HomeMy WebLinkAbout04-13 - Resolutions RESOLUTION NO. 04-13 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT REVIEW NO. ORC2003-00324 TO CONSTRUCT A 13,855 SQUARE FOOT OFFICE AND RETAIL BUILDING ON 1.70 ACRES OF LAND IN THE NEIGHBORHOOD COMMERCIAL DISTRICT, LOCATED APPROXIMATELY 300 FEET EAST OF ARCHIBALD AVENUE, ON THE NORTH SIDE OF BASE LINE ROAD; AND MAKING FINDINGS IN SUPPORT THEREOF - APN: 1076-191-10. A. Recitals. 1. Drs. George Makkar and Amira Boutros filed an application for Development Review DRC2003-00324 as described in the title of this Resolution. Hereinafter in this Resolution, the subject Development Review request is referred to as "the application." 2. On the 14th day of January 2004, the Planning Commission of the City of Rancho Cucamonga held a meeting to consider the application. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above- referenced meeting on January 14, 2004, including written and oral staff reports, this Commission hereby specifically finds as follows: a. The application applies to property located within an existing shopping centeron the north side of Base Line Road, approximately 300 feet north of Archibald Avenue, with a street frontage of approximately 230 feet on Base Line Road and a lot depth of approximately 275 feet;and b. The property to the north of the subject site is developed with apartments, the property to the south is developed with a shopping center, the property to the east is developed with a mobile home park, and the property to the west is developed with a retail building; and C. The proposed use, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity; and d. The applicant conducted a neighborhood meeting on November 24,2003,to inform surrounding neighborhood residents of the proposed project and to obtain their feedback; however, no residents attended; and e. The project design meets or exceeds the Basic Development Standards for technical requirements, including, but not limited to, parking stalls and setbacks; and PLANNING COMMISSION RESOLUTION NO. 04-13 DRC2003-00324— DRS. GEORGE MAKKAR AND AMIRA BOUTROS January 14, 2004 Page 2 f. The project site was originally master planned for a retail building under Conditional Use Permit 84-13; and g. The application contemplates the operation of veterinarian and retail uses, both permitted uses within the Neighborhood Commercial District; and h. The architectural design of the proposed project, with a colonnade, exposed rafter tails, Spanish tile roof, and similar form and massing, is compatible with the adjacent building, will provide design continuity, and make a positive statement along Base Line Road, a design goal of the General Plan. 3. Based upon the substantial evidence presented to this Commission during the above- referenced meeting on January 14, 2004, including written and oral staff reports, this Commission hereby specifically finds and concludes as follows: a. That the proposed project is consistent with the objectives of the General Plan;and b. That the proposed design is in accord with the objectives of the Development Code and the purposes of the district in which the site is located; and C. That the proposed design is in compliance with each of the applicable provisions of the Development Code; and d. That the proposed design, together with the conditions applicable thereto,will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. 4. Based upon the facts and information contained in the proposed Mitigated Negative Declaration, together with all written and oral reports included for the environmental assessment for the application, the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and Monitoring Program attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. That the Mitigated Negative Declaration has been prepared in compliance with the California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared therefore reflect the independent judgment of the Planning Commission; and, further, this Commission has reviewed and considered the information contained in said Mitigated Negative Declaration with regard to the application. b. Although the Mitigated Negative Declaration identifies certain significant environmental effects that will result if the project is approved, all significant effects have been reduced to an acceptable level by imposition of mitigation measures on the project,which are listed below as conditions of approval. C. Pursuant to the provisions of Section 753.5(c) of Title 14 of the California Code of Regulations, the Planning Commission finds as follows: In considering the record as a whole, the Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the proposed project will have potential for an adverse impact upon wildlife resources orthe habitat upon PLANNING COMMISSION RESOLUTION NO. 04-13 DRC2003-00324— DRS. GEORGE MAKKAR AND AMIRA BOUTROS January 14, 2004 Page 3 which wildlife depends. Further, based upon the substantial evidence contained in the Mitigated Negative Declaration, the staff reports and exhibits, and the information provided to the Planning Commission during the public hearing, the Planning Commission hereby rebuts the presumption of adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code of Regulations. 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. Planning Division 1) All signs shall comply with the existing Uniform Sign Program (USP#30) and shall require separate review and approval. 2) There shall be a minimum of one tree per 30 linear feet of building wall and 30 percent of all trees shall be 24-inch box size or larger. 3) The slightly curving flat parapet elements, flanking the tower, along the south and east elevations, shall be modified to be flat. The spandrel glass feature shall remain. Final design shall be subject to City Planner review during plan check. 4) The pavement in the plaza area near the tower shall be decorative,with scored lines and colored concrete. The final design shall be subject to Planning Division review during plan check. 5) Large size potted plants shall be installed along the north elevation. Landscape plans submitted for plan check shall indicate the potted plants. 6) At the tower feature, spandrel glass shall extend from the top of the tower to the concrete walkway along the south and east elevations. 7) Where rock cobble is used, it shall be real, or native fieldstone. Other forms of stone may be manufactured products. 8) A raised concrete walk shall be installed adjacent to parking stall No. 57, and a landscape planter shall be installed adjacent to space No. 1. Plans submitted for plan check shall indicate the walk and landscape planter. Engineering Division 1) Install one streetlight, 16,000 Lumens, HPSV and one "R26S" street sign, to the satisfaction of the City Engineer. a) Revise existing street improvement plans, City Drawing No. 835 Sheets 1 and 2, as required by the City Engineer. b) Security shall be posted and an agreement executed to the satisfaction of the City Engineer and City Attorney guaranteeing PLANNING COMMISSION RESOLUTION NO. 04-13 DRC2003-00324— DRS. GEORGE MAKKAR AND AMIRA BOUTROS January 14, 2004 Page 4 completion of the street improvements, prior to issuance of building permits. c) Prior to any work being performed in the street right-of-way, fees shall be paid and a construction permit shall be obtained from the City Engineer's office in addition to any permits required. 2) Provide a Water Quality Management Plan (WQMP),to the satisfaction of the City Engineer, and identify applicable Best Management Practices (BMPs) on the grading plan. 3) Prior to the issuance of building permits, a Diversion Deposit and related administrative fees shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at least 50 percent of all wastes generated during construction and demolition are diverted from landfills, and appropriate documentation is provided to the City. Form CD-1 shall be submitted to the Engineering Division when the first building permit application is submitted to Building and Safety. Form CD-2 shall be submitted to the Engineering Division within 60 days following the completion of the construction and/or demolition project. Environmental Mitigation Air Quality 1) All construction equipment shall be maintained in good operating condition so as to reduce operational emissions. The contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers'specifications. Maintenance records shall be available at the construction site for City verification. 2) Prior to issuance of any grading permits, the developer shall submit construction plans to City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD) as well as City Planning staff. 3) All paints and coatings shall meet or exceed performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high volume, low-pressure spray. 4) All asphalt shall meet or exceed performance standards noted in SCAQMD Rule 1108. 5) All construction equipment shall comply with SCAQMD Rules 402 and 403. Additionally, contractors shall include the following provisions: PLANNING COMMISSION RESOLUTION NO. 04-13 DRC2003-00324— DRS. GEORGE MAKKAR AND AMIRA BOUTROS January 14, 2004 Page 5 • Reestablish ground cover on the construction site through seeding and watering. • Pave or apply gravel to any on-site haul roads. • Phase grading to prevent the susceptibility of large areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in accordance with local ordinances and use sound engineering practices. • Sweep streets according to a schedule established by the City if silt is carried over to adjacent public thoroughfares or occurs as a result of hauling. Timing may vary depending upon time of year of construction. • Suspend grading operations during high winds(i.e.,wind speeds exceeding 25 mph) in accordance with Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils haul trucks or cover payloads using tarps or other suitable means. 6) The site shall be treated with water of other soil-stabilizing agent (approved by SCAQMD and Regional Water Quality Control Board [RWQCB]) daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403. 7) Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. 8) The construction contractor shall utilize electric or clean alternative fuel powered equipment where feasible. 9) The construction contractor shall ensure that Construction Grading Plans include a statement that work crews will shut off equipment when not in use. 10) All industrial and commercial facilities shall post signs requiring that trucks shall not be left idling for prolonged periods (i.e., in excess of 10 minutes). 11) All industrial and commercial facilities shall designate preferential parking for vanpools. PLANNING COMMISSION RESOLUTION NO. 04-13 DRC2003-00324— DRS. GEORGE MAKKAR AND AMIRA BOUTROS January 14, 2004 Page 6 12) All residential and commercial structures shall be required to incorporate high efficiency/low polluting heating, air conditioning, appliances, and water heaters. 13) All residential and commercial structures shall be required to incorporate thermal pane windows and weather stripping. Hydrology 1) Structures to retain precipitation and runoff on-site shall be integrated into the design of the project where appropriate. Measures that may be used to minimize runoff and to enhance infiltration include Dutch drains, pre-cast concrete lattice blocks and bricks, terraces, diversions, runoff spreaders, seepage pits, and recharge basins. Noise 1) Construction or grading shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. 2) Construction or grading noise levels shall not exceed the standards specified in Development Code Section 17.02.120-D, as measured at the property line. Developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Planning Division. Said consultant shall report their findings to the Planning Division within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Planning Division. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. 3) Haul truck deliveries shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips(counting both to and from the construction site), then the developer shall prepare a noise mitigation plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 14TH DAY OF JANUARY 2004. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA PLANNING COMMISSION RESOLUTION NO. 04-13 DRC2003-00324 — DRS. GEORGE MAKKAR AND AMIRA BOUTROS January 14, 2004 Page 7 BY: Rich Macias, Chairman ATTEST: Brad Bu ecreta I, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 14th day of January 2004, by the following vote-to-wit: AYES: COMMISSIONERS: FLETCHER, MACIAS, McNIEL, McPHAIL, STEWART NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: NONE City of Rancho Cucamonga In MITIGATION MONITORING PROGRAM Project File No.: Development Review DRC2003-00324 This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation measures identified in the Mitigated Negative Declaration for the above-listed project. This program has been prepared in compliance with State law to ensure that adopted mitigation measures are implemented (Section 21081.6 of the Public Resources Code). Program Components - This MMP contains the following elements: 1. Conditions of Approval that act as impact mitigation measures are recorded with the action and the procedure necessary to ensure compliance. The mitigation measure conditions of approval are contained in the adopted Resolution of Approval for the project. 2. A procedure of compliance and verification has been outlined for each action necessary. This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported. 3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring progresses, changes to compliance procedures may be necessary based upon recommendations by those responsible for the program. Program Management-The MMP will be in place through all phases of the project. The project planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly and proper action is taken on each mitigation. Each City department shall ensure compliance of the conditions (mitigation) that relate to that department. Procedures -The following steps will be followed by the City of Rancho Cucamonga. 1. A fee covering all costs and expenses, including any consultants'fees, incurred by the City in performing monitoring or reporting programs shall be charged to the applicant. 2. A MMP Reporting Form will be prepared for each potentially significant impact and its corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached hereto. This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported. All monitoring and reporting documentation will be kept in the project file with the department having the original authority for processing the project. Reports will be available from the City upon request at the following address: City of Rancho Cucamonga - Lead Agency Planning Division 10500 Civic Center Drive Rancho Cucamonga, CA 91730 Mitigation Monitoring Program Development Review DRC2003-00324 Page 2 3. Appropriate specialists will be retained if technical expertise beyond the City's staff is needed, as determined by the project planner or responsible City department, to monitor specific mitigation activities and provide appropriate written approvals to the project planner. 4. The project planner or responsible City department will approve, by signature and date, the completion of each action item that was identified on the MMP Reporting Form. After each measure is verified for compliance, no further action is required for the specific phase of development. 5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off as completed by the project planner or responsible City department at the bottom of the MMP Reporting Form. 6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation measures. The project planner is responsible for approving any such refinements or additions. An MMP Reporting Form will be completed by the project planner or responsible City department and a copy provided to the appropriate design, construction, or operational personnel. 7. The project planner or responsible City department has the authority to stop the work of construction contractors if compliance with any aspects of the MMP.is not occurring after written notification has been issued. The project planner or responsible City department also has the authority to hold certificates of occupancies if compliance with a mitigation measure attached hereto is not occurring. The project planner or responsible City department has the authority to hold issuance of a business license until all mitigation measures are implemented. 8. Any conditions (mitigation) that require monitoring after project completion shall be the responsibility of the City of Rancho Cucamonga's Planning Division. The Division shall require the applicant to post any necessary funds (or other forms of guarantee)with the City. These funds shall be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measure for the required period of time. 9. In those instances requiring long-term project monitoring, the applicant shall provide the City with a plan for monitoring the mitigation activities at the project site and reporting the monitoring results to the City. Said plan shall identify the reporter as an individual qualified to know whether the particular mitigation measure has been implemented. The monitoring/reporting plan shall conform to the City's MMP and shall be approved by the Community Development Director or City Planner prior to the issuance of building permits. MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III) Project File No.: Development Review DRC2003-00324 Applicant: Drs. George Makkar and Amira Boutros Initial Study Prepared by: Donald Granger Date: May 12. 2003 Mitigation Measures No. Responsible Monitoring Timing of Method of Verif led Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Air'QualitybWRIM ' _ ? y All construction equipment shall be maintained in good CP C Review of Plans A/C 2/4 operating condition so as to reduce operational emissions. Contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers'specifications. Maintenance records shall be available at the construction site for City verification. Prior to the issuance of any grading permits, developer CP/CE C Review of Plans C 2 shall submit construction plans to City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the Southern California Air Quality Management District (SCAQMD) as well as City Planning Staff. All paints and coatings shall meet or exceed CP C Review of Plans A/C 2/4 performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high volume, low-pressure spray. All asphalt shall meet or exceed performance standards BO B Review of Plans A/C 2 noted in SCAQMD Rule 1108. All construction equipment shall comply with SCAQMD CE C Review of Plans A/C 2/4 Rules 402 and 403. Additionally, contractors shall include the following provisions: • Reestablish ground cover on the construction site CE C - Review of Plans A/C 2/4 through seeding and watering. • Pave or apply gravel to any on-site haul roads. CE C Review of Plans A/C 2/4 1 of 4 Mitigation Measures No.I Responsible Monitoring Timing of Method of Verif led Sanctions for Implementing Action for Monitoring Frequency Verification Verification . . - D. • Phase grading to prevent the susceptibility of large CE C Review of Plans A/C 2/4 areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of CE C Review of Plans A/C 2/4 exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in CE C Review of Plans A 4 accordance with local ordinances and use sound engineering ractices. • Sweep streets according to a schedule established CE C Review of Plans A 4 by the City if silt is carried over to adjacent public thoroughfares or occurs as a result of hauling. Timing may vary depending upon time of year of construction. • Suspend grading operations during high winds CE C Review of Plans A 4 (i.e., wind speeds exceeding 25 miles per hour) in accordance with SCAQMD Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils CE C Review of Plans A 4 haul trucks or cover payloads using tarps or other suitable means. The site shall be treated with water or other CE C Review of Plans A/C 4 soil-stabilizing agent (approved by SCAQMD and RW QCB)daily to reduce PM,o emissions,in accordance with SCAQMD Rule 403. Chemical soil-stabilizers (approved by SCAQMD and CE C Review of Plans A/C 4 RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PMIO emissions. The construction contractor shall utilize electric or clean CE C Review of Plans A/C 4 alternative fuel powered equipment where feasible. The construction contractor shall ensure that CE C Review of Plans A/C 2/4 construction-grading plans include a statement that work crews will shut off equipment when not in use. All industrial and commercial facilities shall post signs BO C Review of Plans A 4 requiring that trucks shall not be left idling for prolonged periods (i.e., in excess of 10 minutes). All industrial and commercial facilities shall designate CP C Review of PlansA/C 2/3 preferential parking for vanpools. 2 of 4 Mitigation Measures No./ Responsible . . of Verif led Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance All residential and commercial structures shall be BO C/D Review of Plans C 2/4 required to incorporate high efficiency/low polluting heating,air conditioning,appliances,and water heaters. All residential and commercial structures shall be BO C/D Review of Plans C 2/4 required to incorporate thermal pane windows and weather-stripping. M droto and Water Quality �r . Y:- i. 9Y .. :... y < <5 i'.` ;� . .31 xy''vn'�n ,m:tk n�„s j,$..,. .,,zy, Yaa.,ss i`.'tz.�'+ .;.',}. '' Structures to retain precipitation and runoff on-site shall CE B/C/D Review of Plans A/C 2/4 be integrated into the design of the project where appropriate. Measures that may be used to minimize runoff and to enhance infiltration include Dutch drains, precast concrete lattice blocks and bricks, terraces, diversions,runoff spreaders,seepage pits,and recharge basins. Noise-, Construction or grading shall not take place between the BO C During A 4 hours of 8:00 p.m. and 6:30 a.m. on weekdays, Construction including Saturday, or at any time on Sunday or a national holiday. Construction or grading noise levels shall not exceed the CP C During A 4 standards specified in Development Code Section Construction 17.02.120-D, as measured at the property line. Developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Planning Division. Said consultant shall report their findings to the Planning Division within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Planning Division. If noise levels exceed the above standards,then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. 3 of 4 Mitigation Measures No.I Responsible •Implementing Action for Monitoring . . . . . FrequencyDate/initials Non-Compliance Haul truck deliveries shall not take place between the PO/BO C During A 4/7 hours of 8:00 p.m. and 6:30 a.m. on weekdays, Construction including Saturday, or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips (counting both to and from the construction site),then the developer shall prepare a noise mitigation plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. Key to Checklist Abbreviations Responsible Person ' Monitoring Frequency ,u Method of Verification Sanctions CDD -Community Development Director.or A-With Each New A-On-site Inspection 1 =Withhold Recordation of Final designee Development Map CP -City Planner or designee B- Prior To Construction B -Other Agency Permit/Approval 2 -Withhold Grading or Building Permit CE- City Engineer or designee C -Throughout Construction C- Plan Check 3-Withhold Certificate of Occupancy BO -Building Official or designee D-On Completion D- Separate Submittal (Reports/Studies 4- Stop Work Order /Plans) PO - Police Captain or designee E-Operating 5- Retain Deposit or Bonds FC- Fire Chief or designee 6 - Revoke CUP 7 - Citation 4 of 4 COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT#: DRC2003-00324 SUBJECT: OFFICE/RETAIL BUILDING APPLICANT: DRS. GEORGE MAKKAR AND AMIRA BOUTROS LOCATION: NORTH SIDE OF BASE LINE ROAD EASTOF ARCHIBALD AVENUE ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACTTHE PLANNING DIVISION,(909)477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents,officers,or employees,because of the issuance of such approval,or in the alternative,to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorneys fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may,at its sole discretion,participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Copies of the signed Planning Commission Resolution of Approval No. 04-13, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. B. Time Limits 1. Conditional Use Permit, Variance, or Development/Design Review approval shall expire if building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans,architectural elevations,exterior materials and colors,landscaping,sign program,and grading on file in the Planning Division, the conditions contained herein, Development Code regulations. 2. Prior to any use of the project site or business activity being commenced thereon,all Conditions of Approval shall be completed to the satisfaction of the City Planner. SC-1 0-03 1 Project No.DRC2003-00324 Completion Date 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and —/—/_ State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Division to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for City Planner review and approval prior to the issuance of building permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.)or prior to final map approval in the case of a custom lot subdivision,or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code,all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 7. A detailed on-site lighting plan, including a photometric diagram,shall be reviewed and approved �—J— by the City Planner and Police Department(477-2800) prior to the issuance of building permits. Such plan shall indicate style, illumination,location,height,and method of shielding so as not to adversely affect adjacent properties. 8. Trash receptacle(s)are required and shall meet City standards. The final design,locations,and ��— the number of trash receptacles shall be subject to City Planner review and approval prior to the issuance of building permits. 9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls,berming,and/or landscaping to the satisfaction of the City Planner. For single- family residential developments, transformers shall be placed in underground vaults. 10. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination. 11. All parkways, open areas, and landscaping shall be permanently maintained by the property owner,homeowners'association,or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for City Planner and City Engineer review and approved prior to the issuance of building permits. D. Shopping Centers 1. A uniform hardscape and street furniture design including seating benches, trash receptacles, free-standing potted plants, bike racks, light bollards, etc., shall be utilized and be compatible with the architectural style. Detailed designs shall be submitted for Planning Division review and approval prior to the issuance of building permits. 2. Provide for the following design features in each trash enclosure, to the satisfaction of the City Planner: a. Architecturally integrated into the design of (the shopping center/the project). b. Separate pedestrian access that does not require the opening of the main doors and to include self-closing pedestrian doors. C. Large enough to accommodate two trash bins. _J_J— d. Roll-up doors. e. Trash bins with counter-weighted lids. —/— SC-10-03 2 Project No. DRC2003-00324' Completion Date f. Architecturally treated overhead shade trellis. —/— g. Chain link screen on top to prevent trash from blowing out of the enclosure and designed to be hidden from view. 3. Graffiti shall be removed within 72 hours. ��- 4. The entire site shall be kept free from trash and debris at all times and in no event shall trash and debris remain for more than 24 hours. 5. All operations and businesses shall be conducted to comply with the following standards which shall be incorporated into the lease agreements for all tenants: a. Noise Level - All commercial activities shall not create any noise that would exceed an exterior noise level of 60 dB during the hours of 10 p.m. until 7 a.m.and 65 dB during the hours of 7 a.m. until 10 p.m. b. Loading and Unloading-No person shall cause the loading,unloading,opening,closing,or other handling of boxes, crates, containers, building materials, garbage cans, or other similar objects between the hours of 10 p.m.and 7 a.m.unless otherwise specified herein, in a manner which would cause a noise disturbance to a residential area. 6. Textured pavement shall be provided across circulation aisle, pedestrian walkway, and plaza. They shall be of brick/tile pavers,exposed aggregate,integral color concrete,or any combination thereof. Full samples shall be submitted for City Planner review and approval prior to the issuance of building permits. 7. The lighting fixture design shall compliment the architectural program. It shall include the plaza area lighting fixtures, building lighting fixtures (exterior), and parking lot lighting fixtures. 8. Any outdoor vending machines shall be recessed into the building faces and shall not extend into the pedestrian walkways. The design details shall be reviewed and approved by the City Planner prior to the issuance of building permits. E. Building Design 1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections, shall be shielded from view and the sound buffered from adjacent properties and streets as required by the Planning Division. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the City Planner. Details shall be included in building plans. F. Parking and Vehicular Access (indicate details on building plans) 1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet wide. 2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall contain a 12-inch walk adjacent to the parking stall (including curb). 3. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided throughout the development to connect dwellings/units/buildings with open spaces/plazas/ recreational uses. 4. All parking spaces shall be double striped per City standards and all driveway aisles,entrances, and exits shall be striped per City standards. SC-10-03 3 Project No. DRC2003-00324 Completion Date 5. Handicap accessible stalls shall be provided for commercial and office facilities with 25 or more parking stalls. Designate two percent or one stall; whichever is greater, of the total number of stalls for use by the handicapped. 6. Motorcycle parking area shall be provided for commercial and office facilities with 25 or more parking stalls. Developments with over 100 parking stalls shall provide motorcycle parking at the rate of one percent. The area for motorcycle parking shall be a minimum of 56 square feet. G. Trip Reduction 1. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily residential projects of more than 10 units. Minimum spaces equal to five percent of the required automobile parking spaces or three bicycle storage spaces,whichever is greater. After the first 50 bicycle storage spaces are provided,additional storage spaces required are 2.5 percent of the required automobile parking spaces. Warehouse distribution uses shall provide bicycle storage spaces at a rate of 2.5 percent of the required automobile parking spaces with a minimum of a 3-bike rack. In no case shall the total number of bicycle parking spaces required exceed 100. Where this results in a fraction of 0.5 or greater, the'number shall be rounded off to the higher whole number. 2. Carpool and vanpool designated off-street parking close to the building shall be provided for commercial, office, and industrial facilities at the rate of 10 percent of the total parking area. If covered,the vertical clearance shall be no less than 9 feet. H. Landscaping 1. A detailed landscape and irrigation plan,including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for City Planner review and approval prior to the issuance of building permits or prior final map approval in the case of a custom lot subdivision. 2. Existing trees required to be preserved in place shall be protected with a construction barrier in accordance with the Municipal Code Section 19.08.110,and so noted on the grading plans. The location of those trees to be preserved in place and new locations for transplanted trees shall be shown on the detailed landscape plans. The applicant shall follow all of the arborist's recommendations regarding preservation, transplanting, and trimming methods. 3. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within commercial and office projects, shall be specimen size trees-24-inch box or larger. 4. Within parking lots,trees shall be planted at a rate of one 15-gallon tree for every three parking stalls. 5. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one �—J— tree per 30 linear feet of building. 6. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope,but less than 2:1 slope,shall be,at minimum, irrigated and landscaped with appropriate ground cover for erosion control. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 7. For multi-family residential and non-residential development,property owners are responsible for the continual maintenance of all landscaped areas on-site, as well as contiguous planted areas within the public right-of-way. All landscaped areas shall be kept free from weeds and debris and maintained in healthy and thriving condition,and shall receive regular pruning,fertilizing,mowing, and trimming. Any damaged,dead,diseased,or decaying plant material shall be replaced within 30 days from the date of damage. SC-10-03 4 Project No.DRC2003-00324 Completion Date 8. The final design of the perimeter parkways,walls,landscaping,and sidewalks shall be included in _/—/— the required landscape plans and shall be subject to City Planner review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Division. 9. Special landscape features such as mounding, alluvial rock, specimen size trees, meandering sidewalks (with(with horizontal change), and intensified landscaping, is required along ' 10. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 11. Landscaping and irrigation shall be designed to conserve water through the principles of Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code. I. Signs 1. The signs indicated on the submitted plans are conceptual only and not a part of this approval. Any signs signs proposed for this development shall comply with the Sign Ordinance and shall require separate application and approval by the Planning Division prior to installation of any signs. J. Environmental 1. Mitigation measures are required for the project. The applicant is responsible for the cost of implementing said said measures, including monitoring and reporting. Applicant shall be required to post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the amount of $719.00 prior to the issuance of building permits, guaranteeing satisfactory performance and completion of all mitigation measures. These funds maybe used bythe Cityto retain consultants and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete all actions required by the approved environmental documents shall be considered grounds for forfeit. K. Other Agencies 1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location of mailboxes. Multi-family residential developments shall provide a solid overhead structure for mailboxes with adequate lighting. The final location of the mailboxes and the design of the overhead structure shall be subject to City Planner review and approval prior to the issuance of building permits. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION,(909)477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S) L. General Requirements 1. Submit five complete sets of plans including the following: �—�— a. Site/Plot Plan; b. Foundation Plan; c. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; SC-10.03 5 Project No.DRC2003-00324 Completion Date f. Plumbing and Sewer Plans, including isometrics, underground diagrams,water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Division Project Number (i.e., TT#, CUP#, DR If, etc.) clearly identified on the outside of all plans. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and"wet"signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to the City prior to permit issuance. 4. Separate permits are required for fencing and/or walls. 5. Business Business shall not open for operation prior to posting the Certificate of Occupancy issued by the Building and Safety Division. M. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number(i.e., DRC2003-00324). The applicant shall comply with the latest adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Division for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new commercial or industrial development project or major addition,the applicant shall pay development fees at the established rate. Such fees may include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee,Transportation Development Fee, Permit and Plan Check Fees, and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Division prior to permits issuance. 3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map recordation and prior to issuance of building permits. 4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. 5. Construct trash enclosure(s) per City Standard (available at the Planning Division's public counter). N. New Structures 1. Provide compliance with the California Building Code (CBC) for property line clearances considering use, area, and fire-resistiveness. 2. Provide compliance with the California Building Code for required occupancy separations. 3. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC —J--/— Section 1505. 4. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A 5. Openings in exterior walls shall be protected in accordance with CBC Table 5-A. 6. Provide smoke and heat venting in accordance with CBC Section 906. ��- 7. Upon tenant improvement plan check submittal, additional requirements may be needed. Jam_ SC-10-03 6 Project No.ORC2003-00324 Completion Date O. Grading 1. Grading of the subject property shall be in accordance with California Building Code,City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the time of application for grading plan check. 4. The final grading, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 5. A separate grading plan check submittal is required for all new construction projects and for —J--L— existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The grading plan shall be prepared,stamped,and signed by a California registered Civil Engineer. APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: P. Street Improvements 1. Pursuant to City Council Resolution No.88-557,no person shall make connections from a source of energy,fuel or power to any building service equipment which is regulated by technical codes and for which a permit is required unless, in addition to any and all other codes, regulations and ordinances, all improvements required by these conditions of development approval have been completed and accepted by the City Council,except:that in developments containing more than one building or unit, the development,may have energy connections made to a percentage of those buildings, or units proportionate to the completion of improvements as required by conditions of approval of development. In no case shall more than 95 percent of the buildings or units be connected to energy prior to completion and acceptance of all improvements required by these conditions of approval of development. 0. Public Maintenance Areas 1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the City Engineer prior to final map approval or issuance of building permits whichever occurs first. Formation costs shall be borne by the developer. R. Utilities 1. Provide separate utility services to each parcel including sanitary sewerage system,water,gas, —J_/_ electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 2. The developer shall be responsible for the relocation of existing utilities as necessary. ---J—J_ 3. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga County Water District(CCW D), Rancho Cucamonga Fire Protection District,and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CCW D is required prior to final map approval or issuance of permits,whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. SC-10-03 7 Project No. DRC2003-00324 Completion Date 4. Approvals have not been secured from all utilities and other interested agencies involved. Approval of the final parcel map will be subject to any requirements that may be received from them. S. General Requirements and Approvals 1. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all new streetlights for the first six months of operation,prior to final map approval or prior to building permit issuance if no map is involved. APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: T. Security Lighting 1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power. These areas should be lighted from sunset to sunrise and on photo sensored cell. 2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with direct lighting to be provided by all entryways. Lighting shall be consistent around the entire development. 3. Lighting in exterior areas shall be in vandal-resistant fixtures. U. Security Hardware 1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within 40 inches of any locking device,tempered glass or a double cylinder dead bolt shall be used. 2. All roof openings giving access to the building shall be secured with either iron bars,metal gates, or alarmed. V. Windows 1. Storefront windows shall be visible to passing pedestrians and traffic. 2. Security glazing is recommended on storefront windows to resist window smashes and impede _J_J_ entry to burglars. W. Building Numbering 1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime visibility. 2. Developer shall paint roof top numbers on one or more roofs of this development. They shall be _J_J_ a minimum of three feet in length and two feet in width and of contrasting color to background. The stencils for this purpose are on loan at the Rancho Cucamonga Police Department. X. Alarm Systems 1. Install a burglar alarm system and a panic alarm if needed. Instructing management and —J--/— employees on the operation of the alarm system will reduce the amount of false alarms and in turn save dollars and lives. 2. Alarm companies shall be provided with the 24-hour Sheriff's dispatch number: (909) 941-1488. J_J_ SC-10-03 8 Project No.DRC2003-00324 Completion Date APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, FIRE PROTECTION PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED SC-10-03 9 �... ..: - FIRE PROTECTION DISTRICT FIRE SAFETY DIVISION STANDARD CONDITIONS FD PLAN REVIEW#: PRJ2003-00113 PROJECT#: DRC2003-00324 PROJECT NAME: Ranch Plaza DATE: April 14, 2003 PLAN TYPE: Preliminary Review APPLICANT NAME: Michael Krallos OCCUPANCY CLASS: Group B, S, M FLOOR AREA (S): 13320 square feet TYPE CONSTRUCTION: Type V FIRE PROTECTION SYSTEM REQUIRED: Sprinklers LOCATION: Baseline East of Archibald FD REVIEW BY: Tim Fejeran, Fire Inspector PLANNER: Donald Graver _ Yi 'C1 iL rte'4; yI/' ( ' 3 `Z../ /tom FIRE DISTRICT USEONLY �14G� YY �w t ..+ii 4 1• as " r i ", -A." t : Outstanding Fire District Issues Status"—' "Cleared.when required information is entered below i Project applidation complete ` r [ r ALL OF THE FOLLOWING STANDARD CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, (909) 477-2770, TO VERIFY COMPLIANCE WITH THE FOLLOWING: RANCHO CUCAMONGA FIRE DISTRICT- STANDARD CONDITIONS & REQUIREMENTS — General, Procedural, Technical, or Operational Information that shall be Included, Corrected, or Completed as noted below. The following is applicable to the above project. FSC-1 General Requirements for Public and Private Water Supply 1. General Guidance for Fire Hydrants: The following provides general guidance for the spacing and location of fire hydrants. Remember these are the maximum permitted distances between fire hydrants: a. The maximum distance between fire hydrants in commercial/industrial projects is 300-feet. No portion of the exterior wall shall be located more than 150-feet from an approved fire hydrant. For cul-de-sacs the distance shall not exceed 100-feet. b. Fire hydrants are to be located: 1. At the entrance(s)to a project from the existing public roadways. This includes subdivisions and industrial parks. 2. At intersections. 3. On the right side of the street, whenever practical and possible. 4. As required by the Fire Safety Division to meet operational needs. 5. The location of fire hydrants is based upon the operational needs of the Fire District to control a fire. 6. Fire hydrants shall be located a minimum of forty(40)feet from any building. Contact the Fire Safety Division 909 477-2770 2. Minimum Fire Flow with Automatic Fire Sprinklers: The required minimum fire flow for this project is 2500 gallons per minute at a minimum residual pressure of 20 pounds per square inch. This flow reflects a 50 percent reduction for the installation of an approved automatic fire sprinkler system with central station monitoring. This requirement is made in accordance with Fire Code Appendix III-A, as amended, and Fire District Ordinances and Standards. 3. Show Existing Fire Hydrants and Mains: Existing fire hydrants and mains within 600-feet of the project shall be shown on the water plan submitted for review and approval. Include main size. FSC-2 Private(On-Site) Water and/or Fire Sprinkler Underground Plans for Fire Protection 1. Exceeds Allowable Distance: When any portion of a facility or building is located more than 150-feet from a fire hydrant located on a public street, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains capable of supplying the required fire flow shall be provided. The distance is measured as vehicular path of travel on access roadways, not line of sight. Contact the Fire Safety Division (909)477-2770 2. Number of Fire Hydrants: Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof, subject to standard spacing and distribution requirements. Contact the Fire Safety Division (909) 477-2770 3. Fire Sprinkler Underground: Prior to the issuance of a fire sprinkler system permit, the applicant shall submit construction plans, specifications, and calculations for the fire sprinkler system underground to the Fire Safety Division for approval. Contact the Fire Safety Division (909)477-2770 FSC-3 Automatic Fire Sprinkler Systems-Technical Comments 1. Required Installations: Rancho Cucamonga Fire District Ordinance 15 or other adopted code or standard, requires an approved automatic fire sprinkler system to be installed in any of the following: a. Commercial or industrial structures greater than 7,500 square feet Contact the Fire Safety Division (909)477-2770 FSC4 Fire District Site Access-Technical Comments 1. Access Roadways Defined: Fire District access roadways include public roads, streets, and highways, as well as private roads, streets, drive aisles and designated fire lanes. 2. Private Roadways and Fire Lanes: The minimum specifications for private fire district access roadways are: a. The minimum unobstructed width is 26-feet. b. The inside tum radius shall be 20-feet. c. The outside tum radius shall be not less than 50-feet. d. The minimum radius for cul-de-sacs is 45-feet. e. The minimum vertical clearance is 14 feet, 6 inches. f. At any private entry median, the minimum width of traffic lanes shall be 20-feet. g. The angle of departure and approach shall not exceed 9 degrees or 20 percent. h. The maximum grade of the driving surface shall not exceed 12%. i. Support a minimum load of 70,000 pounds gross vehicle weight(GVW). 3. Fire Lane Identification: All required fire lanes shall be identified by red curbing and signage. A drawing of the proposed signage that meets the minimum Fire District standards shall be submitted to and approved. Contact the Rancho Cucamonga Fire Protection District at(909)477-2770 for a copy of the FD Fire Lanes standard. FSC-10 Hazard Control Permits-Technical Comments The below indicated permit requirements are based on those permits commonly associated with the projects operations or building construction. As noted below Special Permits may be required, dependent upon approved use(s)the applicant must contact the Fire Safety Division for specific information: Note: Carefully review the items below.There may be significant impact on the proposed project. Italicized text indicates a Rancho Cucamonga Fire District amendment. 1. General Use Permit shall be required for any activity or operation not specifically described below, which in the judgment of the Fire Chief is likely to produce conditions that may be hazardous to life or property. FSC-12 Plan Submittal Required Notice Required plans shall be submitted and approved prior to construction in accordance with 2000/2001 Building, Fire, Mechanical, and Plumbing Codes; 1999 Electrical Code; Health and Safety Code; Public Resources Code; and RCFPD Ordinances FD15 and FD39, Guidelines and Standards. NOTE: In addition to the fees due at this time please note that separate plan check fees for tenant improvements,fire protection systems and/or any consultant reviews will be assessed at time of submittal of plans. FSC-14 Alternate Materials and Methods The Fire Safety Division will review requests for alternate materials and methods within the scope of our authority. The request must be submitted on the Fire District"Application for Alternate Method"form along with supporting documents. Contact the Fire Safety Division at(909)477-2770 for assistance. PRIOR TO ISSUANCE OF BUILDING PERMITS- Complete the following: 1. Private/On-site Fire Hydrants: Prior to the issuance of any building permit, the applicant shall submit construction plans, specifications, flow test data and calculations for the private water main system for review and approval by the.Fire District. Plans and installation shall comply with Fire District standards. Contac the Fire Safety Division for a copy of"Fire District Notes for Underground and Water Plans"Contact the Fire Safety Division (909)477-2770 2. Private Fire Hydrants/On-site Installation: All private on-site fire hydrants shall be installed, flushed, and operable prior to delivering any combustible building materials on-site (i.e., lumber, roofing materials, etc.). A representative of Fire Construction Services shall inspect the installation and witness hydrant flushing. The builder/developer shall submit final test and inspection report to the Fire Safety Division. Contact Building and Safety/Fire Construction Services (909)477-2713. PRIOR TO OCCUPANCY OR FINAL INSPECTION- Complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with Rancho Cucamonga Fire Protection District and City of Rancho Cucamonga Engineering Standard Plan 134, 'Installation of Reflective Hydrant Markers." On private property these markers are to be maintained in good condition by the property owner. Contact Building and Safety/Fire Construction Services (909)477-2713. 2. Private Fire Hydrants-Final Acceptance: For the purpose of final acceptance, an additional test of the on-site fire hydrants shall be conducted by the builder/developer in the presence of the Water District or Fire Construction Services, as appropriate. The builder/developer shall submit the final test report to the Fire Safety Division. 3. Fire Sprinkler System- Plans and Permit: Plans for the required automatic fire sprinkler system shall be submitted to Fire Construction Services for review and approval. No work is allowed without a Fire Construction Services permit. Contact Building and Safety/Fire Construction Services (909) 477-2713. 4. Fire Sprinkler System- Final Inspection: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler system(s) shall be tested and accepted by Fire Construction Services. Contact Building and Safety/Fire Construction Services (909)477-2713. 5. Sprinkler Monitoring: The fire sprinkler system monitoring system shall be installed, tested, and operational immediately following the completion of the fire sprinkler system. Monitoring is required with 20 sprinklers in Group I Occupancies, or 100 or more sprinklers in all other Occupancies. Contact Building and Safety/Fire Construction Services (909)477-2713. 6. Knox Rapid Entry System: A Knox rapid entry key vault shall be installed prior to final inspection. Proof of purchase shall be submitted prior to final building plan approval. Contact the Fire Safety Division for specific details and ordering information. Contact Building and Safety/Fire Construction Services (909)477-2713 for inspection. 7. Fire Lanes: Prior to the issuance of any Certificate of Occupancy, the fire lanes shall be installed in accordance with the approved fire lane plan. The CC&R's or other approved documents shall contain an approved fire lane map and provisions that prohibit parking in the fire lanes. The method of enforcement shall be documented. The CC&R's shall also identify who is responsible for not less than annual inspection and maintenance of all required fire lanes. Contact Building and Safety/Fire Construction Services (909)477-2713. 8. Address-Other Than Single-family: New buildings other than single-family dwellings shall post the address with minimum 8-inch numbers on contrasting background, visible from the street and electrically illuminated during periods of darkness. When the building setback exceeds 200 feet from the public street an additional non-illuminated 6-inch minimum number address shall be provided at the property entrance. Contact Building and Safety/Fire Construction Services (909)477-2713. 9. Multi-unit Complexes: In multi-unit complexes approved address numbers, and/or building identification letters shall be provided on the front and back of all units, suites,or buildings. The Fire District shall review and approve the numbering plan in coordination with the City of Rancho Cucamonga. Contact Building and Safety/Fire Construction Services (909)477-2713. 10. Fire District Confidential Business Occupancy Information: The applicant shall complete the Rancho Cucamonga Fire District"Confidential Business Occupancy Information" Form and submit to the Fire Safety Division.This form provides contact information for Fire District use in the event of an emergency at the subject building or property. Contact Fire Safety Division (909)477-2770 Fire District Forms and Letters Note: If these conditions are part of the final Standard Conditions issued by the Planning Division referenced Fire District forms and letters are not included. Contact the Fire Safety Division for copies of forms or letters.The forms and letter are also found in previously issued Fire District comments. Fire District Review Letter(P&E)-Template SL 10/31/02 Revision