HomeMy WebLinkAbout04-51 - Resolutions RESOLUTION NO. 04-51
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA,APPROVING TENTATIVE PARCEL
MAP SUBTPM16488, A SUBDIVISION OF ONE PARCEL FOR OFFICE
CONDOMINIUM PURPOSES IN THE INDUSTRIAL PARK DISTRICT
(SUBAREA 7), LOCATED ON THE NORTH SIDE OF LAUREL STREET,
WEST OF RED OAK AVENUE; AND MAKING FINDINGS IN SUPPORT
THEREOF -APN: 0208-352-91.
A. Recitals.
1. Oasis Commercial Development filed an application for the approval of Tentative Parcel
Map SUBTPM16488, as described in the title of this Resolution. Hereinafter in this Resolution, the
subject Tentative Parcel Map request is referred to as "the application."
2. On the 12th day of May 2004, the Planning Commission of the City of Rancho
Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing
on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved bythe Planning Commission
of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the
above referenced public hearing on May 12, 2004, including written and oral staff reports, together
with public testimony, this Commission hereby specifically finds as follows:
a. The application applies to a vacant 2.27 acre parcel of land on the north side of
Laurel Street, west of Red Oak Avenue; and
b. The properties to the north of the subject site are developed with a restaurant,
coffee shop, and fast food restaurant, and are zoned Industrial Park; the property to the south is
developed with office buildings and is zoned Industrial Park;the property to the east is vacant and is
zoned Industrial Park, and has an approved land use entitlement for an office building; and the
property to west is developed with a restaurant and is zoned Industrial Park; and
C. The application proposes the subdivision of air space for office condominium
purposes; and
d. The application, in conjunction with Development Review DRC2003-00988,
proposes the development of an office building; and
e. The subdivision, together with the recommended conditions of approval, complies
with all minimum development standards for the City of Rancho Cucamonga.
PLANNING COMMISSION RESOLUTION NO. 04-51
SUBTPM16488 —OASIS COMMERCIAL DEVELOPMENT
May 12, 2004
Page 2
3. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing and upon the specific findings of facts set forth in paragraphs 1 and
2 above, this Commission hereby finds and concludes as follows:
a. That the tentative parcel map is consistent with the General Plan, Development
Code, and any applicable specific plans; and
b. The design or improvements of the tentative parcel map is consistent with the
General Plan, Development Code, and any applicable specific plans; and
C. The site is physically suitable for the type of development proposed; and
d. The design of the subdivision is not likely to cause substantial environmental
damage and avoidable injury to humans and wildlife or their habitat; and
e. The tentative parcel map is not likely to cause serious public health problems; and
f. The design of the tentative parcel map will not conflict with any easement acquired
by the public at large, now of record, for access through or use of the property within the proposed
subdivision.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration, together with all written and oral reports included for the environmental assessment for
the application, the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and
Monitoring Program attached hereto, and incorporated herein by this reference, based upon the
findings as follows:
a. That the Mitigated Negative Declaration has been prepared in compliance with the
California Environmental Quality Act (CEQA) of 1970, as amended, and the State CEQA guidelines
promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared
therefore reflect the independent judgment of the Planning Commission; and, further, this
Commission has reviewed and considered the information contained in said Mitigated Negative
Declaration with regard to the application.
b. Although the Mitigated Negative Declaration identifies certain significant
environmental effects that will result if the project is approved, all significant effects have been
reduced to an acceptable level by imposition of mitigation measures on the project, which are listed
below as conditions of approval.
C. Pursuant to the provisions of Section 753.5(c) of Title 14 of the California Code of
Regulations, the Planning Commission finds as follows: In considering the record as a whole, the
Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the
proposed project will have potential for an adverse impact upon wildlife resources orthe habitat upon
which wildlife depends. Further, based upon the substantial evidence contained in the Mitigated
Negative Declaration, the staff reports and exhibits, and the information provided to the Planning
Commission during the public hearing, the Planning Commission hereby rebuts the presumption of
adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code of Regulations.
PLANNING COMMISSION RESOLUTION NO. 04-51
SUBTPM16488 — OASIS COMMERCIAL DEVELOPMENT
May 12, 2004
Page 3
5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth below
and in the Standard Conditions, attached hereto and incorporated herein by this reference.
Planning Division
1) All pertinent conditions of approval for Development Review
DRC2003-00988 shall apply.
Engineering Division
1) Provide a revised drainage report for review by the City Engineer prior
to issuance of grading permits. Report shall be per the City's"Drainage
Report Requirements" handout, and shall expand upon the April 16,
2004, "Preliminary Hydrology Report." The report shall determine
appropriate facilities for draining the current ponding area in the drive
aisle along the north project boundary. The drainage system should be
sized for Q100 and an overflow path should be provided, in case of
plugging, to protect the property. Sumps in the private storm drain
system shall be designed for Q100 and the pond depth can be no greater
than 12 inches in automobile parking areas.
2) Incorporate drain inserts, a Best Management Practice (BMP),
(ID number MP-52) into the design and identify it on the Grading Plans.
Storm Drain Signage (number SD-13) shall also be installed.
3) Maintenance of BMPs identified in the Water Quality Management Plan
(WQMP) shall be addressed in the project Covenants, Conditions, and
Restrictions (CC&Rs).
Environmental Mitigation
Air Quality
1) All construction equipment shall be maintained in good operating
condition so as to reduce operational emissions. The contractor shall
ensure that all construction equipment is being properly serviced and
maintained as per manufacturers' specifications. Maintenance records
shall be available at the construction site for City verification.
2) Prior to the issuance of any grading permits, the developer shall submit
construction plans to the City denoting the proposed schedule and
projected equipment use. Construction contractors shall provide
evidence that low-emission mobile construction equipment will be
utilized, or that their use was investigated and found to be infeasible for
the project. Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality Management District
(SCAQMD), as well as City Planning staff.
PLANNING COMMISSION RESOLUTION NO. 04-51
SUBTPM16488 — OASIS COMMERCIAL DEVELOPMENT
May 12, 2004
Page 4
3) All paints and coatings shall meet or exceed performance standards
noted in SCAQMD Rule 1113. Paints and coatings shall be applied
either by hand or high-volume, low-pressure spray.
4) All asphalt shall meet or exceed performance standards noted in
SCAQMD Rule 1108.
5) All construction equipment shall comply with SCAQMD Rules 402 and
403. Additionally, contractors shall include the following provisions:
• Reestablish ground cover on the construction site through
seeding and watering.
• Pave or apply gravel to any on-site haul roads.
• Phase grading to prevent the susceptibility of large areas to
erosion over extended periods of time.
• Schedule activities to minimize the amounts of exposed
excavated soil during and after the end of work periods.
• Dispose of surplus excavated material in accordance with local
ordinances and use sound engineering practices.
• Sweep streets according to a schedule established by the City if
silt is carried over to adjacent public thoroughfares, or occurs as
a result of hauling. Timing may vary depending upon the time of
year of construction.
• Suspend grading operations during high winds (i.e.,wind speeds
exceeding 25 miles per hour) in accordance with SCAQMD Rule
403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils haul trucks or
cover payloads using tarps or other suitable means.
6) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and the Regional Water Quality Control Board
[RWQCB]) daily to reduce Particulate Matter (PMro) emissions, in
accordance with SCAQMD Rule 403.
7) Chemical soil-stabilizers(approved by SCAQMD and RWQCB)shall be
applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PMro emissions.
8) The construction contractor shall utilize electric or clean alternative
fuel-powered equipment where feasible.
9) The construction contractor shall ensure that construction-grading
plans include a statement that work crews will shut off equipmentwhen
not in use.
PLANNING COMMISSION RESOLUTION NO. 04-51
SUBTPM16488—OASIS COMMERCIAL DEVELOPMENT
May 12, 2004
Page 5
10) All industrial and commercial facilities shall post signs requiring that
trucks shall not be left idling for prolonged periods (i.e., in excess of 10
minutes).
11) All industrial and commercial facilities shall designate preferential
parking for vanpools.
12) All industrial and commercial site tenants with 50 or more employees
shall be required to post both bus and Metrolink schedules in
conspicuous areas.
13) All industrial and commercial site tenants with 50 or more employees
shall be required to configure their operating schedules around the
Metrolink schedule to the extent reasonably feasible.
14) All residential and commercial structures shall be required to
incorporate high-efficiency/low-polluting heating, air conditioning,
appliances, and water heaters.
15) All residential and commercial structures shall be required to
incorporate thermal pane windows and weather-stripping.
Guttural Resources
1) If any prehistoric archaeological resources are encountered before or
during grading, the developer will retain a qualified archaeologist to
monitor construction activities to take appropriate measures to protect
or preserve them for study. With the assistance of the archaeologist,
the City of Rancho Cucamonga will:
• Enact interim measures to protect undesignated sites from
demolition or significant modification without an opportunity for
the City to establish its archaeological value.
• Consider establishing provisions to require incorporation of
archaeological sites within new developments, using their special
qualities as a theme or focal point.
• Pursue educating the public about the area's archaeological
heritage.
• Propose mitigation measures and recommend conditions of
approval to eliminate adverse project effects on significant,
important, and unique prehistoric resources,following appropriate
CEQA guidelines.
• Prepare a technical resources management report, documenting
the inventory, evaluation, and proposed mitigation of resources
within the project area. Submit one copy of the completed report,
with original illustrations, to the San Bernardino County
Archaeological Information Center for permanent archiving.
PLANNING COMMISSION RESOLUTION NO. 04-51
SUBTPM16488 —OASIS COMMERCIAL DEVELOPMENT
May 12, 2004
Page 6
2) A qualified paleontologist shall conduct a preconstruction field survey of
the project site. The paleontologist shall submit a report of findings that
will also provide specific recommendations regarding further mitigation
measures (i.e., paleontological monitoring) that may be appropriate.
Where mitigation monitoring is appropriate, the program must include,
but not be limited to, the following measures:
• Assign a paleontological monitor, trained, and equipped to allow
the rapid removal of fossils with minimal construction delay,to the
site full-time during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared or graded,
divert earth-disturbing activities elsewhere until the monitor has
completed salvage. If construction personnel make the
discovery, the grading contractor should immediately divert
construction and notify the monitor of the find.
• Submit a summary report to the City of Rancho Cucamonga.
Transfer collected specimens with a copy of the report to the San
Bemardino County Museum.
Geology and Soils
1) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and RWQCB)daily to reduce PM10 emissions,
in accordance with SCAQMD Rule 403.
2) Frontage public streets shall be swept according to a schedule
established by the City to reduce PM10 emissions associated with
vehicle tracking of soil off-site. Timing may vary depending upon the
time of year of construction.
3) Grading operations shall be suspended when wind speeds exceed
25 miles per hour to minimize PM10 emissions from the site during such
episodes.
4) Chemical soil-stabilizers(approved by SCAQMD and RWQCB)shall be
applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PM10 emissions.
Hydrology and Water Quality
1) Structures to retain precipitation and runoff on-site shall be integrated
into the design of the project where appropriate. Measures that may be
used to minimize runoff and to enhance infiltration include Dutch drains,
precast concrete lattice blocks and bricks, terraces, diversions, runoff
spreaders, seepage pits, and recharge basins.
2) Storm Drain Signage (ID number SD-13) shall be indicated on the
precise Grading Plan submitted for plan check.
PLANNING COMMISSION RESOLUTION NO. 04-51
SUBTPM16488— OASIS COMMERCIAL DEVELOPMENT
May 12, 2004
Page 7
3) Media Filters (number MP-40) or Drain Inserts (MP-52) shall be
indicated on the precise Grading Plan submitted for plan check.
4) The precise Grading Plan submitted for plan check shall include"Fact
Sheets" from the California Stormwater BMP Handbook.
5) The precise Grading Plan submitted for plan check shall indicate in the
site description that the project is in the Upper Santa Ana River
watershed, and that known problems include the following
contaminates: salinity, total dissolved solids, nutrients,pathogens,and
chlorides.
6) Prior to issuance of grading or paving permits, the applicant shall
submit to the City Engineer a Notice of Intent (NO[) to comply with
obtaining coverage under the National Pollutant Discharge Elimination
System (NPDES) General Construction Storm Water Permit from the
State Water Resources Control Board. Evidence that this has been
obtained (i.e., a copy of the Waste Discharger's Identification Number)
shall be submitted to the City Engineer for coverage under the NPDES
General Construction Permit.
Noise
1) Construction or grading shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday.
2) Construction or grading noise levels shall not exceed the standards
specified in Development Code Section 17.02.120-D, as measured at
the property line. The developer shall hire a consultant to perform
weekly noise level monitoring as specified in Development Code
Section 17.02.120. Monitoring at other times may be required by the
Planning Division. The said consultant shall report their findings to the
Planning Division within 24 hours; however, if noise levels exceed the
above standards, then the consultant shall immediately notify the
Planning Division. If noise levels exceed the above standards, then
construction activities shall be reduced in intensity to a level of
compliance with above noise standards or halted.
3) Haul truck deliveries shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday. Additionally, if heavy trucks used
for hauling would exceed 100 daily trips (counting both to and from the
construction site), then the developer shall prepare a noise mitigation
plan denoting any construction traffic haul routes. To the extent
feasible, the plan shall denote haul routes that do not pass sensitive
land uses or residential dwellings.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
PLANNING COMMISSION RESOLUTION NO. 04-51
SUBTPM16488 —OASIS COMMERCIAL DEVELOPMENT
May 12, 2004
Page 8
APPROVED AND ADOPTED THIS 12TH DAY OF MAY 2004.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY:
arty T iel, Vice Chairman
ATTEST:
Brad Bu cret ry
I, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby
certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the
Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning
Commission held on the 12th day of May 2004, by the following vote-to-wit:
AYES: COMMISSIONERS: FLETCHER, McNIEL, McPHAIL, STEWART
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: MACIAS
City of Rancho Cucamonga
in MITIGATION MONITORING
PROGRAM
Project File No.: Development Review DRC2003-00988 and Tentative Parcel Map
SUBTPM16488. Related Files: Development Review DRC2003-00987 and Tentative Parcel Map
SUBTPM16487.
This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation
measures identified in the Mitigated Negative Declaration forthe above-listed project. This program
has been prepared in compliance with State law to ensure that adopted mitigation measures are
implemented (Section 21081.6 of the Public Resources Code).
Program Components - This MMP contains the following elements:
1. Conditions of approval that act as impact mitigation measures are recorded with the action
and the procedure necessary to ensure compliance. The mitigation measure conditions of
approval are contained in the adopted Resolution of Approval for the project.
2. A procedure of compliance and verification has been outlined for each action necessary.This
procedure designates who will take action, what action will be taken and when, and to whom
and when compliance will be reported.
3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring
progresses, changes to compliance procedures may be necessary based upon
recommendations by those responsible for the program.
Program Management - The MMP will be in place through all phases of the project. The project
planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project
planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly
and proper action is taken on each mitigation. Each City department shall ensure compliance of the
conditions (mitigation) that relate to that department.
Procedures -The following steps will be followed by the City of Rancho Cucamonga.
1. A fee covering all costs and expenses, including any consultants'fees, incurred by the City in
performing monitoring or reporting programs shall be charged to the applicant.
2. A MMP Reporting Form will be prepared for each potentially significant impact and its
corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached
hereto. This procedure designates who will take action, what action will be taken and when,
and to whom and when compliance will be reported. All monitoring and reporting
documentation will be kept in the project file with the department having the original authority
for processing the project. Reports will be available from the City upon request at the following
address:
City of Rancho Cucamonga - Lead Agency
Planning Division
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
DRC2003-00988 AND SUBTPM16488
OASIS COMMERCIAL DEVELOPMENT
Page 2
3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,
as determined by the project planner or responsible City department, to monitor specific
mitigation activities and provide appropriate written approvals to the project planner.
4. The project planner or responsible City department will approve, by signature and date, the
completion of each action item that was identified on the MMP Reporting Form. After each
measure is verified for compliance, no further action is required for the specific phase of
development.
5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off
as completed by the project planner or responsible City department at the bottom of the MMP
Reporting Form.
6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation
measures.The project planner is responsible for approving any such refinements or additions.
An MMP Reporting Form will be completed by the project planner or responsible City
department and a copy provided to the appropriate design, construction, or operational
personnel.
7. The project planner or responsible City department has the authority to stop the work of
construction contractors if compliance with any aspects of the MMP is not occurring after
written notification has been issued.The project planner or responsible City department also
has the authority to hold certificates of occupancies if compliance with a mitigation measure
attached hereto is not occurring. The project planner or responsible City department has the
authority to hold issuance of a business license until all mitigation measures are implemented.
8. Any conditions (mitigation) that require monitoring after project completion shall be the
responsibility of the City of Rancho Cucamonga Planning Division.The Division shall require
the applicant to post any necessary funds (or other forms of guarantee)with the City. These
funds shall be used by the City to retain consultants and/or pay for City staff time to monitor
and report on the mitigation measure for the required period of time.
9. In those instances requiring long-term project monitoring, the applicant shall provide the City
with a plan for monitoring the mitigation activities at the project site and reporting the
monitoring results to the City. Said plan shall identify the reporter as an individual qualified to
know whether the particular mitigation measure has been implemented. The
monitoring/reporting plan shall conform to the City's MMP and shall be approved by the
Community Development Director or City Planner prior to the issuance of building permits.
MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III)
Project File No.: Development Review DRC2003-00988 and Tentative Parcel Map SUBTPM16488
Related Files:, Development Review DRC2003-00987 and Tentative Parcel Map SUBTPM16487
Applicant: Oasis Commercial Development
Initial Study Prepared by: Donald Granger, Assistant Planner Date: October 29. 2003
ResponsibleMitigation Measures No. Method of Verified Sanctions for
•lementinAction •• Date/initials Non-Compliance
Air Quality
All construction equipment shall be maintained in good CP C Review of Plans A/C 2/4
operating condition so as to reduce operational
emissions. Contractor shall ensure that all construction
equipment is being properly serviced and maintained as
per man ufacturers'specifications. Maintenance records
shall be available at the construction site for City
verification.
Prior to the issuance of any grading permits, developer CP/CE C Review of Plans C 2
shall submit construction plans to City denoting the
proposed schedule and projected equipment use.
Construction contractors shall provide evidence that low
emission mobile construction equipment will be utilized,
or that their use was investigated and found to be
infeasible for the project. Contractors shall also conform
to any construction measures imposed by the SCAQMD
as well as City Planning Staff.
All paints and coatings shall meet or exceed CP C Review of Plans A/C 2/4
performance standards noted in South Coast Air Quality
Management District(SCAQMD)Rule 1113. Paints and
coatings shall be applied either by hand or high volume,
low-pressure spray.
All asphalt shall meet or exceed performance standards BO B Review of Plans A/C 2
noted in SCAQMD Rule 1108.
All construction equipment shall comply with SCAQMD CE C Review of Plans A/C 2/4
Rules 402 and 403. Additionally, contractors shall
include the following provisions:
1 of 7
Mitigation Measures
No. . . od of Verif led Sanctions for„
Implementing Action
for Date finitials Non-Compliance
• Reestablish ground cover on the construction site CE C Review of Plans A/C 2/4
through seeding and watering.
• Pave or apply gravel to any on-site haul roads. CE C Review of Plans A/C 2/4
• Phase grading to prevent the susceptibility of large CE C Review of Plans A/C 2/4
areas to erosion over extended periods of time.
• Schedule activities to minimize the amounts of CE C Review of Plans A/C 2/4
exposed excavated soil during and after the end of
work periods.
• Dispose of surplus excavated material in CE C Review of Plans A q
accordance with local ordinances and use sound
engineering ractices.
• Sweep streets according to a schedule established CE C Review of Plans A q
by the City if silt is carried over to adjacent public
thoroughfares or occurs as a result of hauling.
Timing may vary depending upon time of year of
construction.
• Suspend grading operations during high winds(i.e., gO/CE C During A 4
wind speeds exceeding 25 mph)in accordance with Construction
Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils gO/CE C During A q
haul trucks or cover payloads using tarps or other Construction
suitable means.
The site shall be treated with water or other soil- BO/CE C During A 4
stabilizing agent(approved by SCAQMD and RWQCB) Construction
daily to reduce PM,o emissions, in accordance with
SCAQMD Rule 403.
Chemical soil stabilizers (approved by SCAQMD and BO/CE C During A 4
Regional Water Quality Control Board [RWQCB]) shall Construction
be applied to all inactive construction areas that remain
inactive for 96 hours or more to reduce PM,o emissions.
The construction contractor shall utilize electric or clean CE C Review of Plans A/C 4
alternative fuel powered equipment where feasible.
The construction contractor shall ensure that CE C Review of Plans A/C 2/4
construction-grading plans include a statement that work
crews will shut off equipment when not in use.
2 of 7
Mitigation Measures No.
Responsible
•Implementing Action for Monitoring . . .
FrequencyDate/initials Non-Compliance
All industrial and commercial facilities shall post signs BO C Review of Plans A 4
requiring that trucks shall not be left idling for prolonged
periods (i.e., in excess of 10 minutes).
All industrial and commercial facilities shall designate CP C Review of Plans A/C 2/3
preferential parking for vanpools.
All industrial and commercial site tenants with 50 or CP C Review of Plans D 2/3
more employees shall be required to post both bus and
Metrolink schedules in conspicuous areas.
All industrial and commercial site tenants with 50 or CP C Review of Plans D 2/3
more employees shall be required to configure their
operating schedules around the Metrolink schedule to
the extent reasonably feasible.
All residential and commercial structures shall be BO C/D Review of Plans C 2/4
required to incorporate high efficiency/low polluting
heating,air conditioning,appliances and water heaters.
All residential and commercial structures shall be BO C/D Review of Plans C 2/4
required to incorporate thermal pane windows and
weather-stripping.
Cultural Resources
If any prehistoric archaeological resources are
encountered before or during grading,the developer will
retain a qualified archaeologist to monitor construction
activities, to take appropriate measures to protect or
preserve them for study. With the assistance of the
archaeologist, the City of Rancho Cucamonga will:
• Enact interim measures to protect undesignated CP/BO C Review of A/D 3/4
sites from demolition or significant modification Report
without an opportunity for the City to establish its
archaeological value.
• Consider establishing provisions to require CP/BO C Review of A/D 3/4
incorporation of archaeological sites within new Report
developments, using their special qualities as a
theme or focal point.
• Pursue educating the public about the area's CP/BO C Review of A/D 3/4
archaeological heritage. Report
3 of 7
Mitigation Measures
No. .. of Verif led Sanctions for
ImplementingDate/initials Non-Compliance
Propose mitigation measures and recommend CP/BO C Review of A/D 3/4
conditions of approval to eliminate adverse project Report
effects on significant, important, and unique
prehistoric resources, following appropriate CEQA
uidelines.
• Prepare a technical resources management report, CP C Review of A/D 3/4
documenting the inventory, evaluation, and Report
proposed mitigation of resources within the project
area. Submit one copy of the completed report,with
original illustrations, to the San Bernardino County
Archaeological Information Center for permanent
archivin .
A qualified paleontologist shall conduct a preconstruction CP B Review of A/D 4
field survey of the project site. The paleontologist shall Report
submit a report of findings that will also provide specific
recommendations regarding further mitigation measures
(i.e., paleontological monitoring) that may be
appropriate. Where mitigation monitoring is appropriate,
the program must include, but not be limited to, the
followinq measures:
• Assign a paleontological monitor, trained and CP B Review of A/D 4
equipped to allow the rapid removal of fossils with Report
minimal construction delay, to the site full-time
during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared BO B/C Review of A/D 4
or graded, divert earth-disturbing activities Report
elsewhere until the monitor has completed salvage.
If construction personnel make the discovery, the
grading contractor should immediately divert
construction and notify the monitor of the find.
Submit summary report to City of Rancho CP D Review of D 3
Cucamonga. Transfer collected specimens with a Report
copy of the report to San Bernardino County
Museum.
Geology and Soils
The site shall be treated with water or other soil- BO/CE C During A 4
stabilizing agent (approved by SCAQMD and RWQCB) Construction
daily to reduce PM,o emissions, in accordance with
SCAQMD Rule 403.
4of7
Mitigation Measures No.
Responsible Monitoring Timing of Method of Verif led Sanctions for
Implementing Action for Monitoring Frequency Verification Verification
. . -
D.
Frontage public streets shall be swept according to a CE C During A 4
schedule established by the City to reduce PM10 Construction
emissions associated with vehicle tracking of soil off-
site. Timing may vary depending upon time of year of
construction.
Grading operations shall be suspended when wind BO/CE C During A 4
speeds exceed 25 mph to minimize PMIO emissions Construction
from the site during such episodes.
Chemical soil stabilizers (approved by SCAQMD and BO/CE C During A 4
RWQCB) shall be applied to all inactive construction Construction
areas that remain inactive for 96 hours or more to
reduce PM10 emissions.
Hydrology and Water Quality
Structures to retain precipitation and runoff on-site shall CE B/C/D Review of Plans A/C 2/4
be integrated into the design of the project where
appropriate. Measures that may be used to minimize
runoff and to enhance infiltration include Dutch drains,
precast concrete lattice blocks and bricks, terraces,
diversions, runoff spreaders,seepage pits,and recharge
basins.
Storm Drain Signage (ID number SD-13) shall be CE B/C/D Review of Plans A/C 2/4
indicated on the precise Grading Plan submitted for plan
check.
Media Filters (number MP-40) or Drain Inserts (MP-52) CE B/C/D Review of Plans A/C 2/4
shall be indicated on the precise Grading Plan submitted
for plan check.
The precise Grading Plan submitted for plan check shall CE B/C/D Review of Plans A/C 2/4
include "Fact Sheets" from the California Stormwater
BMP Handbook.
The precise Grading Plan submitted for plan check shall CE B/C/D Review of Plans A/C 2/4
indicate in the Site Description that the project is in the
Upper Santa Ana River watershed and that known
problems include the following contaminates: salinity,
total dissolved solids, nutrients, pathogens and
chlorides.
5 of 7
Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Prior to issuance of grading or paving permits, applicant CE B/(;/DReview of Plans A/C 2/4
shall submit to the City engineer a Notice of Intent(NOI)
to comply with obtaining coverage under the National
Pollutant Discharge Elimination System (NPDES)
General Construction Storm Water Permit from the
State Water Resources Control Board. Evidence that
this has been obtained (i.e., a copy of the Waste
Discharger's Identification Number) shall be submitted
to the City Engineer for coverage under the NPDES
General Construction Permit.
Noise
Construction or grading shall not take place between the BO C During A 4
hours of 8:00 p.m. and 6:30 a.m. on weekdays, Construction
including Saturday, or at any time on Sunday or a
national holiday.
Construction or grading noise levels shall not exceed the CP C During A 4
standards specified in Development Code Section Construction
17.02.120-D, as measured at the property line.
Developer shall hire a consultant to perform weekly
noise level monitoring as specified in Development
Code Section 17.02.120. Monitoring at other times may
be required by the Planning Division.. Said consultant
shall report their findings to the Planning Division within
24 hours; however, if noise levels exceed the above
standards, then the consultant shall immediately notify
the Planning Division. If noise levels exceed the above
standards, then construction activities shall be reduced
in intensity to a level of compliance with above noise
standards or halted.
6 of 7
Mitigation . - Monitoring Timing of Method .
ImplementingVerificationVerification Date/initials Non-Compliance
Haul truck deliveries shall not take place between the PO/BO C During A 4/7
hours of 8:00 p.m. and 6:30 a.m. on weekdays, Construction
including Saturday, or at any time on Sunday or a
national holiday. Additionally, if heavy trucks used for
hauling would exceed 100 daily trips (counting both to
and from the construction site),then the developer shall
prepare a noise mitigation plan denoting any
construction traffic haul routes. To the extent feasible,
the plan shall denote haul routes that do not pass
sensitive land uses or residential dwellings. .
Key to Checklist Abbreviations
Responsible Person Monitoring Frequency Method of Verification Sanctions
CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map
CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit
CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy
BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order
PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds
FC-Fire Chief or designee 6-Revoke CUP
7-Citation
i:\planning\final\ceqa\mmchklst-rov5-03final.doc
7 of 7
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT#: TENTATIVE PARCEL MAP - SUBTPM16488
SUBJECT: TWO OFFICE/ MEDICAL BUILDINGS
APPLICANT: OASIS COMMERCIAL DEVELOPMENT
LOCATION: NORTH SIDE OF LAUREL STREET, WEST OF RED OAK AVENUE
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DIVISION,(909)477-2750, FOR COMPLIANCE
WITH THE FOLLOWING CONDITIONS:
A. General Requirements Completion Date
1. The applicant shall agree to defend at his sole expense any action brought against the City, its
agents,officers,or employees,because of the issuance of such approval,or in the alternative,to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or
employees, for any Court costs and attorney's fees which the City, its agents, officers, or
employees may be required by a court to pay as a result of such action. The City may,at its sole
discretion,participate at its own expense in the defense of any such action but such participation
shall not relieveapplicant of his obligations under this condition.
2. Approval of Tentative Parcel Map SUBTPM16488 is granted subject to the approval of
Development Review DRC2003-00988.
B. Time Limits
1. This tentative tract map or tentative parcel map shall expire, unless extended by the Planning
Commission, unless a complete final map is filed with the City Engineer within 3 years from the
date of the approval.
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which include
site plans,architectural elevations,exterior materials and colors, landscaping,sign program,and
grading on file in the Planning Division,the conditions contained herein, and Development Code
regulations.
2. Prior to any use of the project site or business activity being commenced thereon,all Conditions
of Approval shall be completed to the satisfaction of the City Planner.
SC-1-04 1
i:\planning\final\pingcomm\subtpm16488 conds 5-12.doc
Project No. SUBTPM16488
Completion Date
3. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.) or prior to final map approval in the case of a custom lot subdivision,or approved
use has commenced, whichever comes first.
4. Approval of this request shall not waive compliance with all sections of the Development Code,all
other applicable City Ordinances, and applicable Community or Specific Plans in effect at the
time of building permit issuance.
5. All parkways, open areas, and landscaping shall be permanently maintained by the property
owner, homeowners'association,or other means acceptable to the City. Proof of this landscape
maintenance shall be submitted for City Planner and City Engineer review and approved prior to
the issuance of building permits.
D. Landscaping
1. The final design of the perimeter parkways,walls,landscaping,and sidewalks shall be included in
the required landscape plans and shall be subject to City Planner review and approval and
coordinated for consistency with any parkway landscaping plan which may be required by the
Engineering Division.
2. Landscaping and irrigation systems required to be installed within the public right-of-way on the
perimeter of this project area shall be continuously maintained by the developer.
E. Environmental
1. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures, including monitoring and reporting. Applicant shall be required to
post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the
amount of $719.00 prior to the issuance of building permits, guaranteeing satisfactory
performance and completion of all mitigation measures. These funds maybe used bythe Cityto
retain consultants and/or pay for City staff time to monitor and report on the mitigation measures.
Failure to complete all actions required by the approved environmental documents shall be
considered grounds for forfeit.
F. Other Agencies
1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location
of mailboxes. Multi-family residential developments shall provide a solid overhead structure for
mailboxes with adequate lighting. The final location of the mailboxes and the design of the
overhead structure shall be subject to City Planner review and approval prior to the issuance of
building permits.
APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
G. Dedication and Vehicular Access
1. Reciprocal access easements shall be provided ensuring access to all parcels by CC&Rs or by
deeds and shall be recorded concurrently with the map or prior to the issuance of building
permits, where no map is involved.
SC-1-04
2
i:\planning\final\pingcomm\subtpm16488 conds 5-12.doc
Project No. SUBTPM16488
Completion Date
H. Street Improvements
1. All public improvements(interior streets,drainage facilities,community trails,paseos, landscaped
areas, etc.) shown on the plans and/or tentative map shall be constructed to City Standards.
Interior street improvements shall include, but are not limited to,curb and gutter,AC pavement,
drive approaches, sidewalks, street lights, and street trees.
2. Pursuant to City Council Resolution No.88-557,no person shall make connections from a source
of energy,fuel or power to any building service equipment which is regulated by technical codes
and for which a permit is required unless, in addition to any and all other codes, regulations and
ordinances, all improvements required by these conditions of development approval have been
completed and accepted by the City Council, except:that in developments containing more than
one building or unit, the development may have energy connections made to a percentage of
those buildings, or units proportionate to the completion of improvements as required by
conditions of approval of development. In no case shall more than 95 percent of the buildings or
units be connected to energy prior to completion and acceptance of all improvements required by
these conditions of approval of development.
3. Construct the following perimeter street improvements including, but not limited to:
Curb 8 A.C. Side- Drive Street Street Comm Median Bike
Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other
Laurel Street X X (e)
Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement
reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk
shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be
provided for this item. (e) Curbside drain.
4. Improvement Plans and Construction:
a. Street improvement plans,including street trees,street lights,and intersection safety lights
on future signal poles, and traffic signal plans shall be prepared by a registered Civil
Engineer and shall be submitted to and approved by the City Engineer. Security shall be
posted and an agreement executed to the satisfaction of the City Engineer and the City
Attorney guaranteeing completion of the public and/or private street improvements,prior to
final map approval or the issuance of building permits, whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a
construction permit shall be obtained from the City Engineer's Office in addition to any
other permits required.
C. Pavement striping,marking,traffic signing,street name signing,traffic signal conduit,and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction
project along major or secondary streets and at intersections for future traffic signals and
interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside
of BCR, ECR, or any other locations approved by the City Engineer
Notes:
1) Pull boxes shall be No.6 at intersections and No.5 along streets,a maximum of 200
feet apart, unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch galvanized steel with pull rope or as specified.
SC-1-04
3
i:\planning\final\pingcomm\subtpm 16488 conds 5-12.doc
Project No. SUBTPM16488
Completion Date
e. Handicapped access ramps shall be installed on all corners of intersections per City
Standards or as directed by the City Engineer.
f. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A cash
deposit shall be provided to cover the cost of grading and paving,which shall be refunded
upon completion of the construction to the satisfaction of the City Engineer.
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be
installed to City Standards, except for single family residential lots.
h. Street names shall be approved by the City Planner prior to submittal for first plan check.
5. Install street trees per City street tree design guidelines and standards as follows. The completed
legend (box below) and construction notes shall appear on the title page of the street
improvement plans. Street improvement plans shall include a line item within the construction
legend stating: "Street trees shall be installed per the notes and legend on sheet—(typically
sheet 1)." Where public landscape plans are required,tree installation in those areas shall be
per the public landscape improvement plans.
The City Engineer reserves the right to adjust tree species based upon field conditions and other
variables. For additional information, contact the Project Engineer.
Min.
Grow
Street Name Botanical Name Common Name Space Spacing Size Oty.
Laurel Street Pyrus calleryana NCN 3 ft. 20 ft. 15 gal Fill
aristocrat O.C. In
Construction Notes for Street Trees:
1) All street trees are to be planted in accordance with City standard plans.
2) Prior to the commencement of any planting,an agronomic soils report shall be furnished to
the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil
amendments, as determined by the City inspector.
3) All street trees are subject to inspection and acceptance by the Engineering Division.
4) Street trees are to be planted per public improvement plans only.
I. Public Maintenance Areas
1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting
Districts shall be filed with the City Engineer prior to final map approval or issuance of building
permits whichever occurs first. Formation costs shall be borne by the developer.
J. Utilities
1. The developer shall be responsible for the relocation of existing utilities as necessary.
2. Water and sewer plans shall be designed and constructed to meet the requirements of the
Cucamonga County Water District(CCW D), Rancho Cucamonga Fire Protection District,and the
Environmental Health Department of the County of San Bernardino. A letter of compliance from
the CCW D is required prior to final map approval or issuance of permits,whichever occurs first.
Such letter must have been issued by the water district within 90 days prior to final map approval
in the case of subdivision or prior to the issuance of permits in the case of all other residential
projects.
SC-1-04
4
i:\planning\final\pingcomm\subtpm16488 conds 5-12.doc
Project No. SUBTPM16488
Completion Date
K. General Requirements and Approvals
1. An easement for a joint use driveway shall be provided prior to final map approval or issuance of
building permits, whichever occurs first, for: Surrounding driveways and parking.
2. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all
new streetlights for the first six months of operation, prior to final map approval or prior to building
permit issuance if no map is involved.
3.' Prior to the issuance of building permits,a Diversion Deposit and related administrative fees shall
be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if
at least 50% of all wastes generated during construction and demolition are diverted from
landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to
the Engineering Division when the first building permit application is submitted to Building and
Safety. Form CD-2 shall be submitted to the Engineering Division within 60 days following the
completion of the construction and/or demolition project.
APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, FIRE PROTECTION PLANNING
SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
SEE ATTACHED
0
SC-1-04
5
i:\planning\final\pingcomm\subtpm16488 conds 5-12.doc
RANCHO CUCAMONGA FIRE DISTRICT
STANDARD CONDITIONS
DRC2003-00988
PROJECT/FILE #: SUTPM16488 APPLICANT NAME: Bonaldo Engineering
Laurel/Foothill
PROJECT NAME: Commercial OCCUPANCY CLASS: B
LOCATION: Laurel and Red Oak FLOOR AREA: 11,837 and 11,923
DATE: February 17,2004 TYPE CONSTRUCTION: V-N
PLAN TYPE: Office building FD REVIEW BY: Moises Eskenazi
THE FOLLOWING STANDARD CONDITIONS APPLY TO YOUR PROJECT during
the course of development. Please note that building permits will not be issued
until the on-site and off-site water(fire)plans are approved by CCWD and RCFPD.
RANCHO CUCAMONGA FIRE DISTRICT- STANDARD CONDITIONS & REQUIREMENTS.
FSC-1 General Requirements for Public and Private Water Supply
1. General Guidance for Fire Hydrants: The following provides general guidance for the spacing and
location of fire hydrants. Remember these are the maximum permitted distances between fire hydrants:
a. The maximum distance between fire hydrants in commercial/industrial projects is 300-feet. No
portion of the exterior wall shall be located more than 150-feet from an approved fire hydrant. For
cul-de-sacs the distance shall not exceed 100-feet.
b. Fire hydrants are to be located:
1. At the entrance(s) to a project from the existing public roadways. This includes subdivisions
and industrial parks.
2. At intersections.
3. On the right side of the street, whenever practical and possible.
4. As required by the Fire Safety Division to meet operational needs.
5. The location of fire hydrants is based upon the operational needs of the Fire District to control
a fire. °
6. Fire hydrants shall be located a minimum of 40 feet from any building.
2. Minimum Fire Flow with Automatic Fire Sprinklers: The required minimum fire flow for this project is
1500gallons per minute at a minimum residual pressure of 20 pounds per square inch. This flow reflects
a 50 percent reduction for the installation of an approved automatic fire sprinkler system with central
station monitoring. This requirement is made in accordance with Fire Code Appendix III-A, as amended,
and Fire District Ordinances and Standards.
3. Hydrants Used to Supply Fire Flow: Public fire hydrants located within a 500-foot radius of the
proposed project may be used to provide the required fire flow subject to Fire District review and approval.
Private fire hydrants on adjacent property shall not be used to provide required fire flow.
4. Show Existing Fire Hydrants and Mains: Existing fire hydrants and mains within 600-feet of the project
shall be shown on the water plan submitted for review and approval. Include main size.
FSC-2 Private(On-Site)Water and/or Fire Sprinkler Underground Plans for Fire Protection
1. Exceeds Allowable Distance: When any portion of a facility or building is located more than 150-feet
from a fire hydrant located on a public street, as measured by an approved route around the exterior of
the facility or building, on-site fire hydrants and mains capable of supplying the required fire flow shall be
provided. The distance is measured as vehicular path of travel on access roadways, not line of sight.
2. Number of Fire Hydrants: Provide one fire hydrant for each 1000 gpm of required fire flow or fraction
thereof, subject to standard spacing and distribution requirements.
3. Fire Sprinkler Underground: Prior to the issuance of a fire sprinkler system permit, the applicant shall
submit construction plans, specifications, and calculations for the fire sprinkler system underground to the
Fire Safety Division for approval. Contact the Fire Construction Services (909)477-2713
FSC-4 Fire District Site Access-Technical Comments
1. Access Roadways Defined: Fire District access roadways include public roads, streets, and
highways, as well as private roads, streets, drive aisles and designated fire lanes.
2. Location of Access: All portions of the structure or facility or any portion of the exterior wall of the first
story shall be located within 150-feet of Fire District vehicle access, measured by an unobstructed
approved route around the exterior of the building. Landscaped areas, unpaved changes in elevation,
gates, and fences are an obstruction.
3. Private Roadways and Fire Lanes:The minimum specifications for private fire district access roadways
are:
a. The minimum unobstructed width is 26-feet.
b. The inside turn radius shall be 20-feet.
c. The outside turn radius shall be not less than 46-feet.
d. The minimum radius for cul-de-sacs is 45-feet.
e. The minimum vertical clearance is 14 feet, 6 inches.
f. At any private entry median, the minimum width of traffic lanes shall be 20-feet.
g. The angle of departure and approach shall not exceed 9 degrees or 20 percent.
h. The maximum grade of the driving surface shall not exceed 12%.
i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW).
4. Access Walkways: Approved access walkways shall be provided from the fire apparatus access road
to all required building exterior openings.
5. Vegetation: Trees and shrubs planted in any median shall be kept trimmed to a minimum of 14-feet, 6-
inches from the ground up,so as not to impede fire vehicles.
6. Fire Lane Identification: All required red curbing and signage shall identify fire lanes. A drawing of the
proposed signage that meets the minimum Fire District standards shall be submitted to and approved.
FCS-5 Fire code permit that may be required on your project.
1. General Use Permit shall be required for any activity or operation not specifically described below,
which in the judgment of the Fire Chief is likely to produce conditions that may be hazardous to life or
property.
2. Operate a place of public assembly.
FSC-6 Plan Submittal Required Notice
Required plans shall be submitted and approved prior to construction in accordance with 2000/2001 Building,
Fire, Mechanical, and Plumbing Codes; 1999 Electrical Code; Health and Safety Code; Public Resources
Code; and RCFPD Ordinances FD15 and FD39, Guidelines and Standards.
NOTE: In addition to the fees due at this time please note that separate plan check fees for tenant
improvements,fire protection systems and/or any consultant reviews will be assessed at time of submittal of
plans.
FSC-7 Alternate Materials and Methods
The Fire Safety Division will review requests for alternate materials and methods within the scope of our
authority. The request must be submitted on the Fire District"Application for Alternate Method"form along with
supporting documents. Contact the Fire Safety Division at (909)477-2770 for assistance.
PRIOR TO (PARCEL) MAP RECORDATION- For Each Development Phase
1. Prior to the recordation of the applicable subdivision map, the Fire District in consultation with the City
Engineer shall approve the locations of Traffic Signal Preemption Devices. The subdivider shall enter into an
agreement with the City for the installation of traffic signal preemption equipment for the surrounding
controlled intersections.
2. Reciprocal Access Agreement: The plans as submitted indicate that a required point of Fire District
access:
a. Requires passage on property not under the control of the applicant; or
b. Does not access a public way; or
c. Crosses a property line
Please provide a permanent access agreement granting irrevocable use of the adjacent property for use
by the Fire District to gain access to the subject property. The agreement shall include a statement that
no obstruction, gate, fence, building, or other structure shall be placed within the dedicated access. The
recorded agreement shall include a copy of the site plan required below. The agreement shall be
recorded with the County of San Bernardino, Recorders Office. The Fire Safety Division prior to
recordation shall approve the agreement.
To assist the Fire Safety Division in reviewing the agreement the following shall be included in the
submittal:
a. Title Report. A current title report, policy of title insurance, or other equivalent documentation
proving ownership of all property included in the agreement.
b. Legal Description. A legal description of all property subject to the agreement.
c. Assessor's Parcel Numbers. The assessor's parcel numbers of each parcel subject to the
agreement.
d. Site Plan: The access roadway shall comply with the requirements of Private Roadways and
Fire Lanes listed above. A scaled site plan showing the path of the Fire District access, the width,
turn radii, load-bearing capacity of roadway surface, etc. shall be provided.
Contact the Fire Construction Services 909 477-2713
3. Reciprocal Water Covenant and Agreement: The plans as submitted indicate that a required private fire
mains or appurtenances thereto:
a. Pass through or are located on property not under the control of the applicant; or
b. Crosses a property line
Please provide a permanent maintenance and service agreement between the owner's granting a non-
exclusive easement for the purpose of accessing and maintaining the private water mains, fire hydrants,
and built-in fire protection systems. The agreement shall meet the form and content approved by the
Rancho Cucamonga Fire District, Fire Safety Division. The agreement shall be recorded with the County
of San Bernardino, Recorders Office. The Fire Safety Division prior to recordation shall approve the
agreement.
PRIOR TO ISSUANCE OF BUILDING PERMITS- Complete the following:
1. Private/On-site Fire Hydrants: Prior to the issuance of any building permit, the applicant shall submit
construction plans, specifications, flow test data and calculations for the private water main system for
review and approval by the Fire District. Plans and installation shall comply with Fire District
standards. Contac the Fire Safety Division for a copy of "Fire District Notes for Underground and
Water Plans"
2. Private Fire Hydrants/On-site Installation: All private on-site fire hydrants shall be installed,
flushed, and operable prior to delivering any combustible building materials on-site (i.e., lumber,
roofing materials, etc.). A representative of Fire Construction Services shall inspect the installation
and witness hydrant flushing. The builder/developer shall submit final test and inspection report to the
Fire Safety Division.
3. Public Fire Hydrants: Prior to issuance of any building permit, the applicant shall submit a plan
showing the locations of all new public fire hydrants for the review and approval by the Fire District
and the Water District. On the plan show all existing fire hydrants within a 600-foot radius of the
project.
4. Public Installation: All required public fire hydrants shall be installed, flushed, and operable prior to
delivering any combustible building materials on-site (i.e., lumber, roofing materials, etc.). Water
District personnel shall inspect the installation and witness hydrant flushing. The builder/developer
shall submit a copy of the Water District inspection report to the Fire Safety Division. Contact Water
District to schedule testing.
PRIOR TO OCCUPANCY OR FINAL INSPECTION- Complete the following:
1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire
hydrant location on the street or driveway in accordance with Rancho Cucamonga Fire Protection
District and City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective
Hydrant Markers." On private property these markers are to be maintained in good condition by the
property owner. Contact Building and Safety/Fire Construction Services (909) 477-2713.
2. Private Fire Hydrants- Final Acceptance: For the purpose of final acceptance, an additional test of
the on-site fire hydrants shall be conducted by the builder/developer in the presence of the Water
District or Fire Construction Services, as appropriate. The builder/developer shall submit the final
test report to the Fire Safety Division.
3. Fire Sprinkler System- Plans and Permit: Plans for the required automatic fire sprinkler system
shall be submitted to Fire Construction Services for review and approval. No work is allowed without
a Fire Construction Services permit. Contact Building and Safety/Fire Construction Services (909)
477-2713.
4. Fire Sprinkler System- Final Inspection: Prior to the issuance of a Certificate of Occupancy, the
fire sprinkler system(s) shall be tested and accepted by Fire Construction Services. Contact Building
and Safety/Fire Construction Services (909) 477-2713.
5. Sprinkler Monitoring: The fire sprinkler system monitoring system shall be installed, tested, and
operational immediately following the completion of the fire sprinkler system. Monitoring is required
with 20 sprinklers in Group I Occupancies, or 100 or more sprinklers in all other Occupancies.
Contact Building and Safety/Fire Construction Services (909) 477-2713.
6. Fire Suppression System: Plans and specifications for the fire suppression system for the protection of
commercial-type cooking equipment or other special hazard shall be submitted to Fire Construction
Services for review and approval. No work is allowed without a Fire Construction Services permit.
Contact Building and Safety/Fire Construction Services (909) 477-2713.
7. Fire Alarm System: Plans for the fire alarm system shall be submitted to Fire Construction Services for
review and approval. No work is allowed without a Fire District permit. Contact Building and Safety/Fire
Construction Services (909) 477-2713.
8. Access ControVrraffic Calming Device Permit:A Fire District permit is required to install any access
control device, traffic-calming device, or gate on any access roadway. Applicable CC&R's, or other
approved documents, shall contain provisions that prohibit obstructions such as traffic-calming devices
(speed bumps, humps, etc.),control gates, bollards, or other modifications in fire lanes or access
roadways without prior written approval of the Fire District, Fire Safety Division
9. Knox Rapid Entry System: A Knox rapid entry key vault shall be installed prior to final inspection.
Proof of purchase shall be submitted prior to final building plan approval. Contact the Fire Safety
Division for specific details and ordering information. Contact Building and Safety/Fire Construction
Services (909) 477-2713 for inspection.
10. Construction Access: Fire District access, a minimum 26-feet in width and 14-feet, 6-inches minimum
clear height shall be provided. These minimum clearances shall be maintained free and clear of any
obstructions at all times, in accordance with Fire District Standards. Contact the Fire Safety Division
(909)477-2770
11. Phased Construction: Each phase shall be provided with approved Fire District access roadways.
Dead-end roadways shall not exceed the maximum permitted by the Fire Code or Fire District
standards.
12. Fire Lanes: Prior to the issuance of any Certificate of Occupancy,the fire lanes shall be installed in
accordance with the approved fire lane plan. The CC&R's or other approved documents shall contain an
approved fire lane map and provisions that prohibit parking in the fire lanes. The method of enforcement
shall be documented. The CC&R's shall also identify who is responsible for not less than annual
inspection and maintenance of all required fire lanes. Contact Building and Safety/Fire Construction
Services (909) 477-2713.
13. Address-Other Than Single-family: New buildings other than single-family dwellings shall post the
address with minimum 8-inch numbers on contrasting background, visible from the street and electrically
illuminated during periods of darkness. When the building setback exceeds 200 feet from the public
street an additional non-illuminated 6-inch minimum number address shall be provided at the property
entrance. Contact Building and Safety/Fire Construction Services (909) 477-2713.
14. Fire Suppression Systems-Final Inspection and Testing: Prior to the issuance of a Certificate of
Occupancy,the fire suppression system(s)shall be tested and accepted by Fire Service Construction
Services.
15. Fire Alarm System- Final Inspection and Testing: Prior to the issuance of a Certificate of Occupancy,
the Fire sprinkler Monitoring alarm system shall be tested and accepted by Fire Construction Services.
16. Fire District Confidential Business Occupancy Information: The applicant shall complete the
Rancho Cucamonga Fire District "Confidential Business Occupancy Information" Form and submit to
the Fire Safety Division. This form provides contact information for Fire District use in the event of an
emergency at the subject building or property.