Loading...
HomeMy WebLinkAbout03-109 - Resolutions RESOLUTION NO. 03-109 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT REVIEW DRC2003-00192,A DESIGN REVIEW OF BUILDING ELEVATIONS AND DETAILED SITE PLAN FOR 53 SINGLE-FAMILY LOTS OF TRACT 16371 IN THE AMENDED TENTATIVE TRACT MAP 15974 WITHIN THE VICTORIA ARBORS MASTER PLAN IN THE VICTORIA COMMUNITY PLAN GENERALLY EAST OF DAY CREEK BOULEVARD AND GENERALLY NORTH OF CHURCH STREET AND MAKING FINDINGS IN SUPPORT THEREOF -APN: 0227-171-26. A. Recitals. 1. US Home filed an application for the approval of Development Review DRC2003-00192, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Development Review request is referred to as "the application." 2. On the 27th day of August 2003, the Planning Commission of the City of Rancho Cucamonga conducted a meeting on the application and concluded said meeting on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above- referenced meeting on August 27, 2003, including written and oral staff reports, this Commission hereby specifically finds as follows: a. The property to the north and west of the project is the Joseph Filippi Winery. Church Street and vacant land is generally to the south of the site and vacant land and the future Victoria Park Lane is to the east; and b. The proposed use, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity; and C. The project design is consistent with the Victoria Arbors Master Plan and the following goals and policies: i) The proposed residential uses are compatible to adjacent single-family uses as opposed to more intense multi-family uses. ii) The proposed infill project would create opportunities of a population that reflect income, age, occupation, race, ethnic background lifestyle, values, interest, and religion may interact, exchange ideas, and realize common goals, that are similar to the existing neighborhood to the west. PLANNING COMMISSION RESOLUTION NO. 03-109 DRC2003-00192 — US HOME August 27, 2003 Page 2 iii) The proposed use is in close proximity of a transportation network that is consistent with community goals. The project would eventually be a part of infill single-family residences within proximity to the 1-15 Freeway to the east via Base Line Road and Foothill Boulevard, and the 210 Freeway to the north via Day Creek Boulevard. 3. Based upon the substantial evidence presented to this Commission during the above- referenced meeting and upon the specific findings of facts set forth in paragraphs 1 and 2 above,this Commission hereby finds and concludes as follows: a. That the project is consistent with the General Plan and the Victoria Arbors Master Plan; and b. That the design or improvements of the tentative tract is consistent with the General Plan, and the Victoria Arbors Master Plan; and C. That the site is physically suitable for the type of development proposed; and d. That the design of the project is not likely to cause substantial environmental damage and avoidable injury to humans and wildlife or their habitat; and e. That the project is not likely to cause serious public health problems; and f. That the design of the project will not conflict with any easement acquired by the public at large, now of record, for access through or use of the property within the proposed subdivision. 4. An Environmental Impact Report(State Clearinghouse No. 8808291)was prepared and certified by the City Council as a Master Environmental Impact Report for the Victoria Arbors Master Plan. The California Environmental Quality Act(CEQA)provides that once a Master Environmental Impact Report has been certified, no further Environmental Impact Report or Negative Declaration is required for subsequent projects within the scope of the Master Environmental Impact Report. On July 7, 1999, the City Council certified a supplement to the Environmental Impact Report (State Clearinghouse No. 98041137). Based upon the facts and information contained in the certified Environmental Impact Report, together with all written and oral reports, the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment. a. There have not been substantial changes in the project that require major revisions to the previous Environmental Impact Report because of no new significant environmental effects or substantial increase in the severity of the previously identified significant effects. b. There have not been substantial changes with respect to the circumstances under which the project is undertaken, which will require major revisions to the previous Environmental Impact Report because of the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects. C, There is no new information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the Environmental Impact Report was certified as complete, that shows any of the following: 1) the project will have one or more significant effects not discussed in the previous Environmental Impact Report; 2) PLANNING COMMISSION RESOLUTION NO. 03-109 DRC2003-00192 — US HOME August 27, 2003 Page 3 significant effects previously examined will be substantially more severe than shown in the previous Environmental Impact Report; 3) mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project but the project proponents decline to adopt the mitigation measure or alternative; or 4) mitigation measures or alternatives,which are considerably different from those analyzed in the Final Environmental Impact Report, would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative. 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference: Planning Division 1) All conditions of approval per Planning Commission Resolution No. 01-25 for Tentative Tract 15974, shall apply. 2) All conditions of approval per Planning Commission Resolution Nos. 01-23 and 03-54 for DR01-04, shall apply. 3) The developer shall provide each prospective buyer of the affected lots adjacent to the winery written notice of the required 20-foot landscape buffer with a non-buildable deed restriction in perpetuity. The standard format for the written notice shall be submitted for City Planner review and approval, prior to issuance of building permits. The developer shall submit signed notice from the prospective buyer to the City for records. 4) The developer shall provide each prospective buyer written notice of the adjacent winery. The written notice must disclose the uses and operation within the winery and in a format as approved by the City Planner, prior to issuance of building permits. 5) Submit design for Lot B at the southwest corner of Base Line Road and Victoria Park Lane, Lot C along the west side of Victoria Park Lane, Lot A along the south side of Tract 16370, for City Planner and City Engineer review and approval, prior to plan check. 6) Submit standard design of future trellis, patio, covered patio that may be added within the rear yard by the homeowner for City Planner review. The standard design shall include notes stating that rolled roof, metal, shingles, asphalt shingles are not allowed. The standard design shall be added to the Victoria Arbors Master Plan. 7) Provide conduit to connect to the street and pre-wire houses/buildings for fiber-optic use (minimum Category 5 and RG-6), prior to release of occupancy. Plans shall be submitted for City Planner review and approval, prior to issuance of building permits. PLANNING COMMISSION RESOLUTION NO. 03-109 DRC2003-00192— US HOME August 27, 2003 Page 4 8) Construct block walls with caps between homes (i.e., along interior side and rear property lines) for permanence, durability, and design consistency rather than wood fencing. Decorative block walls shall be provided on all perimeter tract, street side yard, and front return walls. 9) Access gates to the rear yards shall be constructed from a material more durable than wood gates. Acceptable materials include, but are not limited to, wrought iron and plastic. 10) All pertinent conditions of approval contained in Development Agreement 00-04 shall apply. 11) The developer shall provide each prospective buyer written notice of the Victoria Gardens Regional Center and the Cultural Arts Center. The standard format for the written notice shall be submitted for City Planner review and approval, prior to issuance of building permits. 12) Submit standard design of future trellis, patios, or covered patios that may be added within the rear yard by the homeowners for City Planner review. The standard design shall include notes stating that rolled roof, metal, shingles, and asphalt shingles are not allowed. The standard design shall be added to the Victoria Arbors Master Plan. 13) Landscape all front and side yards that are visible from the public-right- of-ways. 14) Where rock cobble is used, it shall be real, native fieldstone. Other forms of stone, such as stacked stone or ledge stone, may be manufactured products. 15) Comer lots shall have parkway adjacent to the curb. 16) All walls visible from or facing a street shall be decorative masonry on both sides. 17) Avoid identical or similar elevation schemes plotted on adjacent lots or across the street from one another. Engineering Division 1) Provide a minimum of 3-inch conduit for future fiber optic use on all streets with connection through the parkway to each lot or parcel. Submit the size, placement, location, the providerof the conduitforCity Engineer review and approval, prior to issuance of grading permits or final map approval, whichever comes first. 2) All pertinent conditions per Tract 15974, shall apply. Street trees shall be installed to City standards. PLANNING COMMISSION RESOLUTION NO. 03-109 DRC2003-00192 — US HOME August 27, 2003 Page 5 Environmental Mitigation 1) The applicant shall implement all pertinent mitigation measures adopted in the Master Environmental Impact Report Victoria Arbors Master Plan as covered by the Environmental Impact Report as certified by the City Council of the City of Rancho Cucamonga. The project shall comply with Mitigation Monitoring Program contained in the Final EIR entitled "Final Environmental Impact Report Victoria Arbors Village SCH No. 98041137' except for Mitigation Measures 4.7.3A, 4.7.38, and 4.7.3D. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 27TH DAY OF AUGUST 2003. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: Rich Macias, Chairman ATTEST: /� Brad B , ecreta I, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 27th day of August 2003, by the following vote-to-wit: AYES: COMMISSIONERS: FLETCHER, MACIAS, McNIEL, McPHAIL NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: STEWART COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT#: DRC2003-00192 SUBJECT: DEVELOPMENT/DESIGN REVIEW APPLICANT: US HOME WEST OF ARBOR LANE, NORTH OF CHURCH STREET AND WEST OF VICTORIA PARK LOCATION: LANE, AND NORTH OF ARBOR LAND (TERMINIS) ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DIVISION,(909)477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its —j--j— agents,officers,or employees,because of the issuance of such approval,or in the alternative,to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may,at its sole discretion,participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Copies of the signed Planning Commission Resolution of Approval No. 03-109, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. B. Time Limits 1. Conditional Use Permit, Variance, or Development/Design Review approval shall expire if building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans,architectural elevations,exterior materials and colors, landscaping,sign program,and grading on file in the Planning Division, the conditions contained herein, Development Code regulations, the Victoria Arbors Master Plan. SC-07-03 1 Project No.DRC2003-00192 Completion Date 2. Prior to any use of the project site or business activity being commenced thereon,all Conditions of Approval shall be completed to the satisfaction of the City Planner. 3. Occupancy of the facilities shall not commence until such time as all Uniform.Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Division to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for City Planner review and approval prior to the issuance of building permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building,etc.) or prior to final map approval in the case of a custom lot subdivision,or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code,all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 7. If no centralized trash receptacles are provided,all trash pick-up shall be for individual units with all receptacles shielded from public view. 8. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls,berming,and/or landscaping to the satisfaction of the City Planner. For single- family residential developments, transformers shall be placed in underground vaults. 9. Street names shall be submitted for City Planner review and approval in accordance with the adopted Street Naming Policy prior to approval of the final map. 10. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination. 11. All parkways, open areas, and landscaping shall be permanently maintained by the property owner,homeowners'association, or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for City Planner and City Engineer review and approved prior to the issuance of building permits. 12. The developer shall submit a construction access plan and schedule for the development of all lots for City Planner and City Engineer approval; including, but not limited to, public notice requirements,special street posting, phone listing for community concerns,hours of construction activity, dust control measures, and security fencing. 13. Six-foot decorative block walls shall be constructed along the project perimeter. If a double wall condition would result, the developer shall make a good faith effort to work with the adjoining property owners to provide a single wall. Developer shall notify, by mail,all contiguous property owner at least 30 days prior to the removal of any existing walls/ fences along the project's perimeter. 14. Construct block walls between homes(i.e.,along interior side and rear property lines),rather than wood fencing for permanence, durability, and design consistency. 15. Access gates to the rear yards shall be constructed from a material more durable than wood gates. Acceptable materials include, but are not limited to, wrought iron and PVC. 16. For residential development, return walls and corner side walls shall be decorative masonry. 17. On corner side yards, provide minimum 5-foot setback between walls/fences and sidewalk. SC-07-03 2 Project No.DRC2003-00192 Completion Date 18. Where rock cobble is used,it shall be real river rock. Other stone veneers maybe manufactured products. D. Building Design 1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections, shall be shielded from view and the sound buffered from adjacent properties and streets as required by the Planning Division. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the City Planner. Details shall be included in building plans. E. Parking and Vehicular Access (indicate details on building plans) 1. Multiple car garage driveways shall be tapered down to a standard two-car width at street. 2. On flag lots, use a 12-foot driveway within flag to maximize landscape area. F. Landscaping 1. A detailed landscape and irrigation plan,including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for City Planner review and approval prior to the issuance of building permits or prior final map approval in the case of a custom lot subdivision. 2. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope,but less than 2:1 slope,shall be, at minimum, irrigated and landscaped with appropriate ground cover for erosion control. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 3. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater slope shall be landscaped and irrigated for erosion control and to soften their appearance as follows: one 15-gallon or larger size tree per each 150 sq.ft.of slope area, 1-gallon or larger size shrub per each 100 sq.ft.of slope area,and appropriate ground cover. In addition,slope banks in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in staggered clusters to soften and vary slope plane. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 4. For single-family residential development, all slope planting and irrigation shall be continuously maintained in a healthy and thriving condition by the developer until each individual unit is sold and occupied by the buyer. Prior to releasing occupancy for those units, an inspection shall be conducted by the Planning Division to determine that they are in satisfactory condition. 5. Front yard and corner side yard landscaping and irrigation shall be required per the Development Code and/or Victoria Arbor Master Plan. This requirement shall be in addition to the required street trees and slope planting. 6. The final design of the perimeter parkways,walls,landscaping,and sidewalks shall be included in the required landscape plans and shall be subject to City Planner review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Division. 7. Special landscape features such as mounding, alluvial rock, specimen size trees, meandering sidewalks (with horizontal change), and intensified landscaping, is required along Victoria Park Lane and Arbors Lane. 8. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. SC-07-03 3 Project No.DRC2003-00192 Completion Date 9. All walls shall be provided with decorative treatment. If located in public maintenance areas,the design shall be coordinated with the Engineering Division. G. Environmental 1. The developer shall provide each prospective buyer written notice of the 210 and 1-15 Freeways in a standard format as determined by the City Planner,prior to accepting a cash deposit on any property. 2. A final acoustical report shall be submitted for City Planner review and approval prior to the issuance of building permits. The final report shall discuss the level of interior noise attenuation to below 45 CNEL, the building materials and construction techniques provided, and if appropriate,verify the adequacy of the mitigation measures. The building plans will be checked for conformance with the mitigation measures contained in the final report. 3. The applicant shall submit certification from an acoustical engineer that all recommendations of the acoustical report were implemented in construction, including measurements of interior and exterior noise levels to document compliance with City standards. Certification shall be submitted to the Building&Safety Division prior to final occupancy release of the affected homes. 4. Mitigation measures are required for the project. The applicant is responsible for the cost of implementing said measures, including monitoring and reporting. Applicant shall be required to post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the amount of $719.00 prior to the issuance of building permits, guaranteeing satisfactory performance and completion of all mitigation measures. These funds maybe used bythe Cityto retain consultants and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete all actions required by the approved environmental documents shall be considered grounds for forfeit. H. Other Agencies 1. The applicant shall contact the U.S.Postal Service to determine the appropriate type and location of mailboxes. Multi-family residential developments shall provide a solid overhead structure for mailboxes with adequate lighting. The final location of the mailboxes and the design of the overhead structure shall be subject to City Planner review and approval prior to the issuance of building permits. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION,(909)477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S) I. General Requirements 1. Submit five complete sets of plans including the following: a. Site/Plot Plan; b. Foundation Plan; C. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans(2 sets,detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; SC-07-03 4 Project No. DRC2003-00192 Completion Date f. Plumbing and Sewer Plans,including isometrics, underground diagrams,water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Division Project Number(i.e., DRC2003-00192)clearly identified on the outside of all plans. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to the City prior to permit issuance. 4. Separate permits are required for fencing and/or walls. 5. Business shall not open for operation prior to posting the Certificate of Occupancy issued bythe Building and Safety Division. J. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number(i.e., DRC2003-00192). The applicant shall comply with the latest,adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Division for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new residential project or major addition,the applicant shall pay development fees at the established rate. Such fees may include,but are not limited to: City Beautification Fee, Park Fee, Drainage Fee,Transportation Development Fee, Permit and Plan Check Fees, and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Division prior to permit issuance. 3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map recordation and prior to issuance of building permits. 4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. K. New Structures 1. Provide compliance with the California Building Code (CBC) for property line clearances considering use, area, and fire-resistiveness. 2. Provide compliance with the California Building Code for required occupancy separations. 3. Roofing material shall be installed per the manufacturer's "high wind" instructions. L. Grading 1. Grading of the subject property shall be in accordance with California Building Code,City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the time of application for grading plan check. SC-07-03 5 Project No.DRC2003-00192 Completion Date 4. The final grading, appropriate certifications and compaction reports shall be completed, _/_J_ submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 5. A separate grading plan check submittal is required for all new construction projects and for _/_J_ existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The grading plan shall be prepared,stamped, and signed by a California registered Civil Engineer. APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: M. Security Hardware 1. A secondary locking device shall be installed on all sliding glass doors. _/_J_ 2. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within 40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used. 3. All garage or rolling doors shall have slide bolts or some type of secondary locking devices. N. Windows 1. All sliding glass windows shall have secondary locking devices and should not be able to be lifted from frame or track in any manner. O. Building Numbering 1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime visibility. APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, FIRE PROTECTION PLANNING SERVICES AT, (909)477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED SC-07-03 6 '.•}.. - FIRE PROTECTION DISTRICT z , FIRE SAFETY DIVISION STANDARD CONDITIONS FD PLAN REVIEW#: DRC2003-00192 PROJECT#: DRC2003-00192 PROJECT NAME: US Homes DATE: June 2, 2003 PLAN TYPE: SFR APPLICANT NAME: US Homes OCCUPANCY CLASS: Group R-3 FLOOR AREA (S): Up to 4000+ with garage TYPE CONSTRUCTION: Type V FIRE PROTECTION SYSTEM REQUIRED: None LOCATION: Victoria Pk. Ln. N/O Church FD REVIEW BY: Tim Fejeran Fire Inspector PLANNER: Doug Fenn ALL OF THE FOLLOWING STANDARD CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, (909) 477-2770, TO VERIFY COMPLIANCE WITH THE FOLLOWING: RANCHO CUCAMONGA FIRE DISTRICT- STANDARD CONDITIONS & REQUIREMENTS — General, Procedural, Technical, or Operational Information that shall be Included, Corrected, or Completed as noted below. The following is applicable to the above project. FSC-1 General Requirements for Public and Private Water Supply 1. General Guidance for Fire Hydrants: The following provides general guidance for the spacing and location of fire hydrants. Remember these are the maximum permitted distances between fire hydrants: a. The maximum distance between fire hydrants in single-family residential projects is 500-feet. No portion of the exterior wall facing the addressed street shall be more than 250-feet from an approved fire hydrant. For cul-de-sacs the distance shall not exceed 200 ft. b. Fire hydrants are to be located: 1. At the entrance(s) to a project from the existing public roadways. This includes subdivisions and industrial parks. 2. At intersections. 3. On the right side of the street. whenever practical and possible. 4. As required by the Fire Safety Division to meet operational needs. 5. The location of fire hydrants is based upon the operational needs of the Fire District to control a fire. 6. Fire hydrants shall be located a minimum of forty(40) feet from any building. Contact the Fire Safety Division 909 477-2770 2. Minimum Fire Flow: The required fire flow for this project is 1750 gallons per minute at a minimum residual pressure of 20 pounds per square inch. This requirement is made in accordance with Fire Code Appendix III-A, as amended. Please see "Water Availability" attachment for required verification of fire flow availability for the proposed project. Contact the Fire Safety Division (909)477-2770 FSC-12 Plan Submittal Required Notice Required plans shall be submitted and approved prior to construction in accordance with 2000/01 Building, Fire, Mechanical, and Plumbing Codes; 1999 Electrical Code; Health and Safety Code; Public Resources Code; and RCFPD Ordinances FD15 and FD39, Guidelines and Standards. NOTE: In addition to the fees due at this time please note that separate plan check fees for tenant improvements, fire protection systems and/or any consultant reviews will be assessed at time of submittal of plans. FSC-14 Alternate Materials and Methods The Fire Safety Division will review requests for alternate materials and methods within the scope of our authority. The request must be submitted on the Fire District"Application for Alternate Method"form along with supporting documents. Contact the Fire Safety Division at(909)477-2770 for assistance. PRIOR TO ISSUANCE OF BUILDING PERMITS- Complete the following: 1. Public Fire Hydrants: Prior to issuance of any building permit, the applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and the Water District. On the plan show all existing fire hydrants within a 600-foot radius of the project. Contact the Fire Safety Division (909)477-2770 2. Public Installation: All required public fire hydrants shall be installed, flushed, and operable prior to delivering any combustible building materials on-site (i.e., lumber, roofing materials, etc.). Water District personnel shall inspect the installation and witness hydrant flushing. The builder/developer shall submit a copy of the Water District inspection report to the Fire Safety Division. Contact Water District to schedule testing. PRIOR TO OCCUPANCY OR FINAL INSPECTION- Complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with Rancho Cucamonga Fire Protection District and City of Rancho Cucamonga Engineering Standard Plan 134, 'Installation of Reflective Hydrant Markers." On private property these markers are to be maintained in good condition by the property owner. Contact Building and Safety/Fire Construction Services (909)477-2713. 2. Address Single-family: New single-family dwellings shall post the address with minimum 4-inch numbers on a contrasting background. The numbers shall be internally or externally illuminated during periods of darkness. The numbers shall be visible from the street. When building setback from the public roadway exceeds 100 feet, additional 4-inch numbers shall be displayed at the property entry. Fire District Forms and Letters Note: If these conditions are part of the final Standard Conditions issued by the Planning Division referenced Fire District fortes and letters are not included. Contact the Fire Safety Division for copies of forms or letters.The forms and letter are also found in previously,issued Fire District comments. Fire District Review Letter(P&E)-Template SL 10/31/02 Revision