HomeMy WebLinkAbout04-38 - Resolutions RESOLUTION NO. 04-38 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT REVIEW DRC2003-00987, FOR THE DEVELOPMENT OF AN OFFICE BUILDING TOTALING 16,448 SQUARE FEET ON 1.2 ACRE OF LAND IN THE INDUSTRIAL PARK DISTRICT (SUBAREA 7), LOCATED AT THE NORTHEAST CORNER OF RED OAK AVENUE AND LAUREL STREET; AND MAKING FINDINGS IN SUPPORT THEREOF -APN: 0208-352-11. A. Recitals. 1. Oasis Commercial Development filed an application for approval of Development Review DRC2003-00987, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Development Review request is referred to as "the application." 2. On the 14th day of April 2004, the Planning Commission of the City of Rancho Cucamonga held a meeting to consider the application. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above referenced meeting on April 14,2004, including written and oral staff reports,this Commission hereby specifically finds as follows: a. The application applies to a vacant 1.2 acre parcel of land, located at the northeast comer of Red Oak Avenue and Laurel Street; and b. The properties to the north of the subject site are developed with a restaurant, coffee shop and fast food restaurant, and are zoned Industrial Park; the property to the south is vacant and is zoned Industrial Park; the property to the east is vacant and is zoned Industrial Park; the property to the west is vacant and presently has an application filed for the development of two office buildings; and C. The applicant is proposing to construct a two-story office building, which is a permitted use within the Industrial Park District; and d. The project, together with the recommended conditions of approval, complies with all minimum development standards for the City of Rancho Cucamonga; and e. The project will provide office facilities for a variety of professional offices and promote a high employment density, which is a land use goal of the Industrial Park District; and PLANNING COMMISSION RESOLUTION NO. 04-38 DRC2003-00987— OASIS COMMERCIAL DEVELOPMENT April 14, 2004 Page 2 f. The project design incorporates an exterior courtyard, covered outdoor employee eating area with a decorative wood trellis and the use of two primary materials on the exterior of the building, thereby meeting the design goals of the Industrial Park District by providing a high-level of architectural design and an outdoor pedestrian amenity. 3. Based upon the substantial evidence presented to this Commission during the above- referenced meeting, and upon the specific finding of facts set forth in paragraphs 1 and 2 above,this Commission hereby specifically finds and concludes as follows: a. That the proposed project is consistent with the objectives of the General Plan and Development Code; and b. That the proposed design is in accord with the objectives of the Development Code and the purposes of the district in which the site is located; and C. That the proposed design is in compliance with each of the applicable provisions of the Development Code; and d. That the proposed design, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. 4. Based upon the facts and information contained in the proposed Mitigated Negative Declaration, together with all written and oral reports included for the environmental assessment for the application, the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and Monitoring Program attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. That the Mitigated Negative Declaration has been prepared in compliance with the California Environmental Quality Act (CEQA) of 1970, as amended, and the State CEQA guidelines promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared therefore reflect the independent judgment of the Planning Commission; and, further, this Commission has reviewed and considered the information contained in said Mitigated Negative Declaration with regard to the application. b. Although the Mitigated Negative Declaration identifies certain significant environmental effects that will result if the project is approved, all significant effects have been reduced to an acceptable level by imposition of mitigation measures on the project,which are listed below as conditions of approval. C. Pursuant to the provisions of Section 753.5(c) of Title 14 of the California Code of Regulations, the Planning Commission finds as follows: In considering the record as a whole, the Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the proposed project will have potential for an adverse impact upon wildlife resources or the habitat upon which wildlife depends. Further, based upon the substantial evidence contained in the Mitigated Negative Declaration, the staff reports and exhibits, and the information provided to the Planning Commission during the meeting, the Planning Commission hereby rebuts the presumption of adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code of Regulations. PLANNING COMMISSION RESOLUTION NO. 04-38 DRC2003-00987—OASIS COMMERCIAL DEVELOPMENT April 14, 2004 Page 3 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. Planning Division 1) The columns at the balconies on the second floor shall be boxed out to match the supporting columns on the first floor. The boxed out columns shall extend to the bottom of the cornice. Brick should be added to the columns at all second floor balconies. 2) At the south elevation,west of the exit, the center plaster column shall be eliminated and the brick recess shall be deepened to a depth of 12 inches. 3) The brick band"arrowpoints"at the south and west elevations shall be eliminated. 4) The two large elements that house the stairwells at the south and west elevations shall be lowered to be only slightly above the roofline, and shall be redesigned with a two-tiered cap that matches the rest of the building. Final design shall be subject to City Planner review and approval. 5) Large member lumber sizes (8-inch by 8-inch posts, 8-inch by 10-inch beams, and 2-inch by 6-inch lattice), and beams with decorative ends shall be utilized at the employee outdoor eating area. Posts shall be placed on a 2-foot by 2-foot brick base that is a minimum of 4 feet high, and colored concrete with score lines shall be used in the employee outdoor eating area. 6) The courtyard at the primary entrance (north elevation) of the building shall be redesigned to include landscaping. Final design shall include large-size potted plants. 7) Colored concrete or 24-inch by 24-inch scored concrete shall be used in the first nine spaces in front of the buildings (carpool and handicap), and in the courtyard at the main entrance at the south elevation. 8) All outdoor furniture(tables, benches, trash receptacles, bollards, etc.) shall be uniform. 9) Outdoor furniture shall be provided in the outdoor employee eating area. 10) Decorative concrete pavers shall be provided at the entrance of the two drive aisles. Concrete pavers shall match the existing concrete pavers in the primary east-west drive aisle of the project. 11) All conditions from Tentative Parcel Map SUSTPM16487 shall apply. PLANNING COMMISSION RESOLUTION NO. 04-38 DRC2003-00987 —OASIS COMMERCIAL DEVELOPMENT April 14, 2004 Page 4 Engineering Division 1) Incorporate drain inserts, a Best Management Practice (BMP), (ID number MP-52) into the design and identify them on the Conceptual Grading Plan. Storm drain signage (number SD-13) shall also be installed. 2) Maintenance of BMPs identified in the Water Quality Management Plan (WQMP) shall be addressed in the project Covenants, Conditions, and Restrictions (CC&Rs). 3) The parkway, from one-foot behind the sidewalk to the top of curb,shall slope downward at a two percent grade. 4) Retaining walls, including their footings, shall not cross property lines unless evidence of permission from the neighboring owners is provided. 5) Prior to the issuance of building permits, a Diversion Deposit and related administrative fees shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at least 50 percent of all wastes generated during construction and demolition are diverted from landfills, and appropriate documentation is provided to the City. Form CD-1 shall be submitted to the Engineering Division when the first building permit application is submitted to Building and Safety. Form CD-2 shall be submitted to the Engineering Division within 60 days following the completion of the construction and/or demolition project. Environmental Mitigation Air Quality 1) All construction equipment shall be maintained in good operating condition so as to reduce operational emissions. The contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers' specifications. Maintenance records shall be available at the construction site for City verification. 2) Prior to the issuance of any grading permits, the developer shall submit construction plans to the City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low-emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD) as well as City Planning staff. 3) All paints and coatings shall meet or exceed performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high-volume, low-pressure spray. PLANNING COMMISSION RESOLUTION NO. 04-38 DRC2003-00987—OASIS COMMERCIAL DEVELOPMENT April 14, 2004 Page 5 4) All asphalt shall meet or exceed performance standards noted in SCAQMD Rule 1108. 5) All construction equipment shall comply with SCAQMD Rules 402 and 403. Additionally, contractors shall include the following provisions: • Reestablish ground cover on the construction site through seeding and watering. • Pave or apply gravel to any on-site haul roads. • Phase grading to prevent the susceptibility of large areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in accordance with local ordinances and use sound engineering practices. • Sweep streets according to a schedule established by the City if silt is carried over to adjacent public thoroughfares or occurs as a result of hauling. Timing may vary depending upon the time of year of construction. • Suspend grading operations during high winds(i.e.,wind speeds exceeding 25 miles per hour) in accordance with SCAQMD Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils haul trucks or cover payloads using tarps or other suitable means. 6) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and the Regional Water Quality Control Board [RWQCB]) daily to reduce Particulate Matter (PM10) emissions, in accordance with SCAQMD Rule 403. 7) Chemical soil-stabilizers(approved by SCAQMD and RWQCB)shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. 8) The construction contractor shall utilize electric or clean alternative fuel-powered equipment where feasible. 9) The construction contractor shall ensure that construction-grading plans include a statement that work crews will shut off equipment when not in use. 10) All industrial and commercial facilities shall post signs requiring that trucks shall not be left idling for prolonged periods(i.e., in excess of ten minutes). 11) All industrial and commercial facilities shall designate preferential parking for vanpools. PLANNING COMMISSION RESOLUTION NO. 04-38 DRC2003-00987—OASIS COMMERCIAL DEVELOPMENT April 14, 2004 Page 6 12) All industrial and commercial site tenants with 50 or more employees shall be required to post both bus and Metrolink schedules in conspicuous areas. 13) All industrial and commercial site tenants with 50 or more employees shall be required to configure their operating schedules around the Metrolink schedule to the extent reasonably feasible. 14) All residential and commercial structures shall be required to incorporate high-efficiency/low-polluting heating, air conditioning, appliances, and water heaters. 15) All residential and commercial structures shall be required to incorporate thermal pane windows and weather-stripping. Cultural Resources 1) If any prehistoric archaeological resources are encountered before or during grading, the developer will retain a qualified archaeologist to monitor construction activities,to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: • Enact interim measures to protect undesignated sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. • Consider establishing provisions to require incorporation of archaeological sites within new developments, using their special qualities as a theme or focal point. • Pursue educating the public about the area's archaeological heritage. • Propose mitigation measures and recommend conditions of approval to eliminate adverse project effects on significant, important, and unique prehistoric resources,following appropriate CEQA guidelines. • Prepare a technical resources management report, documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report, with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. 2) A qualified paleontologist shall conduct a preconstruction field survey of the project site. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures (i.e., paleontological monitoring) that may be appropriate. Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: PLANNING COMMISSION RESOLUTION NO. 04-38 DRC2003-00987—OASIS COMMERCIAL DEVELOPMENT April 14, 2004 Page 7 • Assign a paleontological monitor, trained and equipped to allow the rapid removal of fossils with minimal construction delay,to the site full-time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared or graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Submit summary report to City of Rancho Cucamonga. Transfer collected specimens with a copy of the report to San Bernardino County Museum. Geology and Soils 1) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and RWQCB) daily to reduce PMio emissions, in accordance with SCAQMD Rule 403. 2) Frontage public streets shall be swept according to a schedule established by the City to reduce PM10 emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon the time of year of construction. 3) Grading operations shall be suspended when wind speeds exceed 25 miles per hour to minimize PMio emissions from the site during such episodes. 4) Chemical soil-stabilizers(approved by SCAQMD and RWQCB)shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. Hydrology and Water Quality 1) Structures to retain precipitation and runoff on-site shall be integrated into the design of the project where appropriate. Measures that maybe used to minimize runoff and to enhance infiltration include Dutch drains, precast concrete lattice blocks and bricks, terraces, diversions, runoff spreaders, seepage pits, and recharge basins. 2) Storm Drain Signage (ID number SD-13) shall be indicated on the precise Grading Plan submitted for plan check. 3) Media Filters or (number MP-40) or Drain Inserts (MP-52) shall be indicated on the precise Grading Plan submitted for plan check. 4) The precise Grading Plan submitted for plan check shall include"Fact Sheets" from the California Stormwater BMP Handbook. 5) The precise Grading Plan submitted for plan check shall indicate in the Site Description that the project is in the Upper Santa Ana River PLANNING COMMISSION RESOLUTION NO. 04-38 DRC2003-00987—OASIS COMMERCIAL DEVELOPMENT April 14, 2004 Page 8 watershed and that known problems include the following contaminates: Salinity, total dissolved solids, nutrients, pathogens, and chlorides. 6) Prior to issuance of grading or paving permits, the applicant shall submit to the City Engineer a Notice of Intent (NO]) to comply with obtaining coverage under the NPDES General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Dischargers Identification Number) shall be submitted to the City Engineer for coverage under the NPDES General Construction Permit. Noise 1) Construction or grading shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. 2) Construction or grading noise levels shall not exceed the standards specified in Development Code Section 17.02.120-D, as measured at the property line. The developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Planning Division. The said consultant shall report their findings to the Planning Division within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Planning Division. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. 3) Haul truck deliveries shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips (counting both to and from the construction site), then the developer shall prepare a noise mitigation plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 14TH DAY OF APRIL 2004. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: !� 2— ^ Rich Macias, Chairman PLANNING COMMISSION RESOLUTION NO. 04-38 DRC2003-00987—OASIS COMMERCIAL DEVELOPMENT April 14, 2004 Page 9 AT7>4$MX 1, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 14th day of April 2004, by the following vote-to-wit: AYES: COMMISSIONERS: FLETCHER, MACIAS, McNIEL, STEWART NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: McPHA1L City of Rancho Cucamonga MITIGATION MONITORING PROGRAM Project File No.: Development Review DRC2003-00988 and Tentative Parcel Map SUBTPM16488. Related Files: Development Review DRC2003-00987 and Tentative Parcel Map SUBTPM16487. This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation measures identified in the Mitigated Negative Declaration forthe above-listed project. This program has been prepared in compliance with State law to ensure that adopted mitigation measures are implemented (Section 21081.6 of the Public Resources Code). Program Components - This MMP contains the following elements: 1. Conditions of approval that act as impact mitigation measures are recorded.with the action and the procedure necessary to ensure compliance. The mitigation measure conditions of approval are contained in the adopted Resolution of Approval for the project. 2. A procedure of compliance and verification has been outlined for each action necessary.This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported. 3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring progresses, changes to compliance procedures may be necessary based upon recommendations by those responsible for the program. Program Management - The MMP will be in place through all phases of the project. The project planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly and proper action is taken on each mitigation. Each City department shall ensure compliance of the conditions (mitigation) that relate to that department. Procedures -The following steps will be followed by the City of Rancho Cucamonga. 1. A fee covering all costs and expenses, including any consultants'fees, incurred by the City in performing monitoring or reporting programs shall be charged to the applicant. 2. A MMP Reporting Form will be prepared for each potentiallyk significant impact and its corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached hereto. This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported. All monitoring and reporting documentation will be kept in the project file with the department having the original authority for processing the project. Reports will be available from the City upon request at the following address: City of Rancho Cucamonga - Lead Agency Planning Division 10500 Civic Center Drive Rancho Cucamonga, CA 91730 DRC2003-00988 AND SUBTPM16488 OASIS COMMERCIAL DEVELOPMENT Page 2 3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed, as determined by the project planner or responsible City department, to monitor specific mitigation activities and provide appropriate written approvals to the project planner. 4. The project planner or responsible City department will approve, by signature and date, the completion of each action item that was identified on the MMP Reporting Form. After each measure is verified for compliance, no further action is required for the specific phase of development. 5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off as completed by the project planner or responsible City department at the bottom of the MMP Reporting Form. 6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation measures.The project planner is responsible for approving any such refinements or additions. An MMP Reporting Form will be completed by the project planner or responsible City department and a copy provided to the appropriate design, construction, or operational personnel. 7. The project planner or responsible City department has the authority to stop the work of construction contractors if compliance with any aspects of the MMP is not occurring after written notification has been issued.The project planner or responsible City department also has the authority to hold certificates of occupancies if compliance with a mitigation measure attached hereto is not occurring. The project planner or responsible City department has the authority to hold issuance of a business license until all mitigation measures are implemented. 8. Any conditions (mitigation) that require monitoring after project completion shall be the responsibility of the City of Rancho Cucamonga Planning Division.The Division shall require the applicant to post any necessary funds (or other forms of guarantee)with the City. These funds shall be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measure for the required period of time. 9. In those instances requiring long-term project monitoring, the applicant shall provide the City with a plan for monitoring the mitigation activities at the project site and reporting the monitoring results to the City. Said plan shall identify the reporter as an individual qualified to know whether the particular mitigation measure has been implemented. The monitoring/reporting plan shall conform to the City's MMP and shall be approved by the Community Development Director or City Planner prior to the issuance of building permits. MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III) Project File No.: Development Review DRC2003-00988 and Tentative Parcel Map SUBTPM16488 Related Files:, Development Review DRC2003-00987 and Tentative Parcel Map SUBTPM16487 Applicant: Oasis Commercial Development Initial Study Prepared by: Donald Granger, Assistant Planner Date: October 29. 2003 Mitigation Measures No. . . . - Monitoring Timing of Method . Implementing Action for Monitoring Frequency Verification Verification Date/Initials Non-Compliance Air Quality All construction equipment shall be maintained in good CP C Review of Plans A/C 2/4 operating condition so as to reduce operational emissions. Contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers'specifications. Maintenance records shall be available at the construction site for City verification. Prior to the issuance of any grading permits, developer CP/CE C Review of Plans C 2 shall submit construction plans to City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the SCAQMD as well as City Planning Staff. All paints and coatings shall meet or exceed CP C Review of Plans A/C 2/4 performance standards noted in South Coast Air Quality Management District(SCAQMD)Rule 1113. Paints and coatings shall be applied either by hand or high volume, low-pressure spray. All asphalt shall meet or exceed performance standards BO B Review of Plans A/C 2 noted in SCAQMD Rule 1108. All construction equipment shall comply with SCAQMD CE C Review of Plans A/C 2/4 Rules 402 and 403. Additionally, contractors shall include the following provisions: 1 of 7 Mitigation Measures No./ Responsible Monitoring Timing of Method of Verif ied Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance • Reestablish ground cover on the construction site CE C Review of Plans A/C 2/4 through seeding and watering. • Pave or apply gravel to any on-site haul roads. CE C Review of Plans A/C 2/4 • Phase grading to prevent the susceptibility of large CE C Review of Plans A/C 2/4 areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of CE C Review of Plans A/C 2/4 exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in CE C Review of Plans A 4 accordance with local ordinances and use sound engineerinq practices. • Sweep streets according to a schedule established CE C Review of Plans A 4 by the City if silt is carried over to adjacent public thoroughfares or occurs as a result of hauling. Timing may vary depending upon time of year of construction. • Suspend grading operations during high winds (i.e., BO/CE C During A 4 wind speeds exceeding 25 mph)in accordance with Construction Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils BO/CE C During A 4 haul trucks or cover payloads using tarps or other Construction suitable means. The site shall be treated with water or other soil- BO/CE C During A/C 4 stabilizing agent(approved by SCAQMD and RW QCB) Construction daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403. Chemical soil stabilizers (approved by SCAQMD and BO/CE C During A/C 4 Regional Water Quality Control Board [RWQCB]) shall Construction be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM,o emissions. The construction contractor shall utilize electric or clean CE C Review of Plans A/C 4 alternative fuel powered equipment where feasible. The construction contractor shall ensure that CE C Review of Plans A/C 2/4 construction-grading plans include a statement that work crews will shut off equipment when not in use. 2 of 7 Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for Implementing Action for Monitoring Frequency All industrial and commercial facilities shall post signs BO C Review of Plans A 4 requiring that trucks shall not be left idling for prolonged periods (i.e., in excess of 10 minutes). All industrial and commercial facilities shall designate CP C Review of Plans A/C 2/3 preferential parking for vanpools. All industrial and commercial site tenants with 50 or CP C Review of Plans D 2/3 more employees shall be required to post both bus and Metrolink schedules in conspicuous areas. All industrial and commercial site tenants with 50 or CP C Review of Plans D 2/3 more employees shall be required to configure their operating schedules around the Metrolink schedule to the extent reasonably feasible. All residential and commercial structures shall be BO C/D Review of Plans C 2/4 required to incorporate high efficiency/low polluting heating,air conditioning,appliances and water heaters. All residential and commercial structures shall be BO C/D Review of Plans C 2/4 required to incorporate thermal pane windows and weather-stripping. Cultural Resources If any prehistoric archaeological resources are encountered before or during grading,the developer will retain a qualified archaeologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: • Enact interim measures to protect undesignated CPBO C Review of A/D 3/4 sites from demolition or significant modification Report without an opportunity for the City to establish its archaeological value. • Consider establishing provisions to require CP/BO C Review of A/D 3/4 incorporation of archaeological sites within new Report developments, using their special qualities as a theme or focal point. • Pursue educating the public about the area's CP/BO C Review of A/D 3/4 archaeological heritage. Report 3 of 7 Mitigation Measures No./ g of Method . ActionImplementing Date/initials Non-Compliance • Propose mitigation measures and recommend CP/BO C Review of A/D 3/4 conditions of approval to eliminate adverse project Report effects on significant, important, and unique prehistoric resources, following appropriate CEQA guidelines. • Prepare a technical resources management report, CP C Review of A/D 3/4 documenting the inventory, evaluation, and Report proposed mitigation of resources within the project area. Submit one copy of the completed report,with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archivin . A qualified paleontologist shall conduct a preconstruction CP B Review of A/D 4 field survey of the project site. The paleontologist shall Report submit a report of findings that will also provide specific recommendations regarding further mitigation measures (i.e., paleontological monitoring) that may be appropriate. Where mitigation monitoring is appropriate, the program must include, but not be limited to, the followinq measures: • Assign a paleontological monitor, trained and CP B Review of A/D 4 equipped to allow the rapid removal of fossils with Report minimal construction delay, to the site full-time during the interval of earth-disturbing activities. Should fossils be found within an area being cleared BO B/C Review of A/D 4 or graded, divert earth-disturbing activities Report elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Submit summary report to City of Rancho CP D Review of D 3 Cucamonga. Transfer collected specimens with a Report copy of the report to San Bernardino County Museum. Geology and Soils The site shall be treated with water or other soil- BO/CE C During A 4 stabilizing agent(approved by SCAQMD and RWQCB) Construction daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403. 4 of 7 Mitigation Measures No. Responsible Monitoring Timing of of Verif led Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Frontage public streets shall be swept according to a CE C During A 4 schedule established by the City to reduce PM,o Construction emissions associated with vehicle tracking of soil off- site. Timing may vary depending upon time of year of construction. Grading operations shall be suspended when wind BO/CE C During A 4 speeds exceed 25 mph to minimize PM,o emissions Construction from the site during such episodes. Chemical soil stabilizers (approved by SCAQMD and BO/CE C During A 4 RWQCB) shall be applied to all inactive construction Construction areas that remain inactive for 96 hours or more to reduce PM,a emissions. Hydrology and Water Quality Structures to retain precipitation and runoff on-site shall CE B/C/D Review of Plans A/C 2/4 be integrated into the design of the project where appropriate. Measures that may be used to minimize runoff and to enhance infiltration include Dutch drains, precast concrete lattice blocks and bricks, terraces, diversions,runoff spreaders,seepage pits,and recharge basins. Storm Drain Signage (ID number SD-13) shall be CE B/C/D Review of Plans A/C 2/4 indicated on the precise Grading Plan submitted for plan check. Media Filters or (number MP-40) or Drain Inserts (MP- CE B/C/D Review of Plans A/C 2/4 52) shall be indicated on the precise Grading Plan submitted for plan check. The precise Grading Plan submitted for plan check shall CE B/C/D Review of Plans A/C 2/4 include "Fact Sheets" from the California Stormwater BMP Handbook. The precise Grading Plan submitted for plan check shall CE B/C/D Review of Plans A/C 2/4 indicate in the Site Description that the project is in the Upper Santa Ana River watershed and that known problems include the following contaminates: salinity, total dissolved solids, nutrients, pathogens and chlorides. 5 of 7 Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for Implementing Action Date/initials Non-Compliance Prior to issuance of grading or paving permits,applicant CE B/C/D Review of Plans A/C 2/4 shall submit to the City engineer a Notice of Intent(NO[) to comply with obtaining coverage under the National Pollutant Discharge Elimination System (NPDES) General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Discharger's Identification Number) shall be submitted to the City Engineer for coverage under the NPDES General Construction Permit. Noise Construction or grading shall not take place between the BO C During A 4 hours of 8:00 p.m. and 6:30 a.m. on weekdays, Construction including Saturday, or at any time on Sunday or a national holiday. Construction or grading noise levels shall not exceed the CP C During A 4 standards specified in Development Code Section Construction 17.02.120-D, as measured at the property line. Developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Planning Division. Said consultant shall report their findings to the Planning Division within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Planning Division. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. 6 of 7 Mitigation Measures No. Responsible Implementing Action for Monitoring Frequency Verification Verification Date/Initials Non-Compliance Haul truck deliveries shall not take place between the POW C During A 4/7 hours of 8:00 p.m. and 6:30 a.m. on weekdays, Construction including Saturday, or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips (counting both to and from the construction site),then the developer shall prepare a noise mitigation plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. Key to Checklist Abbreviations Responsible Person . - Monitoring Frequency Methotl of Ueriticatton :4 Sanctions{ y . CDD-Community Development Director or designee A-With Each New Development A-On-siteInspection1 -Withhold Recordation of Final Map CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order PO-Police Captain or designee E-Operating. 5-Retain Deposit or Bonds FC-Fire Chief or designee 6-Revoke CUP 7-Citation is\planning\final\cega\mmchklst-rev5-03final.doc 7 of 7 COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT#: DEVELOPMENT REVIEW DRC2003-00987 SUBJECT: OFFICE BUILDING APPLICANT: OASIS COMMERCIAL DEVELOPMENT LOCATION: NORTHEAST CORNER OF RED OAK AVENUE AND LAUREL STREET ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACTTHE PLANNING DIVISION,(909)477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: Completion Date A. General Requirements 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents,officers,or employees,because of the issuance of such approval,or in the alternative,to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may,at its sole discretion,participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Copies of the signed Planning Commission Resolution of Approval No. 04-38, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s)are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. B. Time Limits 1. Development/Design Review approval shall expire if building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans,architectural elevations,exterior materials and colors,landscaping,sign program,and grading on file in the Planning Division,the conditions contained herein,and Development Code regulations. 2. Prior to any use of the project site or business activity being commenced thereon,all Conditions of Approval shall be completed to the satisfaction of the City Planner. SC-1-04 1 i:\planning\final\pingoomm\drr2003-00987 conds 4-14.doc Project No. DRC2003-00987 Completion Date 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and _/_/_ State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Division to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for City Planner review and approval prior to the issuance of building permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.)or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code,all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 7. A detailed on-site lighting plan, including a photometric diagram,shall be reviewed and approved by the City Planner and Police Department(477-2800) prior to the issuance of building permits. Such plan shall indicate style,illumination, location, height, and method of shielding so as not to adversely affect adjacent properties. 8. Trash receptacle(s)are required and shall meet City standards. The final design,locations,and the number of trash receptacles shall be subject to City Planner review and approval prior to the issuance of building permits. 9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls,berming, and/or landscaping to the satisfaction of the City Planner. For single- family residential developments, transformers shall be placed in underground vaults. 10. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination. 11. Where rock cobble is used, it shall be real river rock. Other stone veneers may be manufactured products. D. Building Design 1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections, shall be shielded from view and the sound buffered from adjacent properties and streets as required by the Planning Division. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the City Planner. Details shall be included in building plans. 2. For commercial and industrial projects, paint roll-up doors and service doors to match main building colors. E. Parking and Vehicular Access (indicate details on building plans) 1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet wide. 2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall contain a 12-inch walk adjacent to the parking stall (including curb). SC-1-04 2 i:\planningNfinal\pingcomm\dre2003-00987 conds 4-14.doc Project No. DRC2003-00987 Completion Date 3. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided throughout the development to connect dwellings/units/buildings with open spaces/plazas/ recreational uses. 4. All parking spaces shall be double striped per City standards and all driveway aisles,entrances, and exits shall be striped per City standards. 5. Handicap accessible stalls shall be provided for commercial and office facilities with 25 or more parking stalls. Designate two percent or one stall; whichever is greater, of the total number of stalls for use by the handicapped. 6. Motorcycle parking area shall be provided for commercial and office facilities with 25 or more parking stalls. Developments with over 100 parking stalls shall provide motorcycle parking at the rate of one percent. The area for motorcycle parking shall be a minimum of 56 square feet. F. Trip Reduction 1. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily residential projects of more than 10 units. Minimum spaces equal to five percent of the required automobile parking spaces or three bicycle storage spaces,whichever is greater. After the first 50 bicycle storage spaces are provided, additional storage spaces required are 2.5 percent of the required automobile parking spaces. Warehouse distribution uses shall provide bicycle storage spaces at a rate of 2.5 percent of the required automobile parking spaces with a minimum of a 3-bike rack. In no case shall the total number of bicycle parking spaces required exceed 100. Where this results in a fraction of 0.5 or greater, the number shall be rounded off to the higher whole number. 2. Carpool and vanpool designated off-street parking close to the building shall be provided for commercial, office, and industrial facilities at the rate of 10 percent of the total parking area. If covered, the vertical clearance shall be no less than 9 feet. 3. For industrial projects with at least 40 car parking spaces, bicyclist-changing facilities shall be provided to encourage bicycle commuting. Accessible restrooms with storage lockers for clothing and equipment shall be sufficient. G. Landscaping 1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for City Planner review and approval prior to the issuance of building permits or prior final map approval in the case of a custom lot subdivision. 2. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within commercial and office projects, shall be specimen size trees - 24-inch box or larger. 3. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking stalls. 4. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one tree per 30 linear feet of building. 5. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope, but less than 2:1 slope,shall be,at minimum, irrigated and landscaped with appropriate ground cover for erosion control. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 6. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater slope shall be landscaped and irrigated for erosion control and to soften their appearance as follows: one 15-gallon or larger size tree per each 150 sq.ft.of slope area, 1-gallon or larger size SC-1-04 3 i:\planning\final\pingcomm\dre2003-00987 conds 4-14.doc Project No. DRC2003-00987 Completion Date shrub per each 100 sq.ft.of slope area,and appropriate ground cover. In addition,slope banks in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in staggered clusters to soften and vary slope plane. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 7. For multi-family residential and non-residential development,property owners are responsible for the continual maintenance of all landscaped areas on-site,as well as contiguous planted areas within the public right-of-way. All landscaped areas shall be kept free from weeds and debris and maintained in healthy and thriving condition,and shall receive regular pruning,fertilizing,mowing, and trimming. Any damaged,dead,diseased,or decaying plant material shall be replaced within 30 days from the date of damage. 8. The final design of the perimeter parkways,walls,landscaping,and sidewalks shall be included in the required landscape plans and shall be subject to City Planner review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Division. 9. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 10. All walls shall be provided with decorative treatment. If located in public maintenance areas,the design shall be coordinated with the Engineering Division. 11. Landscaping and irrigation shall be designed to conserve water through the principles of Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code. H. Signs 1. The signs indicated on the submitted plans are conceptual only and not a part of this approval. Any signs proposed for this development shall comply with the Sign Ordinance and shall require separate application and approval by the Planning Division prior to installation of any signs. 2. A Uniform Sign Program for this development shall be submitted for City Planner review and approval prior to issuance of building permits. I. Environmental 1. Mitigation measures are required for the project. The applicant is responsible for the cost of implementing said measures, including monitoring and reporting. Applicant shall be required to post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the amount of $719.00 prior to the issuance of building permits, guaranteeing satisfactory performance and completion of all mitigation measures. These funds maybe used bythe Cityto retain consultants and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete all actions required by the approved environmental documents shall be considered grounds for forfeit. J. Other Agencies 1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location of mailboxes. Multi-family residential developments shall provide a solid overhead structure for mailboxes with adequate lighting. The final location of the mailboxes and the design of the overhead structure shall be subject to City Planner review and approval prior to the issuance of building permits. SC-1-04 4 i:\planning\finaKpingcomm\dre2003-00987 conds 4-14.doc Project No. DRC2003-00987 Completion Date APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION, (909)477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S) K. General Requirements 1. Submit five complete sets of plans including the following: —/—/— a. Site/Plot Plan; b. Foundation Plan; C. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans(2 sets, detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; f. Plumbing and Sewer Plans, including isometrics,underground diagrams,water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Division Project Number(i.e.,SUBTT#, SUBTPM#, DRC#)clearly identified on the outside of all plans. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet"signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to the City prior to permit issuance. 4. Separate permits are required for fencing and/or walls. —/—/- 5. Business shall not open for operation prior to posting the Certificate of Occupancy issued bythe _/_/_ Building and Safety Division. L. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number(i.e., DRC2003-00987). The applicant shall comply with the latest adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Division for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new commercial or industrial development project or major addition,the applicant shall pay development fees at the established rate. Such fees may include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Division prior to permits issuance. 3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map _/_/_ recordation and prior to issuance of building permits. 4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday _/_/_ through Saturday, with no construction on Sunday or holidays. SC-1-04 5 i:\planning\final\pingcomm\dre2003-00987 conds 4-14.doc Project No. DRC2003-00987 Completion Date 5. Construct trash enclosure(s) per City Standard (available at the Planning Division's public counter). M. New Structures 1. Provide compliance with the California Building Code (CBC) for property line clearances considering use, area, and fire-resistiveness. 2. Provide compliance with the California Building Code for required occupancy separations. 3. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC Section 1505. 4. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A 5. Openings in exterior walls shall be protected in accordance with CBC Table 5-A. 6. Upon tenant improvement plan check submittal, additional requirements may be needed. N. Grading 1. Grading of the subject property shall be in accordance with California Building Code,City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to _/_/_ perform such work. 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the time of application for grading plan check. 4. The final grading, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 5. A separate grading plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The grading plan shall be prepared, stamped,and signed by a California registered Civil Engineer. APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: O. Dedication and Vehicular Access 1. Corner property line cutoffs shall be dedicated per City Standards. 2. Reciprocal access easements shall be provided ensuring access to all parcels by CC&Rs or by deeds and shall be recorded concurrently with the map or prior to the issuance of building permits, where no map is involved. P. Street Improvements 1. All public improvements(interior streets,drainage facilities,community trails,paseos,landscaped areas, etc.) shown on the plans and/or tentative map shall be constructed to City Standards. Interior street improvements shall include, but are not limited to,curb and gutter,AC pavement, drive approaches, sidewalks, street lights, and street trees. SC-1-04 6 i:\planning\finalWngcomm\dre2003-00987 conds 4-14.doc Project No. DRC2003-00987 Completion Date 2. Pursuant to City Council Resolution No.88-557,no person shall make connections from a source of energy,fuel or power to any building service equipment which is regulated by technical codes and for which a permit is required unless, in addition to any and all other codes,regulations and ordinances, all improvements required by these conditions of development approval have been completed and accepted by the City Council, except:that in developments containing more than one building or unit, the development may have energy connections made to a percentage of those buildings, or units proportionate to the completion of improvements as required by conditions of approval of development. In no case shall more than 95 percent of the buildings or units be connected to energy prior to completion and acceptance of all improvements required by these conditions of approval of development. 3. Construct the following perimeter street improvements including, but not limited to: Curb& A.C. Side- Drive Street Street Comm Median Bike Street Name Gutter Pvmt walk Appr. I Lights Trees Trail Island Trail Other LAUREL STREET (c) X X RED OAK AVENUE X X X (e) (f) Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be provided for this item. (e) ADA access ramp. (f) Curbside drain. 4. Improvement Plans and Construction: a. Street improvement plans, including street trees,street lights,and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements,prior to final map approval or the issuance of building permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the City Engineer's Office in addition to any other permits required. C. Pavement striping, marking,traffic signing,street name signing,traffic signal conduit,and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer Notes: 1) Pull boxes shall be No.6 at intersections and No.5 along streets,a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2) Conduit shall be 3-inch galvanized steel with pull rope or as specified. e. Handicapped access ramps shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving,which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. SC-1-04 7 i:\planning\finai\pingcomm\dre2003-00987 conds 4-14.doc Project No. DRC2003-00987 Completion Date g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single family residential lots. h. Street names shall be approved by the City Planner prior to submittal for first plan check. 5. Install street trees per City street tree design guidelines and standards as follows. The completed legend (box below) and construction notes shall appear on the title page of the street improvement plans. Street improvement plans shall include a line item within the construction legend stating: "Street trees shall be installed per the notes and legend on sheet—(typically sheet 1)." Where public landscape plans are required, tree installation in those areas shall be per the public landscape improvement plans. The City Engineer reserves the right to adjust tree species based upon field conditions and other variables. For additional information, contact the Project Engineer. Min. Grow Street Name Botanical Name Common Name Space Spacing Size City. Laurel Street Pyrus calleryana NCN 3 ft. 20 ft. 15 gal Fill-In O.C. Red Oak Avenue Platanus acerifolia London Plane Tree 8 ft. 30 ft. 15 gal P.A. 8 feet or O.C. greater Construction Notes for Street Trees: 1) All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting,an agronomic soils report shall be furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector. 3) All street trees are subject to inspection and acceptance by the Engineering Division. 4) Street trees are to be planted per public improvement plans only. Q. Public Maintenance Areas 1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the City Engineer prior to final map approval or issuance of building permits whichever occurs first. Formation costs shall be borne by the developer. R. Utilities 1. The developer shall be responsible for the relocation of existing utilities as necessary. 2. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga County Water District(CCW D), Rancho Cucamonga Fire Protection District,and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CCW D is required prior to final map approval or issuance of permits,whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. S. General Requirements and Approvals 1. An easement for a joint use driveway shall be provided prior to final map approval or issuance of building permits, whichever occurs first, for: Driveways to the north and northwest. 2. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all new streetlights for the first six months of operation, prior to final map approval or prior to building permit issuance if no map is involved. SC-1-04 8 i:\planning\finaKpingcomm\dre2003-00987 conds 4-14.doc Project No. DRC2003-00987 Completion Date APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: T. Security Lighting 1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power. These areas should be lighted from sunset to sunrise and on photo sensored cell. 2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with direct lighting to be provided by all entryways. Lighting shall be consistent around the entire development. 3. Lighting in exterior areas shall be in vandal-resistant fixtures. _/_/_ U. Security Hardware 1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within 40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used. V. Building Numbering 1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime visibility. 2. Developer shall paint roof top numbers on one or more roofs of this development. They shall be a minimum of three feet in length and two feet in width and of contrasting color to background. The stencils for this purpose are on loan at the Rancho Cucamonga Police Department. 3. All developments shall submit an 8 /2"x 11"sheet with the numbering pattern of all multi-tenant developments to the Police Department. APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, FIRE PROTECTION PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED SC-1-04 9 i:\planning\final\pingcomm\dre2003-00987 conds 4-14.doc RANCHO CUCAMONGA FIRE DISTRICT STANDARD CONDITIONS DRC2003-00987 & Oasis Commercial PROJECT/FILE #: SUBTPM16487 APPLICANT NAME: Development PROJECT NAME: Laurel/Red Oak Office OCCUPANCY CLASS: B LOCATION: Laurel and Red Oak FLOOR AREA: 16,648sgft DATE: March 11, 2004 TYPE CONSTRUCTION: V-N PLAN TYPE: Office building FD REVIEW BY: Moises Eskenazi THE FOLLOWING STANDARD CONDITIONS APPLY TO YOUR PROJECT during the course of development Please note that building permits will not be issued until the on-site and off-site water(fire)plans are approved by CCWD and RCFPD. RANCHO CUCAMONGA FIRE DISTRICT- STANDARD CONDITIONS & REQUIREMENTS. FSC-1 General Requirements for Public and Private Water Supply 1. General Guidance for Fire Hydrants: The following provides general guidance for the spacing and location of fire hydrants. Remember these are the maximum permitted distances between fire hydrants: a. The maximum distance between fire hydrants in commercial/industrial projects is 300-feet. No portion of the exterior wall shall be located more than 150-feet from an approved fire hydrant. For cul-de-sacs the distance shall not exceed 100-feet. b. Fire hydrants are to be located: 1. At the entrance(s) to a project from the existing public roadways. This includes subdivisions and industrial parks. 2. At intersections. 3. On the right side of the street, whenever practical and possible. 4. As required by the Fire Safety Division to meet operational needs. 5. The location of fire hydrants is based upon the operational needs of the Fire District to control a fire. 6. Fire hydrants shall be located a minimum of 40 feet from any building. 2. Minimum Fire Flow with Automatic Fire Sprinklers: The required minimum fire flow for this project is 1750gallons per minute at a minimum residual pressure of 20 pounds per square inch. This flow reflects a 50 percent reduction for the installation of an approved automatic fire sprinkler system with central station monitoring. This requirement is made in accordance with Fire Code Appendix III-A, as amended, and Fire District Ordinances and Standards. 3. Hydrants Used to Supply Fire Flow: Public fire hydrants located within a 500-foot radius of the proposed project may be used to provide the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent property shall not be used to provide required fire flow. DRC2003-00987 & SUBTPM16487 Page 1 of 5 4. Show Existing Fire Hydrants and Mains: Existing fire hydrants and mains within 600-feet of the project shall be shown on the water plan submitted for review and approval. Include main size. FSC-2 Private (On-Site) Water and/or Fire Sprinkler Underground Plans for Fire Protection 1. Exceeds Allowable Distance: When any portion of a facility or building is located more than 150-feet from a fire hydrant located on a public street, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains capable of supplying the required fire flow shall be provided. The distance is measured as vehicular path of travel on access roadways, not line of sight. 2. Number of Fire Hydrants: Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof, subject to standard spacing and distribution requirements. 3. Fire Sprinkler Underground: Prior to the issuance of a fire sprinkler system permit, the applicant shall submit construction plans, specifications, and calculations for the fire sprinkler system underground to the Fire Safety Division for approval. Contact the Fire Construction Services(909)477-2713 FSC-4 Fire District Site Access-Technical Comments 1. Access Roadways Defined: Fire District access roadways include public roads, streets, and highways, as well as private roads, streets, drive aisles and designated fire lanes. 2. Location of Access: All portions of the structure or facility or any portion of the exterior wall of the first story shall be located within 150-feet of Fire District vehicle access, measured by an unobstructed approved route around the exterior of the building. Landscaped areas, unpaved changes in elevation, gates, and fences are an obstruction. 3. Private Roadways and Fire Lanes: The minimum specifications for private fire district access roadways are: a. The minimum unobstructed width is 26-feet. b. The inside turn radius shall be 20-feet. c. The outside turn radius shall be not less than 46-feet. d. The minimum radius for cul-de-sacs is 45-feet. e. The minimum vertical clearance is 14 feet, 6 inches. t. At any private entry median,the minimum width of traffic lanes shall be 20-feet. g. The angle of departure and approach shall not exceed 9 degrees or 20 percent. h. The maximum grade of the driving surface shall not exceed 12%. i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW). 4. Access Walkways: Approved access walkways shall be provided from the fire apparatus access road to all required building exterior openings. 5. Vegetation: Trees and shrubs planted in any median shall be kept trimmed to a minimum of 14-feet, 6- inches from the ground up, so as not to impede fire vehicles. 6. Fire Lane Identification: All required red curbing and signage shall identify fire lanes. A drawing of the proposed signage that meets the minimum Fire District standards shall be submitted to and approved. FCS-5 Fire code permit that may be required on your project. 1. General Use Permit shall be required for any activity or operation not specifically described below, which in the judgment of the Fire Chief is likely to produce conditions that may be hazardous to life or ro ert . DRC2003-00987& SUBTPM16487 Page 2 of 5 2. Operate a place of public assembly. FSC-6 Plan Submittal Required Notice Required plans shall be submitted and approved prior to construction in accordance with 2000/2001 Building, Fire, Mechanical, and Plumbing Codes; 1999 Electrical Code; Health and Safety Code; Public Resources Code; and RCFPD Ordinances FD15 and FD39, Guidelines and Standards. NOTE: In addition to the fees due at this time please note that separate plan check fees for tenant improvements,fire protection systems and/or any consultant reviews will be assessed at time of submittal of plans. FSC-7 Alternate Materials and Methods The Fire Safety Division will review requests for alternate materials and methods within the scope of our authority. The request must be submitted on the Fire District"Application for Alternate Method"form along with supporting documents. Contact the Fire Safety Division at(909) 477-2770 for assistance. PRIOR TO (PARCEL) MAP RECORDATION- For Each Development Phase 1. Prior to the recordation of the applicable subdivision map,the Fire District in consultation with the City Engineer shall approve the locations of Traffic Signal Preemption Devices. The subdivider shall enter into an agreement with the City for the installation of traffic signal preemption equipment for the surrounding controlled intersections. 2. Reciprocal Access Agreement: The plans as submitted indicate that a required point of Fire District access: a. Requires passage on property not under the control of the applicant; or b. Does not access a public way; or c. Crosses a property line Please provide a permanent access agreement granting irrevocable use of the adjacent property for use by the Fire District to gain access to the subject property. The agreement shall include a statement that no obstruction, gate, fence, building, or other structure shall be placed within the dedicated access. The recorded agreement shall include a copy of the site plan required below. The agreement shall be recorded with the County of San Bernardino, Recorders Office. The Fire Safety Division prior to recordation shall approve the agreement. To assist the Fire Safety Division in reviewing the agreement the following shall be included in the submittal: a. Title Report. A current title report, policy of title insurance, or other equivalent documentation proving ownership of all property included in the agreement. b. Legal Description. A legal description of all property subject to the agreement. c. Assessor's Parcel Numbers. The assessor's parcel numbers of each parcel subject to the agreement. d. Site Plan: The access roadway shall comply with the requirements of Private Roadways and Fire Lanes listed above. A scaled site plan showing the path of the Fire District access, the width, turn radii, load-bearing capacity of roadway surface, etc. shall be provided. Contact the Fire Construction Services 909 477-2713 DRC2003-00987 & SUBTPM16487 Page 3 of 5 3. Reciprocal Water Covenant and Agreement: The plans as submitted indicate that a required private fire mains or appurtenances thereto: a. Pass through or are located on property not under the control of the applicant; or 4 b. Crosses a property line Please provide a permanent maintenance and service agreement between the owner's granting a non- exclusive easement for the purpose of accessing and maintaining the private water mains, fire hydrants, and built-in fire protection systems. The agreement shall meet the form and content approved by the Rancho Cucamonga Fire District, Fire Safety Division. The agreement shall be recorded with the County of San Bernardino, Recorders Office. The Fire Safety Division prior to recordation shall approve the agreement. . PRIOR TO ISSUANCE OF BUILDING PERMITS- Complete the following: 1. Private/On-site Fire Hydrants: Prior to the issuance of any building permit,the applicant shall submit construction plans, specifications, flow test data and calculations for the private water main system for review and approval by the Fire District. Plans and installation shall comply with Fire District standards. Contac the Fire Safety Division for a copy of"Fire District Notes for Underground and Water Plans." 2. Private Fire Hydrants/On-site Installation: All private on-site fire hydrants shall be installed, flushed, and operable prior to delivering any combustible building materials on-site (i.e., lumber, roofing materials, etc.). A representative of Fire Construction Services shall inspect the installation and witness hydrant flushing. The builder/developer shall submit final test and inspection report to the Fire Safety Division. 3. Public Fire Hydrants: Prior to issuance of any building permit,the applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and the Water District. On the plan show all existing fire hydrants within a 600-foot radius of the project. 4. Public Installation: All required public fire hydrants shall be installed, flushed, and operable prior to delivering any combustible building materials on-site (i.e., lumber, roofing materials, etc.). Water District personnel shall inspect the installation and witness hydrant flushing. The builder/developer shall submit a copy of the Water District inspection report to the Fire Safety Division. Contact Water District to schedule testing. PRIOR TO OCCUPANCY OR FINAL INSPECTION- Complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with Rancho Cucamonga Fire Protection District and City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers." On private property these markers are to be maintained in good condition by the property owner. Contact Building and Safety/Fire Construction Services (909) 477-2713. 2. Private Fire Hydrants- Final Acceptance: For the purpose of final acceptance, an additional test of the on-site fire hydrants shall be conducted by the builder/developer in the presence of the Water District or Fire Construction Services, as appropriate. The builder/developer shall submit the final test report to the Fire Safety Division. 3. Fire Sprinkler System- Plans and Permit: Plans for the required automatic fire sprinkler system shall be submitted to Fire Construction Services for review and approval. No work is allowed without a Fire Construction Services permit. Contact Building and Safety/Fire Construction Services (909) 477-2713. 4. Fire Sprinkler System- Final Inspection: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler system(s) shall be tested and accepted by Fire Construction Services. Contact Building and Safety/Fire Construction Services (909) 477-2713. DRC2003-00987 & SUBTPM16487 Page 4 of 5 5. Sprinkler Monitoring: The fire sprinkler system monitoring system shall be installed, tested, and operational immediately following the completion of the fire sprinkler system. Monitoring is required with 20 sprinklers in Group I Occupancies, or 100 or more sprinklers in all other Occupancies. Contact Building and Safety/Fire Construction Services (909) 477-2713. 6. Fire Suppression System: Plans and specifications for the fire suppression system for the protection of commercial-type cooking equipment or other special hazard shall be submitted to Fire Construction Services for review and approval. No work is allowed without a Fire Construction Services permit. Contact Building and Safety/Fire Construction Services 909 477-2713. 7. Fire Alarm System: Plans for the fire alarm system shall be submitted to Fire Construction Services for review and approval. No work is allowed without a Fire District permit. Contact Building and Safety/Fire Construction Services (909) 477-2713. 8. Access ControUrraffic Calming Device Permit: A Fire District permit is required to install any access control device, traffic-calming device,or gate on any access roadway. Applicable CC&R's,or other approved documents,shall contain provisions that prohibit obstructions such as traffic-calming devices (speed bumps, humps, etc.),control gates, bollards, or other modifications in fire lanes or access roadways without prior written approval of the Fire District, Fire Safety Division 9. Knox Rapid Entry System: A Knox rapid entry key vault shall be installed prior to final inspection. Proof of purchase shall be submitted prior to final building plan approval. Contact the Fire Safety Division for specific details and ordering information. Contact Building and Safety/Fire Construction Services (909) 477-2713 for inspection. 10. Construction Access: Fire District access, a minimum 26-feet in width and 14-feet, 6-inches minimum clear height shall be provided. These minimum clearances shall be maintained free and clear of any obstructions at all times, in accordance with Fire District Standards. Contact the Fire Safety Division (909)477-2770 11. Phased Construction: Each phase shall be provided with approved Fire District access roadways. Dead-end roadways shall not exceed the maximum permitted by the Fire Code or Fire District standards. 12. Fire Lanes: Prior to the issuance of any Certificate of Occupancy,the fire lanes shall be installed in accordance with the approved fire lane plan. The CC&R's or other approved documents shall contain an approved fire lane map and provisions that prohibit parking in the fire lanes. The method of enforcement shall be documented. The CC&R's shall also identify who is responsible for not less than annual inspection and maintenance of all required fire lanes. Contact Building and Safety/Fire Construction Services (909) 477-2713. 13, Address-Other Than Single-family: New buildings other than single-family dwellings shall post the address with minimum 8-inch numbers on contrasting background,visible from the street and electrically illuminated during periods of darkness. When the building setback exceeds 200 feet from the public street an additional non-illuminated 6-inch minimum number address shall be provided at the property entrance. Contact Building and Safety/Fire Construction Services (909) 477-2713. 14. Fire Suppression Systems-Final Inspection and Testing: Prior to the issuance of a Certificate of Occupancy,the fire suppression system(s) shall be tested and accepted by Fire Service Construction Services. 15. Fire Alarm System-Final Inspection and Testing: Prior to the issuance of a Certificate of Occupancy, the Fire sprinkler Monitoring alarm system shall be tested and accepted by Fire Construction Services. 16. Fire District Confidential Business Occupancy Information: The applicant shall complete the Rancho Cucamonga Fire District "Confidential Business Occupancy Information" Form and submit to the Fire Safety Division. This form provides contact information for Fire District use in the event of an emergency at the subject building or property. DRC2003-00987 & SUBTPM16487 Page 5 of 5