HomeMy WebLinkAbout04-92 - Resolutions RESOLUTION NO. 04-92 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT REVIEW DRC2004-00206,A DEVELOPMENT REVIEW OF ELEVATIONS AND DETAILED SITE PLAN FOR 25 SINGLE-FAMILY LOTS OF TENTATIVE TRACT MAP SUBTT16374 IN THE AMENDED TENTATIVE TRACT MAP SUBTT15974 WITHIN THE VICTORIA ARBORS MASTER PLAN IN THE VICTORIA COMMUNITY PLAN, LOCATED AT THE SOUTHEAST CORNER OF VICTORIA PARK LANE AND BASE LINE ROAD; AND MAKING FINDINGS IN SUPPORT THEREOF - APN: 0227-161-141 THRU 147 AND 0227-171-126 THRU 128, 130 THRU 133, 135 AND 137 THRU 139. A. Recitals. 1. Standard Pacific Homes filed an application for the approval of Development Review DRC2004-00206, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Development Review request is referred to as "the application." 2. On the 28th day of July 2004, the Planning Commission of the City of Rancho Cucamonga conducted a meeting on the application and concluded said meeting on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above- referenced meeting on July 28, 2004, including written and oral staff reports, this Commission hereby specifically finds as follows: a. The proposed use, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity; and b. The project design is consistent with the Victoria Arbors Master Plan and the following goals and policies: i) The proposed residential uses are compatible to adjacent single-family uses as opposed to more intense multi-family uses. ii) The proposed in-fill project would create opportunities where a population that reflects diversity of income,age,occupation, race,ethnic background lifestyle,values, interest, and religion may interact, exchange ideas, and realize common goals, that are similar to the existing neighborhood to the west. PLANNING COMMISSION RESOLUTION NO. 04-92 DRC2004-00206— STANDARD PACIFIC HOMES July 28, 2004 Page 2 iii) The proposed use is in close proximity of a transportation network that is consistent with community goals. The project is part of in-fill single-family residences within an existing neighborhood under construction and in proximity to the 1-15 Freeway to the east via Base Line Road and Foothill Boulevard, and the 210 Freeway to the north via Day Creek Boulevard. 3. Based upon the substantial evidence presented to this Commission during the above- referenced meeting and upon the specific findings of facts set forth in paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. That the Development Review is consistent with the General Plan and the Victoria Arbors Master Plan; and b. The design or improvements of the tentative tract is consistent with the General Plan, and the Victoria Arbors Master Plan; and C. The site is physically suitable for the type of development proposed; and d. The design of the project is not likely to cause substantial environmental damage and avoidable injury to humans and wildlife or their habitat; and e. The Development Review is not likely to cause serious public health problems;and f. The design of the Development Review will not conflict with any easement acquired by the public at large, now of record, for access through or use of the property within the proposed subdivision. 4. A Final Environmental Impact Report(State Clearinghouse No.98041137)was prepared and certified by the City Council on July 7, 1999, as a Master Environmental Impact Report for the Victoria Arbors Master Plan. On December 20,2000,the City Council certified an Addendum to the Environmental Impact Report. The California Environmental Quality Act(CEQA)provides that once a Master Environmental Impact Report has been certified, no further Environmental Impact Report or Negative Declaration is required for subsequent projects within the scope of the Master Environmental Impact Report. Based upon the facts and information contained in the certified Environmental Impact Report, together with all written and oral reports, the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment. a. There have not been substantial changes in the project that require major revisions to the previous Environmental Impact Report because of no new significant environmental effects, or substantial increase in the severity of the previously identified significant effects. b. There have not been substantial changes with respect to the circumstances under which the project is undertaken, which will require major revisions to the previous Environmental Impact Report because of the involvement of new significant environmental effects,or a substantial increase in the severity of previously identified significant effects. C. There is no new information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the Environmental PLANNING COMMISSION RESOLUTION NO. 04-92 DRC2004-00206—STANDARD PACIFIC HOMES July 28, 2004 Page 3 Impact Report was certified as complete, that shows any of the following: 1) the project will have one or more significant effects not discussed in the previous Environmental Impact Report; 2) significant effects previously examined will be substantially more severe than shown in the previous Environmental Impact Report; 3) mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project but the project proponents decline to adopt the mitigation measure or alternative; or 4) mitigation measures or alternatives,which are considerably different from those analyzed in the final Environmental Impact Report, would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative. 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. Planning Division 1) All conditions of approval per Planning Commission Resolution No. 01-25 for Tentative Tract Map SUBTT16374 shall apply. 2) All conditions of approval per Planning Commission Resolutions No. 01-23 and 03-54 for the Victoria Arbors Master Plan DR01-04 shall apply. 3) The developer shall provide each prospective buyer written notice of the winery across Victoria Park Lane. The written notice must disclose the uses and operation within the winery and be in a format as approved by the City Planner, prior to issuance of building permits. 4) The developer shall provide each prospective buyer written notice of the Victoria Gardens Regional Center and the Cultural and Library Center. The standard format for the written notice shall be submitted for City Planner review and approval prior to issuance of building permits. 5) Submit design for paseos, subject to City Planner and City Engineer review and approval, prior to issuance of building permits or final map approval, whichever comes first. 6) Submit standard design for future trellises, patios, and covered patios that may be added within the rear yard by the homeowner for City Planner review. The standard design shall include notes stating that rolled roof, metal,wood shingles, and asphalt shingles are not allowed. The standard design shall be added to the Victoria Arbors Master Plan. 7) Provide conduit to connect to the street and pre-wire houses/buildings for fiber-optic use (minimum Category 5 and RG-6), prior to release of occupancy. Plans shall be submitted for City Planner review and approval prior to issuance of building permits. PLANNING COMMISSION RESOLUTION NO. 04-92 DRC2004-00206— STANDARD PACIFIC HOMES July 28, 2004 Page 4 8) Approval of the house design is valid upon the approval of the Amending Tentative Tract Map SUBTT15974. 9) All pertinent conditions of approval contained in Development Agreement 00-04 shall apply. 10) Landscape all front and side yards that are visible from the public-rights-of-way. 11) Where rock cobble is used, it shall be real, native fieldstone. Other forms of stone, such as stacked stone or ledgestone, may be manufactured products. 12) Corner lots shall have parkway adjacent to the curb. 13) All walls visible from or facing a street shall be decorative masonry on both sides. 14) Avoid identical or similar elevation schemes plotted on adjacent lots or across the street from one another. Engineering Division: 1) Pertinent conditions of Tentative Tract Map SUBTT15974 listed below shall apply: a) All internal residential streets shall be developed in accordance with City's "Local Street" standard with typical mid block section curb-to-curb distance of 36 feet, (Lane widths of 18 feet-18 feet, except at intersections.) b) Entry Statements identified by the Victoria Community Plan and Day Creek Boulevard Master Plan shall be accepted into the City's Landscape Maintenance District. All others shall be maintained through a Home Owner's Association (HOA). c) Street trees per City Standards shall be provided for all interior streets. d) No cross-lot drainage. Each unit shall drain to the street or a public approved facility. e) Landscape Maintenance District (LMD) areas shall have a maximum of 3:1 slopes with maximum retaining wall of 30 inches, except the east side of Day Creek Boulevard shall have a maximum slope of 4:1. Top of slope and toe of slope shall have a minimum 1-foot flat area to pedestrian walkways (2-foot flat area at top of slope for larger slopes per City standard. PLANNING COMMISSION RESOLUTION NO. 04-92 DRC2004-00206— STANDARD PACIFIC HOMES July 28, 2004 Page 5 f) Parkways shall be 2 percent from top of curb to back of walk. g) Provide a minimum 3-inch conduit for future fiber optic use on all streets with connection through the parkway to each lot or parcel. The size, placement and location of the conduit shall be shown on the street plans, subject to City Engineer review and approval, prior to final map approval or issuance of building permits, whichever comes first. h) Tentative Tract Map SUBTT16374 shall be recorded prior to issuance of any building permit. Environmental Mitigation 1) The applicant shall implement all pertinent mitigation measures adopted in the Master Environmental Impact Report Victoria Arbors Master Plan as covered by the Environmental Impact Report, as certified by the City Council of the City of Rancho Cucamonga. The project shall comply with Mitigation Monitoring Program contained in the Final EIR entitled "Final Environmental Impact Report Victoria Arbors Village SCH No. 98041137" except for Mitigation Measures 4.7.3A, 4.7.36, and 4.7.3D. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 28TH DAY OF JULY 2004. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: Rich Macias, Chairman ATTEST- Bra S elrLet I, Brad Buller Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 28th day of July 2004, by the following vote-to-wit: PLANNING COMMISSION RESOLUTION NO. 04-92 DRC2004-00206—STANDARD PACIFIC HOMES July 28, 2004 Page 6 AYES: COMMISSIONERS: FLETCHER, MACIAS, McNIEL, McPHAIL, STEWART NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: NONE COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT#: DRC2004-00206 SUBJECT: DEVELOPMENT REVIEW APPLICANT: STANDARD PACIFIC HOMES LOCATION: ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACTTHE PLANNING DIVISION,(909)477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents,officers,or employees,because of the issuance of such approval,or in the alternative,to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may,at its sole discretion,participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Copies of the signed Planning Commission Resolution of Approval No. 04-92, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. B. Time Limits 1. Development/Design Review approval shall expire if building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans,architectural elevations,exterior materials and colors,landscaping,sign program,and grading on file in the Planning Division, the conditions contained herein, Development Code regulations and the Victoria Arbors Master Plan. SC-1-04 1 i:\planning\final\pingcomm\drc2004-00206stdcon7-28.doc Project No DRC2004-00206 Completion Date 2. Prior to any use of the project site or business activity being commenced thereon,all Conditions of Approval shall be completed to the satisfaction of the City Planner. 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Division to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for City Planner review and approval prior to the issuance of building permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code,all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 7. If no centralized trash receptacles are provided,all trash pick-up shall be for individual units with all receptacles shielded from public view. 6. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls,berm ing,and/or landscaping to the satisfaction of the City Planner. For single-, family residential developments,transformers shall be placed in underground vaults. 9. Street names shall be submitted for City Planner review and approval in accordance with the adopted Street Naming Policy prior to approval of the final map. 10. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination. 11. The Covenants, Conditions, and Restrictions (CC&Rs) and Articles of Incorporation of the Homeowners'Association are subject to the approval of the Planning and Engineering Divisions and the City Attorney. They shall be recorded concurrently with the Final Map or prior to the issuance of building permits, whichever occurs first. A recorded copy shall be provided to the City Engineer. The Homeowners' Association shall submit to the Planning Division a list of the name and address of their officers on or before January 1 of each and every year and whenever said information changes. 12. All parkways, open areas, and landscaping shall be permanently maintained by the property owner,homeowners'association,or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for City Planner and City Engineer review and approved prior to the issuance of building permits. 13. The developer shall submit a construction access plan and schedule for the development of all lots for City Planner and City Engineer approval; including, but not limited to, public notice requirements,special street posting,phone listing for community concerns,hours of construction activity, dust control measures, and security fencing. 14. Six-foot decorative block walls shall be constructed along the project perimeter. If a double wall condition would result, the developer shall make a good faith effort to work with the adjoining property owners to provide a single wall. Developer shall notify, by mail,all contiguous property owner at least 30 days prior to the removal of any existing walls/ fences along the project's perimeter. 15. Construct block walls between homes(i.e.,along interior side and rear property lines),rather than wood fencing for permanence, durability, and design consistency. 2 Project No DRC2004-00206 Completion Date 16. Access gates to the rear yards shall be constructed from a material more durable than wood gates. Acceptable materials include, but are not limited to, wrought iron and PVC. 17. For residential development, return walls and corner side walls shall be decorative masonry. 18. On corner side yards,provide minimum 5-foot setback between walls/fences and sidewalk. The 5-foot wall/fence setback and the parkway shall have landscape and irrigation in addition to the required street trees. Detailed landscape and irrigation plans shall be submitted for City Planner review and approval prior to issuance of building permits. The parkway landscaping including trees, shrubs, ground covers and irrigation shall be maintained by the property owner. The developer shall provide each prospective buyer written notice of the parkway maintenance requirement, in a standard format as determined by the City Planner, prior to accepting a cash deposit on any property. 19. 1 Where rock cobble is used, it shall be real river rock. Other stone veneers may be manufactured products. D. Building Design 1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections, shall be shielded from view and the sound buffered from adjacent properties and streets as required by the Planning Division. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the City Planner. Details shall be included in building plans. 2. For all residential development,provide conduit from each unit/lot and a pull box to connect to the street. Provide interior structured wiring for each house/building with minimum Category 5 copper wire, Radio Grade 6 coaxial cable, and a central distribution panel, prior to release of occupancy(fiber-to-the building, FTTB). Plans shall be submitted for City Planner and Building Official review and approval prior to issuance of building permits. E. Parking and Vehicular Access (indicate details on building plans) 1. Multiple car garage driveways shall be tapered down to a standard two-car width at street. 2. On flag lots, use a 12-foot driveway within flag to maximize landscape area. _/—/— F. Landscaping 1. 'A detailed landscape and irrigation plan, including slope planting and model home landscaping in !the case of residential development, shall be prepared by a licensed landscape architect and :submitted for City Planner review and approval prior to the issuance of building permits or prior final map approval in the case of a custom lot subdivision. 2. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope, but less than 2:1 slope, shall be,at minimum, irrigated and landscaped with appropriate ground cover for erosion control. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 3. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater slope shall be landscaped and irrigated for erosion control and to soften their appearance as follows: one 15-gallon or larger size tree per each 150 sq.ft.of slope area, 1-gallon or larger size shrub per each 100 sq.ft. of slope area,and appropriate ground cover. In addition,slope banks in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in staggered clusters to soften and vary slope plane. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 3 Project No DR02004-00206 Completion Date 4. For single-family residential development, all slope planting and irrigation shall be continuously maintained in a healthy and thriving condition by the developer until each individual unit is sold and occupied by the buyer. Prior to releasing occupancy for those units, an inspection shall be conducted by the Planning Division to determine that they are in satisfactory condition. 5. Front yard and corner side yard landscaping and irrigation shall be required per the Development Code. This requirement shall be in addition to the required street trees and slope planting. 6. The final design of the perimeter parkways,walls,landscaping,and sidewalks shall be included in --/--J— the required landscape plans and shall be subject to City Planner review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Division. 7. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 8. Tree maintenance criteria shall be developed and submitted for City Planner review and approval prior to issuance of building permits. These criteria shall encourage the natural growth characteristics of the selected tree species. G. Signs 1. The signs indicated on the submitted plans are conceptual only and not a part of this approval. Any signs proposed for this development shall comply with the Sign Ordinance and shall require separate application and approval by the Planning Division prior to installation of any signs. H. Environmental 1. The developer shall provide each prospective buyer written notice of the Fourth Street Rock Crusher project in a standard format as determined by the City Planner,prior to accepting a cash deposit on any property. 2. A final acoustical report shall be submitted for City Planner review and approval prior to the issuance of building permits. The final report shall discuss the level of interior noise attenuation to below 45 CNEL, the building materials and construction techniques provided, and if appropriate,verify the adequacy of the mitigation measures. The building plans will be checked for conformance with the mitigation measures contained in the final report. 3. The applicant shall submit certification from an acoustical engineer that all recommendations of the acoustical report were implemented in construction, including measurements of interior and exterior noise levels to document compliance with City standards. Certification shall be submitted to the Building&Safety Division prior to final occupancy release of the affected homes. 4. Mitigation measures are required for the project. The applicant is responsible for the cost of implementing said measures, including monitoring and reporting. Applicant shall be required to post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the amount of $719.00 prior to the issuance of building permits, guaranteeing satisfactory performance and completion of all mitigation measures. These funds may be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete all actions required by the approved environmental documents shall be considered grounds for forfeit. I. Other Agencies 1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location of mailboxes. Multi-family residential developments shall provide a solid overhead structure for mailboxes with adequate lighting. The final location of the mailboxes and the design of the overhead structure shall be subject to City Planner review and approval prior to the issuance of building permits. 4 Project No DRC2004-00206 Completion Date APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION, (909)477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S) J. General Requirements 1. Submit five complete sets of plans including the following: a. Site/Plot Plan; b. Foundation Plan; C. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans(2 sets, detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; I. Plumbing and Sewer Plans, including isometrics, underground diagrams,water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Division Project Number(i.e.,SUBTT#,SUBTPM#, DRC#)clearly identified on the outside of all plans. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to _/_/_ the City prior to permit issuance. 4. Separate permits are required for fencing and/or walls. —/_ K. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number(i.e., DRC2001-00001). The applicant shall comply with the latest adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Division for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new residential project or major addition,the applicant shall pay development fees at the established rate. Such fees may include,but are not limited to: City Beautification Fee, Park Fee, Drainage Fee,Transportation Development Fee, Permit and Plan Check Fees, Construction and Demolition Diversion Program deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Division prior to permit issuance. 3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map recordation and prior to issuance of building permits. 4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. 5 Project No DRC2004-00206 Completion Date L. New Structures 1. Provide compliance with the California Building Code (CBC) for property line clearances considering use, area, and fire-resistiveness. 2. Provide compliance with the California Building Code for required occupancy separations. 3. Roofing material shall be installed per the manufacturer's "high wind" instructions. M. Security Hardware 1. A secondary locking device shall be installed on all sliding glass doors. 2. ' One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within 40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used. I 3. All garage or rolling doors shall have slide bolts or some type of secondary locking devices. N. Windows 1. All sliding glass windows shall have secondary locking devices and should not be able to be lifted from frame or track in any manner. O. Building Numbering 1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime _/_/_ visibility. APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, FIRE PROTECTION PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED I 6 RANCHO CUCAMONGA FIRE DISTRICT STANDARD CONDITIONS April 21, 2004 Tract 16374 SFR Tract DRC2004-00206 THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT. FSC-1 Public and Private Water Supply 1. Design guidelines for Fire Hydrants: The following provides design guidelines for the spacing and location of fire hydrants: a. The maximum distance between fire hydrants in single-family residential projects is 500- feet. No portion of the exterior wall facing the addressed street shall be more than 250- feet from an approved fire hydrant. For cul-de-sacs, the distance shall not exceed 200- feet. b. Fire hydrants are to be located. The preferred locations for fire hydrants are: 1. At the entrance(s) to a commercial, industrial or residential project from the public roadways. 2. At intersections. 3. On the right side of the street, whenever practical and possible. 4. As required by the Fire Safety Division to meet operational needs of the Fire District. 5. A minimum of forty-feet (40')from any building. FSC-2 Fire Flow 1. The required fire flow for this project is 1750 gallons per minute at a minimum residual pressure of 20-pounds per square inch. This requirement is made in accordance with Fire Code Appendix III-A, as adopted by the Fire District Ordinances. 2. Public fire hydrants located within a 500-foot radius of the proposed project may be used to provide the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent property shall not be used to provide required fire flow. 3. Firewater plans are required for all projects that must extend the existing water supply to or onto the site. Building permits will not be issued until firewater plans are approved. 4. On all site plans to be submitted for review, show all fire hydrants located within 600-feet of the proposed project site. FSC-4 Requirement for an Automatic Fire Sprinkler Systems Rancho Cucamonga Fire District Ordinance 15, the 2001 California Fire Code and/or any other applicable standards require an approved automatic fire sprinkler system to be installed in: 1. All structures that do not meet Fire District access requirements (see Fire Access). 2. When required fire flow cannot be provided due to inadequate volume or pressure. FSC-6 Fire District Site Access Fire District access roadways include all public roads. Please reference the RCFPD Fire Department Access— Fire Lanes Standard 9-7. 1. If Residential Gates are installed across Fire District access roads, the gates shall be installed in accordance with RCFPD Residential Gate Standard #9-1. The following design requirements apply: a. All automatic gates shall be provided with a Fire District approved, compatible traffic pre- emption device. The devices shall be digital. Analog devices are not acceptable. Devices shall be installed in accordance with the manufacturer's instructions and specifications. b. Vehicle access gates shall be provided with an approved Fire District Knox Key Switch. c. The key switch shall be located outside and immediately adjacent to the gate for use in the event that the traffic pre-emption device fails to operate. d. A traffic loop device must be installed to allow exiting from the complex. e. The gate shall remain in the open position for not less than 20-minutes and shall automatically reset. FSC-9 Single-family Residential Sales Model homes require approved Fire District vehicle access and water supply from a public or private water main system before construction. FSC-13 Alternate Method Application Fire Construction Services staff and the Fire Marshal will review all requests for alternate method, when submitted. The request must be submitted on the Fire District "Application for Alternate Method" form along with supporting documents and payment of the $92 review fee. Chronological Summary of RCFPD Standard Conditions PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to the issuance of any building permits: 1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans, specifications, flow test data and calculations for the private water main system for review and approval by the Fire District. Plans and installation shall comply with Fire District Standards. Approval of the on-site (private) fire underground and water plans is required prior to any building permit issuance for any structure on the site. Private on-site combination domestic and fire supply system must be designed in accordance with RCFPD Standards # 9-4, #10-2 and #10-4. The Building & Safety Division and Fire Construction Services will perform plan checks and inspections. All private on-site fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. Fire construction Services will inspect the installation, witness hydrant flushing and grant a clearance before lumber is dropped. 2. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and CCWD. On the plan, show all existing fire hydrants within a 600-foot radius of the project. All required public fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. CCWD personnel shall inspect the installation and 2 witness the hydrant flushing. Fire Construction Services shall inspect the site after acceptance of the public water system by CCWD. Fire Construction Services must grant a clearance before lumber is dropped. 3. Construction Access: The access roads must be paved in accordance with all the requirements of the RCFPD Fire Lane Standard #9-7. All temporary utilities over access roads must be installed at least 14' 6" above the finished surface of the road. -4. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is responsible for obtaining the fire flow information from CCWD and submitting the letter to Fire Construction Services. 5. Easements and Reciprocal Agreements: All easements and agreements must be recorded with the County of San Bernardino. PRIOR TO THE RELEASE OF TEMPORARY POWER The building construction must be substantially completed in accordance with Fire Construction Services' "Temporary Power Release Checklist and Procedures". PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers". On private property, the markers shall be installed at the centerline of the fire access road, at each hydrant location. 2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in the presence of Fire Construction Services, shall conduct a test of the most hydraulically remote on-site fire hydrants. The underground fire line contractor, developer and/or owner are responsible for hiring the company to perform the test. A final test report shall be submitted to Fire Construction Services verifying the fire flow available. The fire flow available must meet or exceed the required fire flow in accordance with the California Fire Code. 3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler system(s) shall be tested and accepted by Fire Construction Services. 4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler monitoring system must be tested and accepted by Fire Construction Services. The fire sprinkler monitoring system shall be installed, tested and operational immediately following the completion of the fire sprinkler system (subject to the release of power). 5. Fire Suppression Systems and/or other special hazard protection systems shall be inspected, tested and accepted by Fire Construction Services before occupancy is granted and/or equipment is placed in service. 6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm system shall be installed, inspected, tested and accepted by Fire Construction Services. 7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular gates must be inspected, tested and accepted in accordance with RCFPD Standards #9-1 or#9-2 by Fire Construction Services. 8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access roadways must be installed in accordance with the approved plans and acceptable to Fire Construction Services. The CC&R's, the reciprocal agreement and/or other approved documents shall be recorded and contain an approved fire access roadway map with provisions that prohibit parking, specify the method of enforcement and identifies who is responsible for the required annual inspections and the maintenance of all required fire access roadways. 3 9. Address: Prior to the granting of occupancy, single-family dwellings shall post the address with minimum 4-inch numbers on a contrasting background. The numbers shall be internally or externally illuminated during periods of darkness. The numbers shall be visible from the street. When building setback from the public roadway exceeds 100-feet, additional 4-inch numbers shall be displayed at the property entry. 10. Confidential Business Occupancy Information: The applicant shall complete the Rancho Cucamonga Fire District "Confidential Business Occupancy Information" form. This form provides contact information for Fire District use in the event of an emergency at the subject building or property. This form must be presented to the Fire Construction Services Inspector. 4