HomeMy WebLinkAbout04-125 - Resolutions RESOLUTION NO. 04-125
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING TENTATIVE PARCEL
MAP NO. 16657, A SUBDIVISION OF 1 LOT FOR CONDOMINIUM
PURPOSES ON 7.10 NET ACRES OF LAND IN THE GENERAL
INDUSTRIAL DISTRICT(SUBAREA 8), LOCATED ON THE EAST SIDE OF
ROCHESTER AVENUE, NORTH OF ARROW ROUTE, AND MAKING
FINDINGS IN SUPPORT THEREOF - APN: 0229-021-034.
A. Recitals.
1. Fuscoe Engineering filed an application for the approval of Tentative Parcel Map
No. 16657, as described in the title of this Resolution. Hereinafter in this Resolution, the subject
Tentative Tract Map request is referred to as "the application."
2. On the 8th day of December 2004, the Planning Commission of the City of Rancho
Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing
on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW,THEREFORE, it is hereby found, determined, and resolved by the Planning Commission
of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the above-
referenced public hearing on December 8, 2004, including written and oral staff reports,togetherwith
public testimony, this Commission hereby specifically finds as follows:
a. The application applies to property located on the east side of Rochester Avenue,
with a street frontage of approximately 737 feet and a lot depth of approximately 921 feet and is
presently being graded; and
b. The property to the north of the subject site is the sports complex parking lot, the
property to the south consists of vacant property and self storage, the property to the east is
recreational vehicle storage, and the property to the west is industrial beyond Rochester Avenue;
and
C. The parcel map proposes the development of 5 industrial buildings with one
condominium map; and
d. The property, including the parking, paving, landscaping, and exterior elevations,
shall be maintained by an association of owners; and
e. The developer intends to have separate owners within the building space.
PLANNING COMMISSION RESOLUTION NO. 04-125
SUBTPM16657 - FUSCOE ENGINEERING
December 8, 2004
Page 2
3. Based upon the substantial evidence presented to this Commission during the above-
referenced public hearing and upon the specific findings of facts set forth in paragraphs 1 and 2
above, this Commission hereby finds and concludes as follows:
a. That the tentative parcel map is consistent with the General Plan, Development
Code, and any applicable specific plans; and
b. The design or improvements of the tentative parcel map is consistent with the
General Plan, Development Code, and any applicable specific plans; and
C. The site is physically suitable for the type of development proposed; and
d. The design of the parcel map is not likely to cause substantial environmental
damage and avoidable injury to humans and wildlife or their habitat; and
e. The parcel map is not likely to cause serious public health problems; and
f. The design of the parcel map will not conflict with any easement acquired by the
public at large, now of record, for access through or use of the property within the proposed
subdivision.
4. This project is categorically exempt from the requirements of the California Environmental
Quality Act(CEQA) pursuant to State CEQA Guidelines Section 15315 (Class 15 Exemption-Minor
Land Divisions).
5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth below
and in the Standard Conditions, attached hereto and incorporated herein by this reference.
Planning Department
1) ' The conditions of approval for Development Review DRC2003-00732,
as contained in Planning Commission Resolution No. 03-189, shall
apply to this project.
2) Reciprocal access agreement shall be provided for all owners located
on said Parcel Map 16657.
3) Any addition of gates or gated access shall be reviewed and approved
by the Planning Department prior to construction.
4) The Covenants, Conditions, and Restrictions (CC&Rs) and Articles of
Incorporation of the Owners'Association are subject to the approval of
the Planning and Engineering Departments and the City Attorney. They
shall be recorded concurrently with the Final Map or prior to the
issuance of building permits, whichever occurs first. A recorded copy
shall be provided to the City Engineer. The Owners' Association shall
submit to the Planning Department a list of the names and addresses
of their officers on or before January 1 of each and every year and
whenever said information changes.
PLANNING COMMISSION RESOLUTION NO. 04-125
SUBTPM16657 - FUSCOE ENGINEERING
December 8, 2004
Page 3
Engineering Department
1) All pertinent conditions of approval of Planning Commission Resolution
No. 03-189 approving Development Review DRC2003-00732 shall
apply.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 8TH DAY OF DECEMBER 2004.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY:
L rry T. ief, Vice Chairman
ATTEST:
Brad Bull reta
I, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby
certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the
Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning
Commission held on the 8th day of December 2004, by the following vote-to-wit:
AYES: COMMISSIONERS: FLETCHER, McNIEL, McPHAIL, STEWART
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: MACIAS
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT#: TENTATIVE PARCEL MAP SUBTPM1665,7 /
SUBJECT: TENTATIVE PARCEL MAP/STADIUM BUSINESS PARK
APPLICANT: FUSCOE ENGINEERING
LOCATION: SEC JACK BENNY DRIVE AND ROCHESTER AVENUE
ALL OF THE FOLLOWING CONDITIONS APPLY TO-YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DIVISION, (909)477-2750, FOR COMPLIANCE
WITH THE FOLLOWING CONDITIONS:
A. General Requirements Completion Date
1. The applicant shall agree to defend at his sole expense any action brought against the City, its
agents,officers,or employees,because of the issuance of such approval,or in the alternative,to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or
employees, for any Court costs and attorney's fees which the City, its agents, officers, or
employees may be required by a court to pay as a result of such action. The City may,at its sole
discretion,participate at its own expense in the defense of any such action but such participation
shall not relieve applicant of his obligations under this condition.
B. Time Limits
1. This tentative parcel map shall expire, unless extended by the Planning Commission, unless a
complete final map is filed with the City Engineer within 3 years from the date of the approval.
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION, (909)477-2710, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
C. General Requirements
1. Submit five complete sets of plans including the following:
a. Site/Plot Plan;
b. Foundation Plan;
SC-11-04 1
is\planning\f nal\pingcomm\subtpml6657cond 12-8.doc
I
Project No.SUBTPM16657
Completion Date
C. Floor Plan;
d. Ceiling and Roof Framing Plan;
e. Electrical Plans(2 sets,detached)including the size of the main switch, number and size
of service entrance conductors, panel schedules, and single line diagrams;
f. Plumbing and Sewer Plans, including isometrics,underground diagrams,water and waste
diagram, sewer or septic system location, fixture units, gas piping, and heating and air
conditioning; and
g. Planning Division Project Number(i.e.,SUBTPM16657 clearly identified on the outside of
all plans.
2. Contractors must show proof of State and City licenses and Workers'Compensation 6bverage to _/—/_
the City prior to permit issuance.
3. Separate permits are required for fencing and/or walls.
4. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the —/—/—
Building and Safety Division.
D. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be —/—/
marked with the project file number(i.e., SUBTPM16657). The applicant shall comply with the
latest adopted California Codes, and all other applicable codes, ordinances, and regulations in
effect at the time of permit application. Contact the Building and Safety Division for availability of
the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new commercial or industrial development project or —/—/
major addition,the applicant shall pay development fees at the established rate. Such fees may
include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee,Transportation
Development Fee,Permit and Plan Check Fees,Construction and Demolition Diversion Program
deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to
the Building and Safety Division prior to permits issuance.
3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map
recordation and prior to issuance of building permits.
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday —/—/—
through Saturday, with no construction on Sunday or holidays.
5. Construct trash enclosure(s) per City Standard (available at the Planning Division's public
counter).
6. The following is required for side yard use for increase in allowable area: —/ /—
a. Provide a reduced site plan (8 '/3"x 11"),which indicates the non-buildable easement.
b. Recorded"Covenant and Agreement for the Maintenance of a Non-Buildable Easement,"
which is signed by the appropriate property owner(s).
E. Grading
1. Grading of the subject property shall be in accordance with California Building Code,City Grading
Standards, and and accepted grading practices. The final grading plan shall be in substantial
conformance with the approved grading plan.
SC-1-04
2
i:\planning\final\pingcomm\subtpml6657condl2-8.doc
Project No.SUBTPM16657
Completion Date
2. A soils report shall be prepared by a qualified engineer licensed by the State of California to
perform such work.
3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the
time of application for grading plan check.
4. The final grading, appropriate certifications and compaction reports shall be completed,
submitted, and approved by the Building and Safety Official prior to the issuance of building
permits.
5. A separate grading plan check submittal is required for all new construction projects and for
existing buildings where improvements being proposed will generate 50 cubic yards or more of
combined cut and fill. The grading plan shall be prepared,stamped,and signed by a California
registered Civil Engineer.
APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
F. Dedication and Vehicular Access
1. All pertinent conditions of approval of Planning commission Resolution No. 03-189 approving
DRC2003-00732 shall apply.
APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, FIRE PROTECTION PLANNING
SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
SEE ATTACHED
SC-1-04
3
i:\planning\final\pingoomm\subtpml6657condl2-8.doc
1
RANCHO CUCAMONGA FIRE DISTRICT
STANDARD CONDITIONS
October 13, 2004
Stadium Plaza South
Tentative Parcel Map
Condominium Purposes
SUBTPM16657
THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT.
FSC-1 Public and Private Water Supply
1. Design guidelines for Fire Hydrants: The following provides design guidelines for the spacing and
location of fire hydrants: Also see the approved alternative method for this project.
a. The maximum distance between fire hydrants in commercial/industrial projects is 300-feet. No
portion of the exterior wall shall be located more than 150-feet from an approved fire hydrant.
For cul-de-sacs, the distance shall not exceed 100-feet.
b. Fire hydrants are to be located. The preferred locations for fire hydrants are:
1. At the entrance(s) to a commercial, industrial or residential project from the public
roadways.
2. At intersections.
3. On the right side of the street, whenever practical and possible.
4. As required by the Fire Safety Division to meet operational needs of the Fire District.
5. A minimum of forty-feet(40')from any building.
c. If any portion of a facility or building is located more than' 150-feet from a public fire hydrant
measured on an approved route around the exterior of the facility or building, additional private
or public fire hydrants and mains capable of supplying the required fire flow shall be provided.
d. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof.
FSC-2 Fire Flow
3. Public fire hydrants located within a 500-foot radius of the proposed project may be used to provide
the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent
property shall not be used to provide required fire flow.
4. Firewater plans are required for all projects that must extend the existing water supply to or onto the
site.
5. On all site plans to be submitted for review, show all fire hydrants located within 600-feet of the
proposed project site.
FSC-4 Requirement for an Automatic Fire Sprinkler Systems
Rancho Cucamonga Fire District Ordinance 15, the 2001 California Fire Code and/or any other
applicable standards require an approved automatic fire sprinkler system to be installed in commercial or
industrial structures greater than 7,500 square feet.
FSC-5 Fire Alarm System
Based on the number of sprinkler heads; the sprinkler system is required to monitored by a listed central
station fire alarm system.
FSC-6 Fire District Site Access
Fire District access roadways include public roads, streets and highways, as well as private roads,
streets drive aisles and/or designated fire lanes. Please reference the RCFPD Fire Lanes Standard 9-7
1. Location of Access: All portions of the structures 151 story exterior wall shall be located within 150-
feet of Fire District vehicle access, measure on an approved route around the exterior of the
building. Landscaped areas, unpaved changes in elevation, gates and fences are deemed
obstructions.
2. Specifications for private Fire District access roadways per the RCFPD Standards are:
a. The minimum unobstructed width is 26-feet.,
b. The maximum inside turn radius shall be 20=feet.
c. The minimum outside turn radius shall be 46-feet.
d. The minimum radius for cul-de-sacs is 45-feet.
e. The minimum vertical clearance is 14-feet, 6-inches.
f. At any private entry median, the minimum width of traffic lanes shall be 20-feet on each side.
g. The angle of departure and approach shall not exceed 9-degrees or 20 percent.
h. The maximum grade of the driving surface shall.not exceed 12%.
i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW).
j. Trees and shrubs planted adjacent to the fire,lane shall be kept trimmed to a minimum of 14-
feet, 6-inches from the ground up. Vegetation shall not be allowed to obstruct Fire Department
apparatus.
3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be provided
as follows:
a. In buildings without high-piled storage, access shall be provided in accordance with the 2001
California Building Code, Fire and/or any'other applicable standards.
b. In buildings with high-piled storage access doors shall be provided in each 100 lineal feet or
major fraction thereof, of the exterior wall that faces the required access roadways. When
railways are installed provisions shall be made to maintain Fire District access to all required
openings.
4. Access Walkways: Hardscaped access walkways shall be provided from the fire apparatus access
road to all required building exterior openings.
5. Commercial/Industrial Gates: Any gate installed across a Fire Department access road shall be in
accordance with Fire District Standard #9-2. The following design requirements apply:
a. The gate shall be motorized and slide open horizontally or swing inward.
b. All gates must open at the rate of one second for each one-foot of required width.
c. When fully open, the minimum width shall be 20-feet.
d. Gates are not required to be motorized.
7. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site plan
illustrating the proposed delineation that meets the minimum Fire District standards shall be included
in the architectural plans submitted to B&S for approval.
2
8. Approved Fire Department Access: Any approved mitigation measures must be clearly noted on
the site plan. A copy of the approved Alternative Method application, if applicable, must be
reproduced on the architectural plans submitted to B&S for plan review.
FSC-10 Occupancy and Hazard Control Permits
Listed are those Fire Code permits commonly associated with the business operations and/or building
construction. Plan check submittal is required with the permit application for approval of the permit; field
inspection is required prior to permit issuance. General Use Permit shall be required for any activity or
operation not specifically described below, which in the judgment of the Fire Chief is likely to produce
conditions that may be hazardous to life or property.
• Battery Systems
• Candles and open flames in public assemblies M
• Compressed Gases
• Public Assembly
• Cryogenics
• Dry Cleaning Plants
• Refrigeration Systems
• Repair Garages
• Flammable and Combustible Liquids
• Spraying or Dipping Operations
• Hazardous Materials
• Tents, Canopies and/or Air Supported Structures
• Liquefied Petroleum Gases
•, LPG or Gas Fuel Vehicles in Assembly Buildings
FSC-11 Hazardous Materials—Submittal to the County of San Bernardino
The San Bernardino County Fire Department shall review your Business Emergency/Contingency Plan
for compliance with minimum standards. Contact the San Bernardino County Fire, Hazardous Materials
Division at (909) 387-4631 for forms and assistance. The County Fire Department is the Cal/EPA
Certified Unified Program Agency (CUPA)for the City of Rancho Cucamonga.
1. If the facility is a NEW business, a Certificate of Occupancy issued by Building & Safety will not be
finalized until`, the San Bernardino County Fire Department reviews your Business
Emergency/Contingency Plan. California Government Code, Section 65850.2 prohibits the City from
issuing a final Certificate of Occupancy unless the applicant has met or is meeting specific
hazardous materials disclosure requirements. A Risk Management Program (RMP) may also be
required if regulation substances are to be used or stored at the new facility.
2. Any business that operates on rented or leased property which is required to submit a Plan, is also
required to submit a notice to the owner of the property in writing stating that the business is subject
to the Business Emergency/Contingency Plan mandates and has complied with the provisions. The
tenant must provide a copy of the Plan to the property owner within five (5) working days, if
requested by the owner.
FSC-12 Hazardous Materials - Submittal to Fire Construction Services
Plans shall be submitted and approved prior to construction of buildings and/or, the installation of
equipment designed to store, use or dispense hazardous materials in accordance with the 2001
California Building, Fire, Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances FD15 and FD39
and other implemented and/or adopted standards.
3
FSC-13 Alternate Method Application
Fire Construction Services staff and the Fire Marshal will review all requests for alternate method, when
submitted. The request must be submitted on the Fire District "Application for Alternate Method" form
along with supporting documents and payment of the $92 review fee.
FCS-14 Map Recordation
1. Reciprocal Access Agreement: The plan as submitted indicate that the required Fire Department
access:
a. Is located on property which is not under the control of the applicant; or
b. Crosses a property line; or
c. Is shared by multiple owners; or
d. Is located on common space under the control of an ownir's association
Please provide a permanent access agreement,granting irrevocable use of the property to the Fire
District. The agreement shall include a statement that no obstruction, gate, fence, building or other
structure shall be placed within the dedicated access without Fire District approval. The recorded
agreement shall include a copy of the site ,plan. The agreement shall be presented to Fire
Construction Services for review and approval, .prior to recordation. The agreement shall be
recorded with the Recorder's Office, County of San Bernardino.
To assist Fire Construction Services in reviewing the agreement the following shall be included in
the submittal:
a. The current title reports to provide a legal description and proof of ownership for all properties
included in the agreement.
b. The assessor's parcel numbers of each parcel subject to the agreement.
c. A scaled site plan showing the path of the Fire District access, the width, turn radii and slope of
roadway surface shall be provided. The access roadway shall comply with the requirements of
the RCFPD Fire Lane Standard #9-7.
2. Reciprocal Water Covenant and Agreement: The plans as submitted indicate that a required
private fire mains or appurtenances
a. Pass through or are located on property not under the control of the applicant; or
b. Crosses a property line; or
c. Provide service to adjacent properties; or
d. Is located on common space under the control of an owner's association; or
e. Is shared by multiple owners.
Please provide a permanent maintenance and service agreement between the owner for the private
water mains, fire hydrants and fire protection equipment essential to the water supply. The
agreement shall meet the form and content approved by the Rancho Cucamonga Fire District. The
agreement shall be submitted to Fire Construction Services for review and approval, prior to
recordation. The agreement shall be recorded within the Recorder's Office, County of San
Bernardino.
Chronological Summary of RCFPD Standard Conditions
PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to the
issuance of any building permits:
1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans,
specifications, flow test data and calculations for the private water main system for review and
approval by the Fire District. Plans and installation shall comply with Fire District Standards.
Approval of the on-site (private) fire underground and water plans is required prior to any building
4
permit issuance for any structure on the site. Private on-site combination domestic and fire supply
system must be designed in accordance with RCFPD Standards # 9-4, #10-2 and #10-4. The
Building & Safety Division and Fire Construction Services will perform plan checks and inspections.
All private on-site fire hydrants shall be installed, flushed and operable prior to delivering any
combustible framing materials to the site. Fire construction Services will inspect the installation,
witness hydrant flushing and grant a clearance before lumber is dropped.
2. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the
locations of all new public fire hydrants for the review and approval by the Fire District and CCWD.
On the plan, show all existing fire hydrants within a 600-foot radius of the project. Please reference
the RCFPD Water Plan Submittal Procedure Standard 9-8.
All required public fire hydrants shall be installed, flushed and operable prior to delivering any
combustible framing materials to the site. CCWD personnel shall inspecL,the installation and
witness the hydrant flushing. Fire Construction Services shall inspect the site after acceptance of
the public water system by CCWD. Fire Construction Services must grant a clearance before
lumber is dropped.
3. Construction Access: The access roads must be paved in accordance with all the requirements of
the RCFPD Fire Lane Standard #9-7. All temporary utilities over access roads must be installed at
least 14' 6" above the finished surface of the road.
4. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is responsible for
obtaining the fire -flow information from CCWD and submitting the letter to Fire Construction
Services.
5. Easements and Reciprocal Agreements: All easements and agreements must be recorded with
the County of San Bernardino.
PRIOR TO THE RELEASE OF TEMPORARY POWER
The building construction must be substantially completed in accordance with Fire Construction Services'
"Temporary Power Release Checklist and Procedures".
PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following:
1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire
hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga
Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers". On private property,
the markers shall be installed at the centerline of the fire access road, at each hydrant location.
2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in the
presence of Fire Construction Services, shall conduct a test of the most hydraulically remote on-site
fire hydrants. The underground fire line contractor, developer and/or owner are responsible for
hiring the company to perform the test. A final test report shall be submitted to Fire Construction
Services verifying the fire flow available. The fire flow available must meet or exceed the required
fire flow in accordance with the California Fire Code.
3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler
system(s) shall be tested and accepted by Fire Construction Services.
4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler
monitoring system must be tested and accepted by Fire Construction Services. The fire sprinkler
monitoring system shall be installed, tested and operational immediately following the completion of
the fire sprinkler system (subject to the release of power).
5
5. Fire Suppression Systems and/or other special hazard protection systems shall be inspected,
tested and accepted by Fire Construction Services before occupancy is granted and/or equipment is
placed in service.
6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm system shall
be installed, inspected, tested and accepted by Fire Construction Services.
7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular gates must
be inspected, tested and accepted in accordance with RCFPD Standards #9-1 or #9-2 by Fire
Construction Services.
8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access
roadways must be installed in accordance with the approved plans and -acceptable to Fire
Construction Services. '
The CC&R's, the reciprocal agreement and/or other approved documents shall be recorded and
contain an approved fire access roadway map with provisions that prohibit parking, specify the
method of enforcement and identifies who is responsible for the required annual inspections and the
maintenance of all required fire access roadways.
9. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and multi-family
buildings shall post the address with minimum 8-inch numbers on contrasting background, visible
from the street and electrically illuminated during periods of darkness. When the building setback
exceeds ,200 feet from the public street, an additional non-illuminated 6-inch minimum number
address shall be provided at the property entrance. Larger address numbers will be required on
buildings located on wide streets or built with large setbacks in multi-tenant commercial and
industrial buildings. The suite designation numbers and/or letters shall be provided on the front and
back of all suites.
10. Hazardous Materials: Prior to the issuance of a Certificate of Occupancy, the applicant must
demonstrate (in writing from the County) that the facility has met or is meeting the Risk Management
Plan (RMP) or Business Emergency/Contingency Plan with the San Bernardino County Fire
Department, Hazardous Materials/Emergency Response and Enforcement Division. The applicant
must also obtain inspection and acceptance by Fire Construction Services.
11. Confidential Business Occupancy Information: The applicant shall complete the Rancho
Cucamonga Fire District "Confidential Business Occupancy Information" form. This form provides
contact information for Fire District use in the event of an emergency at the subject building or
property. This form must be presented to the Fire Construction Services Inspector.
12. Easements and Reciprocal Agreements: All easements and agreements must be recorded with
the County of San Bernardino.
13. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, a 8 %i' x 11" or 11" x 17"
site plan of the site in accordance with RCFPD Standard #13-1 shall be revised by the applicant to
reflect the actual location of all devices and building features as required in the standard., The site
plan must be reviewed and accepted by the Fire Inspector.
6