emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon time of year of construction. 3) Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PM10 emissions from the site during such episodes. 4) Chemical soil stabilizers (approved by SCAQMD and RWQCB)shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. 5) The construction contractor shall select the construction equipment used on-site based on low-emission factors and high-energy efficiency. The construction contractor shall ensure the construction grading plans include a statement that all construction equipment will be tuned and maintained in accordance with the manufacturer's specifications. 6) The contractor shall utilize electric or clean alternative fuel-powered equipment where feasible. 7) The construction contractor shall ensure that construction grading plans include a statement that work crews will shut of equipment when not in use. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 26TH DAY OF SEPTEMBER 2001. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: ry/e-)6I4 �Az4f��d _ tarry T. iel, Chairman PLANNING COMMISSION RESOLUTION NO. 01-88 DRC2001-00082 — NORTHKIRK PRESBYTERIAN CHURCH September 26, 2001 Page 6 ATTEST: rad Bull creta I, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 26th day of September 2001, by the following vote-to-wit: AYES: COMMISSIONERS: MACIAS, MANNERINO, MCNIEL, STEWART, TOLSTOY NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: NONE City of Rancho Cucamonga MITIGATION MONITORING PROGRAM Project File No.: DRC2001-00082 (Northkirk Presbyterian Church) This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation measures identified in the Mitigated Negative Declaration for the above-listed project. This program has been prepared in compliance with State law to ensure that adopted mitigation measures are implemented (Section 21081.6 of the Public Resources Code). Program Components - This MMP contains the following elements: 1. Conditions of approval that act as impact mitigation measures are recorded with the action and the procedure necessary to ensure compliance.The mitigation measure conditions of approval are contained in the adopted Resolution of Approval for the project. 2. A procedure of compliance and verification has been outlined for each action necessary. This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported. 3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring progresses, changes to compliance procedures may be necessary based upon recommendations by those responsible for the program. Program Management- The MMP will be in place through all phases of the project. The project planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly and proper action is taken on each mitigation. Each City department shall ensure compliance of the conditions (mitigation) that relate to that department. Procedures -The following steps will be followed by the City of Rancho Cucamonga. 1. A fee covering all costs and expenses, including any consultants'fees, incurred by the City in performing monitoring or reporting programs shall be charged to the applicant. 2. A MMP Reporting Form will be prepared for each potentially significant impact and its corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached hereto. This procedure designates who will take action, what action will be taken and when,and to whom and when compliance will be reported. All monitoring and reporting documentation will be kept in the project file with the department having the original authority for processing the project. Reports will be available from the City upon request at the following address: City of Rancho Cucamonga - Lead Agency Planning Division 10500 Civic Center Drive Rancho Cucamonga, CA 91730 Mitigation Monitoring Program Page 2 3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,as determined by the project planner or responsible City department,to monitor specific mitigation activities and provide appropriate written approvals to the project planner. 4. The project planner or responsible City department will approve, by signature and date, the completion of each action item that was identified on the MMP Reporting Form. After each measure is verified for compliance, no further action is required for the specific phase of development. 5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off as completed by the project planner or responsible City department at the bottom of the MMP Reporting Form. 6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation measures. The project planner is responsible for approving any such refinements or additions. An MMP Reporting Form will be completed by the project planneror responsible City department and a copy provided to the appropriate design, construction, or operational personnel. 7. The project planner or responsible City department has the authority to stop the work of construction contractors if compliance with any aspects of the MMP is not occurring after written notification has been issued. The project planner or responsible City department also has the authority to hold certificates of occupancies if compliance with a mitigation measure attached hereto is not occurring. The project planner or responsible City department has the authority to hold issuance of a business license until all mitigation measures are implemented. 8. Any conditions (mitigation) that require monitoring after project completion shall be the responsibility of the City of Rancho Cucamonga Community Development Department. The Department shall require the applicant to post any necessary funds(or otherforms of guarantee) with the City. These funds shall be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measure for the required period of time. 9. In those instances requiring long-term project monitoring, the applicant shall provide the City with a plan for monitoring the mitigation activities at the project site and reporting the monitoring results to the City. Said plan shall identify the reporter as an individual qualified to know whether the particular mitigation measure has been implemented. The monitoring/reporting plan shall conform to the City's MMP and shall be approved by the Community Development Director prior to the issuance of building permits. 1APLANNINGWIRrPLANNING COMMISSIOMDRC2001-00082.MMP.DOC MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III) Project File No.: DRC 2001-00082 Applicant: Northkirk Presbyterian Church Initial Study Prepared by: Nancy Ferguson Date: August 30 2001 ResponsibleMitigation Measures No.I of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date 11nitials Non-Compliance yak The site shall be treated with water or other soil stabilizing agent) CP C Review of plans A/C 2 approved by SCAQMD and RWQCB)daily to reduce PMio emission, in accordance with SCAQMD Rule 403. Beryl and W Streets shall be swept according to a schedule CP C Review of plans A/C 2 established by the City to reduce PM,o emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon time of year of construction. Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PM,o emissions from the site during such CP C Review of plans A/C 2 episodes. Chemical soil stabilizers(approved by SCAQMD and RWQCB) shall be applied to all inactive construction areas that remain CP C Review of plans A/C 2 inactive for 96 hours or more to reduce PM,o emissions. Contractor shall select the construction equipment based on low emission factors and high-energy efficiency. All construction CP BIC Review of plans A/C 2 equipment will be tuned and maintained in accordance with the manufacturer's specifications. Contractor shall utilize electric or clean alternative fuel powered CP BIC Review of plans A/C 2 equipment where feasible. The construction contractor shall ensure that construction-grading CP/CE B Review of plans C 2 plans include a statement that work crews will shut off equipment when not in use. r5-IYee - - '.] - .. -.4 ' ... '- .'A'1 _ ..v 1k.Y P?;x ...._ u l"�.'., L: .tee_ �._ "E ' /r N • to An acoustical study shall be prepared prior to issuance of permits CP A Review of report CID 2 to determine appropriate sound attenuation measures to reduce and mitigation exterior noise levels at or below 60 dBA and interior noise levels to measures. 45 dBA. Key to Checklist Abbreviations — -- IZespOnsl6le Person - " Momtonng Frequency it., Methoi of., Sanctions' P CDD-Community Development Director A-With Each New Development A-On-site Inspection 1 -V ithhold Recordation of Final Ma CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds FC-Fire Chief or designee 6-Revoke CUP I:\P LAN N I N G\FINAL\C EOA\M M C H K LST.W P D COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT M CONDITIONAL USE PERMIT DRC2001-00082 SUBJECT: 18,260 SQUARE FOOT CHURCH, SANCTUARY, AND CLASSROOM EXPANSION APPLICANT: NORTHKIRK PRESBYTERIAN CHURCH LOCATION: 9101 19TH STREET ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DIVISION, (909) 477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents, officers, or employees, because of the issuance of such approval, or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. A copy of the signed Resolution of Approval or City Planner's letter of approval, and all Standard Conditions, shall be included in legible form on the grading plans, building and construction plans, and landscape and irrigation plans submitted for plan check. B. Time Limits 1. Conditional Use Permit, Variance, or Development/Design Review approval shall expire if building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include _/_/_ site plans, architectural elevations, exterior materials and colors, landscaping, sign program, and grading on file in the Planning Division, the conditions contained herein, and Development Code regulations. SC-04-01 1 Project No.DRC2001-00082 Completion Date 2. Prior to any use of the project site or business activity being commenced thereon, all Conditions of Approval shall be completed to the satisfaction of the City Planner. 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Division to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for City Planner review and approval prior to the issuance of building permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 7. A detailed on-site lighting plan, including a photometric diagram, shall be reviewed and approved by the City Planner and Police Department (477-2800) prior to the issuance of building permits. Such plan shall indicate style, illumination, location, height, and method of shielding so as not to adversely affect adjacent properties. 8. Trash receptacle(s) are required and shall meet City standards. The final design, locations, and the number of trash receptacles shall be subject to City Planner review and approval prior to the issuance of building permits. 9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping to the satisfaction of the City Planner. For single family residential developments, transformers shall be placed in underground vaults. 10. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination. 11. Six-foot decorative block walls shall be constructed along the project perimeter. If a double wall condition would result, the developer shall make a good faith effort to work with the adjoining property owners to provide a single wall. Developer shall notify, by mail, all contiguous property owner at least 30 days prior to the removal of any existing walls/ fences along the project's perimeter. 12. Where rock cobble is used, it shall be real river rock. Other stone veneers may be manufactured products. 13. The Master Plan is approved in concept only. Future development for (each building) shall be subject to separate Development/Design Review process for Planning Commission approval. D. Parking and Vehicular Access (indicate details on building plans) 1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet wide. 2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall contain a 12-inch walk adjacent to the parking stall (including curb). SC-04-01 2 Project No.DRC2001-00082 Completion Date 3. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided throughout the development to connect dwellings/units/buildings with open spaces/plazas/ recreational uses. 4. All parking spaces shall be double striped per City standards and all driveway aisles, entrances, and exits shall be striped per City standards. 5. Handicap accessible stalls shall be provided for commercial and office facilities with 25 or more parking stalls. Designate two percent or one stall, whichever is greater, of the total number of stalls for use by the handicapped. 6. Motorcycle parking area shall be provided for commercial and office facilities with 25 or more parking stalls. Developments with over 100 parking stalls shall provide motorcycle parking at the rate of one percent. The area for motorcycle parking shall be a minimum of 56 square feet. E. Landscaping 1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for City Planner review and approval prior to the issuance of building permits or prior final map approval in the case of a custom lot subdivision. 2. Existing trees required to be preserved in place shall be protected with a construction barrier in accordance with the Municipal Code Section 19.08.110, and so noted on the grading plans. The location of those trees to be preserved in place and new locations for transplanted trees shall be shown on the detailed landscape plans. The applicant shall follow all of the arborist's recommendations regarding preservation, transplanting, and trimming methods. 3. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking stalls, sufficient to shade 50% of the parking area at solar noon on August 21. 4. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one tree per 30 linear feet of building. 5. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope, but less than 2:1 slope, shall be, at minimum, irrigated and landscaped with appropriate ground cover for erosion control. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 6. For multi-family residential and non-residential development, property owners are responsible for the continual maintenance of all landscaped areas on-site, as well as contiguous planted areas within the public right-of-way. All landscaped areas shall be kept free from weeds and debris and maintained in healthy and thriving condition, and shall receive regular pruning, fertilizing, mowing, and trimming. Any damaged, dead, diseased, or decaying plant material shall be replaced within 30 days from the date of damage. 7. The final design of the perimeter parkways, walls, landscaping, and sidewalks shall be included in the required landscape plans and shall be subject to City Planner review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Division. 8. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 9. All walls shall be provided with decorative treatment. If located in public maintenance areas, the design shall be coordinated with the Engineering Division. 10. Landscaping and irrigation shall be designed to conserve water through the principles of Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code. SC-04-01 3 Project No.DRC2001-00082 completion Date F. Signs 1. The signs indicated on the submitted plans are conceptual only and not a part of this approval. Any signs proposed for this development shall comply with the Sign Ordinance and shall require separate application and approval by the Planning Division prior to installation of any signs. G. Environmental 1. Mitigation measures are required for the project. The applicant is responsible for the cost of implementing said measures, including monitoring and reporting. Applicant shall be required to post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the amount of $ 719.00 prior to the issuance of building permits, guaranteeing satisfactory performance and completion of all mitigation measures. These funds may be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete all actions required by the approved environmental documents shall be considered grounds for forfeit. H. Other Agencies 1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location of mail boxes. Multi-family residential developments shall provide a solid overhead structure for mail boxes with adequate lighting. The final location of the mail boxes and the design of the overhead structure shall be subject to City Planner review and approval prior to the issuance of building permits. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION, (909) 477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: I. General Requirements 1. Submit four complete sets of plans including the following: a. Site/Plot Plan; b. Foundation Plan; c. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; f. Plumbing and Sewer Plans, including isometrics, underground diagrams, water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Division Project Number (i.e., TT #, CUP #, DR #, etc.) clearly identified on the outside of all plans. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet"signature are required prior to plan check submittal. 3. Separate permits are required for fencing and/or walls. 4. Contractors must show proof of State and City licenses and Workers' Compensation coverage to the City prior to permit issuance. SC-04-01 4 Project No.DRC2001-00082 Completion Date 5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the Building and Safety Division. J. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number (i.e., CUP 98-01). The applicant shall comply with the latest adopted Uniform Building Code, Uniform Mechanical Code, Uniform Plumbing Code, National Electric Code, Title 24 Accessibility requirements, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Please contact the Building and Safety Division for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new commercial or industrial development or addition to an existing development, the applicant shall pay development fees at the established rate. Such fees may include, but are not limited to: Transportation Development Fee, Drainage Fee, School Fees, Permit and Plan Checking Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Division prior to permit issuance. 3. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. 4. Construct trash enclosure(s) per City Standard (available at the Planning Division's public counter). K. New Structures 1. Provide compliance with the Uniform Building Code for the property line clearances considering use, area, and fire-resistiveness. 2. Roofing material shall be installed per the manufacturer's"high wind"instructions. 3. Plans for food preparation areas shall be approved by County of San Bernardino Environmental Health Services prior to issuance of building permits. 4. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with UBC Table 5-A. 5. Exterior walls shall be constructed of the required fire rating in accordance with UBC Table 5-A 6. Openings in exterior walls shall be protected in accordance with UBC Table 5-A. L. Grading 1. Grading of the subject property shall be in accordance with the Uniform Building Code, City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the time of application for grading plan check. 4. The final grading plans shall be completed and approved prior to issuance of building permits. SC-04-01 5 Project No.DRC2001-00082 Completion Date 5. A separate grading plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The Grading Plan shall be prepared, stamped, and signed by a California Registered Civil Engineer. APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: M. Street Improvements 1. Improvement Plans and Construction: a. Street improvement plans, including street trees, street lights, and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements, prior to final map approval or the issuance of building permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the City Engineer's Office in addition to any other permits required. c. Pavement striping, marking, traffic signing, street name signing, traffic signal conduit, and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer Notes: (1) Pull boxes shall be No. 6 at intersections and No. 5 along streets, a maximum of 200 feet apart, unless otherwise specified by the City Engineer. (2) Conduit shall be 3-inch (at intersections) or 2-inch (along streets) galvanized steel with pull rope or as specified. e. Handicapped access ramps shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving, which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single family residential lots. h. Street names shall be approved by the City Planner prior to submittal for first plan check. 2. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. 3. A permit shall be obtained from Caltrans for any work within the following right-of-way: 19th Street. SC-04-01 6 Project No.DRC2001-00082 Completion Date N. Public Maintenance Areas 1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the City Engineer prior to final map approval or issuance of building permits whichever occurs first. Formation costs shall be borne by the developer. O. Utilities 1. Provide separate utility services to each parcel including sanitary sewerage system, water, gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 2. The developer shall be responsible for the relocation of existing utilities as necessary. 3. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga County Water District (CCWD), Rancho Cucamonga Fire Protection District, and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CCWD is required prior to final map approval or issuance of permits, whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. 4. Approvals have not been secured from all utilities and other interested agencies involved. Approval of the final parcel map will be subject to any requirements that may be received from them. P. General Requirements and Approvals 1. A non-refundable deposit shall be paid to the City, covering the estimated operating costs for all new street lights for the first six months of operation, prior to final map approval or prior to building permit issuance if no map is involved. APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, FIRE PROTECTION PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: Q. Water Plans for Fire Protection 1. Fire flow requirements for this project shall be 1 500 gallons per minute at a minimum residual pressure of 20 pounds per square inch in accordance with Fire Code Appendix III-A, as amended. The required fire flow shall be delivered by fire hydrants located in accordance with Fire Code Appendix III-B, as amended. 2. All required public fire hydrants shall be installed, flushed and operable prior to delivering any combustible building materials on-site (i.e., lumber, roofing materials, etc.). Water District personnel shall inspect the installation and witness hydrant flushing. The builder/developer shall submit test report to the Fire Safety Division. 3. For the purpose of final acceptance, an additional test of the on-site fire hydrants shall be conducted by the builder/developer in the presence of the Water District or Fire Construction Services, as appropriate. The builder/developer shall submit the final test report to the Fire Safety Division. 4. Existing fire hydrants and mains within 600 feet of the project shall be shown on the water plan submitted for review and approval. Include main size. 5. Prior to the issuance of any building permit, the applicant shall submit construction plans, specifications, and calculations for the fire sprinkler system underground. SC-04-01 7 Project No.DRC2001-00082 Completion Date 6. Required Note: If the system is private the applicant shall do the following prior to the issuance of the building permit: a. Submit proof that provisions have been made for the annual testing, repair and maintenance of the system. A copy of the maintenance agreement shall be submitted to the District. b. For developments with multiple owners, they shall establish a reciprocal maintenance agreement, which shall be submitted to the Fire District for acceptance. 7. Prior to the issuance of any Certificate of Occupancy, all fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with Rancho Cucamonga Fire Protection District and City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers." On private property these markers are to be maintained in good condition by the property owner. R. Water Availability 1. Prior to the issuance of a building permit, the applicant shall provide evidence of adequate fire flow. The Rancho Cucamonga Fire Protection District Water Availability for Fire Protection Form shall be signed by the Water District and submitted for approval by the Rancho Cucamonga Fire Protection District. If sufficient water to meet fire flow requirements is not available, an automatic fire extinguishing system may be required in each structure affected by the insufficient flow. S. Automatic Fire Sprinkler Systems 1. RCFPD Ordinance 15 or other adopted code or standard, requires an approved automatic fire sprinkler system. 2. All commercial structures greater than 7,500 square feet, all Group A or E Occupancies with an occupant load of 50 or more persons, all multi-family residential structures, and all structures which do not meet Fire District access requirements (FP5), shall be protected by an approved automatic fire sprinkler system. 3. Prior to the issuance of a building permit, the applicant shall submit plans for any automatic fire sprinkler system to the Fire District for review and approval. No work is allowed without a Fire District permit. 4. Prior to the issuance of a Certificate of Occupancy, the fire sprinkler system(s) shall be tested and accepted by the Fire District. 5. The fire sprinkler system monitoring system shall be installed, tested and operational immediately following the completion of the fire sprinkler system. Monitoring is required with 20 sprinklers in Group I Occupancies, or 100 or more sprinklers in all other Occupancies. T. Fire Access 1. Residential & Commercial: Prior to issuance of any grading permits, the applicant shall submit and obtain approval of plans for all roads, streets and courts, public or private, from the Fire District in consultation with the Grading Committee. The plans shall include the plan view, sectional view, and indicate the width of the street or court measured flow line to flow line. All proposed fire apparatus turnarounds shall be clearly marked when a dead-end street exceeds 150 feet or when otherwise required. Applicable CC&R's, or other approved documents, shall contain provisions that prohibit obstructions such as traffic calming devices (speed bumps, humps, etc.), control gates, bollards, or other modifications in fire lanes or access roadways without prior written approval of the Fire District, Fire Safety Division. 2. The minimum width for a Fire District access road or fire lane is 26 feet. The minimum inside turn radius is 20 feet. The minimum outside turn radius is 50 feet. The minimum radius for cul-de-sacs is SC-04-01 8 Project No.DRC2001-00082 Completion Date 50 feet. The minimum vertical clearance is 14 feet, 6 inches. At any entry median the minimum width of traffic lanes shall be 20 feet. 3. All portions of the facility or any portion of the exterior wall of the first story shall be located within 150 feet of Fire District vehicle access, measured by an unobstructed approved route around the exterior of the building. Approved access walkways shall be provided from the fire apparatus access road to exterior building openings. 4. A Knox rapid entry key vault shall be installed prior to final inspection. Proof of purchase shall be submitted prior to final building plan approval. Contact the Fire Safety Division for specific details and ordering information. 5. Prior to the issuance of any grading permits, the applicant shall submit and obtain the Fire District's approval of the construction of any gate across required Fire District access roadways/driveways. 6. Trees and shrubs planted in any median shall be kept trimmed to a minimum of 14 feet, 6 inches from the ground up,so as not to impede fire vehicles. 7. A note shall be placed on all plans which clearly indicates the following: Emergency access, a minimum 26 feet in width and 14 feet, 6 inches in height shall be provided and maintained free and clear of any obstructions at all times during construction, in accordance with Fire District Standards. 8. Prior to the issuance of a building permit, the applicant shall submit plans and obtain approval from the Fire District for fire lanes on required Fire District access roadway less than 40 feet in width. The plans shall indicate the locations of red curbing and signage. A drawing of the proposed signage that meets the minimum Fire District standards shall be submitted to and approved. Contact the Rancho Cucamonga Fire Protection District at (909)477-2770 for a copy of the "FD Access — Fire Lanes"standard. 9. Prior to the issuance of any Certificate of Occupancy, the fire lanes shall be installed in accordance with the approved fire lane plan. The CC&R's or other approved documents shall contain a fire lane map and provisions that prohibit parking in the fire lanes. The method of enforcement shall be documented. The CC&R's shall also identify who is responsible for not less than annual inspection and maintenance of all required fire lanes. 10. New buildings other than dwellings shall post the address with minimum 8-inch numbers on contrasting background, visible from the street and electrically illuminated during periods of darkness. When the building setback exceeds 200 feet from the public street an additional non- illuminated 6-inch minimum number address shall be provided at the property entrance. U. Combustible Construction Letter 1. Required Note: Prior to the issuance of a building permit for combustible construction, the builder shall submit a letter to the Fire District on company letterhead stating that water for fire fighting purposes and the all weather fire protection access road shall be in place and operational before any combustible material is placed on-site. V. Architectural Building Plans 1. Prior to approval of a site development/use permit, or the issuance of a building permit, whichever _/_/_ occurs first, the applicant shall submit plans for the review and approval of the Fire District. Call the Fire Construction Services Unit at (909) 477-2713 for the Fire Safety Site/Architectural Notes to be placed on the plans prior to submittal. W. Fire Alarm System 1. An automatic fire alarm (and detection) system is required by RCFPD Ordinance 15, based on use or floor area, or by another adopted code or standard. SC-04-01 9 Project No.DRC2001-00082 Completion Date 2. Prior to issuance of a building permit, plans for the fire alarm system shall be submitted to the Fire District for review and approval. No work is allowed without a Fire District permit. 3. Prior to the issuance of a Certificate of Occupancy, the fire alarm (and detection) system(s) shall be tested and accepted by the Fire District. X. Fees 1. Fire District fee(s), plus a $1.00 microfilm fee per"plan page"will be due to the Rancho Cucamonga Fire District as follows:** a. $132 for Water Plan Review for Public Fire Protection b. $677 (per new building)for New Commercial and Industrial Development **Note: Separate plan check fees for tenant improvement work, fire protection systems (fire sprinklers, alarm systems, fire extinguishing systems, etc.), and/or any consultant reviews will be assessed upon separate submittals of plans. Y. Hazard Control Permits 1. As noted below Special Permits may be required, dependent upon intended use: a. Operate a place of public assembly. Z. Plan Submittal Required Notice 1. Plans shall be submitted and approved prior to construction in accordance with 1997/98 Building, Fire, Mechanical, and Plumbing Codes; 1999 Electrical and RCFPD Ordinances FD15 and FD32, Guidelines and Standards. NOTE: Separate plan check fees for tenant improvements, fire protection systems and/or any consultant reviews will be assessed at time of submittal of plans. NOTE: A separate grading plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The grading plan shall be prepared, stamped and signed by a California Registered Professional Civil Engineer. AA. Other Requirements/Comments 1. NOTE: Prior to Planning Division approval the applicant must address all, and resolve all Fire District comments and/or conditions. SC-04-01 10