Loading...
HomeMy WebLinkAbout03-59 - Resolutions RESOLUTION NO. 03-59 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA,APPROVING TENTATIVE PARCEL MAP SUBTPM16071, A SUBDIVISION OF TWO PARCELS FOR OFFICE CONDOMINIUM PURPOSES ON 3.08 ACRES OF LAND IN THE INDUSTRIAL PARK DISTRICT (SUBAREA 6), LOCATED ON THE WEST SIDE OF UTICA AVENUE, APPROXIMATELY 300 FEET SOUTH OF ARROW ROUTE, AND MAKING FINDINGS IN SUPPORT THEREOF - APN: 0209-491-06 AND 07. A. Recitals. 1. G & L Commercial, LLC filed an application for the approval of Tentative Parcel Map SUBTPM16071, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Tentative Parcel Map request is referred to as "the application." 2. On the 9th day of April 2003, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above- referenced public hearing on April 9, 2003, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a. The application applies to property located on the west side of Utica Avenue, approximately 300 feet south of Arrow Route,with a street frontage of approximately 416 feet and lot depth of approximately 290 feet, and is presently rough-graded and vacant; and b. The property to the north of the subject site is presently vacant, the property to the south is developed with an industrial building, the property to the east is developed with an industrial building, and the property to the west is developed with an office building; and c. The application proposes the subdivision of air space for office condominium purposes; and d. The application, in conjunction with Development Review DRC2002-00929, proposes the development of eight office buildings totaling 52,614 square feet; and e. The subdivision, together with the recommended conditions of approval, complies with all minimum development standards for the City of Rancho Cucamonga. PLANNING COMMISSION RESOLUTION NO. 03-59 SUBTPM16071 — G & L COMMERCIAL, LLC April 9, 2003 Page 2 3. Based upon the substantial evidence presented to this Commission during the above- referenced public hearing and upon the specific findings of facts set forth in paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. That the tentative parcel map is consistent with the General Plan, Development Code, and any applicable specific plans; and b. The design or improvements of the tentative parcel map is consistent with the General Plan, Development Code, and any applicable specific plans; and C. The site is physically suitable for the type of development proposed; and d. The design of the subdivision is not likely to cause substantial environmental damage and avoidable injury to humans and wildlife or their habitat; and e. The tentative parcel map is not likely to cause serious public health problems; and f. The design of the tentative parcel map will not conflict with any easement acquired by the public at large, now of record, for access through or use of the property within the proposed subdivision. 4. Based upon the facts and information contained in the proposed Mitigated Negative Declaration, together with all written and oral reports included for the environmental assessment for the application, the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and Monitoring Program attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. That the Mitigated Negative Declaration has been prepared in compliance with the California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared therefore reflect the independent judgment of the Planning Commission; and, further, this Commission has reviewed and considered the information contained in said Mitigated Negative Declaration with regard to the application. b. Although the Mitigated Negative Declaration identifies certain significant environmental effects that will result if the project is approved, all significant effects have been reduced to an acceptable level by imposition of mitigation measures on the project, which are listed below as conditions of approval. C. Pursuant to the provisions of Section 753.5(c) of Title 14 of the California Code of Regulations, the Planning Commission finds as follows: In considering the record as a whole, the Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the proposed project will have potential for an adverse impact upon wildlife resources orthe habitat upon which wildlife depends. Further, based upon the substantial evidence contained in the Mitigated Negative Declaration, the staff reports and exhibits, and the information provided to the Planning Commission during the public hearing, the Planning Commission hereby rebuts the presumption of adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code of Regulations. PLANNING COMMISSION RESOLUTION NO. 03-59 SUBTPM16071 — G & L COMMERCIAL, LLC April 9, 2003 Page 3 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. Planning Division 1) The separate parcels contained within the project boundaries shall be legally combined into one parcel prior to issuance of building permits. Engineering Division 1) Proposed driveways on Utica Avenue shall be a minimum 35 feet (50 feet maximum)wide at right-of-way per City Standard No. 101, Type C. Beyond right-of-way, driveways can be reduced to 26 feet wide minimum. a) Align centerline of northerly drive approach (35 feet wide) with Pullman Court. 2) Sidewalks shall cross drive approaches at the zero curb face. Provide additional public right-of-way as needed. Special pavers shall be located outside the public right-of-way. Parkways shall slope at two percent from the top of curb to one foot behind the sidewalk along Utica Avenue frontage. 3) Revise City Drawing No. 1340 to reflect construction of the new drive approaches, sidewalk, streetlights and street trees to the satisfaction of the City Engineer prior to building permit issuance. Environmental Mitigation Measures Air Quality 1) The site shall be treated with water or other soil-stabilizing agent(approved by South Coast Air Quality Management District[SCAQMD]and Regional Water Quality Control Board[RWQCB])daily to reduce Particulate Matter (PM)10 emissions, in accordance with SCAQMD Rule 403. 2) Utica Avenue shall be swept according to a schedule established by the City to reduce PM10 emissions associated with vehicle tracking of soil off- site. Timing may vary depending upon time of year of construction. 3) Grading operations shall be suspended when wind speeds exceed 25 miles per hour to minimize PM10 emissions from the site during such episodes. 4) Chemical soil stabilizers(approved by SCAQMD and the RWQCB)shall be applied to all inactive construction areas that remain inactive for96 hours or more to reduce PM,o emissions. PLANNING COMMISSION RESOLUTION NO. 03-59 SUBTPM16071 — G & L COMMERCIAL, LLC April 9, 2003 Page 4 5) The construction contractor shall select the construction equipment based on low emission factors and high-energy efficiency. The construction contractor shall ensure the grading plans include a statement that all construction equipment will be tuned and maintained in accordance with the manufacturers' specifications. 6) The construction contractor shall utilize electric or dean alternative fuel powered equipment where feasible. 7) The construction contractor shall ensure that construction-grading plans include a statement that work crews will shut off equipment when not in use. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 9TH DAY OF APRIL 2003. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: j ' 4aT�)Niel, Chairman ATTEST: rad Bull retary I, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 9th day of April 2003, by the following vote-to-wit: AYES: COMMISSIONERS: MACIAS, MCNIEL, STEWART NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: NONE City of Rancho Cucamonga in MITIGATION MONITORING PROGRAM Project File No.: Tentative Parcel Map SUBTPM16071 and Development Review DRC2002-00929 This Mitigation Monitoring Program(MMP)has been prepared for use in implementing the mitigation measures identified in the Mitigated Negative Declaration/Environmental Impact Report) for the above-listed project. This program has been prepared in compliance with State law to ensure that adopted mitigation measures are implemented (Section 21081.6 of the Public Resources Code). Program Components -This MMP contains the following elements: 1. Conditions of approval that act as impact mitigation measures are recorded with the action and the procedure necessary to ensure compliance.The mitigation measure conditions of approval are contained in the adopted Resolution of Approval for the project._ _ _ 2. A procedure of compliance and verification has been outlined for each action necessary. This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported. 3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring progresses, changes to compliance procedures may be necessary based upon recommendations by those responsible for the program. Program Management -The MMP will be in place through all phases of the project. The project planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly and proper action is taken on each mitigation. Each City department shall ensure compliance of the conditions (mitigation) that relate to that department. Procedures -The following steps will be followed by the City of Rancho Cucamonga. 1. A fee covering all costs and expenses, including any consultants'fees, incurred by the City in performing monitoring or reporting programs shall be charged to the applicant. 2. A MMP Reporting Form will be prepared for each potentially significant impact and its corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached hereto. This procedure designates who will take action,what action will betaken and when,and to whom and when compliance will be reported. All monitoring and reporting documentation will be kept in the project file with the department having the original authority for processing the project. Reports will be available from the City upon request at the following address: City of Rancho Cucamonga - Lead Agency Planning Division/Engineering Division 10500 Civic Center Drive Rancho Cucamonga, CA 91730 Mitigation Monitoring Program SUBTPM16071 & DRC2002-00929 Page 2 s 3. Appropriate specialists will be retained if technical expertise beyond the City staffs is needed,as determined by the project planner or responsible City department,to monitor specific mitigation activities and provide appropriate written approvals to the project planner. 4. The project planner or responsible City department will approve, by signature and date, the completion of each action item that was identified on the MMP Reporting Form. After each measure is verified for compliance, no further action is required for the specific phase of development. 5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off as completed by the project planner or responsible City department at the bottom of the MMP Reporting Form. 6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation measures.The project planner is responsible for approving any such refinements or additions. An MMP Reporting Form will be completed bythe project planner or responsible City department and a copy provided to the appropdate-design, construction, or operational personnel. 7. The project planner or responsible City department has the authority to stop the work of construction contractors if compliance with any aspects of the MMP is not occurring afterwritten notification has been issued. The project planner or responsible City department also has the authority to hold certificates of occupancies if compliance with a mitigation measure attached hereto is not occurring.The project planner or responsible City department has the authority to hold issuance of a business license until all mitigation measures are implemented. 8. Any conditions (mitigation) that require monitoring after project completion shall be the responsibility of the City of Rancho Cucamonga Planning Division.The Division shall require the applicant to post any necessary funds (or other forms of guarantee)with the City. These funds shall be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measure for the required period of time. 9. In those instances requiring long-term project monitoring, the applicant shall provide the City with a plan for monitoring the mitigation activities at the project site and reporting the monitoring results to the City. Said plan shall identify the reporter as an individual qualified to know whether the particular mitigation measure has been implemented. The monitoring/reporting plan shall conform to the City's MMP and shall be approved by the Community Development Director or City Planner prior to the issuance of building permits. MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III) Project File No.: SUBTPM16071 & DRC2002-00929 Applicant: G & L Commercial, LLC Initial Study Prepared by: Donald Granger Date: March 18. 2003 Mitigation Measures No. Responsible Monitoring Timin f Method of Verified Sanctions for Implementing Action for Monitoring Frequency • . D. te/initials Non-compliance Air Quality The site shall be treated with water or other soil stabilizing agent CP C Review of plans A/C 2 (approved by South Coast Air Quality Management District [SCAQMD]and Regional Water Quality Control Board[RWQCB]) daily to reduce Particulate Matter(PM)ID emissions,in accordance with SCAQMD Rule 403. Utica Avenue shall be swept according to a schedule established by CP C Review of plans AIC 2 the City to reduce PMru emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon time of year of construction. Grading operations shall be suspended when wind speeds exceed CP C Review of plans A/C 2 25 mph to minimize PMro emissions from the site during such episodes. Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall CP C Review of plans AJC 2 be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PMro emissions. The construction contractor shall select the construction equipment CP B/C Review of plans A/C 2 based on low emission factors and high-energy efficiency. The construction contractor shall ensure the grading plans include a statement that all construction equipment will be tuned and maintained in accordance with the manufacturers'specifications. The construction contractor shall utilize electric or dean alternative CP C Review of plans A/C 2 fuel powered equipment where feasible. The construction contractor shall ensure that construction-grading CP/CE B Review of plans C 2 plans Include a statement that work crews will shut off equipment when not in use. Key to Checklist Abbreviations Responsible Person ' . ` Mon(tering'Frequeney "". -C Method of Verification • > t- `"`•" t''sanctions• • ' CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map CP-City Planner or designee B-Prior To Construction B-Other Agency Permit I Approval 2-Withhold Grading or Building Permit CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds FC-Fire Chief or designee 6-Revoke CUP COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT#: SUBTPM16071 SUBJECT: CONDOMINIUM PARCEL MAP APPLICANT: G&L COMMERCIAL, LLC LOCATION: WEST SIDE OF UTICA AVENUE, SOUTH OF ARROW ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DIVISION, (909) 477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents, officers, or employees, because of the issuance of such approval, or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. B. Time Limits 1. This tentative tract map or tentative parcel map shall expire, unless extended by the Planning Commission, unless a complete final map is filed with the City Engineer within 3 years from the date of the approval. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans, architectural elevations, exterior materials and colors, landscaping, sign program, and grading on file in the Planning Division, the conditions contained herein, and Development Code regulations. 2. Prior to any use of the project site or business activity being commenced thereon, all Conditions of Approval shall be completed to the satisfaction of the City Planner. 3. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced, whichever comes first. SC-01-03 1 Project No.SUBTPM16071 Completion Date 4. Approval of this request shall not waive compliance with all sections of the Development ��— Code, all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 5. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping to the satisfaction of the City Planner. For single-family residential developments, transformers shall be placed in underground vaults. 6. Street names shall be submitted for City Planner review and approval in accordance with the adopted Street Naming Policy prior to approval of the final map. 7. All parkways, open areas, and landscaping shall be permanently maintained by the property owner, homeowners' association, or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for City Planner and City Engineer review and approved prior to the issuance of building permits. D. Landscaping 1. Landscaping and irrigation systems required to be installed within the public right-of-way on ��— the perimeter of this project area shall be continuously maintained by the developer. E. Environmental 1. Mitigation measures are required for the project. The applicant is responsible for the cost of implementing said measures, including monitoring and reporting. Applicant shall be required to post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the amount of $ 719.00 prior to the issuance of building permits, guaranteeing satisfactory performance and completion of all mitigation measures. These funds may be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete all actions required by the approved environmental documents shall be considered grounds for forfeit. F. Other Agencies 1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location of mailboxes. Multi-family residential developments shall provide a solid overhead structure for mailboxes with adequate lighting. The final location of the mailboxes and the design of the overhead structure shall be subject to City Planner review and approval prior to the issuance of building permits. APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: G. Dedication and Vehicular Access 1. Dedication shall be made of the following rights-of-way on the perimeter streets (measured from street centerline): 33 total feet on Utica Avenue SC-01-03 2 Project No.SUBTPM16071 Completion Date H. Street Improvements 1. Construct the following perimeter street improvements including, but not limited to: Curb& A.C. Side- Drive Street Street Comm Median Bike Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other UTICA AVENUE X X X X 2. Improvement Plans and Construction: a. Street improvement plans, including street trees, street lights, and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements, prior to final map approval or the issuance of building permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the City Engineer's Office in addition to any other permits required. C. Pavement striping, marking, traffic signing, street name signing, traffic signal conduit, and interconnect conduit shall-be-installed to the-satisfaction of the City-Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer Notes: 1) Pull boxes shall be No. 6 at intersections and No. 5 along streets, a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2) Conduit shall be 3-inch (at intersections) or 2-inch (along streets) galvanized steel with pull rope or as specified. e. Handicapped access ramps shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving, which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single family residential lots. h. Street names shall be approved by the City Planner prior to submittal for first plan check. 3. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in _J_/_ accordance with the City's street tree program. SC-01-03 3 Project No.SUBTPM16071 Completion Date 4. Install street trees per City street tree design guidelines and standards as follows. The completed legend and construction notes shall appear on the title page of the street improvement plans. Where public landscape plans are required, tree installation in those areas shall be per the public landscape improvement plans. The City Engineer reserves the right to adjust tree species based upon field conditions and other variables. For additional information, contact the Engineering Division. Min. Grow Street Name Botanical Name Common Name Space Spacing Size* ary. UTICA AVENUE Brachychiton Bottle Treet 5 ft. 1 25 ft. 15 gal Fill POP O.C. In 'TREES SHALL BE 15-GALLON SIZE UNLESS OTHERWISE APPROVED. Construction Notes for Street Trees: 1) All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting, an agronomic soils report shall be furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector. 3) All street trees are subject to inspection and acceptance by the Engineering Division. 4) Street trees are to be planted per public improvement plans only. 5. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with adopted policy. On collector or larger streets, lines of sight shall be plotted for all project intersections, including driveways. Local residential street intersections and commercial or industrial driveways may have lines of sight plotted as required. I. Public Maintenance Areas 1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the City Engineer prior to final map approval or issuance of building permits whichever occurs first. Formation costs shall be borne by the developer. J. Drainage and Flood Control 1. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the property from adjacent areas. K. Utilities 1. Provide separate utility services to each parcel including sanitary sewerage system, water, —J—J_ gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 2. The developer shall be responsible for the relocation of existing utilities as necessary. 3. Water and sewer plans shall be designed and constructed to meet the requirements of the _/—J_ Cucamonga County Water District (CCW D), Rancho Cucamonga Fire Protection District, and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CCWD is required prior to final map approval or issuance of permits, whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. 4. Approvals have not been secured from all utilities and other interested agencies involved. Approval of the final parcel map will be subject to any requirements that may be received from them. SC-01-03 4 Project No.SUBTPM16071 Completion Date L. General Requirements and Approvals 1. The separate parcels contained within the project boundaries shall be legally combined into one parcel prior to issuance of building permits. 2. A non-refundable deposit shall be paid to the City, covering the estimated operating costs for all new streetlights for the first six months of operation, prior to final map approval or prior to building permit issuance if no map is involved. APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, FIRE PROTECTION PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED SC-01-03 5 a � FIRE PROTECTION DISTRICT r" } FIRE SAFETY DIVISION STANDARD CONDITIONS FD PLAN REVIEW#: FD-02-0863 PROJECT#: SUBTPM16071 PROJECT NAME: Utica Office Complex DATE: March 19, 2003 PLAN TYPE: Standard Conditions for Office Complex (8 Buildings) APPLICANT NAME: G&L Commercial OCCUPANCY CLASS: Group B FLOOR AREA (S): Varies up to 7836 Square feet TYPE CONSTRUCTION: Type V-N - FIRE PROTECTION - --- — SYSTEM REQUIRED: Sprinklers for all buildings, Standpipe connections in Courtyard LOCATION: Arrow and Utica FD REVIEW BY: Tim Fejeran Fire Inspector PLANNER: Donald GranJge,�,,,��_ _ ALL OF THE FOLLOWING STANDARD CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, (909) 477-2770, TO VERIFY COMPLIANCE WITH THE FOLLOWING: RANCHO CUCAMONGA FIRE DISTRICT- STANDARD CONDITIONS & REQUIREMENTS — General, Procedural, Technical, or Operational Information that shall be Included, Corrected, or Completed as noted below. The following is applicable to the above project. FSC-1 General Requirements for Public and Private Water Supply 1. General Guidance for Fire Hydrants: The following provides general guidance for the spacing and location of fire hydrants. Remember these are the maximum permitted distances between fire hydrants: a. The maximum distance between fire hydrants in commercial/industrial projects is 300-feet. No portion of the exterior wall shall be located more than 150-feet from an approved fire hydrant. For cul-de-sacs the distance shall not exceed 100-feet. b. Fire hydrants are to be located: 1. At the entrance(s) to a project from the existing public roadways. This includes subdivisions and industrial parks. 2. At intersections. 3. On the right side of the street, whenever practical and possible. 4. As required by the Fire Safety Division to meet operational needs. 5. The location of fire hydrants is based upon the operational needs of the Fire District to control a fire. 6. Fire hydrants shall be located a minimum of forty(40)feet from any building. Contact the Fire Safety Division 909 477-2770 2. Minimum Fire Flow with Automatic Fire Sprinklers: The required minimum fire flow for this project is 3000 gallons per minute at a minimum residual pressure of 20 pounds per square inch. This flow reflects a 50 percent reduction for the installation of an approved automatic fire sprinkler system with central station monitoring. This requirement is made in accordance with Fire Code Appendix III-A, as amended, and Fire District Ordinances and Standards. FSC-2 Private(On-Site)Water and/or Fire Sprinkler Underground Plans for Fire Protection 1. Exceeds Allowable Distance:When any portion of a facility or building is located more than 150-feet from a fire hydrant located on a public street, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains capable of supplying the required fire flow shall be provided. The distance is measured as vehicular path of travel on access roadways, not line of sight. Contact the Fire Safety Division (909)477-2770 2. Number of Fire Hydrants: Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof, subject to standard spacing and distribution requirements. Contact the Fire Safety Division (909) 477-2770 3. Fire Sprinkler Underground: Prior to the issuance of a fire sprinkler system permit, the applicant shall submit construction plans, specifications, and calculations for the fire sprinkler system underground to the Fire Safety Division for approval. Contact the Fire Safety Division (909)477-2770 FSC-3 Automatic Fire Sprinkler Systems-Technical Comments 1. Required Installations: Rancho Cucamonga Fire District Ordinance 15 or other adopted code or standard, requires an approved automatic fire sprinkler system to be installed in any of the following: a. Commercial or industrial structures greater than 7,500 square feet Contact the Fire Safety Division (909)477-2770 FSC-4 Fire District Site Access-Technical Comments 1. Access Roadways Defined: Fire District access roadways include public roads, streets, and highways, as well as private roads, streets, drive aisles and designated fire lanes. 2. Location of Access: All portions of the structure or facility or any portion of the exterior wall of the first story shall be located within 150-feet of Fire District vehicle access,measured by an unobstructed approved route around the exterior of the building. Landscaped areas, unpaved changes in elevation, gates, and fences are an obstruction. Standpipe system required in center court yard to mitigate access. 3. Private Roadways and Fire Lanes:The minimum specifications for private fire district access roadways are: a. The minimum unobstructed width is 26-feet. b. The inside tum radius shall be 20-feet. c. The outside turn radius shall be not less than 50-feet. d. The minimum radius for cul-de-sacs is 454eet. e. The minimum vertical clearance is 14 feet, 6 inches. f. At any private entry median, the minimum width of traffic lanes shall be 20-feet. g. The angle of departure and approach shall not exceed 9 degrees or 20 percent. h. The maximum grade of the driving surface shall not exceed 12%. i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW). 4. Access Doorways: In addition to any exterior opening required by the Building or Fire Code,approved doorways,accessible without the use of a ladder, shall be provided as follows: a. In buildings without high-piled storage, one or more approved access doors shall be provided in150 lineal feet or major fraction thereof along the exterior wall that faces required access roadways or walkways. b. In buildings with high-piled storage one or more approved access doors shall be provided in each 100 lineal feet or major fraction thereof, of the exterior wall that faces required access roadways.When a railroad siding is installed provisions shall be made to maintain Fire District access to all required openings. Contact the Fire Safety Division at 909 477-2770. 5. Fire Lane Identification: All required fire lanes shall be identified by red curbing and signage. A drawing of the proposed signage that meets the minimum Fire District standards shall be submitted to and approved. Contact the Rancho Cucamonga Fire Protection District at(909)477-2770 for a copy of the FD Fire Lanes standard. FSC-12 Plan Submittal Required Notice Required plans shall be submitted and approved prior to construction in accordance with 1997/98 Building, Fire, Mechanical,and Plumbing Codes; 1999 Electrical Code, Health and Safety Code; Public Resources Code;and RCFPD Ordinances FD15 and FD32, Guidelines and Standards. NOTE: In addition to the fees due at this time please note that separate plan check fees for tenant improvements,fire protection systems and/or any consultant reviews will be assessed at time of submittal of plans. FSC-14 Alternate Materials and Methods The Fire Safety Division will review requests for alternate materials and methods within the scope of our authority. The request must be submitted on the Fire District"Application for Alternate Method"form along with supporting documents. Contact the Fire Safety Division at(909)477-2770 for assistance. PRIOR TO ISSUANCE OF BUILDING PERMITS- Complete the following: 1. Private/On-site Fire Hydrants: Prior to the issuance of any building permit, the applicant shall submit construction plans, specifications, flow test data and calculations for the private water main system for review and approval by the Fire District. Plans and installation shall comply with Fire District standards. Contac the Fire Safety Division for a copy of"Fire District Notes for Underground and Water Plans." Contact the Fire Safety Division (909)477-2770 2. Private Fire Hydrants/On-site Installation: All private on-site fire hydrants shall be installed, flushed, and operable prior to delivering any combustible building materials on-site (i.e., lumber, roofing materials, etc.). A representative of Fire Construction Services shall inspect the installation and witness hydrant flushing. The builder/developer shall submit final test and inspection report to the Fire Safety Division. Contact Building and Safety/Fire Construction Services (909) 477-2713. 3. Public Fire Hydrants: Prior to issuance of any building permit, the applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and the Water District. On the plan show all existing fire hydrants within a 600-foot radius of the project. Contact the Fire Safety Division (909)477-2770 4. Public Installation: All required public fire hydrants shall be installed, flushed, and operable prior to delivering any combustible building materials on-site (i.e., lumber, roofing materials, etc.). Water District personnel shall inspect the installation and witness hydrant flushing. The builder/developer shall submit a copy of the Water District inspection report to the Fire Safety Division. Contact Water District to schedule testing. PRIOR TO OCCUPANCY OR FINAL INSPECTION- Complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with Rancho Cucamonga Fire Protection District and City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers." On private property these markers are to be maintained in good condition by the property owner. Contact Building and Safety/Fire Construction Services (909)477-2713. 2. Private Fire Hydrants- Final Acceptance: For the purpose of final acceptance, an additional test of the on-site fire hydrants shall be conducted by the builder/developer in the presence of the Water District or Fire Construction Services, as appropriate. The builder/developer shall submit the final test report to the Fire Safety Division. 3. Fire Sprinkler System- Plans and Permit: Plans for the required automatic fire sprinkler system shall be submitted to Fire Construction Services for review and approval. No work is allowed without a Fire Construction Services permit. Contact Building and Safety/Fire Construction Services (909) 477-2713. 4. Fire Sprinkler System- Final Inspection: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler system(s) shall be tested and accepted by Fire Construction Services. Contact Building and Safety/Fire Construction Services (909)477-2713. 5. Sprinkler Monitoring:The fire sprinkler system monitoring system shall be installed, tested, and operational immediately following the completion of the fire sprinkler system. Monitoring is required with 20 sprinklers in Group I Occupancies, or 100 or more sprinklers in all other Occupancies. Contact Building and Safety/Fire Construction Services (909) 477-2713. 6. Knox Rapid Entry System: A Knox rapid entry key vault shall be installed prior to final inspection. Proof of purchase shall be submitted prior to final building plan approval. Contact the Fire Safety Division for specific details and ordering information. Contact Building and Safety/Fire Construction Services (909) 477-2713 for inspection. 7. Fire Lanes: Prior to the issuance of any Certificate of Occupancy,the fire lanes shall be installed in accordance with the approved fire lane plan. The CC&R's or other approved documents shall contain an approved fire lane map and provisions that prohibit parking in the fire lanes. The method of enforcement shall be documented. The CC&R's shall also identify who is responsible for not less than annual inspection and maintenance of all required fire lanes. Contact Building and Safety/Fire Construction Services (909)477-2713. 8. Address-Other Than Single-family: New buildings other than single-family dwellings shall post the address with minimum 8-inch numbers on contrasting background, visible from the street and electrically illuminated during periods of darkness. When the building setback exceeds 200 feet from the public street an additional non-illuminated 6-inch minimum number address shall be provided at the property entrance.Contact Building and Safety/Fire Construction Services (909) 477-2713. 9. Fire.District Confidential Business Occupancy Information: The applicant shall complete the Rancho Cucamonga Fire District "Confidential Business Occupancy Information° Form and submit to the Fire Safety Division. This form provides contact information for Fire District use in the event of an emergency at the subject building or property. Contact Fire Safety Division (909)477-2770 Fire District Review Letter(P&E)-Template SL 10/31/02 Revision