HomeMy WebLinkAbout03-60 - Resolutions RESOLUTION NO. 03-60
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT
REVIEW DRC2002-00929 FOR EIGHT OFFICE BUILDINGS, TOTALING
52,614 SQUARE FEET ON 3.08 ACRES OF LAND IN THE INDUSTRIAL
PARK DISTRICT(SUBAREA 6), LOCATED ON THE WEST SIDE OF UTICA
AVENUE, APPROXIMATELY 300 FEET SOUTH OF ARROW ROUTE, AND
MAKING FINDINGS IN SUPPORT THEREOF -APN: 0209-491-06 AND 07.
A. Recitals.
1. G & L Commercial, LLC filed an application for the approval of Development Review
DRC2002-00929, as described in the title of this Resolution. Hereinafter in this Resolution, the
subject Development Review request is referred to as "the application."
2. On the 9th day of April 2003, the Planning Commission of the City of Rancho Cucamonga
conducted a meeting on the application and concluded said meeting on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission
of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the above-
referenced meeting on April 9, 2003, including written and oral staff reports, this Commission hereby
specifically finds as follows:
a. The application applies to property located on the west side of Utica Avenue,
approximately 300 feet south of Arrow Route, with a street frontage of approximately 416 feet and lot
depth of approximately 290 feet, and is presently rough-graded and vacant; and
b. The property to the north of the subject site is presently vacant, the property to the
south is developed with an industrial building, the property to the east is developed with an industrial
building, and the property to the west is developed with an office building; and
C. The application proposes the construction of eight office buildings totaling 52,614
square feet, a permitted use within the Industrial Park District; and
d. The project, together with the recommended conditions of approval,complies with
all minimum development standards for the City of Rancho Cucamonga; and
e. The project will provide office facilities for a variety of professional offices, a land
use goal of the Industrial Park Districts; and
f. The project design incorporates an interior courtyard, smooth plaster finish,
polished granite insets, a limestone base and decorative cornice; thereby meeting the design goals
PLANNING COMMISSION RESOLUTION NO. 03-60
DRC2002-00929—G & L COMMERCIAL, LLC
April 9, 2003
Page 2
Industrial Park District by providing a high-level of architectural design and an outdoor pedestrian
amenity.
3. Based upon the substantial evidence presented to this Commission during the above-
referenced meeting and upon the specific findings of facts set forth in paragraphs 1 and 2 above,this
Commission hereby finds and concludes as follows:
a. The proposed project is consistent with the objectives of the General Plan; and
b. The proposed use is in accord with the objectives of the Development Code and the
purposes of the district in which the site is located; and
C. The proposed use is in compliance with each of the applicable provisions of the
Development Code; and
d. The proposed use, together with the conditions applicable thereto, will not be
detrimental to the public health, safety, or welfare or materially injurious to properties or
improvements in the vicinity.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration, together with all written and oral reports included for the environmental assessment for
the application, the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and
Monitoring Program attached hereto, and incorporated herein by this reference, based upon the
findings as follows:
a. That the Mitigated Negative Declaration has been prepared in compliance with the
California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines
promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared
therefore reflect the independent judgment of the Planning Commission; and, further, this
Commission has reviewed and considered the information contained in said Mitigated Negative
Declaration with regard to the application.
b. Although the Mitigated Negative Declaration identifies certain significant
environmental effects that will result if the project is approved, all significant effects have been
reduced to an acceptable level by imposition of mitigation measures on the project, which are listed
below as conditions of approval.
C. Pursuant to the provisions of Section 753.5(c) of Title 14 of the California Code of
Regulations, the Planning Commission finds as follows: In considering the record as a whole, the
Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the
proposed project will have potential for an adverse impact upon wildlife resources orthe habitat upon
which wildlife depends. Further, based upon the substantial evidence contained in the Mitigated
Negative Declaration, the staff reports and exhibits, and the information provided to the Planning
Commission during the public hearing, the Planning Commission hereby rebuts the presumption of
adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code of Regulations.
5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth below
and in the Standard Conditions, attached hereto and incorporated herein by this reference.
PLANNING COMMISSION RESOLUTION NO. 03-60
DRC2002-00929— G & L COMMERCIAL, LLC
April 9, 2003
Page 3
Planning Division
1) At the time construction activity commences, and throughout the
duration of construction, the developer shall install traffic signs with the
following text: "Local businesses open during construction." The signs
shall meet all applicable regulations for traffic and highway signage.
Prior to installation of the signs, the location, placement, and quantity of
signs shall be reviewed and approved by the Planning and Engineering
Divisions.
2) The retaining wall on the north property line shall be shifted southerly,
thereby creating a landscape planter.
3) The trash enclosure near the west property line shall be moved to the
north or south, away from the pedestrian connection on the parcel to
the west.
4) Undulating berms shall be provided in the landscaped setback area
along the Utica Avenue frontage to screen parking lot. Tables, chairs,
and shade shall be provided in each employee outdoor eating area.
Engineering Division
1) Proposed driveways on Utica Avenue shall be a minimum of 35 feet(50
feet maximum)wide at right-of-way per City Standard No. 101, Type C.
Beyond right-of-way, driveways can be reduced to 26 feet wide
minimum.
a) Align centerline of northerly drive approach (35 feet wide) with
Pullman Court.
2) Sidewalks shall cross drive approaches at the zero curb face. Provide
additional public right-of-way as needed. Special pavers shall be
located outside the public right-of-way. Parkways shall slope at 2
percent from the top of curb to 1-foot behind the sidewalk along Utica
Avenue frontage.
3) Revise City Drawing No. 1340 to reflect construction of the new drive
approaches, sidewalk, streetlights, and street trees to the satisfaction
of the City Engineer prior to building permit issuance.
Environmental Mitigation Measures
Air Quality
1) The site shall be treated with water or other soil-stabilizing agent(approved
by South Coast Air Quality Management District[SCAQMD]and Regional
Water Quality Control Board [RWQCB]) daily to reduce Particulate Matter
(PM)10 emissions, in accordance with SCAQMD Rule 403.
PLANNING COMMISSION RESOLUTION NO. 03-60
DRC2002-00929—G & L COMMERCIAL, LLC
April 9, 2003
Page 4
2) Utica Avenue shall be swept according to a schedule established by the
City to reduce PM10 emissions associated with vehicle tracking of soil off-
site. Timing may vary depending upon time of year of construction.
3) Grading operations shall be suspended when wind speeds exceed
25 miles per hour to minimize PM10 emissions from the site during such
episodes.
4) Chemical soil stabilizers(approved by SCAQMD and the RWQCB)shall be
applied to all inactive construction areas that remain inactive for 96 hours
or more to reduce PM10 emissions.
5) The construction contractor shall select the construction equipment based
on low emission factors and high-energy efficiency. The construction
contractor shall ensure the grading plans include a statement that all
construction equipment will be tuned and maintained in accordance with
the manufacturers' specifications.
6) The construction contractor shall utilize electric or clean alternative fuel
powered equipment where feasible.
7) The construction contractor shall ensure that construction-grading plans
include a statement that work crews will shut off equipment when not in
use.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 9TH DAY OF APRIL 2003.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY: -
arry T c iel, Chairman
ATTEST:
rad Bulle etary
I, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby
certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the
Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning
Commission held on the 9th day of April 2003, by the following vote-to-wit:
AYES: COMMISSIONERS: MACIAS, MCNIEL, STEWART
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: NONE
City of Rancho Cucamonga
MITIGATIOU MONITORING
PROGRAM
Project File No.: Tentative Parcel Map SUBTPM16071 and Development Review DRC2002-00929
This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation
measures identified in the Mitigated Negative Declaration/Environmental Impact Report) for the
above-listed project. This program has been prepared in compliance with State law to ensure that
adopted mitigation measures are implemented (Section 21081.6 of the Public Resources Code).
Program Components -This MMP contains the following elements:
1. Conditions of approval that act as impact mitigation measures are recorded with the action and
the procedure necessary to ensure compliance.The mitigation measure conditions of approval
__ are_contained in the adopted Resolution of Approval for the project.
2. A procedure of compliance and verification has been outlined for each action necessary. This
procedure designates who will take action, what action will be taken and when, and to whom
and when compliance will be reported.
3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring
progresses, changes to compliance procedures may be necessary based upon
recommendations by those responsible for the program.
Program Management -The MMP will be in place through all phases of the project. The project
planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project
planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly
and proper action is taken on each mitigation. Each City department shall ensure compliance of the
conditions (mitigation) that relate to that department.
Procedures - The following steps will be followed by the City of Rancho Cucamonga.
1. A fee covering all costs and expenses, including any consultants'fees, incurred by the City in
performing monitoring or reporting programs shall be charged to the applicant.
2. A MMP Reporting Form will be prepared for each potentially significant impact and its
corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached
hereto. This procedure designates who will take action,what action will betaken and when,and
to whom and when compliance will be reported. All monitoring and reporting documentation will
be kept in the project file with the department having the original authority for processing the
project. Reports will be available from the City upon request at the following address:
City of Rancho Cucamonga - Lead Agency
Planning Division/Engineering Division
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
Mitigation Monitoring Program
SUBTPM16071 & DRC2002-00929
Page 2
3. Appropriate specialists will be retained if technical expertise beyond the City staffs is needed,as
determined by the project planner or responsible City department,to monitor specific mitigation
activities and provide appropriate written approvals to the project planner.
4. The project planner or responsible City department will approve, by signature and date, the
completion of each action item that was identified on the MMP Reporting Form. After each
measure is verified for compliance, no further action is required for the specific phase of
development.
5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off
as completed by the project planner or responsible City department at the bottom of the MMP
Reporting Form.
6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation
measures. The project planner is responsible for approving any such refinements or additions.
An MMP Reporting Form will be completed by the project planneror responsible City department
and a copy provided-to the appropriate design,construction,—or-operational-personnel.
7. The project planner or responsible City department has the authority to stop the work of
construction contractors if compliance with any aspects of the MMP is not occurring after written
notification has been issued. The project planner or responsible City department also has the
authority to hold certificates of occupancies if compliance with a mitigation measure attached
hereto is not occurring.The project planner or responsible City department has the authority to
hold issuance of a business license until all mitigation measures are implemented.
8. Any conditions (mitigation) that require monitoring after project completion shall be the
responsibility of the City of Rancho Cucamonga Planning Division.The Division shall require the
applicant to post any necessary funds (or other forms of guarantee)with the City. These funds
shall be used by the City to retain consultants and/or pay for City staff time to monitor and report
on the mitigation measure for the required period of time.
9. In those instances requiring long-term project monitoring, the applicant shall provide the City
with a plan for monitoring the mitigation activities at the project site and reporting the monitoring
results to the City. Said plan shall identify the reporter as an individual qualified to know whether
the particular mitigation measure has been implemented. The monitoring/reporting plan shall
conform to the City's MMP and shall be approved by the Community Development Director or
City Planner prior to the issuance of building permits.
MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III)
Project File No.: SUBTPM16071 & DRC2002-00929 Applicant: G & L Commercial. LLC
Initial Study Prepared by: Donald Granger Date: March 18. 2003
ResponsibleMitigation Measures No.
Implementing Action for Monitoring Frequency Verifi6tion Verification
Date/Initials Non-Compliance
Air Quality '
.1 ¢ 9
The site shall be treated with water or other soil stabilizing agent CP C Review of plans A/C 2
(approved by South Coast Air Quality Management District
[SCAQMD]and Regional Water Quality Control Board[RWQCB])
daily to reduce Particulate Matter(PM)IO emissions,in accordance
with SCAQMD Rule 403.
Utica Avenue shall be swept according to a schedule established by CP C Review I f plans A/C 2
the City to reduce PM,o emissions associated with vehicle tracking
of soil off-site. Timing may vary depending upon time of year of
construction.
Grading operations shall be suspended when wind speeds exceed CP C Review of plans A/C 2
25 mph to minimize PM,o emissions from the site during such
episodes.
Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall CP C Review of plans A/C 2
be applied to all Inactive construction areas that remain Inactive for
96 hours or more to reduce PM,emissions.
The construction contractor shall select the construction equipment CP B/C Review of plans A/C 2
based on low emission factors and high-energy efficiency. The
construction contractor shall ensure the grading plans include a
statement that all construction equipment will be tuned and
maintained in accordance with the manufacturers'specifications.
The construction contractor shall utilize electric or clean altemative CP C Review of plans A/C 2
fuel powered equipment where feasible.
The construction contractor shall ensure that construction-grading CP/CE B Review of plans C 2
plans Include a statement that work crews will shut off equipment
when not in use.
Key to Checklist Abbreviations
6 _"
Responsiblek Person MnlConng Frequency ° Method of Varlfication ° ' ;`: Sanctions 4,
CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map
CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit
CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy
BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order
PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds
FC-Fire Chief or designee 6-Revoke CUP
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT#: DRC2002-00929
SUBJECT: FOUR INDUSTRIAL BUILDINGS
APPLICANT: G&L COMMERCIAL, LLC
LOCATION: WEST SIDE OF UTICA AVENUE, SOUTH OF ARROW
ALL- OF THE-FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DIVISION, (909) 477-2750, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
Completion Date
A. General Requirements
1. The applicant shall agree to defend at his sole expense any action brought against the City,
its agents, officers, or employees, because of the issuance of such approval, or in the
alternative, to relinquish such approval. The applicant shall reimburse the City, its agents,
officers, or employees, for any Court costs and attorney's fees which the City, its agents,
officers, or employees may be required by a court to pay as a result of such action. The City
may, at its sole discretion, participate at its own expense in the defense of any such action
but such participation shall not relieve applicant of his obligations under this condition.
2. Copies of the signed Planning Commission Resolution of Approval No. 03-60, Standard
Conditions, and all environmental mitigations shall be included on the plans (full size). The
sheet(s) are for information only to all parties involved in the construction/grading activities
and are not required to be wet sealed/stamped by a licensed Engineer/Architect.
B. Time Limits
1. Conditional Use Permit, Variance, or Development/Design Review approval shall expire if
building permits are not issued or approved use has not commenced within 5 years from the
date of approval. No extensions are allowed.
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which
include site plans, architectural elevations, exterior materials and colors, landscaping, sign
program, and grading on file in the Planning Division, the conditions contained herein, and
Development Code regulations.
2. Prior to any use of the project site or business activity being commenced thereon, all
Conditions of Approval shall be completed to the satisfaction of the City Planner.
SC-01-03 1
Project No.DRC2002-00929
Completion Date
3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code
and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall
be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety
Division to show compliance. The buildings shall be inspected for compliance prior to
occupancy.
4. Revised site plans and building elevations incorporating all Conditions of Approval shall be
submitted for City Planner review and approval prior to the issuance of building permits.
5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.) or prior to final map approval in the case of a custom lot subdivision, or
approved use has commenced, whichever comes first.
6. Approval of this request shall not waive compliance with all sections of the Development
Code, all other applicable City Ordinances, and applicable Community or Specific Plans in
effect at the time of building permit issuance.
7. A detailed on-site fighting plan, including a photometric diagram, shall be reviewed and
approved by the City Planner and Police Department (477-2800) prior to the issuance of
building permits. Such plan shall indicate style, illumination, location, height, and method of
shielding so as not to adversely affect adjacent properties.
8. _Trash_receptacle(s)_are_required and-shall-meet City-standards. The final design, locations, _J_/_
and the number of trash receptacles shall be subject to City Planner review and approval
prior to the issuance of building permits.
9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall
be located out of public view and adequately screened through the use of a combination of
concrete or masonry walls, berming, and/or landscaping to the satisfaction of the City
Planner. For single-family residential developments, transformers shall be placed in
underground vaults.
10. All building numbers and individual units shall be identified in a clear and concise manner,
including proper illumination.
11. All parkways, open areas, and landscaping shall be permanently maintained by the property
owner, homeowners' association, or other means acceptable to the City. Proof of this
landscape maintenance shall be submitted for City Planner and City Engineer review and
approved prior to the issuance of building permits.
D. Building Design
1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or
projections, shall be shielded from view and the sound buffered from adjacent properties and
streets as required by the Planning Division. Such screening shall be architecturally
integrated with the building design and constructed to the satisfaction of the City Planner.
Details shall be included in building plans.
2. For commercial and industrial projects, paint roll-up doors and service doors to match main
building colors.
E. Parking and Vehicular Access (indicate details on building plans)
1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space
abuts a building, wall, support column, or other obstruction, the space shall be a minimum of
11 feet wide.
SC-01-03 2
Project No.DRC2002-00929
Completion Date
2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall
contain a 12-inch walk adjacent to the parking stall (including curb).
3. Textured pedestrian pathways and textured pavement across circulation aisles shall be
provided throughout the development to connect dwellings/units/buildings with open
spaces/plazas/recreational uses.
4. All parking spaces shall be double striped per City standards and all driveway aisles,.
entrances, and exits shall be striped per City standards.
5. Handicap accessible stalls shall be provided for commercial and office facilities with 25 or
more parking stalls. Designate two percent or one stall; whichever is greater, of the total
number of stalls for use by the handicapped.
6. Motorcycle parking area shall be provided for commercial and office facilities with 25 or more
parking stalls. Developments with over 100 parking stalls shall provide motorcycle parking at
the rate of one percent. The area for motorcycle parking shall be a minimum of 56 square
feet.
F. Trip Reduction
1. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily
residential projects of more than 10 units. Minimum spaces equal to five percent of the
- required automobile parking spaces-or-three bicycle storage spaces, whichever is greater.
After the first 50 bicycle storage spaces are provided, additional storage spaces required are
2.5 percent of the required automobile parking spaces. Warehouse distribution uses shall
provide bicycle storage spaces at a rate of 2.5 percent of the required automobile parking
spaces with a minimum of a 3-bike rack. In no case shall the total number of bicycle parking
spaces required exceed 100. Where this results in a fraction of 0.5 or greater, the number
shall be rounded off to the higher whole number.
2. Carpool and vanpool designated off-street parking close to the building shall be provided for
commercial, office, and industrial facilities at the rate of 10 percent of the total parking area.
If covered, the vertical clearance shall be no less than 9 feet.
G. Landscaping
1. A detailed landscape and irrigation plan, including slope planting and model home
landscaping in the case of residential development, shall be prepared by a licensed
landscape architect and submitted for City Planner review and approval prior to the issuance
of building permits or prior final map approval in the case of a custom lot subdivision.
2. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within
commercial and office projects, shall be specimen size trees-24-inch box or larger.
3. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three
parking stalls.
4. Trees shall be planted in areas of public view adjacent to and along structures at a rate of
one tree per 30 linear feet of building.
5. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope, but less than
,2:1 slope, shall be, at minimum, irrigated and landscaped with appropriate ground cover for
erosion control. Slope planting required by this section shall include a permanent irrigation
system to be installed by the developer prior to occupancy.
6. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or
greater slope shall be landscaped and irrigated for erosion control and to soften their
appearance as follows: one 15-gallon or larger size tree per each 150 sq. ft. of slope area,
1-gallon or larger size shrub per each 100 sq. ft. of slope area, and appropriate ground
SC-01-03 3
Project No.DRC2002-00929
Completion Date
cover. In addition, slope banks in excess of 8 feet in vertical height and 2:1 or greater slope
shall also include one 5-gallon or larger size tree per each 250 sq. ft. of slope area. Trees
and shrubs shall be planted in staggered clusters to soften and vary slope plane. Slope
planting required by this section shall include a permanent irrigation system to be installed by
the developer prior to occupancy.
7. For multi-family residential and non-residential development, property owners are responsible
for the continual maintenance of all landscaped areas on-site, as well as contiguous planted
areas within the public right-of-way. All landscaped areas shall be kept free from weeds and
debris and maintained in healthy and thriving condition, and shall receive regular pruning,
fertilizing, mowing, and trimming. Any damaged, dead, diseased, or decaying plant material
shall be replaced within 30 days from the date of damage.
8. The final design of the perimeter parkways, walls, landscaping, and sidewalks shall be
included in the required landscape plans and shall be subject to City Planner review and
approval and coordinated for consistency with any parkway landscaping plan which may be
required by the Engineering Division.
9. Landscaping and irrigation systems required to be installed within the public right-of-way on
the perimeter of this project area shall be continuously maintained by the developer.
10. All walls shall be provided with decorative treatment. If located in public maintenance areas,
the design shall be coordinated with the Engineering Division.
11. Landscaping and irrigation shall be designed to conserve water through the principles of
Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code.
H. Signs
1. The signs indicated on the submitted plans are conceptual only and not a part of this Jam_
approval. Any signs proposed for this development shall comply with the Sign Ordinance
and shall require separate application and approval by the Planning Division prior to
installation of any signs.
2. A Uniform Sign Program for this development shall be submitted for City Planner review and
approval prior to issuance of building permits.
I. Environmental
1. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures, including monitoring and reporting. Applicant shall be required
to post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the
amount of $ 719.00 prior to the issuance of building permits, guaranteeing satisfactory
performance and completion of all mitigation measures. These funds may be used by the
City to retain consultants and/or pay for City staff time to monitor and report on the mitigation
measures. Failure to complete all actions required by the approved environmental
documents shall be considered grounds for forfeit.
J. Other Agencies
1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and
location of mailboxes. Multi-family residential developments shall provide a solid overhead
structure for mailboxes with adequate lighting. The final location of the mailboxes and the
design of the overhead structure shall be subject to City Planner review and approval prior to
the issuance of building permits.
SC-01-03 4
Project No.DRC2002-00929
Completion Date
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION, (909) 477-2710,
FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
K. General Requirements
1. Submit five complete sets of plans including the following:
a. Site/Plot Plan;
b. Foundation Plan;
C. Floor Plan;
d. Ceiling and Roof Framing Plan;
e. Electrical Plans (2 sets, detached) including the size of the main switch, number and
size of service entrance conductors, panel schedules, and single line diagrams;
f. Plumbing and Sewer Plans, including isometrics, underground diagrams, water and
waste diagram, sewer or septic system location, fixture units, gas piping, and heating
and air conditioning; and
g. Planning Division Project Number (i.e., TT #, CUP #, DR #, etc.) clearly identified on
the outside of all plans.
2. Submit two sets of structural calculations, energy conservation calculations, and a soils
report. Architect's/Engineer's stamp and "wet" signature are required prior to plan check
submittal.
3. Contractors must show proof of State and City licenses and Workers' Compensation —J_/_
coverage to the City prior to permit issuance.
4. Separate permits are required for fencing and/or walls. --J—J-
5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by --/--J—
the Building and Safety Division.
L. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be
marked with the project file number (i.e., DRC2002-00929). The applicant shall comply with
the latest adopted California Codes, and all other applicable codes, ordinances, and
regulations in effect at the time of permit application. Contact the Building and Safety
Division for availability of the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new commercial or industrial development project
or major addition, the applicant shall pay development fees at the established rate. Such
fees may include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee,
Transportation Development Fee, Permit and Plan Check Fees, and School Fees. Applicant
shall provide a copy of the school fees receipt to the Building and Safety Division prior to
permits issuance.
3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map
recordation and prior to issuance of building permits.
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday
through Saturday, with no construction on Sunday or holidays.
SC-01-03 5
Project No.DRC2002-00929
Completion Date
5. Submit trash enclosure(s) per City Standard (available at the Planning Division's public
counter).
6. The following is required for side yard use °Building A" for increase in allowable area:
a. Provide a reduced site plan (8 t/2" x 11°), which indicates the non-buildable easement.
b. Recorded "Covenant and Agreement for the Maintenance of a Non-Buildable
Easement,"which is signed by the appropriate property owner(s).
M. New Structures
1. Provide compliance with the California Building Code (CBC) for property line clearances
considering use,use, area, and fire-resistiveness.
2. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC
Section 1505.
3. Exterior walls shall be constructed of the required fire rating in accordance with CBC ��—
Table 5-A
4. Openings in exterior walls shall be protected in accordance with CBC Table 5-A. —/-
--5.—Upon-tenant-improvement_plan.check.submittal,-additional_requirements_may_be needed.
N. Grading
1. Grading of the subject property shall be in accordance with California Building Code, City _J_J_
Grading Standards, and accepted grading practices. The final grading plan shall be in
substantial conformance with the approved grading plan.
2. A soils report shall be prepared by a qualified engineer licensed by the State of California,to —/_J—
perform such work.
3. A geological report shall be prepared by a qualified engineer or geologist and submitted at ��—
the time of application for grading plan check.
4. The final grading, appropriate certifications and compaction reports shall be completed,
submitted, and approved by the Building and Safety Official prior to the issuance of building
permits.
5. A separate grading plan check submittal is required for all new construction projects and for
existing buildings buildings where improvements being proposed will generate 50 cubic yards or more
of combined cut and fill. The grading plan shall be prepared, stamped, and signed by a
California registered Civil Engineer.
APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
O. Dedication and Vehicular Access
1. Dedication shall be made of the following rights-of-way on the perimeter streets (measured ��—
from street centerline):
33 total feet on Utica Avenue —1�—
SC-01-03 6
Project No.DRC2002-00929
Completion Date
P. Street Improvements
1. Construct the following perimeter street improvements including, but not limited to:
Curb 8 AC. Side- Drive Street Street Comm Median Bike
Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other
Utica Avenue X X X X
2. Improvement Plans and Construction:
a. Street improvement plans, including street trees, street lights, and intersection safety
lights on future signal poles, and traffic signal plans shall be prepared by a registered
Civil Engineer and shall be submitted to and approved by the City Engineer. Security
shall be posted and an agreement executed to the satisfaction of the City Engineer and
the City Attorney guaranteeing completion of the public and/or private street
improvements, prior to final map approval or the issuance of building permits,
whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a _/_/_
construction permit shall be obtained from the City Engineer's Office in addition to any
other permits required.
—c.—Pavement-striping,-marking,-traffic-signing,-street-name signing,-traffic signal conduit,
and interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Signal conduit with pull boxes shall be installed with any new construction or
reconstruction project along major or secondary streets and at intersections for future
traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the
street at 3 feet outside of BCR, ECR, or any other locations approved by the City
Engineer
Notes:
1) Pull boxes shall be No. 6 at intersections and No. 5 along streets, a maximum of
200 feet apart, unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch (at intersections) or 2-inch (along streets) galvanized
steel with pull rope or as specified.
e. Handicapped access ramps shall be installed on all corners of intersections per City
Standards or as directed by the City Engineer.
f. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A
cash deposit shall be provided to cover the cost of grading and paving, which shall be
refunded upon completion of the construction to the satisfaction of the City Engineer.
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be
installed to City Standards, except for single family residential lots.
h. Street names shall be approved by the City Planner prior to submittal for first plan
check.
3. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in
accordance with the City's street tree program.
SC-01-03 7
Project No.DRC2002-00929
Completion Date
4. Install street trees per City street tree design guidelines and standards as follows. The
completed legend and construction notes shall appear on the title page of the street
improvement plans. Where public landscape plans are required, tree installation in those
areas shall be per the public landscape improvement plans. i
The City Engineer reserves the right to adjust tree species based upon field conditions and
other variables. For additional information, contact the Engineering Division.
Min.
Grow
Street Name Botanical Name Common Name Space Spacing Size` City.
Utica Avenue Brachychiton Bottle Tree 5 ft. 25 ft. O.C. 15 gal Fill In
populneus
'TREES SHALL BE 15-GALLON SIZE UNLESS OTHERWISE APPROVED.
Construction Notes for Street Trees:
1) All street trees are to be planted in accordance with City standard plans.
2) Prior to the commencement of any planting, an agronomic soils report shall be
furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may
require backfill soil amendments, as determined by the City inspector.
3) All street trees are subject to inspection and acceptance by the Engineering Division.
4) Street trees are to be planted per public improvement plans only.
5. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with
adopted policy. On collector or larger streets, lines of sight shall be plotted for all project
intersections, including driveways. Local residential street intersections and commercial or
industrial driveways may have lines of sight plotted as required.
Q. Public Maintenance Areas
1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting
Districts shall be filed with the City Engineer prior to final map approval or issuance of
building permits whichever occurs first. Formation costs shall be borne by the developer.
R. Drainage and Flood Control
1. Adequate provisions shall be made for acceptance and disposal of surface drainage entering
the property from adjacent areas.
S. Utilities
1. Provide separate utility services to each parcel including sanitary sewerage system, water,
gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility
Standards. Easements shall be provided as required.
2. The developer shall be responsible for the relocation of existing utilities as necessary.
3. Water and sewer plans shall be designed and constructed to meet the requirements of the
Cucamonga County Water District(CCWD), Rancho Cucamonga Fire Protection District, and
the Environmental Health Department of the County of San Bernardino. A letter of
compliance from the CCWD is required prior to final map approval or issuance of permits,
whichever occurs first. Such letter must have been issued by the water district within 90
days prior to final map approval in the case of subdivision or prior to the issuance of permits
in the case of all other residential projects.
4. Approvals have not been secured from all utilities and other interested agencies involved.
Approval of the final parcel map will be subject to any requirements that may be received
from them.
SC-01-03 8
Project No.DRC2002-00M
Completion Date
T. General Requirements and Approvals
1. The separate parcels contained within the project boundaries shall be legally combined into
one parcel prior to issuance of building permits.
2. A non-refundable deposit shall be paid to the City, covering the estimated operating costs for
all new streetlights for the first six months of operation, prior to final map approval or prior to
building permit issuance if no map is involved.
APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
U. Security Lighting
1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power.
These areas should be lighted from sunset to sunrise and on photo sensored cell.
2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,
with direct lighting to be provided by all entryways. Lighting shall be consistent around the
entire development.
3. Lighting in exterior areas shall be in vandal-resistant fixtures. —I—I—
V. Security Hardware
1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are
within 40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be
used.
W. Building Numbering
1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for
nighttime visibility.
2. Developer shall paint roof top numbers on one or more roofs of this development. They shall
be a minimum of three feet in length and two feet in width and of contrasting color to
background. The stencils for this purpose are on loan at the Rancho Cucamonga Police
Department.
APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, FIRE PROTECTION
PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING
CONDITIONS: ,
SEE ATTACHED
SC-01-03 9
FIRE PROTECTION DISTRICT
` FIRE SAFETY DIVISION
STANDARD CONDITIONS
FD PLAN REVIEW#: FD-02-0863
PROJECT#: DRC2002-00929
PROJECT NAME: Utica Office Complex
DATE: March 19, 2003
PLAN TYPE: Standard Conditions for Office Complex (8 Buildings)
APPLICANT NAME: G&L Commercial
OCCUPANCY CLASS: Group B
FLOOR AREA (S): Varies up to 7836 Square feet
TYPE CONSTRUCTION: Type V-N
FIRE-PROTECTION—
SYSTEM REQUIRED: Sprinklers for all buildings Standpipe connections in Courtyard
LOCATION: Arrow and Utica
FD REVIEW BY: Tim Fejeran Fire Inspector
PLANNER: Donald Granger _
ALL OF THE FOLLOWING STANDARD CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, (909)477-2770, TO VERIFY
COMPLIANCE WITH THE FOLLOWING:
RANCHO CUCAMONGA FIRE DISTRICT- STANDARD CONDITIONS & REQUIREMENTS —
General, Procedural, Technical, or Operational Information that shall be Included,
Corrected, or Completed as noted below. The following is applicable to the above
project.
FSC-1 General Requirements for Public and Private Water Supply
1. General Guidance for Fire Hydrants: The following provides general guidance for the spacing and
location of fire hydrants. Remember these are the maximum permitted distances between fire hydrants:
a. The maximum distance between fire hydrants in commercial/industrial projects is 300-feet. No
portion of the exterior wall shall be located more than 150-feet from an approved fire hydrant. For
cul-de-sacs the distance shall not exceed 100-feet.
b. Fire hydrants are to be located:
1. At the entrance(s) to a project from the existing public roadways. This includes subdivisions
and industrial parks.
2. At intersections.
3. On the right side of the street, whenever practical and possible.
4. As required by the Fire Safety Division to meet operational needs.
5. The location of fire hydrants is based upon the operational needs of the Fire District to control
a fire.
6. Fire hydrants shall be located a minimum of forty(40)feet from any building.
Contact the Fire Safety Division 909 477-2770
2. Minimum Fire Flow with Automatic Fire Sprinklers: The required minimum fire flow for this project is
3000 gallons per minute at a minimum residual pressure of 20 pounds per square inch. This flow reflects
a 50 percent reduction for the installation of an approved automatic fire sprinkler system with central
station monitoring. This requirement is made in accordance with Fire Code Appendix III-A, as amended,
and Fire District Ordinances and Standards.
FSC-2 Private(On-Site)Water and/or Fire Sprinkler Underground Plans for Fire Protection
1. Exceeds Allowable Distance: When any portion of a facility or building is located more than 150-feet
from a fire hydrant located on a public street, as measured by an approved route around the exterior of
the facility or building, on-site fire hydrants and mains capable of supplying the required fire flow shall be
provided. The distance is measured as vehicular path of travel on access roadways, not line of sight.
Contact the Fire Safety Division (909)477-2770
2. Number of Fire Hydrants: Provide one fire hydrant for each 1000 gpm of required fire flow or fraction
thereof, subject to standard spacing and distribution requirements. Contact the Fire Safety Division (909)
477-2770
3. Fire Sprinkler Underground: Prior to the issuance of a fire sprinkler system permit, the applicant shall
submit construction plans, specifications, and calculations for the fire sprinkler system underground to the
Fire Safety Division for approval. Contact the Fire Safety Division (909)477-2770
FSC-3 Automatic Fire Sprinkler Systems-Technical Comments
1. Required Installations:
Rancho Cucamonga Fire District Ordinance 15 or other adopted code or standard, requires an approved
automatic fire sprinkler system to be installed in any of the following:
a. Commercial or industrial structures greater than 7,500 square feet
Contact the Fire Safety Division (909)477-2770
FSC-4 Fire District Site Access-Technical Comments
1. Access Roadways Defined: Fire District access roadways include public roads, streets, and
highways, as well as private roads, streets, drive aisles and designated fire lanes.
2. Location of Access: All portions of the structure or facility or any portion of the exterior wall of the first
story shall be located within 150-feet of Fire District vehicle access, measured by an unobstructed
approved route around the exterior of the building. Landscaped areas, unpaved changes in elevation,
gates, and fences are an obstruction. Standpipe system required in center court yard to
mitigate access.
3. Private Roadways and Fire Lanes:The minimum specifications for private fire district access roadways
are:
a. The minimum unobstructed width is 26-feet.
b. The inside tum radius shall be 20-feet.
c. The outside tum radius shall be not less than 504eet.
d. The minimum radius for cul-de-sacs is 45-feet.
e. The minimum vertical clearance is 14 feet, 6 inches.
f. At any private entry median,the minimum width of traffic lanes shall be 20-feet.
g. The angle of departure and approach shall not exceed 9 degrees or 20 percent.
h. The maximum grade of the driving surface shall not exceed 12%.
i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW).
4. Access Doorways: In addition to any exterior opening required by the Building or Fire Code, approved
doorways,accessible without the use of a ladder,shall be provided as follows:
a. In buildings without high-piled storage, one or more approved access doors shall be provided
in150 lineal feet or major fraction thereof along the exterior wall that faces required access
roadways or walkways.
b. In buildings with high-piled storage one or more approved access doors shall be provided in
each 100 lineal feet or major fraction thereof, of the exterior wall that faces required access
roadways. When a railroad siding is installed provisions shall be made to maintain Fire District
access to all required openings. Contact the Fire Safety Division at 909 477-2770.
5. Fire Lane Identification: All required fire lanes shall be identified by red curbing and signage. A
drawing of the proposed signage that meets the minimum Fire District standards shall be submitted to
and approved. Contact the Rancho Cucamonga Fire Protection District at (909)477-2770 for a copy of
the FD Fire Lanes standard.
FSC-12 Plan Submittal Required Notice
Required plans shall be submitted and approved prior to construction in accordance with 1997/98 Building,
Fire, Mechanical, and Plumbing Codes; 1999 Electrical Code; Health and Safety Code; Public Resources
Code; and RCFPD Ordinances FD15 and FD32, Guidelines and Standards.
NOTE: In addition to the fees due at this time please note that separate plan check fees for tenant
improvements,fire protection systems and/or any consultant reviews will be assessed at time of submittal of
plans.
FSC-14 Alternate Materials and Methods
The Fire Safety Division will review requests for alternate materials and methods within the scope of our
authority. The request must be submitted on the Fire District"Application for Alternate Method"form along with
supporting documents. Contact the Fire Safety Division at(909)477-2770 for assistance.
PRIOR TO ISSUANCE OF BUILDING PERMITS- Complete the following:
1. Private/On-site Fire Hydrants: Prior to the issuance of any building permit,the applicant shall submit
construction plans, specifications, flow test data and calculations for the private water main system for
review and approval by the Fire District. Plans and installation shall comply with Fire District
standards. Contac the Fire Safety Division for a copy of"Fire District Notes for Underground and
Water Plans."Contact the Fire Safety Division (909)477-2770
2. Private Fire Hydrants/On-site Installation: All private on-site fire hydrants shall be installed,
flushed, and operable prior to delivering any combustible building materials on-site (i.e., lumber,
roofing materials, etc.). A representative of Fire Construction Services shall inspect the installation
and witness hydrant flushing. The builder/developer shall submit final test and inspection report to the
Fire Safety Division. Contact Building and Safety/Fire Construction Services (909) 477-2713.
3. Public Fire Hydrants: Prior to issuance of any building permit, the applicant shall submit a plan
showing the locations of all new.public fire hydrants for the review and approval by the Fire District
and the Water District. On the plan show all existing fire hydrants within a 600-foot radius of the
project. Contact the Fire Safety Division (909)477-2770
4. Public Installation: All required public fire hydrants shall be installed, flushed, and operable prior to
delivering any combustible building materials on-site (i.e., lumber, roofing materials, etc.). Water
District personnel shall inspect the installation and witness hydrant flushing. The builder/developer
shall submit a copy of the Water District inspection report to the Fire Safety Division. Contact Water
District to schedule testing.
PRIOR TO OCCUPANCY OR FINAL INSPECTION- Complete the following:
1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire
hydrant location on the street or driveway in accordance with Rancho Cucamonga Fire Protection
District and City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective
Hydrant Markers." On private property these markers are to,be maintained in good condition by the
property owner. Contact Building and Safety/Fire Construction Services (909) 477-2713.
2. Private Fire Hydrants- Final Acceptance: For the purpose of final acceptance, an additional test of
the on-site fire hydrants shall be conducted by the builder/developer in the presence of the Water
District or Fire Construction Services, as appropriate. The builder/developer shall submit the final
test report to the Fire Safety Division.
3. Fire Sprinkler System- Plans and Permit: Plans for the required automatic fire sprinkler system
shall be submitted to Fire Construction Services for review and approval. No work is allowed without
a Fire Construction Services permit. Contact Building and Safety/Fire Construction Services (909)
477-2713.
4. Fire Sprinkler System- Final Inspection: Prior to the issuance of a Certificate of Occupancy, the
fire sprinkler system(s) shall be tested and accepted by Fire Construction Services. Contact Building
and Safety/Fire Construction Services (909) 477-2713.
5. Sprinkler Monitoring: The fire sprinkler system monitoring system shall be installed, tested, and
operational immediately following the completion of the fire sprinkler system. Monitoring is required
with 20 sprinklers in Group I Occupancies, or 100 or more sprinklers in all other Occupancies.
Contact Building and Safety/Fire Construction Services (909)477-2713.
6. Knox Rapid Entry System: A Knox rapid entry key vault shall be installed prior to final inspection.
Proof of purchase shall be submitted prior to final building plan approval. Contact the Fire Safety
Division for specific details and ordering information. Contact Building and Safety/Fire Construction
Services (909) 477-2713 for inspection.
7. Fire Lanes: Prior to the issuance of any Certificate of Occupancy,the fire lanes shall be installed in
accordance with the approved fire lane plan. The CC&R's or other approved documents shall contain an
approved fire lane map and provisions that prohibit parking in the fire lanes. The method of enforcement
shall be documented. The CC&R's shall also identify who is responsible for not less than annual
inspection and maintenance of all required fire lanes. Contact Building and Safety/Fire Construction
Services (909) 477-2713.
8. Address-Other Than Single-family: New buildings other than single-family dwellings shall post the
address with minimum 8-inch numbers on contrasting background,visible from the street and electrically
illuminated during periods of darkness. When the building setback exceeds 200 feet from the public
street an additional non-illuminated 6-inch minimum number address shall be provided at the property
entrance.Contact Building and Safety/Fire Construction Services (909) 477-2713.
9. Fire District Confidential Business Occupancy Information: The applicant shall complete the
Rancho Cucamonga Fire District "Confidential Business Occupancy Information" Form and submit to
the Fire Safety Division. This form provides contact information for Fire District use in the event of an
emergency at the subject building or property. Contact Fire Safety Division (909)477-2770
Fire District Review Letter(P&E)-Template
SL 10/31/02 Revision