Loading...
HomeMy WebLinkAbout02-109 - Resolutions RESOLUTION NO. 02-109 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING CONDITIONAL USE PERMIT DRC2002-00653, FOR THE CONSTRUCTION OFA FIRE STATION ON 2.46 ACRES OF LAND IN THE LOW-MEDIUM RESIDENTIAL DISTRICT (4-8 DWELLING UNITS PER ACRE) OF THE VICTORIA COMMUNITY PLAN, LOCATED AT THE SOUTHWEST CORNER OF DAY CREEK BOULEVARD AND THE SOUTHERN PACIFIC RAILROAD RIGHT OF WAY, AND MAKING FINDINGS IN SUPPORT THEREOF- APN: 1089-031-18. A. Recitals. 1. The Rancho Cucamonga Fire Protection District filed an application for approval of Conditional Use Permit DRC2002-00653, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Conditional Use Permit request is referred to as "the application." 2. On the 13th day of November 2002, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is herebyfound, determined, and resolved bythe Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above- referenced public hearing on November 13, 2002, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a. The application applies to property located on the west side of Day Creek Boulevard, between Base Line Road and the Pacific Electric right-of-way, with a street frontage of approximately 250 feet and a lot depth of 320 feet, and is presently vacant; and b. The property to the north is an existing residential development. The properties to the south and west are currently vacant and undeveloped, and to the east is Day Creek Boulevard; and C. The development of a Fire Station is consistent with the objectives of the General Plan pertaining to the provision of adequate levels of service. 3. Based upon the substantial evidence presented to this Commission during the above- referenced public hearing and upon the specific findings of facts set forth in paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. The Conditional Use Permit is consistent with the General Plan, Development Code, and the Victoria Community Plan; and PLANNING COMMISSION RESOLUTION NO. 02-109 DRC2002-00653— RANCHO CUCAMONGA FIRE PROTECTION DISTRICT November 13, 2002 Page 2 b. The design or improvements of the project is consistent with the General Plan, Development Code, and the Victoria Community Plan; and C. The site is physically suitable for the type of development proposed; and d. The design of the proposed project will not cause substantial environmental damage and avoidable injury to humans and wildlife or their habitat; and e. The proposed project is not likely to cause serious public health problems. 4. Based upon the facts and information contained in the proposed Mitigated Negative Declaration, together with all written and oral reports included for the environmental assessment for the application, the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and Monitoring Program attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. That the Mitigated Negative Declaration has been prepared in compliance with the California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared therefore reflect the independent judgment of the Planning Commission; and, further, this Commission has reviewed and considered the information contained in said Mitigated Negative Declaration with regard to the application. b. Although the Mitigated Negative Declaration identifies certain significant environmental effects that will result if the project is approved, all significant effects have been reduced to an acceptable level by imposition of mitigation measures on the project that are listed below as Conditions of Approval. C. Pursuant to the provisions of Section 753.5(c) of Title 14 of the California Code of Regulations, the Planning Commission finds as follows: In considering the record as a whole, the Initial Study, and Mitigated Negative Declaration for the project, there is no evidence that the proposed project will have potential for an adverse impact upon wildlife resources orthe habitat upon which wildlife depends. Further, based upon the substantial evidence contained in the Mitigated Negative Declaration, the staff reports and exhibits, and the information provided to the Planning Commission during the public hearing, the Planning Commission hereby rebuts the presumption of adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code of Regulations. 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference: Planning Division 1) Walls shall be decorative and shall comply with setback and design requirements of the Victoria Community Plan and Day Creek Boulevard. 2) Where rock cobble is used, it shall be real river rock. PLANNING COMMISSION RESOLUTION NO. 02-109 DRC2002-00653— RANCHO CUCAMONGA FIRE PROTECTION DISTRICT November 13, 2002 Page 3 Engineering Division 1) Provide a Parcel Map or Lot Line Adjustment with a separate instrument for dedication of Oak Creek Court, Day Creek Boulevard, and Base Line Road. 2) Day Creek Boulevard frontage shall be improved in accordance with City "Major Divided Arterial" standards as required, including but not limited to, protect existing curb and gutter or repair as required, sidewalk, streetlights, street trees, signs, and striping. 3) Provide a traffic signal at the intersection of Day Creek Boulevard and Oak Creek Court, and direct the City Engineer to evaluate safe movements of intersection traffic flow. 4) Oak Creek Court shall be improved in accordance with City"Collector" standards as required, including but not limited to, curb and gutter, sidewalk, pavement, driveway approaches, streetlights, street trees, signs, and striping. 5) Install the storm drain per the approved City drawings to the satisfaction of the City Engineer from Oak Creek Court southerly to the existing storm drain in Base Line Road. Provide a storm drain easement or acceptance letter for the drainage from Oak Creek Court. 6) The proposed project may be subject to pay its fair share reimbursement costs for street improvements along Day Creek Boulevard and storm drain improvements pending the submittal of a reimbursement agreement from adjacent developers. 7) The Pacific Electric Inland Empire Trail shall loop down along Day Creek Boulevard to Oak Creek Court within a 25-foot wide parkway for Trail purposes. 8) As a public facility, the site will be required to generally follow LMD design requirements on-site, as well as off-site. The landscape architect should contact City staff. Environmental Mitigation Air Quality 1) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and RWQCB)daily to reduce PM10 emission,in accordance with SCAQMD Rule 403. 2) Day Creek Boulevard shall be swept according to a schedule established by the City to reduce PM10 emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon time of year of construction. PLANNING COMMISSION RESOLUTION NO. 02-109 DRC2002-00653 — RANCHO CUCAMONGA FIRE PROTECTION DISTRICT November 13, 2002 Page 4 3) Grading and clearing operations shall be suspended when wind speeds exceed 25 miles per hour to minimize PM10 emissions from the site during such episodes. 4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB)shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. 5) The construction contractor shall select the construction equipment used on-site based on low emission factors and high-energy efficiency. The construction contractor shall ensure the construction-grading plans include a statement that all construction equipment will be tuned and maintained in accordance with the manufacturers' specifications. 6) The construction contractor shall utilize electric or clean alternative fuel powered equipment where feasible. 7) The construction contractor shall ensure that construction-grading plans include a statement that work crews will shut off equipment when not in use. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 13TH DAY OF NOVEMBER 2002. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA 1�7 13Y: Rich Macias, Vice Chairman ATTEST: �r Brad By creta I, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 13th day of November 2002, by the following vote-to-wit: AYES: COMMISSIONERS: MACIAS, MCNIEL, STEWART NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: MCNIEL, TOLSTOY City of Rancho Cucamonga MITIGATION MONITORING PROGRAM Project File No.: DRC2002-00653 This Mitigation Monitoring Program(MMP)has been prepared for use in implementing the mitigation measures identified in the Mitigated Negative Declaration forthe above-listed project. This program has been prepared in compliance with State law to ensure that adopted mitigation measures are implemented (Section 21081.6 of the Public Resources Code). Program Components -This MMP contains the following elements: 1. Conditions of approval that act as impact mitigation measures are recorded with the action and the procedure necessary to ensure compliance.The mitigation measure conditions of approval are contained in the adopted Resolution of Approval for the project. 2. A procedure of compliance and verification has been outlined for each action necessary. This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported. 3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring progresses, changes to compliance procedures may be necessary based upon recommendations by those responsible for the program. Program Management -The MMP will be in place through all phases of the project. The project planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly and proper action is taken on each mitigation. Each City department shall ensure compliance of the conditions (mitigation) that relate to that department. Procedures -The following steps will be followed by the City of Rancho Cucamonga. 1. A fee covering all costs and expenses, including any consultants'fees, incurred by the City in performing monitoring or reporting programs shall be charged to the applicant. 2. A MMP Reporting Form will be prepared for each potentially significant impact and its corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached hereto. This procedure designates who will take action,what action will be taken and when,and to whom and when compliance will be reported. All monitoring and reporting documentation will be kept in the project file with the department having the original authority for processing the project. Reports will be available from the City upon request at the following address: City of Rancho Cucamonga - Lead Agency Planning Division 10500 Civic Center Drive - - - - — - Rancho-Cucamonga,,-CA-91730 — - Mitigation Monitoring Program Page 2 3. Appropriate specialists will be retained if technical expertise beyond the City staffs is needed,as determined by the project planner or responsible City department,to monitor specific mitigation activities and provide appropriate written approvals to the project planner. 4. The project planner or responsible City department will approve, by signature and date, the completion of each action item that was identified on the MMP Reporting Form. After each measure is verified for compliance, no further action is required for the specific phase of development. 5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off as completed by the project planner or responsible City department at the bottom of the MMP Reporting Form. 6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation measures.The project planner is responsible for approving any such refinements or additions. An MMP Reporting Form will be completed by the project planner or responsible City department and a copy provided to the appropriate design, construction, or operational personnel. 7. The project planner or responsible City department has the authority to stop the work of construction contractors if compliance with any aspects of the MMP is not occurring afterwritten notification has been issued. The project planner or responsible City department also has the authority to hold certificates of occupancies if compliance with a mitigation measure attached hereto is not occurring.The project planner or responsible City department has the authority to hold issuance of a business license until all mitigation measures are implemented. 8. Any conditions (mitigation) that require monitoring after project completion shall be the responsibility of the City of Rancho Cucamonga Community Development Department. The Department shall require the applicant to post any necessary funds(or other forms of guarantee) with the City. These funds shall be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measure for the required period of time. 9. In those instances requiring long-term project monitoring, the applicant shall provide the City with a plan for monitoring the mitigation activities at the project site and reporting the monitoring results to the City. Said plan shall identify the reporter as an individual qualified to know whether the,particular mitigation measure has been implemented. The monitoring/reporting plan shall conform to the City's MMP and shall be approved by the Community Development Director prior to the issuance of building permits. (:\FINAL\CEQA\MMP Form-revmpd i MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III) Project File No.: DRC2002-00653 Applicant: City of Rancho Cucamonga Initial Study i Prepared by: Kirt Coury Date: October 14. 2002 ResponsibleMitigation Measures No.I of Verif ied Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date finitials Non-Compliance Air ualit n., Y The site shall be treated with water or other soil stabilizing agent (approved by SCAQMD and RW QCB)daily to reduce PM,o emission, CP C Review of plans A/C 2 in accordance with SCAQMD Rule 403. Day Creek Boulevard shall be swept according to a schedule CP C Review of plans A/C 2 established by the City to reduce PM, emissions associated with vehicle tracking of soil off-site.Timing may vary depending upon time of year of construction. Grading operations shall be suspended when wind speeds exceed 25 CP C Review of plans A/C 2 mph to minimize PM,o emissions from the site during such episodes. Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be applied to all inactive construction areas that remain inactive for 96 CP C Review of plans A/C _ 2 hours or more to reduce PM,,emissions. The construction I contractor shall select the construction equipment _ based on low emission factors and high-energy efficiency. The CP C Review of plans A/C 2 construction contractor shall ensure the construction grading plans include a statement that all construction equipment will be turned and maintained in accordance with the manufacturers'specifications. The construction contractor shall utilize electric or dean alternative fuel CPC Review of plans A/C 2 powered equipment where feasible. - The construction contractor shall ensure that construction-grading CP/CE BIC Review of plans - A/C 2 plans include a statement that work crews will shut off equipment when not in use. - Key to Checklist Abbreviations RespOOSible-persot Mortl oiing Fregyency Method of Verification` .; w h .sanc'ijons CDD-CommunityDevelopment Director A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit CE-City Engineers or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds FC-Fire Chief or designee - 6-Revoke CUP I:\PLANNING\FINAL\CEQAWMCHKLST.WPD - - I l COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT#: DRC2002-00653 SUBJECT: FIRE STATION NO. 173 APPLICANT: RANCHO CUCAMONGA FIRE PROTECTION DISTRICT WEST SIDE OF DAY CREEK BOULEVARD BETWEEN BASE LINE ROAD AND THE LOCATION: PACIFIC ELECTRIC RAILROAD RIGHT-OF-WAY ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DIVISION, (909) 477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: eomoletion Date A. General Requirements 1. The applicant shall agree to defend at his sole expenselany action brought against the City, --/--J— its agents, officers, or employees, because of the issuance of such approval, or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Copies of the signed Planning Commission Resolution of Approval No. 02-109, Standard —J--/— Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. B. Time Limits 1. Conditional Use Permit, Variance, or Development/Design Review approval shall expire if _/_J_ building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which _/_/_ include site plans, architectural elevations, exterior materials and colors, landscaping, sign program, and grading on file in the Planning Division, the conditions contained herein, _ Development Code regulations and-the Victoria Community Plan. -- 2. Prior to any use of the project site or business activity being commenced thereon, all Conditions of Approval shall be completed to the satisfaction of the City Planner. SC-08-02 1 Project No.DRC2002-00653 Completion Date 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code __J_/_ and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Division to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for City Planner review and approval prior to the issuance of building permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as,grading, tree removal, encroachment, building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 7. A detailed on-site lighting plan, including a photometric diagram, shall be reviewed and approved by the City Planner and Police Department (477-2800) prior to the issuance of building permits. Such plan shall indicate style, illumination, location, height, and method'of shielding so as not to adversely affect adjacent properties. 8. Trash receptacle(s) are required and shall meet City standards. The final design, locations, and the number of trash receptacles shall be subject to City Planner review and approval prior to the issuance of building permits. 9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall _J_J_ be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping to the satisfaction of the City Planner. For single-family residential developments, transformers shall be placed in underground vaults. 10. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination. 11. Six-foot decorative block walls shall be constructed along the project perimeter. If a double wall condition would result, the developer shall make a good faith effort to work with the adjoining property owners to provide a single wall. Developer shall notify, by mail, all contiguous property owner at least 30 days prior to the removal of any existing walls/fences along the project's perimeter. 12. Where rock cobble is used, it shall be real river rock. Other stone veneers may be —J--/— manufactured products. D. Building Design 1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections, shall be shielded from view and the sound buffered from adjacent properties and streets as required by the Planning Division. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the City Planner. Details shall be included in building plans. E. Parking and Vehicular Access (indicate details on building plans) 1,—All-parking-spaces-shall_be_9_feet-widehy 1-8_feet-long._When-a side_of_any_parking space- abuts a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet wide. SC-08-02 2 Project No.DRC2002-00653 Completion Date 2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall _/—J_ contain a 12-inch walk adjacent to the parking stall (including curb). 3. All parking spaces shall be double striped per City standards and all driveway aisles, _/—J_ entrances, and exits shall be striped per City standards. F. Trip Reduction 1. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily residential projects of more than 10 units. Minimum spaces equal to five percent of the required automobile parking spaces or three bicycle storage spaces, whichever is greater. After the first 50 bicycle storage spaces are provided, additional storage spaces required are 2.5 percent of the required automobile parking spaces. Warehouse distribution uses shall provide bicycle storage spaces at a rate of 2.5 percent of the required automobile parking spaces with a minimum of a 3-bike rack. In no case shall the total number of bicycle parking spaces required exceed 100. Where this results in a fraction of 0.5 or,greater, the number shall be rounded off to the higher whole number. G. Landscaping 1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for City Planner review and approval prior to the issuance of building permits or prior final map approval in the case of a custom lot subdivision. 2. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking stalls. 3. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one tree per 30 linear feet of building. 4. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope, but less than 2:1 slope, shall be, at minimum, irrigated and landscaped with appropriate ground cover for erosion control. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 5. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater slope shall be landscaped and irrigated for erosion control and to soften their appearance as follows: one 15-gallon or larger size tree per each 150 sq. ft. of slope area, 1-gallon or larger size shrub per each 100 sq. ft. of slope area, and appropriate ground cover. In addition, slope banks in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in staggered clusters to soften and vary slope plane. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 6. The final design of the perimeter parkways, walls, landscaping, and sidewalks shall be included in the required landscape plans and shall be subject to City Planner review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Division. 7. Special landscape features such as mounding, alluvial rock, specimen size trees, meandering sidewalks (with horizontal change), and intensified landscaping, is required along Day Creek Boulevard. 8. Landscaping and irrigation systems required to be installed within the public right-of-way on Jam_ the perimeter of this project area shall be continuously maintained by the developer. SC-08-02 3 Project No.DRC2002-00653 Completion Date 9. All walls shall be provided with decorative treatment. If located in public maintenance areas, the design shall be coordinated with the Engineering Division. 10. Landscaping and irrigation shall be designed to conserve water through the principles of �—J— Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code. H. Signs 1. The signs indicated on the submitted plans are conceptual only and not a part of this approval. Any signs proposed for this development shall comply with the Sign Ordinance and shall require separate application and approval by the Planning Division prior to installation of any signs. I. Environmental 1. Mitigation measures are required for the project. The applicant is responsible for the cost of implementing said measures, including monitoring and reporting. Applicant shall be required to post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the amount of $ 719.00 prior to the issuance of building permits, guaranteeing satisfactory performance and completion of all mitigation measures. These funds may be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete all actions required by the approved environmental documents shall be considered grounds for forfeit. J. Other Agencies 1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location of mailboxes. Multi-family residential developments shall provide a solid overhead structure for mailboxes with adequate lighting. The final location of the mailboxes and the design of the overhead structure shall be subject to City Planner review and approval prior to the issuance of building permits. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION, (909) 477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S) K. General Requirements 1. Submit five complete sets of plans including the following: ��— a. Site/Plot Plan; b. Foundation Plan; C. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; f. Plumbing and Sewer Plans, including isometrics, underground diagrams, water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and _ g. Planning Division Project Number (i.e., TT #, CUP #, DR #, etc.) clearly identified on the outside of all plans. SC-08-02 4 Project No. DRC2002-00653 Completion Date 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers' Compensation coverage to the City prior to permit issuance. 4. Separate permits are required for fencing and/or walls. 5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the Building and Safety Division. L. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project'file number (i.e., DRC2002-00653). The applicant shall comply with the latest adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Division for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new commercial or industrial development project or major addition, the applicant shall pay development fees at the established rate. Such fees may include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation Development Fee, Permit and Plan Check Fees, and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Division prior to permits issuance. 3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map recordation and prior to issuance of building permits. 4. Construction activity shall not occur between the hours lof 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. 5. Construct trash enclosure(s) per City Standard (available at the Planning Division's public counter). M. New Structures 1. Provide compliance with the California Building Code (CBC) for property line clearances considering use, area, and fire-resistiveness. 2. Provide compliance with the California Building Code for required occupancy separations. 3. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC Section 1505. 4. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A 1 5. Openings in exterior walls shall be protected in accordance with CBC Table 5-A. �—J- 6. Provide smoke and heat venting in accordance with CBC Section 906. —/—/- 7. Upon tenant improvement plan check submittal, additional requirements may be needed. SC-08-02 5 Project No.DRC2002-00653 Completion Date N. Grading 1. Grading of the subject property shall be in accordance with California Building Code, City Grading Standards,Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified,engineer licensed by the State of California to —/—/— perform such work. 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at ��— the time of application for grading plan check. 4- The final grading, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 5. A separate grading plan check submittal is required for all new construction projects and for existing buildings buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The grading plan shall be prepared, stamped, and signed by a California registered Civil Engineer. APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: O. Dedication and Vehicular Access 1. Rights-of-way and easements shall be dedicated to the City for all interior public streets, ��— community trails, public paseos, public landscape areas, street trees, traffic signal encroachment and maintenance, and public drainage facilities as shown on the plans and/or tentative map. Private easements for non-public facilities (cross-lot drainage, local feeder trails, etc.) shall be reserved as shown on the plans and/or tentative map. 2. Dedication shall be made of the following rights-of-way on the perimeter streets (measured ��— from street centerline): Varies total feet on Day Creek Boulevard Varies total total feet on Base Line Road 3. Corner property line cutoffs shall be dedicated per City Standards. —/—/- 4. All existing easements lying within future rights-of-way shall be quit-claimed or delineated on ��— the final map. 5. Easements for public sidewalks and/or street trees placed outside the public right-of-way shall be be dedicated to the City. 6. Additional street right-of-way shall be dedicated along right turn lanes, to provide a minimum of 7 feet measured from the face of curbs. If curb adjacent sidewalk is used along the right turn lane, a parallel street tree maintenance easement shall be provided. P. Street Improvements 1. All public improvements (interior streets, drainage facilities, community trails, paseos, landscaped_areas, etc.) shown on the plans and/or tentative map shall be constructed to City Standards. Interior street improvements shall include, but are not limited to, curb and gutter, AC pavement, drive approaches, sidewalks, streetlights, and street trees. SC-08-02 6 Project No. DRC2002-00653 Completion Date 2. Construct the following perimeter street improvements including, but not limited to: Street Name Curb& A-C. Side- Drive Street Street Comm Median Bike Other Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Rails to Dav Creek Boulevard X X X X X Trails X 3. Improvement Plans and Construction: a. Street improvement plans, including street trees, street lights, and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements, prior to final map approval or the issuance of building permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and, a construction permit shall be obtained from the City Engineer's Office in addition to any other permits required. C. Pavement striping, marking, traffic signing, street name signing, traffic signal conduit, and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer Notes: 1) Pull boxes shall be No. 6 at intersections and No. 5 along streets, a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2) Conduit shall be 3-inch (at intersections) or 2-inch (along streets) galvanized steel with pull rope or as specified. e. Handicapped access ramps shall be installed on all corners of intersections per City --/—J— Standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving, which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be �-J- installed to City Standards, except for single family residential lots. h. Street names shall be approved by the City Planner prior to submittal for first plan check. 4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. 5Intersection line-of-sight designs-shall-be-reviewed-by-the City-Engineer-for-conformance-with adopted policy. On collector or larger streets, lines of sight shall be plotted for all project intersections, including driveways. Local residential street intersections and commercial or industrial driveways may have lines of sight plotted as required. SC-08-02 7 Project No.DRC2002-00653 completion Date Q. Public Maintenance Areas 1. Public landscape areas are required to incorporate substantial areas (40%) of mortared �—J— cobble or other acceptable non-irrigated surfaces. 2. All required public landscaping and irrigation systems shall be continuously maintained by the developer until accepted by the City. 3. Parkway landscaping on the following street(s) shall conform to the results of the respective Beautification Master Plan Day Creek Master Plan. R. Drainage and Flood Control 1. A final drainage study shall be submitted to and approved by the City Engineer prior to final map approval or the issuance of building permits, whichever occurs first. All drainage facilities shall be installed as required by the City Engineer. 2. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the property from adjacent areas. 3. Trees are prohibited within 5 feet of the outside diameter of any public storm drain pipe measured from the outer edge of a mature tree trunk. 4. Public storm drain easements shall be graded to convey overflows in the event of a blockage in a sump catch basin on the public street. S. Utilities 1. Provide separate utility services to each parcel including sanitary sewerage system, water, gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 2. The developer shall be responsible for the relocation of existing utilities as necessary. �—J- 3. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga County Water District (CCWD), Rancho Cucamonga Fire Protection District, and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CCWD is required prior to final map approval or issuance of permits, whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. 4. Approvals have not been secured from all utilities and other interested agencies involved. Approval of the final parcel map will be subject to any requirements that may be received from them. T. General Requirements and Approvals 1. A non-refundable deposit shall be paid to the City, covering the estimated operating costs for all new streetlights for the first six months of operation, prior to final map approval or prior to building permit issuance if no map is involved. APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: U. Security Lighting 1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power. These areas should be lighted from sunset to sunrise and on photo sensored cell. SC-08-02 8 Project No.DRC2002-00653 Completion Date 2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings, with direct lighting to be provided by all entryways. Lighting shall be consistent around the entire development. 3. Lighting in exterior areas shall be in vandal-resistant fixtures. �—J— V. Security Hardware 1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within 40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used. 2. All garage or rolling doors shall have slide bolts or some type of secondary locking devices. W. Security Fencing 1. All businesses or residential communities with security fencing and gates will provide the police with a keypad access and a unique code. The initial 'code is to be submitted to the Police Crime Prevention Unit along with plans. If this code is changed due to a change in personnel or for any other reason, the new code must be supplied to the Police via the 24- hour dispatch center at (909) 941-1488 or by contacting the Crime Prevention Unit at (909) 477-2800 extension 2474 or extension 2475. X. Building Numbering 1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime visibility. SC-08-02 9