HomeMy WebLinkAbout03-69 - Resolutions RESOLUTION NO. 03-69
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING TENTATIVE PARCEL
MAP SUBTPM16009, A SUBDIVISION OF 4.86 ACRES INTO PARCELS IN
THE GENERAL INDUSTRIAL DISTRICT(SUBAREA 13), LOCATED AT THE
SOUTHEAST CORNER AND SOUTHWEST CORNER OF 6TH STREET
AND CHARLES SMITH AVENUE, AND MAKING FINDINGS IN SUPPORT
THEREOF—APN: 229-263-05 AND 229-283-04 AND 05.
A. Recitals.
1. RKW Development Corporation filed an application for approval of Tentative Parcel Map
SUBTPM16009, as described in the title of this Resolution. Hereinafter in this Resolution, the
subject Tentative Parcel Map request is referred to as "the application."
2. On December 11, 2002, and continued to January 8, February 26, March 26, April 23,
and May 14, 2003, the Planning Commission held a duly advertised public hearing for the above-
described map.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission
of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the above-
referenced public hearing on December 11, 2002, and January 8, February 26, March 26, April 23,
and May 14, 2003, including written and oral staff reports, together with public testimony, this
Commission hereby specifically finds as follows:
a. The application applies to three parcels of land on 4.86 acres of land at the
southeast comer and southwest comer of 6th Street and Charles Smith Avenue; and
b. The applicant proposes to subdivide the project site into four parcels; and
C. The property to the south of the subject site is improved with one office and one
industrial building, the property to the east is the 1-15 Freeway, and the properties to the north and
west are vacant; and
d. Two residential homes exist on-site that have been determined to be non-historic
and are proposed to be removed; and
e. The property is located within a designated Delhi Sands flower-loving fly habitat
zone; and
f. The site has 65 various species of heritage trees; and
g. Access into the site is from Charles Smith Avenue; and
PLANNING COMMISSION RESOLUTION NO. 03-69
SUBTPM16009— RKW DEVELOPMENT CORPORATION
May 14, 2003
Page 2
h. The property abuts the 1-15 Freeway to the east; and
i. Accompanying this application is a proposal to construct four
industrial/manufacturing buildings (Development Review DRC2002-00751).
3. Based upon the substantial evidence presented to this Commission during the above-
referenced public hearing and upon the specific findings of facts set forth in paragraphs 1 and 2
above, this Commission hereby finds and concludes as follows:
a. The Tentative Parcel Map is consistent with the General Plan and Development
Code; and
b. The design or improvements of the Tentative Parcel Map is consistent with the
General Plan and the Development Code; and
C. The site is physically suitable for the type of development proposed; and
d. The design of the subdivision is not likely to cause substantial environmental
damage and avoidable injury to humans and wildlife or their habitat; and
e. The Tentative Parcel Map is not likely to cause serious public health problems;and
f. The design of the Tentative Parcel Map will not conflict with any easement acquired
by the public at large, now of record, for access through or use of the property within the proposed
subdivision.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration, together with all written and oral reports included for the environmental assessment for
the application, the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and
Monitoring Program attached hereto, and incorporated herein by this reference, based upon the
findings as follows:
a. That the Mitigated Negative Declaration has been prepared in compliance with the
California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines
promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared
therefore reflect the independent judgment of the Planning Commission; and, further, this
Commission has reviewed and considered the information contained in said Mitigated Negative
Declaration with regard to the application.
b. Although the. Mitigated Negative Declaration identifies certain significant
environmental effects that will result if the project is approved, all significant effects have been
reduced to an acceptable level by imposition of mitigation measures on the project,which are listed
below as Conditions of Approval.
C. Pursuant to the provisions of Section 753.5(c) of Title 14 of the California Code of
Regulations, the Planning Commission finds as follows: In considering the record as a whole, the
Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the
proposed project will have potential for an adverse impact upon wildlife resources or the habitat upon
which wildlife depends. Further, based upon the substantial evidence contained in the Mitigated
Negative Declaration, the staff reports and exhibits, and the information provided to the Planning
PLANNING COMMISSION RESOLUTION NO. 03-69
SUBTPM16009— RKW DEVELOPMENT CORPORATION
May 14, 2003
Page 3
Commission during the public hearing, the Planning Commission hereby rebuts the presumption of
adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code of Regulations
5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth below
Standard Conditions, attached hereto and incorporated herein by this reference:
Engineering Division
1) All street frontages shall be improved including, but not limited to,curbs
and gutters, sidewalks, drive approaches, streetlights, street trees,
signing, striping, etc., and as required. Charles Smith Avenue is a City
Industrial Local street,6th Street is a City Major Divided Arterial west of
Charles Smith Avenue and Major Arterial/Secondary east of Charles
Smith Avenue. The transition from Major Divided to Major Secondary is
subject to Traffic Engineer approval.
2) Complete the south side of 6th Street, including parkway under the
freeway. The parkway may be a 4.5-foot wide curb adjacent sidewalk.
If the bridge abutment interferes, then a special design shall be
submitted to the City for consideration.
3) Improvements to 6th Street shall include removal and reconstruction of
existing a.c. pavement to centerline of the street.
4) Provide appropriate improvements for proper transitions and joining of
existing improvements.
5) The transportation fee credit and/or reimbursement may be utilized for
6th Street improvements. The exact limits of improvements eligible
shall be determined during plan check consistent with the backbone
concept.
6) Provide easement for the storm drain and coordinate with other
agencies for underground utility relocation/easement.
7) Process street vacation. Charles Smith Avenue shall not be vacated
until the new Charles Smith Avenue is constructed.
8) The existing overhead utilities (telecommunications and electrical) on
the project side of Charles Smith Avenue shall be undergrounded along
the entire project frontage extending to the first pole off site (north and
south), prior to public improvement acceptance or occupancy,
whichever occurs first. All services crossing 6th Street shall be
undergrounded at the same time. The developer may request a
reimbursement agreement to recover one-half the City adopted cost for
undergrounding from future development as it occurs on the opposite
side of the street. If the developer fails to submit for said
reimbursement agreement within six months of the public
PLANNING COMMISSION RESOLUTION NO. 03-69
SUBTPM16009 — RKW DEVELOPMENT CORPORATION
May 14, 2003
Page 4
improvements being accepted by the City, all rights of the developer to
reimbursement shall terminate.
9) An in lieu-fee as a contribution for future undergrounding of the existing
overhead utilities (telecommunications and electrical except for the
66 kv electrical) on the opposite side of 6th Street shall be paid prior to
issuance of building permits. The fee shall be one-half the City adopted
unit amount times the length of the frontage.
10) The developer shall obtain a Caltrans encroachment permit prior to
issuance of building permits.
Environmental Mitigation
Air Quality
1) The site shall be treated with water or other soil-stabilizing agent
(approved by South Coast Air Quality Management District and
Regional Water Quality Control Board)daily to reduce PM10 emissions,
in accordance with SCAQMD Rule 403.
2) Charles Smith Avenue and 6th Street shall be swept according to a
schedule established by the City to reduce PM10 emissions associated
with vehicle tracking of soil off-site. Timing may vary depending upon
time of year of construction.
3) Grading operations shall be suspended when wind speeds exceed
25 miles per hour to minimize PM10 emissions from the site during such
episodes.
4) Chemical soil stabilizers (approved by South Coast Air Quality
Management District and Regional Water Quality Control Board) shall
be applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PM10 emissions.
5) The construction contractor shall select the construction equipment
used on-site based on low emission factors and high-energy efficiency.
The construction contractor shall ensure the Construction Grading
Plans include a statement that all construction equipment will be tuned
and maintained in accordance with the manufacturers' specifications.
6) The construction contractor shall utilize electric or clean alternative fuel
powered equipment where feasible.
7) The construction contractor shall ensure that Construction-Grading
Plans include a statement that work crews will shut off equipment when
not in use.
8) If the industrial buildings associated with Development Review
DRC2002-00750 are constructed concurrently with the industrial
PLANNING COMMISSION RESOLUTION NO. 03-69
SUBTPM16009 — RKW DEVELOPMENT CORPORATION
May 14, 2003
Page 5
buildings associated with Development Review DRC2002-00751, the
contractor shall use low volatile organic compound paints sprayed over
a period of 65 days.
Biological
1) In order to preserve the Oak tree in its existing location,the grade level
will need to be preserved for a distance of 25 feet out from the trunk in
all directions. This area is the root preservation zone and no
development or construction operations may occur therein.
2) Prior to grading, a fence shall be constructed to minimize potential
damage to the root zone.
3) The final Landscape Plan shall show that no landscape or other
encroachment shall occur within the root zone. The surface of the root
preservation area shall be treated with decomposed granite, organic
compost, or cobblestones in order to create an aesthetically appealing
texture.
Hazards
1) Prior to issuance of demolition permits, the applicant shall have an
asbestos survey completed for the structures. A report of findings shall
be presented to the Building Official with the application for a demolition
permit. Should the survey show asbestos is present, the applicant
shall follow the recommendations made in the report for proper
treatment and/or removal during demolition.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 14TH DAY OF MAY 2003.
PLANNING COM ISSION OF THE CITY OF RANCHO CUCAMONGA
BY:
arty r cNiel, Chairman
ATTEST:
Bra er, ec to r
I, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby
certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the
Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning
Commission held on the 14th day of May 2003, by the following vote-to-wit:
PLANNING COMMISSION RESOLUTION NO. 03-69
SUBTPM16009— RKW DEVELOPMENT CORPORATION
May 14, 2003
Page 6
AYES: COMMISSIONERS: FLETCHER, MACIAS, McNIEL, STEWART
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: McPHAIL
City of Rancho Cucamonga
MITIGATION MONITORING
PROGRAM
Project File No.: Tentative Parcel Map SUBTPM16009 and Development Review DRC2002-00751
This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation
measures identified in the Mitigated Negative Declaration for the above-listed project. This program
has been prepared in compliance with State law to ensure that adopted mitigation measures are
implemented (Section 21081.6 of the Public Resources Code).
Program Components - This MMP contains the following elements:
1. Conditions of approval that act as impact mitigation measures are recorded with the action and
the procedure necessary to ensure compliance.The mitigation measure conditions of approval
are contained in the adopted Resolution of Approval for the project.
2. A procedure of compliance and verification has been outlined for each action necessary. This
procedure designates who will take action, what action will be taken and when, and to whom
and when compliance will be reported.
3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring
progresses, changes to compliance procedures may be necessary based upon
recommendations by those responsible for the program.
Program Management-The MMP will be in place through all phases of the project. The project
planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project
planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly
and proper action is taken on each mitigation. Each City department shall ensure compliance of the
conditions (mitigation) that relate to that department.
Procedures -The following steps will be followed by the City of Rancho Cucamonga.
1. A fee covering all costs and expenses, including any consultants' fees, incurred by the City in
performing monitoring or reporting programs shall be charged to the applicant.
2. A MMP Reporting Form will be prepared for each potentially significant impact and its
corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached
hereto. This procedure designates who will take action,what action will be taken and when,and
to whom and when compliance will be reported. All monitoring and reporting documentation will
be kept in the project file with the department having the original authority for processing the
project. Reports will be available from the City upon request at the following address:
City of Rancho Cucamonga - Lead Agency
Planning Division
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
Mitigation Monitoring Program
SUBTPM16009 and DR2002-00751
March 26, 2003
Page 2
3. Appropriate specialists will be retained if technical expertise beyond the City staffs is needed,as
determined by the project planner or responsible City department,to monitor specific mitigation
activities and provide appropriate written approvals to the project planner.
4. The project planner or responsible City department will approve, by signature and date, the
completion of each action item that was identified on the MMP Reporting Form. After each
measure is verified for compliance, no further action is required for the specific phase of
development.
5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off
as completed by the project planner or responsible City department at the bottom of the MMP
Reporting Form.
6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation
measures. The project planner is responsible for approving any such refinements or additions.
An MMP Reporting Form will be completed bythe project planner or responsible City department
and a copy provided to the appropriate design, construction, or operational personnel.
7. The project planner or responsible City department has the authority to stop the work of
construction contractors if compliance with any aspects of the MMP is not occurring afterwritten
notification has been issued. The project planner or responsible City department also has the
authority to hold certificates of occupancies if compliance with a mitigation measure attached
hereto is not occurring.The project planner or responsible City department has the authority to
hold issuance of a business license until all mitigation measures are implemented.
8. Any conditions (mitigation) that require monitoring after project completion shall be the
responsibility of the City of Rancho Cucamonga Planning Division.The Division shall require the
applicant to post any necessary funds (or other forms of guarantee)with the City. These funds
shall be used by the City to retain consultants and/or pay for City staff time to monitor and report
on the mitigation measure for the required period of time.
9. In those instances requiring long-term project monitoring, the applicant shall provide the City
with a plan for monitoring the mitigation activities at the project site and reporting the monitoring
results to the City. Said plan shall identify the reporter as an individual qualified to know whether
the particular mitigation measure has been implemented. The monitoring/reporting plan shall
conform to the City's MMP and shall be approved by the Community Development Director or
City Planner prior to the issuance of building permits.
MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III)
Project File No.: SUBTPM16009 & DRC2002-00751 Applicant: RKW Development Corporation
Initial Study Prepared by: Warren Morelion Date: November 18. 2002
ResponsibleMitigation Measures No. of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Air Quality
The site shall be treated with water or other soil stabilizing agent CP C Review of plans A/C 2
(approved by South Coast Air Quality Management District and
Regional Water Quality Control Board)daily to reduce PMro emission,
in accordance with SCAQMD Rule 403.
Charles Smith Avenue and 6th Street shall be swept according to a CP C Review of plans 2
schedule established by the City to reduce PMID emissions associated
with vehicle tracking of soil off-site.Timing may vary depending upon
time of year of construction.
Grading operations shall be suspended when wind speeds exceed 25 CP C Review of plans 2
mph to minimize PMru emissions from the site during such episodes.
Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall CP C Review of plans 2
be applied to all inactive construction areas that remain inactive for 96
hours or more to reduce PMra emissions.
The construction contractor shall select the construction equipment CP C Review of plans 2
used on-site based on low emission factors and high-energy efficiency.
The construction contractor shall ensure the construction grading
plans indude a statement that all construction equipmentwill be tuned
and maintained in accordance with the manufacturers'specifications.
The construction contractor shall utilize electric or dean alternative fuel CP C Review of plans 2
powered equipment where feasible.
The construction contractor shall ensure that construction-grading CP/CE B/C Review of plans A/C 2
plans include a statement that work crews will shut off equipment when
not in use.
If the industrial buildings associated with Development Review CP A Review of plans A/C 4
DRC2002-00750 are constructed concurrently with the industrial
buildings assodaled with Development Review DRC2002-00751,the
contractor shall use low volatile organic compound paints sprayed over
a period of 65 days.
v f
'Biologicamesourc®s„ =
In order to preserve the Oak tree in its existing location the grade level CP C Review of plans A/C 2
will need to be preserved for a distance of 25 feet out from the trunk in
all directions. This area is the root preservation zone and no
development or construction operations may occur therein.
Prior to grading, a fence shall be constructed to minimize potential CP C Review of plans A/C 2
damage to the root zone.
Mitigation Measures No.
Responsible . . of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Biological Resources (continued)
The final landscape plan shall show that no landscape or other CP C Review of plans A/C 2
encroachment shall occur within the root zone. The surface of the root
preservation area shall be treated with decomposed granite,organic
compost or cobblestones in order to create an aesthetically appealing
texture.
Hazards
Prior to issuance of demolition permits,the applicant shall have an CP C Review of plans KID 2
asbestos survey completed for the structures. A report of findings
shall be presented to the Building Official with the application for a
demolition permit. Should the survey show asbestos is present,the
applicant shall follow the recommendations made in the report for
proper treatment and/or removal during demolition.
Key to Checklist Abbreviations
Responsible Person - Monitoring Frequency Method of Verification sanctions '
`e
CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map
CP-City Planner or designee B-Prior To construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit
CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy
BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order
PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds
FC-Fire Chief or designee 6-Revoke CUP
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT#: TENTATIVE PARCEL MAP SUBTPM16009
SUBJECT: SUBDIVISION OF 4.86 ACRES OF LAND INTO 4 PARCELS
APPLICANT: RKW DEVELOPMENT CORPORATION
SOUTHEAST AND SOUTHWEST CORNERS OF 6TH STREET AND CHARLES SMITH
LOCATION: AVENUE
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DIVISION, (909) 477-2750, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
Completion Date
A. General Requirements
1. The applicant shall agree to defend at his sole expense any action brought against the City,
its agents, officers, or employees, because of the issuance of such approval, or in the
alternative, to relinquish such approval. The applicant shall reimburse the City, its agents,
officers, or employees, for any Court costs and attorney's fees which the City, its agents,
officers, or employees may be required by a court to pay as a result of such action. The City
may, at its sole discretion, participate at its own expense (without applicant's reimbursement)
in the defense of any such action but such participation shall not relieve applicant of its other
obligations under this condition.
2. Copies of the signed Planning Commission Resolution of Approval No. 03-69, Standard
Conditions, and all environmental mitigations shall be included on the plans (full size). The
sheet(s) are for information only to all parties involved in the construction/grading activities
and are not required to be wet sealed/stamped by a licensed Engineer/Architect.
B. Time Limits
1. This tentative tract map or tentative parcel map shall expire, unless extended by the Planning
Commission, unless a complete final map is filed with the City Engineer within 3 years from
the date of the approval.
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which
include site plans, architectural elevations, exterior materials and colors, landscaping, sign
program, and grading on file in the Planning Division, the conditions contained herein, and
Development Code regulations.
SC-08-02 1
Project No.SUBTPM16009
Completion Date
2. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.) or prior to final map approval in the case of a custom lot subdivision, or
approved use has commenced, whichever comes first.
3. Approval of this request shall not waive compliance with all sections of the Development
Code, all other applicable City Ordinances, and applicable Community or Specific Plans in
effect at the time of building permit issuance.
4. All parkways, open areas, and landscaping shall be permanently maintained by the property
owner, homeowners' association, or other means acceptable to the City. Proof of this
landscape maintenance shall be submitted for City Planner and City Engineer review and
approved prior to the issuance of building permits.
D. Landscaping
1. The final design of the perimeter parkways, walls, landscaping, and sidewalks shall be
included in the required landscape plans and shall be subject to City Planner review and
approval and coordinated for consistency with any parkway landscaping plan which may be
required by the Engineering Division.
2. Special landscape features such as mounding, and west of Charles Smith Avenue only,
meandering sidewalks (with horizontal change), is required along 6th Street.
3. Landscaping and irrigation systems required to be installed within the public right-of-way on
the perimeter of this project area shall be continuously maintained by the developer.
4. On projects which abut the 1-15 Freeway, the developer shall provide landscaping within the
freeway right-of-way along the boundary of this project or pay an in-lieu of construction cash
deposit. The landscape and irrigation plans shall be prepared in conformance with Caltrans
and City Standards through the City of Rancho Cucamonga. Plans shall be reviewed and
approved by the City Planner and City Engineer. Landscape and irrigation shall be installed
prior to the release of occupancy of the project. If final approvals and/or installation are not
complete at that time, the City will accept a cash deposit for future landscaping of the
Caltrans right-of-way.
E. Environmental
1. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures, including monitoring and reporting. Applicant shall be required
to post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the
amount of $ 719.00 prior to the issuance of building permits, guaranteeing satisfactory
performance and completion of all mitigation measures. These funds may be used by the
City to retain consultants and/or pay for City staff time to monitor and report on the mitigation
measures. Failure to complete all actions required by the approved environmental
documents shall be considered grounds for forfeit.
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION, (909) 477-2710,
FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
F. General Requirements
1. Submit five complete sets of plans including the following: —/—/—
a. Site/Plot Plan;
SC-08-02 2
Project No.SUBTPM16009
Completion Date
b. Foundation Plan;
C. Floor Plan;
d. Ceiling and Roof Framing Plan;
e. Electrical Plans (2 sets, detached) including the size of the main switch, number and
size of service entrance conductors, panel schedules, and single line diagrams;
f. Plumbing and Sewer Plans, including isometrics, underground diagrams, water and
waste diagram, sewer or septic system location, fixture units, gas piping, and heating
and air conditioning; and
g. Planning Division Project Number (i.e., TT #, CUP #, DR #, etc.) clearly identified on
the outside of all plans.
2. Submit two sets of structural calculations, energy conservation calculations, and a soils
report. Architect's/Engineer's stamp and "wet" signature are required prior to plan check
submittal.
3. Contractors must show proof of State and City licenses and Workers' Compensation
coverage to the City prior to permit issuance.
4. Separate permits are required for fencing and/or walls.
5. Business Business shall not open for operation prior to posting the Certificate of Occupancy issued by _/_/_
the Building and Safety Division.
G. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be
marked with the project file number (i.e., SUBTPM16009). The applicant shall comply with
the latest adopted California Codes, and all other applicable codes, ordinances, and
regulations in effect at the time of permit application. Contact the Building and Safety
Division for availability of the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new commercial or industrial development project
or major addition, the applicant shall pay development fees at the established rate. Such
fees may include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee,
Transportation Development Fee, Permit and Plan Check Fees, and School Fees. Applicant
shall provide a copy of the school fees receipt to the Building and Safety Division prior to
permits issuance.
3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map
recordation and prior to issuance of building permits.
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday
through Saturday, with no construction on Sunday or holidays.
5. Construct trash enclosure(s) per City Standard (available at the Planning Division's public
counter).
6. The following is required for side yard use for increase in allowable area:
a. Provide a reduced site plan (8 '/2" x 11"), which indicates the non-buildable easement.
b. Recorded "Covenant and Agreement for the Maintenance of a Non-Buildable
Easement," which is signed by the appropriate property owner(s).
SC-08-02 3
Project No.SUBTPM16009
Completion Date
H. New Structures
1. Provide compliance with the California Building Code (CBC) for property line clearances
considering use, area, and fire-resistiveness.
2. Provide compliance with the California Building Code for required occupancy separations.
3. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC —/_/—
Section 1505.
4. Exterior walls shall be constructed of the required fire rating in accordance with CBC
Table 5-A
5. Openings in exterior walls shall be protected in accordance with CBC Table 5-A. —/_
6. Provide smoke and heat venting in accordance with CBC Section 906. ��-
7. Upon tenant improvement plan check submittal, additional requirements may be needed. —/_
I. Grading
1. Grading of the subject property shall be in accordance with California Building Code, City
Grading Standards, and accepted grading practices. The final grading plan shall be in
substantial conformance with the approved grading plan.
2. A soils report shall be prepared by a qualified engineer licensed by the State of California to ��—
perform such work.
3. A geological report shall be prepared by a qualified engineer or geologist and submitted at
the time time of application for grading plan check.
4. The final grading, appropriate certifications and compaction reports shall be completed,
submitted, and approved by the Building and Safety Official prior to the issuance of building
permits.
5. A separate grading plan check submittal is required for all new construction projects and for
existing buildings buildings where improvements being proposed will generate 50 cubic yards or more
of combined cut and fill. The grading plan shall be prepared, stamped, and signed by a
California registered Civil Engineer.
APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
J. Dedication and Vehicular Access
1. Dedication shall be made of the following rights-of-way on the perimeter streets (measured
from street street centerline):
44- 50 feet total feet on 6th Street, east of Charles Smith Avenue
66 feet feet total feet on Charles Smith Avenue —1—/-
2. Corner property line cutoffs shall be dedicated per City Standards. /�-
3. Private drainage easements for cross-lot drainage shall be provided and shall be delineated /�—
or noted on the final map.
4. Easements for public sidewalks and/or street trees placed outside the public right-of-way
—/—
shall be dedicated to the City.
SC-08-02 4
Project No.SUBTPM16009
Completion Date
5. The developer shall make a good faith effort to acquire the required off-site property interests
necessary to construct the required public improvements, and if he/she should fail to do so,
the developer shall, at least 120 days prior to submittal of the final map for approval, enter
into an agreement to complete the improvements pursuant to Government Code Sections
66462 and 66462.5 at such time as the City decides to acquire the property interests
required for the improvements. Such agreement shall provide for payment by the developer
of all costs incurred by the City if the City decides to acquire the off-site property interests
required in connection with the subdivision. Security for a portion of these costs shall be in
the form of a cash deposit in the amount given in an appraisal report obtained by the City, at
developer's cost. The appraiser shall have been approved by the City prior to
commencement of the appraisal. This condition applies in particular, but not limited to:
Charles Smith Avenue, north of 6th Street.
K. Street Improvements
1. All public improvements (interior streets, drainage facilities, community trails, paseos,
landscaped areas, etc.) shown on the plans and/or tentative map shall beconstructed to City
Standards. Interior street improvements shall include, but are not limited to, curb and gutter,
AC pavement, drive approaches, sidewalks, street lights, and street trees.
2. Construct the following perimeter street improvements including, but not limited to:
Curb& A.C. Side- Drive Street Street Comm Median Bike
Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island I Trail Other
X
6th Street X X e X X X b
Charles Smith Avenue X X X X X X b
Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement
reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk
shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be
provided for this item (e) Curvilinear west of Charles Smith Avenue.
3. Improvement Plans and Construction:
a. Street improvement plans, including street trees, street lights, and intersection safety
lights on future signal poles, and traffic signal plans shall be prepared by a registered
Civil Engineer and shall be submitted to and approved by the City Engineer. Security
shall be posted and an agreement executed to the satisfaction of the City Engineer and
the City Attorney guaranteeing completion of the public and/or private street
improvements, prior to final map approval or the issuance of building permits,
whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a
construction permit shall be obtained from the City Engineer's Office in addition to any
other permits required.
C. Pavement striping, marking, traffic signing, street name signing, traffic signal conduit,
and interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Signal conduit with pull boxes shall be installed with' any new construction or
reconstruction project along major or secondary streets and at intersections for future
traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the
street at 3 feet outside of BCR, ECR, or any other locations approved by the City
Engineer
SC-08-02 5
Project No.SUBTPM16009 .
Completion Date
Notes:
1) Pull boxes shall be No. 6 at intersections and No. 5 along streets, a maximum of
200 feet apart, unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch (at intersections) or 2-inch (along streets) galvanized
steel with pull rope or as specified.
e. Handicapped access ramps shall be installed on all corners of intersections per City
Standards or as directed by the City Engineer.
f. Existing City roads requiring construction shall remain_ open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A
cash deposit shall be provided to cover the cost of grading and paving, which shall be
refunded upon completion of the construction to the satisfaction of the City Engineer.
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be
installed to City Standards, except for single family residential lots.
4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in
accordance with the City's street tree program.
5. Install street trees per City street tree design guidelines and standards as follows. The
completed legend and construction notes shall appear on the title page of the street
improvement plans. Where public landscape plans are required, tree installation in those
areas shall be per the public landscape improvement plans.
The City Engineer reserves the right to adjust tree species based upon field conditions and
other variables. For additional information, contact Laura Bonaccorsi at extension 4023.
Min.
Grow
Street Name Botanical Name Common Name Space Spacing Size city.
6th Street Magnolia grandiflora NCN 3' 20' O.C. 15 gal
Planting areas "Saint Marys"
less than 8'
Charles Smith Brachychiton Bottle Tree 5' 25'O.C. 15 gal
Avenue populneus
'TREES SHALL BE 15-GALLON SIZE UNLESS OTHERWISE APPROVED.
Construction Notes for Street Trees:
1) All street trees are to be planted in accordance with City standard plans.
2) Prior to the commencement of any planting, an agronomic soils report shall be
furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may
require backfill soil amendments, as determined by the City inspector.
3) All street trees are subject to inspection and acceptance by the Engineering Division.
4) Street trees are to be planted per public improvement plans only.
6. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with
adopted policy. On collector or larger streets, lines of sight shall be plotted for all project
intersections, including driveways. Local residential street intersections and commercial or
industrial driveways may have lines of sight plotted as required.
7. A permit shall be obtained from Caltrans for any work within the following right of-way: 1-15
at 6th Street.
SC-08-02 6
Project No.SUBTPM16009
Completion Date
L. Public Maintenance Areas
1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting
Districts shall be filed with the City Engineer prior to final map approval or issuance of
building permits whichever occurs first. Formation costs shall be borne by the developer.
M. Drainage and Flood Control
1. A final drainage study shall be submitted to and approved by the City Engineer prior to final
map approval or the issuance of building permits, whichever occurs first. All drainage
facilities shall be installed as required by the City Engineer.
2. Adequate provisions shall be made for acceptance and disposal of surface drainage entering
the property from adjacent areas.
3. Trees are prohibited within 5 feet of the outside diameter of any public storm drain pipe
measured from the outer edge of a mature tree trunk.
4. Public storm drain easements shall be graded to convey overflows in the event of a blockage
in a sump catch basin on the public street.
N. Utilities
1. Provide separate utility services to each parcel including sanitary sewerage system, water,
gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility
Standards. Easements shall be provided as required.
2. The developer shall be responsible for the relocation of existing utilities as necessary.
3. Water and sewer plans shall be designed and constructed to meet the requirements of the _J_J_
Cucamonga County Water District (CCWD), Rancho Cucamonga Fire Protection District, and
the Environmental Health Department of the County of San Bernardino. A letter of
compliance from the CCWD is required prior to final map approval or issuance of permits,
whichever occurs first. Such letter must have been issued by the water district within 90
days prior to final map approval in the case of subdivision or prior to the issuance of permits
in the case of all other residential projects.
4. Approvals have not been secured from all utilities and other interested agencies involved.
Approval of the final parcel map will be subject to any requirements that may be received
from them.
O. General Requirements and Approvals
1. Permits shall be obtained from the following agencies for work within their right of-way:
Caltrans.
2. A non-refundable deposit shall be paid to the City, covering the estimated operating costs for
all new streetlights for the first six months of operation, prior to final map approval or prior to
building permit issuance if no map is involved.
APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, FIRE PROTECTION
PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING
CONDITIONS:
SEE ATTACHED
SC-0&02 7
a - FIRE PROTECTION DISTRICT
FIRE SAFETY DIVISION
STANDARD CONDITIONS
FD PLAN REVIEW#: FD-02-0667-A
PROJECT#: DRC2002-00751 and TPM16009
PROJECT NAME: The Vineyards West
DATE: October 30, 2002
PLAN TYPE: Commercial/Industrial and TPM Review
APPLICANT NAME: RKW Development
OCCUPANCY CLASS: Group S
FLOOR AREA (S): Largest 18,537 s.f. of 4 Buildings
TYPE CONSTRUCTION: Type V-N
FIRE PROTECTION
SYSTEM REQUIRED: Automatic fire S"Iler Systems with approved monitoring
LOCATION: SEC and SWC 6 and Charles Smith
FD REVIEW BY: Steve Locati Fire Protection Planning Specialist
PLANNER: Warren Morelion
r FIRE DISTRICT USE ONLY
Outstanding Fire District Issues Status—"Cleared"when required information is entered below
01
r, 01
Section B Issues Cleared 10/10/02- Fees in the amount of$214 paid in full.i Recorded by:
ALL OF THE FOLLOWING TECHNICAL REVIEW COMMENTS APPLY TO YOUR
PROJECT. THOSE PORTIONS OF THE PLANS COVERED BY COMMENTS IN
SECTIONS B THROUGH E ARE CONSIDERED INCOMPLETE AS NOTED.
APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, (909) 477-2770, EXT.
3009, TO VERIFY COMPLIANCE WITH THE FOLLOWING:
PLEASE CONSIDER THIS PROJECT 'INCOMPLETE" UNTIL ITEMS IN SECTIONS "B" THROUGH "E" ARE
CORRECTED OR ADDRESSED
A. Outstanding Fire District Completeness Issues Affecting Approval of Project
1. There are no outstanding Fire District "completeness" items for this project. Any conditions,
comments, or corrections are technical in nature and shall be addressed prior to issuance of required
permits or a certificate of occupancy as indicated.
B. Fire District Fees
1. No Fees Due: All fees due at this time have been paid.
C. Community Facilities Districts Annexation
1. There are no Fire District annexation issues for this project. It is located within an existing Community
Facilities District for fire protection
D. Available Water Supply
1. There are no Fire District water supply or fire flow issues for this project based on one of the
following:
a. The required verification of available water supply has been received.The Rancho Cucamonga Fire
Protection District Water AvailabilitV for Fire Protection Form has been completed by the Water
District and submitted to the Fire Safety Division, or
b. The project does not require proof of available water supply or additional fire flow.
E. Fire District Access Issues to Be Addressed Immediately
1. No Access Problems:There are no outstanding "incompleteness" items related to FD access for this
project. For outstanding technical issues see below.
RANCHO CUCAMONGA FIRE DISTRICT- STANDARD CONDITIONS & REQUIREMENTS —
General, Procedural, Technical, or Operational Information that shall be Included,
Corrected, or Completed as noted below. The following are applicable to this project:
FSR-1 General Requirements for Public and Private Water Supply
1. General Guidance for Fire Hydrants: The following provides general guidance for the spacing and
location of fire hydrants. Remember these are the maximum permitted distances between fire hydrants:
a. The maximum distance between fire hydrants in commerciaVindustrial projects is 300-feet. No
portion of the exterior wall shall be located more than 150-feet from an approved fire hydrant. For
cul-de-sacs the distance shall not exceed 100-feet.
b. Fire hydrants are to be located:
1. At the entrance(s) to a project from the existing public roadways. This includes subdivisions
and industrial parks.
2. At intersections.
3. On the right side of the street, whenever practical and possible.
4. As required by the Fire Safety Division to meet operational needs.
5. The location of fire hydrants is based upon the operational needs of the Fire District to control
a fire.
6. Fire hydrants shall be located a minimum of forty(40)feet from any building.
Contact the Fire Safety Division 909 477-2770
2. Minimum Fire Flow with Automatic Fire Sprinklers: The required minimum fire flow for this project is
2250 gallons per minute at a minimum residual pressure of 20 pounds per square inch. This flow
reflects a 50 percent reduction for the installation of an approved automatic fire sprinkler system with
central station monitoring. This requirement is made in accordance with Fire Code Appendix III-A, as
amended, and Fire District Ordinances and Standards.
3. Hydrants Used to Supply Fire Flow: Public fire hydrants located within a 500-foot radius of the
proposed project may be used to provide the required fire flow subject to Fire District review and approval.
Private fire hydrants on adjacent property shall not be used to provide required fire flow. Contact the Fire
Safety Division (909)477-2770
4. Show Existing Fire Hydrants and Mains: Existing fire hydrants and mains within 600-feet of the project
shall be shown on the water plan submitted for review and approval. Include main size.
FSR-2 Private(On-Site)Water and/or Fire Sprinkler Underground Plans for Fire Protection
1. Exceeds Allowable Distance: When any portion of a facility or building is located more than 150-feet
from a fire hydrant located on a public street, as measured by an approved route around the exterior of
the facility or building, on-site fire hydrants and mains capable of supplying the required fire flow shall be
provided. The distance is measured as vehicular path of travel on access roadways, not line of sight.
Contact the Fire Safety Division (909)477-2770
2. Number of Fire Hydrants: Provide one fire hydrant for each 1000 gpm of required fire flow or fraction
thereof, subject to standard spacing and distribution requirements. Contact the Fire Safety Division (909)
477-2770
3. Fire Sprinkler Underground: Prior to the issuance of a fire sprinkler system permit, the applicant shall
submit construction plans, specifications, and calculations for the fire sprinkler system underground to the
Fire Safety Division for approval. Contact the Fire Safety Division (909)477-2770
FSR-3 Automatic Fire Sprinkler Systems-Technical Comments
1. Required Installations:
Rancho Cucamonga Fire District Ordinance 15 or other adopted code or standard, requires an approved
automatic fire sprinkler system to be installed in any of the following:
a. Commercial or industrial structures greater than 7,500 square feet.
Contact the Fire Safety Division (909)477-2770
FSR-4 Fire District Site Access-Technical Comments
1. Access Roadways Defined: Fire District access roadways include public roads, streets, and
highways, as well as private roads, streets, drive aisles and designated fire lanes.
2. Location of Access: All portions of the structure or facility or any portion of the exterior wall of the first
story shall be located within 150-feet of Fire District vehicle access, measured by an unobstructed
approved route around the exterior of the building. Landscaped areas, unpaved changes in elevation,
gates, and fences are an obstruction.
3. Private Roadways and Fire Lanes:The minimum specifications for private fire district access roadways
are:
a. The minimum unobstructed width is 26-feet.
b. The inside tum radius shall be 20-feet.
c. The outside turn radius shall be not less than 50-feet.
d. The minimum radius for cul-de-sacs is 454eet.
e. The minimum vertical clearance is 14 feet, 6 inches.
f. At any private entry median,the minimum width of traffic lanes shall be 20-feet.
g. The angle of departure and approach shall not exceed 9 degrees or 20 percent.
h. The maximum grade of the driving surface shall not exceed 12%.
i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW).
4. Access Doorways: In addition to any exterior opening required by the Building or Fire approved
doorways, accessible without the use of a ladder, shall be provided as follows:
a. In buildings without high-piled storage, one or more approved access doors shall be provided
inl50 lineal feet or major fraction thereof along the exterior wall that faces required access
roadways or walkways.
b. In buildings with high-piled storage one or more approved access doors shall be provided in
each 100 lineal feet or major fraction thereof, of the exterior wall that faces required access
roadways. When a railroad siding is installed provisions shall be made to maintain Fire District
access to all required openings. Contact the Fire Safety Division at 909 477-2770.
5. Access Walkways: Approved access walkways shall be provided from the fire apparatus access road
to all required building exterior openings.
6. Fire Lane Identification: All required fire lanes shall be identified by red curbing and signage. A
drawing of the proposed signage that meets the minimum Fire District standards shall be submitted to
and approved. Contact the Rancho Cucamonga Fire Protection District at(909)477-2770 for a copy of
the FD Fire Lanes standard.
SCR-10 Hazard Control Permits-Technical Comments
The below indicated permit requirements are based on those permits commonly associated with the projects
operations or building construction. As noted below Special Permits may be required, dependent upon
approved use(s)the applicant must contact the Fire Safety Division for specific information:
Note: Carefully review the items below. There may be significant impact on the proposed project.
Italicized text indicates a Rancho Cucamonga Fire District amendment.
1. General Use Permit shall be required for any activity or operation not specifically described below,
which in the judgment of the Fire Chief is likely to produce conditions that may be hazardous to life or
property.
2. To install any access control device, system, or any material under, upon or within the required fire
district access roadway. This includes any gate, barrier, traffic-calming device, speed bump, speed
hump or any device that delays, slows, or restricts Fire District response.
3. High piled combustible storage.
4. Pallets. Idle storage, handling, repair, or manufacturing of combustible pallets in excess of 100 units
at any one site.
FSR-11 Hazardous Materials—Compliance with Disclosure and Reporting Regulations
The San Bernardino County Fire Department shall review your Business Emergency/Contingency Plan for
compliance with minimum standards. Contact the San Bernardino County Fire, Hazardous Materials Division
at (909) 387-8400 for forms and assistance. The County Fire Department is the Cal/EPA Certified Unified
Program Agency (CUPA) for the City of Rancho Cucamonga.
1. Certificate of Occupancy Restrictions: If the facility is a NEW business, a Certificate of Occupancy
issued by Building and Safety will not be finalized until the San Bernardino County Fire Department
reviews your Business Emergency/Contingency Plan. California Government Code, Section 65850.2
prohibits the City from issuing a final Certificate of Occupancy unless the applicant has met or is
meeting specific hazardous material disclosure requirements. A Risk Management Program (RMP)
may also be required if regulated substances are to be used or stored at the new facility. Contact
County Fire, Hazardous Materials Division at (909) 387-8400 for forms and assistance.
2. Rental or Lease Properties: Any business that operates on rented or leased property, and is
required to submit a Plan, is required to submit a notice to the owner of the property in writing stating
that the business is subject to the Business Emergency/Contingency Plan mandates, and has
complied with the provision, and must provide a copy of the Plan to the property owner within 5
working days after receiving a request from the owner.
3. Fire District Code Adoption: The Fire Code adopted by the Fire District has a provision requiring
collection of information regarding hazardous materials at facilities for purposes of Fire Code
implementation and emergency response.
FSR-12 Plan Submittal Required Notice
Required plans shall be submitted and approved prior to construction in accordance with 1997/98 Building,
Fire, Mechanical, and Plumbing Codes; 1999 Electrical Code; Health and Safety Code; Public Resources
Code; and RCFPD Ordinances FD15 and FD32, Guidelines and Standards.
NOTE: In addition to the fees due at this time please note that separate plan check fees for tenant
improvements,fire protection systems and/or any consultant reviews will be assessed at time of submittal of
plans.
FSR-14 Alternate Materials and Methods
The Fire Safety Division will review requests for alternate materials and methods within the scope of our
authority. The request must be submitted on the Fire District"Application for Alternate Method"form along with
supporting documents. Contact the Fire Safety Division at(909)477-2770 for assistance.
PRIOR TO ISSUANCE OF GRADING PERMIT- For Each Development Phase
1. Fire District Site Access Plan: Prior to the issuance of any grading permit the applicant shall submit a
Fire District Site Access Plan to the Fire District for review and approval. The following, minimum
information and detail shall be included a on a scaled site plan:
a. All roadways shall be clearly indicated. Including roadway width, vertical clearances, cul-de-sac
width, turn radii, curb cuts, angle of departure, grades, etc.
b. For private roadways or drive aisles less than 40-feet or less in width where parking may be
permitted, identify the location of proposed fire lanes.
c. Include a note stating all required fire lanes shall be identified by red curbing and signage.
d. Include detail(s)to identify which of the methods set forth in the Fire District"Fire Lane"standard
will be used to mark the fire lane. A copy of the Fire District"Fire Lane"Standard can be obtained
by calling (909) 477-2770.
e. Roadway with a width of more than 40-feet parking is permitted on both sides.
I. Roadway with a width of 32-feet or more parking is permitted on one side only.
g. The angle of departure and approach shall not exceed 9 degrees or 20 percent.
h. The grade of any fire district access roadway shall not exceed 12 percent.
i. If water plans have been approved, include fire hydrant, control valves, and fire department
connection locations. If water plans are not approved fire hydrant, control valves, and fire
department connection locations shall be included on the Final Site Access Plan.
Contact the Fire Safety Division at 909 477-2770 for assistance.
PRIOR TO ISSUANCE OF BUILDING PERMITS- Complete the following:
1. Private/On-site Fire Hydrants: Prior to the issuance of any building permit, the applicant shall submit
construction plans, specifications, flow test data and calculations for the private water main system for
review and approval by the Fire District. Plans and installation shall comply with Fire District
standards. Contac the Fire Safety Division for a copy of"Fire District Notes for Underground and
Water Plans."Contact the Fire Safety Division (909)477-2770
2. Private Fire Hydrants/On-site Installation: All private on-site fire hydrants shall be installed,
flushed, and operable prior to delivering any combustible building materials on-site (i.e., lumber,
roofing materials, etc.). A representative of Fire Construction Services shall inspect the installation
and witness hydrant flushing. The builder/developer shall submit final test and inspection report to the
Fire Safety Division. Contact Building and Safety/Fire Construction Services (909)477-2713.
3. Public Fire Hydrants: Prior to issuance of any building permit, the applicant shall submit a plan
showing the locations of all new public fire hydrants for the review and approval by the Fire District
and the Water District. On the plan show all existing fire hydrants within a 600-foot radius of the
project. Contact the Fire Safety Division (909)477-2770
4. Public Installation: All required public fire hydrants shall be installed,flushed, and operable prior to
delivering any combustible building materials on-site (i.e., lumber, rooting materials, etc.). Water
District personnel shall inspect the installation and witness hydrant flushing. The builder/developer
shall submit a copy of the Water District inspection report to the Fire Safety Division. Contact Water
District to schedule testing.
5. Building Use Letter- Required Letter: Prior to the issuance of any building permits,the applicant shall
submit a detailed letter of intended use for each building on-site to the Fire District for review and
approval. A form that may be used to meet this requirement is attached at the end of the Fire District
comments. Contact the Fire Safety Division (909)477-2770
PRIOR TO OCCUPANCY OR FINAL INSPECTION- Complete the following:
1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire
hydrant location on the street or driveway in accordance with Rancho Cucamonga Fire Protection
District and City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective
Hydrant Markers." On private property these markers are to be maintained in good condition by the
property owner. Contact Building and Safety/Fire Construction Services (909)477-2713.
2. Private Fire Hydrants- Final Acceptance: For the purpose of final acceptance, an additional test of
the on-site fire hydrants shall be conducted by the builder/developer in the presence of the Water
District or Fire Construction Services, as appropriate. The builder/developer shall submit the final
test report to the Fire Safety Division.
3. Fire Sprinkler System- Plans and Permit: Plans for the required automatic fire sprinkler system
shall be submitted to Fire Construction Services for review and approval. No work is allowed without
a Fire Construction Services permit. Contact Building and Safety/Fire Construction Services (909)
477-2713.
4. Fire Sprinkler System- Final Inspection: Prior to the issuance of a Certificate of Occupancy, the
fire sprinkler system(s) shall be tested and accepted by Fire Construction Services. Contact Building
and Safety/Fire Construction Services (909) 477-2713.
5. Sprinkler Monitoring:The fire sprinkler system monitoring system shall be installed, tested, and
operational immediately following the completion of the fire sprinkler system. Monitoring is required
with 20 sprinklers in Group I Occupancies, or 100 or more sprinklers in all other Occupancies.
Contact Building and Safety/Fire Construction Services (909) 477-2713.
6. Access ControVrraffic Calming Device Permit:A Fire District permit is required to install any access
control device,traffic-calming device, or gate on any access roadway. Applicable CC&R's,or other
approved documents, shall contain provisions that prohibit obstructions such as traffic-calming devices
(speed bumps, humps, etc.),control gates, bollards,or other modifications in fire lanes or access
roadways without prior written approval of the Fire District, Fire Safety Division
7. Knox Rapid Entry System: A Knox rapid entry key vault shall be installed prior to final inspection.
Proof of purchase shall be submitted prior to final building plan approval. Contact the Fire Safety
Division for specific details and ordering information. Contact Building and Safety/Fire Construction
Services (909) 477-2713 for inspection.
8. Construction Access: Fire District access, a minimum 26-feet in width and 14-feet,6-inches minimum
clear height shall be provided. These minimum clearances shall be maintained free and clear of any
obstructions at all times, in accordance with Fire District Standards. Contact the Fire Safety Division
(909)477-2770
9. Site Directory: A building or site directory shall be provided,as noted below:
a. Lighted directory within 20-feet of each primary entrance to the site.The site directory shall
be constructed, located, and installed in accordance with Fire Safety Division Standards.
Contact the Fire Safety Division at 909 477-2770.
10. Fire Lanes: Prior to the issuance of any Certificate of Occupancy, the fire lanes shall be installed in
accordance with the approved fire lane plan. The CC&R's or other approved documents shall contain an
approved fire lane map and provisions that prohibit parking in the fire lanes. The method of enforcement
shall be documented. The CC&R's shall also identify who is responsible for not less than annual
inspection and maintenance of all required fire lanes. Contact Building and Safety/Fire Construction
Services (909) 477-2713.
11. Address-Other Than Single-family: New buildings other than single-family dwellings shall post the
address with minimum 8-inch numbers on contrasting background,visible from the street and electrically
illuminated during periods of darkness. When the building setback exceeds 200 feet from the public
street an additional non-illuminated 6-inch minimum number address shall be provided at the property
entrance. Contact Building and Safety/Fire Construction Services (909) 477-2713.
12. Multi-unit Complexes: In multi-unit complexes approved address numbers,and/or building identification
letters shall be provided on the front and back of all units, suites, or buildings. The Fire District shall
review and approve the numbering plan in coordination with the City of Rancho Cucamonga. Contact
Building and Safety/Fire Construction Services (909) 477-2713.
13. High-pile Combustible Storage-Permit:The applicant is required to obtain a Fire District Permit for
Storage of High-pile Combustible material.Contact the Fire Safety Division (909)477-2770
14. High-pile Combustible Storage-Plans:The applicant shall submit plans for the storage arrangement
to Fire Construction Services.The applicant shall submit detailed plans and a Commodity Analysis report
to Fire Construction Services for approval. If the occupancy classification for the building is designated
as Group S, Division 2,commodities stored shall be limited to light hazard classification only. Contact
Building and Safety/Fire Construction Services (909) 477-2713.
15. Business Emergency/Contingency Plan:The applicant shall submit a Business
Emergency/Contingency Plan for emergency release or threatened release of hazardous materials
and wastes or provide a letter of exemption. Contact the County Fire Department, Hazardous
Materials/Emergency Response and Enforcement Division at(909) 387-8400.
16. Submittal to the Fire District: Prior to issuance of a Certificate of Occupancy a copy of the County
Fire Department approved Business Emergency/Contingency Plan - New Business (Hazardous
Materials Release Response Plans and Inventory) shall be submitted to the Fire District. In some
cases additional information that is not in the Business Emergency/Contingency Plan may be
required in order to support local fire prevention and emergency response programs. Contact Fire
Safety Division (909) 477-2770.
17. Required County Permits: The applicant shall be required to apply for one or more of the following:
Hazardous Materials Handler Permit, a Hazardous Waste Generator Permit, an Aboveground
Storage Tank Permit, and/or an Underground Storage Tank Permit. Contact the County Fire
Department, Hazardous Materials Division/Fire Services Section at (909) 387-3080.
18. Risk Management Plan: The applicant must demonstrate that the facility has met or is meeting all
Risk Management Plan (RMP) requirements if regulated substances are to be handled at the facility.
Contact the County Fire Department, Hazardous Materials/Emergency Response and Enforcement
Division at (909) 387-8400.
19. Fire District Confidential Business Occupancy Information: The applicant shall complete the
Rancho Cucamonga Fire District "Confidential Business Occupancy Information" Form and submit to
the Fire Safety Division. This form provides contact information for Fire District use in the event of an
emergency at the subject building or property. Contact Fire Safety Division (909)477-2770
Fire District Preliminary Review Letter-Template
SL 10/10/02 Revision