HomeMy WebLinkAbout01-106 - Resolutions RESOLUTION NO. 01-106 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING CONDITIONAL USE PERMIT DRC2001-00519, LOCATED AT THE SOUTHWEST CORNER OF BASE LINE ROAD AND ELLENA WEST IN THE NEIGHBORHOOD COMMERCIAL DISTRICT, AND MAKING FINDINGS IN SUPPORT THEREOF—APN: 227-182-10. A. Recitals. 1. Tricon Global Restaurants filed an application for the issuance of Conditional Use Permit DRC2001-00519, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Conditional Use Permit request is referred to as "the application." 2. On the 28th day of November 2001, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above- referenced public hearing on November 28, 2001, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a. The application applies to property located at 7369 Milliken Avenue with a street frontage of 423 feet and lot depth of 670 feet, and is presently improved with the Central Park Plaza, a Neighborhood Commercial Center; and b. The property to the north of the subject site is Low and Low-Medium Residential, the property to the south consists of Low-Medium Residential, the property to the east is Medium-High Residential, and the property to the west is Office Professional; and C. The application contemplates the construction of a restaurant with a drive-thru fast food restaurant; and d. The site is a freestanding pad building within Central Park Plaza neighborhood commercial complex; and e. The proposed restaurant use will support the primary retail use of Central Park Plaza and will reduce vehicle trips accordingly; and PLANNING COMMISSION RESOLUTION NO. 01-106 CUP DRC2001-00519 —TRICON GLOBAL NOVEMBER 28, 2001 Page 2 f. The project meets the basic intent of the Drive-thru Design Policy, in that it has a compatible architecture style with the surrounding uses within the center, and the respect to the 45-foot drive-thru setback from the street frontage; and g. The parking spaces within Central Park Plaza neighborhood commercial are available to the proposed restaurant via a reciprocal parking agreement and; h. The project with the recommended Conditions of Approval, complies with all minimum City development standards; i. The proposed use is consistent with the General Plan objective to provide commercial facilities to meet the service needs of the community,which are conveniently accessible. 3. Based upon the substantial evidence presented to this Commission during the above- referenced public hearing and upon the specific findings of facts set forth in paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. The proposed use is in accordance with the General Plan, the objectives of the Development Code, and the purposes of the district in which the site is located. b. The proposed use, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. C. The proposed use complies with each of the applicable provisions of the Development Code. 4. Based upon the facts and information contained in the proposed Mitigated Negative Declaration, together with all written and oral reports included for the environmental assessment for the application, the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment and adopts a Mitigated Negative Declaration attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. That the Mitigated Negative Declaration has been prepared in compliance with the California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared therefore reflect the independent judgment of the Planning Commission; and, further, this Commission has reviewed and considered the information contained in said Mitigated Negative Declaration with regard to the application. b. Although the Mitigated Negative Declaration identifies certain significant environmental effects that will result if the project is approved, all significant effects have been reduced to an acceptable level by imposition of mitigation measures on the project which are listed below as Conditions of Approval. 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. PLANNING COMMISSION RESOLUTION NO. 01-106 CUP DRC2001-00519 —TRICON GLOBAL NOVEMBER 28, 2001 Page 3 Planning Division 1) Dense landscaping shall be incorporated around the east leg of the drive-thru to provide additional drive-thru screening. 2) All roof and ground-mounted equipment and utilities shall be fully screened. 3) Special paving shall be introduced where pedestrians cross drive aisles. 4) All signs proposed for the building shall be designed in conformance with the City's Sign Ordinance and the Uniform Sign Program for the complex and shall require review and approval by the City Planner, prior to installation. 5) Extend wainscot tiles on all four sides of the building. Windows should not encroach into the wainscot design. Continue the wainscot at the east elevation. Environmental Mitigation Measures 1) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and RWQCB) daily to reduce PMio emissions, in accordance with SCAQMD Rule 403. 2) Street bordering the site shall be swept according to a schedule established by the City to reduce PM10 emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon time of year of construction. 3) Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PM10 emissions from the site during such episodes. 4) Chemical soil-stabilizers(approved by SCAQMD and RWQCB)shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. 5) The construction contractor shall select the construction equipment used on-site based on low-emission factors and high-energy efficiency. The construction contractor shall ensure the construction grading plans include a statement that all construction equipment will be tuned and maintained in accordance with the manufacturers specifications. 6) The construction contractor shall utilize electric or clean-alternative fuel-powered equipment where feasible. 7) The construction contractor shall ensure that construction grading plans include a statement that work crews will shut off equipment when not in use. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. PLANNING COMMISSION RESOLUTION NO. 01-106 CUP DRC2001-00519—TRICON GLOBAL NOVEMBER 28, 2001 Page 4 APPROVED AND ADOPTED THIS 28TH DAY OF NOVEMBER 2001. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA ao)�f'(a- Larry _BY: d �T. c iel, Chairman A7>61rad�iulle , retary I, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 28th day of November, by the following vote-to-wit: AYES: COMMISSIONERS: MACIAS, MCNIEL, STEWART, TOLSTOY NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: MANNERINO City of Rancho Cucamonga n MITIGATION MONITORING PROGRAM Project File No.: CONDITIONAL USE PERMIT DRC2001-00519 This Mitigation Monitoring Program(MMP)has been prepared for use in implementing the mitigation measures identified in the Mitigated Negative Declaration for the above-listed project. This program has been prepared in compliance with State law to ensure that adopted mitigation measures are implemented (Section 21081.6 of the Public Resources Code). Program Components -This MMP contains the following elements: 1. Conditions of approval that act as impact mitigation measures are recorded with the action and the procedure necessary to ensure compliance. The mitigation measure conditions of approval are contained in the adopted Resolution of Approval for the project. 2. A procedure of compliance and verification has been outlined for each action necessary.This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported. 3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring progresses, changes to compliance procedures may be necessary based upon recommendations by those responsible for the program. Program Management-The MMP will be in place through all phases of the project. The project planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly and proper action is taken on each mitigation. Each City department shall ensure compliance of the conditions (mitigation)that relate to that department. Procedures -The following steps will be followed by the City of Rancho Cucamonga. 1. A fee covering all costs and expenses, including any consultants'fees, incurred by the City in performing monitoring or reporting programs shall be charged to the applicant. 2. A MMP Reporting Form will be prepared for each potentially significant impact and its corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached hereto. This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported. All monitoring and reporting documentation will be kept in the project file with the department having the original authority for processing the project. Reports will be available from the City upon request at the following address: City of Rancho Cucamonga - Lead Agency (Planning Division) 10500 Civic Center Drive Rancho Cucamonga, CA 91730 MITIGATION MONITORING PROGRAM DRC2001-00519 —TRICON GLOBAL RESTAURANTS November 28, 2001 Page 2 3. Appropriate specialists will be retained if technical expertise beyond the City staffs is needed, as determined by the project planner or responsible City department, to monitor specific mitigation activities and provide appropriate written approvals to the project planner. 4. The project planner or responsible City department will approve, by signature and date, the completion of each action item that was identified on the MMP Reporting Form. After each measure is verified for compliance, no further action is required for the specific phase of development. 5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off as completed by the project planner or responsible City department at the bottom of the MMP Reporting Form. 6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation measures.The project planner is responsible for approving any such refinements oradditions. An MMP Reporting Form will be completed by the project planner or responsible City department and a copy provided to the appropriate design, construction, or operational personnel. 7. The project planner or responsible City department has the authority to stop the work of construction contractors if compliance with any aspects of the MMP is not occurring after written notification has been issued. The project planner or responsible City department also has the authority to hold certificates of occupancies if compliance with a mitigation measure attached hereto is not occurring. The project planner or responsible City department has the authority to hold issuance of a business license until all mitigation measures are implemented. 8. Any conditions (mitigation) that require monitoring after project completion shall be the responsibility of the City of Rancho Cucamonga Community Development Department. The Department shall require the applicant to post any necessary funds (or other forms of guarantee)with the City. These funds shall be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measure for the required period of time. 9. In those instances requiring long-term project monitoring, the applicant shall provide the City with a plan for monitoring the mitigation activities at the project site and reporting the monitoring results to the City. Said plan shall identify the reporter as an individual qualified to know whether the particular mitigation measure has been implemented. The monitoring/reporting plan shall conform to the Citys MMP and shall be approved by the Community Development Director prior to the issuance of building permits. MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III) Project File No.: DRC2001-00519 Applicant: Tricon Global Restaurants Initial Study Prepared by: Emily Wimer Date: November 6. 2001 Mitigation Measures No. .. g of Method of Verified Sanctions for ActionImplementing Date/initials Non-compliance llahtyP- GR •�.kw.`.�VG. t ?�b t _ 1x_. The site shall be treated with water or other BO B Ongoing A/B 2/4 F soil-stabilizing agent (approved by SCAQMD and RWQCB) daily to reduce PM,o emissions, in accordance with SCAQMD Rule 403. Street bordering the site shall be swept CE C Ongoing A 2 according to a schedule established bythe City to reduce PM10 emissions associated with vehicle tracking of soil offsite.Timing may vary depending upon time of year of construction. Grading operations shall be suspended when wind CE C Ongoing A 2/4 speeds exceed 25 mph to minimize PM,a emissions from the site during such episodes. Chemical soil-stabilizers (approved by SCAQMD CE C Ongoing A 2/4 and RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM,o emissions. The construction contractor shall select the CP/BO C Plan Check A 2 construction equipment used on-site based on low-emission factors and high-energy efficiency. The construction contractor shall ensure the construction grading plans include a statement that all construction equipment will be tuned and maintained in accordance with the manufacturer's specifications. The construction contractor shall utilize electric or CP/BO C Ongoing A 2/4 clean-alternative fuel-powered equipment where feasible. Mitigation . . g of Method . Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance The construction contractor shall ensure that CP/BO B Ongoing A 2 construction-grading plans include a statement that work crews will shut off equipment when not in use. Key to Checklist Abbreviations Responsible Person. Monitoring Frequ cyu', Method+of Verification, Sanctions... CDD -Community Development A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map Director CP-City Planner or designee B- Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit CE-City Engineer or designee C-Throughout Construction C- Plan Check 3-Withhold Certificate of Occupancy BO -Building Official or designee D -On Completion D-Separate Submittal(Reports/Studies/ 4- Stop Work Order Plans) PO- Police Captain or designee E-Operating 5- Retain Deposit or Bonds FC- Fire Chief or designee 6 - Revoke CUP COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT#: DRC2001-00519 SUBJECT: KFC/PIZZA HUT EXPRESS APPLICANT: TRICON GLOBAL RESTAURANTS LOCATION: 7369 MILLIKEN AVENUE ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DIVISION, (909) 477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents, officers, or employees, because of the issuance of such approval, or in the alternative,to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. A copy of the signed Resolution of Approval or City Planners letter of approval, and all Standard Conditions, shall be included in legible form on the grading plans, building and construction plans, and landscape and irrigation plans submitted for plan check. B. Time Limits 1. Conditional Use Permit, Variance, or Development/Design Review approval shall expire if building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans, architectural elevations, exterior materials and colors, landscaping, sign program, and grading on file in the Planning Division, the conditions contained herein, Development Code regulations, and the Central Park Plaza criteria. SC-04-01 1 Project No.DRC2001-00519 Completion Date 2. Prior to any use of the project site or business activity being commenced thereon, all Conditions of Approval shall be completed to the satisfaction of the City Planner. 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Division to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for City Planner review and approval prior to the issuance of building permits. 5. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 6. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping to the satisfaction of the City Planner. For single family residential developments, transformers shall be placed in underground vaults. 7. All parkways, open areas, and landscaping shall be permanently maintained by the property owner, homeowners' association, or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for City Planner and City Engineer review and approved prior to the issuance of building permits. D. Shopping Centers 1. A uniform hardscape and street furniture design including seating benches, trash receptacles, free-standing potted plants, tile trim bike racks, light bollards, etc., shall be utilized and be compatible with the architectural style. Detailed designs shall be submitted for Planning Division review and approval prior to the issuance of building permits. 2. Provide for the following design features In each trash enclosure, to the satisfaction of the City Planner: a. Architecturally integrated into the design of(the shopping center/the project). 3. Graffiti shall be removed within 72 hours. 4. The entire site shall be kept free from trash and debris at all times and in no event shall trash and debris remain for more than 24 hours. 5. All operations and businesses shall be conducted to comply with the following standards which shall be incorporated into the lease agreements for all tenants: a. Noise Level - All commercial activities shall not create any noise that would exceed an exterior noise level of 60 dB during the hours of 10 p.m. until 7 a.m. and 65 dB during the hours of 7 a.m. until 10 p.m. b. Loading and Unloading - No person shall cause the loading, unloading, opening, closing, or other handling of boxes, crates, containers, building materials, garbage cans, or other similar objects between the hours of 10 p.m. and 7 a.m. unless otherwise specified herein, in a manner which would cause a noise disturbance to a residential area. 6. Textured pavement shall be provided across circulation aisle, pedestrian walkway, and plaza. They shall be of brick/tile pavers, exposed aggregate, integral color concrete, or any combination thereof. Full samples shall be submitted for City Planner review and approval prior to the issuance of building permits. SC-04-01 2 Project No.DRC2001.00519 Completion Date 7. The lighting facture design shall compliment the architectural program. It shall include the plaza area lighting fixtures, building lighting fixtures (exterior), and parking lot lighting factures. 8. The design of store fronts shall compliment the architectural program and shall have subtle variations subject to Design Review Committee approval prior to the issuance of building permits. E. Building Design 1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections, shall be shielded from view and the sound buffered from adjacent properties and streets as required by the Planning Division. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the City Planner. Details shall be included in building plans. F. Parking and Vehicular Access (indicate details on building plans) 1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet wide. 2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall contain a 12-inch walk adjacent to the parking stall (including curb). 3. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided throughout the development to connect dwellings/units/buildings with open spaces/plazas/ recreational uses. 4. All parking spaces shall be double striped per City standards and all driveway aisles, entrances, and exits shall be striped per City standards. 5. Plans for any security gates shall be submitted for the City Planner, City Engineer, and Rancho Cucamonga Fire Protection District review and approval prior to issuance of building permits. For residential development, private gated entrances shall provide adequate turn-around space in front of the gate and a separate visitor lane with call box to avoid cars stacking into the public right-of-way. 6. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily residential projects or more than 10 units. Minimum spaces equal to five percent of the required automobile parking spaces or three bicycle storage spaces, whichever is greater. After the first 50 bicycle storage spaces are provided, additional storage spaces required are 2.5 percent of the required automobile parking spaces. Warehouse distribution uses shall provide bicycle storage spaces at a rate of 2.5 percent on the required automobile parking spaces with a minimum of a 3-bike rack. In no case shall the total number of bicycle parking spaces required exceed 100. Where this results in a fraction of 0.5 or greater, the number shall be rounded off to the higher whole number. G. Landscaping 1. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking stalls, sufficient to shade 50% of the parking area at solar noon on August 21. 2. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one tree per 30 linear feet of building. SC-0401 3 Project No.DRC2001-00519 Completion Date H. Signs 1. The signs indicated on the submitted plans are conceptual only and not a part of this approval. Any signs proposed for this development shall comply with the Sign Ordinance and shall require separate application and approval by the Planning Division prior to installation of any signs. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION, (909) 477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: I. General Requirements 1. Submit five complete sets of plans including the following: a. Site/Plot Plan; b. Foundation Plan; c. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; f. Plumbing and Sewer Plans, including isometrics, underground diagrams, water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Division Project Number (.e., TT #, CUP #, DR #, etc.) clearly identified on the outside of all plans. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Archftect's/Engineer's stamp and "wet" signature are required prior to plan check submittal. 3. Separate permits are required for fencing and/or walls. 4. Contractors must show proof of State and City licenses and Workers' Compensation coverage to the City prior to permit issuance. 5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the Building and Safety Division. J. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number(i.e., CUP 98-01). The applicant shall comply with the latest adopted Uniform Building Code, Uniform Mechanical Code, Uniform Plumbing Code, National Electric Code, Title 24 Accessibility requirements, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Please contact the Building and Safety Division for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new commercial or industrial development or addition to an existing development, the applicant shall pay development fees at the established rate. Such fees may include, but are not limited to: Transportation Development Fee, Drainage Fee, School Fees, Permit and Plan Checking Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Division prior to permit issuance. SC-04-01 4 Project No.DRC2001-00519 Completion Date 3. Street addresses shall be provided by the Building Official, after tract/parcel map recordation and prior to issuance of building permits. 4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. 5. Construct trash enclosure(s) per City Standard (available at the Planning Division's public counter). K. New Structures 1. Provide compliance with the California Building Code for the property line clearances considering use, area, and fire-resistiveness. 2. Plans for food preparation areas shall be approved by County of San Bernardino Environmental Health Services prior to issuance of building permits. 3. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with UBC Table 5-A. 4. Exterior walls shall be constructed of the required fire rating in accordance with UBC Table 5-A L. Grading 1. Grading of the subject property shall be in accordance with the Uniform Building Code, City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the time of application for grading plan check. 4. The final grading plans shall be completed and approved prior to issuance of building permits. 5. A separate grading plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The Grading Plan shall be prepared, stamped, and signed by a California Registered Civil Engineer. APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: M. Security Lighting 1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power. _/_/_ These areas should be lighted from sunset to sunrise and on photo sensored cell. 2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings, with _/_/_ direct lighting to be provided by all entryways. Lighting shall be consistent around the entire development. 3. Lighting in exterior areas shall be vandal-resistant fixtures. SC-04-01 5 Project No.DRC2001-00519 Completion Date N. Security Hardware 1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within 40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used. O. Windows 1. Store front windows shall be visible to passing pedestrians and traffic. P. Building Numbering 1. Numbers and the backgrounds shall be contrasting color and shall be reflective for nighttime visibility. Q. Alarm Systems 1. Install a burglar alarm system and a panic alarm if needed. Instructing management and employees on the operation of the alarm system will reduce the amount of false alarms and in tum save dollars and lives. 2. Alarm companies shall be provided with the 24-hour Sheriffs dispatch number: (909)941-1488. SC-04-01 6 '.. .' - FIRE PROTECTION DISTRICT FIRE SAFETY DIVISION INCOMPLETENESS COMMENTS FD PLAN REVIEW#: FD-01-0429-A PROJECT#: DRC2001-00519 PROJECT NAME: KFC/Pizza Hut DATE: November 13, 2001 PLAN TYPE: CUP for Fast Food Restaurant APPLICANT NAME: LDC Cougar OCCUPANCY TYPE: Group A, Division 3 as proposed FLOOR AREA (S): 2253 square feet LOCATION: 7369 Milliken FD REVIEW BY Steve Locati, Fire Protection Planning Specialist PLANNER: Emily Winner ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, (909) 477-2770, EXT. 3009, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: The following conditions of approval represent the minimum standard for approval of the project as submitted. These conditions are based on the plans submitted and may not include all Fire District requirements for the proposed project. Changes in the project may result in additional or changed Fire District requirements. Please make the necessary changes or corrections prior to resubmitting for review. Prior to approval by the Planning Division compliance with all conditions and/or corrections must be completed. All Fire District conditions and comments must be addressed for construction permits can be issued. Contact the Fire Safety Division to schedule an appointment to verify compliance. A. Community Facilities Districts 1. This project is subject to the requirements of the Mello-Roos Community Facilities District. B. Water Plans for Fire Protection 1. Prior to issuance of any building permit, the applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and the Water District. 2. Prior to the issuance of any building permit, the applicant shall submit construction plans, specifications, flow test data and calculations for the private water main system for review and approval by the Fire District. Plans and installation shall comply with Fire District standards. 3. Fire flow requirements for this project shall be 1750 gallons per minute at a minimum residual pressure of 20 pounds per square inch in accordance with Fire Code Appendix III-A, as amended. The required fire flow shall be delivered by fire hydrants located in accordance with Fire Code Appendix III-6, as amended. 4. When any portion of a facility or building is located in excess of 150-feet from a fire hydrant located on a public street on-site fire hydrants and mains capable of supplying the required fire flow shall be provided. The distance is measured as vehicular path of travel on access roadways, not line of sight. 5. All required public fire hydrants shall be installed, flushed, and operable prior to delivering any combustible building materials on-site (i.e., lumber, roofing materials, etc.). Water District personnel shall inspect the installation and witness hydrant flushing. The builder/developer shall submit test report to the Fire Safety Division. 6. All private on-site fire hydrants shall be installed, flushed, and operable prior to delivering any combustible building materials on-site (i.e., lumber, roofing materials, etc.). Fire Construction Services representative shall inspect the installation and witness hydrant flushing. The builder/developer shall submit final test report to the Fire Safety Division. 7. For the purpose of final acceptance, an additional test of the on-site fire hydrants shall be conducted by the builder/developer in the presence of the Water District or Fire Construction Services, as appropriate. The builder/developer shall submit the final test report to the Fire Safety Division. 8. Existing fire hydrants and mains within 600 feet of the project shall be shown on the water plan submitted for review and approval. Include main size. 9. Prior to the issuance of any building permit, the applicant shall submit construction plans, specifications, and calculations for the fire sprinkler system underground. 10. Required Note: If the system is private the applicant shall do the following prior to the issuance of the building permit: a. Submit proof that provisions have been made for the annual testing, repair, and maintenance of the system. A copy of the maintenance agreement shall be submitted to the District. b. For developments with multiple owners, they shall establish a reciprocal maintenance agreement,which shall be submitted to the Fire District for acceptance. 11. Prior to the issuance of any Certificate of Occupancy, all fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with Rancho Cucamonga Fire Protection District and City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers." On private property these markers are to be maintained in good condition by the property owner. C. Water Availability 1. Prior to the issuance of a building permit, the applicant shall provide evidence of adequate fire flow. The Rancho Cucamonga Fire Protection District Water Availability for Fire Protection Form shall be signed by the Water District and submitted for approval by the Rancho Cucamonga Fire Protection District. If sufficient water to meet fire flow requirements is not available, an automatic fire extinguishing system may be required in each structure affected by the insufficient flow. D. Automatic Fire Sprinkler Systems 1. RCFPD Ordinance 15 or other adopted code or standard, requires an approved automatic fire sprinkler system to be installed throughout the building(s). 2. All commercial structures greater than 7,500 square feet, all Group A or E Occupancies with an occupant load of 50 or more persons, all multi-family residential structures, and all structures which do not meet Fire District access requirements (Section E. Fire Access), shall be protected by an approved automatic fire sprinkler system. 3. Prior to the issuance of a building permit, the applicant shall submit plans for any automatic fire sprinkler system Fire Construction Services for review and approval. No work is allowed without a Fire Construction Services permit. 4. Prior to the issuance of a Certificate of Occupancy, the fire sprinkler system(s) shall be tested and accepted by Fire Construction Services. 5. The fire sprinkler system monitoring system shall be installed, tested, and operational immediately following the completion of the fire sprinkler system. Monitoring is required with 20 sprinklers in Group I Occupancies, or 100 or more sprinklers in all other Occupancies. E. Fire Access 1. Fire District access roadways shall be provided for every facility, building, or portion of a building constructed when any portion of the facility or any portion of an exterior wall of the first story of the building is located more than 150-feet from approved fire district vehicle access. The distance is measured by an approved route around the exterior of the facility or building. 2. Fire District access roadways shall include public roads, streets, highways, as well as private roads, streets and designated fire lanes. 3. Commercial: Prior to recordation of a subdivision/tract/parcel map or the issuance of any grading permit, whichever occurs first, the applicant shall obtain approval of the Fire District for all Fire District access roads to within 150 feet of all portions of the exterior of every structure on-site. 4. Residential & Commercial: Prior to issuance of any grading permits, the applicant shall submit and obtain approval of plans for all roads, streets and courts, public or pdvate, from the Fire District in consultation with the Grading Committee. The plans shall include the plan view, sectional view, and indicate the width of the street or court measured flow line to flow line. All proposed fire apparatus turnarounds shall be cleady marked when a dead-end street exceeds 150 feet or when otherwise required. Applicable CC&R's, or other approved documents, shall contain provisions that prohibit obstructions such as traffic calming devices (speed bumps, humps, etc.), control gates, bollards, or other modifications in fire lanes or access roadways without prior written approval of the Fire District, Fire Safety Division. 5. The minimum unobstructed width for a Fire Distdct access roadway or fire lane is 26 feet. The minimum vertical clearance is 14 feet, 6 inches. At any entry median the minimum width of traffic lanes shall be 20 feet. 6. A Knox rapid entry key vault shall be installed prior to final inspection. Proof of purchase shall be submitted prior to final building plan approval. Contact the Fire Safety Division for specific details and ordedng information. 7. Trees and shrubs planted in any median shall be kept trimmed to a minimum of 14 feet, 6 inches from the ground up, so as not to impede fire vehicles. 8. A note shall be placed on all plans which cleady indicates the following: Emergency access, a minimum 26 feet in width and 14 feet, 6 inches in height shall be provided and maintained free and clear of any obstructions at all times during construction, in accordance with Fire District Standards. 9. Prior to the issuance of a building permit,the applicant shall submit plans and obtain approval from the Fire District for fire lanes on required Fire District access roadway less than 40 feet in width. The plans shall indicate the locations of red curbing and signage. A drawing of the proposed signage that meets the minimum Fire District standards shall be submitted to and approved. Contact the Rancho Cucamonga Fire Protection District at(909)477-2770 for a copy of the"FD Access—Fire Lanes"standard. 10. Prior to the issuance of any Certificate of Occupancy, the fire lanes shall be installed in accordance with the approved fire lane plan. The CC&R's or other approved documents shall contain a fire lane map and provisions that prohibit parking in the fire lanes. The method of enforcement shall be documented. The CC&R's shall also identify who is responsible for not less than annual inspection and maintenance of all required fire lanes. 11. New buildings other than dwellings shall post the address with minimum 8-inch numbers on contrasting background, visible from the street and electrically illuminated during periods of darkness. When the building setback exceeds 200 feet from the public street an additional non-illuminated 6-inch minimum number address shall be provided at the property entrance. 12. In multi-unit complexes approved address numbers, and/or building identification letters shall be provided on the front and back of all units, suites, or buildings. The Fire District shall review and approve the numbering plan in coordination with the City of Rancho Cucamonga. 13. Phased projects or temporary fuel modification plans must meet the requirements for permanent plans and be approved by the Fire District. F. Combustible Construction Letter 1. Required Note: Prior to the issuance of a building permit for combustible construction, the builder shall submit a letter to the Fire District on company letterhead stating that the minimum water supply for fire fighting purposes and the all weather fire protection access roadway that meets Fire District Standards shall be in place and operational before any combustible material is placed on-site. The roadway shall be maintained at all times. G. Architectural Building Plans 1. Prior to approval of a site development/use permit, or the issuance of a building permit, whichever occurs first, the applicant shall submit plans for the review and approval of the Fire District. Call the Fire Construction Services Unit at (909) 477-2713 for the Fire Safety Site/Architectural Notes to be placed on the plans prior to submittal. H. Fire Suppression System (Required for Commercial Cooking Equipment or Special Hazards) 1. Prior to the issuance of a building permit, plans, and specifications for the fire suppression system for the protection of commercial-type cooking equipment shall be submitted to Fire Construction Services for review and approval. No work is allowed without a Fire Construction Services permit. 2. Prior to the issuance of a Certificate of Occupancy, the fire suppression system(s) shall be tested and accepted by Fire Service Construction Services. I. Fire Alarm System 1. An automatic fire alarm (and detection) system is required by RCFPD Ordinance 15, based on use or floor area, or by another adopted code or standard. 2. Prior to issuance of a building permit, plans for the fire alarm system shall be submitted to Fire Construction Services for review and approval. No work is allowed without a Fire District permit. 3. Prior to any remodel, modification, additions, or exchange of devices, Fire District approval and a permit are required. Plans and specifications shall be submitted to Fire Construction Services. 4. Prior to the issuance of a Certificate of Occupancy, the fire alarm (and detection) system(s) shall be tested and accepted by Fire Construction Services. J. Fire District Fees Due 1. Fire District feels), plus a $1.00 microfilm fee per"plan page" will be due to the Rancho Cucamonga Fire District as follows: ' a. $82 Start-up fee for commercial, industrial or mufti-family dwelling units (Paid prior to TRC) b. $132 Conditional Use Permit Fee(CUP) C. $132 for Private Fire Mains or Fire Sprinkler Underground Water Supply d. $677(per new building)for New Commercial and Industrial Development 'Note: Separate plan check fees for tenant improvement work, fire protection systems (fire sprinklers, alarm systems, fire extinguishing systems, etc.), and/or any consultant reviews will be assessed upon separate submittals of plans. K. Hazard Control Permits 1. As noted below Special Permits may be required, dependent upon intended use: a. General Use Permit shall be required for any activity or operation not specifically described below, which in the judgment of the Fire Chief is likely to produce conditions, which may be hazardous to life or property. b. Operate a place of public assembly. C. Compressed gases (storage, handling, or use exceeding 100 cubic feet. L. Hazardous Materials—Compliance with Disclosure and Reporting Regulations 1. The below listed businesses, operations, uses or conditions require that the San Bernardino County Fire Department review your Business Emergency/Contingency Plan for compliance with minimum standards. Contact the San Bernardino County Fire, Hazardous Materials Division at (909) 387-3041 for forms and assistance. They are the CUPA for the City of Rancho Cucamonga. 2. Any business that uses, generates, processes, produces, treats, stores, emits, or discharges a hazardous material in quantities at or exceeding 55 gallons, 500 pounds, or 200 cubic feet (compressed gas) at any one time in the course of a year. 3. All hazardous waste generators, regardless of quantity generated. 4. Any business that handles, stores, or uses Category (1) or (II) pesticides, as defined by FIFRA, regardless of amount. 5. Any business that handles DOT Hazard Class 1 (explosives, found in 49 CFR) regardless of amount. 6. Any business that handles extremely hazardous substances (EHS's) in quantities exceeding the threshold planning quantity (T.P.Q.). Extremely Hazardous Substances are designated pursuant to the Emergency Planning and Community Right to Know Act Section 302, and are listed in 40 CFR Part 355. 7. Any business subject to the Emergency Planning and Community Right to Know Act (EPCRA), also known as SARA Title III. Generally, EPCRA includes facilities that handle hazardous substances above 10,000 pounds, or extremely hazardous substances above threshold planning quantities. There are some exceptions, including retail gas stations with up to 75,000 gallons of gasoline or 100,000 gallons of diesel fuel in Underground Storage Tanks (UST's) that meet the 1998 upgrade requirements. To get more information on EPCRA requirements call 1-800-535-0202. Due to State disclosure consolidation laws, Tier II forms need not be submitted to the various State and Federal agencies. Submission of your Business Emergency/ Contingency Plan will meet this requirement; however, EPCRA does require full annual inventory submission rather than a certification statement each March 1. Also, EPCRA facilities are bound by the trade secret limitations of EPCRA, and must sign every page of inventory. 8. Any business that handles radioactive material that is listed in Appendix B of Chapter 1, of 10 CFR. 9. If the facility is a NEW business, a Certificate of Occupancy issued by Building and Safety will not be finalized until the San Bernardino County Fire Department reviews your Business Emergency/Contingency Plan. California Government Code, Section 65850.2 prohibits the City from issuing a final Certificate of Occupancy unless the applicant has met or is meeting specific hazardous material disclosure requirements. A Risk Management Program (RMP) may also be required if regulated substances are to be used or stored at the new facility. Contact County Fire, Hazardous Materials Division at (909) 387-3041 for forms and assistance. 10. Any business that operates on rented or leased property, and is required to submit a Plan, is required to submit a notice to the owner of the property in writing stating that the business is subject to the Business Emergency/Contingency Plan mandates, and has complied with the provision, and must provide a copy of the Plan to the property owner within 5 working days after receiving a request from the owner. 11. The Fire Code adopted by the Fire District has a provision requiring collection of information regarding hazardous materials at facilities for purposes of Fire Code implementation and emergency response. Prior to issuance of a Certificate of Occupancy a copy of the Business Emergency/Contingency Plan - New Business (Hazardous Materials Release Response Plans and Inventory) shall be submitted to the Fire District after it is approved by the San Bernardino County Fire Department. In some cases additional information that is not in the Business Emergency/Contingency Plan may be required in order to support local fire prevention and emergency response programs. M. Plan Submittal Required Notice 1. Plans shall be submitted and approved prior to construction in accordance with 1997/98 Building, Fire, Mechanical, and Plumbing Codes; 1999 Electrical and RCFPD Ordinances FD15 and FD32, Guidelines and Standards. NOTE: Separate plan check fees for tenant improvements, fire protection systems and/or any consultant reviews will be assessed at time of submittal of plans.