HomeMy WebLinkAbout04-101 - Resolutions RESOLUTION NO. 04-101
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT
REVIEW DRC2004-00145, FOR THE DEVELOPMENT OF A PUBLIC
STORAGE BUILDING TOTALING 62,622 SQUARE FEET ON 1.24 ACRE
OF LAND IN THE GENERAL INDUSTRIAL DISTRICT (SUBAREA 8),
LOCATED ON THE SOUTH SIDE OF ARROW ROUTE,APPROXIMATELY
200 FEET EAST OF UTICA AVENUE, AND MAKING FINDINGS IN
SUPPORT THEREOF -APN: 0209-491-80.
A. Recitals.
1. Public Storage filed an application for approval of Development Review
DRC2004-00145, as described in the title of this Resolution. Hereinafter in this Resolution, the
subject Development Review request is referred to as "the application."
2. On the 11th day of August 2004, the Planning Commission of the City of Rancho
Cucamonga held a meeting to consider the application.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning
Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the above-
referenced meeting on August 11, 2004, including written and oral staff reports, this Commission
hereby specifically finds as follows:
a. The application applies to a vacant 1.24 acre parcel of land on the south side of
Arrow Route, east of Utica Avenue; and
b. The properties to the north of the subject site are developed with industrial
condominiums and are zoned Industrial Park;the property to the south is developed with industrial
buildings and is zoned General Industrial;the property to the east is developed with a Public Storage
building and is zoned General Industrial;the property to west is developed with an industrial building
and is zoned General Industrial; and
C. The applicant is proposing to develop a public storage building, a permitted use
within the General Industrial District; and
d. The project,together with the recommended conditions of approval,complies with
all minimum development standards for the City of Rancho Cucamonga; and
e. The project exceeds the required number of off-street parking stalls, and;
PLANNING COMMISSION RESOLUTION NO. 04-101
DRC2004-00145— PUBLIC STORAGE
August 11, 2004
Page 2
f. The project will provide a continuity of architectural design with the existing Public
Storage building to the east, a design goal of General Plan; and
g. The project design includes two primary materials, a decorative cornice and has a
screen wall that is architecturally integrated with the building design;therefore,the project meets the
design goals of the General Industrial District by providing a high-level of architectural design and
screening of loading areas.
3. Based upon the substantial evidence presented to this Commission during the above-
referenced meeting on August 11, 2004, including written and oral staff reports, this Commission
hereby specifically finds and concludes as follows:
a. That the proposed project is consistent with the objectives of the General Plan and
Development Code; and
b. That the proposed design is in accord with the objectives of the Development Code
and the purposes of the district in which the site is located; and
C. That the proposed design is in compliance with each of the applicable provisions of
the Development Code; and
d. That the proposed design, together with the conditions applicable thereto, will not
be detrimental to the public health, safety, or welfare or materially injurious to properties or
improvements in the vicinity.
4. Based upon.the facts and information contained in the proposed Mitigated Negative
Declaration, together with all written and oral reports included for the environmental assessment for
the application,the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and
Monitoring Program attached hereto, and incorporated herein by this reference, based upon the
findings as follows:
a. That the Mitigated Negative Declaration has been prepared in compliance with the
California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines
promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared
therefore reflect the independent judgment of the Planning Commission; and, further, this
Commission has reviewed and considered the information contained in said Mitigated Negative
Declaration with regard to the application.
b. Although the Mitigated Negative Declaration identifies certain significant
environmental effects that will result if the project is approved, all significant effects have been
reduced to an acceptable level by imposition of mitigation measures on the project,which are listed
below as Conditions of Approval.
C. Pursuant to the provisions of Section 753.5(c)of Title 14 of the California Code of
Regulations, the Planning Commission finds as follows: In considering the record as a whole, the
Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the
proposed project will have potential for an adverse impact upon wildlife resources or the habitat
upon which wildlife depends. Further, based upon the substantial evidence contained in the
Mitigated Negative Declaration, the staff reports and exhibits, and the information provided to the
PLANNING COMMISSION RESOLUTION NO. 04-101
DRC2004-00145— PUBLIC STORAGE
August 11, 2004
Page 3
Planning Commission during the meeting,the Planning Commission hereby rebuts the presumption
of adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code of
Regulations.
5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth
below and in the Standard Conditions, attached hereto and incorporated herein by this reference.
Planning Division
1) The automatic sliding gate shall include decorative, dense, view-
obstructing mesh, in order to shield views from Arrow Route.
2) From the southwest corner of the building to the junction of the wall
planes between the Public Storage building and the adjacent building
and above the roofline of the adjacent building,the west elevation shall
include plaster over masonry to achieve continuity of design. Split-face
block, matching the pattern on the north elevation, shall be used from
the southwest corner of the building to the junction of the wall planes
between the Public Storage building and the adjacent building. Final
design shall be subject to City Planner review and approval.
3) Along the north elevation, the plum trellis shall be eliminated and the
gray split-face block pattern shall be continued. Final design shall be
subject to City Planner review and approval.
4) Cornice treatment shall be added to the north and east elevations at
the northeast corner of the building above the split-face block courses.
5) The streetscape landscape design shall match the existing Public
Storage project to the east.
6) Along the east elevation, the two roll-up doors closet to Arrow Route
shall be painted beige to match the painted wall panels.
7) Undulating berms shall be provided in the landscape setback along the
Arrow Route frontage.
8) Prior to occupancy being granted, the exterior of the Public Storage
building to the east (10701 Arrow Route) shall be sandblasted, the
yellow sealer coat removed and the exterior surface of the building
shall be restored to the satisfaction of the City Planner.
9) In order to ensure the timely restoration of the exterior of the existing
Public Storage building to the east (10701 Arrow Route) prior to
occupancy being granted for the 62,622 square foot Public Storage
building (DRC2004-00145),the following shall occur: 1)building plans
shall be submitted for plan check within 30 days of the adoption date of
this resolution; 2) building permits shall be issued within 30 days of all
departments approving the plan check; and 3)construction shall begin
PLANNING COMMISSION RESOLUTION NO. 04-101
DRC2004-00145 — PUBLIC STORAGE
August 11, 2004
Page 4
within 30 days of building permit issuance. Failure to comply with the
above timelines will result in the City Planner requiring the immediate
restoration of the exterior of the Public Storage building located at
10701 Arrow Route.
Engineering Division
1) Arrow Route frontage improvements shall be in accordance with City
"Major Arterial" standards including curb and gutter, curvilinear
sidewalk, commercial drive approach and street trees and as follows:
a) The drive approach shall have a minimum width of 35 feet.
2) Revise existing City Drawing No. 1340 Sheets 1 and 2 to reflect
construction of the above improvements and removal of the existing
drive approach, to the satisfaction of the City Engineer.
3) Driveway accent paving shall be located outside the public right-of-way.
4) Provide a Water Quality Management Plan(WQMP),to the satisfaction
of the City Engineer, and identify applicable Best Management
Practices (BMPs) on the grading plan.
Environmental Mitigation
Air Quality
1) All construction equipment shall be maintained in good operating
condition so as to reduce operational emissions. The contractor shall
ensure that all construction equipment is being properly serviced and
maintained as per man ufacturers'specifications. Maintenance records
shall be available at the construction site for City verification.
2) Prior to the issuance of any grading permits,the developer shall submit
construction plans to the City denoting the proposed schedule and
projected equipment use. Construction contractors shall provide
evidence that low-emission mobile construction equipment will be
utilized,or that their use was investigated and found to be infeasible for
the project. Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality Management District
(SCAQMD) as well as City Planning staff.
3) All paints and coatings shall meet or exceed performance standards
noted in SCAQMD Rule 1113. Paints and coatings shall be applied
either by hand or high-volume, low-pressure spray.
4) All asphalt shall meet or exceed performance standards noted in
SCAQMD Rule 1108.
PLANNING COMMISSION RESOLUTION NO. 04-101
DRC2004-00145— PUBLIC STORAGE
August 11, 2004
Page 5
5) All construction equipment shall comply with SCAQMD Rules 402 and
403. Additionally, contractors shall include the following provisions:
• Reestablish ground cover on the construction site through
seeding and watering.
• Pave or apply gravel to any on-site haul roads.
• Phase grading to prevent the susceptibility of large areas to
erosion over extended periods of time.
Schedule activities to minimize the amounts of exposed
excavated soil during and after the end of work periods.
• Dispose of surplus excavated material in accordance with local
ordinances and use sound engineering practices.
• Sweep streets according to a schedule established by the City if
silt is carried over to adjacent public thoroughfares or occurs as a
result of hauling. Timing may vary depending upon the time of
year of construction.
• Suspend grading operations during high winds (i.e.,wind speeds
exceeding 25 mph) in accordance with Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils haul trucks
or cover payloads using tarps or other suitable means.
6) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and the Regional Water Quality Control Board
[RWQCB]) daily to reduce PM10 emissions, in accordance with
SCAQMD Rule 403.
7) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall
be applied to all inactive construction areas that remain inactive for 96
hours or more to reduce PM10 emissions.
8) The construction contractor shall utilize electric or clean alternative
fuel-powered equipment where feasible.
9) The construction contractor shall ensure that construction grading
plans include a statement that work crews will shut off equipment when
not in use.
10) All industrial and commercial facilities shall post signs requiring that
trucks shall not be left idling for prolonged periods (i.e., in excess of 10
minutes).
PLANNING COMMISSION RESOLUTION NO. 04-101
DRC2004-00145 — PUBLIC STORAGE
August 11, 2004
Page 6
11) All industrial and commercial facilities shall designate preferential
parking for vanpools.
12) All industrial and commercial site tenants with 50 or more employees
shall be required to post both bus and Metrolink schedules in
conspicuous areas.
13) All industrial and commercial site tenants with 50 or more employees
shall be required to configure their operating schedules around the
Metrolink schedule to the extent reasonably feasible.
14) All residential and commercial structures shall be required to
incorporate high-efficiency/low-polluting heating, air conditioning,
appliances, and water heaters.
15) All residential and commercial structures shall be required to
incorporate thermal pane windows and weather-stripping.
Cultural Resources
1) If any prehistoric archaeological resources are encountered before or
during grading, the developer will retain a qualified archaeologist to
monitor construction activities,to take appropriate measures to protect
or preserve them for study. With the assistance of the archaeologist,
the City of Rancho Cucamonga will:
• Enact interim measures to protect undesignated sites from
demolition or significant modification without an opportunity for
the City to establish its archaeological value.
• Consider establishing provisions to require incorporation of
archaeological sites within new developments, using their special
qualities as a theme or focal point.
• Pursue educating the public about the area's archaeological
heritage.
• Propose mitigation measures and recommend conditions of
approval to eliminate adverse project effects on significant,
important, and unique prehistoric resources, following
appropriate CEQA guidelines.
• Prepare a technical resources management report,documenting
the inventory, evaluation, and proposed mitigation of resources
within the project area. Submit one copy of the completed report,
with original illustrations, to the San Bernardino County
Archaeological Information Center for permanent archiving.
PLANNING COMMISSION RESOLUTION NO. 04-101
DRC2004-00145— PUBLIC STORAGE
August 11, 2004
Page 7
2) A qualified paleontologist shall conduct a preconstruction field survey
of the project site. The paleontologist shall submit a report of findings
that will also provide specific recommendations regarding further
mitigation measures (i.e., paleontological monitoring) that may be
appropriate. Where mitigation monitoring is appropriate, the program
must include, but not be limited to, the following measures:
• Assign a paleontological monitor, trained and equipped to allow
the rapid removal of fossils with minimal construction delay, to
the site full-time during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared or graded,
divert earth-disturbing activities elsewhere until the monitor has
completed salvage. If construction personnel make the
discovery, the grading contractor should immediately divert
construction and notify the monitor of the find.
• Submit summary report to City of Rancho Cucamonga. Transfer
collected specimens with a copy of the report to San Bernardino
County Museum.
Geology and Soils
1) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and RWQCB)daily to reduce PM10 emissions,
in accordance with SCAQMD Rule 403.
2) Frontage public streets shall be swept according to a schedule
established by the City to reduce PM10 emissions associated with
vehicle tracking of soil off-site. Timing may vary depending upon the
time of year of construction.
3) Grading operations shall be suspended when wind speeds exceed
25 mph to minimize PM10 emissions from the site during such
episodes.
4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall
be applied to all inactive construction areas that remain inactive for 96
hours or more to reduce PM10 emissions.
Hydrology and Water Quality
1) Structures to retain precipitation and runoff on-site shall be integrated
into the design of the project where appropriate. Measures that may
be used to minimize runoff and to enhance infiltration include Dutch
drains, precast concrete lattice blocks and bricks,terraces, diversions,
runoff spreaders, seepage pits, and recharge basins.
PLANNING COMMISSION RESOLUTION NO. 04-101
DRC2004-00145— PUBLIC STORAGE
August 11, 2004
Page 8
2) Surface runoff shall be directed to landscaped areas wherever
practicable and as recommended by the engineer of record.
3) A physical implementation of a Landscape Plan consistent with County
Water Conservation Resolution or City equivalent, which may include
provision of water sensors, programmable irrigation times for short
cycle.
4) Group plants with similar water requirements in orderto reduce excess
irrigation runoff and promote surface filtration.
5) Placards or stenciling with the phrase"No Dumping—Drains to Ocean"
or equally effective phrase will be placed along the front of the catch of
the catch basin. Placards may be provided by the City, County, or
equivalent. The on-site catch basin will be inspected and maintained
by the owner and/or agent as described in the Water Quality
Management Plan (WQMP) on file with the City of Rancho
Cucamonga.
6) All non-structural Best Management Practices (BMPs)identified in the
WQMP on file with the City of Rancho Cucamonga, including, but not
limited to, tenant education and litter control, shall be implemented as
described in the WQMP.
7) Prior to issuance of grading or paving permits, the applicant shall
submit to the City engineer a Notice of Intent (NOI) to comply with
obtaining coverage under the National Pollutant Discharge Elimination
System (NPDES) General Construction Storm Water Permit from the
State Water Resources Control Board. Evidence that this has been
obtained (i.e.,a copy of the Waste Discharger's Identification Number)
shall be submitted to the City Engineer for coverage under the NPDES
General Construction Permit.
Noise
1) Construction or grading shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday.
2) Construction or grading noise levels shall not exceed the standards
specified in Development Code Section 17.02.120-D, as measured at
the property line. The developer shall hire a consultant to perform
weekly noise level monitoring as specified in Development Code
Section 17.02.120. Monitoring at other times may be required by the
Planning Division. The said consultant shall report their findings to the
Planning Division within 24 hours; however, if noise levels exceed the
above standards, then the consultant shall immediately notify the
Planning Division. If noise levels exceed the above standards, then
PLANNING COMMISSION RESOLUTION NO. 04-101
DRC2004-00145— PUBLIC STORAGE
August 11, 2004
Page 9
construction activities shall be reduced in intensity to a level of
compliance with above noise standards or halted.
3) Haul truck deliveries shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday ora national holiday. Additionally, if heavy trucks used
for hauling would exceed 100 daily trips(counting both to and from the
construction site), then the developer shall prepare a noise mitigation
plan denoting any construction traffic haul routes. To the extent
feasible, the plan shall denote haul routes that do not pass sensitive
land uses or residential dwellings.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 11TH DAY OF AUGUST 2004.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
l
BY: p
rry T. iel, Vice Chairman
ATTEST:
Brad ecre
I, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga,do hereby
certify that the foregoing Resolution was duly and regularly introduced, passed,and adopted by the
Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning
Commission held on the 11th of August, by the following vote-to-wit:
AYES: COMMISSIONERS: FLETCHER, McNIEL, McPHAIL, STEWART
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: MACIAS
City of Rancho Cucamonga
MITIGATION MONITORING
PROGRAM
Project File No.: Development Review DRC2004-00145
This Mitigation Monitoring Program(MMP)has been prepared for use in implementing the mitigation
measures identified in the Mitigated Negative Declaration for the above-listed project. This program
has been prepared in compliance with State law to ensure that adopted mitigation measures are
implemented (Section 21081.6 of the Public Resources Code).
Program Components - This MMP contains the following elements:
1. Conditions of approval that act as impact mitigation measures are recorded with the action and
the procedure necessary to ensure compliance.The mitigation measure conditions of approval
are contained in the adopted Resolution of Approval for the project.
2. A procedure of compliance and verification has been outlined for each action necessary. This
procedure designates who will take action, what action will be taken and when, and to whom
and when compliance will be reported.
3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring
progresses, changes to compliance procedures may be necessary based upon
recommendations by those responsible for the program.
Program Management- The MMP will be in-place through all phases of the project. The project
planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project
planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly
and proper action is taken on each mitigation. Each City department shall ensure compliance of the
conditions (mitigation) that relate to that department.
Procedures -The following steps will be followed by the City of Rancho Cucamonga.
1. A fee covering all costs and expenses, including any consultants' fees, incurred by the City in
performing monitoring or reporting programs shall be charged to the applicant.
2. A MMP Reporting Form will be prepared for each potentially significant impact and its
corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached
hereto. This procedure designates who will take action,what action will be taken and when,and
to whom and when compliance will be reported. All monitoring and reporting documentation will
be kept in the project file with the department having the original authority for processing the
project. Reports will be available from the City upon request at the following address:
City of Rancho Cucamonga - Lead Agency
(Planning Division)
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
Mitigation Monitoring Program
DRC2004-00145
Page 2
3. Appropriate specialists will be retained if technical expertise beyond the City staffs is needed,as
determined by the project planner or responsible City department,to monitor specific mitigation
activities and provide appropriate written approvals to the project planner.
4. The project planner or responsible City department will approve, by signature and date, the
completion of each action item that was identified on the MMP Reporting Form. After each
measure is verified for compliance, no further action is required for the specific phase of
development.
5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off
as completed by the project planner or responsible City department at the bottom of the MMP
Reporting Form.
6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation
measures. The project planner is responsible for approving any such refinements or additions.
An MMP Reporting Form will be completed by the project planner or responsible Citydepartment
and a copy provided to the appropriate design, construction, or operational personnel.
7. The project planner or responsible City department has the authority to stop the work of
construction contractors if compliance with any aspects of the MMP is not occurring afterwritten
notification has been issued. The project planner or responsible City department also has the
authority to hold certificates of occupancies if compliance with a mitigation measure attached
hereto is not occurring. The project planner or responsible City department has the authority to
hold issuance of a business license until all mitigation measures are implemented.
8. Any conditions (mitigation) that require monitoring after project completion shall be the
responsibility of the City of Rancho Cucamonga Planning Division.The Division shall require the
applicant to post any necessary funds (or other forms of guarantee)with the City. These funds
shall be used by the City to retain consultants and/or pay for City staff time to monitor and report
on the mitigation measure for the required period of time.
9. In those instances requiring long-term project monitoring, the applicant shall provide the City
with a plan for monitoring the mitigation activities at the project site and reporting the monitoring
results to the City. Said plan shall identify the reporter as an individual qualified to know whether
the particular mitigation measure has been implemented. The monitoring/reporting plan shall
conform to the City's MMP and shall be approved by the Community Development Director or
City Planner prior to the issuance of building permits.
MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III)
Project File No.: Development Review DRC2004-00145 Applicant: Public Storage
Initial Study Prepared by: _Donald Granger. Assistant Planner Date: March 15. 2004
ResponsibleMitigation Measures No.I g of Method .
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-compliance
Air Quality
All construction equipment shall be maintained in good CP C Review of plans A/C 2/4
operating condition so as to reduce operational
emissions. The Contractor shall ensure that all
construction equipment is being properly serviced and
maintained as per manufacturers' specifications.
Maintenance records shall be available at the
construction site for City verification.
Prior to the issuance of any grading permits, the CP/BO C Review of plans C 2
developer shall submit construction plans to the City
denoting the proposed schedule and projected
equipment use. Construction contractors shall provide
evidence that low-emission mobile construction
equipment will be utilized, or that their use was
investigated and found to be infeasible for the project.
Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality
Management District (SCAQMD) as well as City
Planning Staff.
All paints and coatings shall meet or exceed CP C Review of plans A/C 2/4
performance standards noted in SCAQMD Rule 1113.
Paints and coatings shall be applied either by hand or
high volume, low-pressure spray.
All asphalt shall meet or exceed performance standards BO B Review of plans A/C 2
noted in SCAQMD Rule 1108.
All construction equipment shall comply with SCAQMD BO C Review of plans A/C 2/4
Rules 402 and 403. Additionally, contractors shall
include the following provisions:
• Reestablish ground cover on the construction site BO C Review of plans A/C 2/4
through seeding and watering.
1 of 7
Mitigation Responsibleof Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date /initials Non-Compliance
• Pave or apply gravel to any on-site haul roads. BO C Review of plans .A/C 2/4
• Phase grading to prevent the susceptibility of large SO C Review of plans A/C 2/4
areas to erosion over extended periods of time.
• Schedule activities to minimize the amounts of SO C Review of plans A/C 2/4
exposed excavated soil during and after the end of
work periods.
• Dispose of surplus excavated material in SO C Review of plans A 4
accordance with local ordinances and use sound
engineering practices.
• Sweep streets according to a schedule established SO C During A 4
by the City if silt is carried over to adjacent public construction
thoroughfares or occurs as a result of hauling.
Timing may vary depending upon the time of year of
construction.
• Suspend grading operations during high winds(i.e., BO C During A 4
wind speeds exceeding 25 mph)in accordance with construction
SCAQMD Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils SO C During A 4
haul trucks or cover payloads using tarps or other Construction
suitable means.
The site shall be treated with water or other soil- SO C During A 4
stabilizing agent (approved by SCAQMD and Regional construction
Water Quality Control Board [RWQCBj)daily to reduce
PM10 emissions,in accordance with SCAQMD Rule 403.
Chemical soil-stabilizers (approved by SCAQMD and SO C During A 4
RWQCB) shall be applied to all inactive construction construction
areas that remain inactive for 96 hours or more to
reduce PM10 emissions.
The construction contractor shall utilize electric or clean BO C Review of plans A/C 4
alternative fuel-powered equipment where feasible.
The construction contractor shall ensure that SO C Review of plans A/C 2/4
construction grading plans include a statement that work
crews will shut off equipment when not in use.
2of7
ImplementingMitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for
Date /initials Non-Compliance
All industrial and commercial facilities shall post signs BO C Review of plans A 4
requiring that trucks shall not be left idling for prolonged
periods (i.e., in excess of 10 minutes).
All industrial and commercial facilities shall designate CP C Review of plans A/C 2/3
preferential parking for vanpools.
All industrial and commercial site tenants with 50 or CP C Review of plans D 2/3
more employees shall be required to post both bus and
Metrolink schedules in conspicuous areas.
All industrial and commercial site tenants with 50 or CP C Review of plans D 2/3
more employees shall be required to configure their
operating schedules around the Metrolink schedule to
the extent reasonably feasible.
All residential and commercial structures shall be BO C/D Review of plans C 2/4
required to incorporate high-efficiency/low-polluting
heating,air conditioning,appliances,and water heaters.
All residential and commercial structures shall be BO C/D Review of plans C 2/4
required to incorporate thermal pane windows and
weather-stripping.
Cultural Resources
If any prehistoric archaeological resources are
encountered before or during grading,the developerwill
retain a qualified archaeologist to monitor construction
activities, to take appropriate measures to protect or
preserve them for study. With the assistance of the
archaeologist, the City of Rancho Cucamonga will:
• Enact interim measures to protect undesignated CP/BO C Review of report A/D 3/4
sites from demolition or significant modification
without an opportunity for the City to establish its
archaeological value.
• Consider establishing provisions to require CP/BO C Review of report A/D 3/4
incorporation of archaeological sites within new
developments, using their special qualities as a
theme or focal point.
• Pursue educating the public about the area's CP/BO C Review of report A/D 3/4
archaeological heritage.
3of7
Mitigation Measures No. I Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification
Date/initials Non-Compliance
Propose mitigation measures and recommend CP/BO C Review of report A/D 3/4
conditions of approval to eliminate adverse project
effects on significant, important, and unique
prehistoric resources, following appropriate CEQA
guidelines.
Prepare a technical resources management report, CP C Review of report A/D 3/4
documenting the inventory, evaluation, and
proposed mitigation of resources within the project
area. Submit one copy of the completed report,with
original illustrations, to the San Bernardino County
Archaeological Information Center for permanent
archiving.
A qualified paleontologist shall conduct a preconstruction CP B Review of report A/D 4
field survey of the project site. The paleontologist shall
submit a report of findings that will also provide specific
recommendations regarding further mitigation measures
(i.e., paleontological monitoring) that may be
appropriate. Where mitigation monitoring is appropriate,
the program must include, but not be limited to, the
following measures:
• Assign a paleontological monitor, trained and CP B Review of report A/D 4
equipped to allow the rapid removal of fossils with
minimal construction delay, to the site full-time
during the interval of earth-disturbing activities.
Should fossils be found within an area being cleared BO B/C Review of report A/D 4
or graded, divert earth-disturbing activities
elsewhere until the monitor has completed salvage.
If construction personnel make the discovery, the
grading contractor should immediately divert
construction and notify the monitor of the find.
• Submit a summary report to the City of Rancho CP D Review of report D 3
Cucamonga. Transfer collected specimens with a
copy of the report to the San Bernardino County
Museum.
4 of 7
Mitigation Measures No.I Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date /initials Non-Compliance
Geology and Soils
The site shall be treated with water or other soil- BO C During A 4
stabilizing agent(approved by SCAQMD and RW QCB) construction
daily to reduce PM,o emissions, in accordance with
SCAQMD Rule 403.
Frontage public streets shall be swept according to a BO C During A 4
schedule established by the City to reduce PM,o construction
emissions associated with vehicle tracking of soil off-
site. Timing may vary depending upon the time of year
of construction.
Grading operations shall be suspended when wind BO C During A 4
speeds exceed 25 mph to minimize PM,o emissions construction
from the site during such episodes.
Chemical soil-stabilizers (approved by SCAQMD and BO C During A 4
RWQCB) shall be applied to all inactive construction construction
areas that remain inactive for 96 hours or more to
reduce PM,a emissions.
Hydrology and Water Quality
Structures to retain precipitation and runoff on-site shall BO B/C/D Review of plans A/C 2/4
be integrated into the design of the project where
appropriate. Measures that may be used to minimize
runoff and to enhance infiltration include Dutch drains,
precast concrete lattice blocks and bricks, terraces,
diversions,runoff spreaders,seepage pits,and recharge
basins.
Surface runoff shall be directed to landscaped areas BO B/C/D Review of plans A/C 2/4
wherever practicable and as recommended by the
engineer of record.
A physical implementation of a Landscape Plan BO B/C/D Review of plans A/C 2/4
consistent with County Water Conservation Resolution
or City equivalent,which may include provision of water
sensors, programmable irrigation times for short cycles.
5of7
Mitigation No. Monitoring
ImplementingAction
Group plants with similar water requirements in order to BO B/C/D Review of plans A/C 2/4
reduce excess irrigation runoff and promote surface
filtration.
Placards or stenciling with the phrase "No Dumping — BO B/C/D Review of plans A/C 2/4
Drains to Ocean" or equally effective phrase will be
placed along the front of the catch of the catch basin.
Placards may be provided by the City, County, or
equivalent. The on-site catch basin will be inspected
and maintained by the owner and/or agent as described
in the Water Quality Management Plan (WQMP)on file
with the City of Rancho Cucamonga.
All non-structural Best Management Practices (BMPs) BO B/C/D Review of plans A/C 2/4
identified in the WQMP on file with the City of Rancho
Cucamonga, including, but not limited to, tenant
education and litter control, shall be implemented as
described in the WQMP.
Prior to issuance of grading or paving permits, the BO B/C/D Review of plans A/C 2/4
applicant shall submit to the City engineer a Notice of
Intent(NOI)to complywith obtaining coverage under the
National Pollutant Discharge Elimination System
(NPDES) General Construction Storm Water Permit
from the State Water Resources Control Board.
Evidence that this has been obtained(i.e., a copy of the
Waste Discharger's Identification Number) shall be
submitted to the City Engineer for coverage under the
NPDES General Construction Permit.
Noise
Construction or grading shall not take place between the BO C During A 4
hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction
including Saturday, or at any time on Sunday or a
national holiday.
6of7
Mitigation Measures No. I Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Construction or grading noise levels shall not exceed the CP C During A 4
standards specified in Development Code Section construction
17.02.120-D, as measured at the property line. The
developer shall hire a consultant to perform weekly
noise level monitoring as specified in Development
Code Section 17.02.120. Monitoring at other times may
be required by the Planning Division. Said consultant
shall report their findings to the Planning Division within
24 hours; however, if noise levels exceed the above
standards, then the consultant shall immediately notify
the Planning Division. If noise levels exceed the above
standards,then construction activities shall be reduced
in intensity to a level of compliance with above noise
standards or halted.
Haul truck deliveries shall not take place between the POGO C During A 4/7
hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction
including Saturday, or at any time on Sunday or a
national holiday. Additionally, if heavy trucks used for
hauling would exceed 100 daily trips (counting both to
and from the construction site),then the developer shall
prepare a noise mitigation plan denoting any
construction traffic haul routes. To the extent feasible,
the plan shall denote haul routes that do not pass
sensitive land uses or residential dwellings.
Key to Checklist Abbreviations
Responsible Person Monitoring Frequency Method of Verification Sanctions
CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map
CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit
CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy
BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order
PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds
FC-Fire Chief or designee6-Revoke CUP
7-Citation
7of7
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT M DRC2004-00145
SUBJECT: 62, 622 SQUARE FOOT PUBLIC STORAGE BUILDING
APPLICANT: PUBLIC STORAGE
LOCATION: S/S ARROW ROUTE, 200 FEET EAST OF UTICA AVENUE -APN: 0209-491-80
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DIVISION,(909)477-2750, FOR COMPLIANCE
WITH THE FOLLOWING CONDITIONS:
Completion Date
A. General Requirements
1. The applicant shall agree to defend at his sole expense any action brought against the City, its
agents,officers,or employees,because of the issuance of such approval,or in the altemative,to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or
employees, for any Court costs and attorney's fees which the City, its agents, officers, or
employees may be required by a court to pay as a result of such action. The City may, at its sole
discretion,participate at its own expense in the defense of any such action but such participation
shall not relieve applicant of his obligations under this condition.
2. Copies of the signed Planning Commission Resolution of Approval No. 04-101, Standard
Conditions, and all environmental mitigations shall be included on the plans (full size). The
sheet(s)are for information only to all parties involved in the construction/grading activities and
are not required to be wet sealed/stamped by a licensed Engineer/Architect.
B. Time Limits
1. Conditional Use Permit, Variance, or Development/Design Review approval shall expire if
building permits are not issued or approved use has not commenced within 5 years from the date
of approval. No extensions are allowed.
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which include
site plans,architectural elevations,exterior materials and colors, landscaping,sign program,and
grading on file in the Planning Division, the conditions contained herein, and the Development
Code regulations.
SC-1-04 1
i:\planning\final\pingcom m\dre2004-00145cond8-11.doc
Project No.DRC2004-00145
Completion Date
2. Prior to any use of the project site or business activity being commenced thereon,all Conditions _/—/—
of Approval shall be completed to the satisfaction of the City Planner.
3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and _/—/—
State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be
submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Division
to show compliance. The buildings shall be inspected for compliance prior to occupancy.
4. Revised site plans and building elevations incorporating all Conditions of Approval shall be
—/—
submitted for City Planner review and approval prior to the issuance of building permits.
5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved
use has commenced, whichever comes first.
6. Approval of this request shall not waive compliance with all sections of the Development Code,all
other applicable City Ordinances, and applicable Community or Specific Plans in effect at the
time of building permit issuance.
7. A detailed on-site lighting plan, including a photometric diagram,shall be reviewed and approved
by the the City Planner and Police Department(477-2800)prior to the issuance of building permits.
Such plan shall indicate style, illumination, location,height,and method of shielding so as not to
adversely affect adjacent properties.
8. Trash receptacle(s)are required and shall meet City standards. The final design, locations,and —/_/—
the number of trash receptacles shall be subject to City Planner review and approval prior to the
issuance of building permits.
9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be ��—
located out of public view and adequately screened through the use of a combination of concrete
or masonry walls, berming,and/or landscaping to the satisfaction of the City Planner. For single-
family residential developments, transformers shall be placed in underground vaults.
10. All building numbers and individual units shall be identified in a clear and concise manner,
including proper proper illumination.
11. All parkways, open areas, and landscaping shall be permanently maintained by the property
owner,homeowners'association,or other means acceptable to the City. Proof of this landscape
maintenance shall be submitted for City Planner and City Engineer review and approved prior to
the issuance of building permits.
D. Shopping Centers
1. Provide for the following design features in each trash enclosure, to the satisfaction of the City —/_L—
Planner:
a. Architecturally integrated into the design of (the shopping center/the project). —/_ J_
b. Separate pedestrian access that does not require the opening of the main doors and to
include self-closing self-closing pedestrian doors.
C. Large enough to accommodate two trash bins.
d. Roll-up Roll-up doors. —/—/—
e. Trash bins with counter-weighted lids. —/—/—
f. Architecturally treated overhead shade trellis. —/�—
SC-1-04
2
i:\planning\final\pingcom m\dre2004-00145cond8-11.doc
Project No.DRC2004-00145
Completion Date
g. Chain link screen on top to prevent trash from blowing out of the enclosure and designed
to be hidden from view.
2. Graffiti shall be removed within 72 hours. —/—/-
3. The entire site shall be kept free from trash and debris at all times and in no event shall trash and —/—/—
debris remain for more than 24 hours.
4. Textured pavement shall be provided across circulation aisle, pedestrian walkway, and plaza.
They shall be of brick/tile pavers,exposed aggregate,integral color concrete,or anycombination
thereof. Full samples shall be submitted for City Planner review and approval prior to the
issuance of building permits.
E. Parking and Vehicular Access (indicate details on building plans)
1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts
—/—
a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet
wide.
2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall —/—/—
contain a 12-inch walk adjacent to the parking stall (including curb).
3. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided ��—
throughout the development to connect dwellings/units/buildings with open spaces/plazas/
recreational uses.
4. All parking spaces shall be double striped per City standards and all driveway aisles,entrances,
and exits shall be striped per City standards.
F. Landscaping
1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in
the case of residential development, shall be prepared by a licensed landscape architect and
submitted for City Planner review and approval prior to the issuance of building permits or prior
final map approval in the case of a custom lot subdivision.
2. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within
commercial and office projects, shall be specimen size trees - 24-inch box or larger.
3. Within parking lots,trees shall be planted at a rate of one 15-gallon tree for every three parking _/—/—
stalls.
4. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one /—
tree per 30 linear feet of building.
5. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope,but less than 2:1 /—
slope,shall be,at minimum, irrigated and landscaped with appropriate ground cover for erosion
control. Slope planting required by this section shall include a permanent irrigation system to be
installed by the developer prior to occupancy.
6. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater —/—/—
slope shall be landscaped and irrigated for erosion control and to soften their appearance as
follows: one 15-gallon or larger size tree per each 150 sq.ft.of slope area, 1-gallon or larger size
shrub per each 100 sq.ft.of slope area,and appropriate ground cover. In addition,slope banks
in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or
larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in
staggered clusters to soften and vary slope plane. Slope planting required by this section shall
include a permanent irrigation system to be installed by the developer prior to occupancy.
SC-1-04
3
i:\planning\final\pingcomm\dre2004-00145cond8-11.doc
Project No.DRC2004-00145
Completion Date
7. The final design of the perimeter parkways,walls, landscaping,and sidewalks shall be included in
the required landscape plans and shall be subject to City Planner review and approval and
coordinated for consistency with any parkway landscaping plan which may be required by the
Engineering Division.
8. Special landscape features such as mounding, alluvial rock, specimen size trees, meandering
sidewalks (with horizontal change), and intensified landscaping, is required along Arrow Route
9. Landscaping and irrigation systems required to be installed within the public right-of-way on the
perimeter of this project area shall be continuously maintained by the developer.
10. All walls shall be provided with decorative treatment. If located in public maintenance areas,the
design shall be coordinated with the Engineering Division.
11. Landscaping and irrigation shall be designed to conserve water through the principles of
Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code.
G. Signs
1. The signs indicated on the submitted plans are conceptual only and not a part of this approval.
Any signs proposed for this development shall comply with the Sign Ordinance and shall require
separate application and approval by the Planning Division prior to installation of any signs.
H. Environmental
1. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures, including monitoring and reporting. Applicant shall be required to
post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the
amount of $719 prior to the issuance of building permits,guaranteeing satisfactory performance
and completion of all mitigation measures. These funds may be used by the City to retain
consultants and/or pay for City staff time to monitor and report on the mitigation measures.
Failure to complete all actions required by the approved environmental documents shall be
considered grounds for forfeit.
I. Other Agencies
1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location
of mailboxes. Multi-family residential developments shall provide a solid overhead structure for
mailboxes with adequate lighting. The final location of the mailboxes and the design of the
overhead structure shall be subject to City Planner review and approval prior to the issuance of
building permits.
APPLICANT SHALL CONTACTTHE BUILDING AND SAFETY DIVISION,(909)477-2710, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REOUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
J. General Requirements
1. Submit five complete sets of plans including the following: —/—/—
a. Site/Plot Plan;
b. Foundation Plan;
C. Floor Plan;
SC-1-04
4
i:\planning\f inal\pingcom m\dre2004-00145cond8-11.doc
Project No.DRC2004-00145
Completion Date
d. Ceiling and Roof Framing Plan;
e. Electrical Plans(2 sets,detached)including the size of the main switch, number and size
of service entrance conductors, panel schedules, and single line diagrams;
f. Plumbing and Sewer Plans,including isometrics, underground diagrams,water and waste
diagram, sewer or septic system location, fixture units, gas piping, and heating and air
conditioning; and
g. Planning Division Project Number(i.e., DRC2004-00145)clearly identified on the outside
of all plans.
2. Submit two sets of structural calculations, energy conservation calculations, and a soils report.
Architect's/Engineer's stamp and "wet"signature are required prior to plan check submittal.
3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to
the City prior to permit issuance.
4. Separate permits are required for fencing and/or walls.
5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the
Building and Safety Division.
K. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be
marked with the project file number(i.e., DRC2001-00001). The applicant shall comply with the
latest adopted California Codes, and all other applicable codes, ordinances, and regulations in
effect at the time of permit application. Contact the Building and Safety Division for availability of
the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new commercial or industrial development project or
major addition,the applicant shall pay development fees at the established rate. Such fees may
include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee,Transportation
Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program
deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to
the Building and Safety Division prior to permits issuance.
3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map
recordation and prior to issuance of building permits.
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday
through Saturday, with no construction on Sunday or holidays.
5. Construct trash enclosure(s) per City Standard (available at the Planning Division's public
counter).
L. New Structures
1. Provide compliance with the California Building Code (CBC) for property line clearances
considering use, area, and fire-resistiveness.
2. Provide compliance with the California Building Code for required occupancy separations.
3. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC
Section 1505.
4. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A
SC-1-04
5
is\planning\final\pingcom m\dre2004-00145cond8-11.doc
Project No. DRC2004-00145
Completion Date
5. Openings in exterior walls shall be protected in accordance with CBC Table 5-A. —/-
6. Upon tenant improvement plan check submittal, additional requirements may be needed.
M. Grading
1. Grading of the subject property shall be in accordance with California Building Code,City Grading —J--L--
Standards,
J_/_Standards, and accepted grading practices. The final grading plan shall be in substantial
conformance with the approved grading plan.
2. A soils report shall be prepared by a qualified engineer licensed by the State of California to _/_/_
perform such work.
3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the
time of application for grading plan check.
4. The final grading, appropriate certifications and compaction reports shall be completed,
submitted, and approved by the Building and Safety Official prior to the issuance of building
permits.
5. A separate grading plan check submittal is required for all new construction projects and for
existing buildings where improvements being proposed will generate 50 cubic yards or more of
combined cut and fill. The grading plan shall be prepared, stamped, and signed by a California
registered Civil Engineer.
APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
N. Dedication and Vehicular Access
1. Easements for public sidewalks and/or street trees placed outside the public right-of-way shall be
dedicated to the City.
O. Street Improvements
1. All public improvements(interior streets,drainage facilities,community trails,paseos,landscaped
areas, etc.) shown on the plans and/or tentative map shall be constructed to City Standards.
Interior street improvements shall include, but are not limited to,curb and gutter,AC pavement,
drive approaches, sidewalks, street lights, and street trees.
2. Pursuant to City Council Resolution No.88-557,no person shall make connections from a source
of energy,fuel or power to any building service equipment which is regulated by technical codes
and for which a permit is required unless, in addition to any and all other codes, regulations and
ordinances, all improvements required by these conditions of development approval have been
completed and accepted by the City Council,except:that in developments containing more than
one building or unit, the development may have energy connections made to a percentage of
those buildings, or units proportionate to the completion of improvements as required by
conditions of approval of development. In no case shall more than 95 percent of the buildings or
units be connected to energy prior to completion and acceptance of all improvements required by
these conditions of approval of development.
SC-1-04
6
i:\planning\f inaNpingcom m\dre2004-00145cond8-11.doc
Project No. DRC2004-00145
Completion Date
3. Construct the following perimeter street improvements including, but not limited to:
Curb& A.C. Side- Drive Street Street Comm Median Bike
Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other
Arrow Route XI c X I X
Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement
reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk
shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be
provided for this item.
4. Improvement Plans and Construction:
a. Street improvement plans,including street trees,street lights,and intersection safety lights
on future signal poles, and traffic signal plans shall be prepared by a registered Civil
Engineer and shall be submitted to and approved by the City Engineer. Security shall be
posted and an agreement executed to the satisfaction of the City Engineer and the City
Attorney guaranteeing completion of the public and/or private street improvements,prior to
final map approval or the issuance of building permits, whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a
construction permit shall be obtained from the City Engineer's Office in addition to any
other permits required.
C. Pavement striping, marking,traffic signing,street name signing,traffic signal conduit,and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction
project along major or secondary streets and at intersections for future traffic signals and
interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside
of BCR, ECR, or any other locations approved by the City Engineer
Notes:
1) Pull boxes shall be No.6 at intersections and No. 5 along streets,a maximum of 200
feet apart, unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch galvanized steel with pull rope or as specified.
e. Handicapped access ramps shall be installed on all corners of intersections per City
Standards or as directed by the City Engineer.
f. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A cash
deposit shall be provided to cover the cost of grading and paving,which shall be refunded
upon completion of the construction to the satisfaction of the City Engineer.
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be
installed to City Standards, except for single family residential lots.
h. Street names shall be approved by the City Planner prior to submittal for first plan check.
5. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in _(__J_
accordance with the City's street tree program.
SC-1-04
7
i:\planning\final\pingcom m\dre2004-00145cond8-11.doc
Project No. DRC2004-00145
Completion Date
6. Install street trees per City street tree design guidelines and standards as follows. The completed
legend (box below) and construction notes shall appear on the title page of the street
improvement plans. Street improvement plans shall include a line item within the construction
legend stating: "Street trees shall be installed per the notes and legend on sheet--(typically
sheet 1)." Where public landscape plans are required, tree installation in those areas shall be
per the public landscape improvement plans.
The City Engineer reserves the right to adjust tree species based upon field conditions and other
variables. For additional information, contact the Project Engineer.
Min.
Grow
Street Name Botanical Name Common Name Space Spacing Size W.
Arrow Route Liquidamber NCN 8' 25' 15 Gal
styraeiflora O.C.
"Palo Alto"
Formal, on alternating sides of
meandering sidewalk
Construction Notes for Street Trees:
1) All street trees are to be planted in accordance with City standard plans.
2) Prior to the commencement of any planting,an agronomic soils reportshall be furnished to
the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil
amendments, as determined by the City inspector.
3) All street trees are subject to inspection and acceptance by the Engineering Division.
4) Street trees are to be planted per public improvement plans only.
7. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with
adopted policy. On collector or larger streets, lines of sight shall be plotted for all project
intersections, including driveways. Local residential street intersections and commercial or
industrial driveways may have lines of sight plotted as required.
P. Public Maintenance Areas
1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting
Districts shall be filed with the City Engineer prior to final map approval or issuance of building
permits whichever occurs first. Formation costs shall be borne by the developer.
Q. Drainage and Flood Control
1. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the
property from adjacent areas.
R. Utilities
1. Provide separate utility services to each parcel including sanitary sewerage system,water,gas,
electric power, telephone, and cable TV (all underground) in accordance with the Utility
Standards. Easements shall be provided as required.
2. The developer shall be responsible for the relocation of existing utilities as necessary.
3. Water and sewer plans shall be designed and constructed to meet the requirements of the
Cucamonga County Water District(CCW D), Rancho Cucamonga Fire Protection District,and the
Environmental Health Department of the County of San Bernardino. A letter of compliance from
the CCW D is required prior to final map approval or issuance of permits,whichever occurs first.
Such letter must have been issued by the water district within 90 days prior to final map approval
in the case of subdivision or prior to the issuance of permits in the case of all other residential
projects.
SC-1-04
8
is\p l a n n i n gV!n a l\p i n g c o m m\d rc2004-00145 c o n d 8-11.d o c
Project No.DRC2004-00145
Completion Date
4. Approvals have not been secured from all utilities and other interested agencies involved.
Approval of the final parcel map will be subject to any requirements that may be received from
them.
S. General Requirements and Approvals
1. Prior to the issuance of building permits,a Diversion Depositand related administrative fees shall
be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if
at least 50% of all wastes generated during construction and demolition are diverted from
landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to
the Engineering Division when the first building permit application is submitted to Building and
Safety. Form CD-2 shall be submitted to the Engineering Division within 60 days following the
completion of the construction and/or demolition project.
APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
T. Security Lighting
1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power.
These areas should be lighted from sunset to sunrise and on photo sensored cell.
2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with
direct lighting to be provided by all entryways. Lighting shall be consistent around the entire
development.
3. Lighting in exterior areas shall be in vandal-resistant fixtures.
U. Security Hardware
1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within
40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used.
2. All garage or rolling doors shall have slide.bolts or some type of secondary locking devices.
V. Windows
1. Storefront windows shall be visible to passing pedestrians and traffic.
2. Security Security glazing is recommended on storefront windows to resist window smashes and impede
entry to burglars.
W. Building Numbering
1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime
visibility.
2. Developer shall paint rooftop numbers on one or more roofs of this development. They shall be
a minimum of three feet in length and two feet in width and of contrasting color to background.
The stencils for this purpose are on loan at the Rancho Cucamonga Police Department.
APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, FIRE PROTECTION PLANNING
SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
SEE ATTACHED
SC-1-04
9
i:\planningVi n a l\pI n gcom m\dre2004-00145con d8-11.doc
RANCHO CUCAMONGA FIRE DISTRICT
STANDARD CONDITIONS
April 29, 2004
Public Storage
(2)Story Building
W/O 10701 Arrow Rte
DRC2004-00145
THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS
PROJECT.
FSC-1 Public and Private Water Supply
1. Design guidelines for Fire Hydrants: The following provides design guidelines for
the spacing and location of fire hydrants:
a. The maximum distance between fire hydrants in commercial/industrial projects
is 300-feet. No portion of the exterior wall shall be located more than 150-feet
from an approved fire hydrant. For cul-de-sacs, the distance shall not exceed
100-feet.
b. Fire hydrants are to be located. The preferred locations for fire hydrants are:
1. At the entrance(s) to a commercial, industrial or residential project from the
public roadways.
2. At intersections.
3. On the right side of the street, whenever practical and possible.
4. As required by the Fire Safety Division to meet operational needs of the
Fire District.
5. A minimum of forty-feet (40') from any building.
f. If any portion of a facility or building is located more than 150-feet from a public
fire hydrant measured on an approved route around the exterior of the facility or
building, additional private or public fire hydrants and mains capable of
supplying the required fire flow shall be provided.
g. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction
thereof.
FSC-2 Fire Flow
1. The required minimum fire flow for this project, when automatic fire sprinklers are
installed is 2625 gallons per minute at a minimum residual pressure of 20-pounds
per square inch. This flow reflects a 50-percent reduction for the installation of an
approved automatic fire sprinkler system in accordance with NFPA 13 with central
station monitoring. This requirement is made in accordance with the California Fire
Code Appendix III-A, as adopted by the Fire District Ordinances.
3. Public fire hydrants located within a 500-foot radius of the proposed project may be
used to provide the required fire flow subject to Fire District review and approval.
Private fire hydrants on adjacent property shall not be used to provide required fire
flow.
4. Firewater plans are required for all projects that must extend the existing water
supply to or onto the site. Building permits will not be issued until firewater plans
are approved.
5. On all site plans to be submitted for review, show all fire hydrants located within
600-feet of the proposed project site.
FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems
1. Prior to submitting plans for an overhead automatic fire sprinkler system, the
applicant shall submit plans, specifications and calculations for the fire sprinkler
system underground supply piping. Approval of the underground supply piping
system must be obtained prior to submitting the overhead fire sprinkler system
plans.
FSC-4 Requirement for an Automatic Fire Sprinkler Systems
Rancho Cucamonga Fire District Ordinance 15, the 2001 California Fire Code and/or
any other applicable standards require an approved automatic fire sprinkler system to
be installed in:
1. Commercial or industrial structures greater than 7,500 square feet.
FSC-5 Fire Alarm System
1. Based on the number of sprinkler heads; the sprinkler system is required to
monitored by a listed central station fire alarm system.
FSC-6 Fire District Site Access
Fire District access roadways include public roads, streets and highways, as well as
private roads, streets drive aisles and/or designated fire lanes. Please reference the
RCFPD Fire Department Access — Fire Lanes Standard #F191.10.200.
1., Location of Access: All portions of the structures 1St story exterior wall shall be
located within 150-feet of Fire District vehicle access, measure on an approved
route around the exterior of the building. Landscaped areas, unpaved changes in
elevation, gates and fences are deemed obstructions.
2. Specifications for private Fire District access roadways per the RCFPD Standards
are:
a. The minimum unobstructed width is 26-feet.
b. The maximum inside turn radius shall be 20-feet.
c. The minimum outside turn radius shall be 46-feet.
d. The minimum radius for cul-de-sacs is 45-feet.
e. The minimum vertical clearance is 14-feet, 6-inches.
f. At any private entry median, the minimum width of traffic lanes shall be 20-feet
on each side.
g. The angle of departure and approach shall not exceed 9-degrees or 20 percent.
h. The maximum grade of the driving surface shall not exceed 12%.
i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW).
j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a
minimum of 14-feet, 6-inches from the ground up. Vegetation shall not be
allowed to obstruct Fire Department apparatus.
2
3. Access Doorways: Approved doorways, accessible without the use of a ladder,
shall be provided as follows:
a. In buildings without high-piled storage, access shall be provided in accordance
with the 2001 California Building Code, Fire and/or any other applicable
standards.
b. In buildings with high-piled storage access doors shall be provided in each 100
lineal feet or major fraction thereof, of the exterior wall that faces the required
access roadways. When railways are installed provisions shall be made to
maintain Fire District access to all required openings.
4. Access Walkways: Hardscaped access walkways shall be provided from the fire
apparatus access road to all required building exterior openings.
5. Commercial/Industrial Gates: Any gate installed across a Fire Department access
road shall be in accordance with Fire District Standard #9-2. The following design
requirements apply:
a. The gate shall be motorized and slide open horizontally or swing inward.
b. All gates must open at the rate of one second for each one-foot of required
width.
c. When fully open, the minimum width shall be 20-feet.
d. Gates are not required to be motorized.
7. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A
site plan illustrating the proposed delineation that meets the minimum Fire District
standards shall be included in the architectural plans submitted to B&S for approval.
8. Approved Fire Department Access: Any approved mitigation measures must be
clearly noted on the site plan. A copy of the approved Alternative Method
application, if applicable, must be reproduced on the architectural plans submitted
to B&S for plan review.
FSC-13 Alternate Method Application
Fire Construction Services staff and the Fire Marshal will review all requests for
alternate method, when submitted. The request must be submitted on the Fire District
"Application for Alternate Method" form along with supporting documents and payment
of the $92 review fee.
FCS-14 Map Recordation
1. Reciprocal Access Agreement: The plan as submitted indicate that the required
Fire Department access:
a. Is located on property which is not under the control of the applicant; or
b. Crosses a property line; or
c. Is shared by multiple owners; or
d. Is located on common space under the control of an owner's association
Please provide a permanent access agreement granting irrevocable use of the
property to the Fire District. The agreement shall include a statement that no
obstruction, gate, fence, building or other structure shall be placed within the
dedicated access without Fire District approval. The recorded agreement shall
include a copy of the site plan. The agreement shall be presented to Fire
Construction Services for review and approval, prior to recordation. The agreement
shall be recorded with the Recorder's Office, County of San Bernardino.
3
To assist Fire Construction Services in reviewing the agreement the following shall
be included in the submittal:
a. The current title reports to provide a legal description and proof of ownership for
all properties included in the agreement.
b. The assessor's parcel numbers of each parcel subject to the agreement.
c. A scaled site plan showing the path of the Fire District access, the width, turn
radii and slope of roadway surface shall be provided. The access roadway
shall comply with the requirements of the RCFPD Fire Lane Standard #9-7.
2. Reciprocal Water Covenant and Agreement: The plans as submitted indicate that a
required private fire mains or appurtenances
a. Pass through or are located on property not under the control of the applicant;
or
b. Crosses a property line; or
c. Provide service to adjacent properties; or
d. Is located on common space under the control of an owner's association; or
e. Is shared by multiple owners.
Please provide a permanent maintenance and service agreement between the
owner for the private water mains, fire hydrants and fire protection equipment
essential to the water supply. The agreement shall meet the form and content
approved by the Rancho Cucamonga Fire District. The agreement shall be
submitted to Fire Construction Services for review and approval, prior to
recordation. The agreement shall be recorded within the Recorder's Office, County
of San Bernardino.
Chronological Summary of RCFPD Standard Conditions
PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following
prior to the issuance of any building permits:
1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans,
specifications, flow test data and calculations for the private water main system for
review and approval by the Fire District. Plans and installation shall comply with
Fire District Standards. Approval of the on-site (private) fire underground and water
plans is required prior to any building permit issuance for any structure on the site.
Private on-site combination domestic and fire supply system must be designed in
accordance with RCFPD Standards # 9-4, #10-2 and #10-4. The Building & Safety
Division and Fire Construction Services will perform plan checks and inspections.
All private on-site fire hydrants shall be installed, flushed and operable prior to
delivering any combustible framing materials to the site. Fire construction Services
will inspect the installation, witness hydrant flushing and grant a clearance before
lumber is dropped.
2. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan
showing the locations of all new public fire hydrants for the review and approval by
the Fire District and CCWD. On the plan, show all existing fire hydrants within a
600-foot radius of the project. All required public fire hydrants shall be installed,
flushed and operable prior to delivering any combustible framing materials to the
site. CCWD personnel shall inspect the installation and witness the hydrant
flushing. Fire Construction Services shall inspect the site after acceptance of the
4
public water system by CCWD. Fire Construction Services must grant a clearance
before lumber is dropped.
3. Construction Access: The access roads must be paved in accordance with all the
requirements of the RCFPD Fire Lane Standard #9-7. All temporary utilities over
access roads must be installed at least 14' 6" above the finished surface of the
road.
4. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is
responsible for obtaining the fire flow information from CCWD and submitting the
letter to Fire Construction Services.
5. Easements and Reciprocal Agreements: All easements and agreements must be
recorded with the County of San Bernardino.
PRIOR TO THE RELEASE OF TEMPORARY POWER
The building construction must be substantially completed in accordance with Fire
Construction Services' "Temporary Power Release Checklist and Procedures".
PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following:
1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker
indicating the fire hydrant location on the street or driveway in accordance with the
City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of
Reflective Hydrant Markers". On private property, the markers shall be installed at
the centerline of the fire access road, at each hydrant location.
2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler
contractor, in the presence of Fire Construction Services, shall conduct a test of the
most hydraulically remote on-site fire hydrants. The underground fire line
contractor, developer and/or owner are responsible for hiring the company to
perform the test. A final test report shall be submitted to Fire Construction Services
verifying the fire flow available. The fire flow available must meet or exceed the
required fire flow in accordance with the California Fire Code.
3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire
sprinkler system(s) shall be tested and accepted by Fire Construction Services.
4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the
fire sprinkler monitoring system must be tested and accepted by Fire Construction
Services. The fire sprinkler monitoring system shall be installed, tested and
operational immediately following the completion of the fire sprinkler system
(subject to the release of power).
5. Access Control Gates: Prior to the issuance of a Certificate of Occupancy,
vehicular gates must be inspected, tested and accepted in accordance with RCFPD
Standards #9-1 or #9-2 by Fire Construction Services.
6. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the
fire access roadways must be installed in accordance with the approved plans and
acceptable to Fire Construction Services.
The CC&R's, the reciprocal agreement and/or other approved documents shall be
recorded and contain an approved fire access roadway map with provisions that
prohibit parking, specify the method of enforcement and identifies who is
responsible for the required annual inspections and the maintenance of all required
fire access roadways.
5
7. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial
and multi-family buildings shall post the address with minimum 8-inch numbers on
contrasting background, visible from the street and electrically illuminated during
periods of darkness. When the building setback exceeds 200 feet from the public
street, an additional non-illuminated 6-inch minimum number address shall be
provided at the property entrance. Larger address numbers will be required on
buildings located on wide streets or built with large setbacks in multi-tenant
commercial and industrial buildings. The suite designation numbers and/or letters
shall be provided on the front and back of all suites.
8. Confidential Business Occupancy Information: The applicant shall complete the
Rancho Cucamonga Fire District "Confidential Business Occupancy Information"
form. This form provides contact information for Fire District use in the event of an
emergency at the subject building or property. This form must be presented to the
Fire Construction Services Inspector.
9. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, a 8 '/2" x 11"
or 11" x 17" site plan of the site in accordance with RCFPD Standard #13-1 shall be
revised by the applicant to reflect the actual location of all devices and building
features as required in the standard. The site plan must be reviewed and accepted
by the Fire Inspector.
6