Loading...
HomeMy WebLinkAbout04-47 - Resolutions RESOLUTION NO. 04-47 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING TENTATIVE TRACT MAP SUBTT16648,A PROPOSED SUBDIVISION OF 8 LOTS; 7 LOTS FOR SINGLE-FAMILY RESIDENTIAL ON 1.64 ACRES, AND 1 PARCEL OF 6.13 ACRES FOR PURPOSES OF DEVELOPING A SELF-STORAGE FACILITY, IN THE LOW RESIDENTIAL DISTRICT(2-4 DWELLING UNITS PERACRE), LOCATED AT THE SOUTHEAST CORNER OF HAVEN AVENUE AND THE EASTBOUND 210-FREEWAY ON-RAMP; AND MAKING FINDINGS IN SUPPORT THEREOF—APN: 1076-331-02 AND 1076-341-01. A. Recitals. 1. Charles Joseph Associates filed an application on behalf of Aim All Storage for the approval of Tentative Tract Map SUBTT16648, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Tentative Tract Map request is referred to as "the application." 2. On the 28th day of April 2004, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved bythe Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above referenced public hearing on April 28, 2004, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a. The application applies to property located at the southeast comer of Haven Avenue and the eastbound 210-Freeway on-ramp, with a street frontage of approximately 440 feet along Heather Street, and a street frontage of approximately 590 feet along Haven Avenue. The site includes curb, gutter and sidewalk improvements along Haven Avenue,and is otherwise unimproved vacant property; and b. The property to the north of the subject site is the 210-Freeway,the property to the south of the proposed storage facility is proposed to be subdivided by Tentative Tract Map SUBTT16648 into seven lots for single-family detached homes, and the property to the east consists of existing single-family homes; and C. The tentative map contains seven lots for single-family residential purposes (1.64 acres), and one parcel intended for a public storage facility (6.14 acres); and PLANNING COMMISSION RESOLUTION NO. 04-47 SUBTT16648—CHARLES JOSEPH ASSOCIATES—AIM ALL STORAGE April 28, 2004 Page 2 d. The proposed project is subject to noise levels exceeding 65 CNEL along Haven Avenue, which can be mitigated to acceptable levels as described in the Noise Study prepared for the project; and e. The project is consistent with the General Plan Land Use Designation of Low Residential, with a proposed residential density of 4 dwelling units per acre; and f. The proposed project of seven lots for single-family residential development, and one lot for a proposed public storage facility, is in accordance with the objectives of the Development Code and the purposes of the Low Residential District; and g. The proposed project conforms to the standards and regulations of the Development Code in terms of setbacks, building separation, and parking, as noted in the Staff Report; and h. The proposed project and the intended uses, together with all Conditions of Approval will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. The project proponents are required to complete all missing parkway improvements adjacent to the site. 3. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing and upon the specific findings of facts set forth in paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. That the tentative tract is consistent with the General Plan and Development Code; and b. The design or improvements of the tentative tract is consistent with the General Plan and the Development Code; and C. The site is physically suitable for the type of development proposed; and d. The design of the subdivision is not likely to cause substantial environmental damage and avoidable injury to humans and wildlife or their habitat; and e. The tentative tract is not likely to cause serious public health problems; and f. The design of the tentative tract will not conflict with any easement acquired by the public at large, now of record, for access through or use of the property within the proposed subdivision. 4. Based upon the facts and information contained in the proposed Mitigated Negative Declaration, together with all written and oral reports included for the environmental assessment for the application, the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and Monitoring Program attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. That the Mitigated Negative Declaration has been prepared in compliance with the California Environmental Quality Act(CEQA) of 1970, as amended, and the State CEQA guidelines promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared PLANNING COMMISSION RESOLUTION NO. 04-47 SUBTT16648 —CHARLES JOSEPH ASSOCIATES—AIM ALL STORAGE April 28, 2004 Page 3 therefore reflect the independent judgment of the Planning Commission; and, further, this Commission has reviewed and considered the information contained in said Mitigated Negative Declaration with regard to the application. b. Although the Mitigated Negative Declaration identifies certain significant environmental effects that will result if the project is approved, all significant effects have been reduced to an acceptable level by the imposition of mitigation measures on the project, which are listed below as Conditions of Approval. C. Pursuant to the provisions of Section 753.5(c) of Title 14 of the California Code of Regulations, the Planning Commission finds as follows: In considering the record as a whole, the Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the proposed project will have potential for an adverse impact upon wildlife resources orthe habitat upon which wildlife depends. Further, based upon the substantial evidence contained in the Mitigated Negative Declaration, the staff reports and exhibits, and the information provided to the Planning Commission during the public hearing, the Planning Commission hereby rebuts the presumption of adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code of Regulations. 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. Planning Division 1) The development of the seven single-family lots will require a subsequent Development Review application. 2) The future development of these lots will require landscaping in excess of the standard City slope planting requirements along the rear boundary of the lots, in order to provide adequate screening and buffering of the future residents for the building wall of the public storage facility. Engineering Division 1) Haven Avenue frontage improvements to be in accordance with City "Major Divided Arterial" standards, including but not limited to the following: a) Provide curb, gutter, sidewalk, and streetlights as required. b) There shall be no additional openings in the Haven Avenue median. c) Install access ramps for pedestrians to cross the 210-Freeway on-ramp. d) Protect existing 210-Freeway on-ramp traffic signal and equipment, or relocate/replace as required. PLANNING COMMISSION RESOLUTION NO. 04-47 SUBTT16648 —CHARLES JOSEPH ASSOCIATES—AIM ALL STORAGE April 28, 2004 Page 4 e) Protect signage, striping and R26"No Stopping"signs, or replace as required. 2) Parkway landscaping behind Lots 6 and 7 shall be included in the Landscape Maintenance District. The parkway landscaping allowing the public storage facility shall be privately maintained. 3) Sidewalks shall cross drive approaches at the zero curb face. Provide additional public right-of-way as needed. 4) Parkways shall slope at two percent from the top of curb to 1-foot behind the sidewalk along all street frontages. 5) Heather Street frontage improvements to be in accordance with City "Local Residential"standards, including but not limited to the following: a) Provide curb and gutter, and property line adjacent sidewalk, as required. b) Provide 5800 Lumen HPSV streetlights, as required. c) Street trees and drive approaches shall be installed upon development. 6) The irrevocable offer of dedication per Parcel Map 7237 shall be abandoned prior to the issuance of building permits. 7) The existing overhead utilities (telecommunications and electrical, except for the 66kv electrical)on the project side of Haven Avenue shall be undergrounded along the entire project frontage of both Lots 6 and 7 of the tentative tract map, as well as Lot 8 of the tentative tract map, which is the site intended for the public storage facility. Undergrounding shall extend to the first pole off—site (south), prior to public improvement acceptance or occupancy, whichever occurs first. All services crossing Haven Avenue shall be undergrounded at the same time. The developer may request a reimbursement agreement to recover one-half the City adopted cost for undergrounding from future development (or redevelopment) as it occurs on the opposite side of the street. If the developer fails to submit for said reimbursement agreement within six months of the public improvements being accepted by the City, all rights of the developer to reimbursement shall terminate. 8) On-site drainage facilities shall be designed for Q100, to the satisfaction of the City Engineer, prior to the issuance of grading permits. Overflows for the commercial site shall not impact the single-family residential lots. 9) According to the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) Panel 7890, a portion of subject PLANNING COMMISSION RESOLUTION NO. 04-47 SUBTT16648—CHARLES JOSEPH ASSOCIATES —AIM ALL STORAGE April 28, 2004 Page 5 property along Haven Avenue is within Flood Zone W. It is possible that sufficient flood protection has been provided with the construction of the 210-Freeway and the Master Plan Storm Drain in Haven Avenue. However, the current Flood Zone 'A' designation remains. The developer shall apply the construction standards outlined in paragraph 19.12.051 of Ordinance 6569 to all new construction within Flood Zone 'A,' or process a revision to the FIRM directly through FEMA. 10) The Best Management Practices (BMPs) identified in the Water Quality Management Plan (WQMP) shall be shown on the Grading Plan to the satisfaction of the City Engineer. Environmental Mitigation Air Quality 1) All construction equipment shall be maintained in good operating condition so as to reduce operational emissions. The contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers' specifications. Maintenance records shall be available at the construction site for City verification. 2) Prior to the issuance of any grading permits, the developer shall submit construction plans to the City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD), as well as City Planning staff. 3) All paints and coatings shall meet or exceed performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high volume, low-pressure spray. 4) All asphalt shall meet or exceed performance standards noted in SCAQMD Rule 1108. 5) All construction equipment shall comply with SCAQMD Rules 402 and 403. Additionally, contractors shall include the following provisions: • Reestablish ground cover on the construction site through seeding and watering. • Pave or apply gravel to any on-site haul roads. • Phase grading to prevent the susceptibility of large areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of exposed excavated soil during and after the end of work periods. PLANNING COMMISSION RESOLUTION NO. 04-47 SUBTT16648— CHARLES JOSEPH ASSOCIATES—AIM ALL STORAGE April 28, 2004 Page 6 • Dispose of surplus excavated material in accordance with local ordinances and use sound engineering practices. • Sweep streets according to a schedule established by the City if silt is carried over to adjacent public thoroughfares or occurs as a result of hauling. Timing may vary depending upon the time of year of construction. • Suspend grading operations during high winds(i.e.,wind speeds exceeding 25 miles per hour) in accordance with SCAQMD Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils haul trucks or cover payloads using tarps or other suitable means. 6) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and Regional Water Quality Control Board [RWQCB]) daily to reduce Particulate Matter (PM1a) emissions, in accordance with SCAQMD Rule 403. 7) Chemical soil-stabilizers(approved by SCAQMD and RWQCB)shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. 8) The construction contractor shall utilize electric or clean alternative fuel-powered equipment where feasible. 9) The construction contractor shall ensure that construction-grading plans include a statement that work crews will shut off equipment when not in use. 10) The public storage facility shall post signs requiring that trucks shall not be left idling for prolonged periods (i.e., in excess of 10 minutes). 11) All residential and commercial structures shall be required to incorporate high-efficiency/low-polluting heating, air conditioning, appliances, and water heaters. 12) All residential and commercial structures shall be required to incorporate thermal pane windows and weather-stripping. Cultural Resources 1) If any prehistoric archaeological resources are encountered before or during grading, the developer will retain a qualified archaeologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: PLANNING COMMISSION RESOLUTION NO. 04-47 SUBTT16648 —CHARLES JOSEPH ASSOCIATES—AIM ALL STORAGE April 28, 2004 Page 7 • Enact interim measures to protect undesignated sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. • Consider establishing provisions to require incorporation of archaeological sites within new developments, using their special qualities as a theme or focal point. • Pursue educating the public about the area's archaeological heritage. • Propose mitigation measures and recommend conditions of approval to eliminate adverse project effects on significant, important, and unique prehistoric resources,following appropriate CEQA guidelines. • Prepare a technical resources management report, documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. 2) A qualified paleontologist shall conduct a pre-construction field survey of the project site. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures (i.e., paleontological monitoring) that may be appropriate. Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: • Assign a paleontological monitor, trained and equipped to allow the rapid removal of fossils with minimal construction delay,to the site full-time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared or graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Submit a summary report to the City of Rancho Cucamonga. Transfer collected specimens with a copy of the report to the San Bernardino County Museum. Geology and Soils 1) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and RWQCB) daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403. 2) Frontage public streets shall be swept according to a schedule established by the City to reduce PM10 emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon the time of year of construction. PLANNING COMMISSION RESOLUTION NO. 04-47 SUBTT16648 —CHARLES JOSEPH ASSOCIATES—AIM ALL STORAGE April 28, 2004 Page 8 3) Grading operations shall be suspended when wind speeds exceed 25 miles per hour to minimize PM10 emissions from the site during such episodes. 4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB)shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. Hydrology and Water Quality 1) Structures to retain precipitation and runoff on-site shall be integrated into the design of the project where appropriate. Measures that may be used to minimize runoff and to enhance infiltration include Dutch drains, precast concrete lattice blocks and bricks, terraces, diversions, runoff spreaders, seepage pits, and recharge basins. 2) Prior to issuance of building permits, the applicant shall submit to the City Engineer for approval of a WQMP, including a project description and identifying BMPs that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The WQMP shall identify the structural and non-structural measures consistent with the Guidelines for New Development and Redevelopment adopted by the City of Rancho Cucamonga June 2000. 3) Prior to issuance of grading or paving permits, the applicant shall submit to the City Engineer a Notice of Intent (NOI) to comply with obtaining coverage under the National Pollutant Discharge Elimination System (NPDES) General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Discharger's Identification Number) shall be submitted to the City Engineer for coverage under the NPDES General Construction Permit. Noise Tentative Tract Map SUBTT16648 - Lots 6 and 7: 1) A barrier with a minimum height of 6 feet shall be constructed at the top of slope adjacent to Haven Avenue, and at the south property line of Lot 7. The barrier should be a continuous structure (without gaps for drainage), and shall be constructed of a material with a surface density of at least 4 pounds per square foot. 2) All glazing assemblies used at the residential lots shall be well fixed and well weather-stripped. In addition, sound rated doors and windows may be required at Lots 6 and 7 for compliance with the interior noise standard. The actual Sound Transmission Class (STC) ratings that will be required for the doors and windows shall be determined as part of the final acoustical report prepared for the residential construction. PLANNING COMMISSION RESOLUTION NO. 04-47 SUBTT16648 —CHARLES JOSEPH ASSOCIATES —AIM ALL STORAGE April 28, 2004 Page 9 3) The interior noise standard is to be met with windows and doors closed. Therefore, ventilation is needed in order to provide a habitable environment. Any fresh air intake ducts or other openings (such as mail slots or vents) should be oriented away from Haven Avenue. All ducts should incorporate at least 6 feet of flexible fiberglass ducting and at least one 90-degree bend. Wall-mounted air conditioners should not be used. 4) The roof system should have a minimum 1/2-inch plywood sheathing that is well sealed to form a continuous barrier to the noise. Minimum R-19 insulation batts shall be placed in the joist space. 5) Exterior walls shall be constructed with gypsum wallboard interior, 7/8-inch stucco exterior, with minimum R-11 insulation batts between the studs. All joints shall be well fitted and/or caulked to form an airtight seal. 6) The front entry doors shall be well weather-stripped solid core assemblies at least 1 3/4-inch thick. The weather stripping around the entire perimeter of the doors shall consist of neoprene bulb gaskets that are compressed when the doors are closed to form an airtight seal. A wooden or aluminum astragal with the neoprene bulb gaskets should be used at double leaf doors to ensure an airtight seal. 7) Attic vents at Lots 6 and 7 should be oriented away from Haven Avenue. If such an orientation cannot be avoided, then an acoustic baffle should be placed in the attic space behind the vent. 8) A qualified acoustical consultant shall review the final design of the project to verify compliance with the City Noise Standards. All Construction Activities 1) Construction or grading shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. 2) Construction or grading noise levels shall not exceed the standards specified in Development Code Section 17.02.120-D, as measured at the property line. The developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Planning Division. Said consultant shall report their findings to the Planning Division within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Planning Division. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. PLANNING COMMISSION RESOLUTION NO. 04-47 SUBTT16648 —CHARLES JOSEPH ASSOCIATES —AIM ALL STORAGE April 28, 2004 Page 10 3) The perimeter wall shall be constructed as early as possible in first phase. 4) Haul truck deliveries shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips (counting both to and from the construction site), then the developer shall prepare a noise mitigation plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 28TH DAY OF APRIL 2004. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: Z/ l/' Rich Macias, Chairman ATTEST: Brad 50e—r, Secre I, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 28th day of April 2004, by the following vote-to-wit: AYES: COMMISSIONERS: FLETCHER, MACIAS, McPHAIL, STEWART NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: McNIEL City of Rancho Cucamonga MITIGATION MONITORING PROGRAM Project File No.: Tentative Tract Map SUBTT16648 and Conditional Use Permit DRC2003-00850 This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation measures identified in the Mitigated Negative Declaration for the above-listed project. This program has been prepared in compliance with State law to ensure that adopted mitigation measures are implemented (Section 21081.6 of the Public Resources Code). Program Components -This MMP contains the following elements: 1. Conditions of approval that act as impact mitigation measures are recorded with the action and the procedure necessary to ensure compliance.The mitigation measure conditions of approval are contained in the adopted Resolution of Approval for the project. 2. A procedure of compliance and verification has been outlined for each action necessary. This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported. 3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring progresses, changes to compliance procedures may be necessary based upon recommendations by those responsible for the program. Program Management - The MMP will be in place through all phases of the project. The project planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly and proper action is taken on each mitigation. Each City department shall ensure compliance of the conditions (mitigation) that relate to that department. Procedures - The following steps will be followed by the City of Rancho Cucamonga. 1. A fee covering all costs and expenses, including any consultants'fees, incurred by the City in performing monitoring or reporting programs shall be charged to the applicant. 2. A MMP Reporting Form will be prepared for each potentially significant impact and its corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached hereto. This procedure designates who will take action,what action will be taken and when,and to whom and when compliance will be reported. All monitoring and reporting documentation will be kept in the project file with the department having the original authority for processing the project. Reports will be available from the City upon request at the following address: City of Rancho Cucamonga - Lead Agency Planning Division 10500 Civic Center Drive Rancho Cucamonga, CA 91730 MITIGATION MONITORING PROGRAM SUBTT16648 AND DRC2003-00850 Page 2 3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,as determined by the project planner or responsible City department,to monitor specific mitigation activities and provide appropriate written approvals to the project planner. 4. The project planner or responsible City department will approve, by signature and,date, the completion of each action item that was identified on the MMP Reporting Form. After each measure is verified for compliance, no further action is required for the specific phase of development. 5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off as completed by the project planner or responsible City department at the bottom of the MMP Reporting Form. 6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation measures. The project planner is responsible for approving any such refinements or additions. An MMP Reporting Form will be completed by the project planner or responsible City department and a copy provided to the appropriate design, construction, or operational personnel. 7. The project planner or responsible City department has the authority to stop the work of construction contractors if compliance with any aspects of the MMP is not occurring after written notification has been issued. The project planner or responsible City department also has the authority to hold certificates of occupancies if compliance with a mitigation measure attached hereto is not occurring.The project planner or responsible City department has the authority to hold issuance of a business license until all mitigation measures are implemented. 8. Any conditions (mitigation) that require monitoring after project completion shall be the responsibility of the City of Rancho Cucamonga Planning Division.The Division shall require the applicant to post any necessary funds (or other forms of guarantee)with the City. These funds shall be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measure for the required period of time. 9. In those instances requiring long-term project monitoring, the applicant shall provide the City with a plan for monitoring the mitigation activities at the project site and reporting the monitoring results to the City. Said plan shall identify the reporter as an individual qualified to know whether the particular mitigation measure has been implemented. The monitoring/reporting plan shall conform to the City's MMP and shall be approved by the Community Development Director or City Planner prior to the issuance of building permits. MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART ill) Project File No.: DRC2003-00850 AND SUBTT16648 Applicant: Charles Joseph Assoc./Aim All Storage Initial Study Prepared by: Debra Meier Date: March 9. 2004 Non- Implementing • Compliance Air Quality All construction equipment shall be maintained in good CP C Review of plans A/C _ 2/4 operating condition so as to reduce operational emissions. The contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers' specifications. Maintenance records shall be available at the construction site for City verification. Prior to the issuance of any grading permits, the CP/CE C Review of plans C 2 developer shall submit construction plans to the City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD) as well as City Planning staff. All paints and coatings shall meet or exceed CP C Review of plans A/C 2/4 performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high volume, low-pressure spray. All asphalt shall meet or exceed performance standards BO B Review of plans A/C 2 noted in SCAQMD Rule 1108. All construction equipment shall comply with SCAQMD CE C Review of plans A/C 2/4 Rules 402 and 403. Additionally, contractors shall include the following provisions: • Reestablish ground cover on the construction site CE C Review of plans A/C 2/4 through seeding and watering. 1 of 9 Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Date Sanctions for Non- Implementing Action for Monitoring Frequency Verification Verification /Initials Compliance • Pave or apply gravel to any on-site haul roads. CE C Review of plans A/C 2/4 • Phase grading to prevent the susceptibility of CE C Review of plans A/C 2/4 large areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of CE C Review of plans A/C 2/4 exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in CE C Review of plans A 4 accordance with local ordinances and use sound engineering ractices. • Sweep streets according to a schedule CE C During A q established by the City if silt is carried over to construction adjacent public thoroughfares or occurs as a result of hauling. Timing may vary depending upon the time of year of construction. • Suspend grading operations during high winds BO/CE C During A 4 (i.e., wind speeds exceeding 25 mph) in construction accordance with Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on BO/CE C During A q soils haul trucks or cover payloads using tarps or Construction other suitable means.. The site shall be treated with water or other soil- BO/CE C During A 4 stabilizing agent (approved by SCAQMD and Regional construction Water Quality Control Board[RWQCB])daily to reduce PM10 emissions,in accordance with SCAQMD Rule 403. Chemical soil-stabilizers (approved by SCAQMD and BO/CE C During A 4 RWQCB) shall be applied to all inactive construction construction areas that remain inactive for 96 hours or more to reduce PM,o emissions The construction contractor shall utilize electric or clean CE C Review of plans A/C 4 alternative fuel-powered equipment where feasible. The construction contractor shall ensure that CE C Review of plans A/C 2/4 construction grading plans include a statement that work crews will shut off equipment when not in use. The public storage facility shall post signs requiring that BO C Review of plans A 4 trucks shall not be left idling for prolonged periods(i.e., in excess of 10 minutes). 2 of 9 Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Date Sanctions for Non- Implementing Action for Monitoring Frequency Verification Verification /Initials Compliance All residential and commercial structures shall be BO C/D Review of plans C 2/4 required to incorporate high-efficiency/low-polluting heating,air conditioning,appliances,and water heaters. All residential and commercial structures shall be BO C/D Review of plans C 2/4 required to incorporate thermal pane windows and weather-stripping. Cultural Resources If any prehistoric archaeological resources are encountered before or during grading,the developer will retain a qualified archaeologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: • Enact interim measures to protect undesignated CP/BO C Review of report A/D 3/4 sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. • Consider establishing provisions to require CP/BO C Review of report A/D 3/4 incorporation of archaeological sites within new developments, using their special qualities as a theme or focal point. • Pursue educating the public about the area's CP/BO C Review of report A/D 3/4 archaeological heritage. • Propose mitigation measures and recommend CP/BO C Review of report A/D 3/4 conditions of approval to eliminate adverse project effects on significant, important, and unique prehistoric resources, following appropriate CEQA guidelines. • Prepare a technical resources management CP C Review of report A/D 3/4 report,documenting the inventory,evaluation,and proposed mitigation of resources within the project area. Submit one copy of the completed report with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. 3 of 9 Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Date Sanctions for Non- Implementing Action for Monitoring Frequency Verification Verification /Initials Compliance A qualified paleontologist shall conduct a preconstruction CP B Review of report A/D 4 field survey of the project site. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures (i.e., paleontological monitoring) that may be appropriate. Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: • Assign a paleontological monitor, trained and CP B Review of report A/D 4 equipped to allow the rapid removal of fossils with minimal construction delay, to the site full-time during the interval of earth-disturbing activities. • Should fossils be found within an area being BO B/C Review of report A/D 4 cleared or graded,divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Submit a summary report to the City of Rancho CP D Review of report D 3 Cucamonga. Transfer collected specimens with a copy of the report to the San Bernardino County Museum. Geology and Soils The site shall be treated with water or other soil- BO/CE C During A 4 stabilizing agent (approved by SCAQMD and RWQCB) construction daily to reduce PM,o emissions, in accordance with SCAQMD Rule 403. Frontage public streets shall be swept according to a CE C During A 4 schedule established by the City to reduce PM,o construction emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon the time of year of construction. Grading operations shall be suspended when wind BO/CE C During A 4 speeds exceed 25 mph to minimize PM,a emissions construction from the site during such episodes. 4 of 9 Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Date Sanctions for Non- Implementing Action for Monitoring Frequency Verification Verification Anitials Compliance Chemical soil-stabilizers (approved by SCAQMD and BO/CE C During A 4 RWQCB) shall be applied to all inactive construction construction areas that remain inactive for 96 hours or more to reduce PMIO emissions. Hydrology and Water Quality Structures to retain precipitation and runoff on-site shall CE B/C/D Review of plans A/C 2/4 be integrated into the design of the project where appropriate. Measures that may be used to minimize runoff and to enhance infiltration include Dutch drains, precast concrete lattice blocks and bricks, terraces, diversions, runoff spreaders,seepage pits,and recharge basins. Prior to issuance of building permits,the applicant shall CE B/C/D Review of plans A/C 2/4 submit to the City Engineer for approval of a Water Quality Management Plan (WQMP), including a project description and identifying Best Management Practices (BMPs)that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The WOMP shall identify the structural and non-structural measures consistent with the Guidelines for New Development and Redevelopment adopted by the City of Rancho Cucamonga June 2000. Prior to issuance of grading or paving permits, the CE BIC/D Review of plans A/C 2/4 applicant shall submit to the City Engineer a Notice of Intent(NOI)to comply with obtaining coverage under the National Pollutant Discharge Elimination System (NPDES) General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained(i.e.,a copy of the Waste Discharger's Identification Number) shall be submitted to the City Engineer for coverage under the NPDES General Construction Permit. 5of9 Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Date Sanctions for Non- Implementing Action for Monitoring Frequency Verification Verification /initials Compliance Noise x PUBLIC STORAGE FACILITY/MANAGERS UNIT Barriers with a minimum of 6%2 feet shall be constructed CPBO A/D Review of Plans C/D 2 around the perimeter of the second-floor decks. The barriers shall be continuous structures and shall be constructed of a material with a surface density of at least 4 pounds per square foot. All glazing assemblies used throughout the manager's apartment shall be well fitted and weather-stripped. In addition, sound-rzted doors and windows shall be required for compliance with the interior noise standard. The following table identifies the estimated minimum sound transmission class (STC) ratings that are required for the doors and windows: A qualified acoustical consultant shall determine the exact STC rating required at each location on the project site during the final design phase of the project.. The interior noise standard is to be met with windows CPEO A/D Review pf Plans C/D 2 and doors closed Therefore, ventilation is needed in order to provide a habitable environment. Any fresh air intake ducts or other openings shall be oriented away from Haven Avenue. All ducts shall incorporate at least 6-inches of flexible fiberglass ducting and at least on 90- degree bend. Wall-mounted air conditioners shall not be used. The roof system shall have a minimum /2-inch plywood CP/BO A/D Review pf Plans C/D 2 sheathing that is well sealed to form a continuous barrier to the noise. Minimum R-19 insulation batts shall be placed in the joist space. Exterior walls shall be constructed with gypsum wall CP/BO A/D Review pf Plans C/D 2 board interior,7/8-inch stucco exterior,with minimum R- 11 insulation batts between the studs. All joints shall be well-fitted and/or caulked to form an airtight seal. 6 of 9 Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Date Sanctions for Non- Implementing Action for Monitoring Frequency Verification Verification /Initials Compliance In order to ensure adequate sound absorption, the CPEO A/D Review pf Plans C/D 2 following should be included in the project design: • Carpet and pad shall be installed in the manager's apartment (including the first floor stair and hall). The carpet shall have a minimum pile height of 1/8-inch. • All interior walls shall be of gypsum wallboard construction. A qualified acoustical consultant shall review the final CP/BO A/D Review pf Plans C/D 2 design of the project to verify compliance with the City Noise Standards. TENTATIVE TRACT 16648 A barrier with a minimum height of 6 feet shall be CP/BO A/D Review pf Plans C/D 2 constructed at the top of slope adjacent to Haven Avenue, and at the south property line of Lot 7. The barrier should be a continuous structure (without gaps for drainage)and shall be constructed of a material with a surface density of at least 4 pounds per square foot. All glazing assemblies used at the residential lots shall CP/BO A/D Review pf Plans C/D 2 be well fixed and well weather-stripped. In addition, sound rated doors and windows may be required at Lots 6 and 7 for compliance with the interior noise standard. The actual sound transmission class (STC) ratings that will be required for the doors and windows shall be determined as part of the final acoustical report prepared for the residential construction. The interior noise standard is to be met with windows CP/BO A/D Review pf Plans C/D 2 and doors closed. Therefore, ventilation is needed in order to provide a habitable environment. Any fresh air intake ducts or other openings (such as mail slots or vents)should be oriented away from Haven Avenue. All ducts should incorporate at least 6 feet of flexible fiberglass ducting and at least one 90-degree bend. Wall-mounted air conditioners should not be used. 7 of 9 Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Date Sanctions for Non- Implementing Action for Monitoring Frequency Verification Verification /Initials Compliance The roof system should have a minimum 1/2-inch CP/BO A/D Review pf Plans C/D 2 plywood sheathing that is well sealed to form a continuous barrier to the noise.Minimum R-19 insulation batts shall be placed in the joist space. Exterior walls shall be constructed with gypsum CP/BO A/D Review pf Plans C/D 2 wallboard interior, 7/8-inch stucco exterior, with minimum R-11 insulation batts between the studs. All joints shall be well-fitted and/or caulked to form an airtight seal. The front entry doors shall be well weather-stripped solid CPEO A/D Review pf Plans C/D 2 core assemblies at least 1 3/4-inch thick. The weather stripping around the entire perimeter of the doors shall consist of neoprene bulb gaskets that are compressed when the doors are closed to form an airtight seal. A wooden or aluminum astragal with the neoprene bulb gaskets should be used at double leaf doors to ensure an airtight seal. Attic vents at Lots 6 and 7 should be oriented away from CP/BO A/D Review pf Plans C/D 2 Haven Avenue. If such an orientation cannot be avoided,then an acoustic baffle should be placed in the attic space behind the vent. A qualified acoustical consultant shall review the final CP/BO A/D Review pf Plans C/D 2 design of the project to verify compliance with the City Noise Standards. DURING CONSTRUCTION Construction or grading shall not take place between the BO C During A 4 hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction including Saturday, or at any time on Sunday or a national holiday. 8 of 9 Mitigation 1 Responsible Monitoring Timing of .. of Verified Date Sanctions for Non- Implementing Action for Monitoring Frequency Verification Verification /Initials Complia . - . . Construction or grading noise levels shall not exceed the CP C During A 4 standards specified in Development Code Section construction 17.02.120-D, as measured at the property line. The developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Planning Division. Said consultant shall report their findings to the Planning Division within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Planning Division. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. The perimeter wall shall be constructed as early as CP C During A A possible in first phase. construction Haul truck deliveries shall not take place between the POGO C During A 4/7 hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction including Saturday, or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips (counting both to and from the construction site),then the developer shall prepare a noise mitigation plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. Key to Checklist Abbreviations Responsible Parson Mor itoring Fregt(ency k, ¢Method ofMriflratlonr Sanctions " CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds FC-Fire Chief or designee 6-R evoke CUP 7-Citation 9 of 9 COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT#: TENTATIVE TRACT MAP SUBTT16648 SUBJECT: AIM ALL STORAGE APPLICANT: CHARLES JOSEPH ASSOCIATES LOCATION: SOUTHEASTCORNER OF HAVEN AVENUE AND THE EASTBOUND210-FREEWAYON-RAMP ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DIVISION,(909)477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: Completion Date A. General Requirements 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents,officers,or employees,because of the issuance of such approval,or in the alternative,to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorneys fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may,at its sole discretion,participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Approval of Tentative Tract Map SUBTT16648 is granted subject to the approval of Conditional /_/_ Use Permit DRC2003-00850. 3. Copies of the signed Planning Commission Resolution of Approval No. 04-47, Standard /—i_ Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. B. Time Limits 1. This tentative tract map shall expire, unless extended by the Planning Commission, unless a complete final map is filed with the City Engineer within 3 years from the date of the approval. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans,architectural elevations,exterior materials and colors,landscaping,sign program,and grading on file in the Planning Division,the conditions contained herein,and Development Code regulations. SC-1-04 1 i:\planning\final\pingcomm\subttl6648 conds 4-28.dm Project No. SUBTT16648 Completion Date 2. Prior to any use of the project site or business activity being commenced thereon,all Conditions of Approval shall be completed to the satisfaction of the City Planner. 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Division to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for City Planner review and approval prior to the issuance of building permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.) or prior to final map approval in the case of a custom lot subdivision,or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code,all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 7. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming,and/or landscaping to the satisfaction of the City Planner. For single- family residential developments, transformers shall be placed in underground vaults. 8. The Covenants, Conditions, and Restrictions (CC&Rs) and Articles of Incorporation of the Homeowners'Association are subject to the approval of the Planning and Engineering Divisions and the City Attorney. They shall be recorded concurrently with the Final Map or prior to the issuance of building permits, whichever occurs first. A recorded copy shall be provided to the City Engineer. The Homeowners' Association shall submit to the Planning Division a list of the name and address of their officers on or before January 1 of each and every year and whenever said information changes. 9. All parkways, open areas, and landscaping shall be permanently maintained by the property owner;homeowners'association,or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for City Planner and City Engineer review and approved prior to the issuance of building permits. 10. Six-foot decorative block walls shall be constructed along the project perimeter. If a double wall condition would result, the developer shall make a good faith effort to work with the adjoining property owners to provide a single wall. Developer shall notify, by mail,all contiguous property owner at least 30 days prior to the removal of any existing walls/ fences along the project's perimeter. 11. Construct block walls between homes(i.e.,along interior side and rear property lines),rather than wood fencing for permanence, durability, and design consistency. 12. Access gates to the rear yards shall be constructed from a material more durable than wood gates. Acceptable materials include, but are not limited to, wrought iron and PVC. 13. For residential development, return walls and corner side walls shall be decorative masonry. 14. For single family residential development, a 2-inch galvanized pipe shall be attached to each support post for all wood fences,with a minimum of two%2-inch lag bolts,to withstand high winds. Both post and pipe shall be installed in an 18-inch deep concrete footing. Pipe shall extend at least 4 feet, 6 inches above grade. 15. Wood fencing shall be treated with stain, paint, or water sealant. SC-1-04 2 i:\planning\final\pingcomm\subtt16648 conds 4-28.doc Project No. SUBTT16648 Completion Date 16. Slope fencing along side property lines may be wrought iron or black plastic coated chain link to maintain an open feeling and enhance views. 17. Where rock cobble is used, it shall be real river rock. Other stone veneers may be manufactured products. D. Landscaping 1. A detailed landscape and irrigation plan,including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for City Planner review and approval prior to the issuance of building permits or prior final map approval in the case of a custom lot subdivision. 2. Existing trees required to be preserved in place shall be protected with a construction barrier in accordance with the Municipal Code Section 19.08.110,and so noted on the grading plans. The location of those trees to be preserved in place and new locations for transplanted trees shall be shown on the detailed landscape plans. The applicant shall follow all of the arborist's recommendations regarding preservation,transplanting, and trimming methods. 3. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope,but less than 2:1 slope,shall be,at minimum, irrigated and landscaped with appropriate ground cover for erosion control. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 4. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater slope shall be landscaped and irrigated for erosion control and to soften their appearance as follows: one 15-gallon or larger size tree per each 150 sq.ft.of slope area, 1-gallon or larger size shrub per each 100 sq.ft.of slope area,and appropriate ground cover. In addition,slope banks in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon,or larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in staggered clusters to soften and vary slope plane. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 5. For single-family residential development, all slope planting and irrigation shall be continuously maintained in a healthy and thriving condition by the developer until each individual unit is sold and occupied by the buyer. Prior to releasing occupancy for those units, an inspection shall be conducted by the Planning Division to determine that they are in satisfactory condition. 6. Front yard and corner side yard landscaping and irrigation shall be required per the Development Code. This requirement shall be in addition to the required street trees and slope planting. 7. The final design of the perimeter parkways,walls,landscaping,and sidewalks shall be included in the required landscape plans and shall be subject to City Planner review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Division. 8. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 9. All walls shall be provided with decorative treatment. If located in public maintenance areas,the design shall be coordinated with the Engineering Division. 10. Tree maintenance criteria shall be developed and submitted for City Planner review and approval prior to issuance of building permits. These criteria shall encourage the natural growth characteristics of the selected tree species. 11. Landscaping and irrigation shall be designed to conserve water through the principles of Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code. SC-1-04 3 i:\planning\final\pingoomm\subtt16648 conds 4-28.doc Project No. SUBTT16648 Completion Date E. Environmental 1. The developer shall provide each prospective buyer written notice of the Fourth Street Rock Crusher project in a standard format as determined by the City Planner,priorto accepting a cash deposit on any property. 2. The developer shall provide each prospective buyer written notice of the 210 and 1-15 Freeways in a standard format as determined by the City Planner,prior to accepting a cash deposit on any property. 3. A final acoustical report shall be submitted for City Planner review and approval prior to the issuance of building permits. The final report shall discuss the level of interior noise attenuation to below 45 CNEL, the building materials and construction techniques provided, and if appropriate,verify the adequacy of the mitigation measures. The building plans will be checked for conformance with the mitigation measures contained in the final report. 4. The applicant shall submit certification from an acoustical engineer that all recommendations of the acoustical report were implemented in construction, including measurements of interior and exterior noise levels to document compliance with City standards. Certification shall be submitted to the Building&Safety Division prior to final occupancy release of the affected homes. 5. Mitigation measures are required for the project. The applicant is responsible for the cost of implementing said measures, including monitoring and reporting. Applicant shall be required to post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the amount of $719.00 prior to the issuance of building permits, guaranteeing satisfactory performance and completion of all mitigation measures. These funds maybe used bythe Cityto retain consultants and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete all actions required by the approved environmental documents shall be considered grounds for forfeit. F. Other Agencies 1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location of mailboxes. Multi-family residential developments shall provide a solid overhead structure for mailboxes with adequate lighting. The final location of the mailboxes and the design of the overhead structure shall be subject to City Planner review and approval prior to the issuance of building permits. APPLICANT SHALL CONTACTTHE BUILDING AND SAFETY DIVISION,(909)477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S) G. General Requirements 1. Submit five complete sets of plans including the following: —/�— a. Site/Plot Plan; b. Foundation Plan; C. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; SC-1-04 4 i:\planning\final\pingcomm\subtti6648 conds 4-28.doc Project No. SUBTT16648 Completion Date f. Plumbing and Sewer Plans, including isometrics,underground diagrams,water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Division Project Number(i.e., SUBTT#, SUBTPM#, DRC#)clearly identified on the outside of all plans. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to the City prior to permit issuance. 4. Separate permits are required for fencing and/or walls. —/—/- 5. Developers wishing to participate in the Community Energy Efficiency Program (CEEP) can contact the Building and Safety Division staff for information and submittal requirements. H. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number (i.e., SUBTT16648). The applicant shall comply with the latest adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Division for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new residential project or major addition,the applicant shall pay development fees at the established rate. Such fees may include,but are not limited to: City Beautification Fee, Park Fee, Drainage Fee,Transportation Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Division prior to permit issuance. 3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map recordation and prior to issuance of building permits. 4. For projects using septic tank facilities, written certification of acceptability, including all supportive information, shall be obtained from the San Bernardino County Department of Environmental Health and submitted to the Building Official prior to the issuance of Septic Tank Permits, and prior to issuance of building permits. 5. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. 6. Submit pool plans to the County of San Bernardino's Environmental Health Services Department for approval. I. Grading 1. Grading of the subject property shall be in accordance with California Building Code,City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. 3. The final grading, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. SC-1-04 5 i:\planning\final\pingcomm\subtt16648 conds 4-28.doc Project No. SUBTT16648 Completion Date 4. A separate grading plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The grading plan shall be prepared,stamped,and signed by a California registered Civil Engineer. APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: J. Dedication and Vehicular Access 1. Rights-of-way and easements shall be dedicated to the City for all interior public streets, community trails,public paseos, public landscape areas,street trees,traffic signal encroachment and maintenance, and public drainage facilities as shown on the plans and/or tentative map. Private easements for non-public facilities (cross-lot drainage, local feeder trails, etc.) shall be reserved as shown on the plans and/or tentative map. 2. Dedication shall be made of the following rights-of-way on the perimeter streets(measured from street centerline): 105 (Varies)total feet on Haven Avenue 30 total feet on Heather Street 3. All existing easements lying within future rights-of-way shall be quit-claimed or delineated on the final map. K. Street Improvements 1. All public improvements(interior streets,drainage facilities,community trails,paseos,landscaped areas, etc.) shown on the plans and/or tentative map shall be constructed to City Standards. Interior street improvements shall include, but are not limited to,curb and gutter,AC pavement, drive approaches, sidewalks, street lights, and street trees. 2. Pursuant to City Council Resolution No.88-557,no person shall make connections from a source of energy,fuel or power to any building service equipment which is regulated by technical codes and for which a permit is required unless, in addition to any and all other codes, regulations and ordinances, all improvements required by these conditions of development approval have been completed and accepted by the City Council,except:that in developments containing more than one building or unit, the development may have energy connections made to a percentage of those buildings, or units proportionate to the completion of improvements as required by conditions of approval of development. In no case shall more than 95 percent of the buildings or units be connected to energy prior to completion and acceptance of all improvements required by these conditions of approval of development. 3. Construct the following perimeter street improvements including, but not limited to: Curb& A.C. Side- Drive Street 1 Street Comm Median Bike Street Name Gutter Pvmt walk I Appr. Lights Trees Trail Island Trail Other HAVEN AVENUE X (c) X HEATHER STREET X X X X X X Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be provided for this item. SC-1-04 6 i:\planning\final\pingcomm\subtt16648 conds 4-28.doc Project No. SUBTT16648 Completion Date 4. Improvement Plans and Construction: a. Street improvement plans, including street trees,street lights,and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements,prior to final map approval or the issuance of building permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the City Engineer's Office in addition to any other permits required. C. Pavement striping,marking,traffic signing,street name signing,traffic signal conduit,and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer Notes: 1) Pull boxes shall be No.6 at intersections and No.5 along streets,a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2) Conduit shall be 3-inch galvanized steel with pull rope or as specified. e. Handicapped access ramps shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving,which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single family residential lots. h. Street names shall be approved by the City Planner prior to submittal for first plan check. 5. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. 6. Install street trees per City street tree design guidelines and standards as follows. The completed legend (box below) and construction notes shall appear on the title page of the street improvement plans. Street improvement plans shall include a line item within the construction legend stating: "Street trees shall be installed per the notes and legend on sheet_(typically Sheet 1)." Where public landscape plans are required, tree installation in those areas shall be per the public landscape improvement plans. The City Engineer reserves the right to adjust tree species based upon field conditions and other variables. For additional information, contact the Project Engineer. SC-1-04 7 i:\planning\final\pingcomm\subtt16648 conds 4-28.doc Project No. SUBTT16648 Completion Date Min. Common Grow Street Name Botanical Name - Name Space Spacing Size aty. Haven Avenue Magnolia NCN 8 ft. 60 ft. O.C. 15 gal Fill (Foreground) grandiflora (INTENTIONALLY In P.A.8 ft.or greater, 'Majestic Beauty SPACED THIS FAR generally in front of APART) sidewalk P.A. less than 8 ft. Magnolia NCN 3 ft. 20 ft. O.C. 15 gal grandiflora 'St. Mary Primary tree in Brachychiton Bottle 8 ft. 25 ft. O.C. 15 gal masses, mainly populneus Tree (INFORMAL IF behind siewalk MAINTAINED BY CITY) Heather Street Platanus London 8 ft. 30 ft. O.C. 15 gal acerifolia Plane Tree Construction Notes for Street Trees: 1) All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting,an agronomic soils report shall be fumished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector. 3) All street trees are subject to inspection and acceptance by the Engineering Division. 4) Street trees are to be planted per public improvement plans only. 7. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with adopted policy. On collector or larger streets, lines of sight shall be plotted for all project intersections, including driveways. Local residential street intersections and commercial or industrial driveways may have lines of sight plotted as required. 8. A permit shall be obtained from Caltrans for any work within the following right of-way: Eastbound 210-Freeway on-ramp. L. Public Maintenance Areas 1. A separate set of landscape and irrigation plans per Engineering Public Works Standards shall _/_/_ be submitted to the City Engineer for review and approval prior to final map approval or issuance of building permits, whichever occurs first. The following landscaped parkways, medians, paseos, easements, trails or other areas shall be annexed into the Landscape Maintenance District: Haven Avenue (behind Lots 6 and 7 only). 2. Public landscape areas are required to incorporate substantial areas(40%)of mortared cobble or other acceptable non-irrigated surfaces. 3. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the City Engineer prior to final map approval or issuance of building permits whichever occurs first. Formation costs shall be borne by the developer. 4. All required public landscaping and irrigation systems shall be continuously maintained by the developer until accepted by the City. 5. Parkway landscaping on the following street(s) shall conform to the results of the respective Beautification Master Plan Haven Avenue. SC-1-04 8 i:\planning\final\pingcomm\subtt16648 conds 4-28.doc Project No. SUBTT16648 Completion Date M. Drainage and Flood Control 1. The project(or portions thereof)is located within a Flood Hazard Zone;therefore,flood protection measures shall be provided as certified by a registered Civil Engineer and approved by the City Engineer. 2. It shall be the developer's responsibility to have the current FIRM Zone'A'designation removed from the project area. The developer shall provide drainage and/or flood protection facilities sufficient to obtain an unshaded "X" designation. The developer's engineer shall prepare all necessary reports, plans, and hydrologic/hydraulic calculations. A Conditional Letter of Map Revision (CLOMR) shall be obtained from FEMA prior to final map approval or issuance of building permits, whichever occurs first. A Letter of Map Revision (LOMR) shall be issued by FEMA prior to occupancy or improvement acceptance, whichever occurs first. 3. A final drainage study shall be submitted to and approved by the City Engineer prior to final map ---J__J_ approval or the issuance of building permits,whichever occurs first. All drainage facilities shall be installed as required by the City Engineer. 4. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the property from adjacent areas. N. Utilities 1. Provide separate utility services to each parcel including sanitary sewerage system,water,gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 2. The developer shall be responsible for the relocation of existing utilities as necessary. 3. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga County Water District(CCW D), Rancho Cucamonga Fire Protection District,and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CCW D is required prior to final map approval or issuance of permits,whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. 4. Approvals have not been secured from all utilities and other interested agencies involved. Approval of the final parcel map will be subject to any requirements that may be received from them. O. General Requirements and Approvals 1. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all new streetlights for the first six months of operation,priorto final map approval or priorto building permit issuance if no map is involved. 2. Prior to the issuance of building permits,a Diversion Deposit and related administrative fees shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at least 50% of all wastes generated during construction and demolition are diverted from landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to the Engineering Division when the first building permit application is submitted to Building and Safety. Form CD-2 shall be submitted to the Engineering Division within 60 days following the completion of the construction and/or demolition project. SC-1-04 9 i:\planning\final\pingcomm\subtt16648 conds 4-28.doc Project No. SUBTT16648 Completion Date APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: P. Security Hardware 1. A secondary locking device shall be installed on all sliding glass doors. 2. All garage or rolling doors shall have slide bolts or some type of secondary locking devices. Q. Windows 1. All sliding glass windows shall have secondary locking devices and should not be able to be lifted from frame or track in any manner. R. Alarm Systems 1. Install a burglar alarm system and a panic alarm if needed. Instructing management and employees on the operation of the alarm system will reduce the amount of false alarms and in turn save dollars and lives. 2. Alarm companies shall be provided with the 24-hour Sheriff's dispatch number: (909) 941-1488. --J--L-- APPLICANT —J_/_APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, FIRE PROTECTION PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED SC-1-04 10 i:\planning\final\pingcomm\subtt16648 conds 4-28.doc RANCHO CUCAMONGA FIRE DISTRICT STANDARD CONDITIONS February 12, 2004 Aim All Self Storage SEC Haven & SR-210 DRC2003-00850 & SUBTPM16648 THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT. FSC-1 Public and Private Water Supply 1. Design guidelines for Fire Hydrants: The following provides design guidelines for the spacing and location of fire hydrants: a. The maximum distance between fire hydrants in commercial/industrial projects is 300-feet. No portion of the exterior wall shall be located more than 150-feet from an approved fire hydrant. For cul-de-sacs, the distance shall not exceed 100-feet. b. Fire hydrants are to be located. The preferred locations for fire hydrants are: 1. At the entrance(s) to a commercial, industrial or residential project from the public roadways. 2. At intersections. 3. On the right side of the street, whenever practical and possible. 4. As required by the Fire Safety Division to meet operational needs of the Fire District. 5. A minimum of forty-feet (40') from any building. c. If any portion of a facility or building is located more than 150-feet from a public fire hydrant measured on an approved route around the exterior of the facility or building, additional private or public fire hydrants and mains capable of supplying the required fire flow shall be provided. d. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof. FSC-2 Fire Flow 1. The required minimum fire flow for this project, when automatic fire sprinklers are installed is 3750 gallons per minute at a minimum residual pressure of 20-pounds per square inch. This flow reflects a 50-percent reduction for the installation of an approved automatic fire sprinkler system in accordance with NFPA 13 with central station monitoring. This requirement is made in accordance with the California Fire Code Appendix III-A, as adopted by the Fire District Ordinances. 2. Public fire hydrants located within a 500-foot radius of the proposed project may be used to provide the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent property shall not be used to provide required fire flow. 3. Firewater plans are required for all projects that must extend the existing water supply to or onto the site. Building permits will not be issued until firewater plans are approved. 4. On all site plans to be submitted for review, show all fire hydrants located within 600-feet of the proposed project site. FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems 1. Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant shall submit plans, specifications and calculations for the fire sprinkler system underground supply piping. Approval of the underground supply piping system must be obtained prior to submitting the overhead fire sprinkler system plans. FSC-4 Requirement for an Automatic Fire Sprinkler Systems Rancho Cucamonga Fire District Ordinance 15, the 2001 California Fire Code and/or any other applicable standards require an approved automatic fire sprinkler system to be installed in: 1. Commercial or industrial structures greater than 7,500 square feet. FSC-5 Fire Alarm System 1. Based on the number of sprinkler heads; the sprinkler system is required to monitored by a listed central station fire alarm system. FSC-6 Fire District Site Access Fire District access roadways include public roads, streets and highways, as well as private roads, streets drive aisles and/or designated fire lanes. Please reference the RCFPD Fire Department Access—Fire Lanes Standard#F191.10.200. 1. Location of Access: All portions of the structures I" story exterior wall shall be located within 150- feet of Fire District vehicle access, measure on an approved route around the exterior of the building. Landscaped areas, unpaved changes in elevation, gates and fences are deemed obstructions. 2. Specifications for private Fire District access roadways per the RCFPD Standards are: a. The minimum unobstructed width is 26-feet. b. The maximum inside turn radius shall be 20-feet. c. The minimum outside tum radius shall be 46-feet. d. The minimum radius for cul-de-sacs is 45-feet. e. The minimum vertical clearance is 14-feet, 6-inches. f. At any private entry median, the minimum width of traffic lanes shall be 20-feet on each side. g. The angle of departure and approach shall not exceed 9-degrees or 20 percent. h. The maximum grade of the driving surface shall not exceed 12%. i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW). j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a minimum of 14-feet, 6-inches from the ground up. Vegetation shall not be allowed to obstruct Fire Department apparatus. 3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be provided as follows: a. In buildings without high-piled storage, access shall be provided in accordance with the 2001 Califomia Building Code, Fire and/or any other applicable standards. b. In buildings with high-piled storage access doors shall be provided in each 100 lineal feet or major fraction thereof, of the exterior wall that faces the required access roadways. When railways are installed provisions shall be made to maintain Fire District access to all required openings. 4. Access Walkways: Hardscaped access walkways shall be provided from the fire apparatus access road to all required building exterior openings. 5. Commercial/Industrial Gates: Any gate installed across a Fire Department access road shall be in accordance with Fire District Standard#9-2. The following design requirements apply: a. The gate shall be motorized and slide open horizontally or swing inward. b. All gates must open at the rate of one second for each one-foot of required width. c. When fully open, the minimum width shall be 20-feet. d. Gates are not required to be motorized. 6. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site plan illustrating the proposed delineation that meets the minimum Fire District standards shall be included in the architectural plans submitted to B&S for approval. FSC-10 Occupancy and Hazard Control Permits Listed are those Fire Code permits commonly associated with the business operations and/or building construction. Plan check submittal is required with the permit application for approval of the permit; field inspection is required prior to permit issuance. General Use Permit shall be required for any activity or operation not specifically described below, which in the judgment of the Fire Chief is likely to produce conditions that may be hazardous to life or property. • Aerosol Products • Magnesium Working • Application of Flammable Finishes • Battery Systems • Organic Coating • Ovens • Cellulose Nitrate • Powder Coating • Compressed Gases • Cryogenics • Radioactive Materials • Dust-Producing Processes and Operations • Refrigeration Systems • Explosive or Blasting Agents • Flammable and Combustible Liquids • Fruit Ripening Plants • Spraying or Dipping Operations • Hazardous Materials • Tents, Canopies and/or Air Supported Structures • High-Pile Combustible Storage (BPS) • Tire Storage • Liquefied Petroleum Gases • Welding and Cutting Operations LPG or Gas Fuel Vehicles in Assembly Buildings Wood Products/Lumber Yards FSC-11 Hazardous Materials—Submittal to the County of San Bernardino The San Bernardino County Fire Department shall review your Business Emergency/Contingency Plan for compliance with minimum standards. Contact the San Bernardino County Fire, Hazardous Materials Division at (909) 387-4631 for forms and assistance. The County Fire Department is the Cal/EPA Certified Unified Program Agency (CUPA) for the City of Rancho Cucamonga. 1. If the facility is a NEW business, a Certificate of Occupancy issued by Building & Safety will not be finalized until the San Bernardino County Fire Department reviews your Business Emergency/Contingency Plan. California Government Code, Section 65850.2 prohibits the City from issuing a final Certificate of Occupancy unless the applicant has met or is meeting specific 3 hazardous materials disclosure requirements. A Risk Management Program (RMP) may also be required if regulation substances are to be used or stored at the new facility. 2. Any business that operates on rented or leased property which is required to submit a Plan, is also required to submit a notice to the owner of the property in writing stating that the business is subject to the Business Emergency/Contingency Plan mandates and has complied with the provisions. The tenant must provide a copy of the Plan to the property owner within five (5) working days, if requested by the owner. FSC-12 Hazardous Materials - Submittal to Fire Construction Services Plans shall be submitted and approved prior to construction of buildings and/or the installation of equipment designed to store, use or dispense hazardous materials in accordance with the 2001 California Building, Fire, Mechanical, Plumbing,Electrical Codes, RCFPD Ordinances FD15 and FD39 and other implemented and/or adopted standards. FSC-13 Alternate Method Application Fire Construction Services staff and the Fire Marshal will review all requests for alternate method, when submitted. The request must be submitted on the Fire District "Application for Alternate Method" form along with supporting documents and payment of the $92 review fee. Chronological Summary of RCFPD Standard Conditions PRIOR TO ISSUANCE OF BUILDING PERMITS —Please complete the following prior to the issuance of any building permits: 1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans, specifications, flow test data and calculations for the private water main system for review and approval by the Fire District. Plans and installation shall comply with Fire District Standards. Approval of the on-site (private) fire underground and water plans is required prior to any building permit issuance for any structure on the site. Private on-site combination domestic and fire supply system must be designed in accordance with RCFPD Standards#9-4, #10-2 and#10-4. The Building & Safety Division and Fire Construction Services will perform plan checks and inspections. All private on-site fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. Fire construction Services will inspect the installation, witness hydrant flushing and grant a clearance before lumber is dropped. 2. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and CCWD. On the plan, show all existing fire hydrants within a 600-foot radius of the project. Please reference the RCFPD Water Plan Submittal Procedure Standard# and#9-5. All required public fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. CCWD personnel shall inspect the installation and witness the hydrant flushing. Fire Construction Services shall inspect the site after acceptance of the public water system by CCWD. Fire Construction Services must grant a clearance before lumber is dropped. 3. Construction Access: The access roads must be paved in accordance with all the requirements of the RCFPD Fire Lane Standard#9-7. All temporary utilities over access roads must be installed at least 14' 6" above the finished surface of the road. 4. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is responsible for obtaining the fire flow information from CCWD and submitting the letter to Fire Construction Services. PRIOR TO THE RELEASE OF TEMPORARY POWER The building construction must be substantially completed in accordance with Fire Construction Services' "Temporary Power Release Checklist and Procedures". PRIOR TO OCCUPANCY OR FINAL INSPECTION—Please complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers". On private property, the markers shall be installed at the centerline of the fire access road, at each hydrant location. 2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in the presence of Fire Construction Services, shall conduct a test of the most hydraulically remote on-site fire hydrants. The underground fire line contractor, developer and/or owner are responsible for hiring the company to perform the test. A final test report shall be submitted to Fire Construction Services verifying the fire flow available. The fire flow available must meet or exceed the required fire flow in accordance with the California Fire Code. 3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler system(s) shall be tested and accepted by Fire Construction Services. 4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler monitoring system must be tested and accepted by Fire Construction Services. The fire sprinkler monitoring system shall be installed, tested and operational immediately following the completion of the fire sprinkler system (subject to the release of power). 5. Fire Suppression Systems and/or other special hazard protection systems shall be inspected, tested and accepted by Fire Construction Services before occupancy is granted and/or equipment is placed in service. 6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm system shall be installed, inspected, tested and accepted by Fire Construction Services. 7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular gates must be inspected, tested and accepted in accordance with RCFPD Standards#9-1 or#9-2 by Fire Construction Services. 8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access roadways must be installed in accordance with the approved plans and acceptable to Fire Construction Services. The CC&R's, the reciprocal agreement and/or other approved documents shall be recorded and contain an approved fire access roadway map with provisions that prohibit parking, specify the method of enforcement and identifies who is responsible for the required annual inspections and the maintenance of all required fire access roadways. 9. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and multi- family buildings shall post the address with minimum 8-inch numbers on contrasting background, visible from the street and electrically illuminated during periods of darkness. When the building setback exceeds 200 feet from the public street, an additional non-illuminated 6-inch minimum number address shall be provided at the property entrance. Larger address numbers will be required on buildings located on wide streets or built with large setbacks in multi-tenant commercial and industrial buildings. The suite designation numbers and/or letters shall be provided on the front and back of all suites. 5 10. Hazardous Materials: Prior to the issuance of a Certificate of Occupancy, the applicant must demonstrate (in writing from the County) that the facility has met or is meeting the Risk Management Plan (RMP) or Business Emergency/Contingency Plan with the San Bernardino County Fire Department, Hazardous Materials/Emergency Response and Enforcement Division. The applicant must also obtain inspection and acceptance by Fire Construction Services. 11. Confidential Business Occupancy Information: The applicant shall complete the Rancho. Cucamonga Fire District "Confidential Business Occupancy Information" form. This form provides contact information for Fire District use in the event of an emergency at the subject building or property. This form must be presented to the Fire Construction Services Inspector. 12. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, a 81/z" x 11" or 11" x 17" site plan of the site in accordance with RCFPD Standard#13-1 shall be revised by the applicant to reflect the actual location of all devices and building features as required in the standard. The site plan must be reviewed and accepted by the Fire Inspector.