HomeMy WebLinkAbout04-55 - Resolutions RESOLUTION NO. 04-55
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT
REVIEW DRC2003-00866 TO CONSTRUCT 4 ONE-STORY CONCRETE
TILT-UP INDUSTRIAL BUILDINGS RANGING FROM 18,270 TO 236,440
SQUARE FEET FOR A TOTAL 303,580 SQUARE FEET ON 12.91 ACRES
OF LAND IN THE GENERAL INDUSTRIAL DISTRICT (SUBAREA 8),
LOCATED AT THE SOUTHEAST CORNER OF ARROW ROUTE AND
ROCHESTER AVENUE IN THE"WATSON 1-15 BUSINESS CENTER,"AND
MAKING FINDINGS IN SUPPORT THEREOF—APN: 0229-121-37AND39
THRU 41, 43, AND 44.
A. Recitals.
1. Panattoni Development filed an application for the approval of Development Review
DRC2004-00866, for the development of 4 industrial buildings totaling 303,580 square feet on 12.91
acres of land within the General Industrial District.
2. On the 12th day of May 2004, the Planning Commission of the City of Rancho
Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing
on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW,THEREFORE, it is hereby found, determined, and resolved by the Planning Commission
of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the above-
referenced public hearing on May 12, 2004, including written and oral staff reports, together with
public testimony, this Commission hereby specifically finds as follows:
a. The application applies to infill properties located at the southeast comer of Arrow
Route and Rochester Avenue, within an existing industrial business park; and
b. The application contemplates the construction of 4 industrial warehouse buildings
totaling 303,580 square feet; and
C. The proposed project, together with the conditions applicable thereto, will not be
detrimental to the public health, safety, or welfare or materially injurious to properties or
improvements in the vicinity.
3. Based upon the substantial evidence presented to this Commission during the above-
referenced public hearing and upon the specific findings of facts set forth in paragraphs 1 and 2
above, this Commission hereby finds and concludes as follows:
a. The proposed project is consistent with the General Plan; and
PLANNING COMMISSION RESOLUTION NO. 04-55
DRC2003-00866 — PANATTONI DEVELOPMENT
May 12, 2004
Page 2
b. The design or improvements of the proposed project is consistent with the
Development Code, and the purposes of the district in which the site is located; and
C. The site is physically suitable for the type of development proposed; and
d. The design of the project is not likely to cause substantial environmental damage
and avoidable injury to humans and wildlife or their habitat; and
e. The proposed project is not likely to cause serious public health problems.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration, together with all written and oral reports included for the environmental assessment for
the application,the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and
Monitoring Program attached hereto, and incorporated herein by this reference, based upon the
findings as follows:
a. That the Mitigated Negative Declaration has been prepared in compliance with the
California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines
promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared
therefore reflect the independent judgment of the Planning Commission; and, further, this
Commission has reviewed and considered the information contained in said Mitigated Negative
Declaration with regard to the application.
b. Although the Mitigated Negative Declaration identifies certain significant
environmental effects that will result if the project is approved, all significant effects have been
reduced to an acceptable level by imposition of mitigation measures on the project,which are listed
below as conditions of approval.
C. Pursuant to the provisions of Section 753.5(c) of Title 14 of the California Code of
Regulations, the Planning Commission finds as follows: In considering the record as a whole, the
Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the
proposed project will have potential for an adverse impact upon wildlife resources orthe habitat upon
which wildlife depends. Further, based upon the substantial evidence contained in the Mitigated
Negative Declaration, the staff reports and exhibits, and the information provided to the Planning
Commission during the public hearing, the Planning Commission hereby rebuts the presumption of
adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code of Regulations.
5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth below
and in the Standard Conditions, attached hereto and incorporated herein by this reference:
Planning Division
1) No wall shall exceed an exposed height of 8 feet as viewed from
adjacent properties and street.
2) No chain link fencing is permitted.
3) Provide tables, chairs, and shade for outdoor employee eating areas.
PLANNING COMMISSION RESOLUTION NO. 04-55
DRC2003-00866 — PANATTONI DEVELOPMENT
May 12, 2004
Page 3
4) Truck parking spaces shall be a minimum of 14 feet wide by 50 feet
deep.
Engineering Division
1) The drainage runoff from these developed site(s) shall not adversely
affect the existing developed sites downstream. For sump catch basins
in the private storm drain, the storm drain from the sump area shall
have a total outlet capacity to handle Q100 and a secondary surface
overflow shall be provided to handle the Q100 if the sump outlet is
plugged.
a) If over-flows are directed to Jersey Court, the existing curbside
drain(s) will need to be increased in size and/or number in order
to handle the Q100.
b) If over-flows are directed to Rochester Avenue, curbside drain
outlets will need to be installed and will be sized to handle the
Q100.
c) Sumps in the private storm drain system shall be designed for
0100 and the pond depth can be no greater than 12 inches in
automobile parking areas (18 inches in truck parking areas).
2) Revise existing Public Street Improvement Plans for RochesterAvenue
to show new storm drain facilities. On Rochester Avenue, remove the
abandoned drive approach and replace with curb and gutter. On Arrow
Route and Rochester Avenue provide and/or protect sidewalk, street
tree(s), streetlights, landscaping, street signs, striping, etc. or replace.
On the Title Sheet of the plans revise the street tree table and
construction notes as required by the City Engineer.
3) Relocate existing trees to accommodate new drive approaches or
provide new trees. Provide additional street trees per City Standards,
to the satisfaction of the City Engineer.
4) Protect all existing street improvements on Rochester, Arrow and
Jersey Court in place; including, but not limited to, curb and gutter,
sidewalk, streetlights, and street trees; or replace as required by the
City Engineer.
5) The existing overhead utilities (telecommunications and electrical,
except for the 66kV electrical) on the project side of Arrow Route
(existing Parcel 6, PM10782) shall be undergrounded along the entire
project frontage, extending from the first pole off site west of Rochester
Avenue to the first pole east of the project boundary, prior to public
improvement acceptance or occupancy, whichever occurs first. All
services crossing Arrow Route shall be undergrounded at the same
time. The developer may request a reimbursement agreement to
recover one-half the City adopted cost for undergrounding from future
PLANNING COMMISSION RESOLUTION NO. 04-55
DRC2003-00866— PANATTONI DEVELOPMENT
May 12, 2004
Page 4
development (redevelopment) as it occurs on the opposite side of the
street. If the developer fails to submit for said reimbursement
agreement within 6 months of the public improvements being accepted
by the City, all rights of the developer to reimbursement shall terminate.
Environmental Mitigation
Air Quality
1) All construction equipment shall be maintained in good operating
condition so as to reduce operational emissions. The contractor shall
ensure that all construction equipment is being properly serviced and
maintained as per manufacturers' specifications. Maintenance records
shall be available at the construction site for City verification.
2) Prior to the issuance of any grading permits, the developer shall submit
construction plans to the City denoting the proposed schedule and
projected equipment use. Construction contractors shall provide
evidence that low emission mobile construction equipment will be
utilized, or that their use was investigated and found to be infeasible for
the project. Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality Management District
(SCAQMD) as well as City Planning Staff.
3) All paints and coatings shall meet or exceed performance standards
noted in SCAQMD Rule 1113. Paints and coatings shall be applied
either by hand or high-volume, low-pressure spray.
4) All asphalt shall meet or exceed performance standards noted in
SCAQMD Rule 1108.
5) All construction equipment shall comply with SCAQMD Rules 402 and
403. Additionally, contractors shall include the following provisions:
• Reestablish ground cover on the construction site through
seeding and watering.
• Pave or apply gravel to any on-site haul roads.
• Phase grading to prevent the susceptibility of large areas to
erosion over extended periods of time.
• Schedule activities to minimize the amounts of exposed
excavated soil during and after the end of work periods.
• Dispose of surplus excavated material in accordance with local
ordinances and use sound engineering practices.
• Sweep streets according to a schedule established by the City if
silt is carried over to adjacent public thoroughfares or occurs as a
result of hauling. Timing may vary depending upon the time of
year of construction.
PLANNING COMMISSION RESOLUTION NO. 04-55
DRC2003-00866— PANATTONI DEVELOPMENT
May 12, 2004
Page 5
• Suspend grading operations during high winds(i.e., wind speeds
exceeding 25 mph) in accordance with Rule 403 requirements.
Maintain a minimum 24-inch freeboard ratio on soils haul trucks or
cover payloads using tarps or other suitable means.
6) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and Regional Water Quality Control Board
[RWQCB]) daily to reduce PM10 emissions, in accordance with
SCAQMD Rule 403.
7) Chemical soil-stabilizers(approved by SCAQMD and RWQCB)shall be
applied to all inactive construction areas that remain inactive for 96
hours or more to reduce PM10 emissions.
8) The construction contractor shall utilize electric or clean alternative fuel
powered equipment where feasible.
9) The construction contractor shall ensure that construction grading plans
include a statement that work crews will shut off equipment when not in
use.
10) All industrial and commercial facilities shall post signs requiring that
trucks shall not be left idling for prolonged periods (i.e., in excess of 10
minutes).
11) All industrial and commercial facilities shall designate preferential
parking for vanpools.
12) All industrial and commercial site tenants with 50 or more employees
shall be required to post both bus and Metrolink schedules in
conspicuous areas.
13) All industrial and commercial site tenants with 50 or more employees
shall be required to configure their operating schedules around the
Metrolink schedule to the extent reasonably feasible.
Cultural Resources
1) If any prehistoric archaeological resources are encountered before or
during grading, the developer will retain a qualified archaeologist to
monitor construction activities, to take appropriate measures to protect
or preserve them for study. With the assistance of the archaeologist,
the City of Rancho Cucamonga will:
Enact interim measures to protect undesignated sites from
demolition or significant modification without an opportunity for
the City to establish its archaeological value.
PLANNING COMMISSION RESOLUTION NO. 04-55
DRC2003-00866 — PANATTONI DEVELOPMENT
May 12, 2004
Page 6
• Consider establishing provisions to require incorporation of
archaeological sites within new developments, using theirspecial
qualities as a theme or focal point.
• Pursue educating the public about the area's archaeological
heritage.
• Propose mitigation measures and recommend conditions of
approval to eliminate adverse project effects on significant,
important, and unique prehistoric resources,following appropriate
CEQA guidelines.
• Prepare a technical resources management report, documenting
the inventory, evaluation, and proposed mitigation of resources
within the project area. Submit one copy of the completed report
with original illustrations, to the San Bernardino County
Archaeological Information Center for permanent archiving.
2) A qualified paleontologist shall conduct a preconstruction field survey of
the project site. The paleontologist shall submit a report of findings that
will also provide specific recommendations regarding further mitigation
measures (i.e., paleontological monitoring) that may be appropriate.
Where mitigation monitoring is appropriate, the program must include,
but not be limited to, the following measures:
• Assign a paleontological monitor, trained and equipped to allow
the rapid removal of fossils with minimal construction delay,to the
site full-time during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared or graded,
divert earth-disturbing activities elsewhere until the monitor has
completed salvage. If construction personnel make the
discovery, the grading contractor should immediately divert
construction and notify the monitor of the find.
• Submit a summary report to City of Rancho Cucamonga.
Transfer collected specimens with a copy of the report to the San
Bernardino County Museum.
Geology and Soils
1) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and RWQCB)daily to reduce PM10 emissions,
in accordance with SCAQMD Rule 403.
2) Frontage public streets shall be swept according to a schedule
established by the City to reduce PM10 emissions associated with
vehicle tracking of soil off-site. Timing may vary depending upon the
time of year of construction.
3) Grading operations shall be suspended when wind speeds exceed
25 mph to minimize PM10 emissions from the site during such episodes.
PLANNING COMMISSION RESOLUTION NO. 04-55
DRC2003-00866 — PANATTONI DEVELOPMENT
May 12, 2004
Page 7
4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB)shall be
applied to all inactive construction areas that remain inactive for 96
hours or more to reduce PM10 emissions.
Hydrology and Water Quality
1) Structures to retain precipitation and runoff on-site shall be integrated
into the design of the project where appropriate. Measures that may be
used to minimize runoff and to enhance infiltration include Dutch drains,
precast concrete lattice blocks and bricks, terraces, diversions, runoff
spreaders, seepage pits, and recharge basins.
2) Prior to issuance of grading permits, the applicant shall prepare a
Storm Water Pollution Prevention Plan (SWPPP) that identifies Best
Management Practices(BMPs)to be implemented during the period the
site is under construction. BMPs shall be identified on the grading
plans for review and approval by the City Engineer.
3) Prior to issuance of building permits, the applicant shall submit to the
City Engineer for approval of a Water Quality Management Plan
(WQMP), including a project description and identifying BMPs that will
be used on-site to reduce pollutants into the storm drain system to the
maximum extent practicable. The WQMP shall identify the structural
and non-structural measures consistent with the Guidelines for New
Development and Redevelopment adopted by the City of Rancho
Cucamonga in June 2000.
4) Prior to issuance of grading or paving permits, the applicant shall
submit to the City Engineer a Notice of Intent (NOI) to comply with
obtaining coverage under the National Pollution Discharge Elimination
System (NPDES) General Construction Storm Water Permit from the
State Water Resources Control Board. Evidence that this has been
obtained (i.e., a copy of the Waste Discharger's Identification Number)
shall be submitted to the City Engineer for coverage under the NPDES
General Construction Permit.
Noise
1) Construction or grading shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday.
2) Construction or grading noise levels shall not exceed the standards
specified in Development Code Section 17.02.120-D, as measured at
the property line. The developer shall hire a consultant to perform
weekly noise level monitoring as specified in Development Code
Section 17.02.120. Monitoring at other times may be required by the
Planning Division. The said consultant shall report their findings to the
Planning Division within 24 hours; however, if noise levels exceed the
above standards, then the consultant shall immediately notify the
PLANNING COMMISSION RESOLUTION NO. 04-55
DRC2003-00866— PANATTONI DEVELOPMENT
May 12, 2004
Page 8
Planning Division. If noise levels exceed the above standards, then
construction activities shall be reduced in intensity to a level of
compliance with above noise standards or halted.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 12TH DAY OF MAY 2004.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY:
arty T. Niel, Vice Chairman
ATTEST: Ir
Brad B ecreta
I, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby
certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the
Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning
Commission held on the 12th day of May 2004, by the following vote-to-wit:
AYES: COMMISSIONERS: FLETCHER, McNIEL, McPHAIL, STEWART
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: MACIAS
City of Rancho Cucamonga
MITIGATION MONITORING
PROGRAM
Project File No.: Development Review DRC2003-00866
This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation
measures identified in the Mitigated Negative Declaration forthe above-listed project. This program
has been prepared in compliance with State law to ensure that adopted mitigation measures are
implemented (Section 21081.6 of the Public Resources Code).
Program Components - This MMP contains the following elements:
1. Conditions of approval that act as impact mitigation measures are recorded with the action and
the procedure necessary to ensure compliance.The mitigation measure conditions of approval
are contained in the adopted Resolution of Approval for the project.
2. A procedure of compliance and verification has been outlined for each action necessary. This
procedure designates who will take action, what action will be taken and when, and to whom
and when compliance will be reported.
3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring
progresses, changes to compliance procedures may be necessary based upon
recommendations by those responsible for the program.
Program Management - The MMP will be in place through all phases of the project. The project
planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project
planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly
and proper action is taken on each mitigation. Each City department shall ensure compliance of the
conditions (mitigation) that relate to that department.
Procedures - The following steps will be followed by the City of Rancho Cucamonga.
1. A fee covering all costs and expenses, including any consultants' fees, incurred by the City in
performing monitoring or reporting programs shall be charged to the applicant.
2. A MMP Reporting Form will be prepared for each potentially significant impact and its
corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached
hereto. This procedure designates who will take action, what action will be taken and when,and
to whom and when compliance will be reported. All monitoring and reporting documentation will
be kept in the project file with the department having the original authority for processing the
project. Reports will be available from the City upon request at the following address:
City of Rancho Cucamonga - Lead Agency
Planning Division
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
DRC2003-00107 AND SUBTPM16123
PANATTONIDEVELOPMENT
Page 2
3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,as
determined by the project planner or responsible City department, to monitor specific mitigation
activities and provide appropriate written approvals to the project planner.
4. The project planner or responsible City department will approve, by signature and date, the
completion of each action item that was identified on the MMP Reporting Form. After each
measure is verified for compliance, no further action is required for the specific phase of
development.
5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off
as completed by the project planner or responsible City department at the bottom of the MMP
Reporting Form.
6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation
measures.The project planner is responsible for approving any such refinements or additions.
An MMP Reporting Form will be completed by the project planner or responsible City department
and a copy provided to the appropriate design, construction, or operational personnel.
7. The project planner or responsible City department has the authority to stop the work of
construction contractors if compliance with any aspects of the MMP is not occurring after written
notification has been issued. The project planner or responsible City department also has the
authority to hold certificates of occupancies if compliance with a mitigation measure attached
hereto is not occurring.The project planner or responsible City department has the authority to
hold issuance of a business license until all mitigation measures are implemented.
8. Any conditions (mitigation) that require monitoring after project completion shall be the
responsibility of the City of Rancho Cucamonga Planning Division.The Division shall require the
applicant to post any necessary funds (or other forms of guarantee)with the City. These funds
shall be used by the City to retain consultants and/or pay for City staff time to monitor and report
on the mitigation measure for the required period of time.
9. In those instances requiring long-term project monitoring, the applicant shall provide the City
with a plan for monitoring the mitigation activities at the project site and reporting the monitoring
results to the City. Said plan shall identify the reporter as an individual qualified to know whether
the particular mitigation measure has been implemented. The monitoring/reporting plan shall
conform to the City's MMP and shall be approved by the Community Development Director or
City Planner prior to the issuance of building permits.
MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III)
Project File No.: DRC2003-00866 Applicant: Panattoni Development
Initial Study Prepared by: Douglas Fenn, Associate Planner Date: March 16. 2004
ResponsibleMitigation Measures No. I g of Method .
Implementing Action for Monitoring Frequency Verification Verification Date/Initials Non-Compliance
Air Quality
All construction equipment shall be maintained in good CP C Review of Plans A/C 2/4
operating condition so as to reduce operational
emissions. Contractor shall ensure that all construction
equipment is being properly serviced and maintained as
per manufacturers'specifications. Maintenance records
shall be available at the construction site for City
verification.
Prior to the issuance of any grading permits, developer CP/CE C Review of Plans C 2
shall submit construction plans to City denoting the
proposed schedule and projected equipment use.
Construction contractors shall provide evidence that low
emission mobile construction equipment will be utilized,
or that their use was investigated and found to be
infeasible for the project. Contractors shall also conform
to any construction measures imposed by the SCAQMD
as well as City Planning Staff.
All paints and coatings shall meet or exceed CP C Review of Plans A/C 2/4
performance standards noted in SCAQMD Rule 1113.
Paints and coatings shall be applied either by hand or
high volume, low-pressure spray.
All asphalt shall meet or exceed performance standards BO B Review of Plans A/C 2
noted in SCAQMD Rule 1108.
All construction equipment shall comply with SCAQMD CE C Review of Plans A/C 2/4
Rules 402 and 403. Additionally, contractors shall
include the following provisions:
• Reestablish ground cover on the construction site CE C Review of Plans A/C 2/4
through seeding and watering.
Pave or apply gravel to any on-site haul roads. CE C Review of Plans A/C 2/4
1 of 6
Mitigation Measures No.
Responsible g of Method .
Implementing Action for Monitoring Frequency Verification Verification
Date/initials Non-Compliance
• Phase grading to prevent the susceptibility of large CE C Review of Plans A/C 2/4
areas to erosion over extended periods of time.
• Schedule activities to minimize the amounts of CE C Review of Plans A/C 2/4
exposed excavated soil during and after the end of
work periods.
• Dispose of surplus excavated material in CE C Review of Plans A 4
accordance with local ordinances and use sound
engineering ractices.
• Sweep streets according to a schedule established CE C During A 4
by the City if silt is carried over to adjacent public Construction
thoroughfares or occurs as a result of hauling.
Timing may vary depending upon time of year of
construction.
• Suspend grading operations during high winds(i.e., BO/CE C During A q
wind speeds exceeding 25 mph)in accordance with Construction
Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils CE C During A 4
haul trucks or cover payloads using tarps or other Construction
suitable means.
The site shall be treated with water or other soil BO/CE C During A 4
stabilizing agent(approved by SCAQMD and RWQCB) Construction
daily to reduce PM10 emissions, in accordance with
SCAQMD Rule 403.
Chemical soil stabilizers (approved by SCAQMD and BO/CE C During A 4
RWQCB) shall be applied to all inactive construction Construction
areas that remain inactive for 96 hours or more to
reduce PMIO emissions.
The construction contractor shall utilize electric or clean CE C Review of Plans A/C 4
alternative fuel powered equipment where feasible.
The construction contractor shall ensure that CE C Review of Plans A/C 2/4
construction-grading plans include a statement that work
crews will shut off equipment when not in use.
All industrial and commercial facilities shall post signs BO C Review of Plans A 4
requiring that trucks shall not be left idling for prolonged
periods (i.e., in excess of 10 minutes).
All industrial and commercial facilities shall designate CP C Review of Plans A/C 2/3
preferential parking for vanpools.
2of6
Mitigation . Responsible Monitoring Timing . od of Verified Sanctions
ImplementingDate/initials Non-Compliance
All industrial and commercial site tenants with 50 or CP C Review of Plans D 2/3
more employees shall be required to post both bus and
Metrolink schedules in conspicuous areas.
All industrial and commercial site tenants with 50 or CP C Review of plans D 2/3
more employees shall be required to configure their
operating schedules around the Metrolink schedule to
the extent reasonably feasible.
Cultural Resources
If any prehistoric archaeological resources are
encountered before or during grading,the developer will
retain a qualified archaeologist to monitor construction
activities, to take appropriate measures to protect or
preserve them for study. With the assistance of the
archaeologist, the City of Rancho Cucamonga will:
• Enact interim measures to protect undesignated CP/BO C Review of Report A/D 3/4
sites from demolition or significant modification
without an opportunity for the City to establish its
archaeological value.
• Consider establishing provisions to require CP/BO C Review of Report A/D 3/4
incorporation of archaeological sites within new
developments, using their special qualities as a
theme or focal point.
• Pursue educating the public about the CP/BO C Reviewof Report A/D 3/4
archaeological heritage of the area.
• Propose mitigation measures and recommend CP/BO C Review of Report A/D 3/4
conditions of approval to eliminate adverse project
effects on significant, important, and unique
prehistoric resources, following appropriate CEQA
guidelines.
• Prepare a technical resources management report, CP C Review of Report A/D 3/4
documenting the inventory, evaluation, and
proposed mitigation of resources within the project
area. Submit one copy of the completed report with
original illustrations, to the San Bernardino County
Archaeological Information Center for permanent
archiving.
3 of 6
Mitigation . . g of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification
Date/initials Non-Compliance
A qualified paleontologist shall conduct a CP B Review of Report A/D 4
preconstruction field survey of the project site. The
paleontologist shall submit a report of findings that
will also provide specific recommendations
regarding further mitigation measures (i.e.,
paleontological monitoring)that may be appropriate.
Where mitigation monitoring is appropriate, the
,program must include, but not be limited to, the
following measures:
Assign a paleontological monitor, trained and CP B Review of Report AID 4
equipped to allow the rapid removal of fossils with
minimal construction delay, to the site full-time
during the interval of earth-disturbing activities.
Should fossils be found within an area being cleared BO. B/C Review of Report A/D 4
or graded, divert earth-disturbing activities
elsewhere until the monitor has completed salvage.
If construction personnel make the discovery, the
grading contractor should immediately divert
construction and notify the monitor of the find.
Submit summary report to City of Rancho CP D Review of Report D 3
Cucamonga. Transfer collected specimens with a
copy of the report to San Bernardino County
Museum.
Geology and Soils -
The site shall be treated with water or other soil BO/CE C During A 4
stabilizing agent(approved by SCAQMD and RWQCB) Construction
daily to reduce PMIo emissions, in accordance with
SCAQMD Rule 403.
Frontage public streets shall be swept according to a CE C During A 4
schedule established by the City to reduce PM10 Construction
emissions associated with vehicle tracking of soil
off-site. Timing may vary depending upon the time of
year of construction.
Grading operations shall be suspended when wind BO/CE C During A 4
speeds exceed 25 mph to minimize PM10 emissions Construction
from the site during such episodes.
4of6
ImplementingMitigation Measures No. I Responsible Monitoring Timing of Method of Verified Sanctions for
Date/Initials Non-Compliance
Chemical soil-stabilizers (approved by SCAQMD and BO/CE C During A 4
RWQCB) shall be applied to all inactive construction Construction
areas that remain inactive for 96 hours or more to
reduce PM10 emissions.
Hydrology and Water Quality
Structures to retain precipitation and runoff on-site shall CE B/C/D Review of Plans A/C 2/4
be integrated into the design of the project where
appropriate. Measures that may be used to minimize
runoff and to enhance infiltration include Dutch drains,
precast concrete lattice blocks and bricks, terraces,
diversions,runoff spreaders,seepage pits,and recharge
basins.
Prior to issuance of grading permits, the applicant shall CE B/C/D Review of Plans A/C 2/4
prepare a SWPPP that identifies Best Management
Practices (BMPs)to be implemented during the period
the site is under construction. BMPs shall be identified
on the grading plans for review and approval by the City
Engineer.
Prior to issuance of building permits,the applicant shall CE B/C/D Review of Plans A/C 2/4
submit to the City Engineer for approval of a Water
Quality Management Plan (WQMP), including a project
description and identifying BMPs that will be used
on-site to reduce pollutants into the storm drain system
to the maximum extent practicable. The WQMP shall
identify the structural and non-structural measures
consistent with the Guidelines for New Development and
Redevelopment adopted by the City of Rancho
Cucamonga in June 2000.
Prior to issuance of grading or paving permits, the CE B/C/D Review of Plans A/C 2/4
applicant shall submit to the City Engineer a Notice of
Intent(NOI)to comply with obtaining coverage under the
National Pollution Discharge Elimination System
(NPDES) General Construction Storm Water Permit
from the State Water Resources Control Board.
Evidence that this has been obtained(i.e.,a copy of the
Waste Discharger's Identification Number) shall be
submitted to the City Engineer for coverage under the
NPDES General Construction Permit.
5of6
Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing
Action Date/initials Non-Compliance
Noise -
Construction or grading shall not take place between the BO C During A ::7hours of 8:00 p.m, and 6:30 a.m. on weekdays, Constructionincluding Saturday, or at any time on Sunday or a
national holiday.
Construction or grading noise levels shall not exceed the CP C During A
standards specified in Development Code Section Construction
17.02.120-D, as measured at the property line. The
developer shall hire a consultant to perform weekly
noise level monitoring as specified in Development
Code Section 17.02.120. Monitoring at other times may
be required by the Planning Division. The said
consultant shall report their findings to the Planning
Division within 24 hours;however, if noise levels exceed
the above standards, then the consultant shall
immediately notify the Planning Division. If noise levels
exceed the above standards,then construction activities
shall be reduced in intensity to a level of compliance with
above noise standards or halted.
Key to Checklist Abbreviations
Responsible Person 'Monitoring Frequency Method of Verification Sanctions
CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map
CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit
CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy
BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order
PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds
FC-Fire Chief or designee 6-Revoke CUP
7-Citation
6 of 6
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT#: DRC2003-00866
SUBJECT: Four Industrial Buildings
APPLICANT: Panattoni Development
LOCATION: Southeast Corner of Arrow Route and Rochester Avenue
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DIVISION,(909)477-2750, FOR COMPLIANCE
WITH THE FOLLOWING CONDITIONS:
A. General Requirements Completion Date
1. The applicant shall agree to defend at his sole expense any action brought against the City, its
agents,officers,or employees,because of the issuance of such approval,or in the alternative,to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or
employees, for any Court costs and attorney's fees which the City, its agents, officers, or
employees may be required by a court to pay as a result of such action. The City may,at its sole
discretion,participate at its own expense in the defense of any such action but such participation
shall not relieve applicant of his obligations under this condition.
2. Copies of the signed Planning Commission Resolution of Approval No. 04-55, Standard
Conditions, and all environmental mitigations shall be included on the plans (full size). The
sheet(s)are for information only to all parties involved in the construction/grading activities and
are not required to be wet sealed/stamped by a licensed Engineer/Architect.
B. Time Limits
1. Conditional Use Permit, Variance, or Development/Design Review approval shall expire if
building permits are not issued or approved use has not commenced within 5 years from the date
of approval. No extensions are allowed.
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which include
site plans,architectural elevations, exterior materials and colors,landscaping,sign program,and
grading on file in the Planning Division, the conditions contained herein, and the Development
Code regulations.
SC-1-04 1
i:\planning\final\pingromm\dre2003-00866cond 5-12.doc
Project No.DRC2003-00866
Completion Date
2. Prior to any use of the project site or business activity being commenced thereon, all Conditions
of Approval shall be completed to the satisfaction of the City Planner.
3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and
State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be
submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Division
to show compliance. The buildings shall be inspected for compliance prior to occupancy.
4. Revised site plans and building elevations incorporating all Conditions of Approval shall be
submitted for City Planner review and approval prior to the issuance of building permits.
5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved
use has commenced, whichever comes first.
6. Approval of this request shall not waive compliance with all sections of the Development Code,all
other applicable City Ordinances, and applicable Community or Specific Plans in effect at the
time of building permit issuance.
7. A detailed on-site lighting plan,including a photometric diagram,shall be reviewed and approved
by the City Planner and Police Department(477-2800) prior to the issuance of building permits.
Such plan shall indicate style,illumination, location, height,and method of shielding so as not to
adversely affect adjacent properties.
8. Trash receptacle(s)are required and shall meet City standards. The final design, locations,and
the number of trash receptacles shall be subject to City Planner review and approval prior to the
issuance of building permits.
9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be
located out of public view and adequately screened through the use of a combination of concrete
or masonry walls, berming, and/or landscaping to the satisfaction of the City Planner. For single-
family residential developments, transformers shall be placed in underground vaults.
10. All building numbers and individual units shall be identified in a clear and concise manner,
including proper illumination.
11. All parkways, open areas, and landscaping shall be permanently maintained by the property
owner,homeowners'association,or other means acceptable to the City. Proof of this landscape
maintenance shall be submitted for City Planner and City Engineer review and approved prior to
the issuance of building permits.
D. Building Design
1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or
projections, shall be shielded from view and the sound buffered from adjacent properties and
streets as required by the Planning Division. Such screening shall be architecturally integrated
with the building design and constructed to the satisfaction of the City Planner. Details shall be
included in building plans.
2. For commercial and industrial projects, paint roll-up doors and service doors to match main
building colors.
E. Parking and Vehicular Access (indicate details on building plans)
1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts
a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet
wide.
SC-1-04
2
i:\planning\final\pingcomm\dre2003-00866cond 5-12.doc
Project No.DRC2003-00866
Completion Date
2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall
contain a 12-inch walk adjacent to the parking stall (including curb).
3. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided
throughout the development to connect dwellings/units/buildings with open spaces/plazas/
recreational uses.
4. All parking spaces shall be double striped per City standards and all driveway aisles, entrances,
and exits shall be striped per City standards.
5. Handicap accessible stalls shall be provided for commercial and office facilities with 25 or more
parking stalls. Designate two percent or one stall; whichever is greater, of the total number of
stalls for use by the handicapped.
6. Motorcycle parking area shall be provided for commercial and office facilities with 25 or more
parking stalls. Developments with over 100 parking stalls shall provide motorcycle parking at the
rate of one percent. The area for motorcycle parking shall be a minimum of 56 square feet.
F. Trip Reduction
1. Carpool and vanpool designated off-street parking close to the building shall be provided for
commercial, office, and industrial facilities at the rate of 10 percent of the total parking area. If
.covered, the vertical clearance shall be no less than 9 feet.
2. Category 5 telephone cable or fiber optic cable shall be provided for office buildings and other
non-residential development.
3. For industrial projects with at least 40 car parking spaces, bicyclist-changing facilities shall be
provided to encourage bicycle commuting. Accessible restrooms with storage lockers for
clothing and equipment shall be sufficient.
G. Landscaping
1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in
the case of residential development, shall be prepared by a licensed landscape architect and
submitted for City Planner review and approval prior to the issuance of building permits or prior
final map approval in the case of a custom lot subdivision.
2. Existing trees required to be preserved in place shall be protected with a construction barrier in
accordance with the Municipal Code Section 19.08.110,and so noted on the grading plans. The
location of those trees to be preserved in place and new locations for transplanted trees shall be
shown on the detailed landscape plans. The applicant shall follow all of the arborist's
recommendations regarding preservation, transplanting, and trimming methods.
3. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within
commercial and office projects, shall be specimen size trees - 24-inch box or larger.
4. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking
stalls.
5. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one
tree per 30 linear feet of building.
6. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope,but less than 2:1
slope, shall be, at minimum, irrigated and landscaped with appropriate ground cover for erosion
control. Slope planting required by this section shall include a permanent irrigation system to be
installed by the developer prior to occupancy.
SC-1-04
3
i:\planning\final\pingcomm\dre2003-00866cond 5-12.doc
Project No.DRC2003-00866
Completion Date
7. For multi-family residential and non-residential development,property owners are responsible for
the continual maintenance of all landscaped areas on-site, as well as contiguous planted areas
within the public right-of-way. All landscaped areas shall be kept free from weeds and debris and
maintained in healthy and thriving condition,and shall receive regular pruning,fertilizing,mowing,
and trimming. Any damaged,dead,diseased,or decaying plant material shall be replaced within
30 days from the date of damage.
8. The final design of the perimeter parkways,walls, landscaping,and sidewalks shall be included in
the required landscape plans and shall be subject to City Planner review and approval and
coordinated for consistency with any parkway landscaping plan which may be required by the
Engineering Division.
9. Landscaping and irrigation systems required to be installed within the public right-of-way on the
perimeter of this project area shall be continuously maintained by the developer.
10. All walls shall be provided with decorative treatment. If located in public maintenance areas,the
design shall be coordinated with the Engineering Division.
11. Tree maintenance criteria shall be developed and submitted for City Planner review and approval
prior to issuance of building permits. These criteria shall encourage the natural growth
characteristics of the selected tree species.
12. Landscaping and irrigation shall be designed to conserve water through the principles of
Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code.
H. Signs
1. The signs indicated on the submitted plans are conceptual only and not a part of this approval.
Any signs proposed for this development shall comply with the Sign Ordinance and shall require
separate application and approval by the Planning Division prior to installation of any signs.
2. A Uniform Sign Program for this development shall be submitted for City Planner review and /_/_
approval prior to issuance of building permits.
I. Environmental
1. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures, including monitoring and reporting. Applicant shall be required to
post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the
amount of$719 prior to the issuance of building permits,guaranteeing satisfactory performance
and completion of all mitigation measures. These funds may be used by the City to retain
consultants and/or pay for City staff time to monitor and report on the mitigation measures.
Failure to complete all actions required by the approved environmental documents shall be
considered grounds for forfeit.
J. Other Agencies
1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location
of mailboxes. Multi-family residential developments shall provide a solid overhead structure for
mailboxes with adequate lighting. The final location of the mailboxes and the design of the
overhead structure shall be subject to City Planner review and approval prior to the issuance of
building permits.
SC-1-04
4
i:\planning\final\pingcomm\dre2003-00866cond 5-12.doc
Project No.DRC2003-00866
Completion Date
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION,(909)477-2710, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
K. General Requirements
1. Submit five complete sets of plans including the following:
a. Site/Plot Plan;
b. Foundation Plan;
C. Floor Plan;
d. Ceiling and Roof Framing Plan;
e. Electrical Plans (2 sets,detached) including the size of the main switch, number and size
of service entrance conductors, panel schedules, and single line diagrams;
I. Plumbing and Sewer Plans, including isometrics, underground diagrams,water and waste
diagram, sewer or septic system location, fixture units, gas piping, and heating and air
conditioning; and
g. Planning Division Project Number(i.e., DRC2003-00866)clearly identified on the outside
of all plans.
2. Submit two sets of structural calculations, energy conservation calculations, and a soils report.
Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal.
3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to —J--L--
the
J_/_the City prior to permit issuance.
4. Separate permits are required for fencing and/or walls.
5. Business Business shall not open for operation prior to posting the Certificate of Occupancy issued by the
Building and Safety Division.
L. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be
marked with the project file number(i.e., DRC2001-00001). The applicant shall comply with the
latest adopted California Codes, and all other applicable codes, ordinances, and regulations in
effect at the time of permit application. Contact the Building and Safety Division for availability of
the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new commercial or industrial development project or
major addition,the applicant shall pay development fees at the established rate. Such fees may
include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation
Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program
deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to
the Building and Safety Division prior to permits issuance.
3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map
recordation and prior to issuance of building permits.
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday
through Saturday, with no construction on Sunday or holidays.
SC-1-04
5
i:\planning\final\pingcomm\dre2003-00866cond 5-12.doc
Project No.DRC2003-00866
Completion Date
5. Construct trash enclosure(s) per City Standard (available at the Planning Division's public
counter).
M. New Structures
1. Provide compliance with the California Building Code (CBC) for property line clearances
considering use, area, and fire-resistiveness.
2. Provide compliance with the California Building Code for required occupancy separations.
3. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC
Section 1505.
4. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A
5. Openings in exterior walls shall be protected in accordance with CBC Table 5-A.
6. Upon tenant improvement plan check submittal, additional requirements may be needed.
N. Grading
1. Grading of the subject property shall be in accordance with California Building Code,City Grading
Standards, and accepted grading practices. The final grading plan shall be in substantial
conformance with the approved grading plan.
2. A soils report shall be prepared by a qualified engineer licensed by the State of California to
perform such work.
3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the
time of application for grading plan check.
4. The final grading, appropriate certifications and compaction reports shall be completed,
submitted, and approved by the Building and Safety Official prior to the issuance of building
permits.
5. A separate grading plan check submittal is required for all new construction projects and for
existing buildings where improvements being proposed will generate 50 cubic yards or more of
combined cut and fill. The grading plan shall be prepared, stamped, and signed by a California
registered Civil Engineer.
APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
O. Dedication and Vehicular Access
1. Reciprocal access easements shall be provided ensuring access to all parcels by CC&Rs or by _/_/_
deeds and shall be recorded concurrently with the map or prior to the issuance of building
permits, where no map is involved.
2. Private drainage easements for cross-lot drainage shall be provided and shall be delineated or
noted on the final map.
SC-1-04
6
i:\planning\final\pingcomm\dre2003-00866cond 5-12.doc
Project No.DRC2003-00866
Completion Date
P. Street Improvements
1. Pursuant to City Council Resolution No.88-557,no person shall make connections from a source
of energy,fuel or power to any building service equipment which is regulated by technical codes
and for which a permit is required unless, in addition to any and all other codes, regulations and
ordinances,all improvements required by these conditions of development approval have been
completed and accepted by the City Council,except:that in developments containing more than
one building or unit, the development may have energy connections made to a percentage of
those buildings, or units proportionate to the completion of improvements as required by
conditions of approval of development. In no case shall more than 95 percent of the buildings or
units be connected to energy prior to completion and acceptance of all improvements required by
these conditions of approval of development.
2. Improvement Plans and Construction:
a. Street improvement plans, including street trees,street lights,and intersection safety lights
on future signal poles, and traffic signal plans shall be prepared by a registered Civil
Engineer and shall be submitted to and approved by the City Engineer. Security shall be
posted and an agreement executed to the satisfaction of the City Engineer and the City
Attorney guaranteeing completion of the public and/or private street improvements,prior to
final map approval or the issuance of building permits, whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a
construction permit shall be obtained from the City Engineer's Office in addition to any
other permits required.
C. Pavement striping, marking,traffic signing,street name signing,traffic signal conduit,and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction
project along major or secondary streets and at intersections for future traffic signals and
interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside
of BCR, ECR, or any other locations approved by the City Engineer
Notes:
1) Pull boxes shall be No.6 at intersections and No.5 along streets,a maximum of 200
feet apart, unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch galvanized steel with pull rope or as specified.
e. Handicapped access ramps shall be installed on all corners of intersections per City
Standards or as directed by the City Engineer.
f. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A cash
deposit shall be provided to cover the cost of grading and paving,which shall be refunded
upon completion of the construction to the satisfaction of the City Engineer.
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be
installed to City Standards, except for single family residential lots.
h. Street names shall be approved by the City Planner prior to submittal for first plan check.
3. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in
accordance with the City's street tree program.
SC-1-04
7
i:\planning\final\pingcomm\dre2003-00866cond 5-12.doc
Project No.DRC2003-00866
Completion Date
Q. Public Maintenance Areas
1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting
Districts shall be filed with the City Engineer prior to final map approval or issuance of building
permits whichever occurs first. Formation costs shall be borne by the developer.
R. Drainage and Flood Control
1. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the
property from adjacent areas.
S. Improvement Completion
1. If the required public improvements are not completed prior to approval of the final parcel map,
an improvement security accompanied by an agreement executed by the Developer and the City
will be required for: Tentative Tract Map 16466.
T. Utilities
1. Provide separate utility services to each parcel including sanitary sewerage system,water, gas,
electric power, telephone, and cable TV (all underground) in accordance with the Utility
Standards. Easements shall be provided as required.
2. The developer shall be responsible for the relocation of existing utilities as necessary.
3. Water and sewer plans shall be designed and constructed to meet the requirements of the
Cucamonga County Water District(CCW D),Rancho Cucamonga Fire Protection District,and the
Environmental Health Department of the County of San Bernardino. A letter of compliance from
the CCW D is required prior to final map approval or issuance of permits,whichever occurs first.
Such letter must have been issued by the water district within 90 days prior to final map approval
in the case of subdivision or prior to the issuance of permits in the case of all other residential
projects.
4. Approvals have not been secured from all utilities and other interested agencies involved.
Approval of the final parcel map will be subject to any requirements that may be received from
them.
U. General Requirements and Approvals
1. The separate parcels contained within the project boundaries shall be legally combined into one
parcel prior to issuance of building permits.
2. Prior to the issuance of building permits,a Diversion Deposit and related administrative fees shall
be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if
at least 50% of all wastes generated during construction and demolition are diverted from
landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to
the Engineering Division when the first building permit application is submitted to Building and
Safety. Form CD-2 shall be submitted to the Engineering Division within 60 days following the
completion of the construction and/or demolition project.
SC-1-04
8
i:\planning\final\pingcomm\dre2003-00866cond 5-12.doc
Project No.DRC2003-00866
Completion Date
APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
V. Security Lighting
1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power.
These areas should be lighted from sunset to sunrise and on photo sensored cell.
2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with
direct lighting to be provided by all entryways. Lighting shall be consistent around the entire
development.
3. Lighting in exterior areas shall be in vandal-resistant fixtures.
W. Security Hardware
1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within
40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used.
2. All garage or rolling doors shall have slide bolts or some type of secondary locking devices.
X. Security Fencing
1. All businesses or residential communities with security fencing and gates will provide the police
with a keypad access and a unique code.The initial code is to be submitted to the Police Crime
Prevention Unit along with plans. If this code is changed due to a change in personnel or for any
other reason, the new code must be supplied to the Police via the 24-hour dispatch center at
(909)941-1488 or by contacting the Crime Prevention Unit at(909)477-2800 extension 2474 or
extension 2475.
Y. Building Numbering
1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime
visibility.
2. Developer shall paint roof top numbers on one or more roofs of this development. They shall be
a minimum of three feet in length and two feet in width and of contrasting color to background.
The stencils for this purpose are on loan at the Rancho Cucamonga Police Department.
Z. Alarm Systems
1. Install a burglar alarm system and a panic alarm if needed. Instructing management and
employees on the operation of the alarm system will reduce the amount of false alarms and in
turn save dollars and lives.
APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, FIRE PROTECTION PLANNING
SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
SEE ATTACHED
SC-1-04
9
i:\planning\final\pingcomm\dre2003-00866cond 5-12.doc
RANCHO CUCAMONGA FIRE PROTECTION DISTRICT
STANDARD CONDITIONS
November 6, 2003
Panattoni Development
SEC Rochester & Arrow
(4) Concrete Tilt-up Buildings
DRC2003-00866
Reciprocal water (fire) supply agreement and non-buildable easement must be recorded prior to
building permit issuance. Proof of existing reciprocal easement with adjacent property must
submitted prior to permit issuance. See letter of obligation by Michael Johnson dated November 5,
2003.
FSC-1 General Requirements for Public and Private Water Supply
1. General Guidance for Fire Hydrants: The following provides general guidance for the spacing and location of
fire hydrants. Remember these are the maximum permitted distances between fire hydrants:
a. The maximum distance between fire hydrants in commercial/industrial projects is 300-feet. No portion
of the exterior wall shall be located more than 150-feet from an approved fire hydrant. For cul-de-sacs
the distance shall not exceed 100-feet.
b. The maximum distance between fire hydrants in multi-family residential is 400-feet. No portion of the
exterior wall shall be located more than 200-feet from an approved fire hydrant. For cul-de-sacs the
distance shall not exceed 150-feet.
c. The maximum distance between fire hydrants in single-family residential projects is 500-feet. No
portion of the exterior wall facing the addressed street shall be more than 250-feet from an approved
fire hydrant. For cul-de-sacs the distance shall not exceed 200 ft.
d. For single-family residential projects in the designated Hazardous Fire Area the maximum distance
between fire hydrants is 400-feet. No portion of the exterior wall facing the addressed street shall be
more than 200-feet from an approved fire hydrant. For cul-de-sacs the distance shall not exceed 150 ft.
e. Fire hydrants are to be located:
1. At the entrance(s)to a project from the existing public roadways. This includes subdivisions and
industrial parks.
2. At intersections.
3. On the right side of the street, whenever practical and possible.
4. As required by the Fire Safety Division to meet operational needs.
5. The location of fire hydrants is based upon the operational needs of the Fire District to control a
fire.
6. Fire hydrants shall be located a minimum of 40' from any building.
2. Minimum Fire Flow with Automatic Fire Sprinklers: The required minimum fire flow for this project is 4000
gallons per minute at a minimum residual pressure of 20 pounds per square inch. This flow reflects a 50
percent reduction for the installation of an approved automatic fire sprinkler system with central station
monitoring. This requirement is made in accordance with Fire Code Appendix III-A, as amended, and Fire
District Ordinances and Standards.
Page 1 of 7
3. Hydrants Used to Supply Fire Flow: Public fire hydrants located within a 500-toot radius of the proposed
project may be used to provide the required fire flow subject to Fire District review and approval. Private fire
hydrants on adjacent property shall not be used to provide required fire flow
FSC-2 Private (On-Site)Water and/or Fire Sprinkler Underground Plans for Fire Protection
1. Exceeds Allowable Distance: When any portion of a facility or building is located more than 150-feet from a
fire hydrant located on a public street, as measured by an approved route around the exterior of the facility or
building, on-site fire hydrants and mains capable of supplying the required fire flow shall be provided. The
distance is measured as vehicular path of travel on access roadways, not line of sight.
2. Number of Fire Hydrants: Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof,
subject to standard spacing and distribution requirements.
3. Fire Sprinkler Underground: Prior to the issuance of a fire sprinkler system permit, the applicant shall submit
construction plans, specifications, and calculations for the fire sprinkler system underground to the Fire Safety
Division for approval.
FSC-3 Automatic Fire Sprinkler Systems-Technical Comments
1. Required Installations:
Rancho Cucamonga Fire District Ordinance 15 or other adopted code or standard, requires an approved
automatic fire sprinkler system to be installed in any of the following:
a. Commercial or industrial structures greater than 7,500 square feet
b. All structures that do not meet Fire District access requirements (See Fire Access)
c. When required fire flow cannot be provided due to inadequate flow or pressure.
2. Access Mitigation: Any structure or building that does not meet minimum Fire District access
requirements shall be protected by an approved automatic fire sprinkler system.
FSC-4 Fire District Site Access-Technical Comments
1. Access Roadways Defined: Fire District access roadways include public roads, streets, and highways, as
well as private roads, streets, drive aisles and designated fire lanes.
2. Location of Access: All portions of the structure or facility or any portion of the exterior wall of the first story
shall be located within 150-feet of Fire District vehicle access, measured by an unobstructed approved route
around the exterior of the building. Landscaped areas, unpaved changes in elevation, gates, and fences are
an obstruction.
3. Private Roadways and Fire Lanes:The minimum specifications for private fire district access roadways are:
a. The minimum unobstructed width is 26-feet.
b. The inside turn radius shall not be larger than 24-feet.
c. The outside turn radius shall be not less than 50-feet.
d. The minimum radius for cul-de-sacs is 45-feet.
e. The minimum vertical clearance is 14 feet, 6 inches.
f. At any private entry median,the minimum width of traffic lanes shall be 20-feet.
g. The angle of departure and approach shall not exceed 9 degrees or 20 percent.
h. The maximum grade of the driving surface shall not exceed 12%.
Page 2 of 7
i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW).
4. Access Doorways: In addition to any exterior opening required by the Building or Fire Code, approved
doorways, accessible without the use of a ladder, shall be provided as follows:
a. In buildings without high-piled storage, one or more approved access doors shall be provided in150
lineal feet or major fraction thereof along the exterior wall that faces required access roadways or
walkways.
5. Access Walkways: Approved access walkways shall be provided from the fire apparatus access road to all
required building exterior openings.
6. Gates Standards: All gates shall be installed in accordance with Fire District Standards. The following
general design requirements apply:
a. The gate shall be motorized and slide open horizontally or swing inward.
b. All gates must fully open with one second for each one foot of required width, e.g., 20-ft./20 sec.
c. When fully open the minimum width shall be 20-feet.
d. Gates on access roads designated "Emergency Services Use Only' may be manually opening.
e. Gates on Commercial/Industrial facilities may be manually operated.
I. After project approval the applicant shall contact the Fire Safety Division for complete standard.
7. Vegetation: Trees and shrubs planted in any median shall be kept trimmed to a minimum of 144eet, 6- inches
from the ground up, so as not to impede fire vehicles. Contact the Fire Construction Services (909) 477-2713
8. Fire Lane Identification: All required fire lanes shall be identified by red curbing and signage. A drawing of
the proposed signage that meets the minimum Fire District standards shall be submitted to and approved.
Contact the Rancho Cucamonga Fire Protection District at (909)477-2770 for a copy of the FD Fire Lanes
standard.
FSC-8 Fire Alarm System
1. Required Installation: An automatic fire alarm (and detection) system is required by RCFPD Ordinance 15,
based on use or floor area,or by another adopted code or standard. Refer to Ordinance 15 and/or the
California Fire Code for specific requirements.
FSC-10 Hazard Control Permits-Technical Comments
The below indicated permit requirements are based on those permits commonly associated with the projects
operations or building construction. As noted below Special Permits may be required, dependent upon approved
use(s) the applicant must contact the Fire Safety Division for specific information:
Note: Carefully review the items below. There may be significant impact on the proposed project. Italicized
text indicates a Rancho Cucamonga Fire District amendment.
1. General Use Permit shall be required for any activity or operation not specifically described below, which in
the judgment of the Fire Chief is likely to produce conditions that may be hazardous to life or property.
2. Operate a place of public assembly.
3. Operate a repair garage (Motor Vehicle H-4).
4. Flammable finishes.
5. Spraying or dipping operations, spray booths, dip tanks, electrostatic apparatus, automobile undercoating,
powder coating, and organic peroxides and dual component coatings (per booth fee).
Page 3 of 7
6. Operate a mechanical refrigeration system (over 200-pounds of refrigerant).
7. Operate dust-producing processes and operations.
8. Flammable and combustible liquid (storage, handling, and/or use). Storage of flammable and combustible
liquids in outside aboveground storage tanks is prohibited by Rancho Cucamonga Fire Code.
9. High piled combustible storage.
10. Liquefied petroleum gas (storage, handling, use or transport, exceeding 100 gallons aggregate capacity).
On a scaled site plan show the occupancy or use of all buildings within a Yz mile radius. Storage exceeding
100 gallons aggregate capacity is not permitted within '/z mile of residential areas.
11. Hot work operations (welding and cutting operations in any occupancy).
12. Compressed natural gas. Bulk storage is not permitted within a Fr mile radius of any residential area. Bulk
storage in non-residential areas shall not exceed 183,000 aggregate capacity. Contact Fire Safety Division
for additional information.
13. Battery system—To install or operate lead-acid batteries over 100-gallon capacity.
14. Cryogenics. Flammable cryogenics are not permitted to be stored, dispensed, or used. Contact the Fire
Safety Division for additional information.
15. Dry cleaning plant.
16. Motor vehicle fuel-dispensing operation.
17. Tire storage—Open area used to store more than 1,000 cubic feet of tires.
18. Wood products—Store more than 200 cubic feet of chips, lumber, plywood, or hogged material.
FSC-11 Hazardous Materials—Compliance with Disclosure and Reporting Regulations
The San Bernardino County Fire Department shall review your Business Emergency/Contingency Plan for
compliance with minimum standards. Contact the San Bernardino County Fire, Hazardous Materials Division at
(909) 387-8412 for forms and assistance. The Codnty Fire Department is the Cal/EPA Certified Unified Program
Agency(CUPA) for the City of Rancho Cucamonga.
1. Certificate of Occupancy Restrictions: If the facility is a NEW business, a Certificate of Occupancy
issued by Building and Safety will not be finalized until the San Bernardino County Fire Department reviews
your Business Emergency/Contingency Plan. California Government Code, Section 65850.2 prohibits the
City from issuing a final Certificate of Occupancy unless the applicant has met or is meeting specific
hazardous material disclosure requirements. A Risk Management Program (RMP) may also be required if
regulated substances are to be used or stored at the new facility. Contact County Fire, Hazardous
Materials Division at (909) 386-8412 for forms and assistance.
2. Rental or Lease Properties: Any business that operates on rented or leased property, and is required to
submit a Plan, is required to submit a notice to the owner of the property in writing stating that the business
is subject to the Business Emergency/Contingency Plan mandates, and has complied with the provision,
and must provide a copy of the Plan to the property owner within 5 working days after receiving a request
from the owner.
FSC-12 Plan Submittal Required Notice
Required plans shall be submitted and approved prior to construction in accordance with 2000/2001 Building, Fire,
Mechanical, and Plumbing Codes; 1999 Electrical Code; Health and Safety Code; Public Resources Code; and
RCFPD Ordinances FD15 and FD39, Guidelines and Standards.
Page 4 of 7
FSC-14 Alternate Materials and Methods
The Fire Safety Division will review requests for alternate materials and methods within the scope of our authority.
The request must be submitted on the Fire District"Application for Alternate Method"form along with supporting
documents. .
PRIOR TO (PARCEL) MAP RECORDATION- For Each Development Phase
1. Prior to the recordation of the applicable subdivision map,the Fire District in consultation with the City Engineer
shall approve the locations of Traffic Signal Preemption Devices. The subdivider shall enter into an agreement with
the City for the installation of traffic signal preemption equipment for the surrounding controlled intersections.
2. Reciprocal Access Agreement: The plans as submitted indicate that a required point of Fire District access:
a. Requires passage on property not under the control of the applicant; or
b. Does not access a public way; or
c. Crosses a property line
Please provide a permanent access agreement granting irrevocable use of the adjacent property for use by the
Fire District to gain access to the subject property. The agreement shall include a statement that no
obstruction, gate, fence, building, or other structure shall be placed within the dedicated access. The recorded
agreement shall include a copy of the site plan required below. The agreement shall be recorded with the
County of San Bernardino, Recorders Office. The agreement shall be approved by the Fire Safety Division
prior to recordation.
To assist the Fire Safety Division in reviewing the agreement the following shall be included in the submittal:
a. Title Report. A current title report, policy of title insurance, or other equivalent documentation
proving ownership of all property included in the agreement.
b. Legal Description. A legal description of all property subject to the agreement.
c. Assessor's Parcel Numbers. The assessor's parcel numbers of each parcel subject to the
agreement.
d. Site Plan: The access roadway shall comply with the requirements of Private Roadways and Fire
Lanes listed above. A scaled site plan showing the path of the Fire District access, the width, turn radii,
load-bearing capacity of roadway surface, etc. shall be provided.
3. Reciprocal Water Covenant and Agreement: The plans as submitted indicate that a required private fire mains
or appurtenances thereto:
a. Pass through or are located on property not under the control of the applicant; or
b. Crosses a property line
Please provide a permanent maintenance and service agreement between the owner's granting a non-
exclusive easement for the purpose of accessing and maintaining the private water mains, fire hydrants, and
built-in fire protection systems. The agreement shall meet the form and content approved by the Rancho
Cucamonga Fire District, Fire Safety Division. The agreement shall be recorded with the County of San
Bernardino, Recorders Office. The agreement shall be approved by the Fire Safety Division prior to
recordation.
PRIOR TO ISSUANCE OF BUILDING PERMITS- Complete the following:
1. Private/On-site Fire Hydrants: Prior to the issuance of any building permit, the applicant shall submit
construction plans, specifications, flow test data and calculations for the private water main system for
review and approval by the Fire District. Plans and installation shall comply with Fire District standards.
Contac the Fire Safety Division for a copy of"Fire District Notes for Underground and Water Plans."
2. Private Fire Hydrants/On-site Installation: All private on-site fire hydrants shall be installed, flushed, and
operable prior to delivering any combustible building materials on-site (i.e., lumber, roofing materials, etc.).
Page 5 of 7
A representative of Fire Construction Services shall inspect the installation and witness hydrant flushing.
The builder/developer shall submit final test and inspection report to the Fire Safety Division.
3. Public Fire Hydrants: Prior to issuance of any building permit, the applicant shall submit a plan showing
the locations of all new public fire hydrants for the review and approval by the Fire District and the Water
District. On the plan show all existing fire hydrants within a 600-foot radius of the project.
4. Public Installation: All required public fire hydrants shall be installed, flushed, and operable prior to
delivering any combustible building materials on-site (i.e., lumber, roofing materials, etc.). Water District
personnel shall inspect the installation and witness hydrant flushing. The builder/developer shall submit a
copy of the Water District inspection report to the Fire Safety Division. Contact Water District to schedule
testing.
5. Building Use Letter- Required Letter: Prior to the issuance of any building permits,the applicant shall submit
a detailed letter of intended use for each building on-site to the Fire District for review and approval. A form that
may be used to meet this requirement is attached at the end of the Fire District comments. Provide a separate
letter for each building or structure with storage use areas.
6. Combustible Construction Letter- Required Letter: Prior to the issuance of a building permit for combustible
construction,the builder shall submit a letter to the Fire District on company letterhead stating that the minimum
water supply for fire fighting purposes and the all-weather fire protection access roadway that meets Fire
District Standards shall be in place and operational before any combustible material is placed on-site. The
roadway shall be maintained at all times.
PRIOR TO OCCUPANCY OR FINAL INSPECTION- Complete the following:
1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant
location on the street or driveway in accordance with Rancho Cucamonga Fire Protection District and City
of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers." On
private property these markers are to be maintained in good condition by the property owner.
2. Private Fire Hydrants- Final Acceptance: For the purpose of final acceptance, an additional test of the
on-site fire hydrants shall be conducted by the builder/developer in the presence of the Water District or
Fire Construction Services, as appropriate. The builder/developer shall submit the final test report to the
Fire Construction Services .
3. Fire Sprinkler System- Plans and Permit: Plans for the required automatic fire sprinkler system shall be
submitted to Fire Construction Services for review and approval. No work is allowed without a Fire
Construction Services permit.
4. Fire Sprinkler System- Final Inspection: Prior to the issuance of a Certificate of Occupancy, the fire
sprinkler system(s) shall be tested and accepted by Fire Construction Services.
5. Sprinkler Monitoring: The fire sprinkler system monitoring system shall be installed,tested, and
operational immediately following the completion of the fire sprinkler system. Monitoring is required with
20 sprinklers in Group I Occupancies, or 100 or more sprinklers in all other Occupancies.
6. Fire Suppression System: Plans and specifications for the fire suppression system for the protection of
commercial-type cooking equipment or other special hazard shall be submitted to Fire Construction Services
for review and approval. No work is allowed without a Fire Construction Services permit.
7. Fire Alarm System: Plans for the fire alarm system shall be submitted to Fire Construction Services for
review and approval. No work is allowed without a Fire District permit.
8. Knox Rapid Entry System: A Knox rapid entry key vault shall be installed prior to final inspection. Proof of
purchase shall be submitted prior to final building plan approval. Contact the Fire Safety Division for specific
details and ordering information.
9. Construction Access: Fire District access, a minimum 26-feet in width and 14-feet, 6-inches minimum clear
height shall be provided. These minimum clearances shall be maintained free and clear of any obstructions
at all times, in accordance with Fire District Standards. Contact the Fire Construction Services (909) 477-2713
10. Site Directory: A building or site directory shall be provided, as noted below:
a. Lighted directory within 20-feet of each primary entrance to the site. The site directory shall be
constructed, located, and installed in accordance with Fire Safety Division Standards.
Page 6 of 7
b. Standard Directory in building lobby.
11. Fire Lanes: Prior to the issuance of any Certificate of Occupancy, the fire lanes shall be installed in
accordance with the approved fire lane plan. The CC&R's or other approved documents shall contain an
approved fire lane map and provisions that prohibit parking in the fire lanes. The method of enforcement shall
be documented. The CC&R's shall also identify who is responsible for not less than annual inspection and
maintenance of all required fire lanes. Contact Building and Safety/Fire Construction Services (909) 477-
2713.
12. Address- Other Than Single-family: New buildings other than single-family dwellings shall post the address
with minimum 8-inch numbers on contrasting background,visible from the street and electrically illuminated
during periods of darkness. When the building setback exceeds 200 feet from the public street an additional
non-illuminated 6-inch minimum number address shall be provided at the property entrance.
13. Multi-unit Complexes: In multi-unit complexes approved address numbers, and/or building identification
letters shall be provided on the front and back of all units, suites, or buildings. The Fire District shall review
and approve the numbering plan in coordination with the City of Rancho Cucamonga.
14. Fire Suppression Systems-Final Inspection and Testing: Prior to the issuance of a Certificate of
Occupancy,the fire suppression system(s)shall be tested and accepted by Fire Service Construction
Services.
15. Fire Alarm System- Final Inspection and Testing: Prior to the issuance of a Certificate of Occupancy,the
fire alarm (and detection)system(s)shall be tested and accepted by Fire Construction Services.
16. High-pile Combustible Storage-Permit:The applicant is required to obtain a Fire District Permit for Storage
of High-pile Combustible material.
17. High-pile Combustible Storage-Plans:The applicant shall submit plans for the storage arrangement to Fire
Construction Services.The applicant shall submit detailed plans and a Commodity Analysis report to Fire
Construction Services for approval. If the occupancy classification for the building is designated as Group S,
Division 2, commodities stored shall be limited to light hazard classification only.
18. Hazardous or Flammable Liquid Storage Tanks-County Review: The plans for flammable or
hazardous liquid storage tanks shall be reviewed and approved by the San Bernardino County Fire
Department, Hazardous Materials Division/Tank Program. Contact County Fire Dept. at (909) 386-8407
19. Hazardous or Flammable Liquid Storage Tanks- Fire District Review: The plans for hazardous or
flammable liquid storage tanks shall also be reviewed and approved by the Rancho Cucamonga Fire
District, Fire Safety Division. Contact RC Fire Dept. at (909) 477-2770.
20. Business Emergency/Contingency Plan: The applicant shall submit a Business
Emergency/Contingency Plan for emergency release or threatened release of hazardous materials and
wastes or provide a letter of exemption. Contact the County Fire Department, Hazardous
Materials/Emergency Response and Enforcement Division at (909) 386-8412.
21. Submittal to the Fire District: Prior to issuance of a Certificate of Occupancy a copy of the County Fire
Department approved Business Emergency/Contingency Plan - New Business (Hazardous Materials
Release Response Plans and Inventory) shall be submitted to the Fire District. In some cases additional
information that is not in the Business Emergency/Contingency Plan may be required in order to support
local fire prevention and emergency response programs.
22. Required County Permits: The applicant shall be required to apply for one or more of the following:
Hazardous Materials Handler Permit, a Hazardous Waste Generator Permit, an Aboveground Storage
Tank Permit, and/or an Underground Storage Tank Permit. Contact the County Fire Department,
Hazardous Materials Division/Field Services Section at (909) 384-8407.
23. Fire District Confidential Business Occupancy Information: The applicant shall complete the Rancho
Cucamonga Fire District "Confidential Business Occupancy Information" Form and submit to the Fire
Safety Division. This form provides contact information for Fire District use in the event of an emergency at
the subject building or property
Page 7 of 7