HomeMy WebLinkAbout05-60 - Resolutions RESOLUTION NO. 05-60 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT REVIEW DRC2004-01019, FOR THE DEVELOPMENT OF 76,019 SQUARE FOOT WORSHIP CENTER AND A 101 STALL PARKING STRUCTURE ON 8.86 ACRES OF LAND IN THE VERY LOW RESIDENTIAL DISTRICT(.1 to 2 DWELLING UNITS PER ACRE), LOCATED AT THE SOUTHWEST CORNER OF HAVEN AVENUE AND VISTA GROVE STREET; AND MAKING FINDINGS IN SUPPORT THEREOF—APN: 1074-271-01. A. Recitals. 1. Hillside Community Church filed an application for approval of DRC2004-01019, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Development Review request is referred to as "the application." 2. On the 27th day of July 2005, the Planning Commission of the City of Rancho Cucamonga held a meeting to consider the application. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above-referenced meeting on July 27,2005, including written and oral staff reports,this Commission hereby specifically finds as follows: a. The application applies to the development of a sanctuary building totaling 76,019 square feet and a 101 stall, bi-level parking structure on 8.86 acres of land located at the southwest corner of Haven Avenue and Vista Grove Street; and b. The property to the north of the subject site is developed with single-family dwelling units, the property to the south is developed with future single-family dwelling units, the property to the east, across Haven Avenue, is developed with a single-family dwelling units, and the property to the west is developed with single-family dwelling units; and C. The church site was originally approved under Conditional Use Permit 82-29 on February 9, 1983. On September 28, 1988, Conditional Use Permit 88-10, which was identical to Conditional Use Permit 82-29, with the exception of the architectural design of the sanctuary, was approved along with a Master Plan and the issuance of a Negative Declaration of environmental impacts. Conditional Use Permit 88-10 also included the master plan for the church. In 1994, the church completed its first permanent building, the Family Center, which is a multi-purpose building that is presently used for worship services; and PLANNING COMMISSION RESOLUTION NO. 05-60 DRC2004-01019— HILLSIDE COMMUNITY CHURCH July 27, 2005 Page 2 d. The applicant is proposing to construct a 76,019 square foot worship center,which includes administrative offices, classrooms, and a 13,125 square foot sanctuary. The proposed sanctuary is in substantial compliance with the approved master plan (Conditional Use Permit 88-10). The proposed 1,400-seat sanctuary is actually smaller than the 1,500-seat sanctuary that was originally approved. The current proposal, as all previously approved proposals, includes the use of the lower (south) ball field for parking. This ball field was constructed and compacted to accommodate vehicles. The two portable buildings that function as Sunday school classrooms will be removed with the construction of the new sanctuary. Also proposed is a bi-level parking structure that will provide 101 parking stalls. The parking structure has been designed to maximize the use of the grades on the site, with the first level being underground and built into an existing slope. The second level will take access from the north parking lot. The parking structure has been designed to blend with the proposed sanctuary and the existing Family Center buildings, utilizing a river rock base on the south and west elevations. Landscape slopes buttressed by a keystone retaining wall surround the three exposed sides (west, south, and east elevations) of the parking structure. e. The applicant conducted four neighborhood meetings to inform the surrounding neighborhood residents of the proposed project and to obtain their feedback. Residents from the surrounding area attended the meetings and provided design suggestions that improved the project and minimized the impact of the sanctuary building. As result of the neighborhood meetings, the applicant made changes to the sanctuary height, building pad elevation,and modified the project to include a bi-level parking structure and the installation of the 6-foot high sound wall at the south property line; and f. The sanctuary will have a seating capacity of 1,400 persons. In 1988, Conditional Use Permit 88-10 was approved, which included a master plan for a 1,500-person sanctuary in the same location as the 1,400-person sanctuary; and g. The project, together with the recommended conditions of approval,complies with all minimum development standards for the City of Rancho Cucamonga; and h. The project requires 375 parking stalls, per the requirements of the Development for churches. The project has been design with 392 paved stalls, 155 ball field stalls,and a satellite parking lot at Chaffey College with shuttle services to the church that provides an additional 400 stalls. The total amount of parking stalls available on-site is 547. In addition,the church has a lease with Chaffey College to use their parking lots, via shuttle service, for an additional parking capacity of 400 spaces. The overall amount of parking stalls available (on-site plus satellite lot at Chaffey College) is 947 stalls; and i. A photometric study was completed to ensure that the upper level of the parking structure and the expansion of the existing parking lot would not cause glare on the single-family dwelling units located west and south of the church property. The parking structure is located 60 feet east of the west property line that separates the church and the single-family residences. The parking structure will generate a zero-foot candle illumination at the shared property line, which is well under the maximum permitted of 5-foot candles. The expansion of the grade level parking lot at the south property line will result in a maximum of .20-foot candle illumination on the residential properties south of the parking lot, which is well under the maximum permitted of 5-foot candles;and PLANNING COMMISSION RESOLUTION NO. 05-60 DRC2004-01019— HILLSIDE COMMUNITY CHURCH July 27, 2005 Page 3 j. The project has been designed with reinforced concrete pipe (RCP) that will function as retention basins in order to ensure that the on-site storm drain system is adequate and will not exceed the capacity of the existing culvert at the southwest corner of the property; and k. The project has been designed with a 101-stall, bi-level parking structure that has been designed to maximize the use of the grades on the site, with the first level being underground and built into an existing slope, thereby blending into to the existing topography and minimizing the visual impact; and I. The sanctuary design has been designed to blend with the existing multi-purpose building, utilizing rock cobble. Further, the sanctuary has been designed to minimize the visual impact on the residents to the north by being designed with a depressed pad elevation that requires 13 feet of excavation and a gable roof element that is common in residential neighborhoods. 3. Based upon the substantial evidence presented to this Commission during the above-referenced meeting, including written and oral staff reports, this Commission hereby specifically finds and concludes as follows: a. That the proposed project is consistent with the objectives of the General Plan and Development Code; and b. That the proposed design is in accord with the objectives of the Development Code and the purposes of the district in which the site is located; and C. That the proposed design is in compliance with each of the applicable provisions of the Development Code; and d. That the proposed design, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. 4. Based upon the facts and information contained in the proposed Mitigated Negative Declaration,together with all written and oral reports included for the environmental assessment for the application,the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and Monitoring Program attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. That the Mitigated Negative Declaration has been prepared in compliance with the California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared therefore reflect the independent judgment of the Planning Commission; and, further, this Commission has reviewed and considered the information contained in said Mitigated Negative Declaration with regard to the application. b. Although the Mitigated Negative Declaration identifies certain significant environmental effects that will result if the project is approved, all significant effects have been reduced to an acceptable level by imposition of mitigation measures on the project which are listed below as conditions of approval. PLANNING COMMISSION RESOLUTION NO. 05-60 DRC2004-01019— HILLSIDE COMMUNITY CHURCH July 27, 2005 Page 4 C. Pursuant to the provisions of Section 753.5(c) of Title 14 of the California Code of Regulations, the Planning Commission finds as follows: In considering the record as a whole, the Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the proposed project will have potential for an adverse impact upon wildlife resources or the habitat upon which wildlife depends. Further, based upon the substantial evidence contained in the Mitigated Negative Declaration, the staff reports and exhibits, and the information provided to the Planning Commission during the public hearing, the Planning Commission hereby rebuts the presumption of adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code of Regulations. 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. Planning Department 1) Tree Removal Permit DRC2005-00382 is hereby approved for the removal of 122 trees for the development of the worship center parking lot and parking structure. Per the arborist report on file with the Planning Department, 16 trees shall be transplanted elsewhere on-site. Ninety-five new trees shall be planted, comprised of 3 species(London Plane, Strawberry, and Sweetgum). All new tree species shall be 24-inch box size. The Tree Removal Permit shall be valid for 90 days from the date of Building Permit issuance. The precise Grading Plan submitted for plan check shall include an exhibit indicating the 122 trees to be removed and the 16 trees to be relocated. 2) All improvements including, but not limited to, the sanctuary, the parking lot, the parking structure, and landscaping shall be completed in one phase. Phasing of the improvements is not permitted. 3) The project shall be developed in accordance with plans approved by the Design Review Committee on May 31, 2005, on file with the Planning Department. 4) All outdoor activities that involve spectator cheering and/or the use of amplified sound systems including, but not limited to, sports activities, concerts, movies, and recreational games, shall not commence prior to 7 a.m. and shall terminate by 10 p.m. Outdoor overnight campouts are permitted, provided that no amplified sound during the hours of 10 p.m. to 7 a.m. and that the activity is within the acoustical requirements of the Development Code during the hours of 10 p.m. to 7 a.m. 5) At the parking structure, climbing vines shall be planted at the base of the concrete columns at the top of the landscape slopes. Parthenocissus tricuspidata (Boston Ivy), or alternative species approved by the Planning Department during plan check, shall be used. PLANNING COMMISSION RESOLUTION NO. 05-60 DRC2004-01019— HILLSIDE COMMUNITY CHURCH July 27, 2005 Page 5 6) Ball field parking shall be utilized commencing with the issuance of the Certificate of Occupancy for the sanctuary. Ball field parking shall be managed in accordance with the report on file with the Planning Department dated April 7, 2005, that calls for the use of cones, flags, and parking lot attendants. 7) For evening services using the ball field parking, the church shall provide sufficient number of parking lot attendants with flashlights to safely direct traffic. 8) A 6-foot high sound wall shall be constructed along the entire south property line in order to mitigate sound from the ball fields.The sound wall shall be constructed in accordance with specifications outlined by acoustical consultants McKay Conant and Brook dated February 16, 2005. The plans submitted for plan check shall indicate the sound wall and all necessary details and cross-sections. 9) Single-tier bleachers shall be utilized at the south ball fields for noise attenuation purposes. Single-tier bleachers shall be installed prior to the Certificate of Occupancy for the sanctuary. 10) All parking lot fixtures shall not exceed 15 feet in height and shall be compatible with the existing parking lot fixtures. The final design shall be subject to City Planner review and approval during plan check. 11) A photometric diagram shall be submitted during plan check demonstrating that illumination levels from the project site are consistent with approved plans on file with the Planning Department. Building & Safety Department 1) The maximum discharge for the existing culvert at the southwest corner of the property shall be 13.7 cubic feet per second (CFS). A Final Drainage Study determining the precise size of the underground pipes for retention purposes shall be provided during plan check to the satisfaction of the Building and Safety plan check engineer. Engineering Department 1) Install missing street improvements, if any, along Haven Avenue and Vista Grove Street per City standards, to the satisfaction of the City Engineer. Street Improvements include, but are not limited to, sidewalk, street trees, community trail, drive approaches, access ramps, and curbside drain outlets. 2) On Vivienda Street, upgrade curbside drain outlet as required. The Drainage Study for the on-site retention facilities shall be reviewed by City Engineer as well as Building and Safety prior to Grading Permit issuance. PLANNING COMMISSION RESOLUTION NO. 05-60 DRC2004-01019— HILLSIDE COMMUNITY CHURCH July 27, 2005 Page 6 3) Include the Best Management Practices (BMPs)identified in the Water Quality Management Plan (WQMP)on Grading Plans when submitted for plan check. 4) Do not install concrete walkway across the Community Trail. Environmental Mitigation Air Quality 1) The site shall be treated with water or other soil-stabilizing agents (approved by South Coast Air Quality Management District[SCAQMD] and Regional Water Quality Control Board [RWQCB]) daily to reduce Fine Particulate Matter(PM10)emissions, in accordance with SCAQMD Rule 403. 2) Haven Avenue and Vista Grove Street shall be swept according to a schedule established by the City to reduce PM10 emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon time of year of construction. 3) Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PM10 emissions from the site during such episodes. 4) Chemical soil stabilizers(approved by SCAQMD and RW QCB)shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. 5) All construction equipment shall be maintained in good operating condition so as to reduce operational emissions. The contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers'specifications. Maintenance records shall be available at the construction site for City verification. 6) Prior to the issuance of any grading permits,the developer shall submit construction plans to the City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low-emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD) as well as City Planning staff. 7) All paints and coatings shall meet or exceed performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high-volume, low-pressure spray. 8) All asphalt shall meet or exceed performance standards noted in SCAQMD Rule 1108. PLANNING COMMISSION RESOLUTION NO. 05-60 DRC2004-01019— HILLSIDE COMMUNITY CHURCH July 27, 2005 Page 7 9) All construction equipment shall comply with SCAQMD Rules 402 and 403. Additionally, contractors shall include the following provisions on Grading Plans and initiate on-site when appropriate or as soon as feasible: • Reestablish ground cover on the construction site through seeding and watering. • Pave or apply gravel to any on-site haul roads. • Phase grading to prevent the susceptibility of large areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in accordance with local ordinances and use sound engineering practices. • Sweep streets according to a schedule established by the City if silt is carried over to adjacent public thoroughfares or occurs as a result of hauling. Timing may vary depending upon the time of year of construction. • Suspend grading operations during high winds (i.e.,wind speeds exceeding 25 mph) in accordance with Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils haul trucks or cover payloads using tarps or other suitable means. 10) The construction contractor shall utilize electric or clean alternative fuel-powered equipment where feasible. 11) The construction contractor shall ensure that construction grading plans include a statement that work crews will shut off equipment when not in use. 12) All residential and commercial structures shall be required to incorporate high-efficiency/low-polluting heating, air conditioning, appliances, and water heaters. 13) All residential and commercial structures shall be required to incorporate thermal pane windows and weather-stripping. Cultural Resources 1) If any prehistoric archaeological resources are encountered before or during grading, the developer will retain a qualified archaeologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: PLANNING COMMISSION RESOLUTION NO. 05-60 DRC2004-01019— HILLSIDE COMMUNITY CHURCH July 27, 2005 Page 8 • Enact interim measures to protect undesignated sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. • Consider establishing provisions to require incorporation of archaeological sites within new developments, using theirspecial qualities as a theme or focal point. • Pursue educating the public about the area's archaeological heritage. • Propose mitigation measures and recommend conditions of approval to eliminate adverse project effects on significant, important,and unique prehistoric resources,following appropriate CEQA guidelines. • Prepare a technical resources management report,documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report, with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. 2) A qualified paleontologist shall conduct a preconstruction field survey of the project site. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures (i.e., paleontological monitoring) that may be appropriate. Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: • Assign a paleontological monitor, trained and equipped to allow the rapid removal of fossils with minimal construction delay,to the site full-time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared or graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Submit a summary report to the City of Rancho Cucamonga. Transfer collected specimens with a copy of the report to the San Bernardino County Museum. Geology and Soils 1) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and RWQCB)daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403 or re-planted with drought resistant landscaping as soon as possible. 2) Frontage public streets shall be swept according to a schedule established by the City to reduce PM10 emissions associated with PLANNING COMMISSION RESOLUTION NO. 05-60 DRC2004-01019— HILLSIDE COMMUNITY CHURCH July 27, 2005 Page 9 vehicle tracking of soil off-site. Timing may vary depending upon the time of year of construction. 3) Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PM10 emissions from the site during such episodes. 4) Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. Hydrology and Water Quality 1) Prior to issuance of grading permits, the permit applicant shall submit to Building Official for approval, Storm Water Pollution Prevention Plan (SW PPP) specifically identifying Best Management Practices (BMPs) that shall be used on-site to reduce pollutants during construction activities entering the storm drain system to the maximum extent practical. 2) An erosion control plan shall be prepared, included in grading plan,and implemented for the proposed project that identifies specific measures to control on-site and off-site erosion from the time of ground disturbing activities are initiated through completion of grading. This erosion control plan shall include the following measures at a minimum: a) Specify the timing of grading and construction to minimize soil exposure to rainy periods experienced in southern California,and b)An inspection and maintenance program shall be included to ensure that any erosion which does occur either on-site or off-site as a result of this project will be corrected through a remediation or restoration program within a specified time frame. 3) During construction, temporary berms such as sandbags or gravel dikes must be used to prevent discharge of debris or sediment from the site when there is rainfall or other runoff. 4) During construction, to remove pollutants, street cleaning will be performed prior to storm events and after the use of water trucks to control dust in order to prevent discharge of debris or sediment from the site. 5) The developer shall implement the BMPs identified in the WQMP prepared by Dan Guerra&Associates (May 2005)to reduce pollutants after construction is complete from entering the storm drain system to the maximum extent practical. 6) Landscaping plans shall include provisions for controlling and minimizing the use of fertilizers/pesticides/herbicides. Landscaped areas shall be monitored and maintained for at least two years to ensure adequate coverage and stable growth. Plans for these areas, PLANNING COMMISSION RESOLUTION NO. 05-60 DRC2004-01019— HILLSIDE COMMUNITY CHURCH July 27, 2005 Page 10 including monitoring provisions for a minimum of two years, shall be submitted to the City for review and approval prior to the issuance of grading permits. 7) Roof Runoff Controls: Pollutants picked up from roofing materials and atmospheric depositions during roof storm water runoff shall pass through a water quality device located at catch basins. 8) Efficient Irrigation: Irrigation systems shall include features such as flow reducers or shutoff valves triggered by a pressure drop to control water loss in the event of broken sprinkler heads or lines. The landscaping areas will be grouped with plants that have similar water requirements. Native or drought species shall also be used where appropriate to reduce excess irrigation runoff and promote surface filtration. 9) Storm Drain Signage:All storm drain inlets and catch basins shall have stenciling or labeling "Keep Gutters Clean For Those Downstream." Legibility of stencils and signs must be maintained. 10) Trash Storage Areas: The trash storage areas will be paved with an impervious surface to mitigate spills. The trash container areas will also be walled to prevent off-site transport of trash. The container floor will be graded such that storm water runoff will flow out of the structure. Ponding will not occur within the trash enclosure. Trash containers shall have lids or an awning to prevent rainfall from entering containers. In addition, storm water runoff from adjoining roofs and pavement must be diverted around the trash area and signs should be posted informing users that hazardous materials are not to be disposed of therein. 11) Prior to issuance of building permits, the applicant shall submit to the City Engineer for approval, a WQMP, including a project description and identifying BMPs that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The WQMP shall identify the structural and non-structural measures consistent with the Guidelines for New Development and Redevelopment adopted by the City of Rancho Cucamonga in June 2004. 12) Prior to issuance of grading or paving permits, the applicant shall obtain a Notice of Intent(NOI)to comply with obtaining coverage under the National Pollution Discharge Elimination System (NPDES)General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e. a copy of the Waste Discharger's Identification Number) shall be submitted to the City Building Official for coverage under the NPDES General Construction Permit. PLANNING COMMISSION RESOLUTION NO. 05-60 DRC2004-01019— HILLSIDE COMMUNITY CHURCH July 27, 2005 Page 11 Noise 1) Construction or grading shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. 2) Construction or grading noise levels shall not exceed the standards specified in Development Code Section 17.02.120-D, as measured at the property line. The developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Building Official. Said consultant shall report their findings to the Building Official within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Building Official. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. 3) The wall at the south property line shall be constructed as early as possible. 4) Haul truck deliveries shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday ora national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips(counting both to and from the construction site), then the developer shall prepare a noise mitigation plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 27TH DAY OF JULY 2005. PLANNING COMMISSION OF E CITY OF RANCHO CUCAMONGA BY: cias, Chairma ATTEST: Dan Coleman, Acting Secretary I, Dan Coleman, Acting Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and PLANNING COMMISSION RESOLUTION NO. 05-60 DRC2004-01019— HILLSIDE COMMUNITY CHURCH July 27, 2005 Page 12 Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 27th day of July 2005, by the following vote-to-wit: AYES: COMMISSIONERS: FLETCHER, MACIAS, McNIEL, McPHAIL NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: STEWART City of Rancho Cucamonga in MITIGATION MONITORING PROGRAM Project File No.: ENVIRONMENTAL ASSESSMENT AND DESIGN REVIEW DRC2004-01019, VARIANCE DRC2005-00321, VARIANCE DRC2005-00322, AND VARIANCE DRC2005-00323 This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation measures identified in the Mitigated Negative Declaration forthe above-listed project. This program has been prepared in compliance with State law to ensure that adopted mitigation measures are implemented (Section 21081.6 of the Public Resources Code). Program Components -This MMP contains the following elements: 1. Conditions of approval that act as impact mitigation measures are recorded with the action and the procedure necessary to ensure compliance.The mitigation measure conditions of approval are contained in the adopted Resolution of Approval for the project. 2. A procedure of compliance and verification has been outlined for each action necessary. This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported. 3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring progresses, changes to compliance procedures may be necessary based upon recommendations by those responsible for the program. Program Management- The MMP will be in-place through all phases of the project. The project planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly and proper action is taken on each mitigation. Each City department shall ensure compliance of the conditions (mitigation) that relate to that department. Procedures -The following steps will be followed by the City of Rancho Cucamonga. 1. A fee covering all costs and expenses, including any consultants' fees, incurred by the City in performing monitoring or reporting programs shall be charged to the applicant. 2. A MMP Reporting Form will be prepared for each potentially significant impact and its corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached hereto. This procedure designates who will take action,what action will be taken and when,and to whom and when compliance will be reported. All monitoring and reporting documentation will be kept in the project file with the department having the original authority for processing the project. Reports will be available from the City upon request at the following address: City of Rancho Cucamonga - Lead Agency (Planning Department) 10500 Civic Center Drive Rancho Cucamonga, CA 91730 Mitigation Monitoring Program DRC2004-01019, DRC2005-00321, DRC2005-00322, AND DRC2005-00323 Page 2 3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,as determined by the project planner or responsible City department, to monitor specific mitigation activities and provide appropriate written approvals to the project planner. 4. The project planner or responsible City department will approve, by signature and date, the completion of each action item that was identified on the MMP Reporting Form. After each measure is verified for compliance, no further action is required for the specific phase of development. 5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off as completed by the project planner or responsible City department at the bottom of the MMP Reporting Form. 6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation measures. The project planner is responsible for approving any such refinements or additions. An MMP Reporting Form will be completed by the project planner or responsible City department and a copy provided to the appropriate design, construction, or operational personnel. 7. The project planner or responsible City department has the authority to stop the work of construction contractors if compliance with any aspects of the MMP is not occurring after written notification has been issued. The project planner or responsible City department also has the authority to hold certificates of occupancies if compliance with a mitigation measure attached hereto is not occurring. The project planner or responsible City department has the authority to hold issuance of a business license until all mitigation measures are implemented. 8. Any conditions (mitigation) that require monitoring after project completion shall be the responsibility of the City of Rancho Cucamonga Planning Division.The Division shall require the applicant to post any necessary funds (or other forms of guarantee) with the City. These funds shall be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measure for the required period of time. 9. In those instances requiring long-term project monitoring, the applicant shall provide the City with a plan for monitoring the mitigation activities at the project site and reporting the monitoring results to the City. Said plan shall identify the reporter as an individual qualified to know whether the particular mitigation measure has been implemented. The monitoring/reporting plan shall conform to the City's MMP and shall be approved by the Community Development Director or City Planner prior to the issuance of building permits. MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III) Project File No.: DRC2004-01019, DRC2005-00321, DRC2005-00322, AND DRC2005-00323 Applicant: Hillside Community Church Initial Study Prepared by: Donald Granger Date: June 7, 2005 ResponsibleMitigation Measures No. of Verif led Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/Initials Non-Compliance Air Quality The site shall be treated with water or other BO C During A 4 soil-stabilizing agents (approved by South Coast Air construction Quality Management District (SCAQMD) and Regional Water Quality Control Board [RWQCB])daily to reduce Fine Particulate Matter(PM10)emissions,in accordance with SCAQMD Rule 403. Haven Avenue and Vista Grove Street shall be swept CP C During A 4 according to a schedule established by the City to construction reduce PM,o emissions associated with vehicle tracking of soil off-site.Timing may vary depending upon time of year of construction. Grading operations shall be suspended when wind CP C During A 4 speeds exceed 25 mph to minimize PM,a emissions construction from the site during such episodes. Chemical soil stabilizers (approved by SCAQMD and BO C During A 4 RWQCB) shall be applied to all inactive construction construction areas that remain inactive for 96 hours or more to reduce PM,o emissions. All construction equipment shall be maintained in good CP C Review of plans A/C 2/4 operating condition so as to reduce operational emissions. The construction contractors shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers' specifications. Maintenance records shall be available at the construction site for City verification. 1 of 9 Mitigation . Responsible Monitoring . of Method . . Implementingns for Date/initials Non-Compliance Prior to the issuance of any grading permits, the CP/BO C Review of plans C 2 developer shall submit construction plans to City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD) as well as City Planning Staff. All paints and coatings shall meet or exceed CP C Review of plans A/C 2/4 performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high volume, low-pressure spray. All asphalt shall meet or exceed performance standards BO B Review of plans A/C 2 noted in SCAQMD Rule 1108. All construction equipment shall comply with SCAQMD BO C Review of plans A/C 2/4 Rules 402 and 403. Additionally, contractors shall include the following provisions on Grading Plans and initiate on-site when appropriate or as soon as feasible: • Reestablish ground cover on the construction site BO C Review of plans A/C 2/4 through seeding and watering. • Pave or apply gravel to any on-site haul roads. BO C Review of plans A/C 2/4 • Phase grading to prevent the susceptibility of large BO C Review of plans A/C 2/4 areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of BO C Review of plans A/C 2/4 exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in BO C Review of plans A 4 accordance with local ordinances and use sound engineering practices. 2 of 9 Mitigation Measures No. Responsible MonitoringImplementing Action for • • Date/Initials Non-Compliance • Sweep streets according to a schedule established BO C During A 4 by the City if silt is carried over to adjacent public construction thoroughfares or occurs as a result of hauling. Timing may vary depending upon time of year of construction. • Suspend grading operations during high winds(i.e., BO C During A 4 wind speeds exceeding 25 mph)in accordance with construction SCAOMD Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils BO C During A 4 haul trucks or cover payloads using tarps or other Construction suitable means. The construction contractor shall utilize electric or clean BO C Review of plans A/C 4 alternative fuel powered equipment where feasible. The construction contractor shall ensure that BO C Review of plans A/C 2/4 construction-grading plans include a statement that work crews will shut off equipment when not in use. All residential and commercial structures shall be BO C Review of plans A/C 2/4 required to incorporate high-efficiency/low-polluting heating,air conditioning,appliances,and water heaters. All residential and commercial structures shall be BO C Review of plans A/C 2/4 required to incorporate thermal pane windows and weather-stripping. Cultural Resources w ,l If any prehistoric archaeological resources are encountered before or during grading,the developer will retain a qualified archaeologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist,the City of Rancho Cucamonga will: Enact interim measures to protect undesignated CP/BO C Review of report P✓D 3/4 sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. 3 of 9 Mitigation Measures No./ Responsible Implementing Action for Monitoring Frequency Verification Verification Date/Initials Non-Compliance • Consider establishing provisions to require CP/BO C Review of report A/D 3/4 incorporation of archaeological sites within new developments, using their special qualities as a theme or focal point. Pursue educating the public about the area's CP/BO C Review of report A/D 3/4 archaeological heritage. • Propose mitigation measures and recommend CP/BO C Review of report A/D 3/4 conditions of approval to eliminate adverse project effects on significant, important, and unique prehistoric resources, following appropriate California Environmental Quality Act (CEQA) guidelines. • Prepare a technical resources management report, CP C Review of report A/D 3/4 documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report,with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. A qualified paleontologist shall conduct a preconstruction field survey of the project site. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures (i.e., paleontological monitoring) that may be appropriate.Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: • Assign a paleontological monitor, trained and CP B Review of report A/D 4 equipped to allow the rapid removal of fossils with minimal construction delay, to the site full-time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared BO B/C Review of report A/D 4 or graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. 4 of 9 Mitigation .. Method of Verif led Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance • Submit summary report to City of Rancho CP D Review of report D 3 Cucamonga. Transfer collected specimens with a copy of the report to San Bernardino County Museum. Geology and Soils The site shall be treated with water or other BO C During A 4 soil-stabilizing agent (approved by SCAQMD and construction RWQCB)daily to reduce PM,o emissions,in accordance with SCAQMD Rule 403 or re-planted with drought resistant landscaping as soon as possible. Frontage public streets shall be swept according to a BO C During A 4 schedule established by the City to reduce PM,o construction emissions associated with vehicle tracking of soil off- site. Timing may vary depending upon time of year of construction. Grading operations shall be suspended when wind BO C During A 4 speeds exceed 25 mph to minimize PM,o emissions construction from the site during such episodes. Chemical soil stabilizers (approved by SCAQMD and BO C During A 4 RWQCB) shall be applied to all inactive construction construction areas that remain inactive for 96 hours or more to reduce PM,o emissions. Hydrology and Water Quality Prior to issuance of grading permits,the permit applicant BO B/C/D Review of plans A/C 2/4 shall submit to Building Official for approval, a SW PPP specifically identifying Best Management Practices (BMPs) that shall be used on-site to reduce pollutants during construction activities, from entering the storm drain system to the maximum extent practical. 5 of 9 Mitigation Measures No. Responsible Monitoring Timing of Method of Verif led Sanctions for Implementing Action for Monitoring Frequency Verification Verification . . - D. An erosion control plan shall be prepared, included in BO B/C/D Review of plans A/C 2/4 the grading plan, and implemented for the proposed project that identifies specific measures to control on- site and off-site erosion from the time ground disturbing activities are initiated through completion of grading. This erosion control plan shall include the following measures at a minimum: a) Specify the timing of grading and construction to minimize soil exposure to rainy periods as experienced in Southern California,and b) An inspection and maintenance program shall be included to ensure that any erosion which does occur either on-site or off-site as a result of this project will be corrected through a remediation or restoration program within a specified time frame. During construction, temporary berms such as BO B/C/D. Review of plans A/C 2/4 sandbags or gravel dikes must be used to prevent discharge of debris or sediment from the site when there is rainfall or other runoff. During construction, to remove pollutants, street BO B/C/D Review of plans A/C 2/4 cleaning will be performed prior to storm events and after the use of water trucks to control dust in order to prevent discharge of debris or sediment from the site. The developer shall implement the BMPs identified in BO B/C/D Review of plans A/C 2/4 the WOMP prepared by Dan Guerra&Associates(May 2005)to reduce pollutants after construction is complete from entering the storm drain system to the maximum extent practical. Landscaping plans shall include provisions for Cr: D/E Review of plans A/C 2/4 controlling and minimizing the use of fertilizers/pesticides/herbicides.Landscaped areas shall be monitored and maintained for at least two years to ensure adequate coverage and stable growth. Plans for these areas, including monitoring provisions for a minimum of two years, shall be submitted to the City for review and approval prior to the issuance of grading permits. 6 of 9 Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date finitials Non-Compliance Roof Runoff Controls: Pollutants picked up from roofing CE WE Review of plans A/C 2/4 materials and atmospheric depositions during roof storm water runoff shall pass through a water quality device located at catch basins. Efficient Irrigation: Irrigation systems shall include CE D/E Review of plans A/C 2/4 features such as flow reducers or shutoff valves triggered by a pressure drop to control water loss in the event of broken sprinkler heads or lines. The landscaping areas will be grouped with plants that have similar water requirements. Native or drought species shall also be used where appropriate to reduce excess irrigation runoff and promote surface filtration. Storm Drain Signage: All storm drain inlets and catch CE D/E Review of plans A/C 2/4 basins shall have stenciling or labeling "Keep Gutters Clean For Those Downstream". Legibility of stencils and signs must be maintained. Trash Storage Areas: The trash storage areas will be CE D/E Review of plans A/C 2/4 paved with an impervious surface to mitigate spills. The trash container areas will also be walled to prevent off-site transport of trash. The container floor will be graded such that storm water runoff will flow out of the structure. Ponding will not occur within the trash enclosure.Trash containers shall have lids or an awning to prevent rainfall from entering containers. In addition, storm water runoff from adjoining roofs and pavement must be diverted around the trash area and signs should be posted informing users that hazardous materials are not to be disposed of therein. Prior to issuance of building permits,the applicant shall CE B/C/D Review of plans A/C 2/4 submit to the City Engineer for approval, a WQMP, including a project description and identifying BMPs that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The WQMP shall identify the structural and non-structural measures consistent with the Guidelines for New Development and Redevelopment adopted by the City of Rancho Cucamonga in June 2004. 7 of 9 Mitigation Measures No. Responsible . . of Verif led Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Prior to issuance of grading or paving permits, the CE B/C/D Review of plans A/C 2/4 applicant shall obtain a Notice of Intent(NOI)to comply with obtaining coverage under the National Pollution Discharge Elimination System (NPDES) General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e. a copy of the Waste Discharger's Identification Number) shall be submitted to the City Building Official for coverage under the NPDES General Construction Permit. -Noise- Construction or grading shall not take place between the SO C During A 4 hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction including Saturday, or at any time on Sunday or a national holiday. Construction or grading noise levels shall not exceed the SO C During A 4 standards specified in Development Code Section construction 17.02.120-D, as measured at the property line. The developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Building Official. Said consultant shall report their findings to the Building Official within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Building Official. If noise levels exceed the above standards,then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. The wall at the south property line shall be constructed CP C/D Review of A/C 3/4 as early as possible. plans/During construction 8 of 9 Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date Haul truck deliveries shall not take place between the PO/BO C During A 4/7 hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction including Saturday, or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips (counting both to and from the construction site),then the developer shall prepare a noise mitigation plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. Key to Checklist Abbreviations Responsible Person Monitoring Frequency Method of'Verification Sanctions`' = CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds FC-Fire Chief or designee 6-Revoke CUP 7-Citation 9 of 9 COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT#: DEVELOPMENT REVIEW DRC2004-01019 SUBJECT: DEVELOPMENT REVIEW FOR 76K WORSHIP CENTER APPLICANT: HILLSIDE COMMUNITY CHURCH SOUTHWEST CORNER OF HAVEN AVENUE AND VISTA GROVE STREET - APN: LOCATION: 1074-271-01 ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents,officers, or employees, because of the issuance of such approval,or in the alternative,to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may,at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Copies of the signed Planning Commission Resolution of Approval No. 05-60, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. B. Time Limits 1. Conditional Use Permit, Variance, or DevelopmenUDesign Review approval shall expire if building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans,architectural elevations,exterior materials and colors, landscaping,sign program,and grading on file in the Planning Department,the conditions contained herein, Development Code regulations. SC-1-05 1 Project No.DRC2004-01019 Completion Date 2. Prior to any use of the project site or business activity being commenced thereon,all Conditions of Approval shall be completed to the satisfaction of the City Planner. 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Department to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for City Planner review and approval prior to the issuance of building permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.)or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code,all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 7. A detailed on-site lighting plan, including a photometric diagram,shall be reviewed and approved by the City Planner and Police Department(477-2800) prior to the issuance of building permits. Such plan shall indicate style, illumination, location, height, and method of shielding so as not to adversely affect adjacent properties. 8. Trash receptacle(s)are required and shall meet City standards. The final design, locations,and the number of trash receptacles shall be subject to City Planner review and approval prior to the issuance of building permits. 9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming,and/or landscaping to the satisfaction of the City Planner. For single- family residential developments, transformers shall be placed in underground vaults. 10. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination. 11. All parkways, open areas, and landscaping shall be permanently maintained by the property owner, homeowners'association,or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for City Planner and City Engineer review and approved prior to the issuance of building permits. D. Building Design 1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections, shall be shielded from view and the sound buffered from adjacent properties and streets as required by the Planning Department. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the City Planner. Details shall be included in building plans. E. Parking and Vehicular Access (indicate details on building plans) 1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet wide. 2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall contain a 12-inch walk adjacent to the parking stall (including curb). SC-1-05 2 Project No.DRC2004-01019 Completion Date 3. All parking spaces shall be double striped per City standards and all driveway aisles,entrances, and exits shall be striped per City standards. 4. Handicap accessible stalls shall be provided for commercial and office facilities with 25 or more parking stalls. Designate two percent or one stall; whichever is greater, of the total number of stalls for use by the handicapped. F. Trip Reduction 1. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily residential projects of more than 10 units. Minimum spaces equal to five percent of the required automobile parking spaces or three bicycle storage spaces,whichever is greater. After the first 50 bicycle storage spaces are provided,additional storage spaces required are 2.5 percent of the required automobile parking spaces. Warehouse distribution uses shall provide bicycle storage spaces at a rate of 2.5 percent of the required automobile parking spaces with a minimum of a 3-bike rack. In no case shall the total number of bicycle parking spaces required exceed 100. Where this results in a fraction of 0.5 or greater, the number shall be rounded off to the higher whole number. G. Landscaping 1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for City Planner review and approval prior to the issuance of building permits or prior final map approval in the case of a custom lot subdivision. 2. Existing trees required to be preserved in place shall be protected with a construction barrier in accordance with the Municipal Code Section 19.08.110,and so noted on the grading plans. The location of those trees to be preserved in place and new locations for transplanted trees shall be shown on the detailed landscape plans. The applicant shall follow all of the arborist's recommendations regarding preservation, transplanting, and trimming methods. 3. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within commercial and office projects, shall be specimen size trees - 24-inch box or larger. 4. Within parking lots,trees shall be planted at a rate of one 15-gallon tree for every three parking stalls. 5. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one tree per 30 linear feet of building. 6. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope,but less than 2:1 slope, shall be,at minimum, irrigated and landscaped with appropriate ground cover for erosion control. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 7. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater slope shall be landscaped and irrigated for erosion control and to soften their appearance as follows: one 15-gallon or larger size tree per each 150 sq.ft.of slope area, 1-gallon or larger size shrub per each 100 sq.ft.of slope area,and appropriate ground cover. In addition,slope banks in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in staggered clusters to soften and vary slope plane. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 8. For multi-family residential and non-residential development, property owners are responsible for the continual maintenance of all landscaped areas on-site, as well as contiguous planted areas within the public right-of-way. All landscaped areas shall be kept free from weeds and debris and maintained in healthy and thriving condition,and shall receive regular pruning,fertilizing,mowing, and trimming. Any damaged,dead,diseased, or decaying plant material shall be replaced within 30 days from the date of damage. SC-1-05 3 Project No.DRC2004-01019 Completion Date 9. The final design of the perimeter parkways,walls, landscaping,and sidewalks shall be included in the required landscape plans and shall be subject to City Planner review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Department. 10. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 11. All walls shall be provided with decorative treatment. If located in public maintenance areas,the design shall be coordinated with the Engineering Department. 12. Landscaping and irrigation shall be designed to conserve water through the principles of Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code. H. Signs 1. The signs indicated on the submitted plans are conceptual only and not a part of this approval. Any signs proposed for this development shall comply with the Sign Ordinance and shall require separate application and approval by the Planning Department prior to installation of any signs. I. Environmental 1. Mitigation measures are required for the project. The applicant is responsible for the cost of implementing said measures, including monitoring and reporting. Applicant shall be required to post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the amount of$474 prior to the issuance of building permits,guaranteeing satisfactory performance and completion of all mitigation measures. These funds may be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete all actions required by the approved environmental documents shall be considered grounds for forfeit. J. Other Agencies 1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location of mailboxes. Multi-family residential developments shall provide a solid overhead structure for mailboxes with adequate lighting. The final location of the mailboxes and the design of the overhead structure shall be subject to City Planner review and approval prior to the issuance of building permits. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT,(909)477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S) K. General Requirements 1. Submit five complete sets of plans including the following: a. Site/Plot Plan; b. Foundation Plan; C. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; f. Plumbing and Sewer Plans, including isometrics, underground diagrams,water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and SC-1-05 4 Project No.DRC2004-01019 Completion Date g. Planning Department Project Number (i.e., DRC2004-01019) clearly identified on the outside of all plans. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to the City prior to permit issuance. 4. Separate pefmits are required for fencing and/or walls. 5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the Building and Safety Department. L. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number(i.e., DRC2001-00001). The applicant shall comply with the latest adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Department for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new commercial or industrial development project or major addition,the applicant shall pay development fees at the established rate. Such fees may include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Department prior to permits issuance. 3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map recordation and prior to issuance of building permits. 4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. 5. Construct trash enclosure(s) per City Standard (available at the Planning Department's public counter). M. New Structures 1. Provide compliance with the California Building Code (CBC) for property line clearances considering use, area, and fire-resistiveness. 2. Provide compliance with the California Building Code for required occupancy separations. 3. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC Section 1505. 4. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A 5. Openings in exterior walls shall be protected in accordance with CBC Table 5-A. 6. Upon tenant improvement plan check submittal, additional requirements may be needed. N. Grading 1. Grading of the subject property shall be in accordance with California Building Code,CityGrading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. SC-1-05 5 Project No.DRC2004-01019 Completion Date 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the time of application for grading plan check. 4. The final grading, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 5. A separate grading plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The grading plan shall be prepared, stamped, and signed by a California registered Civil Engineer. APPLICANT SHALL CONTACT THE ENGINEERING DEPARTMENT, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: O. Dedication and Vehicular Access 1. Dedication shall be made of the following rights-of-way on the perimeter streets(measured from street centerline): 52 total feet on Haven Avenue, to include community trail 2. Corner property line cutoffs shall be dedicated per City Standards. P. Street Street Improvements 1. Pursuant to City Council Resolution No.88-557,no person shall make connections from a source of energy,fuel or power to any building service equipment which is regulated by technical codes and for which a permit is required unless, in addition to any and all other codes, regulations and ordinances, all improvements required by these conditions of development approval have been completed and accepted by the City Council,except:that in developments containing more than one building or unit, the development may have energy connections made to a percentage of those buildings, or units proportionate to the completion of improvements as required by conditions of approval of development. In no case shall more than 95 percent of the buildings or units be connected to energy prior to completion and acceptance of all improvements required by these conditions of approval of development. 2. Construct the following perimeter street improvements including, but not limited to: Curb& AC. Side- Drive Street Street Comm Median Bike Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other Haven Avenue X X (e,f) Vista Grove X X Vivienda Street (f) Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be provided for this item. (e) access ramp(s), (f) curbside drain outlets—install and/or upgrade 3. Improvement Plans and Construction: a. Street improvement plans, including street trees,street lights,and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements,prior to SC-1-05 6 Project No.DRC2004-01019 Completion Date final map approval or the issuance of building permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the City Engineer's Office in addition to any other permits required. C. Pavement striping, marking,traffic signing, street name signing,traffic signal conduit,and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer Notes: 1) Pull boxes shall be No.6 at intersections and No. 5 along streets,a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2) Conduit shall be 3-inch galvanized steel with pull rope or as specified. e. Handicapped access ramps shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving,which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single family residential lots. h. Street names shall be approved by the City Planner prior to submittal for first plan check. 4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. 5. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with adopted policy. On collector or larger streets, lines of sight shall be plotted for all project intersections, including driveways. Local residential street intersections and commercial or industrial driveways may have lines of sight plotted as required. Q. Public Maintenance Areas 1. Parkway landscaping on the following street(s) shall conform to the results of the respective Beautification Master Plan Haven Avenue. R. Drainage and Flood Control 1. A final drainage study shall be submitted to and approved by the City Engineer prior to final map approval or the issuance of building permits, whichever occurs first. All drainage facilities shall be installed as required by the City Engineer. SC-1-05 7 Project No.DRC2004-01019 Completion Date S. General Requirements and Approvals 1. Prior to the issuance of building permits, a Diversion Deposit and related administrative fees shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at least 50% of all wastes generated during construction and demolition are diverted from landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to the Engineering Department when the first building permit application is submitted to Building and Safety. Form CD-2 shall be submitted to the Engineering Department within 60 days following the completion of the construction and/or demolition project. APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: T. Security Lighting 1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power. These areas should be lighted from sunset to sunrise and on photo sensored cell. 2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with direct lighting to be provided by all entryways. Lighting shall be consistent around the entire development. U. Security Hardware 1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within 40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used. 2. All roof openings giving access to the building shall be secured with either iron bars,metal gates, or alarmed. V. Building Numbering 1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime visibility. 2. Developer shall paint roof top numbers on one or more roofs of this development. They shall be _/_/_ a minimum of three feet in length and two feet in width and of contrasting color to background. The stencils for this purpose are on loan at the Rancho Cucamonga Police Department. APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED SC-1-05 8 Rancho Cucamonga Fire Protection District Fire Construction Services STANDARD CONDITIONS April 14, 2005 Hillside Community Church 5354 Haven Avenue DRC2004-01019 THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT. FSC-1 Public and Private Water Supply 1. Design guidelines for Fire Hydrants: The following provides design guidelines for the spacing and location of fire hydrants: a. The maximum distance between fire hydrants in commercial/industrial projects is 300-feet. No portion of the exterior wall shall be located more than 150-feet from an approved fire hydrant. For cul-de-sacs, the distance shall not exceed 100-feet. b. Fire hydrants are to be located. The preferred locations for fire hydrants are: i. At the entrance(s) to a commercial, industrial or residential project from the public roadways. ii. At intersections. iii. On the right side of the street, whenever practical and possible. iv. As required by the Fire Safety Division to meet operational needs of the Fire District. V. A minimum of forty-feet (40') from any building C. If any portion of a facility or building is located more than 150-feet from a public fire hydrant measured on an approved route around the exterior of the facility or building, additional private or public fire hydrants and mains capable of supplying the required fire flow shall be provided. d. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof. FSC-2 Fire Flow 1. The required minimum fire flow for this project, when automatic fire sprinklers are installed is 2,875 gallons per minute at a minimum residual pressure of 20-pounds per square inch. This flow reflects a 50-percent reduction for the installation of an approved automatic fire sprinkler system in accordance with NFPA 13 with central station monitoring. This requirement is made in accordance with the California Fire Code Appendix III-A, as adopted by the Fire District Ordinances. 2. Public fire hydrants located within a 500-foot radius of the proposed project may be used to provide the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent property shall not be used to provide required fire flow. 3. Firewater plans are required for all projects that must extend the existing water supply to or onto the site. Building permits will not be issued until firewater plans are approved. 4. On all site plans to be submitted for review, show all fire hydrants located within 600-feet of the proposed project site. FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems 1. Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant shall submit plans, specifications and calculations for the fire sprinkler system underground supply piping. Approval of the underground supply piping system must be obtained prior to submitting the overhead fire sprinkler system plans. FSC-4 Requirement for an Automatic Fire Sprinkler Systems Rancho Cucamonga Fire District Ordinance 15, the 2001 California Fire Code and/or any other applicable standards require an approved automatic fire sprinkler system to be installed in: 1. Commercial or industrial structures greater than 7,500 square feet. 2. Assembly and Educational Occupancy Buildings. 3. "All structures that do not meet Fire District access requirements (see Fire Access). 4. When required fire flow cannot be provided due to inadequate volume or pressure. 5. When buildings do not meet the requirements of the 2001 California Building Code and the RCFPD Fire Department Access - Fire Lane Standard 9-7 6. When any applicable code or standard requires the structure to be sprinklered. FSC-5 Fire Alarm System 1. RCFPD Ordinance 15, based on use or floor area (or by other adopted codes or standards) requires an automatic and/or manual fire alarm system. Refer to RCFPD Ordinances 15 and 39, the California Building Code, RCFPD Fire Alarm Standard #10-6 and/or the California Fire Code. 2 2. Prior to any removal, remodel, modification and/or additions to the building or suite's fire alarm system, Fire Construction Services' approval and a building permit must be obtained. Plans and specifications shall be submitted to Fire Construction Services in accordance with RCFPD Fire Alarm Standard #10-6. 3. Based on the number of sprinkler heads; the sprinkler system is required to monitored by a listed central station fire alarm system. FSC-6 Fire District Site Access Fire District access roadways include public roads, streets, and highways, as well as private roads, streets drive aisles and/or designated fire lanes. Please reference the RCFPD Fire Lanes Standard 9-7 1. Location of Access: All portions of the structures 1s' story exterior wall shall be located within 150-feet of Fire District vehicle access, measure on an approved route around the exterior of the building. Landscaped areas, unpaved changes in elevation, gates and fences are deemed obstructions. 2. Specifications for private Fire District access roadways per the RCFPD Standards are: a. The minimum unobstructed width is 26-feet. b. The maximum inside turn radius shall be 20-feet. C. The minimum outside turn radius shall be 46-feet. d. The minimum radius for cul-de-sacs is 45-feet. e. The minimum vertical clearance is 14-feet, 6-inches. f. At any private entry median, the minimum width of traffic lanes shall be 20-feet on each side. g. The angle of departure and approach shall not exceed 9-degrees or 20 percent. h. The maximum grade of the driving surface shall not exceed 12%. i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW). j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a minimum of 14-feet, 6-inches from the ground up. Vegetation shall not be allowed to obstruct Fire Department apparatus. 3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be provided as follows: a. In buildings without high-piled storage, access shall be provided in accordance with the 2001 California Building Code, Fire and/or any other applicable standards. b. In buildings with high-piled storage access doors shall be provided in each 100 lineal feet or major fraction thereof, of the exterior wall that faces the required access 3 roadways. When railways are installed provisions shall be made to maintain Fire District access to all required openings. 4. Access Walkways: Hardscaped access walkways shall be provided from the fire apparatus access road to all required building exterior openings. 5. Commercial/Industrial Gates: Any gate installed across a Fire Department access road shall be in accordance with Fire District Standard #9-2. The following design requirements apply: a. The gate shall be motorized and slide open horizontally or swing inward. b. All gates must open at the rate of one second for each one-foot of required width. C. When fully open, the minimum width shall be 20-feet. d. Gates are not required to be motorized. 6. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site plan illustrating the proposed delineation that meets the minimum Fire District standards shall be included in the architectural plans submitted to B&S for approval. 7. Approved Fire Department Access: Any approved mitigation measures must be clearly noted on the site plan. A copy of the approved Alternative Method application, if applicable, must be reproduced on the architectural plans submitted to B&S for plan review. FSC-10 Occupancy and Hazard Control Permits Listed are those Fire Code permits commonly associated with the business operations and/or building construction. Plan check submittal is required with the permit application for approval of the permit; field inspection is required prior to permit issuance. General Use Permit shall be required for any activity or operation not specifically described below, which in the judgment of the Fire Chief is likely to produce conditions that may be hazardous to life or property. • Battery Systems • Candles and open flames in public assemblies • Compressed Gases • Public Assembly • Cryogenics • Dry Cleaning Plants • Refrigeration Systems • Repair Garages • Flammable and Combustible Liquids • Spraying or Dipping Operations • Hazardous Materials • Tents, Canopies and/or Air Supported Structures 4 • Liquefied Petroleum Gases • LPG or Gas Fuel Vehicles in Assembly Buildings FSC-11 Hazardous Materials— Submittal to the County of San Bernardino The San Bernardino County Fire Department shall review your Business Emergency/Contingency Plan for compliance with minimum standards. Contact the San Bernardino County Fire, Hazardous Materials Division at (909) 387-4631 for forms and assistance. The County Fire Department is the Cal/EPA Certified Unified Program Agency (CUPA) for the City of Rancho Cucamonga. 1. If the facility is a NEW business, a Certificate of Occupancy issued by Building & Safety will not be finalized until the San Bernardino County Fire Department reviews your Business Emergency/Contingency Plan. California Government Code, Section 65850.2 prohibits the City from issuing a final Certificate of Occupancy unless the applicant has met or is meeting specific hazardous materials disclosure requirements. A Risk Management Program (RMP) may also be required if regulation substances are to be used or stored at the new facility. 2. Any business that operates on rented or leased property which is required to submit a Plan, is also required to submit a notice to the owner of the property in writing stating that the business is subject to the Business Emergency/Contingency Plan mandates and has complied with the provisions. The tenant must provide a copy of the Plan to the property owner within five (5) working days, if requested by the owner. FSC-12 Hazardous Materials - Submittal to Fire Construction Services Plans shall be submitted and approved prior to construction of buildings and/or the installation of equipment designed to store, use or dispense hazardous materials in accordance with the 2001 California Building, Fire, Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances FD15 and FD39 and other implemented and/or adopted standards. FSC-13 Alternate Method Application Fire Construction Services staff and the Fire Marshal will review all requests for alternate method, when submitted. The request must be submitted on the Fire District "Application for Alternate Method" form along with supporting documents and payment of the $92 review fee. FCS-14 Map Recordation 1. Reciprocal Access Agreement: The plan as submitted indicate that the required Fire Department access: a. Is located on property which is not under the control of the applicant; or b. Crosses a property line; or C. Is shared by multiple owners; or d. Is located on common space under the control of an owner's association Please provide a permanent access agreement granting irrevocable use of the property to the Fire District. The agreement shall include a statement that no obstruction, gate, fence, building or other structure shall be placed within the dedicated access without Fire District approval. The recorded agreement shall include a copy of the site plan. The agreement 5 shall be presented to Fire Construction Services for review and approval, prior to recordation. The agreement shall be recorded with the Recorder's Office, County of San Bernardino. To assist Fire Construction Services in reviewing the agreement the following shall be included in the submittal: a. The current title reports to provide a legal description and proof of ownership for all properties included in the agreement. b. The assessor's parcel numbers of each parcel subject to the agreement. C. A scaled site plan showing the path of the Fire District access, the width, turn radii and slope of roadway surface shall be provided. The access roadway shall comply with the requirements of the RCFPD Fire Lane Standard #9-7. 2. Reciprocal Water Covenant and Agreement: The plans as submitted indicate that a required private fire mains or appurtenances a. Pass through or are located on property not under the control of the applicant; or b. Crosses a property line; or C. Provide service to adjacent properties; or d. Is located on common space under the control of an owner's association; or e. Is shared by multiple owners. Please provide a permanent maintenance and service agreement between the owner for the private water mains, fire hydrants and fire protection equipment essential to the water supply. The agreement shall meet the form and content approved by the Rancho Cucamonga Fire District. The agreement shall be submitted to Fire Construction Services for review and approval, prior to recordation. The agreement shall be recorded within the Recorder's Office, County of San Bernardino. Chronological Summary of RCFPD Standard Conditions PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to the issuance of any building permits: 1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans, specifications, flow test data and calculations for the private water main system for review and approval by the Fire District. Plans and installation shall comply with Fire District Standards. Approval of the on-site (private) fire underground and water plans is required prior to any building permit issuance for any structure on the site. Private on-site combination domestic and fire supply system must be designed in accordance with RCFPD Standards # 9-4, #10-2 and #10-4. The Building & Safety Division and Fire Construction Services will perform plan checks and inspections. 6 2. All private on-site fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. Fire construction Services will inspect the installation, witness hydrant flushing and grant a clearance before lumber is dropped. 3. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and CCWD. On the plan, show all existing fire hydrants within a 600-foot radius of the project. Please reference the RCFPD Water Plan Submittal Procedure Standard 9-8. 4. All required public fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. CCWD personnel shall inspect the installation and witness the hydrant flushing. Fire Construction Services shall inspect the site after acceptance of the public water system by CCWD. Fire Construction Services must grant a clearance before lumber is dropped. 5. Construction Access: The access roads must be paved in accordance with all the requirements of the RCFPD Fire Lane Standard #9-7. All temporary utilities over access roads must be installed at least 14' 6" above the finished surface of the road. 6. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is responsible for obtaining the fire flow information from CCWD and submitting the letter to Fire Construction Services. 7. Easements and Reciprocal Agreements: All easements and agreements must be recorded with the County of San Bernardino. PRIOR TO THE RELEASE OF TEMPORARY POWER The building construction must be substantially completed in accordance with Fire Construction Services' "Temporary Power Release Checklist and Procedures". PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers". On private property, the markers shall be installed at the centerline of the fire access road, at each hydrant location. 2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in the presence of Fire Construction Services, shall conduct a test of the most hydraulically remote on-site fire hydrants. The underground fire line contractor, developer and/or owner are responsible for hiring the company to perform the test. A final test report shall be submitted to Fire Construction Services verifying the fire flow available. The fire flow available must meet or exceed the required fire flow in accordance with the California Fire Code. 3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler system(s) shall be tested and accepted by Fire Construction Services. 4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler monitoring system must be tested and accepted by Fire Construction Services.. 7 The fire sprinkler monitoring system shall be installed, tested and operational immediately following the completion of the fire sprinkler system (subject to the release of power). 5. Fire Suppression Systems and/or other special hazard protection systems shall be inspected, tested and accepted by Fire Construction Services before occupancy is granted and/or equipment is placed in service. 6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm system shall be installed, inspected, tested and accepted by Fire Construction Services. 7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular gates must be inspected, tested and accepted in accordance with RCFPD Standards #9-1 or#9-2 by Fire Construction Services. 8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access roadways must be installed in accordance with the approved plans and acceptable to Fire Construction Services. 9. The CC&R's, the reciprocal agreement and/or other approved documents shall be recorded and contain an approved fire access roadway map with provisions that prohibit parking, specify the method of enforcement and identifies who is responsible for the required annual inspections and the maintenance of all required fire access roadways. 10. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and multi-family buildings shall post the address with minimum 8-inch numbers on contrasting background, visible from the street and electrically illuminated during periods of darkness. When the building setback exceeds 200 feet from the public street, an additional non- illuminated 6-inch minimum number address shall be provided at the property entrance. Larger address numbers will be required on buildings located on wide streets or built with large setbacks in multi-tenant commercial and industrial buildings. The suite designation numbers and/or letters shall be provided on the front and back of all suites. 11. Hazardous Materials: Prior to the issuance of a Certificate of Occupancy, the applicant must demonstrate (in writing from the County) that the facility has met or is meeting the Risk Management Plan (RMP) or Business Emergency/Contingency Plan with the San Bernardino County Fire Department, Hazardous Materials/Emergency Response and Enforcement Division. The applicant must also obtain inspection and acceptance by Fire Construction Services. 12. Confidential Business Occupancy Information: The applicant shall complete the Rancho Cucamonga Fire District "Confidential Business Occupancy Information" form. This form provides contact information for Fire District use in the event of an emergency at the subject building or property. This form must be presented to the Fire Construction Services Inspector. 13. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, a 8 Y2" x 11" or 11" x 17" site plan of the site in accordance with RCFPD Standard #13-1 shall be revised by the applicant to reflect the actual location of all devices and building features as required in the standard. The site plan must be reviewed and accepted by the Fire Inspector. 8