HomeMy WebLinkAbout04-95 - Resolutions RESOLUTION NO. 04-95
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA,CALIFORNIA,APPROVING TENTATIVE TRACT
MAP SUBTT16716, A RESIDENTIAL SUBDIVISION OF 22 LOTS ON
13.22 ACRES OF LAND IN THE LOW RESIDENTIAL DISTRICT
(2-4 DWELLING UNITS PER ACRE)OF THE ETIWANDA SPECIFIC PLAN,
LOCATED ON THE EAST SIDE OF ETIWANDA AVENUE, BETWEEN
ETIWANDA INTERMEDIATE SCHOOL AND ETIWANDA RAILWAY
STATION; AND MAKING FINDINGS IN SUPPORT THEREOF -
APN: 0227-121-16 AND 49.
A. Recitals.
1. J.T. Storm filed an application for the approval of Tentative Tract Map SUBTT16716, as
described in the title of this Resolution. Hereinafter in this Resolution, the subject Tentative Tract
Map request is referred to as "the application."
2. On the 28th day of July 2004, the Planning Commission of the City of Rancho
Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing
on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning
Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the above-
referenced public hearing on July 28, 2004, including written and oral staff reports, together with
public testimony, this Commission hereby specifically finds as follows:
a. The application applies to property located on the east side on Etiwanda Avenue,
between Etiwanda Intermediate School and Etiwanda Railway Station,approximately 660 feet south
of Victoria Avenue with a street frontage of approximately 368 feet and lot depth of 1,318 feet,and is
presently vacant; and
b. The property to the north of the subject site is Etiwanda Intermediate School;to the
south is the historic landmark Etiwanda Railway Station; to the east a vineyard and a single-family
residence; and to the west is Etiwanda Avenue; and
C. The proposed use, together with the conditions applicable thereto, will not be
detrimental to the public health, safety, or welfare or materially injurious to properties or
improvements in the vicinity; and
d. The applicant conducted a neighborhood meeting on February 23,2004,to inform
the surrounding neighborhood residents of the proposed project and to obtain feedback; and
PLANNING COMMISSION RESOLUTION NO. 04-95
SUBTT16716—J.T. STORM
July 28, 2004
Page 2
e. The application contemplates a private gated community of 22 single-family lots,
and a vineyard planted along the Etiwanda Avenue frontage to a depth of approximately 160 feet.
3. Based upon the substantial evidence presented to this Commission during the above-
referenced public hearing and upon the specific findings of facts set forth in paragraphs 1 and 2
above, this Commission hereby finds and concludes as follows:
a. That the tentative tract is consistent with the General Plan, Development Code,and
any applicable specific plans; and
b. The design or improvements of the tentative tract is consistent with the General
Plan, Development Code, and any applicable specific plans; and
C. The site is physically suitable for the type of development proposed; and
d. The design of the subdivision is not likely to cause substantial environmental
damage and avoidable injury to humans and wildlife or their habitat; and
e. The tentative tract is not likely to cause serious public health problems; and
f. The design of the tentative tract will not conflict with any easement acquired by the
public at large, now of record, for access through or use of the property within the proposed
subdivision.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration,together with all written and oral reports included for the environmental assessment for
the application,the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and
Monitoring Program attached hereto, and incorporated herein by this reference, based upon the
findings as follows:
a. That the Mitigated Negative Declaration has been prepared in compliance with the
California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines
promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared
therefore reflect the independent judgment of the Planning Commission; and, further, this
Commission has reviewed and considered the information contained in said Mitigated Negative
Declaration with regard to the application.
b. Although the Mitigated Negative Declaration identifies certain significant
environmental effects that will result if the project is approved, all significant effects have been
reduced to an acceptable level by imposition of mitigation measures on the project,which are listed
below as conditions of approval.
C. Pursuant to the provisions of Section 753.5(c)of Title 14 of the California Code of
Regulations, the Planning Commission finds as follows: In considering the record as a whole, the
Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the
proposed project will have potential for an adverse impact upon wildlife resources or the habitat
upon which wildlife depends. Further, based upon the substantial evidence contained in the
Mitigated Negative Declaration, the staff reports and exhibits, and the information provided to the
Planning Commission during the public hearing, the Planning Commission hereby rebuts the
presumption of adverse effect as set forth in Section 753.5(c-1-d)of Title 14 of the California Code
of Regulations.
PLANNING COMMISSION RESOLUTION NO. 04-95
SUBTT1 6716—J.T. STORM
July 28, 2004
Page 3
5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth
below and in the Standard Conditions, attached hereto and incorporated herein by this reference.
Planning Division
1) All Conditions of Approval of Variance DRC2003-01061 shall apply.
2) Tree Removal Permit DRC2003-01060 is hereby approved for the
removal of all trees for the development of the site. The
applicant/developer shall be required to remove, relocate,and replace
trees subject to Environmental Mitigation/Biological Resources
Conditions. The Tree Removal Permit is valid for 60 days from the
date of the final map recordation or issuance of building permits,
whichever comes first.
3) The perimeter fencing along Etiwanda Avenue shall be made of a
decorative material and designed as the vineyard theme wall was
intended, and conform to the design criteria of the Etiwanda Specific
Plan.
4) All retaining walls visible to the public shall be made of a decorative
wall material, subject to review and approval by the City Planner.
5) The applicant shall get written permission from adjacent property
owners for any off-site grading, prior to issuance of grading permits.
6) The project will include lettered lot(s) for the planting of vineyards.
7) A vineyard planting and maintenance agreement shall be submitted
prior to final map recordation.
8) If the owner of the "Not-A-Part' Parcel chooses to be included in the
Homeowner's Association, an ingress and egress access shall be
provided on the final map for the "Not-A-Part" parcel from the east
property line of said lot,through the proposed development across the
private streets to the access driveway on Etiwanda Avenue. The
purpose is to accommodate and encourage the property owner of the
"Not-A-Part" parcel to ultimately eliminate their driveway access to
Etiwanda Avenue that is too close to the driveway of Etiwanda
Intermediate School.
Engineering Division
1) Etiwanda Avenue frontage improvements are to be in accordance with
"Collector Residential"and Etiwanda Specific Plan standards including,
but not limited to, the following:
2) Provide cobble curb and gutter, sidewalk, street trees and asphalt
pavement, per Figure 5-24 of the Etiwanda Specific Plan.
PLANNING COMMISSION RESOLUTION NO. 04-95
SUBTT1 6716—J.T. STORM
July 28, 2004
Page 4
a) Provide 5800 Lumen HPSV streetlights, as required.
b) No driveways shall be constructed on the Etiwanda Avenue
frontage.
c) Provide traffic striping and signage, as required.
d) Frontage improvements along Etiwanda Avenue shall be
provided for the "Not-A-Part" parcel to the north.
3) The frontage along Etiwanda Avenue for Lots"B"and"C are required
to look like front yards and shall be privately maintained.
4) The emergency fire access and any landscaping in the parkway within
the access area are subject to the approval of the Fire District.
5) Proposed internal street improvements are to be in accordance with
"Local Residential"standards including,but not limited to,the following:
a) Provide curb and gutter, sidewalk, street trees and asphalt
pavement, as required.
b) Provide 5800 Lumen HPSV streetlights, as required.
c) Provide traffic striping and signage, as required.
6) The existing overhead utilities (telecommunications and electrical,
except for the 66 kV electrical)on the project side of Etiwanda Avenue
shall be undergrounded along the entire project frontage, extending to
the first pole off-site (north and south), prior to public improvement
acceptance or occupancy,whichever occurs first. All services crossing
Etiwanda Avenue shall be undergrounded at the same time. The
developer may request a reimbursement agreement to recover one-
half the City adopted cost for undergrounding from future development
(redevelopment) as it occurs on the opposite side of the street. If the
developer fails to submit for said reimbursement agreement within six
months of the public improvements being accepted by the City, all
rights of the developer to reimbursement shall terminate.
7) Construct Etiwanda/San Sevaine Drainage Area 8 Master Plan and
local storm drain facilities (Line XIV-32) from the subject site to the
existing 84-inch storm drain line (Line XIV-25) in East Avenue, to the
satisfaction of the City Engineer. Standard drainage fees for the site
shall be credited to the cost of permanent master plan facilities
(typically serving at least 80 ac), in accordance with City policy. The
developer may request a reimbursement agreement to recover
oversizing costs, in excess of fees,from future development within the
same tributary area. If the developer fails to submit for said
reimbursement agreement within six months of the public
improvements being accepted by the City,all rights of the developer to
reimbursement shall terminate.
PLANNING COMMISSION RESOLUTION NO. 04-95
SUBT716716 —J.T. STORM
July 28, 2004
Page 5
a) Because the subject tract is a privately gated community, the
interior storm drains shall be privately maintained to the
connection with Line XIV-32.
8) Parkways shall slope at 2 percent from the top of curb to one-foot
behind the sidewalk along all street frontages.
9) Entrance to the proposed tract shall be designed per the City's Gated
Entrance Design Guide.
Environmental Mitigation
Air Quality
1) All construction equipment shall be maintained in good operating
condition so as to reduce operational emissions. Contractor shall
ensure that all construction equipment is being properly serviced and
maintained as per manufacturers'specifications. Maintenance records
shall be available at the construction site for City verification.
2) Prior to the issuance of any grading permits, developer shall submit
construction plans to City denoting the proposed schedule and
projected equipment use. Construction contractors shall provide
evidence that low emission mobile construction equipment will be
utilized,or that their use was investigated and found to be infeasible for
the project. Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality Management District
(SCAQMD) as well as City Planning staff.
3) All paints and coatings shall meet or exceed performance standards
noted in SCAQMD Rule 1113. Paints and coatings shall be applied
either by hand or high volume, low-pressure spray.
4) All asphalt shall meet or exceed performance standards noted in
SCAQMD Rule 1108.
5) All construction equipment shall complywith SCAQMD Rules 402 and
403. Additionally, contractors shall include the following provisions:
• Reestablish ground cover on the construction site through
seeding and watering.
• Pave or apply gravel to any on-site haul roads.
• Phase grading to prevent the susceptibility of large areas to
erosion over extended periods of time.
• Schedule activities to minimize the amounts of exposed
excavated soil during and after the end of work periods.
PLANNING COMMISSION RESOLUTION NO. 04-95
SUBTT16716 —J.T. STORM
July 28, 2004
Page 6
• Dispose of surplus excavated material in accordance with local
ordinances and use sound engineering practices.
• Sweep streets according to a schedule established by the City if
silt is carried over to adjacent public thoroughfares or occurs as a
result of hauling. Timing may vary depending upon time of year
of construction.
• Suspend grading operations during high winds(i.e.,wind speeds
exceeding 25 mph) in accordance with Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils haul trucks
or cover payloads using tarps or other suitable means.
6) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and Regional Water Quality Control Board
[RWQCB]) daily to reduce PM10 emissions, in accordance with
SCAQMD Rule 403.
7) Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be
applied to all inactive construction areas that remain inactive for 96
hours or more to reduce PM10 emissions.
8) The construction contractor shall utilize electric or clean alternative fuel
powered equipment where feasible.
9) The construction contractor shall ensure that construction-grading
plans include a statement that work crews will shut off equipment when
not in use.
10) All residential and commercial structures shall be required to
incorporate high efficiency/low polluting heating, air conditioning,
appliances, and water heaters.
11) All residential and commercial structures shall be required to
incorporate thermal pane windows and weather-stripping.
Biological Resources
1) Any existing heritage trees (as identified in the City's Tree Preservation
Ordinance)that are removed shall be replaced at a ratio of 1 to 1 with a
5-gallon sized tree.
2) Any heritage windrows removed per the Etiwanda Specific Plan shall
be replaced in linear feet, 8 feet on center on-site.
Cultural Resources
1) If any prehistoric archaeological resources are encountered before or
during grading, the developer will retain a qualified archaeologist to
monitor construction activities,to take appropriate measures to protect
PLANNING COMMISSION RESOLUTION NO. 04-95
SUBTT16716 —J.T. STORM
July 28, 2004
Page 7
or preserve them for study. With the assistance of the archaeologist,
the City of Rancho Cucamonga will:
• Enact interim measures' to protect undesignated sites from
demolition or significant modification without an opportunity for
the City to establish its archaeological value.
• Consider establishing provisions to require incorporation of
archaeological sites within new developments, using their special
qualities as a theme or focal point.
• Pursue educating the public about the area's archaeological
heritage.
• Propose mitigation measures and recommend conditions of
approval to eliminate adverse project effects on significant,
important, and unique prehistoric resources, following
appropriate CEQA guidelines.
• Prepare a technical resources management report,documenting
the inventory, evaluation, and proposed mitigation of resources
within the project area. Submit one copy of the completed report,
with original illustrations, to the San Bernardino County
Archaeological Information Center for permanent archiving.
2) A qualified paleontologist shall conduct a preconstruction field survey
of the project site. The paleontologist shall submit a report of findings
that will also provide specific recommendations regarding further
mitigation measures (i.e., paleontological monitoring) that may be
appropriate. Where mitigation monitoring is appropriate, the program
must include, but not be limited to, the following measures:
• Assign a paleontological monitor, trained and equipped to allow
the rapid removal of fossils with minimal construction delay, to
the site full-time during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared or graded,
divert earth-disturbing activities elsewhere until the monitor has
completed salvage. If construction personnel make the
discovery, the grading contractor should immediately divert
construction and notify the monitor of the find.
• Submit summary report to City of Rancho Cucamonga. Transfer
collected specimens with a copy of the report to San Bernardino
County Museum.
Geologic and Soils
1) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and RWQCB)daily to reduce PM10 emissions,
in accordance with SCAQMD Rule 403.
PLANNING COMMISSION RESOLUTION NO. 04-95
SUBTT16716 —J.T. STORM
July 28, 2004
Page 8
2) Frontage public streets shall be swept according to a schedule
established by the City to reduce PM10 emissions associated with
vehicle tracking of soil off-site. Timing may vary depending upon time
of year of construction.
3) Grading operations shall be suspended when wind speeds exceed
25 mph to minimize PM10 emissions from the site during such
episodes.
4) Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be
applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PM10 emissions.
Hydrology and Water Quality
1) Structures to retain precipitation and runoff on-site shall be integrated
into the design of the project where appropriate. Measures that may
be used to minimize runoff and to enhance infiltration include Dutch
drains, precast concrete lattice blocks and bricks,terraces,diversions,
runoff spreaders, seepage pits, and recharge basins.
2) All construction equipment shall be maintained in good operating
condition so as to reduce operational emissions. Contractor shall
ensure that all construction equipment is being properly serviced and
maintained as per manufacturers'specifications. Maintenance records
shall be available at the construction site for City verification.
3) Prior to issuance of building permits, the applicant shall submit to the
City Engineer for approval of a Water Quality Management Plan
(WQMP), including a project description and identifying Best
Management Practices (BMPs) that will be used on-site to reduce
pollutants into the storm drain system to the maximum extent
practicable. The WQMP shall identify the structural and non-structural
measures consistent with the Guidelines for New Development and
Redevelopment adopted by the City of Rancho Cucamonga in June
2000.
4) Prior to issuance of grading or paving permits,applicant shall submit to
the City Engineer a Notice of Intent (NOI) to comply with obtaining
coverage under the National Pollution Discharge Elimination System
(NPDES) General Construction Storm Water Permit from the State
Water Resources Control Board. Evidence that this has been obtained
(i.e., a copy of the Waste Discharger's Identification Number)shall be
submitted to the City Engineer for coverage under the NPDES General
Construction Permit.
Noise
1) Construction or grading shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday.
PLANNING COMMISSION RESOLUTION NO. 04-95
SUBTT16716—J.T. STORM
July 28, 2004
Page 9
2) Construction or grading noise levels shall not exceed the standards
specified in Development Code Section 17.02.120-D, as measured at
the property line. Developer shall hire a consultant to perform weekly
noise level monitoring as specified in Development Code Section
17.02.120. Monitoring at other times may be required by the Planning
Division. Said consultant shall report their findings to the Planning
Division within 24 hours; however, if noise levels exceed the above
standards, then the consultant shall immediately notify the Planning
Division. If noise levels exceed the above standards,then construction
activities shall be reduced in intensity to a level of compliance with
above noise standards or halted.
3) The perimeter block wall shall be constructed as early as possible in
the first phase.
4) Haul truck deliveries shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday. Additionally, if heavy trucks used
for hauling would exceed 100 daily trips(counting both to and from the
construction site), then the developer shall prepare a noise mitigation
plan denoting any construction traffic haul routes. To the extent
feasible, the plan shall denote haul routes that do not pass sensitive
land uses or residential dwellings.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 28TH DAY OF JULY 2004.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY:
14?
Rich Macias, Chairman
ATTEST:
Brad aut ecret
I, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby
certify that the foregoing Resolution was duly and regularly introduced, passed,and adopted by the
Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning
Commission held on the 28th day of July 2004, by the following vote-to-wit:
AYES: COMMISSIONERS: FLETCHER, MACIAS, McNIEL, McPHAIL, STEWART
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: NONE
City of Rancho Cucamonga
n
MITIGATION MONITORING
PROGRAM
Project File No.: TENTATIVE TRACT MAP SUBTT16716.
This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation
measures identified in the Mitigated Negative Declaration for the above-listed project. This program
has been prepared in compliance with State law to ensure that adopted mitigation measures are
implemented (Section 21081.6 of the Public Resources Code).
Program Components - This MMP contains the following elements:
1. Conditions of approval that act as impact mitigation measures are recorded with the action
and the procedure necessary to ensure compliance. The mitigation measure conditions of
approval are contained in the adopted Resolution of Approval for the project.
2. A procedure of compliance and verification has been outlined for each action necessary.This
procedure designates who will take action, what action will be taken and when, and to whom
and when compliance will be reported.
3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring
progresses, changes to compliance procedures may be necessary based upon
recommendations by those responsible for the program.
Program Management - The MMP will be in place through all phases of the project. The project
planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project
planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly
and proper action is taken on each mitigation. Each City department shall ensure compliance of the
conditions (mitigation) that relate to that department.
Procedures - The following steps will be followed by the City of Rancho Cucamonga.
1. -A fee covering all costs and expenses, including any consultants'fees, incurred by the City in
performing monitoring or reporting programs shall be charged to the applicant.
2. A MMP Reporting Form will be prepared for each potentially significant impact and its
corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached
hereto. This procedure designates who will take action, what action will be taken and when,
and to whom and when compliance will be reported. All monitoring and reporting
documentation will be kept in the project file with the department having the original authority
for processing the project. Reports will be available from the City upon request at the following
address:
City of Rancho Cucamonga - Lead Agency
Planning Division
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
MITIGATION MONITORING PROGRAM
TENTATIVE TRACT MAP SUBTT16716
July 28, 2004
page 2
3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,
as determined by the project planner or responsible City department, to monitor specific
mitigation activities and provide appropriate written approvals to the project planner.
4. The project planner or responsible City department will approve, by signature and date, the
completion of each action item that was identified on the MMP Reporting Form. After each
measure is verified for compliance, no further action is required for the specific phase of
development.
5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off
as completed by the project planner or responsible City department at the bottom of the MMP
Reporting Form.
6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation
measures.The project planner is responsible for approving any such refinements or additions.
An MMP Reporting Form will be completed by the project planner or responsible City
department and a copy provided to the appropriate design, construction, or operational
personnel.
7. The project planner or responsible City department has the authority to stop the work of
construction contractors if compliance with any aspects of the MMP is not occurring after
written notification has been issued.The project planner or responsible City department also
has the authority to hold certificates of occupancies if compliance with a mitigation measure
attached hereto is not occurring. The project planner or responsible City department has the
authority to hold issuance of a business license until all mitigation measures are implemented.
8. Any conditions (mitigation) that require monitoring after project completion shall be the
responsibility of the City of Rancho Cucamonga Planning Division.The Division shall require
the applicant to post any necessary funds (or other forms of guarantee)with the City. These
funds shall be used by the City to retain consultants and/or pay for City staff time to monitor
and report on the mitigation measure for the required period of time.
9. In those instances requiring long-term project monitoring, the applicant shall provide the City
with a plan for monitoring the mitigation activities at the project site and reporting the
monitoring results to the City. Said plan shall identify the reporter as an individual qualified to
know whether the particular mitigation measure has been implemented. The
monitoring/reporting plan shall conform to the City's MMP and shall be approved by the
Community Development Director or City Planner prior to the issuance of building permits.
MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III)
Project File No.: SUBTT16716 Applicant: J.T. Storm Development
Initial Study Prepared by: Emily Wimer, Assistant Planner Date: June 22. 2004
Mitigation Measures No. Responsible Monitoring Timing of of Verif ied Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Air Quality
All construction equipment shall be maintained in good CP C Review of Plans A/C 2/4
operating condition so as to reduce operational
emissions. Contractor shall ensure that all construction
equipment is being properly serviced and maintained as
per manufacturers'specifications. Maintenance records
shall be available at the construction site for City
verification.
Prior to the issuance of any grading permits, developer CP/CE C Review of Plans C 2
shall submit construction plans to City denoting the
proposed schedule and projected equipment use.
Construction contractors shall provide evidence that low
emission mobile construction equipment will be utilized,
or that their use was investigated and found to be
infeasible for the project. Contractors shall also conform
to any construction measures imposed bythe SCAQMD
as well as City Planning Staff.
All paints and coatings shall meet or exceed CP C Review of Plans A/C 2/4
performance standards noted in SCAQMD Rule 1113.
Paints and coatings shall be applied either by hand or
high volume, low-pressure spray.
All asphalt shall meet or exceed performance standards BO B Review of Plans A/C 2
noted in SCAQMD Rule 1108.
All construction equipment shall comply with SCAQMD CE C Review of Plans A/C 2/4
Rules 402 and 403. Additionally, contractors shall
include the following provisions:
• Reestablish ground cover on the construction site CE C Review of Plans A/C 2/4
through seeding and watering.
• Pave or apply gravel to any on-site haul roads. CE C Review of Plans A/C 2/4
1 of 7
l
Mitigation Measures No. Responsible Monitoring Timing of Method of Verif led Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
• Phase grading to prevent the susceptibility of large CE C Review of Plans A/C 2/4
areas to erosion over extended periods of time.
• Schedule activities to minimize the amounts of CE C Review of Plans A/C 2/4
exposed excavated soil during and after the end of
work periods.
• Dispose of surplus excavated material in CE C Review of Plans A 4
accordance with local ordinances and use sound
engineering ractices.
• Sweep streets according to a schedule established CE C During A 4
by the City if silt is carried over to adjacent public Construction
thoroughfares or occurs as a result of hauling.
Timing may vary depending upon time of year of
construction.
• Suspend grading operations during high winds(i.e., BO/CE C During A 4
wind speeds exceeding 25 mph)in accordance with Construction
Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils BO/CE C During A 4
haul trucks or cover payloads using tarps or other Construction
suitable means.
The site shall be treated with water or other soil BO/CE C During A 4
stabilizing agent (approved by SCAQMD and RWQCB) Construction
daily to reduce PM10 emissions, in accordance with
SCAQMD Rule 403.
Chemical soil stabilizers (approved by SCAQMD and BO/CE C During A 4
RWQCB) shall be applied to all inactive construction Construction
areas that remain inactive for 96 hours or more to
reduce PM,o emissions.
The construction contractor shall utilize electric or clean CE C Review of Plans A/C 4
alternative fuel powered equipment where feasible.
The construction contractor shall ensure that CE C Review of Plans A/C 2/4
construction-grading plans include a statement that work
crews will shut off equipment when not in use.
All residential and commercial structures shall be BO C Review of Plans A 4
required to incorporate high efficiency/low polluting
heating,air conditioning, appliances, and water heaters.
2 of 7
Mitigation Measures No. Responsible
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
All residential and commercial structures shall be CP C Review of Plans A/C 2/3
required to incorporate thermal pane windows and
weather-stripping.
Biological Resources
Any existing heritage trees (as identified in the City's CP C Review of Plans A/C 2
Tree Preservation Ordinance)that are removed shall be
replaced at a ratio of 1 to 1 with a 5 gallon sized tree.
Any heritage windows removed per the Etiwanda CP C Review of Plans A/C 2
Specific Plan, shall be replaced in linear feet 8 feet on
center on site.
CulturalResources
If any prehistoric archaeological resources are
encountered before or during grading,the developer will
retain a qualified archaeologist to monitor construction
activities, to take appropriate measures to protect or
preserve them for study. With the assistance of the
archaeologist, the City of Rancho Cucamonga will:
• Enact interim measures to protect undesignated CP/BO C Review of A/D 3/4
sites from demolition or significant modification Report
without an opportunity for the City to establish its
archaeolo ical value.
• Consider establishing provisions to require CP/BO C Review of A/D 3/4
incorporation of archaeological sites within new Report
developments, using their special qualities as a
theme or focal point.
• Pursue educating the public about the area's CP/BO C Review of A/D 3/4
archaeological heritage. Report
Propose mitigation measures and recommend CP/BO C Review of A/D 3/4
conditions of approval to eliminate adverse project Report
effects on significant, important, and unique
prehistoric resources, following appropriate CEQA
guidelines.
3 of 7
Mitigation Measures No. Responsible
Implementing Action for Monitoring Frequency Verification Verif ication Date/initials Non-Compliance
• Prepare a technical resources management report, CP C Review of A/D 3/4
documenting the inventory, evaluation, and Report
proposed mitigation of resources within the project
area. Submit one copy of the completed report,with
original illustrations, to the San Bernardino County
Archaeological Information Center for permanent
archiving.
A qualified paleontologist shall conduct a preconstruction CP B Review of A/D 4
field survey of the project site. The paleontologist shall Report
submit a report of findings that will also provide specific
recommendations regarding further mitigation measures
(i.e., paleontological monitoring) that may be
appropriate.Where mitigation monitoring is appropriate,
the program must include, but not be limited to, the
following measures:
Assign a paleontological monitor, trained and CP B Review of A/D 4
equipped to allow the rapid removal of fossils with Report
minimal construction delay, to the site full-time
during the interval of earth-disturbing activities.
Should fossils be found within an area being cleared BO B/C Review of A/D 4
or graded, divert earth-disturbing activities Report
elsewhere until the monitor has completed salvage.
If construction personnel make the discovery, the
grading contractor should immediately divert
construction and notify the monitor of the find.
• Submit summary report to City of Rancho CP D Review of D 3
Cucamonga. Transfer collected specimens with a Report
copy of the report to San Bernardino County
Museum.
Geologic Problems
The site shall be treated with water or other soil BO/CE C During A 4
stabilizing agent (approved by SCAQMD and RWQCB) Construction
daily to reduce PM,o emissions, in accordance with
SCAQMD Rule 403.
Frontage public streets shall be swept according to a CE C During A 4
schedule established by the City to reduce PM,p Construction
emissions associated with vehicle tracking of soil off-
site. Timing may vary depending upon time of year of
construction.
4 of 7
Mitigation Measures No. Responsible
MonitoringImplementing Action for Non-Compliance
Grading operations shall be suspended when wind BO/CE C During A 4
speeds exceed 25 mph to minimize PM10 emissions Construction
from the site during such episodes.
Chemical soil stabilizers (approved by SCAQMD and BO/CE C During A 4
RWQCB) shall be applied to all inactive construction Construction
areas that remain inactive for 96 hours or more to
reduce PM,a emissions.
Hydrology and Water Quality
Structures to retain precipitation and runoff on-site shall CE B/C/D Review of Plans A/C 2/4
be integrated into the design of the project where
appropriate. Measures that may be used to minimize
runoff and to enhance infiltration include Dutch drains,
precast concrete lattice blocks and bricks, terraces,
diversions,runoff spreaders,seepage pits,and recharge
basins.
All construction equipment shall be maintained in good CE B/C/D Review of Plans A/C 2/4
operating condition so as to reduce operational
emissions. Contractor shall ensure that all construction
equipment is being properly serviced and maintained as
per manufacturers'specifications. Maintenance records
shall be available at the construction site for City
verification.
Prior to issuance of building permits,the applicant shall CE B/C/D Review of Plans A/C 2/4
submit to the City Engineer for approval of a Water
Quality Management Plan (WQMP), including a project
description and identifying Best Management Practices
(BMPs)that will be used on-site to reduce pollutants into
the storm drain system to the maximum extent
practicable. The WQMP shall identify the structural and
non-structural measures consistent with the Guidelines
for New Development and Redevelopment adopted by
the City of Rancho Cucamonga in June 2000. 11
5 of 7
Mitigation Measures No. I Responsible g of Method .
Implementing Action for Monitoring Frequency Verification Verification Date/Initials Non-Compliance
Prior to issuance of grading or paving permits, applicant CE B/C/D Review of Plans A/C 2/4
shall submit to the City Engineer a Notice of Intent(NOI)
to comply with obtaining coverage under the National
Pollutant Discharge Elimination System (NPDES)
General Construction Storm Water Permit from the
State Water Resources Control Board. Evidence that
this has been obtained (i.e., a copy of the Waste
Discharger's Identification Number) shall be submitted
to the City Engineer for coverage under the NPDES
General Construction Permit.
Noise
Construction or grading shall not take place between the BO C During A 4
hours of 8:00 p.m. and 6:30 a.m. on weekdays, Construction
including Saturday, or at any time on Sunday or a
national holiday.
Construction or grading noise levels shall not exceed the CP C During A 4
standards specified in Development Code Section Construction
17.02.120-D, as measured at the property line.
Developer shall hire a consultant to perform weekly
noise level monitoring as specified in Development
Code Section 17.02.120. Monitoring at other times may
be required by the Planning Division. Said consultant
shall report their findings to the Planning Division within
24 hours; however, if noise levels exceed the above
standards, then the consultant shall immediately notify
the Planning Division. If noise levels exceed the above
standards, then construction activities shall be reduced
in intensity to a level of compliance with above noise
standards or halted.
The perimeter block wall shall be constructed as early CP C During A A
as possible in first phase. Construction
6 of 7
Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Haul truck deliveries shall not take place between the PO/BO C During A 4/7
hours of 8:00 p.m. and 6:30 a.m. on weekdays, Construction
including Saturday, or at any time on Sunday or a
national holiday. Additionally, if heavy trucks used for
hauling would exceed 100 daily trips (counting both to
and from the construction site),then the developer shall
prepare a noise mitigation plan denoting any
construction traffic haul routes. To the extent feasible,
the plan shall denote haul routes that do not pass
sensitive land uses or residential dwellings.
Key to Checklist Abbreviations
Responsible Person Monitoring Frequency Method of Verification Sanctions
CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map
CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit
CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy
BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order
PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds
FC-Fire Chief or designee 6-Revoke CUP
7-Citation
7of7
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT#: SUBTT6716
SUBJECT: 22 SINGLE-FAMILY LOTS
APPLICANT: J.T. STORM DEVELOMENT
LOCATION: 13049 VICTORIA STREET
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DIVISION,(909)477-2750, FOR COMPLIANCE
WITH THE FOLLOWING CONDITIONS:
Completion Date
A. General Requirements
1. The applicant shall agree to defend at his sole expense any action brought against the City, its
agents,officers,or employees, because of the issuance of such approval,or in the alternative,to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or
employees, for any Court costs and attorney's fees which the City, its agents, officers, or
employees may be required by a court to pay as a result of such action. The City may,at its sole
discretion,participate at its own expense in the defense of any such action but such participation
shall not relieve applicant of his obligations under this condition.
B. Time Limits
1. This tentative tract map or tentative parcel map shall expire, unless extended by the Planning
Commission, unless a complete final map is filed with the City Engineer within 3 years from the
date of the approval.
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which include
site plans,architectural elevations,exterior materials and colors,landscaping,sign program,and
grading on file in the Planning Division, the conditions contained herein, Development Code
regulations, and the Etiwanda Specific Plan.
2. Prior to any use of the project site or business activity being commenced thereon,all Conditions
of Approval shall be completed to the satisfaction of the City Planner.
3. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.)or prior to final map approval in the case of a custom lot subdivision,or approved
use has commenced, whichever comes first.
1
Project No.SUBTT16716
Completion Date
4. Approval of this request shall not waive compliance with all sections of the Development Code,all
other applicable City Ordinances, and applicable Community or Specific Plans in effect at the
time of building permit issuance.
5. Street names shall be submitted for City Planner review and approval in accordance with the
adopted Street Naming Policy prior to approval of the final map.
D. Landscaping
1. A detaile&landscape and irrigation plan,including slope planting and model home landscaping in
the case of residential development, shall be prepared by a licensed landscape architect and
submitted for City Planner review and approval prior to the issuance of building permits or prior
\ final map approval in the case of a custom lot subdivision.
2. I All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope,but less than 2:1
slope, shall be,at minimum, irrigated and landscaped with appropriate ground cover for erosion
control. Slope planting required by this section shall include a permanent irrigation system to be
installed by the developer prior to occupancy.
3. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater
slope shall be landscaped and irrigated for erosion control and to soften their appearance as
follows: one 15-gallon or larger size tree per each 150 sq.ft.of slope area 1-gallon or larger size
shrub per each 100 sq.ft.of slope area,and appropriate ground cover. In addition,slope banks
in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or
larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in
staggered clusters to soften and vary slope plane. Slope planting required by this section shall'
include a permanent irrigation system to be installed by the developer prior to occupancy.
4. For single-family residential development, all slope planting and irrigation shall be continuously
maintained in a healthy and thriving condition by the developer until each individual unit is sold
and occupied by the buyer. Prior to releasing occupancy for those units, an inspection shall be
conducted by the Planning Division to determine that they are in satisfactory condition.
E. Environmental
1. The developer shall provide each prospective buyer written notice of the 210 and 1-15 Freeways
in a standard format as determined by the City Planner, prior to accepting a cash deposit on any
property.
2. jA final acoustical report shall be submitted for City Planner review and approval prior to the
i issuance of building permits. The final report shall discuss the level of interior noise attenuation
,to below 45 CNEL, the building materials and construction techniques provided, and if
appropriate,verify the adequacy of the mitigation measures. The building plans will be checked
for conformance with the mitigation measures contained in the final report.
3. The applicant shall submit certification from an acoustical engineer that all recommendations of
the acoustical report were implemented in construction, including measurements of interior and
exterior noise levels to document compliance with City standards. Certification shall be
submitted to the Building&Safety Division prior to final occupancy release of the affected homes.
4. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures, including monitoring and reporting. Applicant shall be required to
post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the
amount of $719.00 prior to the issuance of building permits, guaranteeing satisfactory
performance and completion of all mitigation measures. These funds maybe used bythe City to
retain consultants and/or pay for City staff time to monitor and report on the mitigation measures.
Failure to complete all actions required by the approved environmental documents shall be
considered grounds for forfeit.
2
Project No.SUBTT16716
Completion Date
F. Other Agencies
1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location
of mailboxes. Multi-family residential developments shall provide a solid overhead structure for
mailboxes with adequate lighting. The final location of the mailboxes and the design of the
overhead structure shall be subject to City Planner review and approval prior to the issuance of
building permits.
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION,(909)477-2710, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
G. General Requirements
1. Submit five complete sets of plans including the following:
a. Site/Plot Plan;
b. Foundation Plan;
C. Floor Plan;
d. Ceiling and Roof Framing Plan;
e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size
of service entrance conductors, panel schedules, and single line diagrams;
I. Plumbing and Sewer Plans, including isometrics,underground diagrams,water and waste
diagram, sewer or septic system location, fixture units, gas piping, and heating and air
conditioning; and
g. Planning Division Project Number(i.e., SUBTT#, SUBTPM#, DRC#)clearly identified on
the outside of all plans.
2. Submit two sets of structural calculations, energy conservation calculations, and a soils report.
Architect's/Engineer's stamp and "wet"signature are required prior to plan check submittal.
3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to
the City prior to permit issuance.
4. Separate permits are required for fencing and/or walls.
5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the
Building and Safety Division.
6. Developers wishing to participate in the Community Energy Efficiency Program (CEEP) can
contact the Building and Safety Division staff for information and submittal requirements.
H. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be
marked with the project file number(i.e., DRC2001-00001). The applicant shall comply with the
latest adopted California Codes, and all other applicable codes, ordinances, and regulations in
effect at the time of permit application. Contact the Building and Safety Division for availability of
the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new residential project or major addition,the applicant
shall pay development fees at the established rate. Such fees may include,but are not limited to:
City Beautification Fee, Park Fee, Drainage Fee,Transportation Development Fee, Permit and
3
Project No.SUBTT16716
Completion Date
Plan Check Fees,Construction and Demolition Diversion Program deposit and fees and School
Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Division
prior to permit issuance.
3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map —/_/—
recordation and prior to issuance of building permits.
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday
through Saturday, with no construction on Sunday or holidays.
I. New Structures
1. Provide compliance with the California Building Code (CBC) for property line clearances _/—/—
considering use, area, and fire-resistiveness.
2. Provide compliance with the California Building Code for required occupancy separations. _/—/-
3. Roofing material shall be installed per the manufacturer's "high wind" instructions. —/_/—
J. Grading
1. Grading of the subject property shall be in accordance with California Building Code,City Grading —/—/—
Standards, and accepted grading practices. The final grading plan shall be in substantial
conformance with the approved grading plan.
2. A soils report shall be prepared by a qualified engineer licensed by the State of California to
perform such work.
3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the
time of application for grading plan check.
4. The final grading, appropriate certifications and compaction reports shall be completed, —/—/—
submitted, and approved by the Building and Safety Official prior to the issuance of building
permits.
5. A separate grading plan check submittal is required for all new construction projects and for
existing buildings where improvements being proposed will generate 50 cubic yards or more of
combined cut and fill. The grading plan shall be prepared,stamped,and signed by a California
registered Civil Engineer.
APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
K. Dedication and Vehicular Access
1. Dedication shall be made of the following rights-of-way on the perimeter streets(measured from —/—/—
street centerline):
44 total feet on Etiwanda Avenue. —/—/-
2. An irrevocable offer of dedication for roadway purposes shall be made for the private streets.
3. Corner property line cutoffs shall be dedicated per City Standards. —/—/-
4. All existing easements lying within future rights-of-way shall be quit-claimed or delineated on the _/—/—
final map.
5. Easements for public sidewalks and/or street trees placed outside the public right-of-way shall be —/_/—
dedicated to the City.
4
Project No.SUBTT16716
Completion Date
L. Street Improvements
1. Pursuant to City Council Resolution No.88-557,no person shall make connections from a source
of energy,fuel or power to any building service equipment which is regulated by technical codes
and for which a permit is required unless, in addition to any and all other codes, regulations and
ordinances,all improvements required by these conditions of development approval have been
completed and accepted by the City Council,except:that in developments containing more than
one building or unit, the development may have energy connections made to a percentage of
those buildings, or units proportionate to the completion of improvements as required by
conditions of approval of development. In no case shall more than 95 percent of the buildings or
units be connected to energy prior to completion and acceptance of all improvements required by
these conditions of approval of development.
2. Construct the following perimeter street improvements including, but not limited to: _/—/—
Curb Drive Street Street Comm Median Bike
Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other
Etiwanda Avenue (e) I X I X I (f) I X I X
Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement
reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk
shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be
provided for this item. (e)Cobble curb and gutter. (f) Limited access curb for emergency access.
3. Improvement Plans and Construction:
a. Street improvement plans, including street trees,street lights,and intersection safety lights
on future signal poles, and traffic signal plans shall be prepared by a registered Civil
Engineer and shall be submitted to and approved by the City Engineer. Security shall be
posted and an agreement executed to the satisfaction of the City Engineer and the City
Attorney guaranteeing completion of the public and/or private street improvements,prior to
final map approval or the issuance of building permits,whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a
construction permit shall be obtained from the City Engineer's Office in addition to any
other permits required.
C. Pavement striping,marking,traffic signing, street name signing,traffic signal conduit,and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction
project along major or secondary streets and at intersections for future traffic signals and
interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside
of BCR, ECR, or any other locations approved by the City Engineer
Notes:
1) Pull boxes shall be No.6 at intersections and No.5 along streets,a maximum of 200
feet apart, unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch galvanized steel with pull rope or as specified.
e. Handicapped access ramps shall be installed on all corners of intersections per City _/_/_
Standards or as directed by the City Engineer.
f. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A cash
deposit shall be provided to cover the cost of grading and paving,which shall be refunded
upon completion of the construction to the satisfaction of the City Engineer.
5
Project No.SUBTT16716
Completion Date
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be
installed to City Standards, except for single family residential lots.
h. Street names shall be approved by the City Planner prior to submittal for first plan check.
4. Street improvement plans per City Standards for all private streets shall be provided for review
and approval by the City Engineer. Prior to any work being performed on the private streets,fees
shall be paid and construction permits shall be obtained from the City Engineer's Office in
addition to any other permits required.
5. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in
accordance with the City's street tree program.
6. Install street trees per City street tree design guidelines and standards as follows. The completed
1 legend (box below) and construction notes shall appear on the title page of the street
improvement plans. Street improvement plans shall include a line item within the construction
I legend stating: "Street trees shall be installed per the notes and legend on Sheet 1(typically
sheet 1)." Where public landscape plans are required, tree installation in those areas shall be
per the public landscape improvement plans.
The City Engineer reserves the right to adjust tree species based upon field conditions and other
variables. For additional information, contact the Project Engineer.
Min.
Grow
Street Name Botanical Name Common Name Space Spacing Size city.
Etiwanda Avenue Eucalyptus camadulensis Red Gum 8 ft. 30 ft. 5-gal. Fill-in
O.C.
Construction Notes for Street Trees:
1) All street trees are to be planted in accordance with City standard plans.
2) Prior to the commencement of any planting,an agronomic soils report shall be furnished to
the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil
amendments, as determined by the City inspector.
3) All street trees are subject to inspection and acceptance by the Engineering Division.
4) Street trees are to be planted per public improvement plans only.
7. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with
adopted policy. On collector or larger streets, lines of sight shall be plotted for all project
intersections, including driveways.. Local residential street intersections and commercial or
industrial driveways may have lines of sight plotted as 'required.
I
M. Public Maintenance Areas
1. A signed consent and waiver form to join and/or form the appropriate Landscape and.Lighting
Districts shall be filed with the City Engineer prior to final map approval or issuance of building
permits whichever occurs first. Formation costs shall be borne by the developer.
N. Drainage and Flood Control
1. A final drainage study shall be submitted to and approved by the City Engineer prior to final map
approval or the issuance of building permits, whichever occurs first. All drainage facilities shall
be installed as required by the City Engineer.
2. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the
property from adjacent areas.
3. Trees are prohibited within 5 feet of the outside diameter of any public storm drain pipe measured
from the outer edge of a mature tree trunk.
6
Project No.SUBTT16716
completion Date
4. Public storm drain easements shall be graded to convey overflows in the event of a blockage in a
sump catch basin on the public street, and provisions made to pass through walls.
O. Utilities
1. Provide separate utility services to each parcel including sanitary sewerage system,water,gas,
electric power, telephone, and cable TV (all underground) in accordance with the Utility
Standards. Easements shall be provided as required.
2. The developer shall be responsible for the relocation of existing utilities as necessary.
3. Water and sewer plans shall be designed and constructed to meet the requirements of the
Cucamonga County Water District(CCW D), Rancho Cucamonga Fire Protection District,and the
1 Environmental Health Department of the County of San Bernardino. A letter of compliance from
the CCW D is required prior to final map approval or issuance of permits,whichever occurs first.
Such letter must have been issued by the water district within 90 days prior to final map approval
in the case of subdivision or prior to the issuance of permits in the case of all other residential
projects.
4. Approvals have not been secured from all utilities and other interested agencies involved.
Approval of the final parcel map will be subject to any requirements that may be received from
them.
P. General Requirements and Approvals
1. Etiwanda/San Sevaine Area Regional Mainline,Secondary Regional,and Master Plan Drainage
Fees shall be paid prior to final map approval or prior to building permit issuance if no map is
involved.
2. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all
new streetlights for the first six months of operation,prior to final map approval or prior to building
permit issuance if no map is involved.
3. Prior to the issuance of building permits,a Diversion Deposit and related administrative fees shall
be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if
at least 50% of all wastes generated during construction and demolition are diverted from
landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to
the Engineering Division when the first building permit application is submitted to Building and
Safety. Form CD-2 shall be submitted to the Engineering Division within 60 days following the
completion of the construction and/or demolition project.
I
7