HomeMy WebLinkAbout04-23 - Resolutions RESOLUTION NO. 04-23
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING TENTATIVE TRACT
MAP SUBTT16644, A SUBDIVISION OF 16 SINGLE-FAMILY LOTS ON 3.33
ACRES OF LAND IN THE LOW-MEDIUM RESIDENTIAL DISTRICT
(4-8 DWELLING UNITS PER ACRE), LOCATED ON THE WEST SIDE OF
BERYL STREET BETWEEN MIGNONETTE STREET AND CIELITO
STREET; AND MAKING FINDINGS IN SUPPORT THEREOF—APN: 0202-
741-64, 0202-751-36 AND 37.
A. Recitals.
1. Charles Joseph Associates filed an application for the approval of Tentative Tract Map
SUBTT16644, as described in the title of this Resolution. Hereinafter in this Resolution, the subject
Tentative Tract Map request is referred to as "the application."
2. On February 11, 2004, the Planning Commission of the City of Rancho Cucamonga
conducted a duly noticed public hearing on the application and concluded said hearing on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission
of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the above-
referenced public hearing on February 11, 2004, including written and oral staff reports,togetherwith
public testimony, this Commission hereby specifically finds as follows:
a. The application applies to 3.33 acres of vacant property located on the west side of
Beryl Street between Mignonette Street and Cielito Street; and
b. The project consists of the subdivision of 16 single-family lots; and
C. The lot sizes range from 5,004 to 9,816 square feet, with an average lot size of
6,393 square feet; and
d. The subdivision design, lot size, and dimensions are compatible with the
Low-Medium District; and
e. A Tree Removal Permit (DRC2003-01040) has been submitted because
development of the site will require the removal and replacement of trees on-site; and
f. The site will gain access from Beryl Street and include public improvements such
as, but not limited to, new curb, sidewalk, and gutter; and
3. Based upon the substantial evidence presented to this Commission during the above-
referenced public hearing and upon the specific findings of facts set forth in paragraphs 1 and 2
above, this Commission hereby finds and concludes as follows:
PLANNING COMMISSION RESOLUTION NO. 04-23
SUBTT16644— CHARLES JOSEPH ASSOCIATES
February 11, 2004
Page 2
a. That the tentative tract is consistent with the General Plan, Development Code,and
any applicable specific plans; and
b. The design or improvements of the tentative tract is consistent with the General
Plan, Development Code, and any applicable specific plans; and
C. The site is physically suitable for the type of development proposed; and
d. The design of the subdivision is not likely to cause substantial environmental
damage and avoidable injury to humans and wildlife or their habitat; and
e. The tentative tract is not likely to cause serious public health problems; and
f. The design of the tentative tract will not conflict with any easement acquired by the
public at large, now of record, for access through or use of the property within the proposed
subdivision.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration, together with all written and oral reports included for the environmental assessment for
the application, the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and
Monitoring Program attached hereto, and incorporated herein by this reference, based upon the
findings as follows:
a. That the Mitigated Negative Declaration has been prepared in compliance with the
California Environmental Quality Act(CEQA) of 1970, as amended, and the State CEQA guidelines
promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared
therefore reflect the independent judgment of the Planning Commission; and, further, this
Commission has reviewed and considered the information contained in said Mitigated Negative
Declaration with regard to the application.
b. Although the Mitigated Negative Declaration identifies certain significant
environmental effects that will result if the project is approved, all significant effects have been
reduced to an acceptable level by imposition of mitigation measures on the project,which are listed
below as conditions of approval.
C. Pursuant to the provisions of Section 753.5(c) of Title 14 of the California Code of
Regulations, the Planning Commission finds as follows: In considering the record as a whole, the
Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the
proposed project will have potential for an adverse impact upon wildlife resources or the habitat upon
which wildlife depends. Further, based upon the substantial evidence contained in the Mitigated
Negative Declaration, the staff reports and exhibits, and the information provided to the Planning
Commission during the public hearing, the Planning Commission hereby rebuts the presumption of
adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code of Regulations.
5. ° Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition setforth below
and in the Standard Conditions, attached hereto and incorporated herein by this reference.
PLANNING COMMISSION RESOLUTION NO. 04-23
SUBTT16644—CHARLES JOSEPH ASSOCIATES
February 11, 2004
Page 3
Planning Division:
1) Approval of the lot sizes and configuration takes into account the
applicant's commitment that no minor exception or variance request for
reduced setbacks associated with future house products will be
requested.
2) Any minor exception or variance request for reduced setbacks
associated with future house products shall not be granted.
3) Tree Removal Permit DRC2003-01040 is hereby approved for the
removal of trees for the development of the site. The
applicant/developer shall be required to remove and replace trees
subject to Environmental Mitigation Number 1 under Biological
Resources listed below. The Tree Removal Permit is valid for 60 days
from the date of the issuance of building and/or grading permits.
4) All perimeter walls, including retaining walls, visible to the public shall
be made of a decorative block material with decorative cap to the
satisfaction of the City Planner.
5) The applicant shall obtain permission from adjacent property owners
prior to any off-site grading.
Engineering Division:
1) Install private landscaping and irrigation systems in the parkways of
comer Lots 1 and 16 along Beryl Street prior to public improvements
being accepted by the City (side-on to Arterial streets, where rear-on
would be LMD).
2) An in-lieu fee as contribution to the future undergrounding of the
existing overhead utilities (telecommunications and electrical,except for
the 66 kV electrical)on the opposite side of Beryl Street shall be paid to
the City prior to final map approval. The fee shall be one-half the City
adopted unit amount times the length of the project frontage.
3) Transitions to existing curb and gutter (pavement) north and south of
the project boundary shall be to the satisfaction of the City Engineer.
4) Parkways shall slope at 2 percent from the top of curb to 1-foot behind the
sidewalk along all street frontages.
5) Landscape Maintenance District plans for Lots 12-14 shall incorporate
attractive, low maintenance designs, compatible with or transitioning to
adjacent landscape areas, to the satisfaction of the City Engineer. The
maximum slope within publicly maintained landscape areas shall be
3:1. Where slopes occur, a 1-foot flat area behind the sidewalk shall be
provided. Slopes higher than 6 feet shall have a 2-foot wide flat shelf at
the top, along the base of the wall. Slope widths should be minimized
through the use of 30-inch maximum height freestanding retaining walls
PLANNING COMMISSION RESOLUTION NO. 04-23
SUBTT16644 —CHARLES JOSEPH ASSOCIATES
February 11, 2004
Page 4
and up to 4 feet of retaining beneath perimeter walls. Low maintenance
wall treatments should be used. Planting areas for shrubs should have
a minimum width of 3 feet, clear of wall footings. Trees will require
wider planting areas, as determined by the City Engineer.
6) Grading information pertaining to publicly maintained areas, such as
landscape easements, paseos, parks, etc., shall appear on plans
approved by the City Engineer.
7) Driveways to Beryl Street shall be prohibited.
8) Internal 'A' Street, provide traffic striping and signage as required.
9) Dedication shall be made of the following rights-of-way on the perimeter
streets (measured from street centerline): 60 total feet on 'A' Street.
10) Install within existing right of way a route to school public sidewalk as
pedestrian access as determined by the City Engineer.
11) Prior to the issuance of building permits, a Diversion Deposit and
related administrative fees shall be paid for the Construction and
Demolition Diversion Program. The deposit is fully refundable if at least
50 percent of all wastes generated during construction and demolition
are diverted from landfills, and appropriate documentation is provided
to the City. Form CD-1 shall be submitted to the Engineering Division
when the first building permit application is submitted to Building and
Safety. Form CD-2 shall be submitted to the Engineering Division
within 60 days following the completion of the construction and/or
demolition project.
12) Provide 5 feet between sidewalk and perimeter wall along Beryl
Landscape Maintenance Area, top of slope benches (1 foot or 2 feet).
Environmental Mitigation:
Air Quality
1) All construction equipment shall be maintained in good operating
condition so as to reduce operational emissions. The contractor shall
ensure that all construction equipment is being properly serviced and
maintained as per manufacturers'specifications. Maintenance records
shall be available at the construction site for City verification.
2) Prior to the issuance of any grading permits, developer shall submit
construction plans to City denoting the proposed schedule and
projected equipment use. Construction contractors shall provide
evidence that low emission mobile construction equipment will be
utilized, or that their use was investigated and found to be infeasible for
the project. Contractors shall also conform to any construction
PLANNING COMMISSION RESOLUTION NO. 04-23
SUBTT16644— CHARLES JOSEPH ASSOCIATES
February 11, 2004
Page 5
measures imposed by the South Coast Air Quality Management District
(SCAQMD) as well as City Planning Staff.
3) All paints and coatings shall meet or exceed performance standards
noted in SCAQMD Rule 1113. Paints and coatings shall be applied
either by hand or high volume, low-pressure spray.
4) All asphalt shall meet or exceed performance standards noted in
SCAQMD Rule 1108.
5) All construction equipment shall comply with SCAQMD Rules 402 and
403. Additionally, contractors shall include the following provisions:
• Reestablish ground cover on the construction site through
seeding and watering.
• Pave or apply gravel to any on-site haul roads.
• Phase grading to prevent the susceptibility of large areas to
erosion over extended periods of time.
• Schedule activities to minimize the amounts of exposed
excavated soil during and after the end of work periods.
• Dispose of surplus excavated material in accordance with local
ordinances and use sound engineering practices.
• Sweep streets according to a schedule established by the City if
silt is carried over to adjacent public thoroughfares or occurs as a
result of hauling. Timing may vary depending upon time of year
of construction.
• Suspend grading operations during high winds (i.e.,wind speeds
exceeding 25 miles per hour) in accordance with SCAQMD
Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils haul trucks or
cover payloads using tarps or other suitable means.
6) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and Regional Water Quality Control Board
[RWQCB]) daily to reduce Particulate Matter (PM10) emissions, in
accordance with SCAQMD Rule 403.
7) Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be
applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PM10 emissions.
8) The construction contractor shall utilize electric or clean alternative fuel
powered equipment where feasible.
PLANNING COMMISSION RESOLUTION NO. 04-23
SUBTT16644 —CHARLES JOSEPH ASSOCIATES
February 11, 2004
Page 6
9) The construction contractor shall ensure that construction-grading
plans include a statement that work crews will shut off equipmentwhen
not in use.
10) All residential and commercial structures shall be required to
incorporate high efficiency/low polluting heating, air conditioning,
appliances, and water heaters.
11) All residential and commercial structures shall be required to
incorporate thermal pane windows and weather-stripping.
Biological Resources
1) The four Palm trees shall be preserved by transplanting and reused
within the project landscaping.
2) The Deodar Cedar (Survey Tag #1) and California Sycamore tree
(Survey Tag#11)shall be preserved in place, if possible, by using curb
adjacent sidewalk and meandering perimeter wall around the tree drip
line. If the City Engineer and City Planner determine that preservation in
place is not possible, the trees shall be removed and replaced.
3) The remaining 12 trees shall be removed and replaced.
Cultural Resources
1) If any prehistoric archaeological resources are encountered before or
during grading, the developer will retain a qualified archaeologist to
monitor construction activities, to take appropriate measures to protect
or preserve them for study. With the assistance of the archaeologist,
the City of Rancho Cucamonga will:
• Enact interim measures to protect undesignated sites from
demolition or significant modification without an opportunity for
the City to establish its archaeological value.
• Consider establishing provisions to require incorporation of
archaeological sites within new developments, using their special
qualities as a theme or focal point.
• Pursue educating the public about the area's archaeological
heritage.
• Propose mitigation measures and recommend conditions of
approval to eliminate adverse project effects on significant,
important, and unique prehistoric resources,following appropriate
CEQA guidelines.
Prepare a technical resources management report, documenting
the inventory, evaluation, and proposed mitigation of resources
PLANNING COMMISSION RESOLUTION NO. 04-23
SUBTT16644 —CHARLES JOSEPH ASSOCIATES
February 11, 2004
Page 7
within the project area. Submit one copy of the completed report
with original illustrations, to the San Bernardino County
Archaeological Information Center for permanent archiving.
2) A qualified paleontologist shall conduct a preconstruction field survey of
the project site. The paleontologist shall submit a report of findings that
will also provide specific recommendations regarding further mitigation
measures (i.e., paleontological monitoring) that may be appropriate.
Where mitigation monitoring is appropriate, the program must include,
but not be limited to, the following measures:
• Assign a paleontological monitor, trained and equipped to allow
the rapid removal of fossils with minimal construction delay,to the
site full-time during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared or graded,
divert earth-disturbing activities elsewhere until the monitor has
completed salvage. If construction personnel make the
discovery, the grading contractor should immediately divert
construction and notify the monitor of the find.
• Submit summary report to City of Rancho Cucamonga. Transfer
collected specimens with a copy of the report to San Bernardino
County Museum.
Geology and Soils
1) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and RWQCB) daily to reduce PM10 emissions,
in accordance with SCAQMD Rule 403.
2) Frontage public streets shall be swept according to a schedule
established by the City to reduce PM10 emissions associated with
vehicle tracking of soil off-site. Timing may vary depending upon time
of year of construction.
3) Grading operations shall be suspended when wind speeds exceed
25 miles per hour to minimize PM10 emissions from the site during such
episodes.
4) Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be
applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PM10 emissions.
Hydrology and Water Quality
1) Structures to retain precipitation and runoff on-site shall be integrated
into the design of the project where appropriate. Measures that may be
used to minimize runoff and to enhance infiltration include Dutch drains,
PLANNING COMMISSION RESOLUTION NO. 04-23
SUBTT16644—CHARLES JOSEPH ASSOCIATES
February 11, 2004
Page 8
precast concrete lattice blocks and bricks, terraces, diversions, runoff
spreaders, seepage pits, and recharge basins.
2) Prior to issuance of building permits, the applicant shall submit to the
City Engineer for approval of a Water Quality Management Plan
(WQMP), including a project description and identifying Best
Management Practices (BMPs) that will be used on-site to reduce
pollutants into the storm drain system to the maximum extent
practicable. The WQMP shall identify the structural and non-structural
measures consistent with the Guidelines for New Development and
Redevelopment adopted by the City of Rancho Cucamonga in
June 2000.
3) Prior to issuance of grading or paving permits, applicant shall submit to
the City Engineer a Notice of Intent (NOI) to comply with obtaining
coverage under the National Pollutant Discharge Elimination System
(NPDES) General Construction Storm Water Permit from the State
Water Resources Control Board. Evidence that this has been obtained
(i.e., a copy of the Waste Discharger's Identification Number) shall be
submitted to the City Engineer for coverage under the NPDES General
Construction Permit.
Noise
1) Exterior noise -A noise barrier of 6.0 feet in height shall be constructed
along Beryl Street and wrap-around the northwest and southeast comers
of the tract per Preliminary Acoustical Study prepared by RK Engineering
Group.
2) Interior noise-Mechanical ventilation(i.e., air conditioning)and upgraded
windows shall be included on some locations in home construction per
Preliminary Acoustical Study prepared by RK Engineering Group.
3) Construction or grading shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time
on Sunday or a national holiday.
4) Construction or grading noise levels shall not exceed the standards
specified in Development Code Section 17.02.120-D, as measured at the
property line. Developer shall hire a consultant to perform weekly noise
level monitoring as specified in Development Code Section 17.02.120.
Monitoring at other times may be required by the Planning Division. Said
consultant shall report their findings to the Planning Division within 24
hours; however, if noise levels exceed the above standards, then the
consultant shall immediately notify the Planning Division. If noise levels
exceed the above standards, then construction activities shall be reduced
in intensity to a level of compliance with above noise standards or halted.
5) The perimeter block wall shall be constructed as early as possible in first
phase.
PLANNING COMMISSION RESOLUTION NO. 04-23
SUBTT16644— CHARLES JOSEPH ASSOCIATES
February 11, 2004
Page 9
6) Haul truck deliveries shall not take place between the hours of 8:00 p.m.
and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday
or a national holiday. Additionally, if heavy trucks used for hauling would
exceed 100 daily trips (counting both to and from the construction site),
then the developer shall prepare a noise mitigation plan denoting any
construction traffic haul routes. To the extent feasible, the plan shall
denote haul routes that do not pass sensitive land uses or residential
dwellings.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 11TH DAY OF FEBRUARY 2004.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY: B
Larry McNiel, Vice Chairma
ATTEST:
Brad Bu ecreta
I, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby
certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the
Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning
Commission held on the 11th day of February 2004, by the following vote-to-wit:
AYES: COMMISSIONERS: FLETCHER, McNIEL, STEWART
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: MACIAS
ABSTAIN: COMMISSIONERS: McPHAIL
City of Rancho Cucamonga
MITIGATION MONITORING
PROGRAM
Project File No.: TENTATIVE TRACT MAP SUBTT16644
This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation
measures identified in the Mitigated Negative Declaration for the above-listed project. This program
has been prepared in compliance with State law to ensure that adopted mitigation measures are
implemented (Section 21081.6 of the Public Resources Code).
Program Components - This MMP contains the following elements:
1. Conditions of approval that act as impact mitigation measures are recorded with the action
and the procedure necessary to ensure compliance. The mitigation measure conditions of
approval are contained in the adopted Resolution of Approval for the project.
2. A procedure of compliance and verification has been outlined for each action necessary.This
procedure designates who will take action, what action will be taken and when, and to whom
and when compliance will be reported.
3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring
progresses, changes to compliance procedures may be necessary based upon
recommendations by those responsible for the program.
Program Management- The MMP will be in place through all phases of the project. The project
planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project
planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly
and proper action is taken on each mitigation. Each City department shall ensure compliance of the
conditions (mitigation) that relate to that department.
Procedures -The following steps will be followed by the City of Rancho Cucamonga.
1. A fee covering all costs and expenses, including any consultants'fees, incurred by the City in
performing monitoring or reporting programs shall be charged to the applicant.
2. A MMP Reporting Form will be prepared for each potentially significant impact and its
corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached
hereto. This procedure designates who will take action, what action will be taken and when,
and to whom and when compliance will be reported. All monitoring and reporting
documentation will be kept in the project file with the department having the original authority
for processing the project. Reports will be available from the City upon request at the following
address:
City of Rancho Cucamonga - Lead Agency
Planning Division
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
MITIGATION MONITORING PROGRAM
SUBTT16644— CHARLES JOSEPH ASSOCIATES
Page 2
3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,
as determined by the project planner or responsible City department, to monitor specific
mitigation activities and provide appropriate written approvals to the project planner.
4. The project planner or responsible City department will approve, by signature and date, the
completion of each action item that was identified on the MMP Reporting Form. After each
measure is verified for compliance, no further action is required for the specific phase of
development.
5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off
as completed by the project planner or responsible City department at the bottom of the MMP
Reporting Form.
6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation
measures.The project planner is responsible for approving any such refinements or additions.
An MMP Reporting Form will be completed by the project planner or responsible City
department and a copy provided to the appropriate design, construction, or operational
personnel.
7. The project planner or responsible City department has the authority to stop the work of
construction contractors if compliance with any aspects of the MMP is not occurring after
written notification has been issued. The project planner or responsible City department also
has the authority to hold certificates of occupancies if compliance with a mitigation measure
attached hereto is not occurring. The project planner or responsible City department has the
authority to hold issuance of a business license until all mitigation measures are implemented.
8. Any conditions (mitigation) that require monitoring after project completion shall be the
responsibility of the City of Rancho Cucamonga Planning Division.The Division shall require
the applicant to post any necessary funds (or other forms of guarantee)with the City. These
funds shall be used by the City to retain consultants and/or pay for City staff time to monitor
and report on the mitigation measure for the required period of time.
9. In those instances requiring long-term project monitoring, the applicant shall provide the City
with a plan for monitoring the mitigation activities at the project site and reporting the
monitoring results to the City. Said plan shall identify the reporter as an individual qualified to
know whether the particular mitigation measure has been implemented. The
monitoring/reporting plan shall conform to the City's MMP and shall be approved by the
Community Development Director or City Planner prior to the issuance of building permits.
MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III)
Project File No.: SUBTT16644 Applicant: Charles Joseph Associates
Initial Study Prepared by: Lisa Kuschel Date: January 27, 2004
Mitigation Measures No. Responsible Monitoring Timing of Method of Verif ied Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/Initials Non-Compliance
Air Quality
All construction equipment shall be maintained in good CP C Review of Plans A/C 2/4
operating condition so as to reduce operational
emissions. The contractor shall ensure that all
construction equipment is being properly serviced and
maintained as per manufacturers' specifications.
Maintenance records shall be available at the
construction site for City verification.
Prior to the issuance of any grading permits, the CP/CE C Review of Plans C 2
developer shall submit construction plans to City
denoting the proposed schedule and projected
equipment use. Construction contractors shall provide
evidence that low emission mobile construction
equipment will be utilized, or that their use was
investigated and found to be infeasible for the project.
Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality
Management District (SCAQMD) as well as City
Planning Staff.
All paints and coatings shall meet or exceed CP C Review of Plans A/C 2/4
performance standards noted in SCAQMD Rule 1113.
Paints and coatings shall be applied either by hand or
high volume, low-pressure spray.
All asphalt shall meet or exceed performance standards BO B Review of Plans A/C 2
noted in SCAQMD Rule 1108.
All construction equipment shall comply with SCAQMD CE C Review of Plans A/C 2/4
Rules 402 and 403. Additionally, contractors shall
include the following provisions:
Reestablish ground cover on the construction site CE C Review of Plans A/C 2/4
through seeding and watering.
1 of 7
Mitigation Measures No.
Responsible of Method of Verif ied Sanctions for
ActionImplementing Date finitials Non-Compliance
Pave or apply gravel to any on-site haul roads. CE C Review of Plans A/C 2/4
• Phase grading to prevent the susceptibility of large CE C Review of Plans A/C 2/4
areas to erosion over extended periods of time.
• Schedule activities to minimize the amounts of CE C Review of Plans A/C 2/4
exposed excavated soil during and after the end of
work periods.
• Dispose of surplus excavated material in CE C Review of Plans A 4
accordance with local ordinances and use sound
engineering ractices.
• Sweep streets according to a schedule established CE C Review of Plans A 4
by the City if silt is carried over to adjacent public
thoroughfares or occurs as a result of hauling.
Timing may vary depending upon the time of year of
construction.
• Suspend grading operations during high winds(i.e., CE C Review of Plans A 4
wind speeds exceeding 25 mph) in accordance with
SCAQMD Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils CE C Review of Plans A 4
haul trucks or cover payloads using tarps or other
suitable means.
The site shall be treated with water or other soil- CE C Review of Plans A/C 4
stabilizing agent(approved by SCAQMD and RWQCB)
daily to reduce PM,o emissions, in accordance with
SCAQMD Rule 403.
Chemical soil stabilizers (approved by SCAQMD and CE C Review of Plans A/C 4
Regional Water Quality Control Board [RWQCB]) shall
be applied to all inactive construction areas that remain
inactive for 96 hours or more to reduce PM,o emissions.
The construction contractor shall utilize electric or clean CE C Review of Plans A/C 4
alternative fuel powered equipment where feasible.
The construction contractor shall ensure that CE C Review of Plans A/C 2/4
construction grading plans include a statement that work
crews will shut off equipment when not in use.
All residential and commercial structures shall be BO C/D Review of Plans C 2/4
required to incorporate high efficiency4ow polluting
heating,air conditioning,appliances and water heaters.
2of7
Mitigation Measures No.
Responsible
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
All residential and commercial structures shall be BO C/D Review of Plans C 2/4
required to incorporate thermal pane windows and
weather-stripping.
Biological
The four Palm trees shall be preserved by transplanting CP D During A 3/4
and reused within the project landscaping. Construction
The Deodar Cedar (Survey Tag #1) and California CP D During A 3/4
Sycamore tree (Survey Tag #11) shall be preserved in Construction
place, if possible, by using curb adjacent sidewalk and
meandering perimeter wall around tree drip line. If the
City Engineer and City Planner determine that
preservation in place is not possible, the trees shall be
removed and replaced.
The remaining 12 trees shall be removed and replaced. CP D During A 3/4
Construction
Cultural Resources
If any prehistoric archaeological resources are
encountered before or during grading,the developer will
retain a qualified archaeologist to monitor construction
activities, to take appropriate measures to protect or
preserve them for study. With the assistance of the
archaeologist, the City of Rancho Cucamonga will:
• Enact interim measures to protect undesignated CP/BO C Review of A/D 3/4
sites from demolition or significant modification Report
without an opportunity for the City to establish its
archaeological value.
Consider establishing provisions to require CP/BO C Review of A/D 3/4
incorporation of archaeological sites within new Report
developments, using their special qualities as a
theme or focal point.
• Pursue educating the public about the area's CP/BO C Review of A/D 3/4
archaeological heritage. Report
3of7
Mitigation Measures No./
Responsible
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Propose mitigation measures and recommendCP/BO C Review of A/D 3/4
conditions of approval to eliminate adverse project Report
effects on significant, important, and unique
prehistoric resources, following appropriate CEQA
guidelines.
Prepare a technical resources management report, CP C Review of A/D 3/4
documenting the inventory, evaluation, and Report
proposed mitigation of resources within the project
area. Submit one copy of the completed report,with
original illustrations, to the San Bernardino County
Archaeological Information Center for permanent
archivin .
A qualified paleontologist shall conduct a preconstruction CP B Review of A/D 4
field survey of the project site. The paleontologist shall Report
submit a report of findings that will also provide specific
recommendations regarding further mitigation measures
(i.e., paleontological monitoring) that may be
appropriate.Where mitigation monitoring is appropriate,
the program must include, but not be limited to, the
following measures:
• Assign a paleontological monitor, trained and CP B Review of A/D 4
equipped to allow the rapid removal of fossils with Report
minimal construction delay, to the site full-time
during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared BO B/C Review of A/D 4
or graded, divert earth-disturbing activities Report
elsewhere until the monitor has completed salvage.
If construction personnel make the discovery, the
grading contractor should immediately divert
construction and notify the monitor of the find.
• Submit a summary report to the City of Rancho CP D Review of D 3
Cucamonga. Transfer collected specimens with a Report
copy of the report to the San Bernardino County
Museum.
Geology and Soils'
The site shall be treated with water or other soil- BO/CE C During A 4
stabilizing agent(approved by SCAQMD and RWQCB) Construction
daily to reduce PM,o emissions, in accordance with
SCAQMD Rule 403.
4of7
Mitigation Measures No.
Responsible Monitoring Timing of Method of Verif led Sanctions for
ImplementingDate/initials Non-Compliance
Frontage public streets shall be swept according to a CE C During A 4
schedule established by the City to reduce PM,o Construction
emissions associated with vehicle tracking of soil off-
site. Timing may vary depending upon the time of year
of construction.
Grading operations shall be suspended when wind BO/CE C During A 4
speeds exceed 25 mph to minimize PM,o emissions Construction
from the site during such episodes.
Chemical soil-stabilizers (approved by SCAQMD and BO/CE C During A 4
RWQCB) shall be applied to all inactive construction Construction
areas that remain inactive for 96 hours or more to
reduce PM,o emissions.
Hydr6logY,antl Water'Quality vt f •"_: . . °;; � ,w =�f a s ,. . ���pe,��-
A.
Structures to retain precipitation and runoff on-site shall CE B/C/D Review of Plans A/C 2/4
be integrated into the design of the project where
appropriate. Measures that may be used to minimize
runoff and to enhance infiltration include Dutch drains,
precast concrete lattice blocks and bricks, terraces,
diversions,runoff spreaders,seepage pits,and recharge
basins.
Prior to issuance of building permits,the applicant shall CE B/C/D Review of Plans A/C 2/4
submit to the City Engineer for approval of a Water
Quality Management Plan (WQMP), including a project
description and identifying Best Management Practices
(BMPs)that will be used on-site to reduce pollutants into
the storm to the maximum extent practicable. The
WQMP shall identify the structural and non-structural
measures consistent with the Guidelines .for New
Development and Redevelopment adopted bythe Cityof
Rancho Cucamonga in June 2000.
5 of 7
Mitigation Measures No. Responsible Monitoring Timing of Method of Verif ied Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Prior to issuance of grading or paving permits, the CE B/C/D Review of Plans A/C 2/4
applicant shall submit to the City Engineer a Notice of
Intent(NOI)to complywith obtaining coverage under the
National Pollutant Discharge Elimination System
(NPDES) General Construction Storm Water Permit
from the State Water Resources Control Board.
Evidence that this has been obtained (i.e. a copy of the
Waste Discharger's Identification Number) shall be
submitted to the City Engineer for coverage under the
NPDES General Construction Permit.
Noise
Exterior Noise-A noise barrier of 6.0 feet in height shall BO C During Plan A/C 4
be constructed along Beryl Street and wrap-around the Check and
northwest and southeast corners of the tract per Construction
Preliminary Acoustical Study prepared by RK
Engineering Group.
Interior Noise - Mechanical ventilation (i.e., air BO C During Plan A/C 4
conditioning) and upgraded windows shall be included Check and
on some locations in home construction per Preliminary Construction
Acoustical Study prepared by RK Engineering Group.
Construction or grading shall not take place between the BO C During A 4
hours of 8:00 p.m. and 6:30 a.m. on weekdays, Construction
including Saturday, or at any time on Sunday or a
national holiday.
6of7
Mitigation Measures No.
Responsible
MonitoringImplementing Action for Monitoring FrequencyDate/initials Non-Compliance
Construction or grading noise levels shall not exceed the CP C During A 4
standards specified in Development Code Section Construction
17.02.120-D, as measured at the property line. The
developer shall hire a consultant to perform weekly
noise level monitoring as specified in Development
Code Section 17.02.120. Monitoring at other times may
be required by the Planning Division. Said consultant
shall report their findings to the Planning Division within
24 hours; however, if noise levels exceed the.above
standards, then the consultant shall immediately notify
the Planning Division. If noise levels exceed the above
standards, then construction activities shall be reduced
in intensity to a level of compliance with above noise
standards or halted.
The block wall on the south property line shall be CP C During A A
constructed as early as possible in the first phase. Construction
Haul truck deliveries shall not take place between the PO/BO C During A 4/7
hours of 8:00 p.m. and 6:30 a.m, on weekdays, Construction
including Saturday, or at any time on Sunday or a
national holiday. Additionally, if heavy trucks used for
hauling would exceed 100 daily trips (counting both to
and from the construction site),then the developer shall
prepare a noise mitigation plan denoting any
construction traffic haul routes. To the extent feasible,
the plan shall denote haul routes that do not pass
sensitive land uses or residential dwellings.
Key to Checklist Abbreviations
Responsible Person Monitoring Frequency Method of Verification Sanctions
CDD-Community Development Director or designee A-With Each New Development A On-site Inspection 1 -Withhold Recordation of Final Map
CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit
CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy
BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order
PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds
FC-Fire Chief or designee6-Revoke CUP
7-Citation
7of7
COMMUNITY DEVELOPMENT
DEPARTMENT
I
STANDARD CONDITIONS
PROJECT #: TENTATIVE TRACT MAP SUBTT16644
SUBJECT: 16 LOT SUBDIVISION
APPLICANT: CHARLES JOSEPH ASSOCIATES
LOCATION: WEST SIDE OF BERYL, BETWEEN MIGNONETTE AND CIELITO
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DIVISION,(909)477-2750, FOR COMPLIANCE
WITH THE FOLLOWING CONDITIONS:
A. General Requirements Completion Date
1. The applicant shall agree to defend at his sole expense any action brought against the City, its
agents,officers,or employees, because of the issuance of such approval,or in the alternative,to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or
employees, for any Court costs and attorney's fees which the City, its agents, officers, or
employees may be required by a court to pay as a result of such action. The City may,at its sole
discretion,participate at its own expense in the defense of any such action but such participation
shall not relieve applicant of his obligations under this condition.
B. Time Limits
1. This tentative tract map or tentative parcel map shall expire, unless extended by the Planning
Commission, unless a complete final map is filed with the city Engineer within 3 years from the
date of the approval.
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which include
site plans,architectural elevations,exterior materials and colors, landscaping,sign program,and
grading on file in the Planning Division, the conditions contained herein, and the Development
Code regulations.
2. Prior to any use of the project site or business activity being commenced thereon,all Conditions
of Approval shall be completed to the satisfaction of the City Planner.
3. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.) or prior to final map approval in the case of a custom lot subdivision,or approved
use has commenced, whichever comes first.
SC-10-03 1
Project No. SUBTT16644
Completion Date
4. Approval of this request shall not waive compliance with all sections of the Development Code,all
other applicable City Ordinances, and applicable Community or Specific Plans in effect at the
time of building permit issuance.
5. Street names shall be submitted for City Planner review and approval in accordance with the
adopted Street Naming Policy prior to approval of the final map.
6. All building numbers and individual units shall be identified in a clear and concise manner,
including proper illumination.
7. The Covenants, Conditions, and Restrictions (CC&Rs) and Articles of Incorporation of any
Homeowners'Association are subject to the approval of the Planning and Engineering Divisions
and the City Attorney. They shall be recorded concurrently with the Final Map or prior to the
issuance of building permits, whichever occurs first. A recorded copy shall be provided to the
City Engineer. The Homeowners' Association shall submit to the Planning Division a list of the
name and address of their officers on or before January 1 of each and every year and whenever
said information changes.
D. Parking and Vehicular Access (indicate details on building plans)
1. Multiple car garage driveways shall be tapered down to a standard two-car width at street.
E. Landscaping
1. A detailed landscape and irrigation plan,including slope planting and model home landscaping in
the case of residential development, shall be prepared by a licensed landscape architect and
submitted for City Planner review and approval prior to the issuance of building permits or prior
final map approval in the case of a custom lot subdivision.
2. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope,but less than 2:1
slope,shall be, at minimum, irrigated and landscaped with appropriate ground cover for erosion
control. Slope planting required by this section shall include a permanent irrigation system to be
installed by the developer prior to occupancy.
3. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater
slope shall be landscaped and irrigated for erosion control and to soften their appearance as
follows: one 15-gallon or larger size tree per each 150 sq.ft. of slope area, 1-gallon or larger size
shrub per each 100 sq.ft.of slope area,and appropriate ground cover. In addition,slope banks
in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or
larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in
staggered clusters to soften and vary slope plane. Slope planting required by this section shall
include a permanent irrigation system to be installed by the developer prior to occupancy.
4. For single-family residential development, all slope planting and irrigation shall be continuously
maintained in a healthy and thriving condition by the developer until each individual unit is sold
avid occupied by the buyer. Prior to releasing occupancy for those units, an inspection shall be
conducted by the Planning Division to determine that they are in satisfactory condition.
5. The final design of the perimeter parkways,walls, landscaping,and sidewalks shall be included in _/_/_
the required landscape plans and shall be subject to City Planner review and approval and
coordinated for consistency with any parkway landscaping plan which may be required by the
Engineering Division.
F. Environmental
1. A final acoustical report shall be submitted for City Planner review and approval prior to the
issuance of building permits for any houses. The final report shall discuss the level of interior
noise attenuation to below 45 CNEL,the building materials and construction techniques provided,
and if appropriate, verify the adequacy of the mitigation measures. The building plans will be
checked for conformance with the mitigation measures contained in the final report.
SC-10-03 2
Project No. SUBTT16644
Completion Date
2. The applicant shall submit certification from an acoustical engineer that all recommendations of
the acoustical report were implemented in construction, including measurements of interior and
exterior noise levels to document compliance with City standards. Certification shall be
submitted to the Building&Safety Division prior to final occupancy release of the affected homes.
3. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures, including monitoring and reporting. Applicant shall be required to
post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the
amount of$719 prior to the issuance of building permits,guaranteeing satisfactory performance
and completion of all mitigation measures. These funds may be used by the City to retain
consultants and/or pay for City staff time to monitor and report on the mitigation measures.
Failure to complete all actions required by the approved environmental documents shall be
considered grounds for forfeit.
G. Other Agencies
1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location
of mailboxes. Multi-family residential developments shall provide a solid overhead structure for
mailboxes with adequate lighting. The final location of the mailboxes and the design of the
overhead structure shall be subject to City Planner review and approval prior to the issuance of
building permits.
APPLICANT SHALL CONTACTTHE BUILDING AND SAFETY DIVISION, (909)477-2710, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
H. General Requirements
1. Submit five complete sets of plans including the following: —/—/—
a. Site/Plot Plan;
b. Foundation Plan;
C. Floor Plan;
d. Ceiling and Roof Framing Plan;
e. Electrical Plans(2 sets,detached) including the size of the main switch, number and size
of service entrance conductors, panel schedules, and single line diagrams;
I. Plumbing and Sewer Plans,including isometrics, underground diagrams,water and waste
diagram, sewer or septic system location, fixture units, gas piping, and heating and air
conditioning; and
g. Planning Division Project Number (i.e., TT #, CUP #, DR #, etc.) clearly identified on the
outside of all plans.
2. Submit two sets of structural calculations, energy conservation calculations, and a soils report.
Architect's/Engineer's stamp and "wet"signature are required prior to plan check submittal.
3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to
the City prior to permit issuance.
4. Separate permits are required for fencing and/or walls. —/—/-
5. Developers wishing to participate in the Community Energy Efficiency Program (CEEP) can
contact the Building and Safety Division staff for information and submittal requirements.
SC-10-03 3
Project No. SUBTT16644
Completion Date
I. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be
marked with the project file number(i.e., DRC2001-00001). The applicant shall comply with the
latest adopted California Codes, and all other applicable codes, ordinances, and regulations in
effect at the time of permit application. Contact the Building and Safety Division for availability of
the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new residential project or major addition,the applicant
shall pay development fees at the established rate. Such fees may include,but are not limited to:
City Beautification Fee, Park Fee, Drainage Fee,Transportation Development Fee, Permit and
Plan Check Fees,and School Fees. Applicant shall provide a copy of the school fees receipt to
the Building and Safety Division prior to permit issuance.
3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map
recordation and prior to issuance of building permits.
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday
through Saturday, with no construction on Sunday or holidays.
J. New Structures
1. Provide compliance with the California Building Code (CBC) for property line clearances
considering use, area, and fire-resistiveness.
2. Provide compliance with the California Building Code for required occupancy separations.
3. Roofing material shall be installed per the manufacturer's "high wind" instructions.
K. Grading
1. Grading of the subject property shall be in accordance with California Building Code,City Grading
Standards, and accepted grading practices. The final grading plan shall be in substantial
conformance with the approved grading plan.
2. A soils report shall be prepared by a qualified engineer licensed by the State of California to
perform such work.
3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the
time of application for grading plan check.
4. The final grading, appropriate certifications and compaction reports shall be completed,
submitted, and approved by the Building and Safety Official prior to the issuance of building
permits.
5. A separate grading plan check submittal is required for all new construction projects and for
existing buildings where improvements being proposed will generate 50 cubic yards or more of
combined cut and fill. The grading plan shall be prepared,stamped, and signed by a California
registered Civil Engineer.
SC-10-03 4
Project No.SUBTT16644
Completion Date
APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
L. Dedication and Vehicular Access
1. Rights-of-way and easements shall be dedicated to the City for all interior public streets,
community trails,public paseos,public landscape areas,street trees,traffic signal encroachment
and maintenance, and public drainage facilities as shown on the plans and/or tentative map.
Private easements for non-public facilities (cross-lot drainage, local feeder trails, etc.) shall be
reserved as shown on the plans and/or tentative map.
2. Dedication shall be made of the following rights-of-way on the perimeter streets (measured from
street centerline):
60 total feet on 'A' Street
3. Corner Corner property line cutoffs shall be dedicated per City Standards. —/—/-
4. All existing easements lying within future rights-of-way shall be quit-claimed or delineated on the
final map.
5. Easements for public sidewalks and/or street trees placed outside the public right-of-way shall be
dedicated to the City.
M. Street Improvements
1. All public improvements(interior streets,drainage facilities,community trails,paseos, landscaped
areas, etc.) shown on the plans and/or tentative map shall be constructed to City Standards.
Interior street improvements shall include, but are not limited to,curb and gutter,AC pavement,
drive approaches, sidewalks, street lights, and street trees.
2. Construct the following perimeter street improvements including, but not limited to:
Curb& A.C. Side- Drive Street Street Comm Median Bike
Street Name Gutter Pvmt walk I Appr. Lights. Trees Trail Island Trail I Other
Beryl Street X X X X X
'A' Street X X X X X X
3. Improvement Plans and Construction:
a. Street improvement plans,including street trees,street lights,and intersection safety lights
on future signal poles, and traffic signal plans shall be prepared by a registered Civil
Engineer and shall be submitted to and approved by the City Engineer. Security shall be
posted and an agreement executed to the satisfaction of the City Engineer and the City
Attorney guaranteeing completion of the public and/or private street improvements,prior to
final map approval or the issuance of building permits, whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a
construction permit shall be obtained from the City Engineer's Office in addition to any
other permits required.
C. Pavement striping,marking,traffic signing,street name signing,traffic signal conduit,and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Handicapped access ramps shall be installed on all corners of intersections per City _/_/_
Standards or as directed by the City Engineer.
SC-10-03 5
Project No.SUBTT16644
Completion Date
e. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A cash
deposit shall be provided to cover the cost of grading and paving,which shall be refunded
upon completion of the construction to the satisfaction of the City Engineer.
f. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be
installed to City Standards, except for single family residential lots.
g. Street names shall be approved by the City Planner prior to submittal for first plan check.
4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in
accordance with the City's street tree program.
5. Install street trees per City street tree design guidelines and standards as follows. The completed
legend and construction notes shall appear on the title page of the street improvement plans.
Where public landscape plans are required,tree installation in those areas shall be per the public
landscape improvement plans.
The City Engineer reserves the right to adjust tree species based upon field conditions and other
variables. For additional information, contact the Project Engineer.
Min.
Grow
Street Name Botanical Name Common Name Space Spacing Size' city.
Beryl Street
P.A. 5' or greater Geijera parviflora Australian Willow 5' 20' o.c. 15 gal Fill
in
P.A. less than 5' Eriobotrya deflexa Bronze Loquat Tree 3' 25' o.c. 15 gal Fill
in
'A' Street Select appropriate tree from approved street tree list for Rancho
Cucamonga. List each street as a separate line item within this legend.
STREET TREES LISTED BELOW ARE TO APPEAR ON LMD PLANS, LISTED FOR
REFERENCE ONLY— NOT TO APPEAR ON STREET IMPROVEMENT PLANS.
At rear yard lots
Beryl Street
P.A. 5' or greater Geijera parviflora Australian Willow 5' 20' o.c. 15 gal
P.A. less than 5' Eriobotrya deflexa Bronze Loquat Tree 3' 25' o.c. 15 gal
'TREES SHALL BE 15-GALLON SIZE UNLESS OTHERWISE APPROVED.
Construction Notes for Street Trees:
1) All street trees are to be planted in accordance with City standard plans.
2) Prior to the commencement of any planting,an agronomic soils report shall be furnished to
the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil
amendments, as determined by the City inspector.
3) All street trees are subject to inspection and acceptance by the Engineering Division.
4) Street trees are to be planted per public improvement plans only.
N. Public Maintenance Areas
1. A separate set of landscape and irrigation plans per Engineering Public Works Standards shall
be submitted to the City Engineer for review and approval prior to final map approval or issuance
of building permits, whichever occurs first. The following landscaped parkways, medians,
paseos, easements, trails or other areas shall be annexed into the Landscape Maintenance
District: The three rear yard lots on Beryl Street (Lots 12-14)
2. Public landscape areas are required to incorporate substantial areas(40%)of mortared cobble or
other acceptable non-irrigated surfaces.
SC-10-03 6
Project No. SUBTT16644
Completion Date
3. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting
Districts shall be filed with the City Engineer prior to final map approval or issuance of building
permits whichever occurs first. Formation costs shall be borne by the developer.
4. All required public landscaping and irrigation systems shall be continuously maintained by the
developer until accepted by the City.
O. Drainage and Flood Control
1. A final drainage study shall be submitted to and approved by the City Engineer prior to final map _/_/_
approval or the issuance of building permits, whichever occurs first. All drainage facilities shall
be installed as required by the City Engineer.
2. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the
property from adjacent areas.
3. Trees are prohibited within 5 feet of the outside diameter of any public storm drain pipe measured
from the outer edge of a mature tree trunk.
P. Utilities
1. Provide separate utility services to each parcel including sanitary sewerage system,water,gas,
electric power, telephone, and cable TV (all underground) in accordance with the Utility
Standards. Easements shall be provided as required.
2. The developer shall be responsible for the relocation of existing utilities as necessary.
3. Water and sewer plans shall be designed and constructed to meet the requirements of the
Cucamonga County Water District(CCW D), Rancho Cucamonga Fire Protection District,and the
Environmental Health Department of the County of San Bernardino. A letter of compliance from
the CCW D is required prior to final map approval or issuance of permits,whichever occurs first.
Such letter must have been issued by the water district within 90 days prior to final map approval
in the case of subdivision or prior to the issuance of permits in the case of all other residential
projects.
4. Approvals have not been secured from all utilities and other interested agencies involved.
Approval of the final parcel map will be subject to any requirements that may be received from
them.
O. General Requirements and Approvals
1. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all
new streetlights for the first six months of operation,prior to final map approval or prior to building
permit issuance if no map is involved.
APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, FIRE PROTECTION PLANNING
SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
SEE ATTACHED
SC-10-03 7
RANCHO CUCAMONGA FIRE DISTRICT
STANDARD CONDITIONS
PROJECT/FILE #: Subtt16644 APPLICANT NAME: Charles Joseph & Assoc.
PROJECT NAME: Beryl Subdivision OCCUPANCY CLASS: Group R-3
LOCATION: 6896 Beryl FLOOR AREA (S): Subdivision only
DATE: 10-21-2003 CONSTRUCTION TYPE: Type V-N
PLAN TYPE: SFR tract 16-lot subdiv. FD REVIEW BY: Moises Eskenazi
PLANNER: Rick Fischer ANNEXATION: N/R Fire: Non-High Hazard
Building permits will not be issued without approved water plans from
CCWD and FCS.
A fire flow letter will be required upon plan check submittal for the home
construction.
THE FOLLOWING STANDARD CONDITIONS APPLY TO YOUR PROJECT.
RANCHO CUCAMONGA FIRE DISTRICT- STANDARD CONDITIONS & REQUIREMENTS —
FSC-1 General Requirements for Public and Private Water Supply. Water(fire) plans must be approved by
RCFPD and CCWD prior to permit issuance
1. General Guidance for Fire Hydrants: The following provides general guidance for the spacing and location of
fire hydrants. Remember these are the maximum permitted distances between fire hydrants:
a. The maximum distance between fire hydrants in multi-family residential is 400-feet. No portion of the
exterior wall shall be located more than 200-feet from an approved fire hydrant. For cul-de-sacs the
distance shall not exceed 150-feet.
b. The maximum distance between fire hydrants in single-family residential projects is 500-feet. No portion
of the exterior wall facing the addressed street shall be more than 250-feet from an approved fire
hydrant. For cul-de-sacs the distance shall not exceed 200 ft.
c. For single-family residential projects in the designated Hazardous Fire Area the maximum distance
between fire hydrants is 400-feet. No portion of the exterior wall facing the addressed street shall be
more than 200-feet from an approved fire hydrant. For cul-de-sacs the distance shall not exceed 150 ft.
d. Fire hydrants are to be located:
1. At the entrance(s) to a project from the existing public roadways. This includes subdivisions and
industrial parks.
2. At intersections.
3. On the right side of the street, whenever practical and possible.
4. As required by the Fire Safety Division to meet operational needs.
5. The location of fire hydrants is based upon the operational needs of the Fire District to control a fire.
6. Fire hydrants shall be located a minimum of 40 feet from any building.
2. The required fire flow for this project will be determined when the square footage of the homes are determined.
This Fire flow requirement is made in accordance with Fire Code Appendix III-A, as amended.
3. Hydrants Used to Supply Fire Flow: Public fire hydrants located within a 500-foot radius of the proposed
project may be used to provide the required fire flow subject to Fire District review and approval. Private fire
hydrants on adjacent property shall not be used to provide required fire flow.
4. Show Existing Fire Hydrants and Mains: Existing fire hydrants and mains within 600-feet of the project shall
be shown on the water plan submitted for review and approval. Include main size.
FSC-2 Private (On-Site) Water and/or Fire Sprinkler Underground Plans for Fire Protection
1. Number of Fire Hydrants: Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof,
subject to standard spacing and distribution requirements.
FSC-4 Fire District Site Access-Technical Comments
1. Access Roadways Defined: Fire District access roadways include public roads, streets, and highways, as
well as private roads, streets, drive aisles and designated fire lanes.
2. Restricted Residential Access Mitigation: The installation of gates and restricted access to residential
developments may necessitate installation of approved automatic fire sprinkler systems. This condition applies
to projects in the designated Hazardous Fire Area, when the Fire District determines that gates, other means of
restricting access or conditions delaying response exists. Contact the Fire Construction Services (909) 477-
2713
3. Restricted Residential Access: Gated or access for all residential development shall comply with the following:
a. All automatic gates shall be provided with a Fire District approved, compatible traffic pre-emption
device. Approved devices are available from Opticom (3M) and Tomar Electronics. Devices shall be
installed in accordance with the manufacturer's instructions and specifications.
b. A Knox Rapid Entry System Key Box is required to be installed adjacent to each gate in a Fire District
approved location.The box shall be mounted where it is clearly visible and access is unobstructed.
c. Vehicle access gates shall be provided with an approved Fire District Knox Key Switch.
d. The key switch shall be located immediately adjacent to the Knox Box for use in the event that the
traffic pre-emption device fails to operate.
e. The gate shall remain in the open position for not less than 20-minutes and shall automatically reset.
Contact Building and Safety/Fire Construction Services 909 477-2713 for inspection.
FSC-5 Plan Submittal Required Notice
Required plans shall be submitted and approved prior to construction in accordance with 2000/2001 Building, Fire,
Mechanical, and Plumbing Codes; 1999 Electrical Code; Health and Safety Code; Public Resources Code; and
RCFPD Ordinances FD15 and FD39, Guidelines and Standards.
PRIOR TO ISSUANCE OF BUILDING PERMITS- Building permits will not be issued until the
water (fire) plans are submitted and approved by CCWD and Fire Construction Services
Complete the following:
1. Private/On-site Fire Hydrants: Prior to the issuance of any building permit, the applicant shall submit
construction plans, specifications, flow test data and calculations for the private water main system for review
and approval by the Fire District. Plans and installation shall comply with Fire District standards.
2. Private Fire Hydrants/On-site Installation: All private on-site fire hydrants shall be installed, flushed, and
operable prior to delivering any combustible building materials on-site (i.e., lumber, roofing materials, etc.). A
representative of Fire Construction Services shall inspect the installation and witness hydrant flushing. The
builder/developer shall submit final test and inspection report to the Fire Safety Division.
3. Public Fire Hydrants: Prior to issuance of any building permit, the applicant shall submit a plan showing the
locations of all new public fire hydrants for the review and approval by the Fire District and the Water District.
On the plan show all existing fire hydrants within a 600-foot radius of the project
4. Public Installation: All required public fire hydrants shall be installed, flushed, and operable prior to
delivering any combustible building materials on-site (i.e., lumber, roofing materials, etc.). Water District
personnel shall inspect the installation and witness hydrant flushing. The builder/developer shall submit a
copy of the Water District inspection report to the Fire Safety Division. Contact Water District to schedule
testing.
PRIOR TO OCCUPANCY OR FINAL INSPECTION- Complete the following:
1 Private Fire Hydrants- Final Acceptance: For the purpose of final acceptance, an additional test of the on-
site fire hydrants shall be conducted by the builder/developer in the presence of the Water District or Fire
Construction Services, as appropriate. The builder/developer shall submit the final test report to the Fire
Safety Division.
2. Construction Access: Fire District access, a minimum 26-feet in width and 14-feet, 6-inches minimum clear
height shall be provided. These minimum clearances shall be maintained free and clear of any obstructions at
all times, in accordance with Fire District Standards. Contact the Fire Safety Division (909) 477-2770
3. Phased Construction: Each phase shall be provided with approved Fire District access roadways. Dead-
end roadways shall not exceed the maximum permitted by the Fire Code or Fire District standards.