Loading...
HomeMy WebLinkAbout04-03 - Resolutions RESOLUTION NO. 04-03 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT REVIEW NO. DRC2003-00358, THE DESIGN REVIEW OF 6 SINGLE-FAMILY DETACHED HOMES FOR TENTATIVE TRACT MAP SUBTT16554 IN THE LOW RESIDENTIAL DISTRICT (2-4 DWELLING UNITS PER ACRE), LOCATED AT THE SOUTHWEST CORNER OF BASE LINE ROAD AND HERMOSA AVENUE, AND MAKING FINDINGS IN SUPPORT THEREOF -APN: 1077-041-57. A. Recitals. 1. Pinewave Design and Engineering filed an application for Development Review DRC2003-00358, the Design Review of Tentative Tract Map SUBTT16554, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Development Review request is referred to as "the application." 2. On the 14th day of January 2004, the Planning Commission of the City of Rancho Cucamonga held a meeting to consider the application. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved bythe Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Pari A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above- referenced meeting on January 14, 2004, including written and oral staff reports, this Commission hereby specifically finds as follows: a. The application applies to property located at the southwest comer of Base Line Road and Hermosa Avenue with a street frontage of approximately 216 feet on Base Line Road and approximately 315 feet on Hermosa Avenue and presently contains the Minor House, a designated Historical Landmark; and b. The property to the north of the subject site across Base Line Road is developed with condominiums, the properties to the south and west are developed with single-family homes, and the property to the east is developed with an electrical substation; and C. The proposed use, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity; and d. The applicant conducted a neighborhood meeting on October 21,2003,attended by 15 residents, to inform surrounding neighborhood residents of the proposed project and to obtain their feedback; and e. The project design meets or exceeds the Basic Development Standards for lot area, lot width, lot frontage, lot depth, and building setbacks; and PLANNING COMMISSION RESOLUTION NO. 04-03 DRC2003-00358— PINEWAVE DESIGN AND ENGINEERING January 14, 2004 Page 2 f. The project, in conjunction with Landmark Alteration Permit DRC2003-00711, will relocate the Minor House to Lot 6 of Tentative Tract Map SUBTT16554 and become part of a neighborhood, a desirable goal; and g. The design and exterior materials of the single family homes incorporates wood siding and decorative braces, architectural elements found on the historic Minor House, thereby fostering a continuity design, a goal of the General Plan. 3. Based upon the substantial evidence presented to this Commission during the above- referenced meeting and upon the specific findings of facts set forth in paragraphs 1 and 2 above,this Commission hereby specifically finds and concludes as follows: a. That the proposed project is consistent with the objectives of the General Plan;and b. That the proposed design is in accord with the objectives of the Development Code and the purposes of the district in which the site is located; and C. That the proposed design is in compliance with each of the applicable provisions of the Development Code; and d. That the proposed design, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. 4. Based upon the facts and information contained in the proposed Mitigated Negative Declaration, together with all written and oral reports included for the environmental assessment for the application, the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and Monitoring Program attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. That the Mitigated Negative Declaration has been prepared in compliance with the California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared therefore reflect the independent judgment of the Planning Commission; and, further, this Commission has reviewed and considered the information contained in said Mitigated Negative Declaration with regard to the application. b. Although the Mitigated Negative Declaration identifies certain significant environmental effects that will result if the project is approved, all significant effects have been reduced to an acceptable level by imposition of mitigation measures on the project, which are listed below as conditions of approval. C. Pursuant to the provisions of Section 753.5(c) of Title 14 of the California Code of Regulations, the Planning Commission finds as follows: In considering the record as a whole, the Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the proposed project will have potential for an adverse impact upon wildlife resources orthe habitat upon which wildlife depends. Further, based upon the substantial evidence contained in the Mitigated Commission during the public hearing, the Planning Commission hereby rebuts the presumption of adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code of Regulations. PLANNING COMMISSION RESOLUTION NO. 04-03 DRC2003-00358— PINEWAVE DESIGN AND ENGINEERING January 14, 2004 Page 3 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference: Planning Division 1) The houses shall be plotted with substantial front setback variation, with a variation of +/- 5 feet, at a minimum. Final design shall be subject to City Planner review and approval during the precise grade plan submitted for plan check. 2) The colors of the stucco and ledge stone base shall vary on each lot in order to provide visual interest. Plans submitted for plan check shall indicate the required variations in the stucco color and ledge stone base. 3) A Model 2 plan shall be plotted on Lot 1. 4) All Model 1 plans shall have an additional architectural feature or site design, such as a front porch or a decorative driveway with unique scored lines, to provide variation in the streetscape. Plans submitted for plan check shall indicate the additional architectural feature. 5) The .developer shall provide each prospective buyer of comer lots written notice of maintaining the landscaped parkway. The written notice shall be signed by the prospective buyer prior to acceptance of cash deposit on the property. 6) Prior to issuance of building permits, the developer shall submit documentation to the Planning Division that the property owners of the lots that share the southerly boundary of Tentative Tract Map SUBTT16554 have agreed to a 1-foot high extension to the existing wall on the southerly boundary line of Tentative Tract Map SUBTT16554. 7) Access gates to the rear yards shall be constructed from a material more durable than wood gates. Acceptable materials include, but are not limited to, wrought iron and plastic. 8) All conditions of approval per Historic Preservation Commission Resolution No. 04-01 for Landmark Alteration Permit DRC2003-00711 shall apply. 9) Prior to building permit issuance, the project shall be scheduled as a Consent Calendar item on Design Review for review of the decorative driveway layouts. Engineering Division 1) Protect existing traffic signing and striping on Base Line Road. Protect or modify existing traffic signal equipment in Base Line Road. Protect PLANNING COMMISSION RESOLUTION NO. 04-03 DRC2003-00358— PINEWAVE DESIGN AND ENGINEERING January 14, 2004 Page 4 existing traffic signal equipment, signing, and striping on Hermosa Avenue. Protect existing R26 signs on Base Line Road and Hermosa Avenue or replace as required. Revise existing improvement plans for Base Line Road and Hermosa Avenue as needed to show new improvements. 2) An in-lieu fee as contribution to the future undergrounding of the existing overhead utilities(telecommunications and electrical,except for the 66 kV electrical) on the opposite side of Hermosa Avenue shall be paid to the City, prior to the issuance of building permits. The fee shall be one-half the City adopted unit amount times the length from the southerly property boundary to the northerly terminus pole just south of Base Line Road. 3) The existing driveways on Base Line Road and Hermosa Avenue shall be removed and replaced with curb and gutter and sidewalk. 4) The existing overhead electrical and telecommunication service lines to the existing house shall be undergrounded and the utility pole removed. 5) Provide a Water Quality Management Plan (WQMP) and identify applicable Best Management Practices (BMPs) on the conceptual grading plan. 6) The final map for Tract 16554 shall be approved prior to the issuance of building permits. 7) The following shall apply for driveways downhill from street: 6 feet at 6 percent(14 percent maximum between grade breaks)and 18-feet flat in front of garage (could be 13 feet at 5 percent to flow line, then up 5 feet at 2 percent). 8) All improvements within public rights-of-way shall be constructed per public improvement plans with a 2 percent slope within the right-of-way from the property line to the top of the curb. 9) Install private landscaping and irrigation systems in the parkways of comer Lots 1 and 6 along Hermosa Avenue, prior to public improvements being accepted by the City. (Side-on to Arterial streets, where rear-on would be Landscape Maintenance District). 10) Prior to the issuance of building permits, a Diversion Deposit and related administrative fees shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at least 50 percent of all wastes generated during construction and demolition are diverted from landfills, and appropriate documentation is provided to the City. Form CD-1 shall be submitted to the Engineering Division when the first building permit application is submitted to Building and Safety. Form CD-2 shall be submitted to the Engineering Division PLANNING COMMISSION RESOLUTION NO. 04-03 DRC2003-00358— PINEWAVE DESIGN AND ENGINEERING January 14, 2004 Page 5 within 60 days following the completion of the construction and/or demolition project. 11) Construct concrete 'V' gutter along Lots 4, 5, and 6. Environmental Mitigation Air Quality 1) All construction equipment shall be maintained in good operating condition so as to reduce operational emissions. The contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers'specifications. Maintenance records shall be available at the construction site for City verification. 2) Prior to issuance of any grading permits, the developer shall submit construction plans to the City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD) as well as City Planning staff. 3) All paints and coatings shall meet or exceed performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high volume, low-pressure spray. 4) All asphalt shall meet or exceed performance standards noted in SCAQMD Rule 1108. 5) All construction equipment shall comply with SCAQMD Rules 402 and 403. Additionally, contractors shall include the following provisions: • Reestablish ground cover on the construction site through seeding and watering. • Pave or apply gravel to any on-site haul roads. • Phase grading to prevent the susceptibility of large areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in accordance with local ordinances and use sound engineering practices. • Sweep streets according to a schedule established by the City if silt is carried over to adjacent public thoroughfares or occurs as a PLANNING COMMISSION RESOLUTION NO. 04-03 DRC2003-00358— PINEWAVE DESIGN AND ENGINEERING January 14, 2004 Page 6 result of hauling. Timing may vary depending upon time of year of construction. • Suspend grading operations during high winds(i.e.,wind speeds exceeding 25 mph) in accordance with Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils haul trucks or cover payloads using tarps or other suitable means. 6) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and Regional Water Quality Control Board [RWQCB]) daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403. 7) Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. 8) The construction contractor shall utilize electric or clean altemative fuel powered equipment where feasible. 9) The construction contractor shall ensure that Construction Grading Plans include a statement that work crews will shut off equipment when not in use. 10) All residential and commercial structures shall be required to incorporate high efficiencyllow polluting heating, air conditioning, appliances, and water heaters. 11) All residential and commercial structures shall be required to incorporate thermal pane windows and weather stripping. Biological Resources 1) The Fruitless Mulberry tree shall be saved by transplanting or replaced with the largest nursery grown specimen available to the satisfaction of the City Planner. The tree shall be planted on the lot with the relocated Minor House. Cultural Resources 1) During grading and grubbing of the project site, the developerwill retain a qualified archaeologist to monitor construction activities and take appropriate measures to protect or preserve them for study. The archaeologist will monitor the northeast quadrant of the property, with an emphasis in the area of the bam slab. Also, with the assistance of the archaeologist, the City of Rancho Cucamonga will: • Enact interim measures to protect undesignated sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. PLANNING COMMISSION RESOLUTION NO. 04-03 DRC2003-00358— PINEWAVE DESIGN AND ENGINEERING January 14, 2004 Page 7 • Consider establishing provisions to require incorporation of archaeological sites within new developments, using their special qualities as a theme or focal point. • Pursue educating the public about the area's archaeological heritage. • Propose mitigation measures and recommend conditions of approval to eliminate adverse project effects on significant, important, and unique prehistoric resources,following appropriate CEQA guidelines. • Prepare a technical resources management report, documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report, with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. 2) A qualified paleontologist shall conduct a preconstruction field survey of the project site. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures (i.e., paleontological monitoring) that may be appropriate. Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: • Assign a paleontological monitor, trained and equipped to allow the rapid removal of fossils with minimal construction delay,to the site full-time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared or graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Submit summary report to City of Rancho Cucamonga. Transfer collected specimens with a copy of the report to San Bernardino County Museum. Geology and Soils 1) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and RWQCB) daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403. 2) Frontage public streets shall be swept according to a schedule established by the City to reduce PM10 emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon time of year of construction. 3) Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PM10 emissions from the site during such episodes. PLANNING COMMISSION RESOLUTION NO. 04-03 DRC2003-00358— PINEWAVE DESIGN AND ENGINEERING January 14, 2004 Page 8 4) Chemical soil stabilizers (approved by SCAQMD and RWQCB)shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM,o emissions. Hydrology 1) Structures to retain precipitation and runoff on-site shall be integrated into the design of the project where appropriate. Measures that may be used to minimize runoff and to enhance infiltration include Dutch drains, pre-cast concrete lattice blocks and bricks, terraces, diversions, runoff spreaders, seepage pits, and recharge basins 2) Prior to issuance of building permits, the applicant shall submit to the City Engineer for approval of a Water Quality Management Plan (WQMP), including a project description and identifying Best Management Practices (BMPs) that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The WQMP shall identify the structural and non-structural measures consistent with the Guidelines for New Development and Redevelopment adopted by the City of Rancho Cucamonga in June 2000. 3) Prior to issuance of grading or paving permits, the applicant shall submit to the City Engineer a Notice of Intent (NOI) to comply with obtaining coverage under the National Pollution Discharge Elimination System (NPDES) General Construction Storrs Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Discharger's Identification Number) shall be submitted to the City Engineer for coverage under the NPDES General Construction Permit. Noise 1) An 8-foot high masonry wall will be constructed along the northern boundary of the subdivision, fronting Base Line Road, and along the eastern boundary of Lot 1. A 6-foot high masonry wall shall be constructed along the western and southern boundary of the subdivision, and along the eastern boundary of Lot 6. 2) The plans submitted for plan check shall have STC 28 dual-insulated windows and STC 33 solid core exterior wood doors with seals. 3) Construction or grading shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. 4) Construction or grading noise levels shall not exceed the standards specified in Development Code Section 17.02.120-D, as measured at the property line. Developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section PLANNING COMMISSION RESOLUTION NO. 04-03 DRC2003-00358- PINEWAVE DESIGN AND ENGINEERING January 14, 2004 Page 9 17.02.120. Monitoring at other times may be required by the Planning Division. Said consultant shall report their findings to the Planning Division within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Planning Division. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. 5) The perimeter block wall shall be constructed as early as possible in first phase. 6) Haul truck deliveries shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips (counting both to and from the construction site), then the developer shall prepare a noise mitigation plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 14TH DAY OF JANUARY 2004. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: - z zv'---� Rich Macias, Chairman ATTEST: Brad Bu creta 1, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 14th day of January 2004, by the following vote-to-wit: AYES: COMMISSIONERS: FLETCHER, MACIAS, McNIEL, McPHAIL, STEWART NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: NONE City of Rancho Cucamonga - ' MITIGATION MONITORING PROGRAM Project File No.: DRC2003-00358 AND SUBTT16554 This Mitigation Monitoring Program(MMP)has been prepared for use in implementing the mitigation measures identified in the Mitigated Negative Declaration forthe above-listed project. This program has been prepared in compliance with State law to ensure that adopted mitigation measures are implemented (Section 21081.6 of the Public Resources Code). Program Components -This MMP contains the following elements: 1. Conditions of approval that act as impact mitigation measures are recorded with the action and the procedure necessary to ensure compliance.The mitigation measure conditions of approval are contained in the adopted Resolution of Approval for the project. 2. A procedure of compliance and verification has been outlined for each action necessary. This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported. 3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring progresses, changes to compliance procedures may be necessary based upon recommendations by those responsible for the program. Program Management -The MMP will be in-place through all phases of the project. The project planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly and proper action is taken on each mitigation. Each City department shall ensure compliance of the conditions (mitigation) that relate to that department. Procedures -The following steps will be followed by the City of Rancho Cucamonga. 1. A fee covering all costs and expenses, including any consultants'fees, incurred by the City in performing monitoring or reporting programs shall be charged to the applicant. 2. A MMP Reporting Form will be prepared for each potentially significant impact and its corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached hereto. This procedure designates who will take action,what action will be taken and when,and to whom and when compliance will be reported. All monitoring and reporting documentation will be kept in the project file with the department having the original authority for processing the project. Reports will be available from the City upon request at the following address: City of Rancho Cucamonga - Lead Agency (Planning Division) 10500 Civic Center Drive Rancho Cucamonga, CA 91730 Mitigation Monitoring Program DRC2003-00358 AND SUBTT16554 Page 2 3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,as determined by the project planner or responsible City department,to monitor specific mitigation activities and provide appropriate written approvals to the project planner. 4. The project planner or responsible City department will approve, by signature and date,the completion of each action item that was identified on the MMP Reporting.Form. After each measure is verified for compliance, no further action is required for the specific phase of development. 5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off as completed by the project planner or responsible City department at the bottom of the MMP Reporting Form. 6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation measures.The project planner is responsible for approving any such refinements or additions. An MMP Reporting Form will be completed by the project planner or responsible City department and a copy provided to the appropriate design, construction, or operational personnel. 7. The project planner or responsible City department has the authority to stop the work of construction contractors if compliance with any aspects of the MMP is not occurring afterwritten notification has been issued. The project planner or responsible City department also has the authority to hold certificates of occupancies if compliance with a mitigation measure attached hereto is not occurring.The project planner or responsible City department has the authority to hold issuance of a business license until all mitigation measures are implemented. 8. Any conditions (mitigation) that require monitoring after project completion shall be the responsibility of the City of Rancho Cucamonga Planning Division.The Division shall require the applicant to post any necessary funds (or other forms of guarantee)with the City. These funds shall be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measure for the required period of time. 9. In those instances requiring long-term project monitoring, the applicant shall provide the City with a plan for monitoring the mitigation activities at the project site and reporting the monitoring results to the City. Said plan shall identify the reporter as an individual qualified to know whether the particular mitigation measure has been implemented. The monitoring/reporting plan shall conform to the City's MMP and shall be approved by the Community Development Director or City Planner prior to the issuance of building permits. . MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III) Project File No.: DRC2003-00358 and SUBTT16554 Applicant: Pinewave Design and Engineering Initial Study Prepared by: Donald Granger Date: May 5. 2003 Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Air Quality " All construction equipment shall be maintained in good CP- C Review of Plans A/C 2/4 operating condition so as to reduce operational emissions. Contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers'specifications. Maintenance records shall be available at the construction site for City verification. Prior to the issuance of any grading permits, developer CP/CE C Review of Plans C 2 shall submit construction plans to the City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the SCAQMD as well as City Planning staff. All paints and coatings shall meet or exceed CP C Review of Plans A/C 2/4 performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high volume, low-pressure spray. All asphalt shall meet or exceed performance standards BO B Review of Plans A/C 2 noted in SCAQMD Rule 1108. All construction equipment shall comply with SCAQMD CE C Review of Plans A/C 2/4 Rules 402 and 403. Additionally, contractors shall include the following provisions: • Reestablish ground cover on the construction site CE C Review of Plans A/C 2/4 through seeding and watering. • Pave or apply gravel to any on-site haul roads. CE C Review of Plans A/C 2/4 1 of 7 Mitigation Measures No. Responsible Monitoring Timing of Method . Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance • Phase grading to prevent the susceptibility of large CE C Review of Plans A/C 2/4 areas to erosion over extended Periods of time. • Schedule activities to minimize the amounts of CE C Review of Plans A/C 2/4 exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in CE C Review of Plans A 4 accordance with local ordinances and use sound engineering ractices. • Sweep streets according to a schedule established CE C During A 4 by the City if silt is carried over to adjacent public Construction thoroughfares or occurs as a result of hauling. Timing may vary depending upon time of year of construction. • Suspend grading operations during high winds(i.e., BO/CE C During A 4 wind speeds exceeding 25 mph)in accordance with Construction Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils CE C Review of Plans A 4 haul trucks or cover payloads using tarps or other suitable means. The site shall be treated with water or other soil BO/CE C During A 4 stabilizing agent(approved by SCAQMD and RWQCB) Construction daily to reduce PM,a emissions, in accordance with SCAQMD Rule 403. Chemical soil stabilizers (approved by SCAQMD and BO/CE C Review of Plans A 4 RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PMIO emissions. The construction contractor shall utilize electric or clean CE C Review of Plans A/C 4 alternative fuel powered equipment where feasible. The construction contractor shall ensure that CE C Review of Plans A/C 2/4 construction-grading plans include a statement that work crews will shut off equipment when not in use. All residential and commercial structures shall be BO C/D Review of Plans C 2/4 required to incorporate high efficiency/low polluting heating, air conditioning,appliances and water heaters. 2 of 7 Mitigation Measures No.f Responsible Monitoring Timing of of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance All residential and commercial structures shall be BO C/D Review of Plans C 2/4 required to incorporate thermal pane windows and weather-stripping. biological- The iological The Fruitless Mulberry tree shall be saved by CP C Review of A/C 2/4 transplanting or replaced with the largest nursery grown Plans/During specimen available to the satisfaction of the City Construction Planner. The tree shall be planted'on the lot with the relocated Minor House. Cultural Resources 4 ; � . _ . During grading and grubbing of the project site, the CP/BO C Review of A/C 2/4 developer will retain a qualified archaeologist to monitor Plans/During construction activities and take appropriate measures to Construction protect or preserve them for study. The archaeologist will monitor the northeast quadrant of the property,with an emphasis in the area of the barn slab. Also,with the assistance of the archaeologist, the City of Rancho Cucamonga will: • Enact interim measures to protect undesignated CP/BO C Review of A/D 3/4 sites from demolition or significant modification Report without an opportunity for the City to establish its archaeological value. • Consider establishing provisions to require CP/BO C Review of A/D 3/4 incorporation of archaeological sites within new Report developments, using their special qualities as a theme or focal point. • Pursue educating the public about the area's CP/BO C Review of A/D 3/4' archaeological heritage. Report • Propose mitigation measures and recommend CP/BO C Review of A/D 3/4 conditions of approval to eliminate adverse project Report effects on significant, important, and unique prehistoric resources, following appropriate CEOA guidelines. 3 of 7 Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/Initials Non-Compliance • Prepare a technical resources management report, CP C Review of A/D 3/4 documenting the inventory, evaluation, and Report proposed mitigation of resources within the project area. Submit one copy of the completed report,with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. A qualified paleontologist shall conduct a preconstruction CP B Review of A/D 4 field survey of the project site. The paleontologist shall Report submit a report of findings that will also provide specific recommendations regarding further mitigation measures (i.e., paleontological monitoring) that may be appropriate.Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: Assign a paleontological monitor, trained and CP B Review of A/D 4 equipped to allow the rapid removal of fossils with Report minimal construction delay, to the site full-time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared BO B/C Review of A/D 4 or graded, divert earth-disturbing activities Report elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Submit summary report to City of Rancho CP D Review of D 3 Cucamonga. Transfer collected specimens with a Report copy of the report to San Bernardino County Museum. Geology-and Soils ," ;, a �.,. , " , ; � The site shall be treated with water or other soil BO/CE C During A 4 stabilizing agent(approved by SCAQMD and RWQCB) Construction. daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403. Frontage public streets shall be swept according to a CE C During A 4 schedule established by the City to reduce PM,a Construction emissions associated with vehicle tracking of soil off- site. Timing may vary depending upon time of year of construction. 4 of 7 Mitigation . . of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Grading operations shall be suspended when wind BO/CE C During A 4 speeds exceed 25 mph to minimize PM10 emissions Construction from the site during such episodes. Chemical soil stabilizers (approved by SCAQMD and BO/CE C During A 4 RWQCB) shall be applied to all inactive construction Construction areas that remain inactive for 96 hours or more to reduce PM,a emissions. Hy3roipgyah3Water,Qpal�tyFO� a�� . , :_t;a ... . ,..w,lA..x-,>..,,,.w ss•:: s. k6,Jvi. a,a' .tee z Structures to retain precipitation and runoff on-site shall CE B/C/D Review of Plans A/C 2/4 be integrated into the design of the project where appropriate. Measures that may be used to minimize runoff and to enhance infiltration include Dutch drains, precast concrete lattice blocks and bricks, terraces, diversions,runoff spreaders,seepage pits,and recharge basins. Prior to issuance of building permits,the applicant shall CE B/C/D Review of Plans A/C 2/4 submit to the City Engineer for approval of a Water Quality Management Plan (WQMP), including a project description and identifying Best Management Practices (BMPs)that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The WQMP shall identifythe structural and non-structural measures consistent with the Guidelines for New Development and Redevelopment adopted by the City of Rancho Cucamonga in June 2000. Prior to issuance of grading or paving permits,applicant CE B/C/D Review of Plans A/C 2/4 shall submit to the City Engineer a Notice of Intent(NOI) to comply with obtaining coverage under the National Pollutant Discharge Elimination System (NPDES) General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Discharger's Identification Number) shall be submitted to the City Engineer for coverage under the NPDES General Construction Permit. 5 of 7 Mitigation Measures No. Responsible Monitoring Timing of of Verif ied Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance , _. d , i h"P ,�pS''. T�Y�? w st U. .v_x s"�`'K,zi"%R an,Ws'� ..i.....',r✓ ... ...._. .. . .m�a xnu e-=,xe' 'n. An 8-foot high masonry wall will be constructed along BO/CP C/D Review of A/C/D 2,3 the northern boundary of the subdivision,fronting Base Plans/During Line Road, and along the eastern boundary of Lot 1. A Construction 6-foot high masonry wall shall be constructed along the western and southern boundary of the subdivision,and along the eastern boundary of Lot 6. The plans submitted for plan check shall have STC 28 BO/CP C/D Review of A/C/D 2,3 dual-insulated windows and STC 33 solid core exterior Plans/During wood doors with seals. Construction Construction or grading shall not take place between the BO C During A 4 hours of 8:00 p.m. and 6:30 a.m. on weekdays, Construction including Saturday, or at any time on Sunday or a national holiday. Construction or grading noise levels shall not exceed the CP C During A 4 standards specified in Development Code Section Construction 17.02.120-D, as measured at the property line. Developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Planning Division. Said consultant shall report their findings to the Planning Division within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Planning Division. If noise levels exceed the above standards,then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. The perimeter block wall shall be constructed as early CP C During A A as possible in first phase. Construction 6of7 Mitigation Measures No. Responsible . of Method of Verif led Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Haul truck deliveries shall not take place between the POBO C During A 4/7 hours of 8:00 p.m. and 6:30 a.m. on weekdays, Construction including Saturday, or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips (counting both to and from the construction site),then the developer shall prepare a noise mitigation plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. Key to Checklist Abbreviations Responsible Person Monitoring Frequency ? a. p Method of Verification , > Sanctions CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds FC-Fire Chief or designee 6-Revoke CUP 7-Citation i:\planning\finahceqaVnmchkist-rev5-03final.doc 7 of 7 COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT#: DEVELOPMENT REVIEW DRC2003-00358 SUBJECT: 6-LOT DEVELOPMENT REVIEW APPLICANT: PINEWAVE DESIGN AND ENGINEERING LOCATION: SOUTHWEST CORNER OF BASE LINE ROAD AND HERMOSA AVENUE ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DIVISION,(909)477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: completion Date A. General Requirements 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents,officers,or employees,because of the issuance of such approval,or in the alternative,to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may,at its sole discretion,participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Approval of Development Review DRC2003-00358. is granted subject to the approval of Tentative Tract SUBTT16554 and Minor Exception DRC2003-00726. 3. Copies of the signed Planning Commission Resolution of Approval No. 04-03, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s)are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. B. Time Limits 1. Conditional Use Permit, Variance, or Development/Design Review approval shall expire if building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans,architectural elevations,exterior materials and colors,landscaping,sign program,and grading on file in the Planning Division, the conditions contained herein, Development Code regulations. SC-10-03 1 Project No.DRC2003-00358 Completion Date 2. Prior to any use of the project site or business activity being commenced thereon,all Conditions of Approval shall be completed to the satisfaction of the City Planner. 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Division to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for City Planner review and approval prior to the issuance of building permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.)or prior to final map approval in the case of a custom lot subdivision,or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code,all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 7. If no centralized trash receptacles are provided,all trash pick-up shall be for individual units with all receptacles shielded from public view. 8. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berm ing,and/or landscaping to the satisfaction of the City Planner. For single- family residential developments, transformers shall be placed in underground vaults. 9. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination. 10. All parkways, open areas, and landscaping shall be permanently maintained by the property owner,homeowners'association,or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for City Planner and City Engineer review and approved prior to the issuance of building permits. 11. The project contains a designated Historical Landmark. The site shall be developed and maintained in accordance with Historic Landmark Alteration Permit No. DRC2003-00711 .Any further modifications to the site including, but not limited to, exterior alterations and/or interior alterations which affect the exterior of the buildings or structures, removal of landmark trees, demolition, relocation, reconstruction of buildings or structures, or changes to the site, shall require a modification to the Historic Landmark Alteration Permit subject to Historic Preservation Commission review and approval. 12. Six-foot decorative block walls shall be constructed along the project perimeter. If a double wall condition would result, the developer shall make a good faith effort to work with the adjoining property owners to provide a single wall. Developer shall notify, by mail,all contiguous property owner at least 30 days prior to the removal of any existing walls/fences along the project's perimeter. 13. Construct block walls between homes(i.e.,along interior side and rear property lines),rather than wood fencing for permanence, durability, and design consistency. 14. Access gates to the rear yards shall be constructed from a material more durable than wood gates. Acceptable materials include, but are not limited to, wrought iron and PVC. 15. For residential development, return walls and corner side walls shall be decorative masonry. 16. On corner side yards, provide minimum 5-foot setback between walls/fences and sidewalk. SC-10-03 2 Project No. DRC2003-00358 Completion Date 17. Where rock cobble is used, it shall be real river rock. Other stone veneers may be manufactured products. D. Building Design 1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections, shall be shielded from view and the sound buffered from adjacent properties and streets as required by the Planning Division. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the City Planner. Details shall be included in building plans. E. Parking and Vehicular Access (indicate details on building plans) 1. Multiple car garage driveways shall be tapered down to a standard two-car width at street. F. Landscaping 1. A detailed landscape and irrigation plan,including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for City Planner review and approval prior to the issuance of building permits or prior final map approval in the case of a custom lot subdivision. 2. Existing trees required to be preserved in place shall be protected with a construction barrier in accordance with the Municipal Code Section 19.08.110,and so noted on the grading plans. The location of those trees to be preserved in place and new locations for transplanted trees shall be shown on the detailed landscape plans. The applicant shall follow all of the arborist's recommendations regarding preservation, transplanting, and trimming methods. 3. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope,but less than 2:1 slope, shall be,at minimum, irrigated and landscaped with appropriate ground cover for erosion control. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 4. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater slope shall be landscaped and irrigated for erosion control and to soften their appearance as follows: one 15-gallon or larger size tree per each 150 sq.ft.of slope area, 1-gallon or larger size shrub per each 100 sq.ft.of slope area,and appropriate ground cover. In addition,slope banks in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in staggered clusters to soften and vary slope plane. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 5. For single-family residential development, all slope planting and irrigation shall be continuously maintained in a healthy and thriving condition by the developer until each individual unit is sold and occupied by the buyer. Prior to releasing occupancy for those units, an inspection shall be conducted by the Planning Division to determine that they are in satisfactory condition. 6. Front yard and corner side yard landscaping and irrigation shall be required perthe Development Code. This requirement shall be in addition to the required street trees and slope planting. 7. The final design of the perimeter parkways,walls,landscaping,and sidewalks shall be included in the required landscape plans and shall be subject to City Planner review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Division. 8. Special landscape features such as mounding, alluvial rock, specimen size trees, meandering sidewalks (with horizontal change), and intensified landscaping, is required along Base Line Road. SC-10-03 3 Project No. DRC2003-00358 Completion Date 9. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 10. All walls shall be provided with decorative treatment. If located in public maintenance areas,the design shall be coordinated with the Engineering Division. G. Signs 1. The signs indicated on the submitted plans are conceptual only and not a part of this approval. Any signs proposed for this development shall comply with the Sign Ordinance and shall require separate application and approval by the Planning Division prior to installation of any signs. H. Environmental 1. A final acoustical report shall be submitted for City Planner review and approval prior to the issuance of building permits. The final report shall discuss the level of interior noise attenuation to below 45 CNEL, the building materials and construction techniques provided, and if appropriate,verify the adequacy of the mitigation measures. The building plans will be checked for conformance with the mitigation measures contained in the final report. 2. The applicant shall submit certification from an acoustical engineer that all recommendations of the acoustical report were implemented in construction, including measurements of interior and exterior noise levels to document compliance with City standards. Certification shall be submitted to the Building&Safety Division prior to final occupancy release of the affected homes. 3. Mitigation measures are required for the project. The applicant is responsible for the cost of implementing said measures, including monitoring and reporting. Applicant shall be required to post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the amount of $719.00 prior to the issuance of building permits, guaranteeing satisfactory performance and completion of all mitigation measures. These funds maybe used bythe City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete all actions required by the approved environmental documents shall be considered grounds for forfeit. I. Other Agencies 1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location of mailboxes. Multi-family residential developments shall provide a solid overhead structure for mailboxes with adequate lighting. The final location of the mailboxes and the design of the overhead structure shall be subject to City Planner review and approval prior to the issuance of building permits. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION,(909)477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S) J. General Requirements 1. Submit five complete sets of plans including the following: ��— a. Site/Plot Plan; b. Foundation Plan; C. Floor Plan; d. Ceiling and Roof Framing Plan; SC-10-03 4 Project No. DRC2003-00358 Completion Date e. Electrical Plans (2 sets,detached) including the size of the main switch, number.and size of service entrance conductors, panel schedules, and single line diagrams;' f. Plumbing and Sewer Plans, including isometrics,underground diagrams,water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Division Project Number(i.e.,TT#, CUP#, DR#, etc.) clearly identified on the outside of all plans. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet"signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to the City prior to permit issuance. 4. Separate permits are required for fencing and/or walls. ��- 5. Developers wishing to participate in the Community Energy Efficiency Program (CEEP) can contact the Building and Safety Division staff for information and submittal requirements. K. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number(i.e., DRC2001-00001). The applicant shall comply with the latest adopted California Codes, and all other applicable codes,ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Division for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new residential project or major addition,the applicant shall pay development fees at the established rate. Such fees may include,but are not limited to: City Beautification Fee, Park Fee, Drainage Fee,Transportation Development Fee, Permit and Plan Check Fees,and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Division prior to permit issuance. 3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map recordation and prior to issuance of building permits. 4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday _LJ__J_ through Saturday, with no construction on Sunday or holidays. L. New Structures 1. Provide compliance with the California Building Code (CBC) for property line clearances considering use, area, and fire-resistiveness. 2. Provide compliance with the California Building Code for required occupancy separations. 3. Roofing material shall be installed per the manufacturer's "high wind" instructions. M. Grading 1. Grading of the subject property shall be in accordance with California Building Code,City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. SC-10-03 5 Project No.DRC2003-00358 Completion Date 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the time of application for grading plan check. 4. The final grading, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 5. A separate grading plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The grading plan shall be prepared,stamped,and signed by a California registered Civil Engineer. APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: N. Dedication and Vehicular Access 1. Rights-of-way and easements shall be dedicated to the City for all interior public streets, community trails,public paseos, public landscape areas,street trees,traffic signal encroachment and maintenance, and public drainage facilities as shown on the plans and/or tentative map. Private easements for non-public facilities (cross-lot drainage, local feeder trails, etc.) shall be reserved as shown on the plans and/or tentative map. 2. Dedication shall be made of the following rights-of-way on the perimeter streets(measured from street centerline): 60 total feet on Base Line Road 3. Corner property line cutoffs shall be dedicated per City Standards. /- 4. Vehicular access rights shall be dedicated to the City for the following streets: Base Line Road. 5. All existing easements lying within future rights-of-way shall be quit-claimed or delineated on the final map. 6. Easements for public sidewalks and/or street trees placed outside the public right-of-way shall be dedicated to the City. O. Street Improvements 1. All public improvements(interior streets,drainage facilities,community trails,paseos,landscaped areas, etc.) shown on the plans and/or tentative map shall be constructed to City Standards. Interior street improvements shall include, but are not limited to,curb and gutter,AC pavement, drive approaches, sidewalks, street lights, and street trees. 2. Construct the following perimeter street improvements including, but not limited to: Curb S AC. Side- Drive Street Street Comm Median Bike Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other Base Line Road x x x x Hermosa Avenue x x x x "A"Street x x x x x x 3. Improvement Plans and Construction: a. Street improvement plans,including street trees,street lights,and intersection safety lightson future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City SC-10-03 6 Project No.DRC2003-00358 Completion Date Attorney guaranteeing completion of the public and/or private street improvements,prior to final map approval or the issuance of building permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the City Engineer's Office in addition to any other permits required. C. Pavement striping,marking,traffic signing,street name signing,traffic signal conduit,and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer Notes: 1) Pull boxes shall be No.6 at intersections and No.5 along streets,a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2) Conduit shall be 3-inch (at intersections) or 2-inch (along streets) galvanized steel with pull rope or as specified. e. Handicapped access ramps shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving,which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single family residential lots. h. Street names shall be approved by the City Planner prior to submittal for first plan check. 4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. 5. Install street trees per City street tree design guidelines and standards as follows. The completed legend and construction notes shall appear on the title page of the street improvement plans. Where public landscape plans are required,tree installation in those areas shall be per the public landscape improvement plans. SC-10-03 7 Project No. DRC2003-00358 Completion Date The City Engineer reserves the right to adjust tree species based upon field conditions and other variables. For additional information, contact the Project Engineer. Min. Grow Street Name Botanical Name Common Name Space Spacing size Qty. Base Line Road 3' Foreground tree Magnolia grandiflora NCN 30'o.c. 15-gal Fill P.A.8'or greater 'Samuel Sommer formal in P.A. less than 8'or Magnolia grandiflora NCN 3' 20'o.c. 15-gal under power lines 'St. Mary' formal Background tree Liquidambar American Sweet Gum 8' 25'o.c. 15-gal P.A.8'or greater styraciflua informal Accent tree Lagerstoemia indica Crape Myrtle Hybrid- 3' 20'o.c. 24' 'Natchez' white box Hermosa Avenue 8'or greater p.a. Platanus acerifloia London Place tree 8' 30'o.c. 15-gal 8'or greater p.a. Lagerstoemia indica Crape Myrtle Hybrid- 3' 20'o.c. 24' under utilities 'Catawba'multi dark purple box Smaller than 8'p.a. Lagersteomia indica Crape Myrtle Hybrid- 3' 20'o.c. 24' no utilities 'Catawba'standard dark purple box `Use Sycamores as on-site background tree within inadequate room necessitates Crape Myrtles Cul-de-sac provide Select tree from the street name approved Street Tree List for Rancho Cucamonga 'TREES SHALL BE 15-GALLON SIZE UNLESS OTHERWISE APPROVED. Construction.Notes for Street Trees: 1) All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting,an agronomic soils report shall be furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector. 3) All street trees are subject to inspection and acceptance by the Engineering Division. 4) Street trees are to be planted per public improvement plans only. 6. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with JJ_ adopted policy. On collector or larger streets, lines of sight shall be plotted for all project intersections, including driveways. Local residential street intersections and commercial or industrial driveways may have lines of sight plotted as required. P. Public Maintenance Areas 1. A separate set of landscape and irrigation plans per Engineering Public Works Standards shall be submitted to the City Engineer for review and approval prior to final map approval or issuance of building permits, whichever occurs first. The following landscaped parkways, medians, paseos, easements, trails or other areas shall be annexed into the Landscape Maintenance District: Base Line Road Lots 1-3. SC-10-03 8 Project No.DRC2003-00358 Completion Date 2. Public landscape areas are required to incorporate substantial areas ( % of mortared cobble or other acceptable non-irrigated surfaces. 3. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the City Engineer prior to final map approval or issuance of building permits whichever occurs first. Formation costs shall be borne by the developer. 4. All required public landscaping and irrigation systems shall be continuously maintained by the developer until accepted by the City. 5. Parkway landscaping on the following street(s) shall conform to the results of the respective Beautification Master Plan Base Line Road. 0. Drainage and Flood Control 1. A final drainage study shall be submitted to and approved by the City Engineer prior to final map approval or the issuance of building permits, whichever occurs first. All drainage facilities shall be installed as required by the City Engineer. 2. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the _J_J_ property from adjacent areas. 3. Trees are prohibited within 5 feet of the outside diameter of any public storm drain pipe measured from the outer edge of a mature tree trunk. 4. Public storm drain easements shall be graded to convey overflows in the event of a blockage in a sump catch basin on the public street. R. Utilities 1. Provide separate utility services to each parcel including sanitary sewerage system,water, gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 2. The developer shall be responsible for the relocation of existing utilities as necessary. 3. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga County Water District(CCW D), Rancho Cucamonga Fire Protection District,and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CCW D is required prior to final map approval or issuance of permits,whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. 4. Approvals have not been secured from all utilities and other interested agencies involved. _/_J_ Approval of the final parcel map will be subject to any requirements that may be received from them. S. General Requirements and Approvals 1. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all new streetlights for the first six months of operation,prior to final map approval or prior to building permit issuance if no map is involved. SC-10-03 9 Project No. DRC2003-00358 Completion Date APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: T. Security Hardware 1. A secondary locking device shall be installed on all sliding glass doors. 2. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within 40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used. 3. All garage or rolling doors shall have slide bolts or some type of secondary locking devices. U. Windows 1. All sliding glass windows shall have secondary locking devices and should not be able to be lifted from frame or track in any manner. V. Building Numbering 1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime visibility. APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, FIRE PROTECTION PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED SC-10-03 10 '... . FIRE PROTECTION DISTRICT FIRE SAFETY DIVISION STANDARD CONDITIONS PROJECT M DRC2003-00358 (DRC2003-00088) &SUBTT16554 PROJECT NAME: Des Marais DATE: November 16, 2003 PLAN TYPE: SFR Tract APPLICANT NAME: Des Marais OCCUPANCY CLASS: Group R-3 FLOOR AREA(S): < 3600 Square feet TYPE CONSTRUCTION: Type V FIRE PROTECTION SYSTEM REQUIRED: none LOCATION: SW corner of Baseline and Hermosa FD REVIEW BY: . Moises Eskenazi, Sr. Plans Examiner PLANNER: Donald Grander _ THE FOLLOWING STANDARD CONDITIONS MAYAPPLY TO YOUR PROJECT. RANCHO CUCAMONGA FIRE DISTRICT- STANDARD CONDITIONS & REQUIREMENTS — General, Procedural, Technical, or Operational Information that shall be Included, Corrected, or Completed as noted below. The following is applicable to project FD-03- 0914 and DRC2003-00088 / DRC2003-00358 & SUBTT16554: FSC-1 General Requirements for Public and Private Water Supply 1. General Guidance for Fire Hydrants: The following provides general guidance for the spacing and location of fire hydrants. Remember these are the maximum permitted distances between fire hydrants: a. The maximum distance between fire hydrants in single-family residential projects is 500-feet. No portion of the exterior wall facing the addressed street shall be more than 250-feet from an approved fire hydrant. For cul-de-sacs the distance shall not exceed 200 ft. b. Fire hydrants are to be located: 1. At the entrance(s)to a project from the existing public roadways. This includes subdivisions and industrial parks. 2. At intersections. 3. On the right side of the street, whenever practical and possible. 4. As required by the Fire Safety Division to meet operational needs. 5. The location of fire hydrants is based upon the operational needs of the Fire District to control a fire. Contact the Fire Safety Division 909 477-2770 2. Minimum Fire Flow: The required fire flow for this project is 1500 gallons per minute at a minimum residual pressure of 20 pounds per square inch. This requirement is made in accordance with Fire Code Appendix III- A, as amended. Please see"Water Availability' attachment for required verification of fire flow availability for the proposed project. Contact the Fire Safety Division (909)477-2770 3. Hydrants Used to Supply Fire Flow: Public Fre hydrants located within a 500-foot radius of the proposed project may be used to provide the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent property shall not be used to provide required fire flow. Contact the Fire Safety Division (909)477-2770 4. Show Existing Fire Hydrants and Mains: Existing fire hydrants and mains within 600-feet of the project shall be shown on the water plan submitted for review and approval. Include main size. 5. Single-family Residential Plans: For single-family residential and accessory structures show all fire hydrants located within 600-feet of the proposed project site. PRIOR TO ISSUANCE OF BUILDING PERMITS- Complete the following: 1. Public Fire Hydrants: Prior to issuance of any building permit, the applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and the Water District. On the plan show all existing fire hydrants within a 600-foot radius of the project. Contact the Fire Safety Division (909)477-2770 2. Public Installation: All required public fire hydrants shall be installed, flushed, and operable prior to delivering any combustible building materials on-site (i.e., lumber, roofing materials, etc.). Water District personnel shall inspect the installation and witness hydrant flushing. The builder/developer shall submit a copy of the Water District inspection report to the Fire Safety Division. Contact Water District to schedule testing. 3. Combustible Construction Letter-Required Letter: Prior to the issuance of a building permit for combustible construction, the builder shall submit a letter to the Fire District on company letterhead stating that the minimum water supply for fire fighting purposes and the all-weather fire protection access roadway that meets Fire District Standards shall be in place and operational before any combustible material is placed on-site. The roadway shall be maintained at all times. PRIOR TO OCCUPANCY OR FINAL INSPECTION- Complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with Rancho Cucamonga Fire Protection District and City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers." On private property these markers are to be maintained in good condition by the property owner. Contact Building and Safety/Fire Construction Services (909)477-2713. 2. Construction Access: Fire District access, a minimum 26-feet in width and 14-feet, 6-inches minimum clear height shall be provided. These minimum clearances shall be maintained free and clear of any obstructions at all times, in accordance with Fire District Standards. Contact the Fire Safety Division (909)477-2770 3. Address Single-family: New single-family dwellings shall post the address with minimum 4-inch numbers on a contrasting background. The numbers shall be internally or externally illuminated during periods of darkness. The numbers shall be visible from the street. When building setback from the public roadway exceeds 100 feet, additional 4-inch numbers shall be displayed at the property entry.