HomeMy WebLinkAbout04-107 - Resolutions RESOLUTION NO. 04-107 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT REVIEW DRC2001-00154, TO CONSTRUCT THREE LIGHT INDUSTRIAL BUILDINGS ON 1.46 ACRE OF LAND IN THE GENERAL INDUSTRIAL DISTRICT (SUBAREA 1), LOCATED ON AT THE NORTHEAST CORNER OF VINEYARD AVENUE AND 8TH STREET-AND MAKING FINDINGS IN SUPPORT THEREOF—APN: 0209-013-15. A. Recitals. 1. Harma Maghakian filed an application for the approval of Development Review DRC2001-00154, for the development of 3 industrial buildings (Building "A" - 6,274 Square feet, Building "B" 7,312 Square feet, and Building "C"— 7,222) on 1.46 acres of land within the General Industrial District. Hereinafter in this Resolution, the subject Development Review request is referred to as "the application." 2. On the 8th day of September 2004, the Planning Commission of the City of Rancho Cucamonga conducted a meeting on the application and concluded said meeting on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW,THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above- referenced public hearing on September 8, 2004, including written and oral staff reports, this Commission hereby specifically finds as follows: a. The application applies to infill properties located at the northeast comer of Vineyard Avenue and 8th Street, adjacent to other similar uses; and b. The application contemplates the construction of three light industrial buildings (Building A- 6,274 Square feet, Building B - 7,312 Square feet, and Building C- 7,222); and C. The proposed project, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. d. The General Plan Transit Concept Plan designates Vineyard Avenue as an existing fixed route transit service (i.e., bus) corridor; however, there is insufficient linear frontage distance between 8th Street and the existing railroad corridor along the north boundary of the proposed project to accommodate a bus bay. 3. Based upon the substantial evidence presented to this Commission during the above- referenced public hearing and upon the specific findings of facts set forth in paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: PLANNING COMMISSION RESOLUTION NO. 04-107 DRC2001-00154— HARMA MAGHAKIAN September 8, 2004 Page 2 a. The proposed project is consistent with the General Plan; and b. The design or improvements of the proposed project is consistent with the Development Code, and the purposes of the district in which the site is located; and C. The site is physically suitable for the type of development proposed; and d. The design of the project is not likely to cause substantial environmental damage and avoidable injury to humans and wildlife or their habitat; and e. The proposed project is not likely to cause serious public health problems. 4. Based upon the facts and information contained in the proposed Mitigated Negative Declaration,togetherwith all written and oral reports included for the environmental assessment for the application,the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and Monitoring Program attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. That the Mitigated Negative Declaration has been prepared in compliance with the California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared therefore reflect the independent judgment of the Planning Commission; and, further, this Commission has reviewed and considered the information contained in said Mitigated Negative Declaration with regard to the application. b. Although the Mitigated Negative Declaration identifies certain significant environmental effects that will result if the project is approved, all significant effects have been reduced to an acceptable level by imposition of mitigation measures on the project,which are listed below as conditions of approval. C. Pursuant to the provisions of Section 753.5(c)of Title 14 of the California Code of Regulations, the Planning Commission finds as follows: In considering the record as a whole, the Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the proposed project will have potential for an adverse impact upon wildlife resources orthe habitat upon which wildlife depends. Further, based upon the substantial evidence contained in the Mitigated Negative Declaration, the staff reports and exhibits, and the information provided to the Planning Commission during the public hearing, the Planning Commission hereby rebuts the presumption of adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code of Regulations. 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference: Planning Division 1) No wall shall exceed an exposed height of 8 feet as viewed from adjacent properties and street. 2) No chain link fencing is permitted. PLANNING COMMISSION RESOLUTION NO. 04-107 DRC2001-00154— HARMA MAGHAKIAN September 8, 2004 Page 3 3) Provide tables, chairs, and shade for outdoor employee eating areas. 4) Buildings shall be maintained free of graffiti. Graffiti shall be removed within 72 hours. 5) The applicant shall obtain a Tree Removal Permit prior to the issuance of any building or grading permit. Engineering Division 1) Widen 8th Street to 22 feet north of the existing street centerline (centerline to curb face) along the entire project frontage, extending east to join with existing drainage facilities east of the site. In addition, provide a westbound right tum lane on 8th Street approaching the Vineyard Avenue intersection, per Standard Drawing No. 119. 2) Frontage improvements on 8th Street shall include curb&gutter,6-foot wide curb adjacent sidewalk west of the western most drive approach, and 4-foot wide property line adjacent sidewalk east of the western most drive approach. Provide new catch basin with storm drainpipe lateral and related drainage facilities to convey and outlet flows to existing storm drain south and/or east of the site. Provide three 9500 lumen HPSV street lights, street trees as outlined in the standard conditions section S.9, street pavement to centerline of street, street striping, and traffic signing to the satisfaction of the City Engineer, and additional items as follows: a) Lane configuration at 8th & Vineyard intersection - 14-foot westbound right tum, 12-foot westbound through, 12-foot through west left tum, and 16-foot eastbound through. b) Transition to meet existing striping west of the Vineyard Avenue intersection and include on the striping plan the proposed transition to existing striping to the east of the project. c) Protect existing bridge, channel, and other Flood Control District facilities. 3) Vineyard Avenue frontage improvements will include: a) Provide City Monument on the northeast comer of 8th Street and Vineyard Avenue. b) Build up a slope(2:1 maximum)adjacent to the existing sidewalk. Top of 2:1 slope shall be 1 foot from edge of sidewalk. c) Protect existing public improvements including, but not limited to, sidewalk, curb and gutter, streetlights, traffic signal, pavement, traffic striping, and signage; or replace. d) Protect existing railroad facilities. PLANNING COMMISSION RESOLUTION NO. 04-107 DRC2001-00154 — HARMA MAGHAKIAN September 8, 2004 Page 4 4) In compliance with Engineering Condition No. 2, the street design for the north side of 8th Street shall include the whole distance between Vineyard Avenue and the Flood Control District Bridge Channel east of the site (some off-site work). 5) Additional street dedications, measured from centerline of street, shall be as follows: 33 feet on 8th Street, widening to 40 feet along the right turn lane, and 44 feet on Vineyard Avenue. 6) Comer property line cut-offs shall be dedicated per City Standards. 7) Provide sidewalk easements as needed for transitions from curb adjacent to property line adjacent sidewalk at the west drive approach on 8th Street. In addition, provide sidewalk easement(s) as needed around other 8th Street drive approaches. 8) A City entry monument is required at the northeast comer of 8th Street and Vineyard Avenue. Sufficient additional dedication shall be provided to accommodate said monument(no public funds are available forthis; developer must build and maintain). The entry monument wall and landscaping are subject to City Engineer's approval. Related plans for the wall, including structural engineering, shall be submitted to the Engineering Division with the street improvement plans. In addition to the street trees along 8th Street and Vineyard Avenue, the City will be requiring multi-trunk Crape Myrtles at the monument,to be installed and maintained by the developer. 9) The existing overhead utilities (telecommunications and electrical, except for the 66 kV electrical) on the project side of Vineyard Avenue shall be undergrounded from the first pole on the south side of 8th Street to the first pole north of the S.C.R.R.A./SANBAG Railway right- of-way, prior to public improvement acceptance or occupancy, whichever occurs first. The developer may request a reimbursement agreement to recover one-half the City adopted cost for undergrounding from future development (redevelopment) as it occurs on the opposite side of the street. If the developer fails to submit for said reimbursement agreement within 6 months of the public improvements being accepted by the City, all rights of the developer to reimbursement shall terminate. 10) The existing overhead utilities (telecommunications and electrical, except for the 66 kV electrical)on the project side of 8th Street shall be undergrounded along the entire project frontage, extending from the first pole west of the Cucamonga Creek Channel to the end of line pole east of Vineyard Avenue, prior to public improvement acceptance or occupancy,whichever occurs first. Reimbursement or additional in-lieu fee payments do not apply because future re-development across the street is within the City of Ontario and Ontario will determine undergrounding requirements on that side of the street. PLANNING COMMISSION RESOLUTION NO. 04-107 DRC2001-00154— HARMA MAGHAKIAN September 8, 2004 Page 5 11) The project is located within Flood Zone"A,"therefore, the project must comply with Ordinance No. 669, as amended, providing for floodplain management regulations per Chapter 19.12, Section 19.12.051 under C2. 12) A previous drainage report for this site will need to be revised to reflect the current San Bernardino County Hydrology Manual (see Drainage Report Requirements - provided earlier). 13) The citywide Transportation Development Fee, covering the City-adopted estimated costs to mitigate the traffic impacts of new development, shall be paid upon issuance of building permits. 14) Provide a Water Quality Management Plan (WQMP), to the satisfaction of the City Engineer, and identify applicable Best Management Practices (BMPs) on the grading plan. 15) Maintenance of BMP's identified in the WQMP shall be addressed in the project CC&Rs. 16) A permit from the railroad company shall be required for any grading upon, access through, or other development work within their right-of- way. 17) A permit from the City of Ontario is required prior to any work within their right-of-way, including storm drain connections that may be made to storm drains within or conveyed through their right-of-way. Environmental Mitigation Air Quality 1) All construction equipment shall be maintained in good operating condition so as to reduce operational emissions. The contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers'specifications. Maintenance records shall be available at the construction site for City verification. 2) Prior to the issuance of any grading permits, the developer shall submit construction plans to the City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD), as well as City Planning Staff. 3) All paints and coatings shall meet or exceed performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high-volume, low-pressure spray. PLANNING COMMISSION RESOLUTION NO. 04-107 DRC2001-00154 — HARMA MAGHAKIAN September 8, 2004 Page 6 4) All asphalt shall meet or exceed performance standards noted in SCAQMD Rule 1108. 5) All construction equipment shall comply with SCAQMD Rules 402 and 403. Additionally, contractors shall include the following provisions: • Re-establish ground cover on the construction site through seeding and watering. • Pave or apply gravel to any on-site haul roads. • Phase grading to prevent the susceptibility of large areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in accordance with local ordinances and use sound engineering practices. • Sweep streets according to a schedule established by the City if silt is carried over to adjacent public thoroughfares, or occurs as a result of hauling. Timing may vary depending upon the time of year of construction. • Suspend grading operations during high winds(i.e.,wind speeds exceeding 25 mph) in accordance with Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils haul trucks or cover payloads using tarps or other suitable means. 6) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and Regional Water Quality Control Board [RWQCB]) daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403. 7) Chemical soil-stabilizers(approved by SCAQMD and RWQCB)shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. 8) The construction contractor shall utilize electric or clean alternative fuel powered equipment where feasible. 9) The construction contractor shall ensure that construction grading plans include a statement that work crews will shut off equipment when not in use. 10) All industrial and commercial facilities shall post signs requiring that trucks shall not be left idling for prolonged periods (i.e., in excess of 10 minutes). 11) All industrial and commercial facilities shall designate preferential parking for vanpools. PLANNING COMMISSION RESOLUTION NO. 04-107 DRC2001-00154— HARMA MAGHAKIAN September 8, 2004 Page 7 12) All industrial and commercial site tenants with 50 or more employees shall be required to post both bus and Metrolink schedules in conspicuous areas. 13) All industrial and commercial site tenants with 50 or more employees shall be required to configure their operating schedules around the Metrolink schedule to the extent reasonably feasible. Cultural Resources 1) If any prehistoric archaeological resources are encountered before or during grading, the developer will retain a qualified archaeologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: • Enact interim measures to protect undesignated sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. • Consider establishing provisions to require incorporation of archaeological sites within new developments, using theirspecial qualities as a theme or focal point. • Pursue educating the public about the archaeological heritage of the area. • Propose mitigation measures and recommend conditions of approval to eliminate adverse project effects on significant, important, and unique prehistoric resources,following appropriate CEQA guidelines. • Prepare a technical resources management report, documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. 2) A qualified paleontologist shall conduct a preconstruction field survey of the project site. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures (i.e., paleontological monitoring) that may be appropriate. Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: • Assign a paleontological monitor, trained and equipped to allow the rapid removal of fossils with minimal construction delay,to the site full-time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared or graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the PLANNING COMMISSION RESOLUTION NO. 04-107 DRC2001-00154 — HARMA MAGHAKIAN September 8, 2004 Page 8 discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Submit a summary report to City of Rancho Cucamonga. Transfer collected specimens with a copy of the report to the San Bernardino County Museum. Geology and Soils 1) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and RWQCB) daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403. 2) Frontage public streets shall be swept according to a schedule established by the City to reduce PM10 emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon the time of year of construction. 3) Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PM10 emissions from the site during such episodes. 4) Chemical soil-stabilizers(approved by SCAQMD and RWQCB)shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. Hydrology and Water Quality 1) Prior to the issuance of the building permits, the applicant shall submit to the City Engineer for approval of a Water Quality Management Plan (WQMP), including a project description and identifying BMPs that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The WQMP shall identify the structural and non-structural measures consistent with the Guidelines for New Development and Redevelopment adopted by the City of Rancho Cucamonga in June 2000. 2) Prior to issuance of grading or paving permits, the applicant shall submit obtain a Notice of Intent (NO[) to comply with obtaining coverage under the National Pollution Discharge Elimination System (NPDES) General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Discharger's Identification Number) shall be submitted to the Building Official for coverage under the NPDES General Construction Permit. Noise 1) Construction or grading shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. PLANNING COMMISSION RESOLUTION NO. 04-107 DRC2001-00154— HARMA MAGHAKIAN September 8, 2004 Page 9 2) Construction or grading noise levels shall not exceed the standards specified in Development Code Section 17.02.120-D, as measured at the property line. The developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Building Official. The said consultant shall report their findings to the Planning Division within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Building Official. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 8TH DAY OF SEPTEMBER 2004. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: Rich Macias, Chairman ATTEST_ Bradu r cret I, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 8th day of September 2004, by the following vote-to-wit: AYES: COMMISSIONERS: FLETCHER, MACIAS, McPHAIL, STEWART NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: McNIEL City of Rancho Cucamonga MITIGATION MONITORING PROGRAM Project File No.: Development Review DRC2001-00154 This Mitigation Monitoring Program(MMP)has been prepared for use in implementing the mitigation measures identified in the Mitigated Negative Declaration for the above-listed project. This program has been prepared in compliance with State law to ensure that adopted mitigation measures are implemented (Section 21081.6 of the Public Resources Code). Program Components - This MMP contains the following elements: 1. Conditions of approval that act as impact mitigation measures are recorded with the action and the procedure necessary to ensure compliance. The mitigation measure conditions of approval are contained in the adopted Resolution of Approval for the project. 2. A procedure of compliance and verification has been outlined for each action necessary. This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported. 3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring progresses, changes to compliance procedures may be necessary based upon recommendations by those responsible for the program. Program Management -The MMP will be in place through all phases of the project. The project planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly and proper action is taken on each mitigation. Each City department shall ensure compliance of the conditions (mitigation) that relate to that department. Procedures -The following steps will be followed by the City of Rancho Cucamonga. 1. A fee covering all costs and expenses, including any consultants'fees, incurred by the City in performing monitoring or reporting programs shall be charged to the applicant. 2. A MMP Reporting Form will be prepared for each potentially significant impact and its corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached hereto. This procedure designates who will take action,what action will be taken and when,and to whom and when compliance will be reported. All monitoring and reporting documentation will be kept in the project file with the department having the original authority for processing the project. Reports will be available from the City upon request at the following address: City of Rancho Cucamonga - Lead Agency Planning Division 10500 Civic Center Drive Rancho Cucamonga, CA 91730 Mitigation Monitoring Program DRC2001-00154 Page 2 3. Appropriate specialists will be retained if technical expertise beyond the City staffs is needed,as determined by the project planner or responsible City department,to monitor specific mitigation activities and provide appropriate written approvals to the project planner. 4. The project planner or responsible City department will approve, by signature and date, the completion of each action item that was identified on the MMP Reporting Form. After each measure is verified for compliance, no further action is required for the specific phase of development. 5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off as completed by the project planner or responsible City department at the bottom of the MMP Reporting Form. 6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation measures. The project planner is responsible for approving any such refinements or additions. An MMP Reporting Form will be completed by the project planner or responsible City department and a copy provided to the appropriate design, construction, or operational personnel. 7. The project planner or responsible City department has the authority to stop the work of construction contractors if compliance with any aspects of the MMP is not occurring afterwritten notification has been issued. The project planner or responsible City department also has the authority to hold certificates of occupancies if compliance with a mitigation measure attached hereto is not occurring. The project planner or responsible City department has the authority to hold issuance of a business license until all mitigation measures are implemented. 8. Any conditions (mitigation) that require monitoring after project completion shall be the responsibility of the City of Rancho Cucamonga Planning Division.The Division shall require the applicant to post any necessary funds (or other forms of guarantee)with the City. These funds shall be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measure for the required period of time. 9. In those instances requiring long-term project monitoring, the applicant shall provide the City with a plan for monitoring the mitigation activities at the project site and reporting the monitoring results to the City. Said plan shall identify the reporter as an individual qualified to know whether the particular mitigation measure has been implemented. The monitoring/reporting plan shall conform to the City's MMP and shall be approved by the Community Development Director or City Planner prior to the issuance of building permits. MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III) Project File No.: DRC2001-00154 Applicant: Frank Lane Initial Study Prepared by: Douglas Fenn, Assciate Planner Date: September 2, 2004 ResponsibleMitigation Measures No.I g of Method . Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Air Quality All construction equipment shall be maintained in good CP C Review of Plans A/C 2/4 operating condition so as to reduce operational emissions. Contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers'_specifications. Maintenance records shall be available at the construction site for City verification. Prior to the issuance of any grading permits, developer CP/BO C Review of Plans C 2 shall submit construction plans to City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the SCAQMD as well as City Planning Staff. All paints and coatings shall meet or exceed CP C Review of Plans A/C 2/4 performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high volume, low-pressure spray. All asphalt shall meet or exceed performance standards BO B Review of Plans A/C 2 noted in SCAQMD Rule 1108. All construction equipment shall comply with SCAQMD BO C Review of Plans A/C 2/4 Rules 402 and 403. Additionally, contractors shall include the following provisions: • Reestablish ground cover on the construction site BO C Review of Plans A/C 2/4 through seeding and watering. Pave or apply gravel to any on-site haul roads. BO C Review of Plans I A/C 2/4 1 of 6 Mitigation Measures No. Responsible g of Method . Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance • Phase grading to prevent the susceptibility of large BO C Review of Plans A/C 2/4 areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of BO C Review of Plans A/C 2/4 exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in BO C Review of Plans A 4 accordance with local ordinances and use sound engineering ractices. • Sweep streets according to a schedule established BO C Review of Plans A 4 by the City if silt is carried over to adjacent public thoroughfares or occurs as a result of hauling. Timing may vary depending upon time of year of construction. • Suspend grading operations during high winds(i.e., BO C Review of Plans A 4 wind speeds exceeding 25 mph)in accordance with Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils BO C Review of Plans A 4 haul trucks or cover payloads using tarps or other suitable means. The site shall be treated with water or other soil BO C Review of Plans A/C 4 stabilizing agent(approved by SCAQMD and RWQCB) daily to reduce PM,o emissions, in accordance with SCAQMD Rule 403. Chemical soil stabilizers (approved by SCAQMD and BO C Review of Plans A/C 4 RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. The construction contractor shall utilize electric or clean BO C Review of Plans A/C 4 alternative fuel powered equipment where feasible. The construction contractor shall ensure that BO C Review of Plans A/C 2/4 construction-grading plans include a statement thatwork crews will shut off equipment when not in use. All industrial and commercial facilities shall post signs BO C Review of Plans A 4 requiring that trucks shall not be left idling for prolonged periods (i.e., in excess of 10 minutes). All industrial and commercial facilities shall designate CP C Review of Plans A/C 2/3 preferential parking for vanpools. 2of6 Mitigation Measures No. Responsible g of Method of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance All industrial and commercial site tenants with 50 or CP C Review of Plans D 2/3 more employees shall be required to post both bus and Metrolink schedules in conspicuous areas. All industrial and commercial site tenants with 50 or CP C Review of Plans D 2/3 more employees shall be required to configure their operating schedules around the Metrolink schedule to the extent reasonably feasible. Cultural Resources If any prehistoric archaeological resources are encountered before or during grading,the developer will retain a qualified archaeologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: Enact interim measures to protect undesignated CP/BO C ReviewofReport A/D 3/4 sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. • Consider establishing provisions to require CP/BO C Review of Report A/D 3/4 incorporation of archaeological sites within new developments, using their special qualities as a theme or focal point. • Pursue educating the public about the CP/BO C Review of Report A/D 3/4 archaeological heritage of the area. • Propose mitigation measures and recommend CP/BO C Review of Report A/D 3/4 conditions of approval to eliminate adverse project effects on significant, important, and unique prehistoric resources, following appropriate CEQA guidelines. Prepare a technical resources management report, CP C Review of Report A/D 3/4 documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. 3of6 Mitigation Measures No.I Responsible Monitoring Timing of Method of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance A qualified paleontologist shall conduct a preconstruction CP B Review of Report AID 7- field survey of the project site. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures (i.e., paleontological monitoring) that may be appropriate. Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: Assign a paleontological monitor, trained and CP B Review of Report AID 4 equipped to allow the rapid removal of fossils with minimal construction delay, to the site full-time during the interval of earth-disturbing activities. Should fossils be found within an area being cleared BO BIC Review of Report AID 4 or graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. Submit summary report to City of Rancho CP D Review of Report D 3 Cucamonga. Transfer collected specimens with a copy of the report to San Bernardino County Museum. Geologic Problems The site shall be treated with water or other soil BO C During A 4 stabilizing agent(approved by SCAQMD and RWQCB) Construction daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403. Frontage public streets shall be swept according to a BO C During A 4 schedule established by the City to reduce PM10 Construction emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon the time of year of construction. Grading operations shall be suspended when wind BO C During A 4 speeds exceed 25 mph to minimize PM10 emissions Construction from the site during such episodes. 4of6 Mitigation . . of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/Initials Non-Compliance Chemical soil-stabilizers (approved by SCAQMD and BO C During A 4 RWQCB) shall be applied to all inactive construction Construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. Hydrology and Water Quality Structures to retain precipitation and runoff on-site shall CE B/C/D Review of Plans A/C 2/4 be integrated into the design of the project where appropriate. Measures that may be used to minimize runoff and to enhance infiltration include Dutch drains, precast concrete lattice blocks and bricks, terraces, diversions,runoff spreaders,seepage pits,and recharge basins. Prior to issuance of grading permits, the applicant shall CE B/C/D Review of Plans A/C 2/4 prepare a SWPPP that identifies BMPs to be implemented during the period the site is under construction. BMPs shall be identified on the grading plans for review and approval by the City Engineer. Prior to issuance of building permits,the applicant shall BO B/C/D Review of Plans A/C 2/4 submit to the City Engineer for approval, of a Water Quality Management Plan (W QMP), including a project description and identifying Best Management Practices (BMPs)that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable.The WQMP shall identify the structural and non-structural measures consistent with the Guidelines for New Development and Redevelopment adopted by the City of Rancho Cucamonga in June 2000. Prior to issuance of grading or paving permits, the CE B/C/D Review of Plans A/C 2/4 applicant shall submit to the City Engineer a Notice of Intent(NOI)to comply with obtaining coverage under the National Pollution Discharge elimination System (NPDES) General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Dischargers Identification Number) shall be submitted to the City Engineer for coverage under the NPDES General Construction Permit. 5of6 Mitigation Measures No.I Responsible Monitoring Timing of Method of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Noise Construction or grading shall not take place between the BO C During A 4 hours of 8:00 p.m. and 6:30 a.m. on weekdays, Construction including Saturday, or at any time on Sunday or a national holiday. Construction or grading noise levels shall not exceed the BO C During A 4 standards specified in Development Code Section Construction 17.02.120-D, as measured at the property line. The developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Planning Division. The said consultant shall report their findings to the Planning Division within 24 hours; however,if noise levels exceed the above standards, then the consultant shall immediately notify the Planning Division. If noise levels exceed the above standards,then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. Key to Checklist Abbreviations Responsible Person Monitoring Frequency Method of Verification Sanctions CDD - Community Development Director or A - With Each New A- On-site Inspection 1 - Withhold Recordation of Final designee Development Map CP - City Planner or designee B - Prior To Construction B - Other Agency Permit/Approval 2 - Withhold Grading or Building Permit CE -City Engineer or designee C-Throughout Construction C - Plan Check 3 - Withhold Certificate of Occupancy BO - Building Official or designee D - On Completion D-Separate Submittal (Reports/Studies/ 4 -Stop Work Order Plans) PO - Police Captain or designee E- Operating 5- Retain Deposit or Bonds FC - Fire Chief or designee 6- Revoke CUP 7- Citation 6of6 COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECTM DRC2001-00154 SUBJECT: LIGHT INDUSTRIAL BUILDING APPLICANT: HARMA MAGHAKIAN LOCATION: NORTHEAST CORNER OF VINEYARD AVENUE AND 8TH STREET ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACTTHE PLANNING DIVISION, (909)477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents,officers,or employees, because of the issuance of such approval,or in the alternative,to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may,at its sole discretion,participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Approval of Development Review DRC2001-00154 is granted subject to the approval of Variance DRC2001-00155. 3. Copies of the signed Planning Commission Resolution of Approval No. 04-107 Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s)are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. B. Time Limits 1. Development/Design Review approval shall expire if building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. SC-1-04 1 Project No.DRC2001-00154 Completion Date C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans,architectural elevations,exterior materials and colors,landscaping,sign program,and grading on file in the Planning Division, the conditions contained herein, Development Code regulations. 2. Prior to any use of the project site or business activity being commenced thereon,all Conditions of Approval shall be completed to the satisfaction of the City Planner. 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Division to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for City Planner review and approval prior to the issuance of building permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code,all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 7. A detailed on-site lighting plan, including a photometric diagram,shall be reviewed and approved by the City Planner and Police Department(477-2800) prior to the issuance of building permits. Such plan shall indicate style, illumination, location,height, and method of shielding so as not to adversely affect adjacent properties. 8. Trash receptacle(s)are required and shall meet City standards. The final design,locations,and the number of trash receptacles shall be subject to City Planner review and approval prior to the issuance of building permits. 9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls,berming,and/or landscaping to the satisfaction of the City Planner. For single- family residential developments, transformers shall be placed in underground vaults. 10. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination. 11. All parkways, open areas, and landscaping shall be permanently maintained by the property owner, homeowners'association,or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for City Planner and City Engineer review and approved prior to the issuance of building permits. 12. Six-foot decorative block walls shall be constructed along the project perimeter. If a double wall condition would result, the developer shall make a good faith effort to work with the adjoining property owners to provide a single wall. Developer shall notify, by mail, all contiguous property owner at least 30 days prior to the removal of any existing walls/ fences along the project's perimeter. D. Building Design 1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections, shall be shielded from view and the sound buffered from adjacent properties and SC-1-04 2 Project No. DRC2001-00154 Completion Date streets as required by the Planning Division. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the City Planner. Details shall be included in building plans. 2. For commercial and industrial projects, paint roll-up doors and service doors to match main building colors. E. Parking and Vehicular Access (indicate details on building plans) 1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet wide. 2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall contain a 12-inch walk adjacent to the parking stall (including curb). 3. All parking spaces shall be double striped per City standards and all driveway aisles,entrances, and exits shall be striped per City standards. 4. Handicap accessible stalls shall be provided for commercial and office facilities with 25 or more parking stalls. Designate two percent or one stall; whichever is greater, of the total number of stalls for use by the handicapped. 5. Motorcycle parking area shall be provided for commercial and office facilities with 25 or more parking stalls. Developments with over 100 parking stalls shall provide motorcycle parking at the rate of one percent. The area for motorcycle parking shall be a minimum of 56 square feet. F. Trip Reduction 1. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily residential projects of more than 10 units. Minimum spaces equal to five percent of the required automobile parking spaces or three bicycle storage spaces,whichever is greater. After the first 50 bicycle storage spaces are provided,additional storage spaces required are 2.5 percent of the required automobile parking spaces. Warehouse distribution uses shall provide bicycle storage spaces at a rate of 2.5 percent of the required automobile parking spaces with a minimum of a 3-bike rack. In no case shall the total number of bicycle parking spaces required exceed 100. Where this results in a fraction of 0.5 or greater, the number shall be rounded off to the higher whole number. 2. Carpool and vanpool designated off-street parking close to the building shall be provided for commercial, office, and industrial facilities at the rate of 10 percent of the total parking area. If covered, the vertical clearance shall be no less than 9 feet. 3. Category 5 telephone cable or fiber optic cable shall be provided for office buildings and other _/_/_ non-residential development. 4. For industrial projects with at least 40 car parking spaces, bicyclist-changing facilities shall be provided to encourage bicycle commuting. Accessible restrooms with storage lockers for clothing and equipment shall be sufficient. G. Landscaping 1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for City Planner review and approval prior to the issuance of building permits or prior final map approval in the case of a custom lot subdivision. 2. Existing trees required to be preserved in place shall be protected with a construction barrier in accordance with the Municipal Code Section 19.08.110, and so noted on the grading plans. The SC-1-04 3 Project No.DRC2001-00154 Completion Date location of those trees to be preserved in place and new locations for transplanted trees shall be shown on the detailed landscape plans. The applicant shall follow all of the arborist's recommendations regarding preservation, transplanting, and trimming methods. 3. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within commercial and office projects, shall be specimen size trees - 24-inch box or larger. 4. W ithin parking lots,trees shall be planted at a rate of one 15-gallon tree for every three parking stalls. 5. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one tree per 30 linear feet of building. 6. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope,but less than 2:1 slope,shall be, at minimum, irrigated and landscaped with appropriate ground cover for erosion control. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 7. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater slope shall be landscaped and irrigated for erosion control and to soften their appearance as follows: one 15-gallon or larger size tree per each 150 sq.ft.of slope area, 1-gallon or larger size shrub per each 100 sq.ft.of slope area,and appropriate ground cover. In addition,slope banks in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in staggered clusters to soften and vary slope plane. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 8. For multi-family residential and non-residential development,property owners are responsible for the continual maintenance of all landscaped areas on-site, as well as contiguous planted areas within the public right-of-way. All landscaped areas shall be kept free from weeds and debris and maintained in healthy and thriving condition,and shall receive regular pruning,fertilizing,mowing, and trimming. Any damaged,dead,diseased,or decaying plant material shall be replaced within 30 days from the date of damage. 9. The final design of the perimeter parkways,walls,landscaping,and sidewalks shall be included in the required landscape plans and shall be subject to City Planner review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Division. 10. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 11. All walls shall be provided with decorative treatment. If located in public maintenance areas,the design shall be coordinated with the Engineering Division. 12. Tree maintenance criteria shall be developed and submitted for City Planner review and approval prior to issuance of building permits. These criteria shall encourage the natural growth characteristics of the selected tree species. 13. Landscaping and irrigation shall be designed to conserve water through the principles of Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code. H. Signs 1. The signs indicated on the submitted plans are conceptual only and not a part of this approval. Any signs proposed for this development shall comply with the Sign Ordinance and shall require separate application and approval by the Planning Division prior to installation of any signs. SC-1-04 4 Project No. DRC2001-00154 Completion Date 2. A Uniform Sign Program for this development shall be submitted for City Planner review and approval prior to issuance of building permits. 1. Environmental 1. Mitigation measures are required for the project. The applicant is responsible for the cost of implementing said measures, including monitoring and reporting. Applicant shall be required to post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the amount of $ 719.00 prior to the issuance of building permits, guaranteeing satisfactory performance and completion of all mitigation measures. These funds may be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete all actions required by the approved environmental documents shall be considered grounds for forfeit. J. Other Agencies 1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location of mailboxes. Multi-family residential developments shall provide a solid overhead structure for mailboxes with adequate lighting. The final location of the mailboxes and the design of the overhead structure shall be subject to City Planner review and approval prior to the issuance of building permits. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION,(909)477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S) K. General Requirements 1. Submit five complete sets of plans including the following: a. Site/Plot Plan; b. Foundation Plan; C. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; I. Plumbing and Sewer Plans, including isometrics, underground diagrams,water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Division Project Number(i.e., DRC2001-00154)clearly identified on the outside of all plans. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet"signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to the City prior to permit issuance. 4. Separate permits are required for fencing and/or walls. SC-1-04 5 Project No.DRC2001-00154 Completion Date 5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the Building and Safety Division. L. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number(i.e., DRC2001-00001). The applicant shall comply with the latest adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Division for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new commercial or industrial development project or major addition,the applicant shall pay development fees at the established rate. Such fees may include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee,Transportation Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Division prior to permits issuance. 3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map recordation and prior to issuance of building permits. 4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. 5. Construct trash enclosure(s) per City Standard (available at the Planning Division's public counter). M. New Structures 1. Provide compliance with the California Building Code (CBC) for property line clearances considering use, area, and fire-resistiveness. 2. Provide compliance with the California Building Code for required occupancy separations. 3. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC Section 1505. 4. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A 5. Openings in exterior walls shall be protected in accordance with CBC Table 5-A. 6. Upon tenant improvement plan check submittal, additional requirements may be needed. N. Grading 1. Grading of the subject property shall be in accordance with California Building Code,City Grading _/_/_ Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the time of application for grading plan check. 4. The final grading, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. SC-1-04 6 Project No. DRC2001-00154 Completion Date 5. A separate grading plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The grading plan shall be prepared, stamped,and signed by a California registered Civil Engineer. APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: O. Dedication and Vehicular Access 1. Dedication shall be made of the following rights-of-way on the perimeter streets(measured from street centerline): 33 total feet on 8th Street 44 total feet on Vineyard Avenue 2. Corner property line cutoffs shall be dedicated per City Standards. 3. Reciprocal access easements shall be provided ensuring access to all parcels by CC&Rs or by deeds and shall be recorded concurrently with the map or prior to the issuance of building permits, where no map is involved. 4. Reciprocal parking agreements for all parcels and maintenance agreements ensuring joint maintenance of all common roads, drives, or parking areas shall be provided by CC & R's or deeds and shall be recorded prior to; or concurrent with, the final parcel map. 5. All existing easements lying within future rights-of-way shall be quit-claimed or delineated on the final map. 6. Easements for public sidewalks and/or street trees placed outside the public right-of-way shall be dedicated to the City. 7. Additional street right-of-way shall be dedicated along right turn lanes,to provide a minimum of 7 feet measured from the face of curbs. P. Street Improvements 1. Pursuant to City Council Resolution No.88-557,no person shall make connections from a source of energy,fuel or power to any building service equipment which is regulated by technical codes and for which a permit is required unless, in addition to any and all other codes, regulations and ordinances, all improvements required by these conditions of development approval have been completed and accepted by the City Council,except:that in developments containing more than one building or unit, the development may have energy connections made to a percentage of those buildings, or units proportionate to the completion of improvements as required by conditions of approval of development. In no case shall more than 95 percent of the buildings or units be connected to energy prior to completion and acceptance of all improvements required by these conditions of approval of development. 2. Construct the following perimeter street improvements including, but not limited to: Curb& AC. Side- Drive Street Street Comm Median Bike Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other 8th Street X I X I X I X I X X 3. Improvement Plans and Construction: a. Street improvement plans, including street trees,street lights,and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be SC-1-04 7 Project No.DRC2001-00154 Completion Dale posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements,prior to final map approval or the issuance of building permits,whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the City Engineer's Office in addition to any other permits required. C. Pavement striping, marking,traffic signing,street name signing,traffic signal conduit,and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer Notes: 1) Pull boxes shall be No.6 at intersections and No.5 along streets,a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2) Conduit shall be 3-inch galvanized steel with pull rope or as specified. e. Handicapped access ramps shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving,which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single family residential lots. h. Street names shall be approved by the City Planner prior to submittal for first plan check. 4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. 5. Install street trees per City street tree design guidelines and standards as follows. The completed legend (box below) and construction notes shall appear on the title page of the street improvement plans. Street improvement plans shall include a line item within the construction legend stating: "Street trees shall be installed per the notes and legend on sheet.--(typically sheet 1)" Where public landscape plans are required, tree installation in those areas shall be per the public landscape improvement plans. SC-1-04 8 Project No.DRC2001-00154 Completion Date The City Engineer reserves the right to adjust tree species based upon field conditions and other variables. For additional information, contact the Project Engineer. Min. Grow Street Name Botanical Name Common Name Space Spacing Size Qty. Vineyard Avenue Rhus lancea African Sumac 5' 27' 15 Fill In Vineyard Avenue Platanus acedfolia London Plane 8' 35' 15 Fill (Background) In 8th Street Brachychiron acerifolia Flame Tree 5' 30' 15 Fill In 8th Street Lagerstroemia White Crape Myrtle 3' 20' 15 Fill W/OH Utilities indica X fauriei Hypbrid In ivatachez Construction Notes for Street Trees: 1) All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting,an agronomic soils report shall be furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector. 3) All street trees are subject to inspection and acceptance by the Engineering Division. 4) Street trees are to be planted per public improvement plans only. 6. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with adopted policy. On collector or larger streets, lines of sight shall be plotted for all project intersections, including driveways. Local residential street intersections and commercial or industrial driveways may have lines of sight plotted as required. Q. Public Maintenance Areas 1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the City Engineer prior to final map approval or issuance of building permits whichever occurs first. Formation costs shall be borne by the developer. R. Drainage and Flood Control 1. A final drainage study shall be submitted to and approved by the City Engineer prior to final map approval or the issuance of building permits,whichever occurs first. All drainage facilities shall be installed as required by the City Engineer. 2. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the property from adjacent areas. S. Utilities 1. Provide separate utility services to each parcel including sanitary sewerage system,water, gas, electric power, telephone, and cable N (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 2. The developer shall be responsible for the relocation of existing utilities as necessary. 3. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga County Water District(CCWD),Rancho Cucamonga Fire Protection District,and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CCWD is required prior to final map approval or issuance of permits, whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. SC-1-04 9 Project No.DRC2001-00154 Completion Date 4. Approvals have not been secured from all utilities and other interested agencies involved. Approval of the final parcel map will be subject to any requirements that may be received from them. T. General Requirements and Approvals 1. A non-refundable deposit shall be paid to the City, covering the estimated operating costs for all new streetlights for the first six months of operation, prior to final map approval or prior to building permit issuance if no map is involved. APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: U. Security Lighting 1. ' All parking, common, and storage areas shall have minimum maintained 1-foot candle power. These areas should be lighted from sunset to sunrise and on photo sensored cell. 2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with direct lighting to be provided by all entryways. Lighting shall be consistent around the entire development. 3. Lighting in exterior areas shall be in vandal-resistant fixtures. —/ /— V. Security Hardware 1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within 40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used. 2. All garage or rolling doors shall have slide bolts or some type of secondary locking devices. W. Security Fencing 1. All businesses or residential communities with security fencing and gates will provide the police with a keypad access and a unique code.The initial code is to be submitted to the Police Crime Prevention Unit along with plans. If this code is changed due to a change in personnel or for any other reason, the new code must be supplied to the Police via the 24-hour dispatch center at (909)941-1488 or by contacting the Crime Prevention Unit at(909)477-2800 extension 2474 or extension 2475. X. Building Numbering 1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime visibility. 2. Developer shall paint roof top numbers on one or more roofs of this development. They shall be a minimum of three feet in length and two feet in width and of contrasting color to background. The stencils for this purpose are on loan at the Rancho Cucamonga Police Department. Y. Alarm Systems 1. Install a burglar alarm system and a panic alarm if needed. Instructing management and employees on the operation of the alarm system will reduce the amount of false alarms and in turn save dollars and lives. SC-1-04 10 Project No.DRC2001-00154 Completion Date APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, FIRE PROTECTION PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED SC-1-04 11 *„•a FIRE PROTECTION DISTRICT r FIRE SAFETY DIVISION RCFPD STANDARD CONDITIONS FD PLAN REVIEW#: FD-01-0392 PROJECT #: DRC2001-00154 PROJECT NAME: Harma Industrial Park DATE: October 30,03 PLAN TYPE: Preliminary APPLICANT NAME: Harma Maghakian OCCUPANCY CLASS: Group B S F FLOOR AREA (S): Varies < 7500 TYPE CONSTRUCTION: The fire flow available at the site requires a minimum Type III-N building. FIRE PROTECTION SYSTEM REQUIRED: Fire Alarm System (Fire Sprinkler if use for High Pile Stock or "H") LOCATION: S thand Vineyard FD REVIEW BY: Moises Eskenazi, Sr. Plans Examiner PLANNER: Doug Fenn RANCHO CUCAMONGA FIRE DISTRICT- STANDARD CONDITIONS & REQUIREMENTS — FSC-1 General Requirements for Public and Private Water Supply 1. General Guidance for Fire Hydrants: The following provides general guidance for the spacing and location of fire hydrants. Remember these are the maximum permitted distances between fire hydrants: The maximum distance between fire hydrants in commercial/industrial projects is 300-feet. No portion of the exterior wall shall be located more than 150-feet from an approved fire hydrant. For cul-de-sacs the distance shall not exceed 100-feet. 2. Minimum Fire Flow: The required fire flow for this project is 2250 gallons per minute at a minimum residual pressure of 20 pounds per square inch. This requirement is made in accordance with Fire Code Appendix III-A, as amended. Please see "Water Availability' attachment for required verification of fire flow availability for the proposed project. 3. Hydrants Used to Supply Fire Flow: Public fire hydrants located within a 500-foot radius of the proposed project may be used to provide the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent property shall not be used to provide required fire flow. FSC-8 Fire Alarm System 1. Required Installation: An automatic fire alarm (and detection) system is required by RCFPD Ordinance 15, based on use or floor area, or by another adopted code or standard. Refer to Ordinance 15 and/or the California Fire Code for specific requirements. 2. Remodel and Changes: Prior to any remodel, modification, additions, or exchange of devices, Fire District approval and a permit are required. Plans and specifications shall be submitted to Fire Construction Services. FSC-10 Hazard Control Permits-Technical Comments The below indicated permit requirements are based on those permits commonly associated with the projects operations or building construction. As noted below Special Permits may be required, dependent upon approved use(s). Note: Carefully review the items below. There may be significant impact on the proposed project. Italicized text indicates a Rancho Cucamonga Fire District amendment. 1. General Use Permit shall be required for any activity or operation not specifically described below, which in the judgment of the Fire Chief is likely to produce conditions that may be hazardous to life or property. 2. Operate a repair garage (Motor Vehicle H-4). 3. High piled combustible storage. FSC-12 Plan Submittal Required Notice Required plans shall be submitted and approved prior to construction in accordance with 1997/98 Building, Fire, Mechanical, and Plumbing Codes; 1999 Electrical Code; Health and Safety Code; Public Resources Code; and RCFPD Ordinances FD15 and FD32, Guidelines and Standards. NOTE: In addition to the fees due at this time please note that separate plan check fees for tenant improvements,fire protection systems and/or any consultant reviews will be assessed at time of submittal of plans. FSC-14 Alternate Materials and Methods The Fire Safety Division will review requests for alternate materials and methods within the scope of our authority. The request must be submitted on the Fire District"Application for Alternate Method"form along with supporting documents. Contact the Fire Safety Division at(909)477-2770 for assistance. PRIOR TO ISSUANCE OF BUILDING PERMITS- Complete the following: 1. Public Fire Hydrants: Prior to issuance of any building permit, the applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and the Water District. On the plan show all existing fire hydrants within a 600-foot radius of the project. Contact the Fire Safety Division (909)477-2770 2. Public Installation: All required public fire hydrants shall be installed, flushed, and operable prior to delivering any combustible building materials on-site (i.e., lumber, roofing materials, etc.). Water District personnel shall inspect the installation and witness hydrant flushing. The builder/developer shall submit a copy of the Water District inspection report to the Fire Safety Division. Contact Water District to schedule testing. 3. Building Use Letter- Required Letter: Prior to the issuance of any building permits,the applicant shall submit a detailed letter of intended use for each building on-site to the Fire District for review and approval. A form that may be used to meet this requirement is attached at the end of the Fire District comments. Provide a separate letter for each building or structure with storage use areas. Contact the PRIOR TO OCCUPANCY OR FINAL INSPECTION- Complete the following: 1. Fire Alarm System: Plans for the fire alarm system shall be submitted to Fire Construction Services for review and approval. No work is allowed without a Fire District permit. 2. Knox Rapid Entry System: A Knox rapid entry key vault shall be installed prior to final inspection. Proof of purchase shall be submitted prior to final building plan approval. Contact the Fire Safety Division for specific details and ordering information. Contact Building and Safety/Fire Construction Services (909) 477-2713 for inspection. 3. Address-Other Than Single-family: New buildings other than single-family dwellings shall post the address with minimum 8-inch numbers on contrasting background, visible from the street and electrically illuminated during periods of darkness. When the building setback exceeds 200 feet from the public street an additional non-illuminated 6-inch minimum number address shall be provided at the property entrance. 4. Fire Alarm System- Final Inspection and Testing: Prior to the issuance of a Certificate of Occupancy, the fire alarm (and detection)system(s) shall be tested and accepted by Fire Construction Services. 5. High-pile Combustible Storage-Permit:The applicant is required to obtain a Fire District Permit for Storage of High-pile Combustible material. 6. High-pile Combustible Storage- Plans:The applicant shall submit plans for the storage arrangement to Fire Construction Services.The applicant shall submit detailed plans and a Commodity Analysis report to Fire Construction Services for approval. If the occupancy classification for the building is designated as Group S, Division 2, commodities stored shall be limited to light hazard classification only 7. Fire District Confidential Business Occupancy Information: The applicant shall complete the Rancho Cucamonga Fire District "Confidential Business Occupancy Information" Form and submit to the Fire Safety Division.This form provides contact information for Fire District use in the event of an emergency at the subject building or property. PLANNING COMMISSION RESOLUTION NO. 04-107 DRC2001-00154— HARMA MAGHAKIAN September 8, 2004 Page 9 2) Construction or grading noise levels shall not exceed the standards specified in Development Code Section 17.02.120-D, as measured at the property line. The developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Building Official. The said consultant shall report their findings to the Planning Division within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Building Official. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 8TH DAY OF SEPTEMBER 2004. PLANNING COMMISSION OF THE TY OF RANCHO CUCAMONGA BY: Rich Macias, Chairman ATTEST: Brad BulI retary I, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 8th day of September 2004, by the following vote-to-wit: AYES: COMMISSIONERS: FLETCHER, MACIAS, McPHAIL, STEWART NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: McNIEL