HomeMy WebLinkAbout03-121 - Resolutions RESOLUTION NO. 03-121 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT REVIEW DRC2003-00213, THE DESIGN REVIEW OF A 25,000 SQUARE FOOT HOLIDAY INN EXPRESS ON 2.7 ACRES OF LAND, LOCATED ON THE EAST SIDE OF MILLIKEN AVENUE BETWEEN 4TH AND 5TH STREETS, AND MAKING FINDINGS IN SUPPORT THEREOF - APN: 0229-341-12. A. Recitals. 1. Studio 3 Architects filed an application for the approval of Development Review DRC2003-00213, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Development Review request is referred to as "the application." 2. On the 27th day of August 2003, the Planning Commission of the City of Rancho Cucamonga held a meeting to consider the application. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above- referenced meeting on August 27, 2003, including written and oral staff reports, this Commission hereby specifically finds as follows: a. The property to the north and east of the subject site is industrialloffice,the property to the south is vacant, and the property to the west is Milliken Avenue and vacant land; and b. The applicant conducted one meeting to inform surrounding neighborhood residents of the proposed project and to obtain their feedback; and 3. Based upon the substantial evidence presented to this Commission during the above- referenced meeting on August 27, 2003, including written and oral staff reports, this Commission hereby specifically finds and concludes as follows: a. That the proposed project is consistent with the objectives of the General Plan;and b. That the proposed design is in accord with the objectives of the Development Code and the purposes of the district in which the site is located; and C. That the proposed design is in compliance with each of the applicable provisions of the Development Code; and PLANNING COMMISSION RESOLUTION NO. 03-121 DRC2003-00213—STUDIO 3 ARCHITECTS August 27, 2003 Page 2 d. That the proposed design, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. 4. Based upon the facts and information contained in the proposed Mitigated Negative Declaration, together with all written and oral reports included for the environmental assessment for the application, the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and Monitoring Program attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. That the Mitigated Negative Declaration has been prepared in compliance with the California Environmental Quality Act of 1970, as amended, and the State California Environmental Quality Act guidelines promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared therefore reflect the independent judgment of the Planning Commission; and, further, this Commission has reviewed and considered the information contained in said Mitigated Negative Declaration with regard to the application. b. Although the Mitigated Negative Declaration identifies certain significant environmental effects that will result if the project is approved, all significant effects have been reduced to an acceptable level by imposition of mitigation measures on the project,which are listed below as Conditions of Approval. C. Pursuant to the provisions of Section 753.5(c) of Title 14 of the California Code of Regulations, the Planning Commission finds as follows: In considering the record as a whole, the Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the proposed project will have potential for an adverse impact upon wildlife resources orthe habitat upon which wildlife depends. Further, based upon the substantial evidence contained in the Mitigated Negative Declaration, the staff reports and exhibits, and the information provided to the Planning Commission during the public hearing, the Planning Commission hereby rebuts the presumption of adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code of Regulations. 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition setforth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. Planning Division: 1) Tree Removal Permit DRC2003-00725, is hereby approved subject to replacement planting with the largest nursery grown trees available as determined by the City Planner. 2) Extend decorative scored concrete pavement from porte-cochere across drive aisle to connect with Milliken Avenue sidewalk. 3) Provide decorative pavement within drive entry throats (outside public right-of-way). 4) Minimize the amount of turf along Milliken Avenue. PLANNING COMMISSION RESOLUTION NO. 03-121 DRC2003-00213—STUDIO 3 ARCHITECTS August 27, 2003 Page 3 Engineering Division: 1) Widen northbound Milliken Avenue to 51 feet, measured from median curb, from the south to the north project boundaries, and the following: a) Relocate existing commercial drive approaches (remove and replace). b) Provide a striping plan from 4th Street to join existing striping north of the project boundary. The interim striping will make the ultimate northbound through lane a temporary right tum lane for the north project driveway. c) Provide appropriate tapers to transition back to the existing alignment both north and south of the project boundaries. d) Remove and replace the curvilinear sidewalk as needed to accommodate the street widening and all new and relocated drive approaches. Sidewalk shall cross drive approaches at the zero curb face and be in accordance with City Standards. e) No new openings in Milliken Avenue median. f) Provide 9500 Lumen HPSV streetlights on Milliken Avenue frontage in accordance with City Standards. g) Protect existing street trees, sidewalk, R26(s) "NO STOPPING' signs, traffic signs, and other public improvements not affected by the widening, and/or repair, replace, or relocate as required. h) Provide new asphalt concrete street pavement sections, and provide cold planning and AC overlays over existing lanes in accordance with City Standards. 2) Dedicate an additional 15 feet along the Milliken Avenue frontage (75 feet measured from street centerline). 3) No direct drive isle between Milliken Avenue and Pittsburgh Avenue. 4) Parkway shall slope at two percent from the top of curb, to one-foot behind the sidewalk along all street frontages. 5) Vacate non-vehicular access for proposed southerly drive approach. 6) Obtain permission from property owner to the south and record joint access easement for southerly drive approach. Revise existing easement for northerly drive approach to reflect reconstruction. PLANNING COMMISSION RESOLUTION NO. 03-121 DRC2003-00213— STUDIO 3 ARCHITECTS August 27, 2003 Page 4 Environmental Mitigation: Air Quality 1) All construction equipment shall be maintained in good operating conditions so as to reduce operational emissions. Contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers'specifications. Maintenance records shall be available at the construction site for City verification. 2) Prior to the issuance of any grading permits, the developer shall submit construction plans to the City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low-emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District, as well as City Planning staff. 3) All paints and coatings shall meet or exceed performance standards noted in South Coast Air Quality Management District Rule 1113. Paints and coatings shall be applied either by hand or high-volume, low-pressure spray. 4) All asphalt shall meet or exceed performance standards noted in South Coast Air Quality Management District Rule 1108. 5) All construction equipment shall comply with South Coast Air Quality Management District Rules 402 and 403. Additionally,contractors shall include the following provisions: • Re-establish ground cover on the construction site through seeding and watering. • Pave or apply gravel to any on-site haul roads. • Phase grading to prevent the susceptibility of large areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in accordance with local ordinances and use sound engineering practices. • Sweep streets according to a schedule established by the City if silt is carried over to adjacent public thoroughfares or occurs as a result of hauling. Timing may vary depending upon the time of year of construction. PLANNING COMMISSION RESOLUTION NO. 03-121 DRC2003-00213— STUDIO 3 ARCHITECTS August 27, 2003 Page 5 • Suspend grading operations during high winds(i.e.,wind speeds exceeding 25 miles per hour) in accordance with Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils haul trucks or cover payloads using tarps or other suitable means. 6) The site shall be treated with water or other soil-stabilizing agent (approved by South Coast Air Quality Management District and Regional Water Quality Control Board) daily to reduce Particulate Matter,o emissions, in accordance with South Coast Air Quality Management District Rule 403. 7) Chemical soil-stabilizers (approved by South Coast Air Quality Management District and Regional Water Quality Control Board) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce Particulate Matter 10 emissions. 8) The construction contractor shall utilize electric or clean alternative fuel-powered equipment where feasible. 9) The construction contractor shall ensure that constriction Grading Plans include a statement that work crews will shut off equipment when not in use. 10) All residential and commercial structures shall be required to incorporate high-efficiency/low-polluting heating, air conditioners, appliance, and water heaters. 11) All residential and commercial structures shall be required to incorporate thermal pane windows and weather-stripping. Cultural Resources 1) If any prehistoric archaeological resources are encountered before or during grading, the developer will retain a qualified archaeologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: a) Enact interim measures to protect undesignated sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. b) Consider establishing provisions to require incorporation of archaeological sites within new developments by using their special qualities as a theme or focal point. c) Pursue educating the public about the archaeological heritage of the site. PLANNING COMMISSION RESOLUTION NO. 03-121 DRC2003-00213— STUDIO 3 ARCHITECTS August 27, 2003 Page 6 d) Propose mitigation measures and recommend Conditions of Approval to eliminate adverse project effects on significant, important, and unique prehistoric resources following appropriate California Environmental Quality Act guidelines. e) Prepare a technical resources management report, documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report with original illustrations to the San Bernardino County Archaeological Information Center for permanent archiving. f) A qualified paleontologist shall conduct a preconstruction field survey of the project site. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures (i.e., paleontological monitoring)that may be appropriate. Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: • Assign a paleontological monitor, trained and equipped to allow the rapid removal of fossils with minimal construction delay, to the site full-time during the interval of earth- disturbing activities. • Should fossils be found within an area being Geared or graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Submit , a summary report to the City of Rancho Cucamonga. Transfer collected specimens with a copy of the report to the San Bernardino County Museum. Geology 1) The site shall be treated with water or other soil-stabilizing agent (approved by South Coast Air Quality Management District and Regional Water Quality Control Board) daily to reduce Particulate Matterio emissions, in accordance with South Coast Air Quality Management District Rule 403. 2) Frontage public streets shall be swept according to a schedule established by the City to reduce Particulate Matter,o emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon the time of year of construction. PLANNING COMMISSION RESOLUTION NO. 03-121 DRC2003-00213 — STUDIO 3 ARCHITECTS August 27, 2003 Page 7 3) Grading operations shall be suspended when wind speeds exceed 25 miles per hour to minimize Particulate Matterlo emissions from the site during such episodes. 4) Chemical soil-stabilizers (approved by South Coast Air Quality Management District and Regional Water Quality Control Board) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce Particulate Matter,a emissions. Water Quality 1) Structures to retain precipitation and runoff on-site shall be integrated into the design of the project where appropriate. Measures that may be used to minimize runoff and to enhance infiltration include Dutch drains, precast concrete lattice blocks and bricks, terraces, diversions, runoff spreaders, seepage pits, and recharge basins. 2) Prior to issuance of grading permits, the applicant shall prepare a Storm Water Pollution Prevention Plan that identifies Best Management Practices (BMPs)to be implemented during the period the site is under construction. Best Management Practices shall be identified on the Grading Plans for review and approval by the City Engineer. 3) Prior to issuance of building permits, the applicant shall submit to the City Engineer for approval of a Water Quality Management Plan (VVQMP), including a project description and identifying Best Management Practices that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The Water Quality Management Plan shall identify the structural and non- structural measures consistent with the (Guidelines for New Development and Redevelopment) adopted by the City of Rancho Cucamonga in June 2000. 4) Prior to issuance of grading or paving permits, the applicant shall submit to the City Engineer a Notice of Intent (NOI) to comply with obtaining coverage under the National Pollution Discharge Elimination System General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained(i.e., a copy of the Waste Discharge Identification Number)shall be submitted to the City Engineer for coverage under the National Pollution Discharge Elimination System General Construction Permit. Noise 1) An acoustical report shall be submitted for City Planner review and approval prior to the issuance of the building permits. The final report shall discuss the level of interior noise attenuation to below 60LDN, the building materials and construction techniques provided, and if appropriate, verify the adequacy of the mitigation measures. The PLANNING COMMISSION RESOLUTION NO. 03-121 DRC2003-00213–STUDIO 3 ARCHITECTS August 27, 2003 Page 8 Building Plans will be checked for conformance with the mitigation measures contained in the final report. 2) The applicant shall submit certification from an acoustical engineer that all recommendations of the acoustical report were implemented in construction, including measurements of interior and exterior noise levels to document compliance with City standards. Certification shall be submitted to the Building and Safety Division prior to final occupancy release of the affected homes. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 27TH DAY OF AUGUST 2003. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: —� Rich Macias, Chairman ATTEST: Brad By'A"ecr*ry/ 1, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 27th day of August 2003, by the following vote-to-wit: AYES: COMMISSIONERS: FLETCHER, MACIAS, McNIEL, McPHAIL, STEWART NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: NONE City of Rancho Cucamonga in MITIGATION MONITORING PROGRAM Project File No.: DEVELOPMENT REVIEW DRC2003-00213 This Mitigation Monitoring Program(MMP)has been prepared for use in implementing the mitigation measures identified in the Mitigated Negative Declaration forthe above-listed project. This program has been prepared in compliance with State law to ensure that adopted mitigation measures are implemented (Section 21081.6 of the Public Resources Code). Program Components -This MMP contains the following elements: 1. Conditions of approval that act as impact mitigation measures are recorded with the action and the procedure necessary to ensure compliance.The mitigation measure conditions of approval are contained in the adopted Resolution of Approval for the project. 2. A procedure of compliance and verification has been outlined for each action necessary. This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported. 3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring progresses, changes to compliance procedures may be necessary based upon recommendations by those responsible for the program. Program Management - The MMP will be in place through all phases of the project. The project planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly and proper action is taken on each mitigation. Each City department shall ensure compliance of the conditions (mitigation) that relate to that department. Procedures -The following steps will be followed by the City of Rancho Cucamonga. 1. A fee covering all costs and expenses, including any consultants' fees, incurred by the City in performing monitoring or reporting programs shall be charged to the applicant. 2. A MMP Reporting Form will be prepared for each potentially significant impact and its corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached hereto. This procedure designates who will take action,what action will be taken and when,and to whom and when compliance will be reported. All monitoring and reporting documentation will be kept in the project file with the department having the original authority for processing the project. Reports will be available from the City upon request at the following address: City of Rancho Cucamonga - Lead Agency Planning Division 10500 Civic Center Drive Rancho.Cucamonga, CA 91730 Mitigation Monitoring Program Development Review DRC 2003-00213 Page 2 3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,as determined by the project planner or responsible City department,to monitor specific mitigation activities and provide appropriate written approvals to the project planner. 4. The project planner or responsible City department will approve, by signature and date, the completion of each action item that was identified on the MMP Reporting Form. After each measure is verified for compliance, no further action is required for the specific phase of development. 5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off as completed by the project planner or responsible City department at the bottom of the MMP Reporting Form. 6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation measures.The project planner is responsible for approving any such refinements or additions. An MMP Reporting Form will be completed by the project planner or responsible City department and a copy provided to the appropriate design, construction, or operational personnel. 7. The project planner or responsible City department has the authority to stop the work of construction contractors if compliance with any aspects of the MMP is not occurring after written notification has been issued. The project planner or responsible City department also has the authority to hold certificates of occupancies if compliance with a mitigation measure attached hereto is not occurring.The project planner or responsible City department has the authority to hold issuance of a business license until all mitigation measures are implemented. 8. Any conditions (mitigation) that require monitoring after project completion shall be the responsibility of the City of Rancho Cucamonga Planning Division.The Division shall require the applicant to post any necessary funds (or other forms of guarantee)with the City. These funds shall be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measure for the required period of time. 9. In those instances requiring long-term project monitoring, the applicant shall provide the City with a plan for monitoring the mitigation activities at the project site and reporting the monitoring results to the City. Said plan shall identify the reporter as an individual qualified to know whether the particular mitigation measure has been implemented. The monitoring/reporting plan shall conform to the City's MMP and shall be approved by the Community Development Director or City Planner prior to the issuance of building permits. MONITORING CHECKLIST (INITIAL STUDY PART III) Project File No.: DEVELOPMENT REVIEW DRC2003-00213 Applicant: STUDIO 3 ARCHITECTS Initial Study Prepared by: Douglas Fenn, Associate Planner Date: June 5, 2003 Mitigation Measures No./ Responsible Monitoring Timing of Method of Verif led Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Air Quality All construction equipment shall be maintained in CP C Review of Plans A/C 2/4 good operating condition so as to reduce operational emissions. Contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers' specifications. Maintenance records shall be available at the construction site for City verification. Prior to the issuance of any grading permits, CP/CE C Review of Plans C 2 developer shall submit construction plans to City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the SCAQMD as well as City Planning staff. All paints and coatings shall meet or exceed CP C Review of Plans A/C 2/4 performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high volume, low-pressure spray. All asphalt shall meet or exceed performance BO B Review of Plans A/C 2 standards noted in SCAQMD Rule 1108. All construction equipment shall comply with CE C Review of Plans A/C 2/4 SCAQMD Rules 402 and 403. Additionally, contractors shall include the following provisions: • Reestablish ground cover on the construction site CE C Review of Plans A/C 2/4 through seeding and watering. • Pave or apply gravel to any on-site haul roads. CE C Review of Plans A/C 2/4 1 of 7 Mitigation Measures No. Responsible . . Timing of Method of Verified Sanctions Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance • Phase grading to prevent the susceptibility of large CE C Review of Plans A/C 2/4 areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of CE C Review of Plans A/C 2/4 exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in CE C Review of Plans A 4 accordance with local ordinances and use sound engineering ractices. • Sweep streets according to a schedule established CE C Review of Plans A 4 by the City if silt is carried over to adjacent public thoroughfares or occurs as a result of hauling. Timing may vary depending upon time of year of construction. • Suspend grading operations during high winds(i.e., CE C Review of Plans A 4 wind speeds exceeding 25 mph)in accordance with Rule 403 re uirements. • Maintain a minimum 24-inch freeboard ratio on soils CE C Review of Plans A 4 haul trucks or cover payloads using tarps or other suitable means. The site shall be treated with water or other soil CE C Review of Plans A/C 4 stabilizing agent(approved by SCAOMD and RWQCB) daily to reduce PM,o emissions, in accordance with SCAOMD Rule 403. Chemical soil stabilizers (approved by SCAOMD and CE C Review of Plans A/C 4 RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM,o emissions. The construction contractor shall utilize electric or CE C Review of Plans A/C 4 clean alternative fuel powered equipment where feasible. The construction contractor shall ensure that CE C Review of Plans A/C 2/4 construction-grading plans include a statement that work crews will shut off equipment when not in use. All residential and commercial structures shall be BO C/D Review of Plans C 2/4 required to incorporate high efficiency/low polluting heating, air conditioning, appliances and water heaters. 2 of 7 Mitigation Measures No./ Responsible Monitoring Timing of Method of Verified Sanctions for Implementing Ac . . - • Date/initials Non-Compliance All residential and commercial structures shall be BO C/D Review of Plans C 2/4 required to incorporate thermal pane windows and weather-stripping. Cultural Resources. If any prehistoric archaeological resources are CP B/D Review of Plans A/C 2/3 encountered before or during grading,the developer will retain a qualified archaeologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist,the City of Rancho Cucamonga will: • Enact interim measures to protect undesignated CP/BO C Review of A/D 3/4 sites from demolition or significant modification Report without an opportunity for the City to establish its archaeological value. Consider establishing provisions to require CPBO C Review of A/D 3/4 incorporation of archaeological sites within new Report developments, using their special qualities as a theme or focal point. • Pursue educating the public about the area's CP/BO C Review of A/D 3/4 archaeological heritage. Report • Propose mitigation measures and recommend CP/BO C Review of A/D 3/4 conditions of approval to eliminate adverse project Report effects on significant, important, and unique prehistoric resources, following appropriate CEQA guidelines. • Prepare a technical resources management report, CP C Review of A/D 3/4 documenting the inventory, evaluation, and Report proposed mitigation of resources within the project area. Submit one copy of the completed report,with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. 3 of 7 Mitigation Measures No. Responsible Implementing Action for Monitoring Frequency Verif!cation Verification Date/initials Non-Compliance A qualified paleontologist shall conduct a preconstruction CP B Review of A/D 4 field survey of the project site. The paleontologist shall Report submit a report of findings that will also provide specific recommendations regarding further mitigation measures (i.e., paleontological monitoring) that may be appropriate.Where mitigation monitoring is appropriate, the program must include, but not be limited to, the followinq measures: • Assign a paleontological monitor, trained and CP B Review of A/D 4 equipped to allow the rapid removal of fossils with Report minimal construction delay, to the site full-time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared BO B/C Review of A/D 4 or graded, divert earth-disturbing activities Report elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Submit summary report to City of Rancho CP D Review of D 3 Cucamonga. Transfer collected specimens with a Report copy of the report to San Bernardino County Museum. Geolo is Problems 9 The site shall be treated with water or other soil BO/CE C During A 4 stabilizing agent(approved by SCAQMD and Construction RWQCB) daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403. Frontage public streets shall be swept according to a CE C During A 4 schedule established by the City to reduce PM,a Construction emissions associated with vehicle tracking of soil off- site. Timing may vary depending upon time of year of construction. Grading operations shall be suspended when wind BO/CE C During A 4 speeds exceed 25 mph to minimize PMI()emissions Construction from the site during such episodes. 4 of 7 Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Chemical soil stabilizers (approved by SCAQMD and BO/CE C During A 4 RWQCB)shall be applied to all inactive construction Construction areas that remain inactive for 96 hours or more to reduce PM,o emissions. Hydrology and Water Quality. s Structures to retain precipitation and runoff on-site CE B/C/D Review of Plans A/C 2/4 shall be integrated into the design of the project where appropriate. Measures that may be used to minimize runoff and to enhance infiltration include Dutch drains, precast concrete lattice blocks and bricks, terraces, diversions, runoff spreaders, seepage pits, and recharge basins. Prior to issuance of grading permits, the applicant shall prepare a SWPPP that identifies BMPs to be implemented during the period the site is under construction. BMPs shall be identified on the grading plans for review and approval by the City Engineer. Prior to issuance of building permits,the applicant shall submit to the City Engineer for approval of a Water Quality Management Plan (WQMP), including a project description and identifying Best Management Practices (BMPs)that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The WQMP shall identify the structural and non-structural measures consistent with the Guidelines for New Development and Redevelopment adopted by the City of Rancho Cucamonga in June 2000. 5 of 7 Mitigation Measures No. Responsible Implementing Action for Monitoring Frequency Verification Verification Date finitials Non-Compliance Prior to issuance of grading or paving permits, applicant shall submit to the City Engineer a Notice of Intent(NO]) to comply with obtaining coverage under the National Pollution Discharge elimination System (NPDES) General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Dischargers Identification Number) shall be submitted to the City Engineer for coverage under the NPDES General Construction Permit. Noise e R s ww y€ An acoustical report shall be submitted for City Planner review and approval prior to the issuance of building permits. The final report shall discuss the level of interior noise attenuation to below 60 CNEL, the building materials and construction techniques provided, and if appropriate, verify the adequacy of the mitigation measures. The building plans will be checked for conformance with the mitigation measures contained in the final report. The applicant shall submit certification from an acoustical engineer that all recommendations of the acoustical report were implemented in construction, including measurements of interior and exterior noise levels to document compliance with City standards. Certification shall be submitted to the Building and Safety Division prior to final occupancy release of the affected homes. Key to Checklist Abbreviations Responsible Person Monitoring Frequency ' Method of Verification ; Sanctions CDD-Community Development Director or A-With Each New A-On-site Inspection 1 -Withhold Recordation of Final designee Development Map CP - City Planner or designee B- Prior To Construction B - Other Agency Permit/Approval 2 -Withhold Grading or Building Permit 6 of 7 CE-City Engineer or designee C -Throughout Construction C - Plan Check 3-Withhold Certificate of Occupancy BO - Building Official or designee D - On Completion D - Separate Submittal (Reports/Studies 4-Stop Work Order /Plans) PO - Police Captain or designee E-Operating 5- Retain Deposit or Bonds FC- Fire Chief or designee 6- Revoke CUP 7-Citation I:\PLANNING\Doug\DRC2003-00213mm checklist.doc 7 of 7 COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT#: DRC2003-00213 SUBJECT: HOLIDAY INN EXPRESS APPLICANT: STUDIO 3 ARCHITECTS LOCATION: EAST OF MILLIKEN AVENUE BETWEEN 4TH & 5TH STREETS ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DIVISION,(909)477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents,officers,or employees,because of the issuance of such approval,or in the alternative,to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may,at its sole discretion,participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Copies of the signed Planning Commission Resolution of Approval No. 03-121, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. B. Time Limits 1. Conditional Use Permit, Variance, or Development/Design Review approval shall expire if building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans, architectural elevations,exterior materials and colors,landscaping,sign program,and grading on file in the Planning Division,the conditions contained herein,and Development Code regulations. 2. Prior to any use of the project site or business activity being commenced thereon,all Conditions of Approval shall be completed to the satisfaction of the City Planner. SC-07-03 1 Project No. DRC2003-00213 Completion Date 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Division to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building,etc.)or prior to final map approval in the case of a custom lot subdivision,or approved use has commenced, whichever comes first. 5. Approval of this request shall not waive compliance with all sections of the Development Code,all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 6. A detailed on-site lighting plan, including a photometric diagram,shall be reviewed and approved by the City Planner and Police Department(477-2800)prior to the issuance of building permits. Such plan shall indicate style, illumination, location, height,and method of shielding so as not to adversely affect adjacent properties. 7. Trash receptacle(s)are required and shall meet City standards. The final design,locations,and the number of trash receptacles shall be subject to City Planner review and approval prior to the issuance of building permits. 8. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls,berming,and/or landscaping to the satisfaction of the City Planner. For single- family residential developments, transformers shall be placed in underground vaults. 9. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination. 10. All parkways, open areas, and landscaping shall be permanently maintained by the property owner,homeowners'association,or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for City Planner and City Engineer review and approved prior to the issuance of building permits. 11. Six-foot decorative block walls shall be constructed along the project perimeter. If a double wall condition would result, the developer shall make a good faith effort to work with the adjoining property owners to provide a single wall. Developer shall notify,by mail,all contiguous property owner at least 30 days prior to the removal of any existing walls/fences along the project's perimeter. D. Building Design 1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections, shall be shielded from view and the sound buffered from adjacent properties and streets as required by the Planning Division. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the City Planner. Details shall be included in building plans. E. Parking and Vehicular Access (indicate details on building plans) 1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet wide. 2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall contain a 12-inch walk adjacent to the parking stall (including curb). SC-07-03 2 Project No. DRC2003-00213 Completion Date 3. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided _/_/_ throughout the development to connect dwellings/units/buildings with open spaces/plazas/ recreational uses. 4. All parking spaces shall be double striped per City standards and all driveway aisles,entrances, __J_J_ and exits shall be striped per City standards. 5. Handicap accessible stalls shall be provided for commercial and office facilities with 25 or more parking stalls. Designate two percent or one stall; whichever is greater, of the total number of stalls for use by the handicapped. 6. Motorcycle parking area shall be provided for commercial and office facilities with 25 or more parking stalls. Developments with over 100 parking stalls shall provide motorcycle parking at the rate of one percent. The area for motorcycle parking shall be a minimum of 56 square feet. F. Trip Reduction 1. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily —J--/— residential projects of more than 10 units. Minimum spaces equal to five percent of the required automobile parking spaces or three bicycle storage spaces,whichever is greater. After the first 50 bicycle storage spaces are provided,additional storage spaces required are 2.5 percent of the required automobile parking spaces. Warehouse distribution uses shall provide bicycle storage spaces at a rate of 2.5 percent of the required automobile parking spaces with a minimum of a 3-bike rack. In no case shall the total number of bicycle parking spaces required exceed 100. Where this results in a fraction of 0.5 or greater, the number shall be rounded off to the higher whole number. 2. Carpool and vanpool designated off-street parking close to the building shall be provided for commercial, office, and industrial facilities at the rate of 10 percent of the total parking area. If covered, the vertical clearance shall be no less than 9 feet. 3. For industrial projects with at least 40 car parking spaces, bicyclist-changing facilities shall be provided to encourage bicycle commuting. Accessible restrooms with storage lockers for clothing and equipment shall be sufficient. G. Landscaping 1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for City Planner review and approval prior to the issuance of building permits or prior final map approval in the case of a custom lot subdivision. 2. Existing trees required to be preserved in place shall be protected with a construction barrier in accordance with the Municipal Code Section 19.08.110,and so noted on the grading plans. The location of those trees to be preserved in place and new locations for transplanted trees shall be shown on the detailed landscape plans. The applicant shall follow all of the arborist's recommendations regarding preservation, transplanting, and trimming methods. 3. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within commercial and office projects, shall be specimen size trees -24-inch box or larger. 4. Within parking lots,trees shall be planted at a rate of one 15-gallon tree for every three parking stalls. 5. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one tree per 30 linear feet of building. 6. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope, but less than 2:1 slope,shall be,at minimum, irrigated and landscaped with appropriate ground cover for erosion control. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. SC-07-03 3 Project No. DRC2003-00213 Completion Date 7. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater slope shall be landscaped and irrigated for erosion control and to soften their appearance as follows: one 15-gallon or larger size tree per each 150 sq.ft.of slope area, 1-gallon or larger size shrub per each 100 sq.ft.of slope area,and appropriate ground cover. In addition,slope banks in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in staggered clusters to soften and vary slope plane. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 8. For multi-family residential and non-residential development,property owners are responsible for the continual maintenance of all landscaped areas on-site, as well as contiguous planted areas within the public right-of-way. All landscaped areas shall be kept free from weeds and debris and maintained in healthy and thriving condition,and shall receive regular pruning,fertilizing,mowing, and trimming. Any damaged,dead,diseased,or decaying plant material shall be replaced within 30 days from the date of damage. 9. The final design of the perimeter parkways,walls,landscaping,and sidewalks shall be included in the required landscape plans and shall be subject to City Planner review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Division. 10. Special landscape features such as mounding, alluvial rock, specimen size trees, meandering sidewalks (with horizontal change), and intensified landscaping, is required along Milliken Avenue. 11. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 12. All walls shall be provided with decorative treatment. If located in public maintenance areas,the design shall be coordinated with the Engineering Division. 13. Landscaping and irrigation shall be designed to conserve water through the principles of Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code. H. Signs 1. The signs indicated on the submitted plans are conceptual only and not a part of this approval. Any signs proposed for this development shall comply with the Sign Ordinance and shall require separate application and approval by the Planning Division prior to installation of any signs. I. Environmental 1. A final acoustical report shall be submitted for City Planner review and approval prior to the issuance of building permits. The final report shall discuss the level of interior noise attenuation to below 45 CNEL, the building materials and construction techniques provided, and if appropriate,verify the adequacy of the mitigation measures. The building plans will be checked for conformance with the mitigation measures contained in the final report. 2. The applicant shall submit certification from an acoustical engineer that all recommendations of the acoustical report were implemented in construction,including measurements of interior and exterior noise levels to document compliance with City standards. Certification shall be submitted to the Building&Safety Division prior to final occupancy release of the affected homes. 3. Mitigation measures are required for the project. The applicant is responsible for the cost of implementing said measures, including monitoring and reporting. Applicant shall be required to post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the amount of $719.00 prior to the issuance of building permits, guaranteeing satisfactory performance and completion of all mitigation measures. These funds may be used bythe Cityto retain consultants and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete all actions required by the approved environmental documents shall be considered grounds for forfeit. SC-07-03 4 Project No. DRC2003-00213 Completion Date J. Other Agencies 1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location _/_J_ of mailboxes. Multi-family residential developments shall provide a solid overhead structure for mailboxes with adequate lighting. The final location of the mailboxes and the design of the overhead structure shall be subject to City Planner review and approval prior to the issuance of building permits. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION,(909)477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S) K. General Requirements 1. Submit five complete sets of plans including the following: a. Site/Plot Plan; b. Foundation Plan; C. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans(2 sets,detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; f. Plumbing and Sewer Plans,including isometrics,underground diagrams,water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Division Project Number(i.e., DRC2003-00213)clearly identified on the outside of all plans. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet"signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to the City prior to permit issuance. 4. Separate permits are required for fencing and/or walls. L. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number(i.e.,DRC2003-00213). The applicant shall comply with the latest adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Division for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new residential project or major addition,the applicant _/_J_ shall pay development fees at the established rate. Such fees may include,but are not limited to: City Beautification Fee, Park Fee, Drainage Fee,Transportation Development Fee, Permit and Plan Check Fees, and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Division prior to permit issuance. SC-07-03 5 Project No. DRC2003-00213 Completion Date 3. Prior to issuance of building permits for a new commercial or industrial development project or major addition,the applicant shall pay development fees at the established rate. Such fees may include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee,Transportation Development Fee, Permit and Plan Check Fees, and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Division prior to permits issuance. 4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. 5. Construct trash enclosure(s) per City Standard (available at the Planning Division's public counter). 6. Submit pool plans to the County of San Bernardino's Environmental Health Services Department /_J_ for approval. M. New Structures 1. Provide compliance with the California Building Code (CBC) for property line clearances considering use, area, and fire-resistiveness. 2. Provide compliance with the California Building Code for required occupancy separations. 3. Roofing material shall be installed per the manufacturer's "high wind" instructions. 4. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC --/--L— Section 1505. 5. Provide draft stops in attics in line with common walls. 6. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A _/—J_ 7. Openings in exterior walls shall be protected in accordance with CBC Table 5-A. 8. If the area of habitable space above the first floor exceeds 3,000 square feet, then the construction type shall be V-1 Hour minimum. 9. Walls and floors separating dwelling units in the same building shall be not less than 1-hour fire-resistive construction. N. Grading 1. Grading of the subject property shall be in accordance with California Building Code,City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the time of application for grading plan check. 4. The final grading, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 5. A separate grading plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The grading plan shall be prepared, stamped, and signed by a California registered Civil Engineer. SC-07-03 6 Project No. DRC2003-00213 Completion Date APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: 0. Dedication and Vehicular Access 1. Dedication shall be made of the following rights-of-way on the perimeter streets(measured from street centerline): 75 total feet on Milliken Avenue P. Street Improvements 1. Construct the following perimeter street improvements including, but not limited to: Curb& A.C. Side- Drive Street Street Comm Median Bike Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other MILLIKEN AVENUE X (b) (c) X X X Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk shall be curvilinear per Standard 114. 2. Improvement Plans and Construction: a. Street improvement plans, including street trees,street lights,and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements,prior to final map approval or the issuance of building permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the City Engineer's Office in addition to any other permits required. C. Pavement striping,marking,-traffic signing,street name signing,traffic signal conduit,and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer Notes: 1) Pull boxes shall be No.6 at intersections and No.5 along streets,a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2) Conduit shall be 3-inch (at intersections) or 2-inch (along streets) galvanized steel with pull rope or as specified. e. Handicapped access ramps shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving,which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. SC-07-03 7 Project No. DRC2003-00213 Completion Date g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single family residential lots. h. Street names shall be approved by the City Planner prior to submittal for first plan check. 3. Install street trees per City street tree design guidelines and standards as follows. The completed legend and construction notes shall appear on the title page of the street improvement plans. Where public landscape plans are required,tree installation in those areas shall be perthe public landscape improvement plans. The City Engineer reserves the right to adjust tree species based upon field conditions and other variables. For additional information, contact the Project Engineer. Min. Grow Street Name Botanical Name Common Name Space Spacing Size' city. Milliken Avenue Liquidamber Sweet gum (30%) 8 ft. 25 ft. 15-gal Fill-In styraciflua O.C. Brachychiton Bottle tree (70%) 5 ft. 25 ft. 15-gal Fill-In populneus O.C. 'TREES SHALL BE 15-GALLON SIZE UNLESS OTHERWISE APPROVED. Construction Notes for Street Trees: 1) All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting,an agronomic soils report shall be furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector. 3) All street trees are subject to inspection and acceptance by the Engineering Division. 4) Street trees are to be planted per public improvement plans only. 4. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with adopted policy. On collector or larger streets, lines of sight shall be plotted for all project intersections, including driveways. Local residential street intersections and commercial or industrial driveways may have lines of sight plotted as required. 0. Public Maintenance Areas 1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the City Engineer prior to final map approval or issuance of building permits whichever occurs first. Formation costs shall be borne by the developer. 2. Parkway landscaping on the following street(s) shall conform to the results of the respective Beautification Master Plan. R. Utilities 1. Provide separate utility services to each parcel including sanitary sewerage system,water,gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 2. The developer shall be responsible for the relocation of existing utilities as necessary. 3. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga County Water District(CCW D),Rancho Cucamonga Fire Protection District,and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CCW D is required prior to final map approval or issuance of permits,whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. SC-07-03 8 Project No. DRC2003-00213 Completion Date S. General Requirements and Approvals 1. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all new streetlights for the first six months of operation,prior to final map approval or prior to building permit issuance if no map is involved. APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: T. Security Lighting 1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power. These areas should be lighted from sunset to sunrise and on photo sensored cell. 2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with direct lighting to be provided by all entryways. Lighting shall be consistent around the entire development. 3. Lighting in exterior areas shall be in vandal-resistant fixtures. _ 1—J— U. Security Hardware 1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within 40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used. 2. All garage or rolling doors shall have slide bolts or some type of secondary locking devices. V. Security Fencing 1. All businesses or residential communities with security fencing and gates will provide the police with a keypad access and a unique code.The initial code is to be submitted to the Police Crime Prevention Unit along with plans. If this code is changed due to a change in personnel or for any other reason, the new code must be supplied to the Police via the 24-hour dispatch center at (909)941-1488 or by contacting the Crime Prevention Unit at(909)477-2800 extension 2474 or extension 2475. W. Windows 1. All sliding glass windows shall have secondary locking devices and should not be able to be lifted from frame or track in any manner. 2. Security glazing is recommended on storefront windows to resist window smashes and impede entry to burglars. X. Building Numbering 1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime visibility. Y. Alarm Systems 1. Install a burglar alarm system and a panic alarm if needed. Instructing management and employees on the operation of the alarm system will reduce the amount of false alarms and in turn save dollars and lives. 2. Alarm companies shall be provided with the 24-hour Sheriff's dispatch number: (909) 941-1488. SC-07-03 9 Project No. DRC2003-00213 Completion Date APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, FIRE PROTECTION PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED SC-07-03 10 FIRE PROTECTION DISTRICT FIRE SAFETY DIVISION STANDARD CONDITIONS FD PLAN REVIEW#: DRC2003-00213 PROJECT#: DRC2003-00213 PROJECT NAME: Holiday Inn Express DATE: April 23, 2003 PLAN TYPE: Preliminary Review APPLICANT NAME: Studio 3 Architects OCCUPANCY CLASS: Group R-1 FLOOR AREA(S): 25,000 TYPE CONSTRUCTION: Type V FIRE PROTECTION SYSTEM REQUIRED: Sprinklers, Alarms LOCATION: . Milliken N/O Fourth FD REVIEW BY: Tim Fejeran, Fire Inspector PLANNER: Doug Fe,,,,,,,,.,.,,,,,,,,;.,„,,.,,,,,,,,,,,,,,,,,,,.,,,.,, FIRE DISTRICT USE ONLY 9 i W, Outstanding Fire District Issues Status-"Cleared”when required information is entered below: Section B Issues Cleared Fees in the amount at' paid in,full. Recorded by: ALL OF THE FOLLOWING STANDARD CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, (909) 477-2770, TO VERIFY COMPLIANCE WITH THE FOLLOWING: RANCHO CUCAMONGA FIRE DISTRICT- STANDARD CONDITIONS & REQUIREMENTS - General, Procedural, Technical, or Operational Information that shall be Included, Corrected, or Completed as noted below. The following is applicable to the above project. FSC-1 General Requirements for Public and Private Water Supply 1. General Guidance for Fire Hydrants: The following provides general guidance for the spacing and location of fire hydrants. Remember these are the maximum permitted distances between fire hydrants: a. The maximum distance between fire hydrants in commercial/industrial projects is 300-feet. No portion of the exterior wall shall be located more than 150-feet from an approved fire hydrant. For cul-de-sacs the distance shall not exceed 100-feet. b. Fire hydrants are to be located: 1. At the entrance(s)to a project from the existing public roadways. This includes subdivisions and industrial parks. 2. At intersections. 3. On the right side of the street, whenever practical and possible. 4. As required by the Fire Safety Division to meet operational needs. 5. The location of fire hydrants is based upon the operational needs of the Fire District to control a fire. 6. Fire hydrants shall be located a minimum of forty(40)feet from any building. Contact the Fire Safety Division 909 477-2770 2. Minimum Fire Flow with Automatic Fire Sprinklers: The required minimum fire flow for this project is 2125 gallons per minute at a minimum residual pressure of 20 pounds per square inch. This flow reflects a 50 percent reduction for the installation of an approved automatic fire sprinkler system with central station monitoring. This requirement is made in accordance with Fire Code Appendix III-A, as amended, and Fire District Ordinances and Standards. (Reduction may be granted with a full NFPA 13 System) 3. Show Existing Fire Hydrants and Mains: Existing fire hydrants and mains within 600-feet of the project shall be shown on the water plan submitted for review and approval. Include main size. FSC-2 Private(On-Site)Water and/or Fire Sprinkler Underground Plans for Fire Protection 1. Number of Fire Hydrants: Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof, subject to standard spacing and distribution requirements. Contact the Fire Safety Division (909) 477-2770 2. Fire Sprinkler Underground: Prior to the issuance of a fire sprinkler system permit;the applicant shall submit construction plans, specifications, and calculations for the fire sprinkler system underground to the Fire Safety Division for approval. Contact the Fire Safety Division (909)477-2770 FSC-3 Automatic Fire Sprinkler Systems-Technical Comments 1. Required Installations: Rancho Cucamonga Fire District Ordinance 15 or other adopted code or standard, requires an approved automatic fire sprinkler system to be installed in any of the following: a. Commercial or industrial structures greater than 7,500 square feet b. Multi-family residential structures. May require an approved means of occupant notification of water flow switch operation. Contact the Fire Safety Division (909)477-2770 FSC-4 Fire District Site Access-Technical Comments 1. Access Roadways Defined: Fire District access roadways include public roads, streets, and highways, as well as private roads, streets, drive aisles and designated fire lanes. 2. Location of Access: All portions of the structure or facility or any portion of the exterior wall of the first story shall be located within 150-feet of Fire District vehicle access, measured by an unobstructed approved route around the exterior of the building. Landscaped areas, unpaved changes in elevation, gates,and fences are an obstruction. 3. Private Roadways and Fire Lanes:The minimum specifications for private fire district access roadways are: a. The minimum unobstructed width is 26-feet. b. The inside tum radius shall be 20-feet. c. The outside tum radius shall be not less than 50-feet. d. The minimum radius for cul-de-sacs is 45-feet. e. The minimum vertical clearance is 14 feet, 6 inches. f. At any private entry median,the minimum width of traffic lanes shall be 20-feet. g. The angle of departure and approach shall not exceed 9 degrees or 20 percent. h. The maximum grade of the driving surface shall not exceed 12%. i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW). 4. Fire Lane Identification: All required fire lanes shall be identified by red curbing and signage. A drawing of the proposed signage that meets the minimum Fire District standards shall be submitted to and approved. Contact the Rancho Cucamonga Fire Protection District at(909)477-2770 for a copy of the FD Fire Lanes standard. FSC-8 Fire Alarm System 1. Required Installation: An automatic fire alarm (and detection)system is required by RCFPD Ordinance 15, based on use or floor area,or by another adopted code or standard. Refer to Ordinance 15 and/or the California Fire Code for specific requirements. FSC-10 Hazard Control Permits-Technical Comments The below indicated permit requirements are based on those permits commonly associated with the projects operations or building construction. As noted below Special Permits may be required, dependent upon approved use(s) the applicant must contact the Fire Safety Division for specific information: Note: Carefully review the items below. There may be significant impact on the proposed project. Italicized text indicates a Rancho Cucamonga Fire District amendment. 1. General Use Permit shall be required for any activity or operation not specifically described below, which in the judgment of the Fire Chief is likely to produce conditions that may be hazardous to life or property. 2. Other: Haz-Mat for pool chemical storage if beyond exempt amounts FSC-12 Plan Submittal Required Notice Required plans shall be submitted and approved prior to construction in accordance with 1997/98 Building, Fire, Mechanical, and Plumbing Codes; 1999 Electrical Code; Health and Safety Code; Public Resources Code; and RCFPD Ordinances FD15 and FD32, Guidelines and Standards. NOTE: In addition to the fees due at this time please note that separate plan check fees for tenant improvements,fire protection systems and/or any consultant reviews will be assessed at time of submittal of plans. FSC-14 Alternate Materials and Methods The Fire Safety Division will review requests for alternate materials and methods within the scope of our authority. The request must be submitted on the Fire District"Application for Alternate Method"form along with supporting documents. Contact the Fire Safety Division at(909) 477-2770 for assistance. PRIOR TO ISSUANCE OF BUILDING PERMITS- Complete the following: 1. Private/On-site Fire Hydrants: Prior to the issuance of any building permit, the applicant shall submit construction plans, specifications, flow test data and calculations for the private water main system for review and approval by the Fire District. Plans and installation shall comply with Fire District standards. Contac the Fire Safety Division for a copy of"Fire District Notes for Underground and Water Plans."Contact the Fire Safety Division (909)477-2770 2. Private Fire Hydrants/On-site Installation: All private on-site fire hydrants shall be installed, flushed, and operable prior to delivering any combustible building materials on-site (i.e., lumber, roofing materials, etc.). A representative of Fire Construction Services shall inspect the installation and witness hydrant flushing. The builder/developer shall submit final test and inspection report to the Fire Safety Division. Contact Building and Safety/Fire Construction Services 909 477-2713. 3. Public Fire Hydrants: Prior to issuance of any building permit, the applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and the Water District. On the plan show all existing fire hydrants within a 600-foot radius of the project. Contact the Fire Safety Division (909)477-2770 4. Public Installation: All required public fire hydrants shall be installed, flushed, and operable prior to delivering any combustible building materials on-site (i.e., lumber, roofing materials, etc.). Water District personnel shall inspect the installation and witness hydrant flushing. The builder/developer shall submit a copy of the Water District inspection report to the Fire Safety Division. Contact Water District to schedule testing. PRIOR TO OCCUPANCY OR FINAL INSPECTION- Complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with Rancho Cucamonga Fire Protection District and City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers." On private property these markers are to be maintained in good condition by the property owner. Contact Building and Safety/Fire Construction Services (909) 477-2713. 2. Private Fire Hydrants- Final Acceptance: For the purpose of final acceptance, an additional test of the on-site fire hydrants shall be conducted by the builder/developer in the presence of the Water District or Fire Construction Services, as appropriate. The builder/developer shall submit the final test report to the Fire Safety Division. 3. Fire Sprinkler System- Plans and Permit: Plans for the required automatic fire sprinkler system shall be submitted to Fire Construction Services for review and approval. No work is allowed without a Fire Construction Services permit. Contact Building and Safety/Fire Construction Services (909) 477-2713. 4. Fire Sprinkler System- Final Inspection: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler system(s) shall be tested and accepted by Fire Construction Services. Contact Building and Safety/Fire Construction Services (909) 477-2713. 5. Sprinkler Monitoring: The fire sprinkler system monitoring system shall be installed, tested, and operational immediately following the completion of the fire sprinkler system. Monitoring is required with 20 sprinklers in Group I Occupancies, or 100 or more sprinklers in all other Occupancies. Contact Building and Safety/Fire Construction Services (909) 477-2713. 6. Residential Occupant Notification: Group R, Division 1 Occupancies provided with an approved automatic fire sprinkler system shall have an approved means of occupant notification. Occupant notification shall result from the actuation of any water-flow device or manual fire alarm box.The system shall notify all occupants simultaneously. 7. Fire Alarm System: Plans for the fire alarm system shall be submitted to Fire Construction Services for review and approval. No work is allowed without a Fire District permit. Contact Building and Safety/Fire Construction Services (909) 477-2713. 8. Knox Rapid Entry System: A Knox rapid entry key vault shall be installed prior to final inspection. Proof of purchase shall be submitted prior to final building plan approval. Contact the Fire Safety Division for specific details and ordering information. Contact Building and Safety/Fire Construction Services (909)477-2713 for inspection. 9. Site Directory: A building or site directory shall be provided, as noted below: a. Standard Directory in building lobby. Contact the Fire Safety Division at 909 477-2770. 10. Fire Lanes: Prior to the issuance of any Certificate of Occupancy,the fire lanes shall be installed in accordance with the approved fire lane plan. The CC&R's or other approved documents shall contain an approved fire lane map and provisions that prohibit parking in the fire lanes. The method of enforcement shall be documented. The CC&R's shall also identify who is responsible for not less than annual inspection and maintenance of all required fire lanes. Contact Building and Safety/Fire Construction Services (909) 477-2713. 11. Address-Other Than Single-family: New buildings other than single-family dwellings shall post the address with minimum 8-inch numbers on contrasting background, visible from the street and electrically illuminated during periods of darkness. When the building setback exceeds 200 feet from the public street an additional non-illuminated 6-inch minimum number address shall be provided at the property entrance. Contact Building and Safety/Fire Construction Services (909) 477-2713. 12. Fire Alarm System-Final Inspection and Testing: Prior to the issuance of a Certificate of Occupancy, the fire alarm (and detection)system(s)shall be tested and accepted by Fire Construction Services. Contact Building and Safety/Fire Construction Services (909) 477-2713. 13. Fire District Confidential Business Occupancy Information: The applicant shall complete the Rancho Cucamonga Fire District"Confidential Business Occupancy Information" Form and submit to the Fire Safety Division. This form provides contact information for Fire District use in the event of an emergency at the subject building or property. Contact Fire Safety Division (909)477-2770 Items or Issues Not Identified Elsewhere 1. Plans note the use of NFPA 101 Life-Safety Code. Be advised that the model codes adopted and referenced by the Rancho Cucamonga Fire Protection District include; California Fire Code, California Building Code, California Code of Regulations Title 19,22 and RCFD Ordinance 39 for Low Rise occupancy requirements. Make appropriate notes on submittals. Fire District Forms and Letters Note: If these conditions are part of the final Standard Conditions issued by the Planning Division referenced Fire District forms and letters are not included.Contact the Fire Safety Division for copies of forms or letters.The forms and letter are also found in previously issued Fire District comments. Fire District Review Letter(P&E)-Template SL 10/31/02 Revision