HomeMy WebLinkAbout04-32 - Resolutions RESOLUTION NO. 04-32
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA,APPROVING TENTATIVE PARCEL
MAP SUBTPM16118, A SUBDIVISION OF 5.12 GROSS ACRES OF LAND
INTO 6 PARCELS IN THE INDUSTRIAL PARK (SUBAREA 12) AND
GENERAL INDUSTRIAL (SUBAREA 13) DISTRICTS, LOCATED ON THE
EAST SIDE OF CHARLES SMITH AVENUE, AT SAN MARINO STREET,
AND MAKING FINDINGS IN SUPPORT THEREOF—APN: 0229-321-21
A. Recitals.
1. Henry Reiter filed an application for approval of Tentative Parcel Map SUBTPM16118, as
described in the title of this Resolution. Hereinafter in this Resolution, the subject Tentative Parcel
Map request is referred to as "the application."
2. On March 24, 2004, the Planning Commission held a duly advertised public hearing for
the above-described map.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission
of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the above-
referenced public hearing on March 24, 2004, including written and oral staff reports, together with
public testimony, this Commission hereby specifically finds as follows:
a. The application applies to 5.12 gross acres of land, located on the east side of
Charles Smith Avenue, at San Marino Street; and
b. The applicant proposes to subdivide the project site into six separate parcels; and
C. The property to the north of the subject site is improved with an automated
commercial fuel station, the property to the west is improved with industrial development, and to the
south and east of the site is the 1-15 Freeway; and
d. The site is a remnant grape vineyard that is primarily vacant with the exception of
scattered grape vines and weeds; and
e. The property is vacant and has occasionally been disced for weed control; and
f. The property is located within a designated Delhi Sands flower-loving fly habitat
zone; and
g. Access into the site is from Charles Smith Avenue; and
h. The property abuts the 1-15 Freeway to the east.
PLANNING COMMISSION RESOLUTION NO. 04-32
SUBTPM16118— HENRY REITER
March 24, 2004
Page 2
3. Based upon the substantial evidence presented to this Commission during the above-
referenced public hearing and upon the specific findings of facts set forth in paragraphs 1 and 2
above, this Commission hereby finds and concludes as follows:
a. The Tentative Parcel Map is consistent with the General Plan and Development
Code; and
b. The design or improvements of the Tentative Parcel Map is consistent with the
General Plan and the Development Code; and
C. The site is physically suitable for the type of development proposed; and
d. The design of the subdivision is not likely to cause substantial environmental
damage and avoidable injury to humans and wildlife or their habitat; and
e. The Tentative Parcel Map is not likely to cause serious public health problems;and
f. The design of the Tentative Parcel Map will not conflict with any easement acquired
by the public at large, now of record, for access through or use of the property within the proposed
subdivision.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration, together with all written and oral reports included for the environmental assessment for
the application, the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and
Monitoring Program attached hereto, and incorporated herein by this reference, based upon the
findings as follows:
a. That the Mitigated Negative Declaration has been prepared in compliance with the
California Environmental Quality Act (CEQA) of 1970, as amended, and the State CEQA guidelines
promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared
therefore reflect the independent judgment of the Planning Commission; and, further, this
Commission has reviewed and considered the information contained in said Mitigated Negative
Declaration with regard to the application.
b. Although the Mitigated Negative Declaration identifies certain significant
environmental effects that will result if the project is approved, all significant effects have been
reduced to an acceptable level by imposition of mitigation measures on the project,which are listed
below as Conditions of Approval.
C. Pursuant to the provisions of Section 753.5(c) of Title 14 of the California Code of
Regulations, the Planning Commission finds as follows: In considering the record as a whole, the
Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the
proposed project will have potential for an adverse impact upon wildlife resources or the habitat upon
which wildlife depends. Further, based upon the substantial evidence contained in the Mitigated
Negative Declaration, the staff reports and exhibits, and the information provided to the Planning
Commission during the public hearing, the Planning Commission hereby rebuts the presumption of
adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code of Regulations
PLANNING COMMISSION RESOLUTION NO. 04-32
SUBTPM16118— HENRY REITER
March 24, 2004
Page 3
5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth below
and in the Standard Conditions, attached hereto and incorporated herein by this reference:
Engineering Division
1) Charles Smith Avenue Public Improvements shall include curb and
gutter, pavement, property line adjacent sidewalk, drive approaches,
drainage devices, streetlights and street trees per City standards,to the
satisfaction of the City Engineer.
a) Street trees, a minimum of 15-gallon size, shall be of a species
and spaced in accordance with the City's Street Tree Program.
b) Provide curbside drain outlets on all parcels to prevent
concentrated drainage across drive approaches.
c) Provide four 5800 lumen HPSV streetlights.
d) Provide and or protect existing traffic signing and striping and R26
"NO PARKING" signs.
2) Provide a Water Quality Management Plan(WQMP), to the satisfaction
of the City Engineer, and identify applicable Best Management
Practices (BMPs) on the Grading Plan.
3) Proposed driveways to Charles Smith Avenue shall align with existing
driveways on the opposite side of the street and be in accordance with
City Drive Approach Standard and City 'Driveway Policy' within
acceptable limits as determined by the Traffic Division during plan
check of street improvement plans.
Environmental Mitigation
Air Quality
1) All construction equipment shall be maintained in good operating
condition so as to reduce operational emissions. The contractor shall
ensure that all construction equipment is being properly serviced and
maintained as per manufacturers' specifications. Maintenance records
shall be available at the construction site for City verification.
2) Priorto the issuance of any grading permits, the developer shall submit
construction plans to the City denoting the proposed schedule and
projected equipment use. Construction contractors shall provide
evidence that low-emission mobile construction equipment will be
utilized, or that their use was investigated and found to be infeasible for
the project. Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality Management District
(SCAQMD), as well as City Planning staff.
PLANNING COMMISSION RESOLUTION NO. 04-32
SUBTPM16118— HENRY REITER
March 24, 2004
Page 4
3) All paints and coatings shall meet or exceed performance standards
noted in SCAQMD Rule 1113. Paints and coatings shall be applied
either by hand or high volume, low-pressure spray.
4) All asphalt shall meet or exceed performance standards noted in
SCAQMD Rule 1108.
5) All construction equipment shall comply with SCAQMD Rules 402 and
403. Additionally, contractors shall include the following provisions:
• Reestablish ground cover on the construction site through
seeding and watering.
• Pave or apply gravel to any on-site haul roads.
• Phase grading to prevent the susceptibility of large areas to
erosion over extended periods of time.
• Schedule activities to minimize the amounts of exposed
excavated soil during and after the end of work periods.
• Dispose of surplus excavated material in accordance with local
ordinances and use sound engineering practices.
• Sweep streets according to a schedule established by the City if
silt is carried over to adjacent public thoroughfares or occurs as a
result of hauling. Timing may vary depending upon the time of
year of construction.
• Suspend grading operations during high winds(i.e.,wind speeds
exceeding 25 miles per hour) in accordance with SCAQMD
Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils haul trucks or
cover payloads using tarps or other suitable means.
6) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and Regional Water Quality Control Board
[RWQCB]) daily to reduce PM10 emissions, in accordance with
SCAQMD Rule 403.
7) Chemical soil stabilizers (approved by SCAQMD and RWQCB)shall be
applied to all inactive construction areas that remain inactive for
96 hours or more to reduce Particulate Matter(PM,o) emissions.
8) The construction contractor shall utilize electric orclean alternative fuel-
powered equipment where feasible.
PLANNING COMMISSION RESOLUTION NO. 04-32
SUBTPM16118 — HENRY REITER
March 24, 2004
Page 5
9) The construction contractor shall ensure that construction grading plans
include a statement that work crews will shut off equipment when not in
use.
10) All industrial and commercial facilities shall post signs requiring that
trucks shall not be left idling for prolonged periods (i.e., in excess of ten
minutes).
11) All industrial and commercial facilities shall designate preferential
parking for vanpools.
12) All industrial and commercial site tenants with 50 or more employees
shall be required to post both bus and Metrolink schedules in
conspicuous areas.
13) All industrial and commercial site tenants with 50 or more employees
shall be required to configure their operating schedules around the
Metrolink schedule to the extent reasonably feasible.
Cultural Resources
1) If any prehistoric archaeological resources are encountered before or
during grading, the developer will retain a qualified archaeologist to
monitor construction activities, to take appropriate measures to protect
or preserve them for study. With the assistance of the archaeologist,
the City of Rancho Cucamonga will:
• Enact interim measures to protect undesignated sites from
demolition or significant modification without an opportunity for
the City to establish its archaeological value.
• Consider establishing provisions to require incorporation of
archaeological sites within new developments, using their special
qualities as a theme or focal point.
• Pursue educating the public about the area's archaeological
heritage.
• Propose mitigation measures and recommend conditions of
approval to eliminate adverse project effects on significant,
important, and unique prehistoric resources,following appropriate
CEQA guidelines.
• Prepare a technical resources management report, documenting
the inventory, evaluation, and proposed mitigation of resources
within the project area. Submit one copy of the completed report,
with original illustrations, to the San Bernardino County
Archaeological Information Center for permanent archiving.
PLANNING COMMISSION RESOLUTION NO. 04-32
SUSTPM16118— HENRY REITER
March 24, 2004
Page 6
2) A qualified paleontologist shall conduct a preconstruction field survey of
the project site. The paleontologist shall submit a report of findings that
will also provide specific recommendations regarding further mitigation
measures (i.e., paleontological monitoring) that may be appropriate.
Where mitigation monitoring is appropriate, the program must include,
but not be limited to, the following measures:
• Assign a paleontological monitor, trained and equipped to allow
the rapid removal of fossils with minimal construction delay,to the
site full-time during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared or graded,
divert earth-disturbing activities elsewhere until the monitor has
completed salvage. If construction personnel make the discovery,
the grading contractor should immediately divert construction and
notify the monitor of the find.
• Submit a summary report to the City of Rancho Cucamonga.
Transfer collected specimens with a copy of the report to the San
Bernardino County Museum.
Geology and Soils
1) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and RWQCB) daily to reduce PM10 emissions,
in accordance with SCAQMD Rule 403.
2) Frontage public streets shall be swept according to a schedule
established by the City to reduce PM10 emissions associated with
vehicle tracking of soil off-site. Timing may vary depending upon the
time of year of construction.
3) Grading operations shall be suspended when wind speeds exceed
25 miles per hour to minimize PM10 emissions from the site during such
episodes.
4) Chemical soil-stabilizers(approved by SCAQMD and RWQCB)shall be
applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PM10 emissions.
Hydrology and Water Quality
1) The developer shall implement the BMPs identified in the WQMP
(Reiter Development, December 2003). All BMPs shall be identified on
the Grading Plans for review and approval by the City Engineer.
2) Structures to retain precipitation and runoff on-site shall be integrated
into the design of the project where appropriate. Measures that may be
used to minimize runoff and to enhance infiltration include Dutch drains,
PLANNING COMMISSION RESOLUTION NO. 04-32
SUBTPM16118— HENRY REITER
March 24, 2004
Page 7
precast concrete lattice blocks and bricks, terraces, diversions, runoff
spreaders, seepage pits, and recharge basins.
3) Prior to issuance of grading or paving permits, the applicant shall
submit to the City Engineer a Notice of Intent (NOI) to comply with
obtaining coverage under the National Pollutant Discharge Elimination
System (NPDES) General Construction Storm Water Permit from the
State Water Resources Control Board. Evidence that this has been
obtained (i.e., a copy of the Waste Dischargers Identification Number)
shall be submitted to the City Engineer for coverage under the NPDES
General Construction Permit.
Noise
1) Construction or grading shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday.
2) Construction or grading noise levels shall not exceed the standards
specified in Development Code Section 17.02.120-D, as measured at
the property line. The developer shall hire a consultant to perform
weekly noise level monitoring as specified in Development Code
Section 17.02.120. Monitoring at other times may be required by the
Planning Division. Said consultant shall report their findings to the
Planning Division within 24 hours; however, if noise levels exceed the
above standards, then the consultant shall immediately notify the
Planning Division. If noise levels exceed the above standards, then
construction activities shall be reduced in intensity to a level of
compliance with above noise standards or halted.
3) The perimeter block wall shall be constructed as early as possible in
the first phase.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 24TH DAY OF MARCH 2004.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY: Za(�t )4�5
LarrydNiel, Vice Chairman
ATTEST:
Brad Bu creta
PLANNING COMMISSION RESOLUTION NO. 04-32
SUBTPM16118— HENRY REITER
March 24, 2004
Page 8
I, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby
certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the
Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning
Commission held on the 24th day of March 2004, by the following vote-to-wit:
AYES: COMMISSIONERS: FLETCHER, McNIEL, McPHAIL, STEWART
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: MACIAS
City of Rancho Cucamonga
MITIGATION MONITORING
PROGRAM
Project File No.: Tentative Parcel Map SUBTPM16118 and Development Review DRC2003-01038
This Mitigation Monitoring Program(MMP)has been prepared for use in implementing the mitigation
measures identified in the Mitigated Negative Declaration for the above-listed project. This program
has been prepared in compliance with State law to ensure that adopted mitigation measures are
.implemented (Section 21081.6 of the Public Resources Code).
Program Components -This MMP contains the following elements:
1. Conditions of approval that act as impact mitigation measures are recorded with the action
and the procedure necessary to ensure compliance. The mitigation measure conditions of
approval are contained in the adopted Resolution of Approval for the project.
i
2. A procedure of compliance and verification has been outlined for each action necessary.This
procedure designates who will take action, what action will be taken and when, and to whom
and when compliance will be reported.
3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring
progresses, changes to compliance procedures may be necessary. based upon
recommendations by those responsible for the program.
Program Management - The MMP will be in place through all phases of the project. The project
planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project
planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly
and proper action is taken on each mitigation. Each City department shall ensure compliance of the
conditions (mitigation) that relate to that department.
Procedures - The following steps will be followed by the City of Rancho Cucamonga.
1. A fee covering all costs and expenses, including any consultants'fees, incurred by the City in
performing monitoring or reporting programs shall be charged to the applicant.
2. A MMP Reporting Form will be prepared for each potentially significant impact and its
corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached
hereto. This procedure designates who will take action, what action will be taken and when,
and to whom and when compliance will be reported. All monitoring and reporting
documentation will be kept in the project file with the department having the original authority
for processing the project. Reports will be available from the City upon request at the following
address:
City of Rancho Cucamonga - Lead Agency
Planning Division
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
MITIGATION MONITORING PROGRAM
SUBTPM16118 and DRC2003-01038
Page 2
3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,
as determined by the project planner or responsible City department, to monitor specific
mitigation activities and provide appropriate written approvals to the project planner.
4. The project planner or responsible City department will approve, by signature and date, the
completion of each action item that was identified on the MMP Reporting Form. After each
measure is verified for compliance, no further action is required for the specific phase of
development.
5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off
as completed by the project planner or responsible City department at the bottom of the MMP
Reporting Form.
6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation
measures.The project planner is responsible for approving any such refinements or additions.
An MMP Reporting Form will be completed by the project planner or responsible City
department and a copy provided to the appropriate design, construction, or operational
personnel.
7. The project planner or responsible City department has the authority to stop the work of
construction contractors if compliance with any aspects of the MMP is not occurring after
written notification has been issued.The project planner or responsible City department also
has the authority to hold certificates of occupancies if compliance with a mitigation measure
attached hereto isnot occurring.The project planner or responsible City department has the
authority to hold issuance of a business license until all mitigation measures are implemented.
8. Any conditions (mitigation) that require monitoring after project completion shall be the
responsibility of the City of Rancho Cucamonga Planning Division.The Division shall require
the applicant to post any necessary funds (or other forms of guarantee)with the City. These
funds shall beused by the City to retain consultants and/or pay for City staff time to monitor
and report on the mitigation measure for the required period of time.
9. In those instances requiring long-term project monitoring, the applicant shall provide the City
with a plan for monitoring the mitigation activities at the project site and reporting the
monitoring results to the City. Said plan shall identify the reporter as an individual qualified to
know whether the particular mitigation measure has been implemented. The
monitoring/reporting plan shall conform to the City's MMP and shall be approved by the
Community Development Director or City Planner prior to the issuance of building permits.
MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III)
Project File No.: SUBTPM16118 and DRC2003-01038 Applicant: Henry Reiter
Initial Study Prepared by: Warren Morelion, Assistant Planner Date: June 23, 2003
Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Air Quality
All construction equipment shall be maintained in good CP C Review of-Plans A/C 2/4
operating condition so as to reduce operational
emissions. The contractor shall ensure that all
construction equipment is being properly serviced and
maintained as per manufacturers' specifications.
Maintenance records shall be available at the
construction site for City verification.
Prior to the issuance of any grading permits, the CP/CE C Review of Plans C 2
developer shall submit construction plans to the City
denoting the proposed schedule and projected
equipment use. Construction contractors shall provide
evidence that low-emission mobile construction
equipment will be utilized, or that their use was
investigated and found to be infeasible for the project.
Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality
Management District (SCAQMD) as well as City
Planning staff.
All paints and coatings shall meet or exceed CP C Review of Plans A/C 2/4
performance standards noted in SCAQMD Rule 1113.
Paints and coatings shall be applied either by hand or
high volume, low-pressure spray.
All asphalt shall meet or exceed performance standards BO B Review of Plans A/C 2
noted in SCAQMD Rule 1108.
All construction equipment shall comply with SCAQMD CE C Review of Plans A/C 2/4
Rules 402 and 403. Additionally, contractors shall
include the following provisions:
• Reestablish ground cover on the construction site CE C Review of Plans A/C 2/4
through seeding and watering.
• Pave or apply gravel to any on-site haul roads. CE C Review of Plans A/C 2/4
• Phase grading to prevent the susceptibility of large CE C Review of Plans A/C 2/4
areas to erosion over extended periods of time.
1 of 6
ImplementingMitigation Measures No. Responsible Monitoring Timing of Method of Verif ied Sanctions for
Date/initials Non-Compliance
• Schedule activities to minimize the amounts of CE C Review of Plans A/C 2/4
exposed excavated soil during and after the end of
workperiods'
• Dispose of surplus excavated material in. CE C Review of Plans A 4
accordance with local ordinances and use sound
engineering ractices.
• Sweep streets according to a schedule established CE C During A 4
by the City if silt is carried over to adjacent public Construction
thoroughfares or occurs as a result of hauling.
Timing may vary depending upon the time of year of
construction.
• Suspend grading operations during high winds (i.e., BO/CE C During A. 4
wind speeds exceeding 25 mph) in accordance with Construction
Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils CE C Review of Plans A 4
haul trucks or cover payloads using tarps or other
suitable means.
The site shall be treated with water or other BO/CE C During A 4
soil-stabilizing agent (approved by SCAQMD and Construction
Regional Water Quality Control Board [RWQCB]) daily
to reduce P1010 emissions,in accordance with SCAQMD
Rule 403.
Chemical soil stabilizers (approved by SCAOMD and BO/CE C During A 4
RWQCB) shall be applied to all inactive construction Construction
areas that remain inactive for 96 hours or more to
reduce PM10 emissions.
The construction contractor shall utilize electric or clean CE C Review of Plans A/C 4
alternative fuel-powered equipment where feasible.
The construction contractor shall ensure that CE C Review of Plans A/C 2/4
construction grading plans include a statement that work
crews will shut off equipment when not in use.
All industrial and commercial facilities shall post signs BO C Review of Plans A 4
requiring that trucks shall not be left idling for prolonged
periods (i.e., in excess of 10 minutes).
All industrial and commercial facilities shall designate CP C Review of Plans A/C 2/3
preferential parking for vanpools.
All industrial and commercial site tenants with 50 or CP C — Review of Plans D 3
more employees shall be required to post both bus and
Metrolink schedules in conspicuous areas.
2 of 6
Mitigation Measures No. Responsible Monitoring Timing of
Method of Verif led Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date Anitials Non-Compliance
All industrial and commercial site tenants with 50 or CP C Review of Plans D 2/3
more employees shall be required to configure their
operating schedules around the Metrolink schedule to
the extent reasonably feasible.
Cultural Resources
If any prehistoric archaeological resources are
encountered before or during grading,the developer will
retain a qualified archaeologist to monitor construction
activities, to take appropriate measures to protect or
preserve them for study. With the assistance of the
archaeologist, the City of Rancho Cucamonga will:
• Enact interim measures to protect undesignated CP/BO C Review of A/D 3/4
sites from demolition or significant modification Report
without an opportunity for the City to establish its
archaeological value.
• Consider establishing provisions to require CP/BO C Review of A/D 3/4
incorporation of archaeological sites within new Report
developments, using their special qualities as a
theme or focal point.
• Pursue educating the public about the area's CP/BO C Review of A/D 3/4
archaeological heritage. Report
• Propose mitigation measures and recommend CP/BO C Review of A/D 3/4
conditions of approval to eliminate adverse project Report
effects on significant, important, and unique
prehistoric resources, following appropriate CEQA
guidelines.
• Prepare a technical resources management report, CP C Review of A/D 3/4
documenting the inventory, evaluation, and Report —
proposed mitigation of resources within the project
area. Submit one copy of the completed report,with
original illustrations, to the San Bernardino County
Archaeological Information Center for permanent
archiving.
3 of 6
Mitigation Measures No./ Responsible of Verif led Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
A qualified paleontologist shall conduct a preconstruction CP B Review of A/D 4
field survey of the project site. The paleontologist shall Report
submit a report of findings that will also provide specific
recommendations regarding further mitigation measures
(i.e., paleontological monitoring) that may be
appropriate.Where mitigation monitoring is appropriate,
the program must include, but not be limited to, the
following measures:
• Assign a paleontological monitor, trained and CP - B Review of A/D 4
equipped to allow the rapid removal of fossils with Report
minimal construction delay, to the site full-time
during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared BO B/C Review of A/D 4
or graded, divert earth-disturbing activities Report
elsewhere until the monitor has completed salvage.
If construction personnel make the discovery, the
grading contractor should immediately divert
construction and n otify the monitor of the find.
• Submit a summary report to the City of Rancho CP D Review of D 3
Cucamonga. Transfer collected specimens with a Report
copy of the report to the San Bernardino County
Museum.
Geology and Soils
The site shall be treated with water or other BO/CE C During A 4
soil-stabilizing agent (approved by SCAQMD and Construction
RWQCB)daily to reduce PM10 emissions,in accordance
with SCAQMD Rule 403.
Frontage public streets shall be swept according to a CE C During A 4
schedule established by the City to reduce PM,o Construction
emissions associated with vehicle tracking of soil off-
site. Timing may vary depending upon the time of year
of construction.
Grading operations shall be suspended when wind BO/CE C During A 4
speeds exceed 25 mph to minimize PM10 emissions Construction
from the site during such episodes.
Chemical soil-stabilizers (approved by SCAQMD and BO/CE C During A 4
RWQCB) shall be applied to all inactive construction Construction
areas that remain inactive for 96 hours or more to
reduce PM,o emissions.
4of6
Mitigation Measures No.
Responsible Monitoring Timing of Method .
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance and Water Quality17
k < a a
_ .
The developer shall implement the Best Management CE B/C/D Review of Plans A/C 2/4
Practices (BMPs) identified in the Water Quality
Management Plan (WQMP) (Reiter Development,
December 2003). All BMPs shall be identified on the
Grading Plans for review and approval by the City
Engineer.
Structures to retain precipitation and runoff on-site shall CE B/C/D Review of Plans A/C 2/4
be integrated into the design of the project where
appropriate. Measures that may be used to minimize
runoff and to enhance infiltration include Dutch drains,
precast concrete lattice blocks and bricks, terraces,
diversions,runoff spreaders,seepage pits,and recharge
basins.
Prior to issuance of grading or paving permits, the CE B/C/D Review of Plans A/C 2/4
applicant shall submit to the City Engineer a Notice of
Intent(NOI)to comply with obtaining coverage underthe
National Pollutant Discharge Elimination System
(NPDES) General Construction Storm Water Permit
from the State Water Resources Control Board.
Evidence that this has been obtained(i.e.,a copy of the
Waste Dischargers Identification Number) shall be
submitted to the City Engineer for coverage under the
NPDES General Construction Permit.
Noise
Construction or grading shall not take place between the BO C During A 4
hours of 8:00 p.m. and 6:30 a.m. on weekdays, Construction —
including Saturday, or at any time on Sunday or a
national holiday.
5 of 6
Mitigation Measures No.
Responsible Monitoring Timing of Met hod of Verif ied Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance or grading noise levels shall not exceed the CP C During A 4
standards specified in Development Code Section Construction
17.02.120-D, as measured at the property line. The
developer shall hire a consultant to perform weekly
noise level monitoring as specified in Development
Code Section 17.02.120. Monitoring at other times may
be required by the Planning Division. Said consultant
shall report their findings to the Planning Division within
24.hours; however, if noise levels exceed the above
standards, then the consultant shall immediately notify
the Planning Division. If noise levels exceed the above
standards,then construction activities shall be reduced
in intensity to a level of compliance with above noise
standards or halted.
The perimeter block wall shall be constructed as early CP C During A 4
as possible in first phase. Construction
Key to Checklist Abbreviations
Responsible Person MonitoringIFrequericyi ` xx Methodof;Va�iflcatlon ; � „! Sanctions
CDD-CamurlyDe.eopnertDrecVordesgim A-WihEEchNevDwkprnert A-On-site Inspection 1-WdttnldReoadaboncfFrdMap
CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-WMinldGradngorRdJgPernd
CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-V4&hcl iCerdca18d0=4xmy
BO-Building Official or designee D-On Completion D-Separal--SlrrA poports/9Ldm/Ras) 4-Stop Work Order
PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds
FC-Fire Chief or designee 6-Revoke CUP
7-Citation
6 of 6
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT#: TENTATIVE PARCEL MAP SUBTPM16118
SUBJECT: SUBDIVISION OF 5.12 GROSS ACRES OF LAND INTO 6 PARCELS
APPLICANT: HENRY REITER
LOCATION: EAST SIDE OF CHARLES SMITH AVENUE, AT SAN MARINO STREET
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DIVISION,(909)477-2750, FOR COMPLIANCE
WITH THE FOLLOWING CONDITIONS:
Completion Date
A. General Requirements
1. The applicant shall agree to defend at his sole expense any action brought against the City, its --J_/_
agents,officers,or employees,because of the issuance of such approval,or in the alternative,to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or
employees, for any Court costs and attorneys fees which the City, its agents, officers, or
employees may be required by a court to pay as a result of such action. The City may,at its sole
discretion, participate at its own expense in the defense of any such action but such participation
shall not relieve applicant of his obligations under this condition.
B. Time Limits
1. This tentative tract map or tentative parcel map shall expire, unless extended by the Planning
Commission, unless a complete final map is filed with the City Engineer within 3 years from the
date of the approval.
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which include
site plans,architectural elevations,exterior materials and colors,landscaping,sign program,and
grading on file in the Planning Division,the conditions contained herein,and Development Code
regulations.
2. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.) or prior to final map approval in the case of a custom lot subdivision,or approved
use has commenced, whichever comes first.
SC-1-04 1
i:\planning\final\pingcomm\subtpml6ll8 conds 3-24.doc
Project No. SUBTPM16118
Completion Date
3. Approval of this request shall not waive compliance with all sections of the Development Code,all _/—/—
other applicable City Ordinances, and applicable Community or Specific Plans in effect at the
time of building permit issuance.
4. All parkways, open areas, and landscaping shall be permanently maintained by the property
owner, homeowners'association,or other means acceptable to the City. Proof of this landscape
maintenance shall be submitted for City Planner and City Engineer review and approved prior to
the issuance of building permits.
D. Landscaping
1. The final design of the perimeter parkways,walls,landscaping,and sidewalks shall be included in
the required required landscape plans and shall be subject to City Planner review and approval and
coordinated for consistency with any parkway landscaping plan which may be required by the
Engineering Division.
2. Special landscape features such as mounding, is required along Charles Smith Avenue. _J—/-
3. Landscaping and irrigation systems required to be installed within the public right-of-way on the
perimeter of this project area shall be continuously maintained by the developer.
4. On projects which abut the 1-15 Freeway, the developer shall provide landscaping within the ��—
freeway right-of-way along the boundary of this project or pay an in-lieu of construction cash
deposit. The landscape and irrigation plans shall be prepared in conformance with Caltrans and
City Standards through the City of Rancho Cucamonga. Plans shall be reviewed and approved
by the City Planner and City Engineer. Landscape and irrigation shall be installed prior to the
release of occupancy of the project. If final approvals and/or installation are not complete at that
time, the City will accept a cash deposit for future landscaping of the Caltrans right-of-way.
I
E. Environmental
1. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures,including monitoring and reporting. Applicant shall be required to
post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the
amount of $719.00 prior to the issuance of building permits, guaranteeing satisfactory
performance and completion of all mitigation measures. These funds may be used by the City to
retain consultants and/or pay for City staff time to monitor and report on the mitigation measures.
Failure to complete all actions required by the approved environmental documents shall be
considered grounds for forfeit.
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION,(909)477-2710, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
F. General Requirements
1. Submit five complete sets of plans including the following: —/—/—
a. Site/Plot Plan;
b. Foundation Plan;
C. Floor Plan;
d. Ceiling and Roof Framing Plan;
e. Electrical Plans(2 sets,detached) including the size of the main switch, number and size
of service entrance conductors, panel schedules, and single line diagrams;
SC-1-04
2
i:\planning\final\pingcomm\subtpm16118 conds 3-24.doc
Project No. SUBTPM16118
Completion Date
f. Plumbing and Sewer Plans, including isometrics,underground diagrams,water and waste
diagram, sewer or septic system location, fixture units, gas piping, and heating and air
conditioning; and
g. Planning Division Project Number(i.e., SUBTT#, SUBTPM#, DRC#) clearly identified on
the outside of all plans.
2. Submit two sets of structural calculations, energy conservation calculations, and a soils report.
Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal.
3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to
the City prior to permit issuance.
4. Separate permits are required for fencing and/or walls: ��-
5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the
Building and Safety Division.
G. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be
marked with the project file number(i.e.,SUBTPM16118/DRC2003-01038). The applicant shall
comply with the latest adopted California Codes,and all other applicable codes,ordinances,and
regulations in effect at the time of permit application. Contact the Building and Safety Division for
availability of the Code Adoption Ordinance and applicable handouts.
I
2. Prior to issuance of building permits for a new commercial or industrial development project or
major addition,the applicant shall pay development fees at the established rate. Such fees may
include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee,Transportation
Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program
deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to
the Building and Safety Division prior to permits issuance.
3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map
recordation and prior to issuance of building permits.
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday
through Saturday, with no construction on Sunday or holidays.
5. Construct trash enclosure(s) per City Standard (available at the Planning Division's public
counter).
H. New Structures
1. Provide compliance with the California Building Code (CBC) for property line clearances
considering use, area, and fire-resistiveness.
2. Provide compliance with the California Building Code for required occupancy separations.
3. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC
Section 1505.
4. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A
5. Upon tenant improvement plan check submittal, additional requirements may be needed.
SC-1-04
3
i:\planning\final\pingcomm\subtpm16118 conds 3-24.doc
Project No. SUBTPM16118
Completion Date
I. Grading
1. Grading of the subject property shall be in accordance with California Building Code,City Grading
Standards, and accepted grading practices. The final grading plan shall be in substantial
conformance with the approved grading plan.
2. A soils report shall be prepared by a qualified engineer licensed by the State of California to
perform such work.
3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the
time of application for grading plan check.
4. The final grading, appropriate certifications and compaction reports shall be completed,
submitted, and and approved by the Building and Safety Official prior to the issuance of building
permits.
5. A separate grading plan check submittal is required for all new construction projects and for
existing buildings buildings where improvements being proposed will generate 50 cubic yards or more of
combined cut and'fill. The grading plan shall be prepared,stamped, and signed by a Califomia
registered Civil Engineer.
APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
J. Dedication and Vehicular Access
1. Dedication shall be made of the following rights-of-way on the perimeter streets(measured from
street centerline):
33 Feet total feet on Charles Smith Avenue —/—/—
K. Street Improvements
1. Construct the following perimeter street improvements including, but not limited to:
Curb& A.C. Side- Drive Street Street Comm Median Bike
Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other
Charles Smith Avenue X (b) X X X X (e)
(f)
Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement
reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk
shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be
provided for this item. (e) Curbside drain outlets on each parcel. (f)Traffic signing and striping
as required.
2. Improvement Plans and Construction:
a. Street improvement plans, including street trees,street lights,and intersection safety lights
on future signal poles, and traffic signal plans shall be prepared by a registered Civil
Engineer and shall be submitted to and approved by the City Engineer. Security shall be
posted and an agreement executed to the satisfaction of the City Engineer and the City
Attorney guaranteeing completion of the public and/or private street improvements,prior to
final map approval or the issuance of building permits, whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a —/_/—
construction permit shall be obtained from the City Engineer's Office in addition to any
other permits required.
SC-1-04
4
i:\planning\final\pingcomm\subtpm16118 conds 3-24.doc
Project No. SUBTPM16118
Completion Date
C. Pavement striping,marking,traffic signing,street name signing,traffic signal conduit,and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction
project along major or secondary streets and at intersections for future traffic signals and
interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside
of BCR, ECR, or any other locations approved by the City Engineer
Notes:
1) Pull boxes shall be No.6 at intersections and No.5 along streets,a maximum of 200
feet apart, unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch galvanized steel with pull rope or as specified.
e. Handicapped access ramps shall be installed on all corners of intersections per City
Standards or as directed by the City Engineer.
f. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A cash
deposit shall be provided to cover the cost of grading and paving,which shall be refunded
upon completion of the construction to the satisfaction of the City Engineer.
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be
installed to City Standards, except for single family residential lots.
h. Street names shall be approved by the City Planner prior to submittal for first plan check.
3. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in _/_/_
accordance with the City's street tree program.
4. Install street trees per City street tree design guidelines and standards as follows. The completed
legend (box below) and construction notes shall appear on the title page of the street
improvement plans. Street improvement plans shall include a line item within the construction
legend stating: "Street trees shall be installed per the notes and legend on sheet 1." Where
public landscape plans are required, tree installation in those areas shall be per the public
landscape improvement plans.
The City Engineer reserves the right to adjust tree species based upon field conditions and other
variables. For additional information, contact the Project Engineer.
Min.Grow
Street Name Botanical Name Common Name Space Spacing Size Uty.
Charles Smith Ave. Brachychiton Bottle Tree 5 ft. 25 ft. 15 Fill-In
populineus O.C. gal.
Construction Notes for Street Trees:
1) All street trees are to be planted in accordance with City standard plans.
2) Prior to the commencement of any planting,an agronomic soils report shall be furnished to
the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil
amendments, as determined by the City inspector.
3) All street trees are subject to inspection and acceptance by the Engineering Division.
4) Street trees are to be planted per public improvement plans only.
L. Public Maintenance Areas
1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting
Districts shall be filed with the City Engineer prior to final map approval or issuance of building
permits whichever occurs first. Formation costs shall be borne by the developer.
SC-1-04
5
i:\planning\final\pingcomm\subtpm16118 conds 3-24Aoc
Project No. SUBTPM16118
Completion Date
M. Drainage and Flood Control
1. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the
property from adjacent areas.
N. Improvement Completion
1. If the required public improvements are not completed prior to approval of the final parcel map,
an improvement security accompanied by an agreement executed bythe Developer and the City
will be required for: Parcel Map SUBTPM16118.
O. Utilities
1. Provide separate utility services to each parcel including sanitary sewerage system,water,gas,
electric power, telephone, and cable TV (all underground) in accordance with the Utility
Standards. Easements shall be provided as required.
2. The developer shall be responsible for the relocation of existing utilities as necessary.
3. Water and sewer plans shall be designed and constructed to meet the requirements of the
Cucamonga County Water District(CCW D),Rancho Cucamonga Fire Protection District,and the
Environmental Health Department of the County of San Bernardino. A letter of compliance from
the CCW D is required prior to final map approval or issuance of permits,whichever occurs first.
Such letter must have been issued by the water district within 90 days prior to final map approval
in the case of subdivision or prior to the issuance of permits in the case of all other residential
projects.
i,
4. Approvals have not been secured from all utilities and other interested agencies involved.
Approval of the final parcel map will be subject to any requirements that may be received from
them.
P. General Requirements and Approvals
1. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all
new streetlights for the first six months of operation,prior to final map approval or prior to building
permit issuance if no map is involved.
2. Prior to the issuance of building permits,a Diversion Deposit and related administrative fees shall
be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if
at least 50% of all wastes generated during construction and demolition are diverted from
landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to
the Engineering Division when the first building permit application is submitted to Building and
Safety. Form CD-2 shall be submitted to the Engineering Division within 60 days following the
completion of the construction and/or demolition project.
APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, FIRE PROTECTION PLANNING
SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
SEE ATTACHED
SC-1-04
6
i:\planning\final\pingcomm�subtpm16118 conds 3-24.doc
RANCHO CUCAMONGA FIRE DISTRICT
STANDARD CONDITIONS
January 12, 2004
Charles Smith Industrial Park
E/S Charles Smith S/O San Marino
DRC2003-00881, DRC2003-01038 & SUBTPM16118
PLEASE PAY THE $82.00 FEE STILL DUE FOR DRC2003-00881
THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT
FSC-1 Public and Private Water Supply
1. Design guidelines for Fire Hydrants: The following provides design guidelines for the spacing and
location of fire hydrants:
a. The maximum distance between fire hydrants in commercial/industrial projects is 300-feet.
No portion of the exterior wall shall be located more than 150-feet from an approved fire
hydrant. For cul-de-sacs, the distance shall not exceed 100-feet.
b. Fire hydrants are to be located. The preferred locations for fire hydrants are:
1. At the entrance(s) to a commercial, industrial or residential project from the public
roadways.
2. At intersections.
3. On the right side of the street, whenever practical and possible.
4. As required by the Fire Safety Division to meet operational needs of the Fire District.
5. A minimum of forty-feet (40') from any building.
C. If any portion of a facility or building is located more than 150-feet from a public fire hydrant
measured on an approved route around the exterior of the facility or building, additional
private or public fire hydrants and mains capable of supplying the required fire flow shall be
provided.
d. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof.
FSC-2 Fire Flow
1. The required minimum fire flow for this project, when automatic fire sprinklers are installed is 1500
gallons per minute 20-pounds per square inch residual pressure. This flow reflects a 50-percent
reduction for the installation of an approved automatic fire sprinkler system in accordance with
NFPA 13 or 13R with central station monitoring. This requirement is made in accordance with the
California Fire Code Appendix III-A, as adopted by the Fire District Ordinances.
2. Public fire hydrants located within a 500-foot radius of the proposed project may be used to provide
the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent
property shall not be used to provide required fire flow.
RANCHO CUCAMONGA FIRE DISTRICT STANDARD CONDITIONS
DRC2003-00881, DRC2003-01038 & SUBTPM16118
Page 2
3. Water plans for the Fire supply mains and laterals are required for III projects that must extend the
existing water supply to or onto the site. Building permits will not be issued until these plans
are approved.
4. On all site plans to be submitted for review, show all fire hydrants located within 600-feet of the
proposed project site.
FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems
1. Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant shall submit
plans, specifications and calculations for the fire sprinkler system underground supply piping.
Approval of the underground supply piping system must be obtained prior to submitting the
overhead fire sprinkler system plans.
FSC-4 Requirement for an Automatic Fire Sprinkler Systems
Rancho Cucamonga Fire District Ordinance 15, the 2001 California Fire Code and/or any other
applicable standards require an approved automatic fire sprinkler system to be installed in:
1. Commercial or industrial structures greater than 7,500 square feet.
2. When the building access does not meet the requirements of the 2001 California Building Code
and the RCFPD Fire Department Access - Fire Lane Standard 9-7.
3. When required fire flow cannot be provided due to inadequate volume or pressure.
FSC-5 Fire Alarm System
1. When buildings are equipped with fire sprinklers and the head count exceeds 100 a fire alarm
system is required. Refer to the California Building Code, RCFPD Fire Alarm Standard #10-6
and/or the California Fire Code.
2. Prior to installation the building fire alarm system, Fire Construction Services' approval and a
building permit must be obtained. Plans and specifications shall be submitted to Fire Construction
Services in accordance with RCFPD Fire Alarm Standard #10-6.
FSC-6 Fire District Site Access
Fire District access roadways include public roads, streets and highways, as well as private roads,
streets drive aisles and/or designated fire lanes. Please reference the RCFPD Fire Department Access
— Fire Lanes Standard #F191.10.200.
1. Location of Access: All portions of the structures 1 s' story exterior wall shall be located within
150-feet of Fire District vehicle access, measure on an approved route around the exterior of the
building. Landscaped areas, unpaved changes in elevation, gates and fences are deemed
obstructions.
2
RANCHO CUCAMONGA FIRE DISTRICT STANDARD CONDITIONS
DRC2003-00881, DRC2003-01038 & SUBTPM16118
Page 3
2. Specifications for private Fire District access roadways per theIRCFPD Standards are:
a. The minimum unobstructed width is 26-feet.
b. The maximum inside turn radius shall be 24-feet.
C. The minimum outside turn radius shall be 50-feet.
d. The minimum radius for cul-de-sacs is 45-feet.
e. The minimum vertical clearance is 14-feet, 6-inches.
f. At any private entry median, the minimum width of traffic lanes shall be 20-feet on each side.
g. The angle of departure and approach shall not exceed 9-degrees or 20 percent.
h. The maximum grade of the driving surface shall not exceed.12%.
i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW).
j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a minimum of 14-
feet, 6-inches from the ground up. Vegetation shall not be allowed to obstruct Fire
Department apparatus.
3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be'provided.
as follows: i
a. In buildings without high-piled storage, access shall be provided in accordance with the 2001
California Building Code, Fire and/or any other applicable standards.
b. In buildings with high-piled storage access doors shall be provided in each 100 lineal feet or
major fraction thereof, of the exterior wall that faces the required access roadways. When
railways are installed provisions shall be made to maintain Fire District access to all required
openings.
4. Access Walkways: Hardscaped access walkways shall be provided from the fire apparatus
access road to all required building exterior openings.
5. CommerciabIndustrial Gates: Any gate installed across a Fire Department access road shall be
in accordance with Fire District Standard #9-2. The following design requirements apply:
a. The gate shall be motorized and slide open horizontally or swing inward.
b. All gates must open at the rate of one second for each one-foot of required width.
C. When fully open, the minimum width shall be 20-feet.
d. Gates are not required to be motorized.
6. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site plan
illustrating the proposed delineation that meets the minimum Fire District standards shall be
included in the architectural plans submitted to B&S for approval.
7. Approved Fire Department Access: Any approved mitigation measures must be clearly noted on
the site plan. A copy of the approved Alternative Method application, if applicable, must be
reproduced on the architectural plans submitted to B&S for plan review.
3
RANCHO CUCAMONGA FIRE DISTRICT STANDARD CONDITIONS
DRC2003-00881, DRC2003-01038 & SUBTPM16118
Page 4
FSC-10 Occupancy and Hazard Control Permits
Listed are those Fire Code permits commonly associated with the business operations and/or building
construction. Plan check submittal is required with the permit application for approval of the permit; field
inspection is required prior to permit issuance. General Use Permit shall be required for any activity or
operation not specifically described below, which in the judgment of the Fire Chief is likely to produce
conditions that may be hazardous to life or property.
• Aerosol Products Magnesium Working
• Application of Flammable Finishes Motor Vehicle Fuel-Dispensing Operation
• Automobile Wrecking Yards Open Burning
Battery Systems Organic Coating
• Candles and open flames in public assemblies Ovens
• Cellulose Nitrate Powder Coating
• Compressed Gases Public Assembly
• Cryogenics I Pyrotechnical Special Effects
• Dry Cleaning Plants Radioactive Materials
• Dust-Producing Processes and Operations Refrigeration Systems
• Explosive or Blasting Agents Repair Garages
• Flammable and Combustible Liquids Rubbish Handling Operations
• Fruit Ripening Plants Spraying or Dipping Operations
• Hazardous Materials Tents, Canopies and/or Air Supported
Structures
• High-Pile Combustible Storage (HPS) Tire Storage
• Liquefied Petroleum Gases Welding and Cutting Operations
• LPG or Gas Fuel Vehicles in Assembly Buildings Wood Products/Lumber Yards
FSC-11 Hazardous Materials — Submittal to the County of San Bernardino
The San Bernardino County Fire Department shall review your Business Emergency/Contingency Plan
for compliance with minimum standards. Contact the San Bernardino County Fire, Hazardous Materials
Division at (909) 387-4631 for forms and assistance. The County Fire Department is the CaVEPA
Certified Unified Program Agency (CUPA) for the City of Rancho Cucamonga.
1. If the facility is a NEW business, a Certificate of Occupancy issued by Building & Safety will not be
finalized until the San Bernardino County Fire Department reviews your Business
Emergency/Contingency Plan. California Government Code, Section 65850.2 prohibits the City
from issuing a final Certificate of Occupancy unless the applicant has met or is meeting specific
hazardous materials disclosure requirements. A Risk Management Program (RMP) may also be
required if regulation substances are to be used or stored at the new facility.
q
2. Any business that operates on rented or leased property which is required to submit a Plan, is also
required to submit a notice to the owner of the property in writing stating that the business is
subject to the Business Emergency/Contingency Plan mandates and has complied with the
provisions. The tenant must provide a copy of the Plan to the property owner within five (5)
working days, if requested by the owner.
4
RANCHO CUCAMONGA FIRE DISTRICT STANDARD CONDITIONS
DRC2003-00881; DRC2003-01038 & SUBTPM16118
Page 5
FSC-12 Hazardous Materials - Submittal to Fire Construction Services
Plans shall be submitted and approved prior to construction of buildings and/or the installation of
equipment designed to store, use or dispense hazardous materials in accordance with the 2001
California Building, Fire, Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances FD15 and FD39
and other implemented and/or adopted standards.
FSC-13 Alternate Method Application
Fire Construction Services staff and the Fire Marshal will review all requests for alternate method, when
submitted. The request must be submitted on the Fire District "Application for Alternate Method" form
along with supporting documents and payment of the $92 review fee.
Chronological Summary of RCFPD Standard Conditions
PRIOR TO ISSUANCE. OF BUILDING PERMITS — Please complete the following prior to the
issuance of any building permits:
1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans,
specifications, flow test data and calculations for the private water main system for review and
approval by the Fire District. Plans and installation shall comply with Fire District Standards.
Approval of the on-site (private) fire underground and water plans is required prior to any building
permit issuance for any structure on the site. Private on-site combination domestic and fire supply
system must be designed in accordance with RCFPD Standards # 9-4, #10-2 and #10-4. The
Building & Safety Division and Fire Construction Services will perform plan checks and inspections.
All private on-site fire hydrants shall be installed, flushed and operable prior to delivering any
combustible framing materials to the site. Fire construction Services will inspect the installation,
witness hydrant flushing and grant a clearance before lumber is dropped.
2. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the
locations of all new public fire hydrants for the review and approval by the Fire District and CCWD.
On the plan, show all existing fire hydrants within a 600-foot radius of the project. Please
reference the RCFPD Water Plan Submittal Procedure Standard # and #9-5.
All required public fire hydrants shall be installed, flushed and operable prior to delivering any
combustible framing materials to the site. CCWD personnel shall inspect the installation and
witness the hydrant flushing. Fire Construction Services shall inspect the site after acceptance of
the public water system by CCWD. Fire Construction Services must grant a clearance before
lumber is dropped.
3. Construction Access: The access roads must be paved in accordance with all the requirements
of the RCFPD Fire Lane Standard #9-7. All temporary utilities over access roads must be installed
at least 14' 6" above the finished surface of the road.
PRIOR TO THE RELEASE OF TEMPORARY POWER
The building construction must be substantially completed in accordance with Fire Construction Services'
"Temporary Power Release Checklist and Procedures".
5
RANCHO CUCAMONGA FIRE DISTRICT STANDARD CONDITIONS
DRC2003-00881, DRC2003-01038 & SUBTPM16118
Page 6
PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following:
1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire
hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga
Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers". On private property,
the markers shall be installed at the centerline of the fire access road, at each hydrant location.
2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in the
presence of Fire Construction Services, shall conduct a test of the most hydraulically remote on-
site fire hydrants. The underground fire line contractor; developer and/or owner are responsible for
hiring the company to perform the test. A final test report shall be submitted to Fire Construction
Services verifying the fire flow available. The fire flow available must meet or exceed the required
fire flow in accordance with the California Fire Code.
3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler
system(s) shall be tested and accepted by Fire Construction Services.
4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler
monitoring system must be tested and accepted by Fire Construction Services. The fire sdrinkler
monitoring system shall be installed, tested and operational immediately following the completion of
the fire sprinkler system (subject to the release of power).
5. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm system
shall be installed, inspected, tested and accepted by Fire Construction Services.
6. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular gates must
be inspected, tested and accepted in accordance with RCFPD Standards #9-1 or #9-2 by Fire
Construction Services.
7. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access
roadways must be installed in accordance with the approved plans and acceptable to Fire
Construction Services. The CC&R's, the reciprocal agreement and/or other approved documents
shall be recorded and contain an approved fire access roadway map with provisions that prohibit
parking, specify the method of enforcement and identifies who is responsible for the required
annual inspections and the maintenance of all required fire access roadways.
8. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and multi-
family buildings shall post the address with minimum 8-inch numbers on contrasting background,
visible from the street and electrically illuminated during periods of darkness. When the building
setback exceeds 200 feet from the public street, an additional non-illuminated 6-inch minimum
number address shall be provided at the property entrance. Larger address numbers will be
required on buildings located on wide streets or built with large setbacks in multi-tenant commercial
and industrial buildings. The suite designation numbers and/or letters shall be provided on the front
and back of all suites.
9. Hazardous Materials: Prior to the issuance of a Certificate of Occupancy, the applicant must
demonstrate (in writing from the County) that the facility has met or is meeting the Risk
Management Plan (RMP) or Business Emergency/Contingency Plan with the San Bernardino
6
RANCHO CUCAMONGA FIRE DISTRICT STANDARD CONDITIONS
DRC2003-00881, DRC2003-01038 & SUBTPM16118
Page 7
County Fire Department, Hazardous Materials/Emergency Response and Enforcement Division.
The applicant must also obtain inspection and acceptance by Fire Construction Services.
10. Confidential Business Occupancy Information: The applicant shall complete the Rancho
Cucamonga Fire District "Confidential Business Occupancy Information" form. This form provides
contact information for Fire District use in the event of an emergency at the subject building or
property. This form must be presented to the Fire Construction Services Inspector.
11.' Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, a 8 Yz" x 11" or 11" x 17"
site plan of the site in accordance with RCFPD Standard #13-1 shall be revised by the applicant to
reflect the actual location of all devices and building features as required in the standard. The site
plan must be reviewed and accepted by the Fire Inspector.
7