HomeMy WebLinkAbout03-176 - Resolutions RESOLUTION NO. 03-176
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT
REVIEW DRC2003-00146, FOR 21 INDUSTRIAL BUILDINGS TOTALING
215,455 SQUARE FEET ON 12.78 ACRES OF LAND IN THE INDUSTRIAL
PARK DISTRICT (SUBAREA 17), LOCATED ON THE SOUTH SIDE OF
9TH STREET AND EAST SIDE OF BAKER AVENUE AND MAKING
FINDINGS IN SUPPORT THEREOF - APN: 0207-271-20, 35, 43 and 44.
A. Recitals.
1. Himes, Peters, Jepson Architects filed an application for the approval of Development
Review DRC2003-00146, as described in the title of this Resolution. Hereinafter in this Resolution,
the subject Tentative Parcel Map request is referred to as "the application."
2. On the 12th day of November 2003, the Planning Commission of the City of Rancho
Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing
on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning
Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the above-
referenced public hearing on November 12, 2003, including written and oral staff reports together
with public testimony, this Commission hereby specifically finds as follows:
a. The application applies to vacant property located on the south side of 9th Street
and east side of Baker Avenue, with a street frontage of approximately 410 feet on 9th Street and
330 feet on Baker Avenue; and
b. The properties to the north of the subject site, across 9th Street, are presently
developed with single-family homes and are zoned Medium Residential, and the Cask-N-Clever
Restaurant zoned General Commercial; the property to the south is developed with a non-
conforming single-family residence, and an industrial building and is zoned General Industrial; the
properties to the east are vacant and are zoned General Industrial; and the properties to the west
are developed with existing, single-family homes and are zoned Low Residential; and
C. The application proposes the construction of 21 industrial buildings for warehouse
and manufacturing use, ranging in size from 7,944 square feet to 23,728 square feet; and
d. The project together with recommended conditions of approval, meets or exceeds
all minimum development standards for the City of Rancho Cucamonga; and
PLANNING COMMISSION RESOLUTION NO. 03-176
DRC2003-00146— HIMES, PETERS, JEPSON ARCHITECTS
November 12, 2003
Page 2
e. The project will provide warehousing/distribution and manufacturing facilities for
industrial uses of incubator and start-up to moderate size, conveniently located relative to the
industrial area and regional circulation routes; and
f. The architectural design of the project incorporates sandblasted concrete,smooth
tilt-up concrete and accent elements. Each building has sandblasting treatment and a formal entry
office element,thereby meeting the design goals of the Industrial Park District by providing a quality
architectural design.
3. Based upon the substantial evidence presented to this Commission during the above-
referenced public hearing and upon the specific findings of facts set forth in paragraphs 1 and 2
above, this Commission hereby finds and concludes as follows:
a. The proposed project is consistent with the General Plan,and Development Code;
and
b. The proposed use is in accord with the objectives of the Development Code and
the purposes of the district in which the site is located; and
C. The proposed use is in compliance with each of the applicable provisions of the
Development Code; and
d. The proposed use, together with the conditions applicable thereto, will not be
detrimental to the public health, safety, or welfare or materially injurious to properties or
improvement in the vicinity.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration,together with all written and oral reports included for the environmental assessment for
the application,the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and
Monitoring Program attached hereto, and incorporated herein by this reference, based upon the
findings as follows:
a. That the Mitigated Negative Declaration has been prepared in compliance with the
California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines
promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared .
therefore reflect the independent judgment of the Planning Commission; and, further, this
Commission has reviewed and considered the information contained in said Mitigated Negative
Declaration with regard to the application.
b. Although the Mitigated Negative Declaration identifies certain significant
environmental effects that will result if the project is approved, all significant effects have been
reduced to an acceptable level by imposition of mitigation measures on the project,which are listed
below as conditions of approval.
C. Pursuant to the provisions of Section 753.5(c)of Title 14 of the California Code of
Regulations, the Planning Commission finds as follows: In considering the record as a whole, the
Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the
proposed project will have potential for an adverse impact upon wildlife resources or the habitat
PLANNING COMMISSION RESOLUTION NO. 03-176
DRC2003-00146— HIMES, PETERS, JEPSON ARCHITECTS
November 12, 2003
Page 3
upon which wildlife depends. Further, based upon the substantial evidence contained in the
Mitigated Negative Declaration, the staff reports and exhibits, and the information provided to the
Planning Commission during the public hearing, the Planning Commission hereby rebuts the
presumption of adverse effect as set forth in Section 753.5(c-1-d)of Title 14 of the California Code
of Regulations.
5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above,'
this Commission hereby approves the application subject to each and every condition set forth
below and in the Standard Conditions, attached hereto and incorporated herein by this reference:
Planning Division
1) The Master Plan is approved in concept only. Future development for
each building proposed in Phase III shall be subject to separate
Development Review process.
2) Tree Removal permit DRC2003-00619 is hereby approved subject to
replacement planting as shown in the conceptual landscape plan.
3) All pertinent Conditions of Approval for Tentative Parcel Map
SUBTPM16141 shall apply.
4) Undulating berms shall be provided in the landscaped setback area
along 9th Street and Baker Avenue. Berms shall have an average
height of 3 feet,and final design shall be subject to City Planner review
and approval. The precise Grading Plan submitted for plan check shall
indicate the required berming.
5) Light fixtures shall be constructed at a maximum height of 15 feet (to
include pedestal), and shall be shielded and directed away from
residential areas. A detailed lighting plan, including photometric
diagram, shall be prepared prior to issuance of building permits to
provide proper shielding of light sources from adjoining properties.
6) All landscaped areas shall be kept free from weeds and debris and
maintained in healthy growing condition, and shall receive regular
pruning, fertilizing, mowing, and trimming.
7) Tables, chairs, and shade shall be provided in each employee outdoor
eating area.
8) Approval of this request shall not waive compliance with any sections
of the Development Code, State Fire Marshall's regulations, Uniform
Building Code, or any other City Ordinances.
Engineering Division
1) The existing overhead utilities (telecommunications and electrical) on
the project side of Baker avenue shall be undergrounded from the first
PLANNING COMMISSION RESOLUTION NO. 03-176
DRC2003-00146— HIMES, PETERS, JEPSON ARCHITECTS
November 12, 2003
Page 4
pole offsite the northerly project boundary to the first offsite the
southerly project boundary, priorto public improvement acceptance or
occupancy, whichever occurs first. The developer may request a
reimbursement agreement to recover one-half the City adopted cost for
undergrounding from future development(redevelopment)as it occurs
on the opposite side of the street. If the developer fails to submit for
said reimbursement agreement within 6 months of the public
improvements being accepted by the City,all rights of the developer to
reimbursement shall terminate.
2) An in-lieu fee as contribution to the future undergrounding of the
existing overhead utilities (telecommunications and electrical) on the
opposite side of 9th Street shall be paid to the City prior to issuance of
building permits. The fee shall be one-half the City adopted unit
amount times the length of the property frontage on 9th Street.
3) Any existing overhead utilities within the project boundary shall be
undergrounded at the expense of the developer and shall not be
eligible for reimbursement.
4) A public drainage easement shall be provided from "A" Street to the
terminus of the drainage structure and shall be installed to City
Standards, including manholes and a service road for maintenance,to
the satisfaction of the City Engineer.
5) Final Parcel Map SUBTPM16141 shall be approved and recorded prior
to issuance of building permits.
Environmental Mitigation
Air Quality
1) All construction equipment shall be maintained in good operating
condition so as to reduce operational emissions. Contractor shall
ensure that all construction equipment is being properly serviced and
maintained as per man ufacturers'specifications. Maintenance records
shall be available at the construction site for City verification.
2) Prior to the issuance of any grading permits, developer shall submit
construction plans to City denoting the proposed schedule and
projected equipment use. Construction contractors shall provide
evidence that low emission mobile construction equipment will be
utilized, or that their use was investigated and found to be infeasible for
the project. Contractors shall also conform to any construction
measures imposed by the Southern California Air Quality Management
District (SCAQMD) as well as City Planning Staff.
PLANNING COMMISSION RESOLUTION NO. 03-176
DRC2003-00146— HIMES, PETERS, JEPSON ARCHITECTS
November 12, 2003
Page 5
3) All paints and coatings shall meet or exceed performance standards
noted in SCAQMD Rule 1113. Paints and coatings shall be applied
either by hand or high volume, low-pressure spray.
4) All asphalt shall meet or exceed performance standards noted in
SCAQMD Rule 1108.
5) All construction equipment shall comply with SCAQMD Rules 402 and
403. Additionally, contractors shall include the following provisions:
• Reestablish ground cover on the construction site through seeding
and watering.
• Pave or apply gravel to any on-site haul roads.
• Phase grading to prevent the susceptibility of large areas to erosion
over extended periods of time.
• Schedule activities to minimize the amounts of exposed excavated
soil during and after the end of work periods.
• Dispose of surplus excavated material in accordance with local
ordinances and use sound engineering practices.
• Sweep streets according to a schedule established by the City if silt
is carried over to adjacent public thoroughfares or occurs as a
result of hauling. Timing may vary depending upon the time of year
of construction.
• Suspend grading operations during high winds (i.e., wind speeds
exceeding 25 mph) in accordance with Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils haul trucks or
cover payloads using tarps or other suitable means.
6) The site shall be treated with water or other soil stabilizing agent
(approved by SCAQMD and the Regional Water Quality Board
[RWQCB]) daily to reduce Particulate Matter,o (PM10) emissions, in
accordance with SCAQMD Rule 403.
7) Chemical soil stabilizers(approved by SCAQMD and RW QCB)shall be
applied to all inactive construction areas that remain inactive for 96
hours or more to reduce PM1a emissions.
8) The construction contractor shall utilize electric or clean alternative fuel
powered equipment where feasible.
PLANNING COMMISSION RESOLUTION NO. 03-176
DRC2003-00146 — HIMES, PETERS, JEPSON ARCHITECTS
November 12, 2003
Page 6
9) The construction contractor shall ensure that construction-grading
plans include a statement that work crews will shut off equipment when
not in use.
10) All industrial and commercial facilities shall post signs requiring that
trucks shall not be left idling for prolonged periods (i.e., in excess of 10
minutes).
11) All industrial and commercial facilities shall designate preferential
parking for vanpools.
12) All industrial and commercial site tenants with 50 or more employees
shall be required to post both bus and Metrolink schedules in
conspicuous areas.
13) All industrial and commercial site tenants with 50 or more employees
shall be required to configure their operating schedules around the
Metrolink schedule to the extent reasonably feasible.
Cultural Resources
1) If any prehistoric archaeological resources are encountered before or
during grading, the developer will retain a qualified archaeologist to
monitor construction activities,to take appropriate measures to protect
or preserve them for study and prepare a technical resources
management report, documenting the inventory, evaluation, and
proposed mitigation of resources within the project area. Submit one
copy of the completed report, with original illustrations, to the San
Bernardino County Archaeological Information Center for permanent
archiving and one copy of the completed report with original
illustrations to the Planning Division of the City of Rancho Cucamonga.
• Enact interim measures to protect undesignated sites from
demolition or significant modification without an opportunity for the
City to establish its archaeological value.
• Consider establishing provisions to require incorporation of
archaeological sites within new developments, using their special
qualities as a theme or focal point.
• Pursue educating the public about the area's archaeological
heritage.
• Propose mitigation measures and recommend conditions of
approval to eliminate adverse project effects on significant,
important, and unique prehistoric resources, following appropriate
California Environmental Quality Act (CEQA) guidelines.
PLANNING COMMISSION RESOLUTION NO. 03-176
DRC2003-00146— HIMES, PETERS, JEPSON ARCHITECTS
November 12, 2003
Page 7
• Prepare a technical resources management report, documenting
the inventory, evaluation, and proposed mitigation of resources
within the project area. Submit one copy of the completed report,
with original illustrations, to the San Bernardino County
Archaeological Information Center for permanent archiving.
2) A qualified paleontologist shall conduct a preconstruction field survey
of the project site. The paleontologist shall submit a report of findings
that will also provide specific recommendations regarding further
mitigation measures (i.e., paleontological monitoring) that may be
appropriate. Where mitigation monitoring is appropriate, the program
must include, but not be limited to, the following measures:
• Assign a paleontological monitor,trained and equipped to allow the
rapid removal of fossils with minimal construction delay, to the site
full-time during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared or graded,
divert earth-disturbing activities elsewhere until the monitor has
completed salvage. If construction personnel make the discovery,
the grading contractor should immediately divert construction and
notify the monitor of the find.
• Submit a summary report to the City of Rancho Cucamonga.
Transfer collected specimens with a copy of the report to the San
Bernardino County Museum.
Geology and Soils
1) The site shall be treated with water or other soil stabilizing agent
(approved by SCAQMD and RWQCB)daily to reduce PM10 emissions,
in accordance with SCAQMD Rule 403.
2) Frontage public streets shall be swept according to a schedule
established by the City to reduce PM10 emissions associated with
vehicle tracking of soil off-site. Timing may vary depending upon the
time of year of construction.
3) Grading operations shall be suspended when wind speeds exceed
25 mph to minimize PM10 emissions from the site during such
episodes.
4) Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be
applied to all inactive construction areas that remain inactive for 96
hours or more to reduce PM10 emissions.
PLANNING COMMISSION RESOLUTION NO. 03-176
DRC2003-00146— HIMES, PETERS, JEPSON ARCHITECTS
November 12, 2003
Page 8
Hydrology and Water Quality
1) Structures to retain precipitation and runoff on-site shall be integrated
into the design of the project where appropriate. Measures that may be
used to minimize runoff and to enhance infiltration include Dutch
drains, precast concrete lattice blocks and bricks,terraces, diversions,
runoff spreaders, seepage pits, and recharge basins.
2) Prior to the issuance of grading permits, the applicant shall prepare a
Storm Water Pollution Prevention Plan (SWPPP) that identifies Best
Management Practices (BMPs) to be implemented during the period
the site is under construction. BMPs shall be identified on the grading
plans for review and approval by the City Engineer.
3) Prior to issuance of building permits, the applicant shall submit to the
City Engineer for approval of a Water Quality Management Plan
(W QMP), including a project description and identifying BMPs that will
be used on-site to reduce pollutants into the storm drain system to the
maximum extent practicable. The WQMP shall identify the structural
and non-structural measures consistent with the Guidelines for New
Development and Redevelopment adopted by the City of Rancho
Cucamonga in June 2000.
4) Prior to issuance of grading or paving permits, the applicant shall
submit to the City Engineer a Notice of Intent (NOI) to comply with
obtaining coverage under the National Pollutant Discharge Elimination
System (NPDES) General Construction Storm Water Permit from the
State Water Resources Control Board. Evidence that this has been
obtained (i.e., a copy of the Waste Dischargers Identification Number)
shall be submitted to the City Engineer for coverage underthe NPDES
General Construction Permit.
Noise
1) Construction or grading shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday.
2) Construction or grading noise levels shall not exceed the standards
specified in Development Code Section 17.02.120-D, as measured at
the property line. The developer shall hire a consultant to perform
weekly noise level monitoring as specified in Development Code
Section 17.02.120. Monitoring at other times may be required by the
Planning Division. Said consultant shall report their findings to the
Planning Division within 24 hours; however, if noise levels exceed the
above standards, then the consultant shall immediately notify the
Planning Division. If noise levels exceed the above standards, then
construction activities shall be reduced in intensity to a level of
compliance with above noise standards or halted.
PLANNING COMMISSION RESOLUTION NO. 03-176
DRC2003-00146 — HIMES, PETERS, JEPSON ARCHITECTS
November 12, 2003
Page 9
3) The perimeter block wall shall be constructed as early as possible in
the first phase.
4) Limit business hours on-site to between 7:00 a.m. and 10:00 p.m.
5) Keep all project doors closed except for actual ingress/egress of the
buildings.
6) Rooftop equipment noise ratings shall not exceed 9.0 bels,or a level of
70 dbA at the distance of 10 feet.
7) Signs shall be clearly posted throughout the project site prohibiting the
use of vehicle horns.
8) All mechanical equipment not associated with the ventilation of the
project buildings shall be installed on the interior of the buildings.
9) Erect sound walls at least 8 feet in height along all project property
lines adjacent to an adjoining residential land use.
10) Haul truck deliveries shall not take place between the hours of 8:00
p.m. and 6:30 a.m.on weekdays, including Saturday,or at anytime on
Sunday or a national holiday. Additionally, if heavy trucks used for
hauling would exceed 100 daily trips (counting both to and from the
construction site), then the developer shall prepare a noise mitigation
plan denoting any construction traffic haul routes. To the extent
feasible, the plan shall denote haul routes that do not pass sensitive
land uses or residential dwellings.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 12TH DAY OF NOVEMBER 2003.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY: —�-
Rich Macias, Chairman
ATTEST:
Brad B I ecreta
I, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby
certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted bythe
PLANNING COMMISSION RESOLUTION NO. 03-176
DRC2003-00146 — HIMES, PETERS, JEPSON ARCHITECTS
November 12, 2003
Page 10
Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning
Commission held on the 12th day of November 2003, by the following vote-to-wit:
AYES: COMMISSIONERS: FLETCHER, MACIAS, McNIEL, McPHAIL, STEWART
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: NONE
City of Rancho Cucamonga
MITIGATION MONITORING
PROGRAM
Project File No.: DRC2003-00146 and SUBTPM16141 —VINEYARD BUSINESS CENTER
This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation
measures identified in the Mitigated Negative Declaration for the above-listed project. This program
has been prepared in compliance with State law to ensure that adopted mitigation measures are
implemented (Section 21081.6 of the Public Resources Code).
Program Components -This MMP contains the following elements:
1. Conditions of approval that act as impact mitigation measures are recorded with the action and
the procedure necessary to ensure compliance.The mitigation measure conditions of approval
are contained in the adopted Resolution of Approval for the project.
2. A procedure of compliance and verification has been outlined for each action necessary.This
procedure designates who will take action, what action will be taken and when, and to whom
and when compliance will be reported.
3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring
progresses, changes to compliance procedures may be necessary based upon
recommendations by those responsible for the program.
Program Management-The MMP will be in place through all phases of the project. The project
planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project
planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly
and proper action is taken on each mitigation. Each City department shall ensure compliance of the
conditions (mitigation)that relate to that department.
Procedures -The following steps will be followed by the City of Rancho Cucamonga.
1. A fee covering all costs and expenses, including any consultants' fees, incurred by the City in
performing monitoring or reporting programs shall be charged to the applicant.
2. A MMP Reporting Form will be prepared for each potentially significant impact and its
corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached
hereto. This procedure designates who will take action,what action will be taken and when,and
to whom and when compliance will be reported. All monitoring and reporting documentation will
be kept in the project file with the department having the original authority for processing the
project. Reports will be available from the City upon request at the following address:
City of Rancho Cucamonga - Lead Agency
Planning Division
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
Mitigation Monitoring Program
DRC2003-00146 & SUBTPM16141 —VINEYARD BUSINESS CENTER
Page 2
3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,as
determined by the project planner or responsible City department,to monitor specific mitigation
activities and provide appropriate written approvals to the project planner.
4. The project planner or responsible City department will approve, by signature and date, the
completion of each action item that was identified on the MMP Reporting Form. After each
measure is verified for compliance, no further action is required for the specific phase of
development.
5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off
as completed by the project planner or responsible City department at the bottom of the MMP
Reporting Form.
6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation
measures.The project planner is responsible for approving any such refinements or additions.
An MMP Reporting Form will be completed bythe project planner or responsible Citydepartment
and a copy provided to the appropriate design, construction, or operational personnel.
7. The project planner or responsible City department has the authority to stop the work of
construction contractors if compliance with any aspects of the MMP is not occurring after written
notification has been issued. The project planner or responsible City department also has the
authority to hold certificates of occupancies if compliance with a mitigation measure attached
hereto is not occurring.The project planner or responsible City department has the authority to
hold issuance of a business license until all mitigation measures are implemented.
8. Any conditions (mitigation) that require monitoring after project completion shall be the
responsibility of the City of Rancho Cucamonga Planning Division.The Division shall require the
applicant to post any necessary funds (or other forms of guarantee)with the City. These funds
shall be used by the City to retain consultants and/or pay for City staff time to monitor and report
on the mitigation measure for the required period of time.
9. In those instances requiring long-term project monitoring, the applicant shall provide the City
with a plan for monitoring the mitigation activities at the project site and reporting the monitoring
results to the City. Said plan shall identify the reporter as an individual qualified to know whether
the particular mitigation measure has been implemented. The monitoring/reporting plan shall
conform to the City's MMP and shall be approved by the Community Development Director or
City Planner prior to the issuance of building permits.
MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III)
Project File No.: DRC2003-00146 and SUBTPM16141 Applicant: Vineyard Business Center
Initial Study Prepared by: KIRT A. COURY. ASSOCIATE PLANNER Date: August 4. 2003
Mitigation Measures No. Responsible Monitoring Timing of Method of Verif led Sanctions for
Implementing Action for Monitoring Frequency Verif ication Verification
. . Date/initials Non-Compliance
Air Quality
All construction equipment shall be maintained in good CP C Review of Plans A/C 2/4
operating condition so as to reduce operational
emissions. Contractor shall ensure that all construction
equipment is being properly serviced and maintained as
per manufacturers'specifications. Maintenance records
shall be available at the construction site for City
verification.
Prior to the issuance of any grading permits, developer CP/CE C Review of Plans C 2
shall submit construction plans to City denoting the
proposed schedule and projected equipment use.
Construction contractors shall provide evidence that low
emission mobile construction equipment will be utilized,
or that their use was investigated and found to be
infeasible for the project. Contractors shall also conform
to any construction measures imposed bythe SCAQMD
as well as City Planning Staff.
All paints and coatings shall meet or exceed CP C Review of Plans A/C 2/4
performance standards noted in SCAQMD Rule 1113.
Paints and coatings shall be applied either by hand or
high volume, low-pressure spray.
All asphalt shall meet or exceed performance standards BO B Review of Plans A/C 2
noted in SCAQMD Rule 1108.
All construction equipment shall comply with SCAQMD CE C Review of Plans A/C 2/4
Rules 402 and 403. Additionally, contractors shall
include the following provisions:
• Reestablish ground cover on the construction site CE C Review of Plans A/C 2/4
through seeding and watering.
• Pave or apply gravel to any on-site haul roads. CE C Review of Plans A/C 2/4
1 of 7
Mitigation Measures No./ Responsible
Implementing Action for Monitoring Frequency Verification Verification Date/Initials Non-Compliance
• Phase grading to prevent the susceptibility of large CE C Review of Plans A/C 2/4
areas to erosion over extended eriods'of time.
• Schedule activities to minimize the amounts of CE C Review of Plans A/C 2/4
exposed excavated soil during and after the end of
work periods.
• Dispose of surplus excavated material in CE C Review of Plans A 4
accordance with local ordinances and use sound
engineering ractices.
• Sweep streets according to a schedule established CE C During A 4
by the City if silt is carried over to adjacent public Construction
thoroughfares or occurs as a result of hauling.
Timing may vary depending upon time of year of
construction.
• Suspend grading operations during high winds(i.e., BO/CE C During A 4
wind speeds exceeding 25 mph)in accordance with Construction
Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils CE C During A 4
haul trucks or cover payloads using tarps or other Construction
suitable means.
The site shall be treated with water or other soil- BO/CE C During A 4
stabilizing agent(approved by SCAQMD and RWQCB) Construction
daily to reduce PM10 emissions, in accordance with
SCAQMD Rule 403.
Chemical soil stabilizers (approved by SCAQMD and BO/CE C During A 4
RWQCB) shall be applied to all inactive construction Construction
areas that remain inactive for 96 hours or more to
reduce PM10 emissions.
The construction contractor shall utilize electric or clean CE C Review of Plans A/C 4
alternative fuel powered equipment where feasible.
The construction contractor shall ensure that CE C Review of Plans A/C 2/4
construction-grading plans include a statement that work
crews will shut off equipment when not in use.
All industrial and commercial facilities shall post signs BO C/D Review of Plans C 2/4
requiring that trucks shall not be left idling for prolonged
periods (i.e., in excess of 10 minutes).
All industrial and commercial facilities shall designate BO C/D Review of Plans A/C 2/4
preferential parking for vanpools.
2 of 7
Mitigation Measures No. Responsible . . of Verif led Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
All industrial commercial site tenants with 50 or more BO C/D Review of Plans A/C 2/4
employees shall be required to post both bus and
Metrolink schedules in conspicuous areas.
All commercial site tenants with 50 or more employees BO C/D Review of Plans A/C 2/4
shall be required to configure their operating schedules
around the Metrolink schedule to the extent reasonably
feasible.
`Cultural Resources
If any prehistoric archaeological resources are
encountered before or during grading,the developer will
retain a qualified archaeologist to monitor construction
activities, to take appropriate measures to protect or
preserve them for study. With the assistance of the
archaeologist, the City of Rancho Cucamonga will:
• Enact interim measures to protect undesignated CP/BO C Review of A/D 3/4
sites from demolition or significant modification Report
without an opportunity for the City to establish its
archaeological value.
• Consider establishing provisions to require CPEO C Review of A/D 3/4
incorporation of archaeological sites within new Report
developments, using their special qualities as a
theme or focal point.
• Pursue educating the public about the area's CP/BO C Review of A/D 3/4
archaeological heritage. Report
• Propose mitigation measures and recommend CP/BO C Review of A/D 3/4
conditions of approval to eliminate adverse project Report
effects on significant, important, and unique
prehistoric resources, following appropriate CEQA
uidelines.
• Prepare a technical resources management report, CP C Review of A/D 3/4
documenting the inventory, evaluation, and Report
proposed mitigation of resources within the project
area. Submit one copy of the completed report,with
original illustrations, to the San Bernardino County
Archaeological Information Center for permanent
archiving.
3 of 7
Mitigation Measures No. Responsible Monitoring Timing of Method of Verif led Sanctions for
Implementing Action for Monitoring Frequency Verification Verification
Date
A qualified paleontologist shall conduct a preconstruction CP B Review of A/D 4
field survey of the project site. The paleontologist shall Report
submit a report of findings that will also provide specific
recommendations regarding further mitigation measures
(i.e., paleontological monitoring) that may be
appropriate.Where mitigation monitoring is appropriate,
the program must include, but not be limited to, the
following measures:
• Assign a paleontological monitor, trained and CP B Review of A/D 4
equipped to allow the rapid removal of fossils with Report
minimal construction delay, to the site full-time
during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared BO B/C Review of A/D 4
or graded, divert earth-disturbing activities Report
elsewhere until the monitor has completed salvage.
If construction personnel make the discovery, the
grading contractor should immediately divert
construction and notify the monitor of the find.
• Submit summary report to City of Rancho CP D Review of D 3
Cucamonga. Transfer collected specimens with a Report
copy of the report to San Bernardino County
Museum.
Geologic Problems ;.: ,,." .,t .'""A�`'*"a 7 MON
The site shall be treated with water or other BO/CE C During A 4
soil-stabilizing agent (approved by SCAQMD and Construction
RW QCB)daily to reduce PM,o emissions,in accordance
with SCAQMD Rule 403.
Frontage public streets shall be swept according to a CE C During A 4
schedule established by the City to reduce PM,o Construction
emissions associated with vehicle tracking of soil
off-site. Timing may vary depending upon time of year
of construction.
Grading operations shall be suspended when wind BO/CE C . During A 4
speeds exceed 25 mph to minimize PMIO emissions Construction
from the site during such episodes.
4 of 7
Mitigation Measures No. Responsible Monitoring Timing of
Method of Verif led Sanctions for
ImplementingDate/initials Non-Compliance
Chemical soil stabilizers (approved by SCAQMD and BO/CE C During A 4
RWQCB) shall be applied to all inactive construction Construction
areas that remain inactive for 96 hours or more to
reduce PM,o emissions.
Hydrology,and Water Quality ' y
RIM.
Structures to retain precipitation and runoff on-site shall CE B/C/D Review of Plans A/C 2/4
be integrated into the design of the project where
appropriate. Measures that may be used to minimize
runoff and to enhance infiltration include Dutch drains,
precast concrete lattice blocks and bricks, terraces,
diversions,runoff spreaders,seepage pits,and recharge
basins.
Prior to issuance of grading permits,the applicant shall CE B/C/D Review of Plans A/C 2/4
prepare a SWPPP that identifies Best Management
Practices (BMPs) to be implemented during the period
the site is under construction. BMPs shall be identified
on the grading plans for review and approval by the City
Engineer.
Prior to issuance of building permits,the applicant shall CE B/C/D Review of Plans A/C 2/4
submit to the City Engineer for approval of a Water
Quality Management Plan (WQMP), including a project
description and identifying BMPs that will be used
on-site to reduce pollutants into the storm drain system
to the maximum extent practicable. The WOMP shall
identify the structural and non-structural measures
consistent with the Guidelines for New Development and
Redevelopment adopted by the City of Rancho
Cucamonga in June 2000.
5of7
Mitigation Measures No. Responsible Monitoring Timing of Method of Verif ied Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/Initials Non-Compliance
Prior to issuance of grading or paving permits,applicant Cl- B/C/D Review of Plans A/C 2/4
shall submit to the City Engineer a Notice of Intent(NOI)
to comply with obtaining coverage under the National
Pollution Discharge elimination System (NPDES)
General Construction Storm Water Permit from the
State Water Resources Control Board. Evidence that
this has been obtained (i.e., a copy of the Waste
Dischargers Identification Number)shall be submitted to
the City Engineer for coverage under the NPDES
General Construction Permit.
'NOise'I,
now
Omw �x
Construction or grading shall not take place between the BO C During A 4
hours of 8:00 p.m. and 6:30 a.m. on weekdays, Construction
including Saturday, or at any time on Sunday or a
national holiday.
Construction or grading noise levels shall not exceed the CP C During A 4
standards specified in Development Code Construction
Section 17.02.120-D, as measured at the property line.
Developer shall hire a consultant to perform weekly
noise level monitoring as specified in Development
Code Section 17.02.120. The Planning Division may
require monitoring at other times. Said consultant shall
report their findings to the Planning Division within 24
hours; however, if noise levels exceed the above
standards, then the consultant shall immediately notify
the Planning Division. If noise levels exceed the above
standards,then construction activities shall be reduced
in intensity to a level of compliance with above noise
standards or halted.
The perimeter block wall shall be constructed as early CP C During A A
as possible in the first phase. Construction
Limit business hours on site to between 7:OOa.m. and CPEO E Business B 3/6
10:00 p.m.. License
Keep all project doors closed except for actual CPEO E Site Inspection A 4/7
ingress/egress of the buildings.
6 of 7
Mitigation Measures No. Responsible Monitoring Timing of
Method of Verif led Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date finitials Non-Compliance
Rooftop equipment noise ratings shall not exceed 9.0 CP/BO E Site Inspection A 4/7
bels, or a level of 70 dbA at the distance of ten feet.
Signs shall be clearly posted throughout the project site CP/BO E Site Inspection A 4/7
prohibiting the use of vehicle horns.
All mechanical equipment not associated with the CP/BO A/D/E Site Inspections/ A/C 4!7
ventilation of the project buildings shall be installed on Plan Checks
the interior of the buildings.
Erect sound walls at least 8 feet in height along all CPEO B/D Site Inspections/ A/C 3
project property lines adjacent to an adjoining residential Plan Checks
land use.
Haul truck deliveries shall not take place between the POGO C During A 4/7
hours of 8:00 p.m. and 6:30 a.m. on weekdays, Construction
including Saturday, or at any time on Sunday or a
national holiday. Additionally, if heavy trucks used for
hauling would exceed 100 daily trips (counting both to
and from the construction site),then the developer shall
prepare a noise mitigation plan denoting any
construction traffic haul routes. To the extent feasible,
the plan shall denote haul routes that do not pass
sensitive land uses or residential dwellings.
Key to Checklist Abbreviations
Responsible Person-',, ., ;,- Monitoring Frequency _ � Method of Verification " .Sanctions
6
CDD - Community Development Director or A-With Each New A-On-site Inspection 1 -Withhold Recordation of Final
designee Development Map
CP-City Planner or designee B- Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building
Permit
CE-City Engineer or designee C-Throughout Construction C- Plan Check 3-Withhold Certificate of
Occupancy
BO- Building Official or designee D - On Completion D -Separate Submittal (Reports/Studies 4-Stop Work Order
/Plans)
PO- Police Captain or designee E -Operating 5- Retain Deposit or Bonds
FC.- Fire Chief or designee 6- Revoke CUP
7-Citation
7 of 7
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT#: DEVELOPMENT REVIEW DRC2003-00146
SUBJECT: VINEYARD BUSINESS CENTER
APPLICANT: HIMES, PETERS, JEPSON ARCHITECTS
LOCATION: SOUTHSIDE OF 9TH STREET/ EASTSIDE OF BAKER AVENUE
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACTTHE PLANNING DIVISION,(909)477-2750,FOR COMPLIANCE
WITH THE FOLLOWING CONDITIONS:
Completion Date
A. General Requirements
1. The applicant shall agree to defend at his sole expense any action brought against the City, its
agents,officers,or employees,because of the issuance of such approval,or in the alternative,to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or
employees, for any Court costs and atiorneys fees which the City, its agents, officers, or
employees may be required by a court to pay as a result of such action. The City may,at its sole
discretion,participate at its own expense in the defense of any such action but such participation
shall not relieve applicant of his obligations under this condition.
2. Approval of Tentative Parcel Map.SUBTPM16141 is granted subject to the approval of
Development Review DRC2003-00146.
3. Copies of the signed Planning Commission Resolution of Approval Nod Standard Conditions, —J---J—
and all environmental mitigations shall be included on the plans (full size). The sheet(s)are for
information only to all parties involved in the construction/grading activities and are not required
to be wet sealed/stamped by a licensed Engineer/Architect.
B. Time Limits
1. Conditional Use Permit, Variance, or Development/Design Review approval shall expire if
building permits are not issued or approved use has not commenced within 5 years from the date
of approval. No extensions are allowed.
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which include
site plans,architectural elevations,exterior materials and colors,landscaping,sign program,and
grading on file in the Planning Division, the conditions contained herein, and the Development
Code regulations.
SC-10-03 1
Project No.DRC2003-00146
Completion Date
2. Prior to any use of the project site or business activity being commenced thereon,all Conditions
of Approval shall be completed to the satisfaction of the City Planner.
3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and
State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be
submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Division
to show compliance. The buildings shall be inspected for compliance prior to occupancy.
4. Revised site plans and building elevations incorporating all Conditions of Approval shall be
submitted for City Planner review and approval prior to the issuance of building permits.
5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.) or prior to final map approval in the case of a custom lot subdivision,or approved
use has commenced,whichever comes first.
6. Approval of this request shall not waive compliance with all sections of the Development Code,all _J_J_
other applicable City Ordinances, and applicable Community or Specific Plans in effect at the
time of building permit issuance.
7. A detailed on-site lighting plan,including a photometric diagram,shall be reviewed and approved __J—J_
by the City Planner and Police Department(477-2800) prior to the issuance of building permits.
Such plan shall indicate style, illumination, location,height,and method of shielding so as not to
adversely affect adjacent properties.
8. Trash receptacle(s)are required and shall meet City standards. The final design,locations,and _J_J_
the number of trash receptacles shall be subject to City Planner review and approval prior to the
issuance of building permits.
9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be J�—
located out of public view and adequately screened through the use of a combination of concrete
or masonry walls,berming,and/or landscaping to the satisfaction of the City Planner. For single-
family residential developments,transformers shall be placed in underground vaults.
10. All building numbers and individual units shall be identified in a clear and concise manner,
including proper illumination.
11. All parkways, open areas, and landscaping shall be permanently maintained by the property Jam_
owner,homeowners'association,or other means acceptable to the City. Proof of this landscape
maintenance shall be submitted for City Planner and City Engineer review and approved prior to
the issuance of building permits.
12. The developer shall submit a construction access plan and schedule for the development of all
lots for City Planner and City Engineer approval; including, but not limited to, public notice
requirements,special street posting,phone listing for community concerns,hours of construction
activity, dust control measures, and security fencing.
13. Six-foot decorative block walls shall be constructed along the project perimeter. If a double wall
condition would result, the developer shall make a good faith effort to work with the adjoining
property owners to provide a single wall. Developer shall notify,by mail,all contiguous property
owner at least 30 days prior to the removal of any existing walls/ fences along the project's
perimeter.
D. Building Design
1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or _J_ _/_
projections, shall be shielded from view and the sound buffered from adjacent properties and
streets as required by the Planning Division. Such screening shall be architecturally integrated
with the building design and constructed to the satisfaction of the City Planner. Details shall be
included in building plans.
SC-10-03 2
Project No.DRC2003-00146
Completion Date
2. For commercial and industrial projects, paint roll-up doors and service doors to match main
building colors.
E. Parking and Vehicular Access (indicate details on building plans)
1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts _/_J_
a building, wall, support column, or other obstruction,the space shall be a minimum of 11 feet
wide.
2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall
contain a 12-inch walk adjacent to the parking stall (including curb).
3. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided
throughout the development to connect dwellings/units/buildings with open spaces/plazas/
recreational uses.
4. All parking spaces shall be double striped per City standards and all driveway aisles,entrances, _J_J_
and exits shall be striped per City standards.
5. Plans for any security gates shall be submitted for the City Planner,City Engineer,and Rancho
Cucamonga Fire Protection District review and approval prior to issuance of building permits.
For residential development,private gated entrances shall provide adequate turn-around space
in front of the gate and a separate visitor lane with call box to avoid cars stacking into the public
right-of-way.
6. Handicap accessible stalls shall be provided for commercial and office facilities with 25 or more ._/_J_
parking stalls. Designate two percent or one stall; whichever is greater, of the total number of
stalls for use by the handicapped.
7. Motorcycle parking area shall be provided for commercial and office facilities with 25 or more _J_J_
parking stalls. Developments with over 100 parking stalls shall provide motorcycle parking at the
rate of one percent. The area for motorcycle parking shall be a minimum of 56 square feet.
F. Trip Reduction
1. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily
residential projects of more than 10 units. Minimum spaces equal to five percent of the required
automobile parking spaces or three bicycle storage spaces,whichever is greater. After the first
50 bicycle storage spaces are provided,additional storage spaces required are 2.5 percent of the
required automobile parking spaces. Warehouse distribution uses shall provide bicycle storage
spaces at a rate of 2.5 percent of the required automobile parking spaces with a minimum of a
3-bike rack. In no case shall the total number of bicycle parking spaces required exceed 100.
Where this results in a fraction of 0.5 or greater, the number shall be rounded off to the higher
whole number.
2. Carpool and vanpool designated off-street parking close to the building shall be provided for
commercial, office, and industrial facilities at the rate of 10 percent of the total parking area. If
covered,the vertical clearance shall be no less than 9 feet.
3. For industrial projects with at least 40 car parking spaces, bicyclist-changing facilities shall be _J_/_
provided to encourage bicycle commuting. Accessible restrooms with storage lockers for
clothing and equipment shall be sufficient.
G. Landscaping
1. A detailed landscape and irrigation plan, including slope planting and model home landscaping inthe case of residential development, shall be prepared by a licensed landscape architect and
submitted for City Planner review and approval prior to the issuance of building permits or prior
final map approval in the case of a custom lot subdivision.
SC-10-03 3
Project No.DRC2003-00146
Completion Date
2. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within
commercial and office projects, shall be specimen size trees-24-inch box or larger.
3. Within parking lots,trees shall be planted at a rate of one 15-gallon tree for every three parking
stalls.
4. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one J J—
tree per 30 linear feet of building.
5. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope,but less than 2:1 JJ_
slope,shall be,at minimum, irrigated and landscaped with appropriate ground cover for erosion
control. Slope planting required by this section shall include a permanent irrigation system to be
installed by the developer prior to occupancy.
6. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater
slope shall be landscaped and irrigated for erosion control and to soften their appearance as
follows: one 15-gallon or larger size tree per each 150 sq.ft.of slope area, 1-gallon or larger size
shrub per each 100 sq.ft.of slope area,and appropriate ground cover. In addition,slope banks
in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or
larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in
staggered clusters to soften and vary slope plane. Slope planting required by this section shall
include a permanent irrigation system to be installed by the developer prior to occupancy.
7. For multi-family residential and non-residential development,property owners are responsible for
the continual maintenance of all landscaped areas on-site,as well as contiguous planted areas
within the public right-of-way. All landscaped areas shall be kept free from weeds and debris and
maintained in healthy and thriving condition,and shall receive regular pruning,fertilizing,mowing,
and trimming. Any damaged,dead,diseased,or decaying plant material shall be replaced within
30 days from the date of damage.
8. The final design of the perimeter parkways,walls,landscaping,and sidewalks shall be included in JJ_
the required landscape plans and shall be subject to City Planner review and approval and
coordinated for consistency with any parkway landscaping plan which may be required by the
Engineering Division.
9. Landscaping and irrigation systems required to be installed within the public right-of-way on the JJ_
perimeter of this project area shall be continuously maintained by the developer.
10. All walls shall be provided with decorative treatment. If located in public maintenance areas,the
design shall be coordinated with the Engineering Division.
11. Landscaping and irrigation shall be designed to conserve water through the principles of JJ_
Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code.
H. Signs
1. The signs indicated on the submitted plans are conceptual only and not a part of this approval. JJ_
Any signs proposed for this development shall complywith the Sign Ordinance and shall require
separate application and approval by the Planning Division prior to installation of any signs.
2. A Uniform Sign Program for this development shall be submitted for City Planner review and
approval prior to issuance of building permits.
I. Environmental
1. The applicant shall submit certification from an acoustical engineer that all recommendations of JJ_
the acoustical report were implemented in construction, including measurements of interior and
exterior noise levels to document compliance with City standards. Certification shall be
submitted to the Building&Safety Division prior to final occupancy release of the affected homes.
SC-10-03 4
Project No.DRC2003-00146
Completion Date
2. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures, including monitoring and reporting. Applicant shall be required to
post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the
amount of$719 prior to the issuance of building permits,guaranteeing satisfactory performance
and completion of all mitigation measures. These funds may be used by the City to retain
consultants and/or pay for City staff time to monitor and report on the mitigation measures.
Failure to complete all actions required by the approved environmental documents shall be
considered grounds for forfeit.
J. Other Agencies
1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location
of mailboxes. Multi-family residential developments shall provide a solid overhead structure for
mailboxes with adequate lighting. The final location of the mailboxes and the design of the
overhead structure shall be subject to City Planner review and approval prior to the issuance of
building permits.
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION,(909)477-2710, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
K. General Requirements
1. Submit five complete sets of plans including the following:
a. Site/Plot Plan;
b. Foundation Plan;
C. Floor Plan;
d. Ceiling and Roof Framing Plan;
e. Electrical Plans (2 sets,detached) including the size of the main switch, number and size
of service entrance conductors, panel schedules, and single line diagrams;
I. Plumbing and Sewer Plans, including isometrics,underground diagrams,water and waste
diagram, sewer or septic system location, fixture units, gas piping, and heating and air
conditioning; and
g. Planning Division Project Number(i.e.,TT#, CUP#, DR#, etc.) clearly identified on the
outside of all plans.
2. Submit two sets of structural calculations, energy conservation calculations, and a soils report.
Architect's/Engineer's stamp and "wet"signature are required prior to plan check submittal.
3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to
the City prior to permit issuance.
4. Separate permits are required for fencing and/or walls.
5. Business Business shall not open for operation prior to posting the Certificate of Occupancy issued by the
Building and Safety Division.
L. Site Development
1. , Plans shall be submitted for plan check and approved prior to construction. All plans shall be
marked with the project file number(i.e., DRC2001-00001): The applicant shall comply with the
latest adopted California Codes, and all other applicable codes, ordinances, and regulations in
SC-10-03 5
Project No.DRC2003-00146
Completion Date
effect at the time of permit application. Contact the Building and Safety Division for availability of
the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new commercial or industrial development project or ��—
major addition,the applicant shall pay development fees at the established rate. Such fees may
include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee,Transportation
Development Fee, Permit and Plan Check Fees, and School Fees. Applicant shall provide a
copy of the school fees receipt to the Building and Safety Division prior to permits issuance.
3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map
recordation and prior to issuance of building permits.
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday �—J—
through Saturday, with no construction on Sunday or holidays.
5. Construct trash enclosure(s) per City Standard (available at the Planning Division's public �-1—
counter).
M. New Structures
1. Provide compliance with the California Building Code (CBC) for property line clearances —/_J—
considering use, area, and fire-resistiveness.
2. Provide compliance with the California Building Code for required occupancy separations.
3. Provide draft stops in attics in line with common walls. ��-
4. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A �-1-
5. Openings in exterior walls shall be protected in accordance with CBC Table 5-A. ��-
6. Provide smoke and heat venting in accordance with CBC Section 906. ��-
7. Upon tenant improvement plan check submittal, additional requirements may be needed.
N. Grading
1. Grading of the subject property shall be in accordance with California Building Code,City Grading __J__J_
Standards, and accepted grading practices. The final grading plan shall be in substantial
conformance with the approved grading plan.
2. A soils report shall be prepared by a qualified engineer licensed by the State of California to —/_J—
perform such work.
3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the ��—
time of application for grading plan check.
4. The final grading, appropriate certifications and compaction reports shall be completed,
submitted, and approved by the Building and Safety Official prior to the issuance of building
permits.
5: A separate grading plan check submittal is required for all new construction projects and for
existing buildings where improvements being proposed will generate 50 cubic yards or more of
combined cut and fill. The grading plan shall be prepared,stamped, and signed by a California
registered Civil Engineer.
SC-10-03 6 .
Project No.DRC2003-00146
Completion Date
APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
0. Dedication and Vehicular Access
1. Rights-of-way and easements shall be dedicated to the City for all interior public streets, _J___J_
community trails, public paseos,public landscape areas,street trees,traffic signal encroachment
and maintenance, and public drainage facilities as shown on the plans and/or tentative map.
Private easements for non-public facilities (cross-lot drainage, local feeder trails, etc.) shall be
reserved as shown on the plans and/or tentative map.
2. Dedication shall be made of the following rights-of-way on the perimeter streets(measured from
street centerline):
33 total feet on 9th Street
33 total feet on Baker Avenue ___J_J_
_J__J-
3. Corner property line cutoffs shall be dedicated per City Standards.
4. Reciprocal parking agreements for all parcels and maintenance agreements ensuring joint _J_J_
maintenance of all common roads, drives, or parking areas shall be provided by CC & R's or
deeds and shall be recorded prior to, or concurrent with,the final parcel map.
5. All existing easements lying within future rights-of-way shall be quit-claimed or delineated on the _J__1_
final map.
P. Street Improvements
1. All public improvements(interior streets,drainage facilities,community trails,paseos,landscaped
areas, etc.) shown on the plans and/or tentative map shall be constructed to City Standards.
Interior street improvements shall include, but are not limited to,curb and gutter,AC pavement,
drive approaches, sidewalks,street lights, and street trees.
2. A minimum of 26-foot wide pavement, within a 40-foot wide dedicated right-of-way shall be _J_J_
constructed for all half-section streets.
3. Construct the following perimeter street improvements including, but not limited to: _J_J—
Curb& A.C. Side- Drive Street Street Comm Median elks
Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other
9th Street X X X X X X
Baker Avenue X X X X X X
4. Improvement Plans and Construction:
a. Street improvement plans,including street trees,street lights,and intersection safety lights
on future signal poles, and traffic signal plans shall be prepared by a registered Civil
Engineer and shall be submitted to and approved by the City Engineer. Security shall be
posted and an agreement executed to the satisfaction of the City Engineer and the City
Attorney guaranteeing completion of the public and/or private street improvements,prior to
final map approval or the issuance of building permits, whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a
construction permit shall be obtained from the City Engineer's Office in addition to any
other permits required.
C. Pavement striping,marking,traffic signing,street name signing,traffic signal conduit,and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
SC-10-03 7
Project No.DRC2003-00146
Completion Date
d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction —J—J_
project along major or secondary streets and at intersections for future traffic signals and
interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside
of BCR, ECR, or any other locations approved by the City Engineer
Notes:
1) Pull boxes shall be No.6 at intersections and No.5 along streets,a maximum of 200
feet apart, unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch (at intersections) or 2-inch (along streets) galvanized steel
with pull rope or as specified.
e. Handicapped access ramps shall be installed on all corners of intersections per City
Standards or as directed by the City Engineer.
f. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A cash
deposit shall be provided to cover the cost of grading and paving,which shall be refunded
upon completion of the construction to the satisfaction of the City Engineer.
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be
installed to City Standards, except for single family residential lots.
h. Street names shall be approved by the City Planner prior to submittal for first plan check.
5. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in --J--J—
accordance with the City's street tree program.
6. Install street trees per City street tree design guidelines and standards as follows. The completed
legend and construction notes shall appear on the title page of the street improvement plans.
Where public landscape plans are required,tree installation in those areas shall be per the public
landscape improvement plans.
The City Engineer reserves the right to adjust tree species based upon field conditions and other
variables. For additional information,contact the Project Engineer.
Min.
Grow
Street Name Botanical Name Common Name Space Spacing Size* Gty.
9th Street Quercus ilex Holly Oak 5' 40' 15
O.C. Gal.
Baker Avenue Pistacia chinensis Pistache 5' 50' 15
O.C. Gal.
'A' Street Select appropriate tree from the approved Street Tree List for Rancho
Cucamonga
`TREES SHALL BE 15-GALLON SIZE UNLESS OTHERWISE APPROVED.
Construction Notes for Street Trees:
1) All street trees are to be planted in accordance with City standard plans.
2) Prior to the commencement of any planting,an agronomic soils report shall be furnished to
the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil
amendments, as determined by the City inspector.
3) All street trees are subject to inspection and acceptance by the Engineering Division.
4) Street trees are to be planted per public improvement plans only.
7. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with
adopted policy. On collector or larger streets, lines of sight shall be plotted for all project
intersections, including driveways. Local residential street intersections and commercial or
industrial driveways may have lines of sight plotted as required.
SC-10-03 8
Project No.DRC2003-00146
Completion Date
0. Public Maintenance Areas
1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting
Districts shall be filed with the City Engineer prior to final map approval or issuance of building
permits whichever occurs first. Formation costs shall be borne by the developer.
R. Drainage and Flood Control
1. A final drainage study shall be submitted to and approved by the City Engineer prior to final map
approval or the issuance of building permits,whichever occurs first. All drainage facilities shall
be installed as required by the City Engineer.
2. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the
property from adjacent areas.
3. Trees are prohibited within 5 feet of the outside diameter of any public storm drain pipe measured
from the outer edge of a mature tree trunk.
4. Public storm drain easements shall be graded to convey overflows in the event of a blockage in a
sump catch basin on the public street.
S. Utilities
1. Provide separate utility services to each parcel including sanitary sewerage system,water,gas,
electric power, telephone, and cable TV (all underground) in accordance with the Utility
Standards. Easements shall be provided as required.
2. The developer shall be responsible for the relocation of existing utilities as necessary.
3. Water and sewer plans shall be designed and constructed to meet the requirements of the
Cucamonga County Water District(CCW D), Rancho Cucamonga Fire Protection District,and the
Environmental Health Department of the County of San Bernardino. A letter of compliance from
the CCW D is required prior to final map approval or issuance of permits,whichever occurs first.
Such letter must have been issued by the water district within 90 days prior to final map approval
in the case of subdivision or prior to the issuance of permits in the case of all other residential
projects.
4. Approvals have not been secured from all utilities and other interested agencies involved.
Approval of the final parcel map will be subject to any requirements that may be received from
them.
T. General Requirements and Approvals
1. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all
new streetlights for the first six months of operation,prior to final map approval or prior to building
permit issuance if no map is involved.
APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
U. Security Lighting
1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power.
These areas should be lighted from sunset to sunrise and on photo sensored cell.
SC-10-03 9
Project No.DRC2003-00148
Completion Date
2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with
direct lighting to be provided by all entryways. Lighting shall be consistent around the entire
development.
3. Lighting in exterior areas shall be in vandal-resistant fixtures.
V. Security Hardware
1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within
40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used.
2. All garage or rolling doors shall have slide bolts or some type of secondary locking devices.
3. All roof openings giving access to the building shall be secured with either iron bars,metal gates,
or alarmed.
W. Security Fencing
1. All businesses or residential communities with security fencing and gates will provide the police
with a keypad access and a unique code.The initial code is to be submitted to the Police Crime
Prevention Unit along with plans. If this code is changed due to a change in personnel or for any
other reason, the new code must be supplied to the Police via the 24-hour dispatch center at
(909)941-1488 or by contacting the Crime Prevention Unit at(909)477-2800 extension 2474 or
extension 2475.
X. Windows
1. Security/burglar bars are not recommended, particularly in residences, due to the delay or
prevention of a speedy evacuation in case of fire.
Y. Building Numbering
1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime _J_J_
visibility.
2. Developer shall paint roof top numbers on one or more roofs of this development. They shall be
a minimum of three feet in length and two feet in width and of contrasting color to background.
The stencils for this purpose are on loan at the Rancho Cucamonga Police Department.
3. All developments shall submit an 8 Y2°x 11"sheet with the numbering pattern of all multi-tenant _J_J_
developments to the Police Department.
APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, FIRE PROTECTION PLANNING
SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
SEE ATTACHED
SCA 0-03 10
FIRE PROTECTION DISTRICT
s
- FIRE SAFETY DIVISION
STANDARD CONDITIONS
PROJECT#: DRC2003-00146 & SUBTPM16141
PROJECT NAME: Vineyard Business Center
DATE: November 5, 2003 .
PLAN TYPE: Industrial Park
APPLICANT NAME: Daniel Tsai
OCCUPANCY CLASS: B/S-1
FLOOR AREA(S): Varies
TYPE CONSTRUCTION: Type V-N
FIRE PROTECTION
SYSTEM REQUIRED: Sprinklers
LOCATION: 8629 9 (21) Buildings
FD REVIEW BY: Moises Eskenazi Sr Plans Examiner
PLANNER: Kirt Court
RANCHO CUCAMONGA FIRE DISTRICT- STANDARD CONDITIONS & REQUIREMENTS —
Reciprocal agreements and Fire flow letter must be received prior to Permit issuance.
FSC-1 General Requirements for Public and Private Water Supply
1. General Guidance for Fire Hydrants: The following provides general guidance for the spacing and
location of fire hydrants. Remember these are the maximum permitted distances between fire hydrants:
a. The maximum distance between fire hydrants in commercial1industrial projects is 300-feet. No
portion of the exterior wall shall be located more than 150-feet from an approved fire hydrant. For
cul-de-sacs the distance shall not exceed 100-feet.
b. Fire hydrants are to be located:
1. At the entrance(s)to a project from the existing public roadways. This includes subdivisions
and industrial parks.
2. At intersections.
3. On the right side of the street, whenever practical and possible.
4. As required by the Fire Safety Division to meet operational needs.
5. The location of fire hydrants is based upon the operational needs of the Fire District to control
a fire.
6. Fire hydrants shall be located a minimum of forty(40) feet from any building.
Contact the Fire Safety Division 909 477-2770
2. Minimum Fire Flow with Automatic Fire Sprinklers: The required minimum fire flow for this project is
2250 gallons per minute at a minimum residual pressure of 20 pounds per square inch. This flow reflects
a 50 percent reduction for the installation of an approved automatic fire sprinkler system with central
station monitoring. This requirement is made in accordance with Fire Code Appendix III-A, as amended,
and Fire District Ordinances and Standards.
3. Show Existing Fire Hydrants and Mains: Existing fire hydrants and mains within 600-feet of the project
shall be shown on the water plan submitted for review and approval. Include main size.
FSC-2 Private(On-Site)Water and/or Fire Sprinkler Underground Plans for Fire Protection
1. Exceeds Allowable Distance:When any portion of a facility or building is located more than 150-feet
from a fire hydrant located on a public street, as measured by an approved route around the exterior of
the facility or building, on-site fire hydrants and mains capable of supplying the required fire flow shall be
provided. The distance is measured as vehicular path of travel on access roadways, not line of sight.
2. Number of Fire Hydrants: Provide one fire hydrant for each 1000 gpm of required fire flow or fraction
thereof,subject to standard spacing and distribution requirements.
3. Fire Sprinkler Underground: Prior to the issuance of a fire sprinkler system permit, the applicant shall
submit construction plans, specifications, and calculations for the fire sprinkler system underground to the
Fire Safety Division for approval.
FSC-3 Automatic Fire Sprinkler Systems-Technical Comments
1. Required Installations:
Rancho Cucamonga Fire District Ordinance 15 or other adopted code or standard, requires an approved
automatic fire sprinkler system to be installed in any of the following:
a. Commercial or industrial structures greater than 7,500 square feet
FSC-4 Fire District Site Access-Technical Comments
1. Access Roadways Defined: Fire District access roadways.include public roads, streets, and
highways, as well as private roads, streets, drive aisles and designated fire lanes.
2. Location of Access: All portions of the structure or facility or any portion of the exterior wall of the first
story shall be located within 150-feet of Fire District vehicle access, measured by an unobstructed
approved route around the exterior of the building. Landscaped areas, unpaved changes in elevation,
gates, and fences are an obstruction.
3. Private Roadways and Fire Lanes:The minimum specifications for private fire district access roadways
are:
a. The minimum unobstructed width is 26-feet.
b. The inside turn radius shall be 24-feet.
c. The outside turn radius shall be not less than 50-feet.
d. The minimum radius for cul-de-sacs is 45-feet.
e. The minimum vertical clearance is 14 feet,6 inches.
I. At any private entry median,the minimum width of traffic lanes shall be 20-feet.
g. The angle of departure and approach shall not exceed 9 degrees or 20 percent.
h. The maximum grade of the driving surface shall not exceed 12%.
i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW).
4. Access Doorways: In addition to any exterior opening required by the Building or Fire Code, approved
doorways, accessible without the use of a ladder, shall be provided as follows:
a. In buildings without high-piled storage, one or more approved access doors shall be provided
inl50 lineal feet or major fraction thereof along the exterior wall that faces required access
roadways or walkways.
b. In buildings with high-piled storage one or more approved access doors shall be provided in
each 100 lineal feet or major fraction thereof, of the exterior wall that faces required access
roadways. When a railroad siding is installed provisions shall be made to maintain Fire District
access to all required openings.
5. Access Walkways: Approved access walkways shall be provided from the fire apparatus access road
to all required building exterior openings.
6. Fire Lane Identification: All required fire lanes shall be identified by red curbing and signage. A
drawing of the proposed signage that meets the minimum Fire District standards shall be submitted to
and approved
FSC-10 Hazard Control Permits-Technical Comments
The below indicated permit requirements are based on those permits commonly associated with the projects
operations or building construction. As noted below Special Permits may be required, dependent upon
approved use(s)the applicant must contact the Fire Safety Division for specific information:
Note: Carefully review the Items below.There may be significant impact on the proposed project.
Italicized text indicates a Rancho Cucamonga Fire District amendment.
1. General Use Permit shall be required for any activity or operation not specifically described below,
which in the judgment of the Fire Chief is likely to produce conditions that may be hazardous to life or
property.
2. Flammable finishes.
3. Spraying or dipping operations, spray booths, dip tanks, electrostatic apparatus, automobile
undercoating, powder coating, and organic peroxides and dual component coatings (per booth fee).
4. Flammable and combustible liquid (storage, handling, and/or use). Storage of flammable and
combustible liquids in outside aboveground storage tanks is prohibited by Rancho Cucamonga Fire
Code.
5. High piled combustible storage.
6. Liquefied petroleum gas (storage, handling, use or transport, exceeding 100 gallons aggregate
capacity). On a scaled site plan show the occupancy or use of all buildings within a Yz mile radius.
Storage exceeding 100 gallons aggregate capacity is not permitted within !6 mile of residential areas.
7. Hot work operations (welding and cutting operations in any occupancy).
FSC-12 Plan Submittal Required Notice
Required plans shall be submitted and approved prior to construction in accordance with 2000/2001 Building,
Fire, Mechanical,and Plumbing Codes; 1999 Electrical Code; Health and Safety Code; Public Resources
Code; and RCFPD Ordinances FD15 and FD39, Guidelines and Standards.
NOTE: In addition to the fees due at this time please note that separate plan check fees for tenant
improvements,fire protection systems and/or any consultant reviews will be assessed at time of submittal of
plans.
FSC-14 Alternate Materials and Methods
The Fire Safety Division will review requests for alternate materials and methods within the scope of our
authority. The request must be submitted on the Fire District"Application for Alternate Method"form along with
supporting documents. Contact the Fire Safety Division at(909)477-2770 for assistance.
PRIOR TO (PARCEL) MAP RECORDATION- For Each Development Phase
1. Prior to the recordation of the applicable subdivision map,the Fire District in consultation with the City
Engineer shall approve the locations of Traffic Signal Preemption Devices. The subdivider shall enter into an
agreement with the City for the installation of traffic signal preemption equipment for the surrounding
controlled intersections.
2. Reciprocal Access Agreement: The plans as submitted indicate that a required point of Fire District
access:
a. Requires passage on property not under the control of the applicant; or
b. Does not access a public way; or
c. Crosses a property line
Please provide a permanent access agreement granting irrevocable use of the adjacent property for use
by the Fire District to gain access to the subject property. The agreement shall include a statement that
no obstruction, gate,fence, building, or other structure shall be placed within the dedicated access. The
recorded agreement shall include a copy of the site plan required below. The agreement shall be
recorded with the County of San Bernardino, Recorders Office. The agreement shall be approved by the
Fire Safety Division prior to recordation.
To assist the Fire Safety Division in reviewing the agreement the following shall be included in the
submittal:
a. Title Report. A current title report, policy of title insurance, or other equivalent documentation
proving ownership of all property included in the agreement.
b. Legal Description. A legal description of all property subject to the agreement.
c. Assessor's Parcel Numbers. The assessor's parcel numbers of each parcel subject to the
agreement.
d. Site Plan: The access roadway shall comply with the requirements of Private Roadways and
Fire Lanes listed above. A scaled site plan showing the path of the Fire District access, the width,
turn radii, load-bearing capacity of roadway surface, etc. shall be provided.
Contact the Fire Safety Division 909 477-2770
3. Reciprocal Water Covenant and Agreement: The plans as submitted indicate that a required private fire
mains or appurtenances thereto:
a. Pass through or are located on property not under the control of the applicant; or
b. Crosses a property line
Please provide a permanent maintenance and service agreement between the owner's granting a non-
exclusive easement for the purpose of accessing and maintaining the private water mains, fire hydrants,
and built-in fire protection systems. The agreement shall meet the form and content approved by the
Rancho Cucamonga Fire District, Fire Safety Division. The agreement shall be recorded with the County
of San Bernardino, Recorders Office. The agreement shall be approved by the Fire Safety Division prior
to recordation.
PRIOR TO ISSUANCE OF BUILDING PERMITS- Complete the following:
1. Private/On-site Fire Hydrants: Prior to the issuance of any building permit, the applicant shall submit
construction plans, specifications, flow test data and calculations for the private water main system for
review and approval by the Fire District. Plans and installation shall comply with Fire District
standards.
2. Private Fire Hydrants/On-site Installation: All private on-site fire hydrants shall be installed,
flushed, and operable prior to delivering any combustible building materials on-site (i.e., lumber,
roofing materials, etc.). A representative of Fire Construction Services shall inspect the installation
and witness hydrant flushing. The builder/developer shall submit final test and inspection report to the
Fire Safety Division.
3. Public Fire Hydrants: Prior to issuance of any building permit, the applicant shall submit a plan
showing the locations of all new public fire hydrants for the review and approval by the Fire District
and the Water District. On the plan show all existing fire hydrants within a 600-foot radius of the
project.
4. Public Installation: All required public fire hydrants shall be installed, flushed, and operable prior to
delivering any combustible building materials on-site (i.e., lumber, roofing materials, etc.). Water
District personnel shall inspect the installation and witness hydrant flushing. The builder/developer
shall submit a copy of the Water District inspection report to the Fire Safety Division. Contact Water
District to schedule testing.
PRIOR TO OCCUPANCY OR FINAL INSPECTION- Complete the following:
1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire
hydrant location on the street or driveway in accordance with Rancho Cucamonga Fire Protection
District and City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective
Hydrant Markers." On private property these markers are to be maintained in good condition by the
property owner.
2. Private Fire Hydrants- Final Acceptance: For the purpose of final acceptance, an additional test of
the on-site fire hydrants shall be conducted by the builder/developer in the presence of the Water
District or Fire Construction Services, as appropriate. The builder/developer shall submit the final
test report to the Fire Safety Division.
3. Fire Sprinkler System- Plans and Permit: Plans for the required automatic fire sprinkler system
shall be submitted to Fire Construction Services for review and approval. No work is allowed without
a Fire Construction Services permit.
4. Fire Sprinkler System- Final Inspection: Prior to the issuance of a Certificate of Occupancy, the
fire sprinkler system(s) shall be tested and accepted by Fire Construction Services
5. Sprinkler Monitoring: The fire sprinkler system monitoring system shall be installed, tested, and
operational immediately following the completion of the fire sprinkler system. Monitoring is required
with 20 sprinklers in Group I Occupancies, or 100 or more sprinklers in all other Occupancies. .
6. Knox Rapid Entry System: A Knox rapid entry key vault shall be installed prior to final inspection.
Proof of purchase shall be submitted prior to final building plan approval. Contact the Fire Safety
Division for specific details and ordering information.
7. Fire Lanes: Prior to the issuance of any Certificate of Occupancy, the fire lanes shall be installed in
accordance with the approved fire lane plan. The CC&R's or other approved documents shall contain an
approved fire lane map and provisions that prohibit parking in the fire lanes. The method of enforcement
shall be documented. The CC&R's shall also identify who is responsible for not less than annual
inspection and maintenance of all required fire lanes.
8. Address-Other Than Single-family: New buildings other than single-family dwellings shall post the
address with minimum 8-inch numbers on contrasting background,visible from the street and electrically
illuminated during periods of darkness. When the building setback exceeds 200 feet from the public
street an additional non-illuminated 6-inch minimum number address shall be provided at the property
entrance.
9. Muni-unit Complexes: In muni-unit complexes approved address numbers, and/or building identification
letters shall be provided on the front and back of all units,suites,or buildings. The Fire,District shall
review and approve the numbering plan in coordination with the City of Rancho Cucamonga.
10. High-pile Combustible Storage-Permit:The applicant is required to obtain a Fire District Permit for
Storage of High-pile Combustible material.
11. High-pile Combustible Storage- Plans:The applicant shall submit plans for the storage arrangement
to Fire Construction Services.The applicant shall submit detailed plans and a Commodity Analysis report
to Fire Construction Services for approval. If the occupancy classification for the building is designated as
Group S, Division 2,commodities stored shall be limited to light hazard classification only.
12. Fire District Confidential Business Occupancy Information: The applicant shall complete the
Rancho Cucamonga Fire District"Confidential Business Occupancy Information" Form and submit to
the Fire Safety Division. This form provides contact information for Fire District use in the event of an
emergency at the subject building or property.