HomeMy WebLinkAbout02-89 - Resolutions RESOLUTION NO. 02-89
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING CONDITIONAL USE
PERMIT NO. DRC2002-00479,TO DEVELOP A FAST FOOD RESTAURANT
WITH DRIVE-THRU IN THE COMMUNITY COMMERCIAL DISTRICT IN THE
ORCHARD PLAZA SHOPPING CENTER, LOCATED ON THE NORTH SIDE
OF FOOTHILL BOULEVARD BETWEEN VINEYARD AND HELLMAN
AVENUES, AND MAKING FINDINGS IN SUPPORT THEREOF —
APN: 208-101-20.
A. Recitals.
1. Glitman and Lazerine Architects filed an application for the approval of Conditional Use
Permit No. DRC2002-00479 as described in the title of this Resolution. Hereinafter in this
Resolution, the subject Development Review request is referred to as "the application."
2. On the 9th day of October 2002, the Planning Commission of the City of Rancho
Cucamonga conducted a meeting on the application and concluded said meeting on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW,THEREFORE, it is hereby found, determined, and resolved by the Planning Commission
of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the above-
referenced meeting on October 9, 2002, including written and oral staff reports, this Commission
hereby specifically finds as follows:
a. The application applies to property located on the north side of Foothill Boulevard
between Vineyard and Hellman Avenues with a street frontage of 130 feet and lot depth of 200 feet
and is presently improved with the Orchard Plaza shopping center; and
b. The property to the north of the subject site across San Bernardino Road is
residential,the property to the south across Foothill Boulevard is multi-family residential,the property
to the east is commercial, and the property to the west is commercial; and
C. Based upon the substantial evidence presented to this Commission during the
above-referenced meeting and upon the specific findings of facts set forth in paragraphs 1 and 2
above, this Commission hereby finds and concludes as follows:
d. The proposed use is in accord with the General Plan, the objectives of the
Development Code, and the purposes of the district in which the site is located.
e. The proposed use, together with the conditions applicable thereto, will not be
detrimental to the public health, safety, or welfare or materially injurious to properties or
improvements in the vicinity.
f. The proposed use complies with each of the applicable provisions of the
Development Code.
PLANNING COMMISSION RESOLUTION NO. 02-89
DRC2002-00479—WENDY'S RESTAURANT INTERNATIONAL
October 9, 2002
Page 2
3. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration, togetherwith all written and oral reports included for the environmental assessment for
the application, the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and
Monitoring Program attached hereto, and incorporated herein by this reference, based upon the
findings as follows:
a. That the Mitigated Negative Declaration has been prepared in compliance with the
California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines
promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared
therefore reflect the independent judgment of the Planning Commission; and, further, this
Commission has reviewed and considered the information contained in said Mitigated Negative
Declaration with regard to the application.
b. Although the Mitigated Negative Declaration identifies certain significant
environmental effects that will result if the project is approved, all significant effects have been
reduced to an acceptable level by imposition of mitigation measures on the project that are listed
below as Conditions of Approval.
C. Pursuant to the provisions of Section 753.5(c) of Title 14 of the California Code of
Regulations, the Planning Commission finds as follows: In considering the record as a whole, the
Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the
proposed project will have potential for an adverse impact upon wildlife resources or the habitat upon
which wildlife depends. Further, based upon the substantial evidence contained in the Mitigated
Negative Declaration, the staff reports and exhibits, and the information provided to the Planning
Commission during the public hearing, the Planning Commission hereby rebuts the presumption of
adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code of Regulations.
4. Based upon the findings and conclusions set forth in paragraphs 1, 2, and 3 above, this
Commission hereby approves the application subject to each and every condition set forth below and
in the Standard Conditions, attached hereto and incorporated herein by this reference.
Environmental Mitigation
Air Quality
1) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and RWQCB)daily to reduce PM10 emissions,
in accordance with SCAQMD Rule 403.
2) Foothill Boulevard shall be swept according to a schedule established
by the City to reduce PM10 emissions associated with vehicle tracking of
soil off-site. Timing may vary depending upon time of year of
construction.
3) Grading operations shall be suspended when wind speeds exceed 25
mph to minimize PM10 emissions from the site during such episodes.
4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB)shall be
applied to all inactive construction areas that remain inactive for 96
hours or more to reduce PM10 emissions.
PLANNING COMMISSION RESOLUTION NO. 02-89
DRC2002-00479—WENDY'S RESTAURANT INTERNATIONAL
October 9, 2002
Page 3
5) The construction contractor shall select the construction equipment
used on-site based on low-emission factors and high-energy efficiency.
The construction contractor shall ensure the construction grading plans
include a statement that all construction equipment will be tuned and
maintained in accordance with the manufacturer's specifications.
6) The construction contractor shall utilize electric or clean alternative
fuel-powered equipment where feasible.
7) The construction contractor shall ensure that construction grading plans
include a statement that work crews will shut off equipment when not in
use.
Geology
1) Construction drawings shall provide details that specify how building
footings and foundation will mitigate any affects resulting from
proximity to Red Hill Fault prior to issuance of building permits.
Noise
1) During all project site excavation and grading on-site, the project
contractors shall equip all construction equipment, fixed or mobile,
with properly operating and maintained mufflers consistent with
manufacturers' standards.
2) The project contractor shall place all stationary construction
equipment so that emitted noise is directed away from sensitive
receptors.
3) The construction contractor shall locate equipment staging areas that
will create the greatest distance between construction related noise
sources and noise sensitive receptors nearest the project site during
all project construction.
4) During all project site construction, the construction contractor shall
limit all construction related activities to between the hours of 6:30
a.m. and 8:00 p.m. Monday through Saturday. No construction is
permitted on Sundays and Government Code holidays.
5. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 9TH DAY OF OCTOBER 2002.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY: �JLO,
Larry McNiel, Chairman
PLANNING COMMISSION RESOLUTION NO. 02-89
DRC2002-00479—WENDY'S RESTAURANT INTERNATIONAL
October 9, 2002
Page 4
ATTEST:
Brad B etre ry
I, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby
certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the
Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning
Commission held on the 9th day of October 2002, by the following vote-to-wit:
AYES: COMMISSIONERS: MACIAS, MANNERINO, MCNIEL, STEWART, TOLSTOY
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: NONE
City of Rancho Cucamonga
MITIGATION MONITORING
PROGRAM
Project File No.: DRC2002-00479
This Mitigation Monitoring Program(MMP)has been prepared for use in implementing the mitigation
measures identified in the (Mitigated Negative Declaration) for the above-listed project. This
program has been prepared in compliance with State law to ensure that adopted mitigation
measures are implemented (Section 21081.6 of the Public Resources Code).
Program Components -This MMP contains the following elements:
1. Conditions of approval that act as impact mitigation measures are recorded with the action
and the procedure necessary to ensure compliance. The mitigation measure conditions of
approval are contained in the adopted Resolution of Approval for the project.
2. A procedure of compliance and verification has been outlined for each action necessary.This
procedure designates who will take action, what action will be taken and when, and to whom
and when compliance will be reported.
3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring
progresses, changes to compliance procedures may be necessary based upon
recommendations by those responsible for the program.
Program Management -The MMP will be in place through all phases of the project. The project
planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project
planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly
and proper action is taken on each mitigation. Each City department shall ensure compliance of the
conditions (mitigation) that relate to that department.
Procedures - The following steps will be followed by the City of Rancho Cucamonga.
1. A fee covering all costs and expenses, including any consultants'fees, incurred by the City in
performing monitoring or reporting programs shall be charged to the applicant.
2. A MMP Reporting Form will be prepared for each potentially significant impact and its
corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached
hereto. This procedure designates who will take action, what action will be taken and when,
and to whom and when compliance will be reported. All monitoring and reporting
documentation will be kept in the project file with the department having the original authority
for processing the project. Reports will be available from the City upon request at the following
address:
City of Rancho Cucamonga - Lead Agency
Planning Division
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
MITIGATION MONITORING PROGRAM
DRC2002-00479
October 9, 2002
Page 2
3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,
as determined by the project planner or responsible City department, to monitor specific
mitigation activities and provide appropriate written approvals to the project planner.
4. The project planner or responsible City department will approve, by signatu re and date, the
completion of each action item that was identified on the MMP Reporting Form. After each
measure is verified for compliance, no further action is required for the specific phase of
development.
5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off
as completed by the project planner or responsible City department at the bottom of the MMP
Reporting Form.
6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation
measures.The project planner is responsible for approving any such refinements or additions.
An MMP Reporting Form will be completed by the project planner or responsible City
department and a copy provided to the appropriate design, construction, or operational
personnel.
7. The project planner or responsible City department has the authority to stop the work of
construction contractors if compliance with any aspects of the MMP is not occurring after
written notification has been issued.The project planner or responsible City department also
has the authority to hold certificates of occupancies if compliance with a mitigation measure
attached hereto is not occurring.The project planner or responsible City department has the
authority to hold issuance of a business license until all mitigation measures are implemented.
8. Any conditions (mitigation) that require monitoring after project completion shall be the
responsibility of the City of Rancho Cucamonga Planning Division.The Division shall require
the applicant to post any necessary funds (or other forms of guarantee)with the City. These
funds shall be used by the City to retain consultants and/or pay for City staff time to monitor
and report on the mitigation measure for the required period of time.
9. In those instances requiring long-term project monitoring,the applicant shall provide the City
with a plan for monitoring the mitigation activities at the project site and reporting the
monitoring results to the City. Said plan shall identify the reporter as an individual qualified to
know whether the particular mitigation measure has been implemented. The
monitoring/reporting plan shall conform to the City's MMP and shall be approved by the
Community Development Director or City Planner prior to the issuance of building permits.
MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III)
Project File No.: DRC 2002-00479 Applicant: _Wendy's Restaurant International
Initial Study Prepared by: Rick Fisher Date: September 16, 2002
Mitigation Measures No. Responsible Monitoring Timing of Method of Verif ied Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Air QualityF
�"la K`X;."'.=.._2PF .,
The site shall be treated with water or other soil stabilizing agent) CP C Review of plans A/C 2
approved by SCAQMD and RW QCB)dailyto reduce PM,o emission,in
accordance with SCAQMD Rule 403.
Foothill Boulevard site shall be swept according to a schedule CP C Review of plans A/C 2
established by the City to reduce PM10 emissions associated with
vehicle tracking of soil off-site. Timing may vary depending upon time
of year of construction.
Grading operations shall be suspended when wind speeds exceed 25
mph to minimize PMra emissions from the site during such episodes. CP C Review of plans A/C 2
Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall
be applied to all inactive construction areas that remain inactive for CP C Review of plans A/C 2
C96 hours or more to reduce PMro emissions.
Contractor shall select the construction equipment based on low
emission factors and high-energy efficiency. All construction CP BIC Review of plans A/C 2
equipment will be tuned and maintained in accordance with the
manufacturers'specifications.
The construction contractor shall utilize electric or dean alternative fuel CP BIC Review of plans A/C 2
powered equipment where feasible.
The construction contractor shall ensure that construction-grading CP B/C Review of plans A/C 2
plans include a statement that work crews will shut off equipment when
not in use.
G00lOgy
Constuction drawings shall provide details which specify how building BO B Review of plans C 2
footings and foundation will mitigate any affects resulting from
proximity to Red Hill Fault prior to issuance of building permits.
Noise .p x
During all project site excavation and grading,the project contractors CP C Notes to Grading A 4
shall equip all construction equipment,fixed or mobile,with properly Plan
operating and maintained mufflers consistent with manufacturers'
standards.
The project contractor shall place all stationary construction Cp C Notes to Grading A 4
equipment so that emitted noise is directed away from sensitive Plan
receptors. -
Mitigation Measures No. Responsible Monitoring Timing of Method of Verif led Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
The construction contractorshall locate equipment staging areas that CP C Notes to Grading A 4
will create the greatest distance between construction related noise Plan
and the noise sensitive receptors nearest the project site during all
project construction.
During all project site construction,the construction contractor shall Cp C Notes to Grading A 4
limit all construction related between the hours of 6:30 a.m. and Plan
8:00 p.m. Monday through Saturday. No construction shall be
allowed on Sundays and Government Code holidays.
Key to Checklist Abbreviations
'`q sWO
Responsible Pel Son . MDOROCInQ Fra(jUBOCy �181f}O$f 01 VBfI}IC8t1011 `r �b r t . 'Saf CtIOnE
r c y,:,yV,...,,?y. NF 'w ":'V'3
CDD-Community Development Director A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map
CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit
CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy
SO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order
PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds
FC-Fire Chief or designee _ 6-Revoke CUP
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT#: DRC2002-00479
SUBJECT: TECHNICAL REVIEW COMMITTEE
APPLICANT: GLITMAN AND LAZERINE ARCHITECTS
LOCATION: NORTH SIDE OF FOOTHILL BETWEEN VINEYARD AND HELLMAN AVENUES
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DIVISION, (909) 477-2750, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
Completion Date
A. General Requirements
1. The applicant shall agree to defend at his sole expense any action brought against the City,
its agents, officers, or employees, because of the issuance of such approval, or in the
alternative, to relinquish such approval. The applicant shall reimburse the City, its agents,
officers, or employees, for any Court costs and attorney's fees which the City, its agents,
officers, or employees may be required by a court to pay as a result of such action. The City
may, at its sole discretion, participate at its own expense in the defense of any such action
but such participation shall not relieve applicant of his obligations under this condition.
2. Copies of the signed Planning Commission Resolution of Approval No. 02-89, Standard
Conditions, and all environmental mitigations shall be included on the plans (full size). The
sheet(s) are for information only to all parties involved in the construction/grading activities
and are not required to be wet sealed/stamped by a licensed Engineer/Architect.
B. Time Limits
1. Conditional Use Permit, Variance, or Development/Design Review approval shall expire if
building permits are not issued or approved use has not commenced within 5 years from the
date of approval. No extensions are allowed.
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which
include site plans, architectural elevations, exterior materials and colors, landscaping, sign
program, and grading on file in the Planning Division, the conditions contained herein,
Development Code regulations, and the Foothill Boulevard Specific Plan.
SC-08-02 1
Project No.DRC2002-00479
Completion Date
2. Prior to any use of the project site or business activity being commenced thereon, all ��—
Conditions of Approval shall be completed to the satisfaction of the City Planner.
3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code
and State State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall
be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety
Division to show compliance. The buildings shall be inspected for compliance prior to
occupancy.
4. Revised site plans and building elevations incorporating all Conditions of Approval shall be
submitted for City Planner review and approval prior to the issuance of building permits.
5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.) or prior to final map approval in the case of a custom lot subdivision, or
approved use has commenced, whichever comes first.
6. Approval of this request shall not waive compliance with all sections of the Development
Code, all other applicable City Ordinances, and applicable Community or Specific Plans in
effect at the time of building permit issuance.
7. A detailed on-site lighting plan, including a photometric diagram, shall be reviewed and __/_J_
approved by the City Planner and Police Department (477-2800) prior to the issuance of
building permits. Such plan shall indicate style, illumination, location, height, and method of
shielding so as not to adversely affect adjacent properties.
8. Trash receptacle(s) are required and shall meet City standards. The final design, locations, ��—
and the number of trash receptacles shall be subject to City Planner review and approval
prior to the issuance of building permits.
9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall ��—
be located out of public view and adequately screened through the use of a combination of
concrete or masonry walls, berming, and/or landscaping to the satisfaction of the City
Planner. For single-family residential developments, transformers shall be placed in
underground vaults.
10. All building numbers and individual units shall be identified in a clear and concise manner, Jam_
including proper illumination.
11. All parkways, open areas, and landscaping shall be permanently maintained by the property ��—
owner, homeowners' association, or other means acceptable to the City. Proof of this
landscape maintenance shall be submitted for City Planner and City Engineer review and
approved prior to the issuance of building permits.
D. Shopping Centers
1. Provide for the following design features in each trash enclosure, to the satisfaction of the ��—
City Planner:
a. Architecturally integrated into the design of (the shopping center/the project). ��—
b. Separate pedestrian access that does not require the opening of the main doors and to ��—
include self-closing pedestrian doors.
C. Large enough to accommodate two trash bins. ��—
d. Roll-up doors. —J�—
e. Trash bins with counter-weighted lids.
f. Architecturally treated overhead shade trellis.
SC-08-02 2
Project No.DRC2002-00479
Completion Date
g. Chain link screen on top to prevent trash from blowing out of the enclosure and
designed to to be hidden from view.
2. Graffiti shall be removed within 72 hours. ��-
3. The entire site shall be kept free from trash and debris at all times and in no event shall trash
and debris remain for more than 24 hours.
4. Signs shall be conveniently posted for "no overnight parking° and for "employee parking
only."
5. All operations and businesses shall be conducted to comply with the following standards
which shall be incorporated into the lease agreements for all tenants:
a. Noise Level - All commercial activities shall not create any noise that would exceed an ��—
exterior noise level of 60 dB during the hours of 10 p.m. until 7 a.m. and 65 dB during
the hours of 7 a.m. until 10 p.m.
b. Loading and Unloading - No person shall cause the loading, unloading, opening, �—J—
closing, or other handling of boxes, crates, containers, building materials, garbage
cans, or other similar objects between the hours of 10 p.m. and 7 a.m. unless
otherwise specified herein, in a manner which would cause a noise disturbance to a
residential area.
6. Textured pavement shall be provided across circulation aisle, pedestrian walkway, and plaza. ��—
They shall be of brick/tile pavers, exposed aggregate, integral color concrete, or any
combination thereof. Full samples shall be submitted for City Planner review and approval
prior to the issuance of building permits.
7. All future building pads shall be seeded and irrigated for erosion control. Detailed plans shall
be included in the landscape and irrigation plans to be submitted for Planning Division
approval prior to the issuance of building permits.
8. The lighting fixture design shall compliment the architectural program. It shall include the ��—
plaza area lighting fixtures, building lighting fixtures (exterior), and parking lot lighting fixtures.
9. All future projects within the shopping center shall be designed to be compatible and �-1—
consistent with the architectural program established.
E. Building Design
1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or __J_J—
projections, shall be shielded from view and the sound buffered from adjacent properties and
streets as required by the Planning Division. Such screening shall be architecturally
integrated with the building design and constructed to the satisfaction of the City Planner.
shall be included in building 9 plans.
2. For commercial and industrial projects, paint roll-up doors and service doors to match main ��—
building colors.
F. Parking and Vehicular Access (indicate details Ion building plans)
1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space ��—
abuts a building, wall, support column, or other obstruction, the space shall be a minimum of
11 feet wide.
2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall
contain a 12-inch walk adjacent to the parking stall (including curb).
SC-08-02 3
Project No.DRC2002-00479
Completion Date
3. Textured pedestrian pathways and textured pavement across circulation aisles shall be
provided throughout the development to connect dwellings/units/buildings with open
spaces/plazas/recreational uses.
4. All parking spaces shall be double striped per City standards and all driveway aisles,
entrances, and exits shall be striped per City standards.
5. Handicap accessible stalls shall be provided for commercial and office facilities with 25 or
more parking stalls. Designate two percent or one stall; whichever is greater, of the total
number of stalls for use by the handicapped.
G. Trip Reduction
1. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily
residential projects of more than 10 units. Minimum spaces equal to five percent of the
required automobile parking spaces or three bicycle storage spaces, whichever is greater.
After the first 50 bicycle storage spaces are provided, additional storage spaces required are
2.5 percent of the required automobile parking spaces. Warehouse distribution uses shall
provide bicycle storage spaces at a rate of 2.5 percent of the required automobile parking
spaces with a minimum of a 3-bike rack. In no case shall the total number of bicycle parking
spaces required exceed 100. Where this results in a fraction of 0.5 or greater, the number
shall be rounded off to the higher whole number.
H. Landscaping
1. A detailed landscape and irrigation plan, including slope planting and model home
landscaping in the case of residential development, shall be prepared by a licensed
landscape architect and submitted for City Planner review and approval prior to the issuance
of building permits or prior final map approval in the case of a custom lot subdivision.
2. Existing trees required to be preserved in place shall be protected with a construction barrier
in accordance with the Municipal Code Section 19.08.110, and so noted on the grading
plans. The location of those trees to be preserved in place and new locations for
transplanted trees shall be shown on the detailed landscape plans. The applicant shall
follow all of the arborist's recommendations regarding preservation, transplanting, and
trimming methods.
3. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within --J--J—
commercial and office projects,shall be specimen size trees-24-inch box or larger.
4. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three —J—J_
parking stalls.
5. The final design of the perimeter parkways, walls, landscaping, and sidewalks shall be
included in the required landscape plans and shall be subject to City Planner review and
approval and coordinated for consistency with any parkway landscaping plan which may be
required by the Engineering Division.
6. All walls shall be provided with decorative treatment. If located in public maintenance areas,
the design shall be coordinated with the Engineering Division.
7. Landscaping and irrigation shall be designed to conserve water through the principles of
Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code.
SC-08-02 4
Project No.DRC2002-00479
Completion Date
I. Signs
1. The signs indicated on the submitted plans are conceptual only and not a part of this
approval. Any signs proposed for this development shall comply with the Sign Ordinance
and shall require separate application and approval by the Planning Division prior to
installation of any signs.
2. A Uniform Sign Program for this development shall be submitted for City Planner review and ��—
approval prior to issuance of building permits.
J. Environmental
1. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures, including monitoring and reporting. Applicant shall be required
to post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the
amount of $719.00 prior to the issuance of building permits, guaranteeing satisfactory
performance and completion of all mitigation measures. These funds may be used by the
City to retain consultants and/or pay for City staff time to monitor and report on the mitigation
measures. Failure to complete all actions required by the approved environmental
documents shall be considered grounds for forfeit.
2. In those instances requiring long term monitoring (i.e.) beyond final certificate of occupancy), /�—
the applicant shall provide a written monitoring and reporting program to the City Planner
prior to issuance of building permits. Said program shall identify the reporter as an individual
qualified to know whether the particular mitigation measure has been implemented.
K. Other Agencies
1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and —J�—
location of mailboxes. Multi-family residential developments shall provide a solid overhead
structure for mailboxes with adequate lighting. The final location of the mailboxes and the
design of the overhead structure shall be subject to City Planner review and approval prior to
the issuance of building permits.
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION, (909) 477-2710,
FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
L. General Requirements
1. Submit five complete sets of plans including the following: �—J—
a. Site/Plot Plan;
b. Foundation Plan;
C. Floor Plan;
d. Ceiling and Roof Framing Plan;
e. Electrical Plans (2 sets, detached) including the size of the main switch, number and
size of service entrance conductors, panel schedules, and single line diagrams;
f. Plumbing and Sewer Plans, including isometrics, underground diagrams, water and
waste diagram, sewer or septic system location, fixture units, gas piping, and heating
and air conditioning; and
SC-08-02 5
Project No.DRC2002-00479
Completion Date
g. Planning Division Project Number (i.e., TT #, CUP #, DR #, etc.) clearly identified on
the outside of all plans.
2. Submit two sets of structural calculations, energy conservation calculations, and a soils
report. Arch Architect's/Engineer's stamp and "wet" signature are required prior to plan check
submittal.
3. Contractors must show proof of State and City licenses and Workers' Compensation ��—
coverage to the City prior to permit issuance.
4. Separate permits are required for fencing and/or walls.
5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by ��—
the Building and Safety Division.
M. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be
marked with with the project file number (i.e., DRC2001-00001). The applicant shall comply with
the latest adopted California Codes, and all other applicable codes, ordinances, and
regulations in effect at the time of permit application. Contact the Building and Safety
Division for availability of the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new residential project or major addition, the
applicant shall pay development fees at the established rate. Such fees may include, but are
not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation Development
Fee, Permit and Plan Check Fees, and School Fees. Applicant shall provide a copy of the
school fees receipt to the Building and Safety Division prior to permit issuance.
3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map
recordation and prior to issuance of building permits.
4. Construct trash enclosure(s) per City Standard (available at the Planning Division's public ��—
counter).
N. New Structures
1. Plans for food preparation areas shall be approved by County of San Bernardino ��—
Environmental Health Services prior to issuance of building permits.
2. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC ___/__J_
Section 1505.
O. Grading
1. Grading of the subject property shall be in accordance with California Building Code, City
Grading Standards,Standards, and accepted grading practices. The final grading plan shall be in
substantial conformance with the approved grading plan.
2. A soils report shall be prepared by a qualified engineer licensed by the State of California to
perform such such work.
3. A geological report shall be prepared by a qualified engineer or geologist and submitted at
the time time of application for grading plan check.
4. The final grading, appropriate certifications and compaction reports shall be completed,
submitted, and approved by the Building and Safety Official prior to the issuance of building
permits.
SC-08-02 6
1 Project No.DRC2002-00479
J / Completion Date
5. A separate grading plan check submittal is required for all new construction projects and for
existing buildings where improvements being proposed will generate 50 cubic yards or more
of combined cut and fill. The grading plan shall be prepared, stamped, and signed by a
California registered Civil Engineer.
APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
P. Security Lighting
1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power.
These areas should be lighted from sunset to sunrise and on photo sensored cell.
2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,
with direct lighting to be provided by all entryways. Lighting shall be consistent around the
entire development.
3. Lighting in exterior areas shall be in vandal-resistant fixtures.
Q. Security Hardware
1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are __J_J_
within 40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be
used.
R. Windows
1. Storefront windows shall be visible to passing pedestrians and traffic.
S. Building Numbering
1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for _�_J_
nighttime visibility.
APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, FIRE PROTECTION
PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING
CONDITIONS:
SEE ATTACHED
SC-08-02 7
IS FIRE PROTECTION DISTRICT
FIRE SAFETY DIVISION
PRELIMINARY REVIEW CORRECTIONS
FD PLAN REVIEW#: FD-02-0682-A
PROJECT#: DRC2002-00479
PROJECT NAME: Wendy's Restaurant
DATE: July 1 2002
PLAN TYPE: Conditional Use Permit
APPLICANT NAME: Colitman and Lazerine
OCCUPANCY CLASS: Group A Division #
FLOOR AREA(S): 3261 square feet
TYPE CONSTRUCTION: Type V-N
FIRE PROTECTION
SYSTEM REQUIRED: Automatic Fire Sprinkler System
LOCATION: 9080 Foothill (OSH Center)
FD REVIEW BY: Steve Locati Fire Protection Planning Specialist
PLANNER: Rick Fisher
ALL OF THE FOLLOWING CORRECTIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, (909) 477-2770, EXT.
3009, TO VERIFY COMPLIANCE WITH THE FOLLOWING REQUIREMENTS:
Completion Date
A. Fire District Fees
1. Unpaid Fees: This project has outstanding unpaid service fees in the amount of $214
that are due and payable at this time. Please remit payment by check made payable
to the "Rancho Cucamonga Fire District. The fees are due for the following
service(s): $82 for initial project review and CUP review
B. Water Plans for Fire Protection
1. Public Fire Hydrants: Prior to issuance of any building permit, the applicant shall
submit a plan showing the locations of all new public fire hydrants for the review and
approval by the Fire District and the Water District. On the plan include all existing fire
hydrants within a 600-foot radius of the project.
2. Private/On-site Fire Hydrants: Prior to the issuance of any building permit, the
applicant shall submit construction plans, specifications, flow test data and calculations
for the private water main system for review and approval by the Fire District. Plans
and installation shall comply with Fire District standards. Contac the Fire Safety
Division for a copy of"Fire District Notes for Underground and Water Plans."
3. Exceeds Allowable Distance: When any portion of a facility or building is located
more than 150-feet from a fire hydrant located on a public street, as measured by an
approved route around the exterior of the facility or building on-site fire hydrants and
mains capable of supplying the required fire flow shall be provided. The distance is
measured as vehicular path of travel on access roadways, not line of sight.
4. Minimum Fire Flow: The required fire flow for this project is 1,500 gallons per minute
at a minimum residual pressure of 20 pounds per square inch. This requirement is
made in accordance with Fire Code Appendix III-A, as amended. Please see "Water
Availability" below for re uired verification of fire flow availability for the proposed
project.
5. Number of Fire Hydrants: Provide one fire hydrant for each 1,000 gpm of required fire
flow or fraction thereof.
6. General Guidance for Fire Hydrants: The following provides general guidance for
the spacing and location of fire hydrants. Remember these are the maximum
permitted distances between fire hydrants:
a. The maximum distance between fire hydrants in commercial/industrial projects is
300-feet.
b. The maximum distance between fire hydrants in multi-family residential is 400-
feet.
C. The maximum distance between fire hydrants in single-family residential projects
is 500-feet.
d. For single-family residential projects in the designated Hazardous Fire Area the
maximum distance between fire hydrants is 4004eet.
e. Fire hydrants are to be located:
1) At the entrance(s) to a project from the existing public roadways. This
includes subdivisions and industrial parks.
2) At intersections.
3) On the right side of the street, whenever practical and possible.
4) As required by the Fire Safety Division to meet operational needs.
f. The distance from a fire hydrant to the building or structure protected shall not
exceed one-half of the maximum allowable separation.
g. The location of fire hydrants is based upon the operational needs of the Fire
District to control a fire.
h. Fire hydrants shall be located a minimum of forty(40)from any building.
7. Hydrants Used to Supply Fire Flow: Public fire hydrants located within a 500-foot
radius of the proposed project may be used to provide the required fire flow subject to
Fire District review and approval. Private fire hydrants on adjacent property shall not
be used to provide required fire flow.
B. Public Installation: All required public fire hydrants shall be installed, flushed, and
operable prior to delivering any combustible building materials on-site (i.e., lumber,
roofing materials, etc.). Water District personnel shall inspect the installation and
witness hydrant flushing. The builder/developer shall submit a copy of the Water
District inspection report to the Fire Safety Division.
g. Private/On-site Installation: All private on-site fire hydrants shall be installed,
flushed, and operable prior to delivering any combustible building materials on-site
(i.e., lumber, roofing materials, etc.). A representative of Fire Construction Services
shall inspect the installation and witness hydrant flushing. The builder/developer shall
submit final test and inspection report to the Fire Safety Division.
10. Final Acceptance: For the purpose of final acceptance, an additional test of the on-
site fire hydrants shall be conducted by the builder/developer in the presence of the
Water District or Fire Construction Services, as appropriate. The builder/developer
shall submit the final test report to the Fire Safety Division.
11. Show Existing Fire Hydrants and Mains: Existing fire hydrants and mains within
600-feet of the project shall be shown on the water plan submitted for review and
approval. Include main size.
12. Fire Sprinkler Underground: Prior to the issuance of a fire sprinkler system permit,
the applicant shall submit construction plans, specifications, and calculations for the
fire sprinkler system underground to the Fire Safety Division for approval.
13. Maintenance Agreement: If the system is private the applicant shall do the following
prior to the issuance of the building permit:
a. Submit proof that provisions have been made for the annual testing, repair, and
maintenance of the system. A copy of the maintenance agreement shall be
submitted to the District.
b. For developments with multiple owners, they shall establish a reciprocal
maintenance agreement that shall be submitted to the Fire District for
acceptance.
14. Hydrant Markers: Prior to the issuance of any Certificate of Occupancy, all fire
hydrants shall have a blue reflective pavement marker indicating the fire hydrant
location on the street or driveway in accordance with Rancho Cucamonga Fire
Protection District and City of Rancho Cucamonga Engineering Standard Plan 134,
"Installation of Reflective Hydrant Markers." On private property these markers are to
be maintained in good condition by the property owner.
C. Available Water Supply-Confirmation Required
1. Prior to the issuance of a building permit, the applicant shall provide evidence of
adequate fire flow. The Rancho Cucamonga Fire Protection District Water Availability
for Fire Protection Form shall be signed by the Water District and submitted for
approval by the Rancho Cucamonga Fire Protection District. If sufficient water to meet
fire flow requirements is not available, an automatic fire extinguishing system may be
required in each structure affected by the insufficient flow. A copy of the required form
is attached at the end of this notice.
D. Automatic Fire Sprinkler Systems
1. Required Installations:
a. Rancho Cucamonga Fire District Ordinance 15 or other adopted code or
standard, requires an approved automatic fire sprinkler system to be installed in
any of the following:
b. Group A Occupancies
2. Plans and Permit: Plans for the required automatic fire sprinkler system shall be
submitted to Fire Construction Services for review and approval. No work is allowed
without a Fire Construction Services permit.
3. Final Inspection: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler
system(s)shall be tested and accepted by Fire Construction Services.
4. Sprinkler Monitoring: The fire sprinkler system monitoring system shall be installed,
tested, and operational immediately following the completion of the fire sprinkler
system. Monitoring is required with 20 sprinklers in Group I Occupancies, or 100 or
moresprinklers in all other Occupancies.
E. Fire Access .
1. Access Roadways Defined: Fire District access roadways include public roads,
streets, and highways, as well as private roads, streets, drive aisles and designated
fire lanes.
2. Private Roadways and Fire Lanes: The minimum specifications for private fire district
access roadways are:
a. The minimum unobstructed width is 26-feet.
b. The inside tum radius shall be 204eet.
C. The outside tum radius shall be not less than 50-feet.
d. The minimum radius for cul-de-sacs is 45-feet.
e. The minimum vertical clearance is 14 feet,6 inches.
f. At any private entry median,the minimum width of traffic lanes shall be 20-feet.
g. The angle of departure and approach shall not exceed 9 degrees or 20 percent.
h. The maximum grade of the driving surface shall not exceed 12%.
i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW).
3. Access Control/Traffic Calming Device Permit: A Fire District permit is required to
install any access control device, traffic-calming device, or gate on any access roadway.
Applicable CC&R's, or other approved documents, shall contain provisions that prohibit
obstructions such as traffic-calming devices (speed bumps, humps, etc.), control gates,
bollards, or other modifications in fire lanes or access roadways without prior written
approval of the Fire District, Fire Safety Division
4. Fire District Site Access Plan- Required Note: Prior to the issuance of any grading
permit the applicant shall submit a Fire District Site Access Pian to the Fire District for
review and approval. The following, minimum information and detail shall be included a
on a scaled site plan:
a. All roadways shall be clearly indicated. Including roadway width, vertical
clearances,cul-de-sac width, tum radii,curb cuts, angle of departure, grades,etc.
b. For private roadways or drive aisles less than 40-feet or less in width where parking
may be permitted, identify the location of proposed fire lanes.
C. Include a note stating all required fire lanes shall be identified by red curbing and
signage.
d. Include detail(s) to identify which of the methods set forth in the Fire District "Fire
Lane" standard will be used to mark the fire lane. A copy of the Fire District "Fire
Lane"Standard can be obtained by calling (909)477-2770.
e. Roadway with a width of more than 40-feet parking is permitted on both sides.
f. Roadway with a width of 32-feet or more parking is permitted on one side only.
g. The angle of departure and approach shall not exceed 9 degrees or 20 percent.
h. The grade of any fire district access roadway shall not exceed 12 percent.
i. If water plans have been approved include fire hydrant and fire department
connection locations.
5. Knox Rapid Entry System: A Knox rapid entry key vault shall be installed prior to final
inspection. Proof of purchase shall be submitted prior to final building plan approval.
Contact the Fire Safety Division for specific details and ordering information.
6. Vegetation: Trees and shrubs planted in any median shall be kept trimmed to a
minimum of 14-feet, 6-inches from the ground up,so as not to impede fire vehicles.
7. Construction Access: Fire District access, a minimum 26-feet in width and 14-feet, 6-
inches minimum clear height shall be provided. These minimum clearances shall be
maintained free and clear of any obstructions at all times, in accordance with Fire District
Standards.
8. Fire Lane Identification: All required fire lanes shall be identified by red curbing and
signage. A drawing of the proposed signage that meets the minimum Fire District
standards shall be submitted to and approved. Contact the Rancho Cucamonga Fire
Protection District at(909)477-2770 for a copy of the FD Fire Lanes standard.
9. Fire Lanes: Prior to the issuance of any Certificate of Occupancy, the fire lanes shall be
installed in accordance with the approved fire lane plan. The CC&R's or other approved
documents shall contain an approved fire lane map and provisions that prohibit parking in
the fire lanes. The method of enforcement shall be documented. The CC&R's shall also
identify who is responsible for not less than annual inspection and maintenance of all
required fire lanes.
10. Address- Other Than Single-family: New buildings other than single-family dwellings
shall post the address with minimum 8-inch numbers on contrasting background, visible
from the street and electrically illuminated during periods of darkness. When the building
setback exceeds 200 feet from the public street an additional non-illuminated 6-inch
minimum number address shall be provided at the property entrance.
11. Multi-unit Complexes: In multi-unit complexes approved address numbers, and/or
building identification letters shall be provided on ' the front and back of all units, suites,
or buildings. The Fire District shall review and approve the numbering plan in
coordination with the City of Rancho Cucamonga.
F. Combustible Construction Letter
1. Required Letter: Prior to the issuance of a building permit for combustible
construction, the builder shall submit a letter to the Fire District on company letterhead
stating that the minimum water supply for fire fighting purposes and the all-weather fire
protection access roadway that meets Fire District Standards shall be in place and
operational before any combustible material is placed on-site. The roadway shall be
maintained at all times.
G. Fire Suppression System (Required for Commercial Cooking Equipment or Special Hazards)
1. Plans and Permits: Prior to the issuance of a building permit, plans, and specifications for
the fire suppression system for the protection of commercial-type cooking equipment or
other special hazard shall be submitted to Fire Construction Services for review and
approval. No work is allowed without a Fire Construction Services permit.
2. Final Inspection and Testing: Prior to the issuance of a Certificate of Occupancy, the fire
suppression system(s)shall be tested and accepted by Fire Service Construction Services.
H. Fire District Service Fees'
1. The following service fees are due to the Fire District and payable at this time:
a. $82 Start-up fee for commercial, industrial or multi-family dwelling units (Paid prior to
TRC
b. $132 Conditional Use Permit Review Fee(CUP)
c. $ 214 - Total due at this time. Remit payment by check made payable to the
"Rancho Cucamonga Fire District."
" Plus a microfiche/laser-fiche fee of $1.00 per plan sheet for all final plans approved
by the Fire Safety Division.
` Note: Separate plan check fees will be assessed by the Fire Construction
Services Unit for review of tenant Improvement work, fire protection systems
(fire sprinklers, alarm systems, fire extinguishing systems, etc.), and/or any
consultant reviews upon submittal of plans.
I. Hazard Control Permits
1. As noted below Special Permits may be required, dependent upon approved use(s):
a. General Use Permit shall be required for any activity or operation not specifically
described below, which in the judgment of the Fire Chief is likely to produce
conditions that may be hazardous to life or property.
b. Operate a place of public assembly.
C. To install any access control device, system, or any material under, upon or
within the required fire district access roadway. This includes any gate, barrier,
traffic-calming device, speed bump, speed hump or any device that delays or
slows Fire District response.
d. Compressed gases (storage, handling, or use exceeding 100 cubic feet.
J. Hazardous Materials—Compliance with Disclosure and Reporting Regulations
1. The below listed businesses, operations, uses or conditions require that the San
Bernardino County Fire Department review your Business Emergency/Contingency
Plan for compliance with minimum standards. Contact the San Bernardino County
Fire, Hazardous Materials Division at (909) 387-3041 for forms and assistance. The
County Fire Department is the CaVEPA Certified Unified Program Agency (CUPA) for
the City of Rancho Cucamonga.
a. Quantities: Any business that uses, generates, processes, produces, treats,
stores, emits, or discharges a hazardous material in quantities at or exceeding
55 gallons, 500 pounds, or 200 cubic feet (compressed gas) at any one time in
the course of a year.
b. Waste: All hazardous waste generators, regardless of quantity generated.
C. SARA Title III: Any business subject to the Emergency Planning and
Community Right to Know Act (EPCRA), also known as SARA Title III.
Generally, EPCRA includes facilities that handle hazardous substances above
10,000 pounds, or extremely hazardous substances above threshold planning
quantities. There are some exceptions, including retail gas stations with up to
75,000 gallons of gasoline or 100,000 gallons of diesel fuel in Underground
Storage Tanks (UST's) that meet the 1998 upgrade requirements. To get more
information on EPCRA requirements call 1-800-535-0202. Due to State
disclosure consolidation laws, Tier II forms need not be submitted to the various
State and Federal agencies. Submission of your Business Emergency/
Contingency Plan will meet this requirement; however, EPCRA does require full
annual inventory submission rather than a certification statement each March 1.
Also, EPCRA facilities are bound by the trade secret limitations of EPCRA, and
must sign every page of inventory.
d. Radioactive Materials: Any business that handles radioactive material that is
listed in Appendix B of Chapter 1, of 10 CFR.
e. Certificate of Occupancy Restrictions: If the facility is a NEW business, a
Certificate of Occupancy issued by Building and Safety will not be finalized until
the San Bernardino County Fire Department reviews your Business
Emergency/Contingency Plan. California Government Code, Section 65850.2
prohibits the City from issuing a final Certificate of Occupancy unless the
applicant has met or is meeting specific hazardous material disclosure
requirements. A Risk Management Program (RMP) may also be required if
regulated substances are to be used or stored at the new facility. Contact
County Fire, Hazardous Materials Division at (909) 387-3041 for forms and
assistance.
f. Rental or Lease Properties: Any business that operates on rented or leased
property, and is required to submit a Plan, is required to submit a notice to the
owner of the property in writing stating that the business is subject to the
Business Emergency/Contingency Plan mandates, and has complied with the
provision, and must provide a copy of the Plan to the property owner within 5
working days after receiving a request from the owner.
g. Fire District Code Adoption: The Fire Code adopted by the Fire District has a
provision requiring collection of information regarding hazardous materials at
facilities for purposes of Fire Code implementation and emergency response.
h. Submittal to the Fire District: Prior to issuance of a Certificate of Occupancy a
copy of the County Fire Department approved Business
Emergency/Contingency Plan - New Business (Hazardous Materials Release
Response Plans and Inventory) shall be submitted to the Fire District. In some
cases additional information that is not in the Business Emergency/Contingency
Plan may be required in order to support local fire prevention and emergency
response programs.
K. Plan Submittal Required Notice
1. Required plans shall be submitted and approved prior to construction in accordance with
1997/98 Building, Fire, Mechanical, and Plumbing Codes; 1999 Electrical and RCFPD
Ordinances FD15 and FD32, Guidelines and Standards.
NOTE: In addition to the fees due at this time please note that separate plan check fees for
tenant improvements, fire protection systems and/or any consultant reviews will be assessed at
time of submittal of plans.
L. Alternate Materials and Methods
1. The Fire Safety Division will review requests for alternate materials and methods within
the scope of our authority. The request must be submitted on the Fire District"Application
for Alternate Method" form along with supporting documents. Contact this Fire Safety
Division at(909)477-2770 for assistance.
Fire District Standard Conditions -Template
SL 10/10/2002 Revision
RANCHO CUCAMONGA FIRE DISTRICT
Fire Safety Division
_ P.O. Box 807
w ` Rancho Cucamonga, CA 91729
(909) 477-2770 FAX (909) 477-2772
Water Availability for Fire Protection
Project Information
(To be completed by Applicant-Please print or type. Provide ALL information to avoid delays)
Project Location:
Project Name:
Building Address: or Tract Map:
Nearest Cross Street: Distance to Nearest Cross Street: Feet
Property Owner:
Occupancy Classification(Use of Building):
Type of Building Construction in Accordance with Building Code: Type
Total Floor Area in Square Feet: Number of Stories:
Applicant Name: Representing:
Applicant Telephone: ( ) Applicant FAX: ( )
Applicant Signature: Date:
(Please Do Not Write Below This Line-Fire District Use Only)
Fire District Plan Review Number:FD-02-0682-A
1. Required Fire Flow: 1750 g.p.m.@ 20 p.s.i.minimum residual pressure per Table A-III-A-1
The above fire flow includes 50%reduction for monitored automatic fire sprinkler system.
2. Public Fire Hydrants:
a. Spacing: 300 feet maximum between fire hydrants.
b. Distribution: Not more than 150 feet from any point of building to an approved fire
hydrant.
3. Private Fire Hydrants Required:
a. Spacing: 300 feet maximum between fire hydrants.
b. Distribution: Not more than 150 feet from any point of building to an approved fire
hydrant. i
c. Number of private fire hydrants required:2 at one per 1000 .m.or fraction thereof.
4. Number of Fire Service Connections to Public Water Systems Required to Maintain Water
Supply Integrity for Backflow Prevention Device Maintenance and Testing:
5. Special Requirements Based on Location or Hazard:
F
re District Representative: Steven Locati Title: Fire Protection Planning Specialist
Signature: Exported on Word Processor Date: October 10,2002
CUCAMONGA COUNTY WATER DISTRICT
10440 Ashford Street
P.O. Box 638
Rancho Cucamonga, CA 91729
(909) 987-2591 FAX (909)476-7031
Water District Information on Fire Flow Availability
(To be completed by Water District)
1. Flow Test Location:
2. Date of Test: Time of Test:
3. Fire Hydrant(s)Flowed Identification Number(s):
4. Number of Fire Hydrants Flowed:
5. Static Water Pressure: p.s.i. Pitot Reading: p.s.i.
6. Static Water Pressure Range: p.s.i to p.s.i.
7. Observed Flow: g.p.m. Residual Water Pressure: p.s.i.
8. Main Size: inches Outlet Size: inches
9. Minimum Observed Flow: g.p.m. Maximum Observed Flow: g.p.m.
10. Calculated flow at 20 p.s.i.: g.p.m.
11. Notes/Additional Comments:
The test results above indicate the capability of the water system at the time the test was made. Since the capacity
of the water system may vary as a result of many factors,including changes in demand placed on the system by
customers,the Water District recommends you give adequate consideration to these variations when performing
our analysis.
Water District Representative: Title:
Signature: Date:
Fire District Development Review — Fees for Service
(This is provided for informational purposes only)
The Fire District Board of Directors has established fees for services related to the review of proposed
development,access,water supply,and vegetation management plans. When the required plans are
submitted the following fees will be assessed by the Fire Safety Division or the Fire Construction Services
Unit: "
$82 Start-up Fee for commercial, industrial or multi-family dwelling units (Paid prior to TRC)
$66 Preliminary Vegetation Management/Fuel Modification Plan (Includes SFR Infill lots)
$66 Final Vegetation Management/Fuel Modification Plan and Inspection (Subdivision)
$132 Single-family Dwelling Review-Located in the Hazardous Fire Area
$132 Fire District Review of Tract or Parcel Maps other than Single-family Residential Tract
$132 Minor Development Review Fee(MDR) (RemodeVTenant Improvement)
$132 Conditional Use Permit Review Fee(CUP)
$132 for Single-family Residential Development
$132 for Single-family Residential Tract(per phase)
$132 for Water Pian Review for Public Fire Protection
$132 for Private Fire Mains or Fire Sprinkler Underground Water Supply
$677 (per new building)for Multi-family Residential Development
$677(per new building)for New Commercial and Industrial Development
Plus a microficho4aser4iche fee of $1.00 per plan sheet for all final plans approved by the Fire Safety Division.