HomeMy WebLinkAbout05-85 - Resolutions RESOLUTION NO. 05-85
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA,CALIFORNIA,APPROVING CONDITIONAL USE
PERMIT DRC2005-00068, FOR PHASED CONSTRUCTION OF A NEW
GOLF COURSE CLUBHOUSE, INCLUDING BANQUET FACILITIES,
DINING ROOM, KITCHEN, PARKING, AND RELATED AMENITIES
LOCATED IN THE LOW RESIDENTIAL DISTRICT; AND MAKING
FINDINGS IN SUPPORT THEREOF —APN: 0207-101-03, 23, AND 35.
A. Recitals.
1. Red Hill Country Club Inc. filed an application that includes the new clubhouse facility
including banquet facilities, dining room, kitchen, parking and related amenities for the issuance of
Conditional Use Permit No. DRC2005-00068,as described in the title of this Resolution. Hereinafter
in this Resolution, the subject Conditional Use Permit request is referred to as "the application."
2. Section 17.08-2 of the Rancho Cucamonga Development Code requires a Conditional
Use Permit for Clubs or Lodges as well as non-commercial Outdoor Recreation Facilities.
3. On the 14th day of September 2005, the Planning Commission of the City of Rancho
Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing
on that date.
4. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning
Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing on September 14, 2005, including written and oral staff reports,
together with public testimony, this Commission hereby specifically finds as follows:
a. The application applies to the property located at 8358 Red Hill Country Club Drive
with a street frontage of 204.45 feet on Red Hill Country Club Drive and lot depth of 292 feet on the
south side of Red Hill Country Club Drive and is presently improved with an existing clubhouse
facility surrounded by an 18-hole golf course; and
b. The proposed clubhouse will be located in the same place as the existing
clubhouse (that will be demolished) and of similar floor area.
C. The property to the north of the subject site is single-family residential,the property
to the south consists of single family residential, the property to the east is single-family residential,
and the property to the west is an 18-hole golf course; and
PLANNING COMMISSION RESOLUTION NO.05-85
DRC2005-00068 — RED HILL COUNTRY CLUB INC.
September 14, 2005
Page 2
d. The proposed use; together with the applicable thereto, will not be detrimental to
the public health, safety, or welfare or materially injurious to the properties or improvements in the
vicinity; and
e. The applicant conducted a neighborhood meeting on July 21, 2005, to inform the
surrounding neighborhood residents of the proposed project to obtain feedback.
3. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing and upon the specific findings of facts set forth in paragraphs 1
and 2 above, this Commission hereby finds and concludes as follows:
a. The proposed use is in accord with the General Plan, the objectives of the
Development Code, and the purposes of the district in which the site is located.
b. The proposed use, together with the conditions applicable thereto, will not be
detrimental to the public health, safety, or welfare or materially injurious to properties or
improvements in the vicinity.
C. The proposed use complies with each of the applicable provisions of the
Development Code.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration, togetherwith all written and oral reports included for the environmental assessmentfor
the application,the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and
Monitoring Program attached hereto, and incorporated herein by this reference, based upon the
findings as follows:
a. That the Mitigated Negative Declaration has been prepared in compliance with the
California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines
promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared
therefore reflect the independent judgment of the Planning Commission; and, further, this
Commission has reviewed and considered the information contained in said Mitigated Negative
Declaration with regard to the application.
b. Although the Mitigated Negative Declaration identifies certain significant
environmental effects that will result if the project is approved, all significant effects have been
reduced to an acceptable level by imposition of mitigation measures on the project which are listed
below as conditions of approval.
C. Pursuant to the provisions of Section 753.5(c)of Title 14 of the California Code of
Regulations, the Planning Commission finds as follows: In considering the record as a whole, the
Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the
proposed project will have potential for an adverse impact upon wildlife resources or the habitat
upon which wildlife depends. Further, based upon the substantial evidence contained in the
Mitigated Negative Declaration, the staff reports and exhibits, and the information provided to the
Planning Commission during the public hearing, the Planning Commission hereby rebuts the
presumption of adverse effect as set forth in Section 753.5(c-1-d)of Title 14 of the California Code
of Regulations.
PLANNING COMMISSION RESOLUTION NO.05-85
DRC2005-00068 — RED HILL COUNTRY CLUB INC.
September 14, 2005
Page 3
5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth
below and in the Standard Conditions, attached hereto and incorporated herein by this reference.
Planning Department
1) Approval of the two-story, 35,176 square foot clubhouse facility is
granted. Any expansion of the building, golf course, or hours of
operation shall be brought back and reviewed by the Planning
Commission.
2) Approval of the project is subject to all conditions stated by the Design
Review Committee and should incorporate all architectural details,
rockwork, style, and color of the building approved on August 2, 2005.
3) Tree Removal Permit DRC2005-00468 is hereby approved for the
removal of select trees for the development of the site. The applicant
shall be required to remove and replace the trees subject to the
Environmental Mitigation Biological Resources Conditions. The Tree
Removal Permit is valid for 60 days from the date of issuance of
Building and or Grading Permits. Replacement trees shall be planted
prior to final occupancy release.
4) All the retaining walls facing the public view shall be constructed of
decorative stacked stone to match the new clubhouse facility, subject
to review and approval by the City Planner.
5) The applicant shall obtain written permission from any adjacent
homeowners for off-site grading prior to issuance of Grading Permits.
6) Planter areas located in the parking lot shall provide a minimum of 5
feet between the landscape area and the retaining walls to allow
mature tree growth.
7) If a new entrance and kiosk is proposed at a later date, the applicant
shall submit the revisions to the Planning Department for approval of a
Minor Development Review.
8) The temporary facilities for the clubhouse use during the construction
shall be limited to the said trailer facilities described within the
development plans and staff report. Any additional temporary facilities
shall be subject to approval of the City Planner.
9) The temporary facilities shall be removed within 30 days after final
occupancy of the new clubhouse.
10) Temporary facilities such as generators,pumps,and temporary utilities
shall be screened and the-noise shall be mitigated at all times. The
applicant shall provide temporary enclosures and/or barricades around
any such utilities.
PLANNING COMMISSION RESOLUTION NO.05-85
DRC2005-00068 — RED HILL COUNTRY CLUB INC.
September 14, 2005
Page 4
11) The business owner shall at all times fully comply with all applicable
regulations of the Department of Alcoholic Beverage Control.
12) The temporary hours of operation shall be limited to 7:00 a.m. to dusk
for all temporary facilities.
13) Once the new building is constructed, the original hours of operation
will resume, Wednesday and Friday 7:00 a.m. to 12:00 a.m.; Sunday,
Tuesday, Thursday, and Saturday 7:00 a.m. to 9:00 p.m., with the golf
course opening at 6:30 a.m. Saturday and Sunday. Should any
expansion of the hours of operation occur,the project shall be brought
back for review and approval of the Conditional Use Permit.
Engineering Department
1) Red Hill Country Club Drive (east/west)frontage improvements should
be in accordance with City "Local Street' standards as allowed and
including:
a) Provide curb and gutter, sidewalk, 5800 Lumens HPSV street
lights, street trees,two(2) R26"No Parking"signs, access ramp,
and driveway, as required.
b) Protect and/or provide additional traffic signing and signage as
required.
c) Provide a turn around at the westerly terminus of Red Hill Country
Club Drive.
d) The gated entrance shall be in accordance with the City Gated
Entrance Design Guide.
e) Additional street dedication may be required during technical plan
check of the street improvement plans.
f) The existing overhead utilities (telecommunications and
electrical), on the project side of Red Hill Country Club Drive,
shall be undergrounded from the first pole off-site east of the
clubhouse entrance to the first pole off-site east of Alta Cuesta
Drive, prior to public improvement acceptance or occupancy,
whichever occurs first. All services crossing Red Hill Country
Club Drive shall be undergrounded at the same time. The
developer may request a reimbursement agreement to recover
one-half the City adopted cost for undergrounding from future
development as it occurs on the opposite side of the street. If the
developer fails to submit said reimbursement within 6 months of
the public improvements being accepted by the City, all rights of
the developer to reimbursement shall terminate.
2) Red Hill Country Club Drive (south of RHCCD)frontage improvements
to be in accordance with City"Local Street'standards as required and
including:
PLANNING COMMISSION RESOLUTION NO.05-85
DRC2005-00068 — RED HILL COUNTRY CLUB INC.
September 14, 2005
Page 5
a) Provide curb and gutter, sidewalk, 5800 Lumens HPSV
streetlights, street trees, and R26 "No Parking" signs, as
required.
b) Protect and/or provide additional traffic signing and signage, as
required.
c) The new driveway between Calle Carabe Place and Red Hill
Country Club Drive (east/west), to be signed "Emergency
Entrance Only." The drive approach shall be a minimum width of
35 feet, per City Standard 101 Type C.
d) Provide "Advance Driveway" warning signs for the proposed
"Temporary Parking Lot/Access"to Red Hill Country Club Drive,
in advance of the driveway because of the curves and the limited
visibility.
e) Additional street dedication may be required during technical plan
check of the street improvement plans.
f) An in-lieu fee as contribution to the future undergrounding of the
existing overhead utilities (telecommunications and electrical,
except for the 66KV electrical) on the opposite side of Red Hill
Country Club Drive shall be paid to the City prior to issuance of
Building Permits. The fee shall be one-half the City adopted
amount times the length of the existing overhead utilities opposite
the Red Hill Country Club Golf Course.
3) Process a Certificate of Compliance for a Lot Line Adjustment, prior to
the issuance of Building Permit.
4) Process a vacation of Red Hill Country Club Drive that encroaches
onto the parking lot, prior the issuance of Building Permit.
5) The Water Quality Management Plan (WQMP) submitted with the
project application has been reviewed and found to be substantially
complete. Include the Best Management Practices(BMPs)identified in
the plan on Grading Plans when submitted for technical plan check.
Environmental Mitigation
Air Quality
1) All construction equipment shall be maintained in good operating
condition so as to reduce operational emissions. The contractor shall
ensure that all construction equipment is being properly serviced and
maintained as per manufacturers'specifications. Maintenance records
shall be available at the construction site for City verification.
2) Prior to the issuance of any Grading Permits, the developer shall
submit construction plans to City denoting the proposed schedule and
projected equipment use. The construction contractors shall provide
PLANNING COMMISSION RESOLUTION NO.05-85
DRC2005-00068— RED HILL COUNTRY CLUB INC.
September 14, 2005
Page 6
evidence that low-emission mobile construction equipment will be
utilized,or that their use was investigated and found to be infeasible for
the project. Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality Management District
(SCAQMD) as well as City Planning Staff.
3) All paints and coatings shall meet or exceed performance standards
noted in SCAQMD Rule 1113. Paints and coatings shall be applied
either by hand or high-volume, low-pressure spray.
4) All asphalt shall meet or exceed performance standards noted in
SCAQMD Rule 1108.
5) All construction equipment shall comply with SCAQMD Rules 402 and
403. Additionally, contractors shall include the following provisions:
• Reestablish ground cover on the construction site through
seeding and watering.
• Pave or apply gravel to any on-site haul roads.
• Phase grading to prevent the susceptibility of large areas to
erosion over extended periods of time.
• Schedule activities to minimize the amounts of exposed
excavated soil during and after the end of work periods.
• Dispose of surplus excavated material in accordance with local
ordinances and use sound engineering practices.
• Sweep streets according to a schedule established by the City if
silt is carried over to adjacent public thoroughfares or occurs as a
result of hauling. Timing may vary depending upon the time of
year of construction.
• Suspend grading operations during high winds (i.e.,wind speeds
exceeding 25 mph) in accordance with Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils haul trucks
or cover payloads using tarps or other suitable means.
6) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and Regional Water Quality Control Board
[RWQCBj) daily to reduce PM10 emissions, in accordance with
SCAQMD Rule 403.
7) Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be
applied to all inactive construction areas that remain inactive for 96
hours or more to reduce PM10 emissions.
8) The construction contractor shall utilize electric or clean alternative fuel
powered equipment where feasible.
PLANNING COMMISSION RESOLUTION NO.05-85
DRC2005-00068— RED HILL COUNTRY CLUB INC.
September 14, 2005
Page 7
9) The construction contractor shall ensure that construction-grading
plans include a statement that work crews will shut off equipment when
not in use.
10) All industrial and commercial facilities shall post signs requiring that
trucks shall not be left idling for prolonged periods (i.e., in excess of 10
minutes).
11) All industrial and commercial facilities shall designate preferential
parking for vanpools.
12) All residential and commercial structures shall be required to
incorporate high-efficiency/low-polluting heating, air conditioning,
appliances, and water heaters.
13) All residential and commercial structures shall be required to
incorporate thermal pane windows and weather-stripping.
Cultural
1) If any prehistoric archaeological resources are encountered before or
during grading, the developer will retain a qualified archaeologist to
monitor construction activities,to take appropriate measures to protect
or preserve them for study. With the assistance of the archaeologist,
the City of Rancho Cucamonga will:
• Enact interim measures to protect undesignated sites from
demolition or significant modification without an opportunity for
the City to establish its archaeological value.
• Consider establishing provisions to require incorporation of
archaeological sites within new developments,using their special
qualities as a theme or focal point.
• Pursue educating the public about the area's archaeological
heritage.
• Propose mitigation measures and recommend conditions of
approval to eliminate adverse project effects on significant,
important, and unique prehistoric resources, following
appropriate California Environmental Quality Act (CEQA)
guidelines.
• Prepare a technical resources management report,documenting
the inventory, evaluation, and proposed mitigation of resources
within the project area. Submit one copy of the completed report
with original illustrations, to the San Bernardino County
Archaeological Information Center for permanent archiving.
2) If any paleontological resource (i.e. plant or animal fossils) are
encountered before or during grading, the developer will retain a
qualified paleontologist to monitor construction activities, to take
appropriate measures to protect or preserve them for study. The
PLANNING COMMISSION RESOLUTION NO.05-85
DRC2005-00068 — RED HILL COUNTRY CLUB INC.
September 14, 2005
Page 8
paleontologist shall submit a report of findings that will also provide
specific recommendations regarding further mitigation measures (i.e.,
paleontological monitoring)that may be appropriate. Where mitigation
monitoring is appropriate, the program must include, but not be limited
to, the following measures:
• Assign a paleontological monitor, trained and equipped to allow
the rapid removal of fossils with minimal construction delay, to
the site full-time during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared or graded,
divert earth-disturbing activities elsewhere until the monitor has
completed salvage. If construction personnel make the
discovery, the grading contractor should immediately divert
construction and notify the monitor of the find.
• Submit a summary report to the City of Rancho Cucamonga.
Transfer collected specimens with a copy of the report to the San
Bernardino County Museum.
Geology and Soils
1) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and RWQCB) daily to reduce Particulate
Matter (PM10) emissions, in accordance with SCAQMD Rule 403 or
re-planted with drought resistant landscaping as soon as possible.
2) Frontage public streets shall be swept according to a schedule
established by the City to reduce PM10 emissions associated with
vehicle tracking of soil off-site. Timing may vary depending upon the
time of year of construction.
3) Grading operations shall be suspended when wind speeds exceed
25 mph to minimize PM10 emissions from the site during such
episodes.
4) Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be
applied to all inactive construction areas that remain inactive for 96
hours or more to reduce PM10 emissions.
Hydrology and Water Quality
1) Prior to issuance of grading permits, the permit applicant shall submit
to Building Official for approval, Storm Water Pollution Prevention Plan
(SWPPP)specifically identifying Best Management Practices (BMPs)
that shall be used on-site to reduce pollutants during construction
activities entering the storm drain system to the maximum extent
practical.
2) An erosion control plan shall be prepared, included in grading plan,
and implemented for the proposed project that identifies specific
measures to control on-site and off-site erosion from the time of ground
disturbing activities are initiated through completion of grading. This
erosion control plan shall include the following measures at a
minimum: a) Specify the timing of grading and construction to
PLANNING COMMISSION RESOLUTION NO.05-85
DRC2005-00068 — RED HILL COUNTRY CLUB INC.
September 14, 2005
Page 9
minimize soil exposure to rainy periods experienced in southern
California, and b) An inspection and maintenance program shall be
included to ensure that any erosion which does occur either on-site or
off-site as a result of this project will be corrected through a
remediation or restoration program within a specified time frame.
3) During construction, temporary berms such as sandbags or gravel
dikes must be used to prevent discharge of debris or sediment from the
site when there is rainfall or other runoff.
4) During construction, to remove pollutants, street cleaning will be
performed prior to storm events and after the use of water trucks to
control dust in order to prevent discharge of debris or sediment from
the site.
5) All drainage shall be diverted away from the trash enclosure area.
6) The developer shall implement the BMPs identified in the Water
Quality Management Plan prepared by CIVILTEC
Engineering/February 2005 to reduce pollutants after construction
entering the storm drain system to the maximum extent practical.
7) Landscaping plans shall include provisions for controlling and
minimizing the use of fertilizers/pesticides/herbicides. Landscaped
areas shall be monitored and maintained for at least two years to
ensure adequate coverage and stable growth. Plans for these areas,
including monitoring provisions for a minimum of two years, shall be
submitted to the City for review and approval prior to the issuance of
Grading Permits.
8) Prior to issuance of Building Permits, the applicant shall submit to the
City Engineer for approval of a Water Quality Management Plan
(WQMP), including a project description and identifying Best
Management Practices (BMPs) that will be used on-site to reduce
pollutants into the storm drain system to the maximum extent
practicable. The WQMP shall identify the structural and non-structural
measures consistent with the Guidelines for New Development and
Redevelopment adopted by the City of Rancho Cucamonga in June
2004.
9) Prior to issuance of Grading or Paving Permits, the applicant shall
obtain a Notice of Intent(NOI)to comply with obtaining coverage under
the National Pollutant Discharge Elimination System(NPDES)General
Construction Storm Water Permit from the State Water Resources
Control Board. Evidence that this has been obtained (i.e., a copy of
the Waste Discharger's Identification Number)shall be submitted to the
City Building Official for coverage under the NPDES General
Construction Permit.
Noise
1) Construction or grading shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday.
2) Construction or grading noise levels shall not exceed the standards
PLANNING COMMISSION RESOLUTION NO.05-85
DRC2005-00068— RED HILL COUNTRY CLUB INC.
September 14, 2005
Page 10
specified in Development Code Section 17.02.120-D, as measured at
the property line. The developer shall hire a consultant to perform
weekly noise level monitoring as specified in Development Code
Section 17.02.120. Monitoring at other times may be required by the
Building Official. Said consultant shall report their findings to the
Building Official within 24 hours; however, if noise levels exceed the
above standards, then the consultant shall immediately notify the
Building Official. If noise levels exceed the above standards, then
construction activities shall be reduced in intensity to a level of
compliance with above noise standards or halted.
3) Haul truck deliveries shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday. Additionally, if heavy trucks used
for hauling would exceed 100 daily trips (counting both to and from the
construction site), then the developer shall prepare a Noise Mitigation
Plan denoting any construction traffic haul routes. To the extent
feasible, the Plan shall denote haul routes that do not pass sensitive
land uses or residential dwellings.
4) Construction or grading shall not take place between the hours of 8:00
p.m. and 6:30 a.m. on weekdays, including Saturday, or at anytime on
Sunday or a national holiday.
5) Construction or grading noise levels shall not exceed the standards
specified in Development Code Section 17.021.20-D, as measured at
the property line. The developer shall hire a consultant to perform
weekly noise level monitoring as specified in Development Code
Section 17.02.120. Monitoring at other times may be required by the
Building Oficial. Said consultant shall report their findings to the
Building Official within 24 hours; however, if noise levels exceed the
above standards, then the consultant shall immediately notify the
Building Official. If noise levels exceed the above standards, then
construction activities shall be reduced in intensity to a level of
compliance with above noise standards or halted.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 14TH DAY OF SEPTEMBER 2005.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY:
— �z -
Ct art, Chai a
ATTEST:;
ZiA6,1-
--E&�—Co�leman, ng Secretary
PLANNING COMMISSION RESOLUTION NO.05-85
DRC2005-00068 — RED HILL COUNTRY CLUB INC.
September 14, 2005
Page 11
I, Dan Coleman, Acting Secretary of the Planning Commission of the City of Rancho Cucamonga,
do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and
adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the
Planning Commission held on the 14th day of September 2005, by the following vote-to-wit:
AYES: COMMISSIONERS: FLETCHER, McNIEL, McPHAIL, STEWART
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: MACIAS
City of Rancho Cucamonga
MITIGATION MONITORING
PROGRAM
Project File No.: Conditional Use Permit DRC2005-00068
This Mitigation Monitoring Program(MMP)has been prepared for use in implementing the mitigation
measures identified in the Mitigated Negative Declaration for the above-listed project. This program
has been prepared in compliance with State law to ensure that adopted mitigation measures are
implemented (Section 21081.6 of the Public Resources Code).
Program Components -This MMP contains the following elements:
1. Conditions of approval that act as impact mitigation measures are recorded with the action and
the procedure necessary to ensure compliance.The mitigation measure conditions of approval
are contained in the adopted Resolution of Approval for.the project.
2. A procedure of compliance and verification has been outlined for each action necessary. This
procedure designates who will take action, what action will be taken and when, and to whom
and when compliance will be reported.
3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring
progresses, changes to compliance procedures may be necessary based upon
recommendations by those responsible for the program.
Program Management -The MMP will be in place through all phases of the project. The project
planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project
planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly
and proper action is taken on each mitigation. Each City department shall ensure compliance of the
conditions (mitigation) that relate to that department.
Procedures -The following steps will be followed by the City of Rancho Cucamonga.
1. A fee covering all costs and expenses, including any consultants'fees, incurred by the City in
performing monitoring or reporting programs shall be charged to the applicant.
2. A MMP Reporting Form will be prepared for each potentially significant impact and its
corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached
hereto. This procedure designates who will take action,what action will be taken and when,and
to whom and when compliance will be reported. All monitoring and reporting documentation will
be kept in the project file with the department having the original authority for processing the
project. Reports will be available from the City upon request at the following address:
City of Rancho Cucamonga - Lead Agency
Planning Department
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
3. Appropriate specialists will be retained if technical expertise beyond the City staffs is needed,as
DRC2005-00068
RED HILL COUNTRY CLUB, INC.
Page 2
determined by the project planner or responsible City department,to monitor specific mitigation
activities and provide appropriate written approvals to the project planner.
4. The project planner or responsible City department will approve, by signature and date, the
completion of each action item that was identified on the MMP Reporting Form. After each
measure is verified for compliance, no further action is required for the specific phase of
development.
5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off
as completed by the project planner or responsible City department at the bottom of the MMP
Reporting Form.
6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation
measures. The project planner is responsible for approving any such refinements or additions.
An MMP Reporting Form will be completed by the project planner or responsible Citydepartment
and a copy provided to the appropriate design, construction, or operational personnel.
7. The project planner or responsible City department has the authority to stop the work of
construction contractors if compliance with any aspects of the MMP is not occurring after written
notification has been issued. The project planner or responsible City department also has the
authority to hold certificates of occupancies if compliance with a mitigation measure attached
hereto is not occurring. The project planner or responsible City department has the authority to
hold issuance of a business license until all mitigation measures are implemented.
8. Any conditions (mitigation) that require monitoring after project completion shall be the
responsibility of the City of Rancho Cucamonga Planning Division.The Division shall require the
applicant to post any necessary funds (or other forms of guarantee)with the City. These funds
shall be used by the City to retain consultants and/or pay for City staff time to monitor and report
on the mitigation measure for the required period of time.
9. In those instances requiring long-term project monitoring, the applicant shall provide the City
with a plan for monitoring the mitigation activities at the project site and reporting the monitoring
results to the City. Said plan shall identify the reporter as an individual qualified to know whether
the particular mitigation measure has been implemented. The monitoring/reporting plan shall
conform to the City's MMP and shall be approved by the Community Development Director or
City Planner prior to the issuance of building permits.
MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III)
Project File No.: DRC2005-00068 Applicant: Red Hill Country Club Inc.
Initial Study Prepared by: Emily Cameron Date: August 9. 2005
Mitigation . . . - Monitoring Timing of Method of Verified Sanctions for
ActionImplementing . Date 11nitials Non-Compliance
Air Quality
All construction equipment shall be maintained in good CP C Review of Plans A/C 2/4
operating condition so as to reduce operational
emissions. The contractor shall ensure that all
construction equipment is being properly serviced and
maintained as per manufacturers' specifications.
Maintenance records shall be available at the
construction site for City verification.
Prior to the issuance of any Grading Permits, the CP/BO C Review of Plans C 2
developer shall submit Construction Plans to the City
denoting the proposed schedule and projected
equipment use. Construction contractors shall provide
evidence that low-emission mobile construction
equipment will be utilized, or that their use was
investigated and found to be infeasible for the project.
Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality
Management District (SCAQMD) as well as City
Planning staff.
All paints and coatings shall meet or exceed CP C Review of Plans A/C 2/4
performance standards noted in SCAQMD Rule 1113.
Paints and coatings shall be applied either by hand or
high-volume, low-pressure spray.
All asphalt shall meet or exceed performance standards BO B Review of Plans A/C 2
noted in SCAQMD Rule 1108.
All construction equipment shall comply with SCAQMD BO C Review of Plans A/C 2/4
Rules 402 and 403. Additionally, contractors shall
include the following provisions:
• Reestablish ground cover on the construction site BO C Review of Plans A/C 2/4
through seeding and watering.
1 of 9
Mitigation Measures No.
Responsible g of Method .
Implementing Action for Monitoring Frequency Verification Verification
Date/initials Non-Compliance
• Pave or apply gravel to any on-site haul roads. BO C Review of Plans A/C 2/4
• Phase grading to prevent the susceptibility of large g0 C Review of Plans 'A/C 2/4
areas to erosion over extended periods of time.
• Schedule activities to minimize the amounts of BO C Review of Plans A/C 2/4
exposed excavated soil during and after the end of
work periods.
• Dispose of surplus excavated material in BO C Review of Plans A 4
accordance with local ordinances and use sound
engineering ractices.
• Sweep streets according to a schedule established BO C During A 4
by the City if silt is carried over to adjacent public Construction
thoroughfares or occurs as a result of hauling.
Timing may vary depending upon the time of year of
construction.
• Suspend grading operations during high winds(i.e., BO C During A 4
wind speeds exceeding 25 mph)in accordance with Construction
Rule 403 re uirements.
• Maintain a minimum 24-inch freeboard ratio on soils BO C During A 4
haul trucks or cover payloads using tarps or other Construction
suitable means.
The site shall be treated with water or other BO C During A/C 4
soil-stabilizing agent (approved by SCAQMD and Construction
Regional Water Quality Control Board [RWQCB])daily
to reduce Particulate Matter (PM�o) emissions, in
accordance with SCAQMD Rule 403.
Chemical soil-stabilizers (approved by SCAQMD and BO C During A/C 4
RWQCB) shall be applied to all inactive construction Construction
areas that remain inactive for 96 hours or more to
reduce PM10 emissions.
The construction contractor shall utilize electric or clean BO C Review of Plans A/C 4
alternative fuel-powered equipment where feasible.
The construction contractor shall ensure that BO C Review of Plans A/C 2/4
Construction Grading Plans include a statement that
work crews will shut off equipment when not in use.
All industrial and commercial facilities shall post signs BO C During A 2/3
requiring that trucks shall not be left idling for prolonged Construction
periods (i.e., in excess of 10 minutes).
2of9
Mitigation • ResponsibleMonitoring
ImplementingAction
All industrial and commercial facilities shall designate CP C Review of Plans A/C 2/3
preferential parking for vanpools.
All residential and commercial structures shall be CP C Review of Plans A/C 2/3
required to incorporate high-efficiency/low-polluting
heating,air conditioning,appliances,and water heaters.
All residential and commercial structures shall be CP C Review of Plans A/C 2/3
required to incorporate thermal pane windows and
weather-stripping.
Biological Resources �'';.` ` "Y _?" .ti srt5`2 .e�; »'r g 5 �'Rt{+$ ✓� ` '',' �s.
The applicant is required to replace all 37 trees on-site CP C Review of Plans A/C 2
at a 1 to 1 ratio, with a minimum tree size of 15-gallon.
Cultural Resources
If any prehistoric and archeological resources are CP/BO C Review of A/D 3/4
encountered before or during grading,the developer will Report
retain a qualified archeologist to monitor construction
activities, to take appropriate measures to protect or
preserve them for study. With the assistance of the
archaeologist, the City of Rancho Cucamonga will:
• Enact interim measures to protect undesignated CP/BO C Review of A/D 3/4
sites from demolition or significant modification Report
without an opportunity for the City to establish its
archaeological value.
• Consider establishing provisions to require CP/BO C Review of A/D 3/4
incorporation of archaeological sites within new Report
developments, using their special qualities as a
theme or focal point.
• Pursue educating the public about the area's CP/BO C Review of A/D 3/4
archaeological heritage. Report
• Propose mitigation measures and recommend CP/BO C Review of A/D 3/4
conditions of approval to eliminate adverse project Report
effects on significant, important, and unique
prehistoric resources, following appropriate
California Environmental Quality Act (CEQA)
guidelines.
3of9
Mitigation Measures No.
Responsible of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
• Prepare a technical resources management report, CP C Review of AID 3/4
documenting the inventory, evaluation, and
Report
proposed mitigation of resources within the project
area. Submit one copy of the completed report,with
original illustrations, to the San Bernardino County
Archaeological Information Center for permanent
archiving.
If any paleontological resource (i.e. plant or animal CP B Review of A/D 4
fossils) is encountered before or during grading, the Report
developer will retain a qualified paleontologist to monitor
construction activities, to take appropriate measures to
protect or preserve them for study. The paleontologist
shall submit a report of findings that will also provide
specific recommendations regarding further mitigation
measures (i.e., paleontological monitoring)that may be
appropriate. Where mitigation monitoring is appropriate,
the program must include, but not be limited to, the
following measures:
• Assign a paleontological monitor, trained and CP B Review of A/D 4
equipped to allow the rapid removal of fossils with Report
minimal construction delay, to the site full-time
during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared BO B/C Review of AID 4
or graded, divert earth-disturbing activities Report
elsewhere until the monitor has completed salvage.
If construction personnel make the discovery, the
grading contractor should immediately divert
construction and notify the monitor of the find.
• Submit a summary report to the City of Rancho CP D Review of D 3
Cucamonga. Transfer collected specimens with a Report
copy of the report to the San Bernardino County
Museum.
Geology and Soils
The site shall be treated with water or other BO C During A 4
soil-stabilizing agent (approved by SCAQMD and Construction
RWQCB)daily to reduce PM,o emissions,in accordance
with SCAQMD Rule 403 with drought resistant
landscaping as soon as possible.
4of9
Mitigation Measures No.I
Responsible g of Method .
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Frontage public streets shall be swept according to a CE C During A 4
schedule established by the City to reduce PM,o Construction
emissions associated with vehicle tracking of soil
off-site. Timing may vary depending upon the time of
year of construction.
Grading operations shall be suspended when wind BO C During A 4
speeds exceed 25 mph to minimize PM,o emissions Construction
from the site during such episodes.
Chemical soil-stabilizers (approved by SCAQMD and BO C During A 4
RWQCB) shall be applied to all inactive construction Construction
areas that remain inactive for 96 hours or more to
reduce PM,o emissions.
Hydrology and Water Quality '
Prior to issuance of Grading Permits, the permit BO B/C/D Review of Plans A/C 2/4
applicant shall submit to Building Official for approval a
Storm Water Pollution Prevention Plan (SWPPP)
specifically identifying Best Management Practices
(BMPs) that shall be used on-site to reduce pollutants
during construction activities entering the storm drain
system to the maximum extent practical.
An Erosion Control Plan shall be prepared, included in CE B/C/D Review of Plans A/C 2/4
the Grading Plan, and implemented for the proposed
project that identifies specific measures to control
on-site and off-site erosion from the time of ground
distribution activities are initiated through completion of
grading. This Erosion Control Plan shall include the
following measures at a minimum: a)Specify the timing
of grading and construction to minimize soil exposure to
rainy periods experienced in southern California,and b)
An inspection and maintenance program shall be
included to ensure that any erosion which does occur
either on-site or off-site as a result of this project will be
corrected through a remediation or restoration program
within a specified time frame.
5 of 9
Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification
Date/initials Non-Compliance
During construction, temporary berms such as CE B/C/D Review of Plans A/C 2/4
sandbags or gravel dikes must be used to prevent
discharge of debris or sediment from the site when there
is rainfall or other runoff.
During construction, to remove pollutants, street CE B/C/D Review of Plans A/C 2/4
cleaning will be performed prior to storm events and
after the use of water trucks to control dust in order to
prevent discharge of debris or sediment from the site.
All drainage shall be diverted away from the trash CE B/C/D Review of Plans A/C 2/4
enclosure area.
The developer shall implement the BMPs identified in CE B/C/D Review of Plans A/C 2/4
the Water Quality Management Plan(WQMP)prepared
by Madole and Associates, dated June 1, 2004, to.
reduce pollutants after construction entering the storm
drain system to the maximum extent practical.
Landscaping Plans shall include provisions for CE B/C/D Review of Plans A/C 2/4
controlling and minimizing the use of
fertilizers/pesticides/herbicides. Landscaped areas shall
be monitored and maintained for at least two years to
ensure adequate coverage and stable growth. Plans for
these areas, including monitoring provisions for a
minimum of two years,shall be submitted to the City for
review and approval prior to the issuance of Grading
Permits.
Prior to issuance of building permits,the applicant shall CE B/C/D Review of Plans A/C2/4
submit to the City Engineer for approval of a WQMP,
including a project description and identifying BMPs that
will be used on-site to reduce pollutants into the storm
drain system to the maximum extent practicable. The
WQMP shall identify the structural and non-structural
measures consistent with the Guidelines for New
Development and Redevelopment adopted by the City of
Rancho Cucamonga in June 2004.
6of9
Mitigation •
ImplementingActionfor Monitoring Frequency Verification Verification Date/initials Non-Compliance
Prior to issuance of Grading or Paving Permits, the CE B/C/D Review of Plans A/C 2/4
applicant shall obtain a Notice of Intent(NOI)to comply
with obtaining coverage under the National Pollutant
Discharge Elimination System (NPDES) General
Construction Storm Water Permit from the State Water
Resources Control Board. Evidence that this has been
obtained (i.e., a copy of the Waste Discharger's
Identification Number) shall be submitted to the City
Building Official for coverage under the NPDES General
Construction Permit.
N61Ses �.,.- ., X{._'#.ts`'"s" , E9s �!,'e+m! rr' ' ix.,nH t rs„pig 3 ! r a� k•"�rv7RE R r 1i s
�a �.,-as ri ra 1-! � +; �.
Construction or grading shall not take place between the BO B Review of Plans C 2
hours of 8:00 p.m. and 6:30 a.m. on weekdays,
including Saturday, or at any time on Sunday or a
national holiday.
Construction or grading noise levels shall not exceed the BO B Review of Plans C 2
standards specified in Development Code Section
17.02.120-D, as measured at the property line. The
developer shall hire a consultant to perform weekly
noise level monitoring as specified in Development
Code Section 17.02.120. Monitoring at other times may
be required by the Building Official. Said consultant
shall report their findings to the Building Official within 24
hours; however, if noise levels exceed the above
standards, then the consultant shall immediately notify
the Building Official. If noise levels exceed the above
standards,then construction activities shall be reduced
in intensity to a level of compliance with above noise
standards or halted.
7of9
Mitigation Measures No.I
Responsible g of Method .
Implementing Action for Monitoring Frequency Verification Verification
Date/Initials Non-Compliance
Haul truck deliveries shall not take place between the PO/BO B Review of Plans C 2
hours of 8:00 p.m. and 6:30 a.m. on weekdays,
including Saturday, or at any time on Sunday or a
national holiday. Additionally, if heavy trucks used for
hauling would exceed 100 daily trips (counting both to
and from the construction site),then the developer shall
prepare a Noise Mitigation Plan denoting any
construction traffic haul routes. To the extent feasible,
the Plan shall denote haul routes that do not pass
sensitive land uses or residential dwellings.
Construction or grading shall not take place between the PO/BO B Review of Plans A/C 2/4
hours of 8:00 p.m. and 6:30 a.m. on weekdays,
including Saturday, or at any time on Sunday or a During
national holiday. Construction
Construction or grading noise levels shall not exceed the PO/BO B Review of Plans A/C 2/4
standards specified in Development Code Section During
17.02.120-D, as measured at the property line. The Construction
developer shall hire a consultant to perform weekly
noise level monitoring as specified in Development
Code Section 17.02.120. Monitoring at other times may
be required by the Building Official. Said consultant
shall report their findings to the Building Official within 24
hours; however, if noise levels exceed the above
standards, then the consultant shall immediately notify
the Building Official. If noise levels exceed the above
standards, then construction activities shall be reduced
in intensity to a level of compliance with above noise
standards or halted.
Key to Checklist Abbreviations
'Responsible=Person MonitoringFregyency °, ' MetfiodofVerification _,., „ �' -' Sanctions
CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map
CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit
CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy
BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order
PO-Police Captain or designee - E-Operating 5-Retain Deposit or Bonds
FC-Fire Chief or designee 6-Revoke CUP
8of9
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT#: DRC2005-00068
SUBJECT: RED HILL COUNTRY CLUBHOUSE
APPLICANT: RED HILL COUNTRY CLUB
LOCATION: RED HILL COUNTRY CLUB DRIVE AND CALLE CASINO DRIVE
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
Comoletion Date
A. General Requirements
1. The applicant shall agree to defend at his sole expense any action brought against the City, its
agents,officers,or employees,because of the issuance of such approval,or in the alternative,to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or
employees, for any Court costs and attorney's fees which the City, its agents, officers, or
employees may be required by a court to pay as a result of such action. The City may,at its sole
discretion,participate at its own expense in the defense of any such action but such participation
shall not relieve applicant of his obligations under this condition.
2. Copies of the signed Planning Commission Resolution of Approval No. 05-85, Standard
Conditions, and all environmental mitigations shall be included on the plans (full size). The
sheet(s)are for information only to all parties involved in the construction/grading activities and
are not required to be wet sealed/stamped by a licensed Engineer/Architect.
B. Time Limits
1. Conditional Use Permit, Variance, or Development/Design Review approval shall expire if
building permits are not issued or approved use has not commenced within 5 years from the date
of approval. No extensions are allowed.
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which include
site plans,architectural elevations,exterior materials and colors,landscaping,sign program,and
grading on file in the Planning Department,the conditions contained herein, Development Code
regulations, the Hillside Development Distirict.
SC-1-05 1
Project No. DRC2005-00068
Completion Date
2. Prior to any use of the project site or business activity being commenced thereon,all Conditions _/___J_
of Approval shall be completed to the satisfaction of the City Planner.
3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and _/_J_
State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be
submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety
Department to show compliance. The buildings shall be'inspected for compliance prior to
occupancy.
4. Revised site plans and building elevations incorporating all Conditions of Approval shall be
submitted for City Planner review and approval prior to the issuance of building permits.
5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.) or prior to final map approval in the case of a custom lot subdivision,or approved
use has commenced,whichever comes first.
6. Approval of this request shall not waive compliance with all sections of the Development Code,all
other applicable City Ordinances, and applicable Community or Specific Plans in effect at the
time of building permit issuance.
7. A detailed on-site lighting plan, including a photometric diagram,shall be reviewed and approved
by the City Planner and Police Department(477-2800) prior to the issuance of building permits.
Such plan shall indicate style, illumination, location, height,and method of shielding so as not to
adversely affect adjacent properties.
8. Trash receptacle(s)are required and shall meet City standards. The final design,locations,and
the number of trash receptacles shall be subject to City Planner review and approval prior to the
issuance of building permits.
9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be
located out of public view and adequately screened through the use of a combination of concrete
or masonry walls,berming,and/or landscaping to the satisfaction of the City Planner. For single-
family residential developments, transformers shall be placed in underground vaults.
10. All building numbers and individual units shall be identified in a clear and concise manner,
including proper illumination.
11. All parkways, open areas, and landscaping shall be permanently maintained by the property
owner,homeowners'association,or other means acceptable to the City. Proof of this landscape
maintenance shall be submitted for City Planner and City Engineer review and approved prior to
the issuance of building permits.
D. Building Design
1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or
projections, shall be shielded from view and the sound buffered from adjacent properties and
streets as required by the Planning Department. Such screening shall be architecturally
integrated with the building design and constructed to the satisfaction of the City Planner. Details
shall be included in building plans.
2. For commercial and industrial projects, paint roll-up doors and service doors to match main
building colors.
E. Parking and Vehicular Access (indicate details on building plans)
1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts
a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet
wide.
SC-1-05
2
Project No. DRC2005-00068
Completion Date
2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall
contain a 12-inch walk adjacent to the parking stall (including curb).
3. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided
throughout the development to connect dwellings/units/buildings with open spaces/plazas/
recreational uses.
4. All parking spaces shall be double striped per City standards and all driveway aisles,entrances,
and exits shall be striped per City standards.
5. Handicap accessible stalls shall be provided for commercial and office facilities with 25 or more
parking stalls. Designate two percent or one stall; whichever is greater, of the total number of
stalls for use by the handicapped.
6. Motorcycle parking area shall be provided for commercial and office facilities with 25 or more
parking stalls. Developments with over 100 parking stalls shall provide motorcycle parking at the
rate of one percent. The area for motorcycle parking shall be a minimum of 56 square feet.
F. Trip Reduction
1. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily
residential projects of more than 10 units. Minimum spaces equal to five percent of the required
automobile parking spaces or three bicycle storage spaces,whichever is greater. After the first
50 bicycle storage spaces are provided,additional storage spaces required are 2.5 percent of the
required automobile parking spaces. Warehouse distribution uses shall provide bicycle storage
spaces at a rate of 2.5 percent of the required automobile parking spaces with a minimum of a
3-bike rack. In no case shall the total number of bicycle parking spaces required exceed 100.
Where this results in a fraction of 0.5 or greater, the number shall be rounded off to the higher
whole number.
G. Landscaping
1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in _J_J_
the case of residential development, shall be prepared by a licensed landscape architect and
submitted for City Planner review and approval prior to the issuance of building permits or prior
final map approval in the case of a custom lot subdivision.
2. -Existing trees required to be preserved in place shall be protected with a construction barrier in __/_J_
accordance with the Municipal Code Section 19.08.110,and so noted on the grading plans. The
location of those trees to be preserved in place and new locations for transplanted trees shall be
shown on the detailed landscape plans. The applicant shall follow all of the arborist's
recommendations regarding preservation, transplanting, and trimming methods.
3. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within
commercial and office projects, shall be specimen size trees-24-inch box or larger.
4. Within parking lots,trees shall be planted at a rate of one 15-gallon tree for every three parking __/_J_
stalls.
5. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one
tree per 30 linear feet of building.
6. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope,but less than 2:1
slope,shall be,at minimum, irrigated and landscaped with appropriate ground cover for erosion
control. Slope planting required by this section shall include a permanent irrigation system to be
installed by the developer prior to occupancy.
7. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater
slope shall be landscaped and irrigated for erosion control and to soften their appearance as
follows: one 15-gallon or larger size tree per each 150 sq.ft.of slope area, 1-gallon or larger size
SC-1-05
3
i/
Project No. DRC2005-00068
Completion Date
shrub per each 100 sq.ft.of slope area,and appropriate ground cover. In addition,slope banks
in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or
larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in
staggered clusters to soften and vary slope plane. Slope planting required by this section shall
include a permanent irrigation system to be installed by the developer prior to occupancy.
8. For multi-family residential and non-residential development,property owners are responsible for
the continual maintenance of all landscaped areas on-site, as well as contiguous planted areas
within the public right-of-way. All landscaped areas shall be kept free from weeds and debris and
maintained in healthy and thriving condition,and shall receive regular pruning,fertilizing,mowing,
and trimming. Any damaged,dead,diseased,or decaying plant material shall be replaced within
30 days from the date of damage.
9. The final design of the perimeter parkways,walls,landscaping,and sidewalks shall be included in
the required landscape plans and shall be subject to City Planner review and approval and
coordinated for consistency with any parkway landscaping plan which may be required by the
Engineering Department.
10. Landscaping and irrigation systems required to be installed within the public right-of-way on the
perimeter of this project area shall be continuously maintained by the developer.
11. All walls shall be provided with decorative treatment. If located in public maintenance areas,the _J_J_
design shall be coordinated with the Engineering Department.
12. Landscaping and irrigation shall be designed to conserve water through the principles of
Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code.
H. Signs
1. The signs indicated on the submitted plans are conceptual only and not a part of this approval.
Any signs proposed for this development shall comply with the Sign Ordinance and shall require
separate application and approval by the Planning Department prior to installation of any signs.
I. Environmental
1. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures, including monitoring and reporting. Applicant shall be required to
post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the
amount of$474 prior to the issuance of building permits,guaranteeing satisfactory performance
and completion of all mitigation measures. These funds may be used by the City to retain
consultants and/or pay for City staff time to monitor and report on the mitigation measures.
Failure to complete all actions required by the approved environmental documents shall be
considered grounds for forfeit.
J. Other Agencies
1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location _/_J_
of mailboxes. Multi-family residential developments shall provide a solid overhead structure for
mailboxes with adequate lighting. The final location of the mailboxes and the design of the
overhead structure shall be subject to City Planner review and approval prior to the issuance of
building permits.
SC-1-05
4
Project No. DRC2005-00068
Completion Date
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT, (909)477-2710,
FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
K. General Requirements
1. Submit five complete sets of plans including the following: —/�—
a. Site/Plot Plan;
b. Foundation Plan;
C. Floor Plan;
d. Ceiling and Roof Framing Plan;
e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size
of service entrance conductors, panel schedules, and single line diagrams;
f. Plumbing and Sewer Plans, including isometrics,underground diagrams,water and waste
diagram, sewer or septic system location, fixture units, gas piping, and heating and air
conditioning; and
g. Planning Department Project Number (i.e., DRC2005-00068) clearly identified on the
outside of all plans.
2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. —/_
Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal.
3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to
the City prior to permit issuance.
4.. Separate permits are required for fencing and/or walls.
5. Business Business shall not open for operation prior to posting the Certificate of Occupancy issued by the
Building and Safety Department.
L. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be ��—
marked with the project file number(i.e., DRC2005-00068). The applicant shall comply with the
latest adopted California Codes, and all other applicable codes, ordinances, and regulations in
effect at the time of permit application. Contact the Building and Safety Department for
availability of the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new commercial or industrial development project or
major addition,the applicant shall pay development fees at the established rate. Such fees may
include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation
Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program
deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to
the Building and Safety Department prior to permits issuance.
3. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday ��—
through Saturday, with no construction on Sunday or holidays.
4. Construct trash enclosure(s) per City Standard (available at the Planning Department's public ��—
counter).
SC-1-05
5
Project No.DRC2005-00068
Completion Date
M. New Structures
1. Provide compliance with the California Building Code (CBC) for property line clearances
considering use,use, area, and fire-resistiveness.
2. Provide compliance with the California Building Code for required occupancy separations.
3. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC __J—/—
Section 1505.
4. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A _J_/-
5. Walls and floors separating dwelling units in the same building shall be not less than 1-hour
fire-resistive construction.
construction.
6. Upon tenant improvement plan check submittal, additional requirements may be needed.
N. Grading
1. Grading of the subject property shall be in accordance with California Building Code,City Grading _(—/—
Standards, and accepted grading practices. The final grading plan shall be in substantial
conformance with the approved grading plan.
2. A soils report shall be prepared by a qualified engineer licensed by the State of California to
perform such work.
3. The final grading, appropriate certifications and compaction reports shall be completed,
submitted, and approved by the Building and Safety Official prior to the issuance of building
permits.
4. A separate grading plan check submittal is required for all new construction projects and for
.existing buildings where improvements being proposed will generate 50 cubic yards or more of
combined cut and fill. The grading plan shall be prepared, stamped,and signed by a California
registered Civil Engineer.
APPLICANT SHALL CONTACT THE ENGINEERING DEPARTMENT, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
O. Dedication and Vehicular Access
1. Dedication shall be made of the following rights-of-way on the perimeter streets(measured from ��—
street centerline):
30 total feet on Red Hill Country Club (East/West) —J—/-
30 total feet on Red Hill Country Club (South of Red Hill Country Club Drive)
2. Corner property line cutoffs shall be dedicated per City Standards. —/—/—
SC-1-05
6
Project No. DRC2005-00068
Completion Date
P. Street Improvements
1. Pursuant to City Council Resolution No.88-557,no person shall make connections from a source
of energy,fuel or power to any building service equipment which is regulated by technical codes
and for which a permit is required unless, in addition to any and all other codes, regulations and
ordinances, all improvements required by these conditions of development approval have been
completed and accepted by the City Council,except:that in developments containing more than
one building or unit, the development may have energy connections made to a percentage of
those buildings, or units proportionate to the completion of improvements as required by
conditions of approval of development. In no case shall more than 95 percent of the buildings or
units be connected to energy prior to completion and acceptance of all improvements required by
these conditions of approval of development.
2. Construct the following perimeter street improvements including, but not limited to:
Curb& A-C. Side- Drive Street Street Comm Median Bike
Street Name Gutter Pvmt walk Appr. I Lights Trees Trail Island Trail Othe
Red Hill Country Club Drive X X X X X X
(East/West)
Red Hill Country Club Drive X X X X X X
(South of Red Hill Country
Club Drive)
Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement
reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk
shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be
provided for this item.
3. Improvement Plans and Construction:
a. Street improvement plans, including street trees,street lights,and intersection safety lights
on future signal poles, and traffic signal plans shall be prepared by a registered Civil
Engineer and shall be submitted to and approved by the City Engineer. Security shall be
posted and an agreement executed to the satisfaction of the City Engineer and the City
Attorney guaranteeing completion of the public and/or private street improvements,prior to
final map approval or the issuance of building permits, whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a
construction permit shall be obtained from the City Engineer's Office in addition to any
other permits required.
c. Pavement striping, marking,traffic signing,street name signing,traffic signal conduit,and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction
project along major or secondary streets and at intersections for future traffic signals and
interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside
of BCR, ECR, or any other locations approved by the City Engineer
Notes:
1) Pull boxes shall be No.6 at intersections and No.5 along streets,a maximum of 200
feet apart, unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch galvanized steel with pull rope or as specified.
e. Handicapped access ramps shall be installed on all corners of intersections per City
Standards or as directed by the City Engineer.
SC-1-05
Project No. DRC2005-00068
Completion Date
f. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A cash
deposit shall be provided to cover the cost of grading and paving,which shall be refunded
upon completion of the construction to the satisfaction of the City Engineer.
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be
installed to City Standards, except for single family residential lots.
h. Street names shall be approved by the City Planner prior to submittal for first plan check.
4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in
accordance with the City's street tree program.
5. Install street trees per City street tree design guidelines and standards as follows. The completed
legend (box below) and construction notes shall appear on the title page of the street
improvement plans. Street improvement plans shall include a line item within the construction
legend stating: "Street trees shall be installed per the notes and legend on sheet—(typically
sheet 1)." Where public landscape plans are required, tree installation in those areas shall be
per the public landscape improvement plans.
The City Engineer reserves the right to adjust tree species based upon field conditions and other
variables. For additional information, contact the Project Engineer.
Min.
Grow
Street Name Botanical Name Common Name Space Spacing Size Qty.
Red Hill Country Platanus acerifolia London Plane Tree 8' 30' 15
Club Drive O.C. gal.
Construction Notes for Street Trees:
1) All street trees are to be planted in accordance with City standard plans.
2) Prior to the commencement of any planting,an agronomic soils report shall be furnished to
the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil
amendments, as determined by the City inspector.
3) All street trees are subject to inspection and acceptance by the Engineering Department.
4) Street trees are to be planted per public improvement plans only.
Q. Public Maintenance Areas
1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting —J_/_
Districts shall be filed with the City Engineer prior to final map approval or issuance of building
permits whichever occurs first. Formation costs shall be borne by the developer.
R. Drainage and Flood Control
1. A final drainage study shall be submitted to and approved by the City Engineer prior to final map
approval or the issuance of building permits,whichever occurs first. All drainage facilities shall
be installed as required by the City Engineer.
2. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the
property from adjacent areas.
S. Utilities
1. Provide separate utility services to each parcel including sanitary sewerage system,water, gas,
electric power, telephone, and cable TV (all underground) in accordance with the Utility
Standards. Easements shall be provided as required.
2. The developer shall be responsible for the relocation of existing utilities as necessary. _1—/—
SC-1-05
8
Project No. DRC2005-00068
Completion Date
3. Water and sewer plans shall be designed and constructed to meet the requirements of the
Cucamonga Valley W ater District(CVW D), Rancho Cucamonga Fire Protection District,and the
Environmental Health Department of the County of San Bernardino. A letter of compliance from
the CVW D is required prior to final map approval or issuance of permits,whichever occurs first.
Such letter must have been issued by the water district within 90 days prior to final map approval
in the case of subdivision or prior to the issuance of permits in the case of all other residential
projects.
4. Approvals have not been secured from all utilities and other interested agencies involved.
Approval of the final parcel map will be subject to any requirements that may be received from
them.
T. General Requirements and Approvals
1. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all
new streetlights for the first six months of operation,prior to final map approval or priorto building
permit issuance if no map is involved.
2. Prior to the issuance of building permits,a Diversion Deposit and related administrative fees shall
be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if
at least 50% of all wastes generated during construction and demolition are diverted from
landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to
the Engineering Department when the first building permit application is submitted to Building and
Safety. Form CD-2 shall be submitted to the Engineering Department within 60 days following
the completion of the construction and/or demolition project.
APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
U. Security Lighting
1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power.
These areas should be lighted from sunset to sunrise and on photo sensored cell.
2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with
direct lighting to be provided by all entryways. Lighting shall be consistent around the entire
development.
3. Lighting in exterior areas shall be in vandal-resistant fixtures.
V. Security Hardware
1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within
40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used.
2. All garage or rolling doors shall have slide bolts or some type of secondary locking devices.
W. Security Fencing
1. All businesses or residential communities with security fencing and gates will provide the police
with a keypad access and a unique code.The initial code is to be submitted to the Police Crime
Prevention Unit along with plans. If this code is changed due to a change in personnel or for any
other reason, the new code must be supplied to the Police via the 24-hour dispatch center at
(909)941-1488 or by contacting the Crime Prevention Unit at(909)477-2800 extension 2474 or
extension 2475.
SC-1-05
9
Project No.DRC2005-00068
Completion Date
X. Windows
1. All sliding glass windows shall have secondary locking devices and should not be able to be lifted
from frame or track in any manner.
Y. Building Numbering
1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime
visibility.
Z. Alarm Systems
1. Install a burglar alarm system and a panic alarm if needed. Instructing management and
employees on the operation of the alarm system will reduce the amount of false alarms and in
turn save dollars and lives.
/ 2. Alarm companies shall be provided with the 24-hour Sheriff's dispatch number: (909) 941-1488.
APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION
PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING
CONDITIONS:
SEE ATTACHED
SC-1-05
10
Rancho Cucamonga Fire Protection
1 District
Fire Construction Services
STANDARD CONDITIONS
July 26, 2005
Redhill Country Club
New Club House & Parking lot improvements
DRC2005-00068
THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS
PROJECT.
FSC-1 Public and Private Water Supply
1. Design guidelines for Fire Hydrants: The following provides design guidelines for the
spacing and location of fire hydrants:
a. The maximum distance between fire hydrants in commercial/industrial projects is
300-feet. No portion of the exterior wall shall be located more than 150-feet from an
approved fire hydrant. For cul-de-sacs, the distance shall not exceed 100-feet.
b. Fire hydrants are to be located. The preferred locations for fire hydrants are:
i. At the entrance(s) to a commercial, industrial or residential project from the
public roadways.
ii. At intersections.
iii. On the right side of the street, whenever practical and possible.
iv. As required by the Fire Safety Division to meet operational needs of the Fire
District.
V. A minimum of forty-feet (40') from any building.
C. If any portion of a facility or building is located more than 150-feet from a public fire
hydrant measured on an approved route around the exterior of the facility or building,
additional private or public fire hydrants and mains capable of supplying the required
fire flow shall be provided.
d. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof.
FSC-2 Fire Flow
1. The required minimum fire flow for this project, when automatic fire sprinklers are
installed is 1,625 gallons per minute at a minimum residual pressure of 20-pounds
per square inch. This flow reflects a 50-percent reduction for the installation of an
approved automatic fire sprinkler system in accordance with NFPA 13 with central station
monitoring. This requirement is made in accordance with the California Fire Code
Appendix III-A, as adopted by the Fire District Ordinances.
2. Public fire hydrants located within a 500-foot radius of the proposed project may be used
to provide the required fire flow subject to Fire District review and approval. Private fire
hydrants on adjacent property shall not be used to provide required fire flow.
3. Firewater plans are required for all projects that must extend the existing water supply to
or onto the site. Building permits will not be issued until fire protection water plans
are approved.
4. On all site plans to be submitted for review, show all fire hydrants located within 600-feet
of the proposed project site.
5. The submitted fire flow letter dated May 19. 2005 does prove that the required fire
flow is available Before construction is approved the Redhill Country Club must
make the necessary improvement to provide the required fire flow or comply with
any other alternative method imposed by the Rancho Cucamonga Fire Marshall.
FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems
1. Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant
shall submit plans, specifications and calculations for the fire sprinkler system
underground supply piping. Approval of the underground supply piping system must be
obtained prior to submitting the overhead fire sprinkler system plans.
FSC-4 Requirement for an Automatic Fire Sprinkler Systems
Rancho Cucamonga Fire District Ordinance 15, the 2001 California Fire Code and/or any other
applicable standards require an approved automatic fire sprinkler system to be installed in:
1. Commercial or industrial structures greater than 7,500 square feet.
2. Assembly and Educational Occupancy Buildings.
3. "All structures that do not meet Fire District access requirements (see Fire Access).
4. When required fire flow cannot be provided due to inadequate volume or pressure.
5. When buildings do not meet the requirements of the 2001 California Building Code and
the RCFPD Fire Department Access - Fire Lane Standard 9-7
6. When any applicable code or standard requires the structure to be sprinklered.
FSC-5 Fire Alarm System
1. RCFPD Ordinance 15, the CBC and the CFC require an automatic and/or manual fire
alarm system. Refer to RCFPD Ordinances 15 and 39, the California Building Code,
RCFPD Fire Alarm Standard #10-6 and/or the California Fire Code.
2. Prior to the installation of the building's fire alarm system, Fire Construction Services'
approval and a.building permit must be obtained. Plans and specifications shall be
2
submitted to Fire Construction Services in accordance with RCFPD Fire Alarm Standard
#10-6.
3. Based on the number of sprinkler heads; the sprinkler system is required to monitored by
a listed central station fire alarm system.
FSC-6 Fire District Site Access
Fire District access roadways include public roads, streets and highways, as well as private
roads, streets drive aisles and/or designated fire lanes. Please reference the RCFPD Fire
Lanes Standard 9-7
1. Location of Access: All portions of the structures 151 story exterior wall shall be located
within 150-feet of Fire District vehicle access, measure on an approved route around the
exterior of the building. Landscaped areas, unpaved changes in elevation, gates and
fences are deemed obstructions.
2. Specifications for private Fire District access roadways per the RCFPD Standards
are:
a. The minimum unobstructed width is 26-feet.
b. The maximum inside turn radius shall be 20-feet.
C. The minimum outside turn radius shall be 46-feet.
d. The minimum radius for cul-de-sacs is 45-feet.
e. The minimum vertical clearance is 14-feet, 6-inches.
f. At any private entry median, the minimum width of traffic lanes shall be 20-feet on
each side.
g. The angle of departure and approach shall not exceed 9-degrees or 20 percent.
h. The maximum grade of the driving surface shall not exceed 12%.
i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW).
j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a
minimum of 14-feet, 6-inches from the ground up. Vegetation shall not be allowed to
obstruct Fire Department apparatus.
3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be
provided as follows:
a. In buildings without high-piled storage, access shall be provided in accordance with
the 2001 California Building Code, Fire and/or any other applicable standards.
b. In buildings with high-piled storage access doors shall be provided in each 100 lineal
feet or major fraction thereof, of the exterior wall that faces the required access
roadways. When railways are installed provisions shall be made to maintain Fire
District access to all required openings.
3
4. Access Walkways: Hardscaped access walkways shall be provided from the fire
apparatus access road to all required building exterior openings.
5. Commercial/Industrial Gates: Any gate installed across a Fire Department access road
shall be in accordance with Fire District Standard #9-2. The following design requirements
apply:
a. Prior to the fabrication and installation of the gates, plans are required to be
submitted to Fire Construction Services (FCS) for approval. Upon the completion of
the installation and before placing the gates in service, inspection and final
acceptance must be requested from FCS.
b. Gates must slide open horizontally or swing inward.
C. Gates may be motorized or manual.
d. When fully open, the minimum clearance dimension of drive access shall be 20 feet.
e. Manual gates must be equipped with a RCFPD lock available at the Fire Safety
Office for$20.00.
f. Motorized gates must open at the rate of one-foot per second.
g. The motorized gate actuation mechanism must be equipped with a manual override
device and a fail-safe or battery backup feature to open the gate or release the
locking Mechanism in case of power failure or mechanical malfunction.
h. Motorized gates shall be equipped with a Knox override key switch. The switch must
be installed outside the gate in a visible and unobstructed location.
i. For motorized gates, a traffic loop device must be installed to allow exiting from the
complex.
j. If traffic pre-emption devices (TPD) are to be installed, the device, location and
operation must be approved by the Fire Chief prior to installation. Bi-directional or
multiple sensors may be required due to complexity of the various entry
configurations.
6. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site
plan illustrating the proposed delineation that meets the minimum Fire District standards
shall be included in the architectural plans submitted to B&S for approval.
FSC-10 Occupancy and Hazard Control Permits
Listed are those Fire Code permits commonly associated with the business operations and/or
building construction. Plan check submittal is required with the permit application for approval.
of the permit; field inspection is required prior to permit issuance. General Use Permit shall be
required for any activity or operation not specifically described below, which in the judgment of
the Fire Chief is likely to produce conditions that may be hazardous to life or property.
• Battery Systems
• Candles and open flames in public assemblies
• Compressed Gases
4
• Public Assembly
• Refrigeration Systems
• Repair Garages
• Flammable and Combustible Liquids
• Spraying or Dipping Operations
• Hazardous Materials
• Tents, Canopies and/or Air Supported Structures
• Liquefied Petroleum Gases
• LPG or Gas Fuel Vehicles in Assembly Buildings
FSC-11 Hazardous Materials— Submittal to the County of San Bernardino
The San Bernardino County Fire Department shall review your Business
Emergency/Contingency Plan for compliance with minimum standards. Contact the San
Bernardino County Fire, Hazardous Materials Division at (909) 387-4631 for forms and
assistance. The County Fire Department is the Cal/EPA Certified Unified Program Agency
(CU PA) for the City of Rancho Cucamonga.
1. If the facility is a NEW business, a Certificate of Occupancy issued by Building & Safety
will not be finalized until the San Bernardino County Fire Department reviews your
Business Emergency/Contingency Plan. California Government Code, Section 65850.2
prohibits the City from issuing a final Certificate of Occupancy unless the applicant has
met or is meeting specific hazardous materials disclosure requirements. A Risk
Management Program (RMP) may also be required if regulation substances are to be
used or stored at the new facility.
2. Any business that operates on rented or leased property which is required to submit a
Plan, is also required to submit a notice to the owner of the property in writing stating that
the business is subject to the Business Emergency/Contingency Plan mandates and has
complied with the provisions. The tenant must provide a copy of the Plan to the property
owner within five (5) working days, if requested by the owner.
FSC-12 Hazardous Materials - Submittal to Fire Construction Services
Plans shall be submitted and approved prior to construction of buildings and/or the installation of
equipment designed to store, use or dispense hazardous materials in accordance with the 2001
California Building, Fire, Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances FD15 and
FD39 and other implemented and/or adopted standards.
FSC-13 Alternate Method Application
Fire Construction Services staff and the Fire Marshal will review all requests for alternate
method when submitted The request must be submitted on the Fire District "Application for
Alternate Method" form along with supporting documents and payment of the $92 review fee.
FCS-14 Map Recordation
1. Reciprocal Access Agreement: The plan as submitted indicate that the required Fire
Department access:
5
a. Is located on property which is not under the control of the applicant; or
b. Crosses a property line; or
C. Is shared by multiple owners; or
d. Is located on common space under the control of an owner's association
Please provide a permanent access agreement granting irrevocable use of the property to
the Fire District. The agreement shall include a statement that no obstruction, gate, fence,
building or other structure shall be placed within the dedicated access without Fire District
approval. The recorded agreement shall include a copy of the site plan. The agreement
shall be presented to Fire Construction Services for review and approval, prior to
recordation. The agreement shall be recorded with the Recorder's Office, County of San
Bernardino.
To assist Fire Construction Services in reviewing the agreement the following shall be
included in the submittal:
a. The current title reports to provide a legal description and proof of ownership for all
properties included in the agreement.
b. The assessor's parcel numbers of each parcel subject to the agreement.
C. A scaled site plan showing the path of the Fire District access, the width, turn radii
and slope of roadway surface shall be provided. The access roadway shall comply
with the requirements of the RCFPD Fire Lane Standard #9-7.
2. Reciprocal Water Covenant and Agreement: The plans as submitted indicate that a
required private fire mains or appurtenances
a. Pass through or are located on property not under the control of the applicant; or
b. Crosses a property line; or
C. Provide service to adjacent properties; or
d. Is located on common space under the control of an owner's association; or
e. Is shared by multiple owners.
Please provide a permanent maintenance and service agreement between the owner for
the private water mains, fire hydrants and fire protection equipment essential to the water
supply. The agreement shall meet the form and content approved by the Rancho
Cucamonga Fire District. The agreement shall be submitted to Fire Construction Services
for review and approval, prior to recordation. The agreement shall be recorded within the
Recorder's Office, County of San Bernardino.
FCS-15 Annexation of the parcel map:
Annexation of the parcel map into the Community Facilities District #85-1 or #88-1 is
required prior to the issuance of grading or building permits.
6
Chronological Summary of RCFPD Standard
Conditions
PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to
the issuance of any building permits:
1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans,
specifications, flow test data and calculations for the private water main system for review
and approval by the Fire District. Plans and installation shall comply with Fire District
Standards. Approval of the on-site (private) fire underground and water plans is required
prior to any building permit issuance for any structure on the site. Private on-site
combination domestic and fire supply system must be designed in accordance with
RCFPD Standards # 9-4, #10-2 and #10-4. The Building & Safety Division and Fire
Construction Services will perform plan checks and inspections.
2. All private on-site fire hydrants shall be installed, flushed and operable prior to delivering
any combustible framing materials to the site. Fire construction Services will inspect the
installation, witness hydrant flushing and grant a clearance before lumber is dropped.
3. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan
showing the locations of all new public fire hydrants for the review and approval by the
Fire District and CCWD. On the plan, show all existing fire hydrants within a 600-foot
radius of the project. Please reference the RCFPD Water Plan Submittal Procedure
Standard 9-8.
4. All required public fire hydrants shall be installed, flushed and operable prior to delivering
any combustible framing materials to the site. CCWD personnel shall inspect the
installation and witness the hydrant flushing. Fire Construction Services shall inspect the
site after acceptance of the public water system by CCWD. Fire Construction Services
must grant a clearance before lumber is dropped.
5. Construction Access: The access roads must be paved in accordance with all the
requirements of the RCFPD Fire Lane Standard #9-7. All temporary utilities over access
roads must be installed at least 14' 6" above the finished surface of the road.
6. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is
responsible for obtaining the fire flow information from CCWD and submitting the letter to.
Fire Construction Services.
7. Easements and Reciprocal Agreements: All easements and agreements must be
recorded with the County of San Bernardino.
PRIOR TO THE RELEASE OF TEMPORARY POWER
The building construction must be substantially completed in accordance with Fire Construction
Services' "Temporary Power Release Checklist and Procedures".
PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following:
1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker
indicating the fire hydrant location on the street or driveway in accordance with the City of
Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant
7
Markers". On private property, the markers shall be installed at the centerline of the fire
access road, at each hydrant location.
2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler
contractor, in the presence of Fire Construction Services, shall conduct a test of the most
hydraulically remote on-site fire hydrants. The underground fire line contractor, developer
and/or owner are responsible for hiring the company to perform the test. A final test
report shall be submitted to Fire Construction Services verifying the fire flow available.
The fire flow available must meet or exceed the required fire flow in accordance with the
California Fire Code.
3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire
sprinkler system(s) shall be tested and accepted by Fire Construction Services.
4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire
sprinkler monitoring system must be tested and accepted by Fire Construction Services.
The fire sprinkler monitoring system shall be installed, tested and operational immediately
following the completion of the fire sprinkler system (subject to the release of power).
5. Fire Suppression Systems and/or other special hazard protection systems shall be
inspected, tested and accepted by Fire Construction Services before occupancy is granted
and/or equipment is placed in service.
6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm
system shall be installed, inspected, tested and accepted by Fire Construction Services.
7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular
gates must be inspected, tested and accepted in accordance with RCFPD Standards #9-1
or#9-2 by Fire Construction Services.
8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire
access roadways must be installed in accordance with the approved plans and acceptable
to Fire Construction Services.
9. The CC&R's, the reciprocal agreement and/or other approved documents shall be
recorded and contain an approved fire access roadway map with provisions that prohibit
parking, specify the method of enforcement and identifies who is responsible for the
required annual inspections and the maintenance of all required fire access roadways.
10. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and
multi-family buildings shall post the address with minimum 8-inch numbers on contrasting
background, visible from the street and electrically illuminated during periods of darkness.
When the building setback exceeds 200 feet from the public street, an additional non-
illuminated 6-inch minimum number address shall be provided at the property entrance.
Larger address numbers will be required on buildings located on wide streets or built with
large setbacks in multi-tenant commercial and industrial buildings. The suite designation
numbers and/or letters shall be provided on the front and back of all suites.
it. Hazardous Materials: Prior to the issuance of a Certificate of Occupancy, the applicant
must demonstrate (in writing from the County) that the facility has met or is meeting the
Risk Management Plan (RMP) or Business Emergency/Contingency Plan with the San
Bernardino County Fire Department, Hazardous Materials/Emergency Response and
Enforcement Division. The applicant must also obtain inspection and acceptance by Fire
Construction Services.
8
12. Confidential Business Occupancy Information: The applicant shall complete the
Rancho Cucamonga Fire District "Confidential Business Occupancy Information" form.
This form provides contact information for Fire District use in the event of an emergency at
the subject building or property. This form must be presented to the Fire Construction
Services Inspector.
13. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, a 8 1/2" x 11" or
11" x 17" site plan of the site in accordance with RCFPD Standard #13-1 shall be revised
by the applicant to reflect the actual location of all devices and building features as
required in the standard. The site plan must be reviewed and accepted by the Fire
Inspector.
9
City of Rancho Cucamonga
MITIGATED NEGATIVE DECLARATION
The following Mitigated Negative Declaration is being circulated for public review in accordance with
the California Environmental Quality Act Section 21091 and 21092 of the Public Resources Code.
Project File No.: Conditional Use Permit DRC2005-00068
Public Review Period Closes: September 14, 2005
Project Name: Project Applicant: Red Hill Country Club, Inc.
Project Location (also see attached map): Located at 8358 Red Hill Country Club Drive —
APN: 0207-101-03-23, and 35.
Project Description: A request to demolish an existing clubhouse and replace with a new
clubhouse totaling 35,176 square feet on 120 acres of land in the Open Space District.
FINDING
This is to advise that the City of Rancho Cucamonga,acting as the lead agency,has conducted an
Initial Study to determine if the project may have a significant effect on the environment and is
proposing this Mitigated Negative Declaration based upon the following finding:
The Initial Study identified potentially significant effects but:
(1) Revisions in the project plans or proposals made or agreed to by the applicant before this
proposed Mitigated Negative Declaration was released for public review would avoid the
effects or mitigate the effects to a point where clearly no significant effects would occur, and
(2) There is no substantial evidence before the agency that the project, as revised, may have a
significant effect on the environment.
If adopted,the Mitigated Negative Declaration means that an Environmental Impact Report will not
be required. The factual and analytical basis for this finding is included in the attached Initial
Study. The project file and all related documents are available for review at the City of Rancho
Cucamonga Planning Department at 10500 Civic Center Drive (909) 477-2750 or Fax (909) 477-
2847.
NOTICE
The public is invited to comment on the proposed Mitigated Negative Declaration during the
review period.
Date of Determination Adopted By