Loading...
HomeMy WebLinkAbout03-39 - Resolutions RESOLUTION NO. 03-39 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT REVIEW DRC2002-00606, FOR CONSTRUCTION OF A 472,720 SQUARE FOOT INDUSTRIAL WAREHOUSE BUILDING ON 19.67 ACRES OF LAND IN THE GENERAL INDUSTRIAL DISTRICT(SUBAREA 5), LOCATED WEST OF HERMOSA AVENUE AND NORTH OF 6TH STREET, AND MAKING FINDINGS IN SUPPORT THEREOF —APN: 0209-211-13, 16, AND 17. A. Recitals. 1. Panattoni Development Co., LLC filed an application for the approval of Development Review DRC2002-00606, for the development of an industrial warehouse building totaling 472,729 square feet on 19.67 acres of land within the General Industrial District. 2. On the 12th day of March 2003, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing on March 12, 2003, including written and oral staff reports, this Commission hereby specifically finds as follows: a. The application applies to property located at the located west of Hermosa Avenue and north of 6th Street ; and b. The property to the north of the subject site is developed with the Biane Winery and various industrial users; to the east across Hermosa Avenue is an industrial warehouse facilitythat is under construction; to the south is the General Motors industrial facility; and to the west is vacant land; and C. The application contemplates the construction of 1 industrial warehouse building totaling 472,729 square feet; and d. The proposed project, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. 3. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing and upon the specific findings of facts set forth in paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: PLANNING COMMISSION RESOLUTION NO. 03-39 DRC2002-00606— PANATTONI DEVELOPMENT CO., LLC March 12, 2003 Page 2 a. The proposed project is consistent with the General Plan; and b. The design or improvements of the proposed project is consistent with the Development Code, and the purposes of the district in which the site is located; and C. The site is physically suitable for the type of development proposed; and d. The design of the project is not likely to cause substantial environmental damage and avoidable injury to humans and wildlife or their habitat; and e. The proposed project is not likely to cause serious public health problems. 4. Based upon the facts and information contained in the proposed Mitigated Negative Declaration, together with all written and oral reports included for the environmental assessment for the application, the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and Monitoring Program attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. That the Mitigated Negative Declaration has been prepared in compliance with the California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared therefore reflect the independent judgment of the Planning Commission; and, further, this Commission has reviewed and considered the information contained in said Mitigated Negative Declaration with regard to the application. b. Although the Mitigated Negative Declaration identifies certain significant environmental effects that will result if the project is approved, all significant effects have been reduced to an acceptable level by imposition of mitigation measures on the project,which are listed below as Conditions of Approval. C. Pursuant to the provisions of Section 753.5(c) of Title 14 of the California Code of Regulations, the Planning Commission finds as follows: In considering the record as a whole, the Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the proposed project will have potential for an adverse impact upon wildlife resources orthe habitat upon which wildlife depends. Further, based upon the substantial evidence contained in the Mitigated Negative Declaration, the staff reports and exhibits, and the information provided to the Planning Commission during the public hearing, the Planning Commission hereby rebuts the presumption of adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code of Regulations. 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference: Planning Division 1) Berms shall be provided along Hermosa Avenue, which undulate and have an average height of 3 feet(maximum slope not to exceed 3.5:1). PLANNING COMMISSION RESOLUTION NO. 03-39 DRC2002-00606 — PANATTONI DEVELOPMENT CO., LLC March 12, 2003 Page 3 2) No wall shall exceed an exposed height of 8 feet as viewed from adjacent properties and street. 3) No chain link fencing is permitted. The chain link fence shown on plans along the west property line will be replaced with the same type of wrought iron pilaster fence that is depicted along the south property line. 4) Provide tables, chairs, and shade for outdoor employee eating areas. 5) Truck parking spaces shall be a minimum of 14 feet wide by 50 feet deep. Engineering Division 1) Hermosa Avenue frontage has recently been widened and improved by a City Project in accordance with City Secondary Arterial standards. Protect all existing facilities including but not limited to curb, gutter, street pavement, storm drain lines, street lighting and conduits. Protect or replace existing R26(s) "NO STOPPING' signs along Hermosa Avenue frontage. Protect and/or provide additional traffic striping and signage as required. 2) Construct the following street improvements in accordance with City requirements along Hermosa Avenue frontage including but not limited to: property line adjacent sidewalk, drive approaches, curbside drain outlets. 3) Southern driveway to align with the proposed driveway on the east side of Hermosa Avenue. 4) Written approval shall be obtained from the MWD, CCWD, and the railroad for placing facilities within their easements. Proof of these approvals shall be provided to the City prior to obtaining building permits. 5) Sumps in the private storm drain system, including the ditch along the northerly retaining wall, shall be designed for Q100. Provide study with calculations. In parking areas the pond depth can be no greater than 12 inches for automobile parking areas and 18 inches in truck only . parking areas. 6) On-site storm drains shall be privately maintained to their connection points on the mainline (existing junction structures located in the street). An encroachment permit is required to connect private storm drains to existing junction structures along public storm drain in Hermosa Avenue. Provide manholes where not existing on private/public junction structure connections. PLANNING COMMISSION RESOLUTION NO. 03-39 DRC2002-00606 — PANATTONI DEVELOPMENT CO., LLC March 12, 2003 Page 4 7) Offsite drainage easements and/or other easements shall be obtained prior to issuance of building permits. Provide an easement to the adjacent properties to the north for cross lot drainage rights. Provide facilities to convey drainage to a public drainage facility or public street. 8) Hermosa Avenue parkways shall slope at 2 percent from the top of the curb to 1-foot behind the sidewalk along the entire frontage. 9) Sidewalks shall cross the drive approaches at the zero curb face. Provide sidewalk easement as needed. 10) Revise existing Public Improvement drawing number 1735, all appropriate sheets, to reflect construction in the parkway to the satisfaction of the City Engineer. Environmental Mitigation Water 1) Prior to issuance of grading permits, the applicant shall prepare a Storm Water Pollution Prevention Plan that identifies Best Management Practices (BMPs)to be implemented during the period the site is under construction. BMPs shall be identified on the grading plans for review and approval by the City Engineer. Air Quality 1) The construction contractor shall ensure that construction grading plans include a statement that work crews will shut off equipment when not in use. 2) The construction contractor shall use low Volatile Organic Compound (VOC) architectural coating during the construction phase of the project. 3) The site shall be treated with water or other soil-stabilizing agent (approved by South Coast Air Quality Management District and Regional Water Quality Control Board) daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403. 4) Hermosa Avenue shall be swept according to a schedule established by the City to reduce PM10 emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon the time of year of construction. 5) Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PM10 emissions from the site during such episodes. 6) The construction contractor shall reduce speeds on all unpaved surfaces to 15 mph to minimize PM10 emissions. PLANNING COMMISSION RESOLUTION NO. 03-39 DRC2002-00606— PANATTONI DEVELOPMENT CO., LLC March 12, 2003 Page 5 7) Chemical soil-stabilizers (approved by South Coast Air Quality Management District and Regional Water Quality Control Board) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. 8) The construction contractor shall select the construction equipment used on-site based on low-emission factors and high-energy efficiency. The construction contractor shall ensure the construction grading plans include a statement that all construction equipment will be tuned and maintained in accordance with the manufacturer's specifications. 9) The construction contractor shall utilize electric or clean alternative fuel-powered equipment where feasible. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 12TH DAY OF MARCH 2003. PLANNING COMMISSION OF TH CITY OF RANCHO CUCAMONGA BY: 12., Rich Macias, Vice Chairman ATTEST: �rad retary I, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 12th day of March 2003, by the following vote-to-wit: AYES: COMMISSIONERS: MACIAS, STEWART, TOLSTOY NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: MCNIEL City of Rancho Cucamonga MITIGATION MONITORING PROGRAM Project File No.: DRC2002-00606 This Mitigation Monitoring Program(MMP)has been prepared for use in implementing the mitigation measures identified in the Mitigated Negative Declaration for the above-listed project. This program has been prepared in compliance with State law to ensure that adopted mitigation measures are implemented (Section 21081.6 of the Public Resources Code). Program Components -This MMP contains the following elements: 1. Conditions of approval that act as impact mitigation measures are recorded with the action and the procedure necessary to ensure compliance.The mitigation measure conditions of approval are contained in the adopted Resolution of Approval for the project. 2. A procedure of compliance and verification has been outlined for each action necessary. This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported. 3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring progresses, changes to compliance procedures may be necessary based upon recommendations by those responsible for the program. Program Management -The MMP will be in place through all phases of the project. The project planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly and proper action is taken on each mitigation. Each City department shall ensure compliance of the conditions (mitigation) that relate to that department. Procedures -The following steps will be followed by the City of Rancho Cucamonga. 1. A fee covering all costs and expenses, including any consultants' fees, incurred by the City in performing monitoring or reporting programs shall be charged to the applicant. 2. A MMP Reporting Form will be prepared for each potentially significant impact and its corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached hereto. This procedure designates who will take action,what action will be taken and when, and to whom and when compliance will be reported. All monitoring and reporting documentation will be kept in the project file with the department having the original authority for processing the project. Reports will be available from the City upon request at the following address: City of Rancho Cucamonga - Lead Agency Planning Division 10500 Civic Center Drive Rancho Cucamonga, CA 91730 Mitigation Monitoring Program Page 2 3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,as determined by the project planner or responsible City department, to monitor specific mitigation activities and provide appropriate written approvals to the project planner. 4. The project planner or responsible City department will approve, by signature and date, the completion of each action item that was identified on the MMP Reporting Form. After each measure is verified for compliance, no further action is required for the specific phase of development. 5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off as completed by the project planner or responsible City department at the bottom of the MMP Reporting Form. 6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation measures. The project planner is responsible for approving any such refinements or additions. An MMP Reporting Form will be completed by the project planner or responsible City department and a copy provided to the appropriate design, construction, or operational personnel. 7. The project planner or responsible City department has the authority to stop the work of construction contractors if compliance with any aspects of the MMP is not occurring after written notification has been issued. The project planner or responsible City department also has the authority to hold certificates of occupancies if compliance with a mitigation measure attached hereto is not occurring.The project planner or responsible City department has the authority to hold issuance of a business license until all mitigation measures are implemented. 8. Any conditions (mitigation) that require monitoring after project completion shall be the responsibility of the City of Rancho Cucamonga Community Development Department. The Department shall require the applicant to post any necessary funds(or other forms of guarantee) with the City. These funds shall be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measure for the required period of time. 9. In those instances requiring long-term project monitoring, the applicant shall provide the City with a plan for monitoring the mitigation activities at the project site and reporting the monitoring results to the City. Said plan shall identify the reporter as an individual qualified to know whether the particular mitigation measure has been implemented. The monitoring/reporting plan shall conform to the City's MMP and shall be approved by the Community Development Director prior to the issuance of building permits. I:\FINAL\CEQA\MMP Form-revmpd MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III) Project File No.: DRC 2002-00606 Applicant: Panattoni Develooment Company. LLC Initial Study Prepared by: Doug Fenn Date: February 13 2003 Mitigation Measures No. Responsible Monitoring Timing of Method of Verif led Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/Initials Non-Compliance Water Quality Prior to issuance of grading permits,the applicant shall prepare a CP B/C Review of plans A/C 2 SW PPP that identifies BMPs to be implemented during the period the site is under construction.BMPs shall be identified on the grading plans for review and approval by the City Engineer. Air Quality The construction contractor shall ensure that construction-grading CP/CE B Review of plans C 2 plans include a statement that work crews will shut off equipment when not in use. Contractor shall use low volatile organic compounds(VOC) CP C Review of plans A/C 2 architectural coating during the construction phase of the project. The site shall be treated with water or other soil stabilizing agent CP C Review of plans A/C 2 (approved by South Coast Air Quality Management District and Regional Water Quality Control Board)daily to reduce Particulate Matter(PM)10 emission,in accordance with South Coast Air Quality Management District Rule 403. Hermosa Avenue shall be swept according to a schedule CP C Review of plans A/C 2 established by the City to reduce PM,o emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon time of year of construction. Grading operations shall be suspended when wind speeds exceed CP C Review of plans A/C 2 25 mph to minimize PM,u emissions from the site during such episodes. The construction contractor shall reduce speeds on all unpaved CP C Review of plans A/C 2 surfaces to 15 mph to minimize PM,emissions. Chemical soil stabilizers(approved by South Coast Air Quality CP C Review of plans A/C 2 Management District and Regional Water Quality Control Board) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM,o emissions. Contractor shall select the construction equipment based on low CP B/C Review of plans A/C 2 emission factors and high-energy efficiency. The construction contractor shall ensure the Construction Grading Plans used on site include a statement to ensure all construction equipment will be tuned and maintained in accordance with the manufacturers' specifications. Mitigation Measures No. Responsible ActionImplementing Date/initials Non-Compliance Air Quality(continued) Contractor shall utilize electric or clean alternative fuel powered CP C Review of plans A/C 2 equipment where feasible. Key to Checklist Abbreviations Responsible.Person .. Monitoring frequencyMethod of Verification sanctions CDD-Community DevelopmentDirectoror designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds FC-Fire Chief or designee 6-Revoke CUP COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT#: Development Review DRC2002-00606 SUBJECT: Industrial Complex APPLICANT: Panattoni Development LOCATION: West of Hermosa Avenue and north of 6th Street ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DIVISION, (909) 477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: Completion Date A. General Requirements 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents, officers, or employees, because of the issuance of such approval, or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Copies of the signed Planning Commission Resolution of Approval No. 03-39, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. B. Time Limits 1. Conditional Use Permit, Variance, or Development/Design Review approval shall expire if building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans, architectural elevations, exterior materials and colors, landscaping, sign program, and grading on file in the Planning Division, the conditions contained herein, and the Development Code regulations. 6 2. Prior to any use of the project site or business activity being commenced thereon, all Conditions of Approval shall be completed to the satisfaction of the City Planner. SC-01-03 1 Project No.DRC2002-00606 Completion Date 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Division to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for City Planner review and approval prior to the issuance of building permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 7. A detailed on-site lighting plan, including a photometric diagram, shall be reviewed and approved by the City Planner and Police Department (477-2800) prior to the issuance of building permits. Such plan shall indicate style, illumination, location, height, and method of shielding so as not to adversely affect adjacent properties. 8. Trash receptacle(s) are required and shall meet City standards. The final design, locations, and the number of trash receptacles shall be subject to City Planner review and approval prior to the issuance of building permits. 9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping to the satisfaction of the City Planner. For single-family residential developments, transformers shall be placed in underground vaults. 10. Street names shall be submitted for City Planner review and approval in accordance with the adopted Street Naming Policy prior to approval of the final map. 11. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination. 12. All parkways, open areas, and landscaping shall be permanently maintained by the property owner, homeowners' association, or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for City Planner and City Engineer review and approved prior to the issuance of building permits. D. Building Design 1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections, shall be shielded from view and the sound buffered from adjacent properties and streets as required by the Planning Division. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the City Planner. Details shall be included in building plans. 2. For commercial and industrial projects, paint roll-up doors and service doors to match main building colors. E. Parking and Vehiculao Access (indicate details on building plans) 1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet wide. SC-01-03 2 Project No.DRC2002-00606 Completion Date 2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall contain a 12-inch walk adjacent to the parking stall (including curb). 3. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided throughout the development to connect dwellings/units/buildings with open spaces/plazas/recreational uses. 4. All parking spaces shall be double striped per City standards and all driveway aisles, entrances, and exits shall be striped per City standards. 5. Plans for any security gates shall be submitted for the City Planner, City Engineer, and Rancho Cucamonga Fire Protection District review and approval prior to issuance of building permits. For residential development, private gated entrances shall provide adequate turn- around space in front of the gate and a separate visitor lane with call box to avoid cars stacking into the public right-of-way. 6. Handicap accessible stalls shall be provided for commercial and office facilities with 25 or more parking stalls. Designate two percent or one stall; whichever is greater, of the total number of stalls for use by the handicapped. 7. Motorcycle parking area shall be provided for commercial and office facilities with 25 or more parking stalls. Developments with over 100 parking stalls shall provide motorcycle parking at the rate of one percent. The area for motorcycle parking shall be a minimum of 56 square feet. F. Trip Reduction 1. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily residential projects of more than 10 units. Minimum spaces equal to five percent of the required automobile parking spaces or three bicycle storage spaces, whichever is greater. After the first 50 bicycle storage spaces are provided, additional storage spaces required are 2.5 percent of the required automobile parking spaces. Warehouse distribution uses shall provide bicycle storage spaces at a rate of 2.5 percent of the required automobile parking spaces with a minimum of a 3-bike rack. In no case shall the total number of bicycle parking spaces required exceed 100. Where this results in a fraction of 0.5 or greater, the number shall be rounded off to the higher whole number. 2. Carpool and vanpool designated off-street parking close to the building shall be provided for commercial, office, and industrial facilities at the rate of 10 percent of the total parking area. If covered, the vertical clearance shall be no less than 9 feet. 3. For industrial projects with at least 40 car parking spaces, bicyclist-changing facilities shall be provided to encourage bicycle commuting. Accessible restrooms with storage lockers for clothing and equipment shall be sufficient. 4. Shower facilities accessible to both men and women shall be provided for persons walking or bicycling to work for each project which meets the following thresholds: Commercial: 250,000 square feet Industrial: 325,000 square feet Office: 125,000 square feet Hotels and Motels: 250 rooms G. Landscaping 1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for City Planner review and approval prior to the issuance of building permits or prior final map approval in the case of a custom lot subdivision. SC-01-03 3 Project No.DRC2002-00606 Completion Date 2. Existing trees required to be preserved in place shall be protected with a construction barrier in accordance with the Municipal Code Section 19.08.110, and so noted on the grading plans. The location of those trees to be preserved in place and new locations for transplanted trees shall be shown on the detailed landscape plans. The applicant shall follow all of the arborist's recommendations regarding preservation, transplanting, and trimming methods. 3. A minimum of 20 trees per gross acre, comprised of the following sizes, shall be provided within the project 30 %-24- inch box or larger. 4. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within commercial and office projects, shall be specimen size trees -24-inch box or larger. 5. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking stalls. 6. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one tree per 30 linear feet of building. 7. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope, but less than 2:1 slope, shall be, at minimum, irrigated and landscaped with appropriate ground cover for erosion control. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 8. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater slope shall be landscaped and irrigated for erosion control and to soften their appearance as follows: one 15-gallon or larger size tree per each 150 sq. ft. of slope area, 1-gallon or larger size shrub per each 100 sq. ft. of slope area, and appropriate ground cover. In addition, slope banks in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in staggered clusters to soften and vary slope plane. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 9. For multi-family residential and non-residential development, property owners are responsible for the continual maintenance of all landscaped areas on-site, as well as contiguous planted areas within the public right-of-way. All landscaped areas shall be kept free from weeds and debris and maintained in healthy and thriving condition, and shall receive regular pruning, fertilizing, mowing, and trimming. Any damaged, dead, diseased, or decaying plant material shall be replaced within 30 days from the date of damage. 10. The final design of the perimeter parkways, walls, landscaping, and sidewalks shall be included in the required landscape plans and shall be subject to City Planner review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Division. 11. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 12. All walls shall be provided with decorative treatment. If located in public maintenance areas, the design shall be coordinated with the Engineering Division. 13. Landscaping and irrigation shall be designed to conserve water through the principles of Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code. H. Signs 1. The signs indicated on the submitted plans are conceptual only and not a part of this approval. Any signs proposed for this development shall comply with the Sign Ordinance and shall require separate application and approval by the Planning Division prior to installation of any signs. SC-01-03 4 Project No.DRC2002-00606 Completion Date I. Environmental 1. Mitigation measures are required for the project. The applicant is responsible for the cost of implementing said measures, including monitoring and reporting. Applicant shall be required to post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the amount of $719 prior to the issuance of building permits, guaranteeing satisfactory performance and completion of all mitigation measures. These funds may be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete all actions required by the approved environmental documents shall be considered grounds for forfeit. J. Other Agencies 1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location of mailboxes. Multi-family residential developments shall provide a solid overhead structure for mailboxes with adequate lighting. The final location of the mailboxes and the design of the overhead structure shall be subject to City Planner review and approval prior to the issuance of building permits. APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: K. Street Improvements 1. Construct the following perimeter street improvements including, but not limited to: Curb& AC. Side- Drive Street Street Comm Median Bike Street Name Gutter Pvml walk Appr. Lights Trees Trail Island Trail Other Hermosa Avenue X X X 2. Improvement Plans and Construction: a. Street improvement plans, including street trees, street lights, and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements, prior to final map approval or the issuance of building permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the City Engineer's Office in addition to any other permits required. C. Pavement striping, marking, traffic signing, street name signing, traffic signal conduit, and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or _/_/_ reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer Notes: 1) Pull boxes shall be No. 6 at intersections and No. 5 along streets, a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2) Conduit shall be 3-inch (at intersections) or 2-inch (along streets) galvanized steel with pull rope or as specified. SC-01-03 5 Project No.DRC2002-00606 Completion Date e. Handicapped access ramps shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving, which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single-family residential lots. h. Street names shall be approved by the City Planner prior to submittal for first plan check. 3. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. 4. Install street trees per City street tree design guidelines and standards as follows. The completed legend and construction notes shall appear on the title page of the street improvement plans. Where public landscape plans are required, tree installation in those areas shall be per the public landscape improvement plans. The City Engineer reserves the right to adjust tree species based upon field conditions and other variables. For additional information, contact engineering staff at extension 4023. Min. Grow Street Name Botanical Name Common Name Space Spacing Size' city. Hermosa Avenue Lagerstroemia Crape myrtle 3' 20' 24" 26 indica O.C. Box 'TREES SHALL BE 15-GALLON SIZE UNLESS OTHERWISE APPROVED. Construction Notes for Street Trees: 1) All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting, an agronomic soils report shall be furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector. 3) All street trees are subject to inspection and acceptance by the Engineering Division. 4) Street trees are to be planted per public improvement plans only. 5. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with adopted policy. On collector or larger streets, lines of sight shall be plotted for all project intersections, including driveways. Local residential street intersections and commercial or industrial driveways may have lines of sight plotted as required. L. Public Maintenance Areas 1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the City Engineer prior to final map approval or issuance of building permits whichever occurs first. Formation costs shall be borne by the developer. M. Drainage and Flood Control 1. A final drainage study shall be submitted to and approved by the City Engineer prior to final map approval or the issuance of building permits, whichever occurs first. All drainage facilities shall be installed as required by the City Engineer. 2. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the property from adjacent areas. SC-01-03 6 Project No.DRC2002-00606 Completion Date N. Utilities 1. Provide separate utility services to each parcel including sanitary sewerage system, water, gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 2. The developer shall be responsible for the relocation of existing utilities as necessary. 3. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga County Water District (CCWD), Rancho Cucamonga Fire Protection District, and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CCWD is required prior to final map approval or issuance of permits, whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. 4. Approvals have not been secured from all utilities and other interested agencies involved. Approval of the final parcel map will be subject to any requirements that may be received from them. O. General Requirements and Approvals 1. The separate parcels contained within the project boundaries shall be legally combined into one parcel prior to issuance of building permits. APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: P. Security Lighting 1. All parking, common, and storage areas shall have minimum maintained 1-foot candlepower. These areas should be lighted from sunset to sunrise and on photo sensored cell. 2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings, with direct lighting to be provided by all entryways. Lighting shall be consistent around the entire development. 3. Lighting in exterior areas shall be in vandal-resistant fixtures. Q. Security Hardware 1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within 40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used. 2. All garage or rolling doors shall have slide bolts or some type of secondary locking devices. 3. All roof openings giving access to the building shall be secured with either iron bars, metal gates, or alarmed. R. Security Fencing 1. All businesses or residential communities with security fencing and gates will provide the police with a keypad access and a unique code. The initial code is to be submitted to the Police Crime Prevention Unit along with plans. If this code is changed due to a change in personnel or for any other reason, the new code must be supplied to the Police via the 24-hour dispatch center at (909) 941-1488 or by contacting the Crime Prevention Unit at (909)477-2800 extension 2474 or extension 2475. SC-01-03 7 Project No.DRC2002-00606 Completion Date S. Building Numbering 1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime visibility. 2. Developer shall paint roof top numbers on one or more roofs of this development. They shall be a minimum of three feet in length and two feet in width and of contrasting color to background. The stencils for this purpose are on loan at the Rancho Cucamonga Police Department. T. Alarm Systems 1. Install a burglar alarm system and a panic alarm if needed. Instructing management and employees on the operation of the alarm system will reduce the amount of false alarms and in turn save dollars and lives. 2. Alarm companies shall be provided with the 24-hour Sheriffs dispatch number: (909)941-1488. APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, FIRE PROTECTION PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED SC-01-03 8 W.0 FIRE PROTECTION DISTRICT F . FIRE SAFETY DIVISION TECHNICAL REVIEW COMMENTS FD PLAN REVIEW#: FD-02-0772 PROJECT#: DRC2002-00606 PROJECT NAME: Panattoni DATE: February 4 2003 PLAN TYPE: 472,000 Square foot warehouse -TRC APPLICANT NAME: Panattoni OCCUPANCY CLASS: Group S F FLOOR AREA(S): 472,000 TYPE CONSTRUCTION: Type V FIRE PROTECTION SYSTEM REQUIRED: Sprinklers LOCATION: West side of Hermosa and North of 6th. APN: 209-211-13,16,17 FD REVIEW BY: Tim Fejeran Fire Inspector PLANNER: DouJq Fenn ALL OF THE FOLLOWING PRELIMINARY REVIEW COMMENTS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, (909) 477-2770, TO VERIFY COMPLIANCE WITH THE FOLLOWING: RANCHO CUCAMONGA FIRE DISTRICT- STANDARD CONDITIONS & REQUIREMENTS — General, Procedural, Technical, or Operational Information that shall be Included, Corrected, or Completed as noted below. The following is applicable to the above project. FSC-1 General Requirements for Public and Private Water Supply 1. General Guidance for Fire Hydrants: The following provides general guidance for the spacing and location of fire hydrants. Remember these are the maximum permitted distances between fire hydrants: a. The maximum distance between fire hydrants in commercial/industrial projects is 300-feet. No portion of the exterior wall shall be located more than 150-feet from an approved fire hydrant. For cul-de-sacs the distance shall not exceed 100-feet. b. Fire hydrants are to be located: 1. At the entrance(s)to a project from the existing public roadways. This includes subdivisions and industrial parks. 2. At intersections. 3. On the right side of the street, whenever practical and possible. 4. As required by the Fire Safety Division to meet operational needs. 5. The location of fire hydrants is based upon the operational needs of the Fire District to control a fire. 6. Fire hydrants shall be located a minimum of forty(40) feet from any building. Contact the Fire Safety Division 909 477-2770 2. Minimum Fire Flow with Automatic Fire Sprinklers: The required minimum fire flow for this project is 4000 gallons per minute at a minimum residual pressure of 20 pounds per square inch. This flow reflects a 50 percent reduction for the installation of an approved automatic fire sprinkler system with central station monitoring. This requirement is made in accordance with Fire Code Appendix III-A, as amended, and Fire District Ordinances and Standards. 3. Hydrants Used to Supply Fire Flow: Public fire hydrants located within a 500-foot radius of the proposed project may be used to provide the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent property shall not be used to provide required fire flow. Contact the Fire Safety Division (909)477-2770 4. Show Existing Fire Hydrants and Mains: Existing fire hydrants and mains within 600-feet of the project shall be shown on the water plan submitted for review and approval. Include main size. FSC-2 Private(On-Site)Water and/or Fire Sprinkler Underground Plans for Fire Protection 1. Exceeds Allowable Distance: When any portion of a facility or building is located more than 150-feet from a fire hydrant located on a public street, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains capable of supplying the required fire flow shall be provided. The distance is measured as vehicular path of travel on access roadways, not line of sight. Contact the Fire Safety Division (909) 477-2770 2. Number of Fire Hydrants: Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof, subject to standard spacing and distribution requirements. Contact the Fire Safety Division (909) 477-2770 3. Fire Sprinkler Underground: Prior to the issuance of a fire sprinkler system permit, the applicant shall submit construction plans, specifications, and calculations for the fire sprinkler system underground to the Fire Safety Division for approval. Contact the Fire Safety Division (909)477-2770 FSC-3 Automatic Fire Sprinkler Systems-Technical Comments 1. Required Installations: Rancho Cucamonga Fire District Ordinance 15 or other adopted code or standard, requires an approved automatic fire sprinkler system to be installed in any of the following: a. Commercial or industrial structures greater than 7,500 square feet Contact the Fire Safety Division (909) 477-2770 FSC-4 Fire District Site Access-Technical Comments 1. Access Roadways Defined: Fire District access roadways include public roads, streets, and highways, as well as private roads, streets, drive aisles and designated fire lanes. 2. Location of Access: All portions of the structure or facility or any portion of the exterior wall of the first story shall be located within 150-feet of Fire District vehicle access, measured by an unobstructed approved route around the exterior of the building. Landscaped areas, unpaved changes in elevation, gates, and fences are an obstruction. 3. Private Roadways and Fire Lanes: The minimum specifications for private fire district access roadways are: a. The minimum unobstructed width is 26-feet. b. The inside turn radius shall be 20-feet. c. The outside turn radius shall be not less than 50-feet. d. The minimum radius for cul-de-sacs is 45-feet. e. The minimum vertical clearance is 14 feet, 6 inches. I. At any private entry median, the minimum width of traffic lanes shall be 20-feet. g. The angle of departure and approach shall not exceed 9 degrees or 20 percent. h. The maximum grade of the driving surface shall not exceed 12%. I. Support a minimum load of 70,000 pounds gross vehicle weight (GVW). 4. Access Doorways: In addition to any exterior opening required by the Building or Fire Code, approved doorways,accessible without the use of a ladder, shall be provided as follows: a. In buildings without high-piled storage, one or more approved access doors shall be provided in 150 lineal feet or major fraction thereof along the exterior wall that faces required access roadways or walkways. b. In buildings with high-piled storage one or more approved access doors shall be provided in each 100 lineal feet or major fraction thereof, of the exterior wall that faces required access roadways.When a railroad siding is installed provisions shall be made to maintain Fire District access to all required openings. Contact the Fire Safety Division at 909 477-2770. 5. Access Walkways: Approved access walkways shall be provided from the fire apparatus access road to all required building exterior openings. 6. Gates Standards: All gates shall be installed in accordance with Fire District Standards. The following general design requirements apply: a. The gate shall be motorized and slide open horizontally or swing inward. b. All gates must fully open with one second for each one foot of required width, e.g., 20-ft./20 sec. c. When fully open the minimum width shall be 20-feet. d. Gates on access roads designated "Emergency Services Use Only" may be manually opening. e. Gates on Commercial/Industrial facilities may be manually operated. f. After project approval the applicant shall contact the Fire Safety Division for complete standard. Contact the Fire Safety Division 909 477-2770 7. Fire Lane Identification: All required fire lanes shall be identified by red curbing and signage. A drawing of the proposed signage that meets the minimum Fire District standards shall be submitted to and approved. Contact the Rancho Cucamonga Fire Protection District at (909)477-2770 for a copy of the FD Fire Lanes standard. FSC-10 Hazard Control Permits-Technical Comments The below indicated permit requirements are based on those permits commonly associated with the projects operations or building construction. As noted below Special Permits may be required, dependent upon approved use(s) the applicant must contact the Fire Safety Division for specific information: Note: Carefully review the items below.There may be significant impact on the proposed project. Italicized text indicates a Rancho Cucamonga Fire District amendment. 1. General Use Permit shall be required for any activity or operation not specifically described below, which in the judgment of the Fire Chief is likely to produce conditions that may be hazardous to life or property. 2. High piled combustible storage. 3. Liquefied petroleum gas (storage, handling, use or transport, exceeding 100 gallons aggregate capacity). On a scaled site plan show the occupancy or use of all buildings within a Yz mile radius. Storage exceeding 100 gallons aggregate capacity is not permitted within Y4 mile of residential areas. 4. Hot work operations (welding and cutting operations in any occupancy). 5. Battery system —To install or operate lead-acid batteries over 100-gallon capacity. FSC-11 Hazardous Materials—Compliance with Disclosure and Reporting Regulations The San Bernardino County Fire Department shall review your Business Emergency/Contingency Plan for compliance with minimum standards. Contact the San Bernardino County Fire, Hazardous Materials Division at (909) 387-8412 for forms and assistance. The County Fire Department is the Cal/EPA Certified Unified Program Agency (CUPA) for the City of Rancho Cucamonga. 1. Certificate of Occupancy Restrictions: If the facility is a NEW business, a Certificate of Occupancy issued by Building and Safety will not be finalized until the San Bernardino County Fire Department reviews your Business Emergency/Contingency Plan. California Government Code, Section 65850.2 prohibits the City from issuing a final Certificate of Occupancy unless the applicant has met or is meeting specific hazardous material disclosure requirements. A Risk Management Program (RMP) may also be required if regulated substances are to be used or stored at the new facility. Contact County Fire, Hazardous Materials Division at (909) 386-8412 for forms and assistance. 2. Rental or Lease Properties: Any business that operates on rented or leased property, and is required to submit a Plan, is required to submit a notice to the owner of the property in writing stating that the business is subject to the Business Emergency/Contingency Plan mandates, and has complied with the provision, and must provide a copy of the Plan to the property owner within 5 working days after receiving a request from the owner. 3. Fire District Code Adoption: The Fire Code adopted by the Fire District has a provision requiring collection of information regarding hazardous materials at facilities for purposes of Fire Code implementation and emergency response. FSC-12 Plan Submittal Required Notice Required plans shall be submitted and approved prior to construction in accordance with 1997/98 Building, Fire, Mechanical, and Plumbing Codes; 1999 Electrical Code; Health and Safety Code; Public Resources Code; and RCFPD Ordinances FD15 and FD32, Guidelines and Standards. NOTE: In addition to the fees due at this time please note that separate plan check fees for tenant improvements,fire protection systems and/or any consultant reviews will be assessed at time of submittal of plans. FSC-14 Alternate Materials and Methods The Fire Safety Division will review requests for alternate materials and methods within the scope of our authority. The request must be submitted on the Fire District"Application for Alternate Method"form along with supporting documents. Contact the Fire Safety Division at (909) 477-2770 for assistance. PRIOR TO ISSUANCE OF BUILDING PERMITS- Complete the following: 1. Private/On-site Fire Hydrants: Prior to the issuance of any building permit, the applicant shall submit construction plans, specifications, flow test data and calculations for the private water mains stem for review and approval by the Fire District. Plans and installation shall comply with Fire District standards. Contac the Fire Safety Division for a copy of"Fire District Notes for Underground and Water Plans."Contact the Fire Safety Division (909) 477-2770 2. Private Fire Hydrants/On-site Installation: All private on-site fire hydrants shall be installed, flushed, and operable prior to delivering any combustible building materials on-site (i.e., lumber, roofing materials, etc.). A representative of Fire Construction Services shall inspect the installation and witness hydrant flushing. The builder/developer shall submit final test and inspection report to the Fire Safety Division. Contact Building and Safety/Fire Construction Services (909) 477-2713. 3. Public Fire Hydrants: Prior to issuance of any building permit,the applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and the Water District. On the plan show all existing fire hydrants within a 800-foot radius of the project. Contact the Fire Safety Division (909)477-2770 4. Public Installation: All required public fire hydrants shall be installed,flushed, and operable prior to delivering any combustible building materials on-site (i.e., lumber, roofing materials, etc.). Water District personnel shall inspect the installation and witness hydrant flushing. The builder/developer shall submit a copy of the Water District inspection report to the Fire Safety Division. Contact Water District to schedule testing. 5. Building Use Letter-Required Letter: Prior to the issuance of any building its,the applicant shall submit a detailed letter of intended use for each building on-site to the Fire District for review and approval. A form that may be used to meet this requirement is attached at the end of the Fire District comments. Provide a separate letter for each building or structure with storage use areas. Contact the Fire Safety Division (909)477-2770 6. Combustible Construction Letter-Required Letter: Prior to the issuance of a building permit for combustible construction,the builder shall submit a letter to the Fire District on company letterhead stating that the minimum water supply for fire fighting purposes and the all-weather fire protection access roadway that meets Fire District Standards shall be in place and operational before any combustible material is placed on-site. The roadway shall be maintained at all times. PRIOR TO OCCUPANCY OR FINAL INSPECTION- Complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with Rancho Cucamonga Fire Protection District and City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers." On private property these markers are to be maintained in good condition by the property owner. Contact Building and Safety/Fire Construction Services (909)477-2713. 2. Private Fire Hydrants- Final Acceptance: For the purpose of final acceptance, an additional test of the on-site fire hydrants shall be conducted by the builder/developer in the presence of the Water District or Fire Construction Services, as appropriate. The builder/developer shall submit the final test report to the Fire Safety Division. 3. Fire Sprinkler System- Plans and Permit: Plans for the required automatic fire sprinkler system shall be submitted to Fire Construction Services for review and approval. No work is allowed without a Fire Construction Services permit. Contact Building and Safety/Fire Construction Services (909) 477-2713. 4. Fire Sprinkler System- Final Inspection: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler system(s) shall be tested and accepted by Fire Construction Services. Contact Building and Safety/Fire Construction Services (909) 477-2713. 5. Sprinkler Monitoring:The fire sprinkler system monitoring system shall be installed, tested, and operational immediately following the completion of the fire sprinkler system. Monitoring is required with 20 sprinklers in Group I Occupancies, or 100 or more sprinklers in all other Occupancies. Contact Building and Safety/Fire Construction Services (909) 477-2713. 6. Knox Rapid Entry System: A Knox rapid entry key vault shall be installed prior to final inspection. Proof of purchase shall be submitted prior to final building plan approval. Contact the Fire Safety Division for specific details and ordering information. Contact Building and Safety/Fire Construction Services (909) 477-2713 for inspection. 7. Construction Access: Fire District access, a minimum 26-feet in width and 14-feet, 6-inches minimum clear height shall be provided. These minimum clearances shall be maintained free and clear of any obstructions at all times, in accordance with Fire District Standards. Contact the Fire Safety Division (909)477-2770 8. Fire Lanes: Prior to the issuance of any Certificate of Occupancy,the fire lanes shall be installed in accordance with the approved fire lane plan. The CC&R's or other approved documents shall contain an approved fire lane map and provisions that prohibit parking in the fire lanes. The method of enforcement shall be documented. The CC&R's shall also identify who is responsible for not less than annual inspection and maintenance of all required fire lanes. Contact Building and Safety/Fire Construction Services (909)477-2713. 9. Address-Other Than Single-family: New buildings other than single-family dwellings shall post the address with minimum 8-inch numbers on contrasting background,visible from the street and electrically illuminated during periods of darkness. When the building setback exceeds 200 feet from the public street an additional non-illuminated 6-inch minimum number address shall be provided at the property entrance. Contact Building and Safety/Fire Construction Services (909) 477-2713. 10. Fire Suppression Systems-Final Inspection and Testing: Prior to the issuance of a Certificate of Occupancy,the fire suppression system(s)shall be tested and accepted by Fire Service Construction Services. Contact Building and Safety/Fire Construction Services (909) 477-2713. 11. High-pile Combustible Storage-Permit:The applicant is required to obtain a Fire District Permit for Storage of High-pile Combustible material. Contact the Fire Safety Division (909)477-2770 12. High-pile Combustible Storage-Plans: The applicant shall submit plans for the storage arrangement to Fire Construction Services.The applicant shall submit detailed plans and a Commodity Analysis report. to Fire Construction Services for approval. If the occupancy classification for the building is designated as Group S, Division 2,commodities stored shall be limited to light hazard classification only. Contact Building and Safety/Fire Construction Services (909)477-2713. 13. Business Emergency/Contingency Plan: The applicant shall submit a Business Emergency/Contingency Plan for emergency.release or threatened release of hazardous materials and wastes or provide a letter of exemption. Contact the County Fire Department, Hazardous Materials/Emergency Response and Enforcement Division at(909) 386-8412. 14. Submittal to the Fire District: Prior to issuance of a Certificate of Occupancy a copy of the County Fire Department approved Business Emergency/Contingency Plan -.New Business (Hazardous Materials Release Response Plans and Inventory) shall be submitted to the Fire District. In some cases additional information that is not in the Business Emergency/Contingency Plan may be required in order to support local fire prevention and emergency response programs. Contact Fire Safety Division (909)477-2770. 15. Required County Permits: The applicant.shall be required to apply for one or more of the following: Hazardous Materials Handler Permit, a Hazardous Waste Generator Permit, an Aboveground Storage Tank Permit, and/or an Underground Storage Tank Permit. Contact the County Fire Department, Hazardous Materials Division/Field Services Section at (909) 384-8407. 16. Risk Management Plan: The applicant must demonstrate that the facility has met or is meeting all Risk Management Plan (RMP) requirements if regulated substances are to be handled at the facility. Contact the County Fire Department, Hazardous Materials/Emergency Response and Enforcement Division at (909) 387-8412. 17. Fire District Confidential Business Occupancy Information: The applicant shall complete the Rancho Cucamonga Fire District "Confidential Business Occupancy Information" Form and submit to the Fire Safety Division. This form provides contact information for Fire District use in the event of an emergency at the subject building or property. Contact Fire Safety Division (909) 477-2770 Fire District Forms and Letters Note: If these conditions are part of the final Standard Conditions issued by the Planning Division referenced Fire District forms and letters are not included. Contact the Fire Safety Division for copies of forms or letters.The forms and letter are also found in previously issued Fire District comments. Fire District Review Letter(P&E)-Template SL 10/31/02 Revision