HomeMy WebLinkAbout05-105 - Resolutions RESOLUTION NO. 05-105 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT REVIEW DRC2005-00715, A REQUEST TO DEVELOP A 331,872 SQUARE FOOT INDUSTRIAL BUILDING ON 15.6 ACRES OF LAND IN THE HEAVY INDUSTRIAL DISTRICT(SUBAREA 9), LOCATED AT THE AT THE NORTHWEST CORNER OF JERSEY BOULEVARD AND BOSTON PLACE; AND MAKING FINDINGS IN SUPPORT THEREOF - APN: 0229-111-65. A. Recitals. 1. GAA Architects, Inc., filed an application for the approval of Development Review DRC2005-00715, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Development Review request is referred to as "the application." 2. On the 9th day of November 2005, the Planning Commission of the City of Rancho Cucamonga conducted a meeting to consider the application and concluded said meeting on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above-referenced meeting on November 9, 2005, including written and oral staff reports, this Commission hereby specifically finds as follows: a. The application applies to the property located on the northwest corner of Jersey Boulevard and Boston Place; and b. The site is surrounded to the north by industrial warehouse uses and industrial buildings are east of the property,to the south are industrial buildings , and the property to the west is developed with industrial/warehouse buildings; and C. The application proposes the development of an industrial warehouse/manufacturing building on 15.6 acres; and d. The project, together with the recommended conditions of approval, meets the development standards for the City of Rancho Cucamonga. 3. Based upon the substantial evidence presented to this Commission during the above-referenced meeting on November 9, 2005, including written and oral staff reports, this Commission hereby specifically finds and concludes as follows: PLANNING COMMISSION RESOLUTION NO. 05-105 DRC2005-00715 — GAA ARCHITECTS, INC. November 9, 2005 Page 2 a. That the proposed project is consistent with the objectives of the General Plan;and b. That the proposed design is in accord with the objectives of the Development Code and the purposes of the district in which the site is located; and C. That the proposed design is in compliance with each of the applicable provisions of the Development Code; and d. That the proposed design, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. 4. On January 9, 2005,the Planning Commission adopted a mitigated Negative Declaration for the associated industrial development. The Commission adoption declared that the impacts could have short-term significant environmental impacts. However, mitigation measures were required to reduce all impacts to a level of less-than-significant. 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. Planning Department: 1) All corresponding conditions as adopted by the Planning Commission on January 26, 2000, (Resolution 00-15) are still applicable for the proposed project. Engineering Department: 1) On street frontages along Arrow Route, Jersey Boulevard, and Boston Place, remove the existing drive approaches not planned for use with this project and replace with curb and gutter,sidewalk, and streettrees per City standards. 2) Install drive approach on Boston Place at the new proposed location and street trees per City standards, to the satisfaction of the City Engineer. a) Street trees, a minimum of 15-gallon size, shall be of a species and space in accordance with the City's street tree program. b) Revise the existing Street Improvement Plan, Number 1339 and 1339-D as required by the City Engineer. c) Security shall be posted and an agreement executed to the satisfaction of the City Engineer and City Attorney guaranteeing the completion of the public improvements prior to the issuance of a City Building Permit. PLANNING COMMISSION RESOLUTION NO. 05-105 DRC2005-00715 —GAA ARCHITECTS, INC. November 9, 2005 Page 3 d) Prior to any work being performed in the public right-of-way,fees shall be paid and a Construction Permit shall be obtained from the City Engineer's office in addition to any other permits required. e) Public Improvement Plans shall be 90 percent complete prior to the issuance of Grading Permits. Public Improvement Plans shall be 100 percent complete, signed by the City Engineer, and an improvement agreement and security provided by the developer prior to Building Permit issuance. 3) Remove the existing storm drain and storm drain easements from the area of proposed Building D. Quitclaim Deeds shall be recorded prior to Building Permit issuance. 4) Contact Cucamonga Valley Water District regarding removal of the existing sewer easements within the area of the proposed Building D. 5) Provide a Water Quality Management Plan, to the satisfaction of the City Engineer, and identify applicable Best Management Practices on the Grading Plan. 6) Prior to the issuance of Building Permits, a Diversion Deposit and related administrative fees shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at least 50 percent of all wastes generated during the construction and demolition are diverted from landfills and appropriate documentation is provided to the City. Form CD-1 shall be submitted to the Engineering Division when the first Building Permit application is submitted to Building and Safety. Form CD-2 shall be submitted to the Engineering Department within 60 days following the completion of the construction and/or demolition project. 7) Prior to the issuance of Building Permits for Building D, the applicant shall pay Development Fees at the rates adopted by City Council. Rates may be increased in accordance with the pending study in process, however, they are currently estimated as: 8) The conditions for DRCDR99-55 shall apply. PLANNING COMMISSION RESOLUTION NO. 05-105 DRC2005-00715- GAA ARCHITECTS, INC. November 9, 2005 Page 4 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 9TH DAY OF NOVEMBER 2005. PLANNING CO ISSION OF THE CITY OF RANCHO CUCAMONGA BY: t I / G-'-, Pam Stew , Cha' n ATTEST: Dan Coleman, Acting Secretary I, Dan Coleman , Acting Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga,at a regular meeting of the Planning Commission held on the 9th day of November 2005, by the following vote-to-wit: AYES: COMMISSIONERS: FLETCHER, McNIEL, McPHAIL, STEWART NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: MACIAS COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT#: DEVELOPMENT DESIGN REVIEW DRC2005-00715 SUBJECT: INDUSTRIAL BUILDING/RANCHO CUCAMONGA DISTRIBUTION CENTER APPLICANT: GAA ARCHITECTS, INC. LOCATION: NORTHWEST CORNER OF JERSEY BOULEVARD AND BOSTON PLACE ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents,officers,or employees, because of the issuance of such approval,or in the alternative,to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may,at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Copies of the signed Planning Commission Resolution of Approval No. 05-105, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. B. Time Limits 1. Development/Design Review approval shall expire if building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans, architectural elevations,exterior materials and colors,landscaping,sign program,and grading on file in the Planning Department,the conditions contained herein, Development Code regulations. 2. Prior to any use of the project site or business activity being commenced thereon,all Conditions of Approval shall be completed to the satisfaction of the City Planner. SC-1-05 1 Project No.DRC2005-00715 Completion Date 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Department to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for City Planner review and approval prior to the issuance of building permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code,all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 7. A detailed on-site lighting plan, including a photometric diagram,shall be reviewed and approved by the City Planner and Police Department(477-2800) prior to the issuance of building permits. Such plan shall indicate style, illumination, location, height,and method of shielding so as not to adversely affect adjacent properties. 8. Trash receptacle(s)are required and shall meet City standards. The final design,locations,and the number of trash receptacles shall be subject to City Planner review and approval prior to the issuance of building permits. 9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls,berming,and/or landscaping to the satisfaction of the City Planner. For single- family residential developments, transformers shall be placed in underground vaults. 10. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination. 11. All parkways, open areas, and landscaping shall be permanently maintained by the property owner, homeowners'association,or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for City Planner and City Engineer review and approved prior to the issuance of building permits. D. Building Design 1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections, shall be shielded from view and the sound buffered from adjacent properties and streets as required by the Planning Department. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the City Planner. Details shall be included in building plans. 2. For commercial and industrial projects, paint roll-up doors and service doors to match main building colors. E. Parking and Vehicular Access (indicate details on building plans) 1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet wide. SC-1-05 2 Project No.DRC2005-00715 Completion Date 2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall contain a 12-inch walk adjacent to the parking stall (including curb). 3. All parking spaces shall be double striped per City standards and all driveway aisles,entrances, and exits shall be striped per City standards. 4. Plans for any security gates shall be submitted for the City Planner, City Engineer, and Rancho Cucamonga Fire Protection District review and approval prior to issuance of building permits. For residential development, private gated entrances shall provide adequate turn-around space in front of the gate and a separate visitor lane with call box to avoid cars stacking into the public right-of-way. 5. Handicap accessible stalls shall be provided for commercial and office facilities with 25 or more parking stalls. Designate two percent or one stall; whichever is greater, of the total number of stalls for use by the handicapped. 6. Motorcycle parking area shall be provided for commercial and office facilities with 25 or more parking stalls. Developments with over 100 parking stalls shall provide motorcycle parking at the rate of one percent. The area for motorcycle parking shall be a minimum of 56 square feet. F. Trip Reduction 1. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily residential projects of more than 10 units. Minimum spaces equal to five percent of the required automobile parking spaces or three bicycle storage spaces,whichever is greater. After the first 50 bicycle storage spaces are provided,additional storage spaces required are 2.5 percent of the required automobile parking spaces. Warehouse distribution uses shall provide bicycle storage spaces at a rate of 2.5 percent of the required automobile parking spaces with a minimum of a 3-bike rack. In no case shall the total number of bicycle parking spaces required exceed 100. Where this results in a fraction of 0.5 or greater, the number shall be rounded off to the higher whole number. 2. Carpool and vanpool designated off-street parking close to the building shall be provided for commercial, office, and industrial facilities at the rate of 10 percent of the total parking area. If covered, the vertical clearance shall be no less than 9 feet. 3. Shower facilities accessible to both men and women shall be provided for persons walking or bicycling to work for each project which meets the following thresholds: Commercial: 250,000 square feet Industrial: 325,000 square feet Office: 125,000 square feet Hotels and Motels: 250 rooms G. Landscaping 1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for City Planner review and approval prior to the issuance of building permits or prior final map approval in the case of a custom lot subdivision. 2. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within commercial and office projects, shall be specimen size trees - 24-inch box or larger. 3. Within parking lots,trees shall be planted at a rate of one 15-gallon tree for every three parking stalls. SC-1-05 3 Project No.DRC2005-00715 Completion Date 4. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one tree per 30 linear feet of building. 5. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope, but less than 2:1 slope,shall be,at minimum, irrigated and landscaped with appropriate ground cover for erosion control. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 6. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater slope shall be landscaped and irrigated for erosion control and to soften their appearance as follows: one 15-gallon or larger size tree per each 150 sq.ft.of slope area, 1-gallon or larger size shrub per each 100 sq.ft.of slope area,and appropriate ground cover. In addition,slope banks in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in staggered clusters to soften and vary slope plane. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 7. For multi-family residential and non-residential development,property owners are responsible for the continual maintenance of all landscaped areas on-site,as well as contiguous planted areas within the public right-of-way. All landscaped areas shall be kept free from weeds and debris and maintained in healthy and thriving condition,and shall receive regular pruning,fertilizing,mowing, and trimming. Any damaged,dead,diseased,or decaying plant material shall be replaced within 30 days from the date of damage. 8. The final design of the perimeter parkways,walls,landscaping,and sidewalks shall be included in the required landscape plans and shall be subject to City Planner review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Department. 9. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 10. All walls shall be provided with decorative treatment. If located in public maintenance areas,the design shall be coordinated with the Engineering Department. 11. Landscaping and irrigation shall be designed to conserve water through the principles of Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code. H. Signs 1. The signs indicated on the submitted plans are conceptual only and not a part of this approval. Any signs proposed for this development shall comply with the Sign Ordinance and shall require separate application and approval by the Planning Department prior to installation of any signs. I. Environmental 1. Mitigation measures are required for the project. The applicant is responsible for the cost of implementing said measures, including monitoring and reporting. Applicant shall be required to post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the amount of$495 prior to the issuance of building permits,guaranteeing satisfactory performance and completion of all mitigation measures. These funds may be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete all actions required by the approved environmental documents shall be considered grounds for forfeit. J. Other Agencies 1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location SC-1-05 4 Project No.DRC2005-00715 Completion Date of mailboxes. Multi-family residential developments shall provide a solid overhead structure for mailboxes with adequate lighting. The final location of the mailboxes and the design of the overhead structure shall be subject to City Planner review and approval prior to the issuance of building permits. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT,(909)477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S) K. General Requirements 1. Submit five complete sets of plans including the following: a. Site/Plot Plan; b. Foundation Plan; C. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; I. Plumbing and Sewer Plans, including isometrics, underground diagrams,water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Department Project Number (i.e., DRC2005-00715) clearly identified on the outside of all plans. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to the City prior to permit issuance. 4. Separate permits are required for fencing and/or walls. 5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the Building and Safety Department. L. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number(i.e., DRC2005-00715). The applicant shall comply with the latest adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Department for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new commercial or industrial development project or major addition,the applicant shall pay development fees at the established rate. Such fees may include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Department prior to permits issuance. SC-1-05 5 Project No.DRC2005-00715 Completion Date include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Department prior to permits issuance. 3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map recordation and prior to issuance of building permits. 4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. 5. Construct trash enclosure(s) per City Standard (available at the Planning Department's public counter). M. New Structures 1. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A 2. Openings in exterior walls shall be protected in accordance with CBC Table 5-A. N. Existing Structures 1. Provide compliance with the California Building Code (CBC) for the property line clearances considering use, area, and fire-resistiveness of existing buildings. 2. Underground on-site utilities are to be located and shown on building plans submitted for building permit application. 3. Upon tenant improvement plan check submittal, additional requirements may be required. O. Grading 1. Grading of the subject property shall be in accordance with California Building Code,City Grading _/_/_ Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the time of application for grading plan check. 4. The final grading, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. SC-1-05 6 Project No.DRC2005-00715 Completion Date APPLICANT SHALL CONTACT THE ENGINEERING DEPARTMENT, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: P. Street Improvements 1. Construct the following perimeter street improvements including, but not limited to: Curb& A.C. Side- Drive Street Street Comm Median Bike Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other 'See below. Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be provided for this item. ' Per Special Conditions of Approval. 2. Improvement Plans and Construction: a. Street improvement plans, including street trees,street lights,and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements,priorto final map approval or the issuance of building permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the City Engineer's Office in addition to any other permits required. C. Pavement striping, marking,traffic signing,street name signing,traffic signal conduit,and _/_/_ interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer Notes: 1) Pull boxes shall be No.6 at intersections and No.5 along streets,a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2) Conduit shall be 3-inch galvanized steel with pull rope or as specified. e. Handicapped access ramps shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving,which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single family residential lots. h. Street names shall be approved by the City Planner prior to submittal for first plan check. 3. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. SC-1-05 7 Project No.DRC2005-00715 Completion Date 4. Install street trees per City street tree design guidelines and standards as follows. The completed legend (box below) and construction notes shall appear on the title page of the street improvement plans. Street improvement plans shall include a line item within the construction legend stating: "Street trees shall be installed per the notes and legend on sheet—(typically sheet 1)." Where public landscape plans are required, tree installation in those areas shall be per the public landscape improvement plans. The City Engineer reserves the right to adjust tree species based upon field conditions and other variables. For additional information, contact the Project Engineer. Min. Grow Street Name Botanical Name Common Name Space Spacing Size City. Arrow Route Lagerstroemia indica Crape Myrtle Hybrid— 3' 20'O.C. 24" Fill 'Tuscarora' Pink Formal,on Box in alternating side of meandering walk Boston Place Rhus lancea African Sumac 5' 20'O.C. 15 Gal Jersey Boulevard Lagerstroemia indica Crape Myrtle Hybrid— 3' 20'O.C. 24" 'Tuscarora' Pink Box Milliken Avenue Pinus canariensis 30% Canary Island Pine 8' 25'O.C. Min. 15 Gal Informal Groupings Brachychiton populneus Bottle Tree 8' 25'O.C. Min. 15 Gal 70% Informal Groupings Construction Notes for Street Trees: 1) All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting,an agronomic soils report shall be furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector. 3) All street trees are subject to inspection and acceptance by the Engineering Department. 4) Street trees are to be planted per public improvement plans only. Q. Public Maintenance Areas 1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the City Engineer prior to final map approval or issuance of building permits whichever occurs first. Formation costs shall be borne by the developer. R. Drainage and Flood Control 1. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the property from adjacent areas. 2. Trees are prohibited within 5 feet of the outside diameter of any public storm drain pipe measured from the outer edge of a mature tree trunk. S. utilities 1. Provide separate utility services to each parcel including sanitary sewerage system,water,gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 2. The developer shall be responsible for the relocation of existing utilities as necessary. SC-1-05 8 Project No.DRC2005-00715 Completion Date 3. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga Valley Water District(CVW D), Rancho Cucamonga Fire Protection District,and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CVW D is required prior to final map approval or issuance of permits,whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. 4. Approvals have not been secured from all utilities and other interested agencies involved. Approval of the final parcel map will be subject to any requirements that may be received from them. APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: T. Security Lighting 1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power. These areas should be lighted from sunset to sunrise and on photo sensored cell. 2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with direct lighting to be provided by all entryways. Lighting shall be consistent around the entire development. 3. Lighting in exterior areas shall be in vandal-resistant fixtures. U. Security Hardware 1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within 40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used. 2. All garage or rolling doors shall have slide bolts or some type of secondary locking devices. V. Security Fencing 1. All businesses or residential communities with security fencing and gates will provide the police with a keypad access and a unique code.The initial code is to be submitted to the Police Crime Prevention Unit along with plans. If this code is changed due to a change in personnel or for any other reason, the new code must be supplied to the Police via the 24-hour dispatch center at (909)941-1488 or by contacting the Crime Prevention Unit at(909)477-2800 extension 2474 or extension 2475. W. Building Numbering 1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime visibility. 2. Developer shall paint roof top numbers on one or more roofs of this development. They shall be a minimum of three feet in length and two feet in width and of contrasting color to background. The stencils for this purpose are on loan at the Rancho Cucamonga Police Department. X. Alarm Systems 1. Install a burglar alarm system and a panic alarm if needed. Instructing management and employees on the operation of the alarm system will reduce the amount of false alarms and in turn save dollars and lives. SC-1-05 9 Project No.DRC2005-00715 completion Date 2. Alarm companies shall be provided with the 24-hour Sheriff's dispatch number: (909) 941-1488. APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED SC-1-05 10 Rancho Cucamonga Fire Protection District Fire Construction Services STANDARD CONDITIONS August 23, 2005 Rancho Cucamonga II Inc. 11559 Arrow DRC2005-00715 THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT. FSC-1 Public and Private Water Supply 1. Design guidelines for Fire Hydrants: The following provides design guidelines for the spacing and location of fire hydrants: a. The maximum distance between fire hydrants in commercial/industrial projects is 300-feet. No portion of the exterior wall shall be located more than 150-feet from ah approved fire hydrant. For cul-de-sacs, the distance shall not exceed 100-feet. b. The preferred locations for fire hydrants are: i. At the entrance(s) to a commercial, industrial or residential project from the public roadways. ii. At intersections. iii. On the right side of the street, whenever practical and possible. iv. As required by the Fire Safety Division to meet operational needs of the Fire District. V. A minimum of forty-feet (40') from any building. C. If any portion of a facility or building is located more than 150-feet from a public fire hydrant measured on an approved route around the exterior of the facility or building, additional private or public fire hydrants and mains capable of supplying the required fire flow shall be provided. d. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof. FSC-2 Fire Flow 1. The required minimum fire flow for this project, when automatic fire sprinklers are installed is 4000 gallons per minute at a minimum residual pressure of 20-pounds per square inch. This flow reflects a 50-percent reduction for the installation of an approved automatic fire sprinkler system in accordance with NFPA 13 with central station monitoring. This requirement is made in accordance with the California Fire Code Appendix III-A, as adopted by the Fire District Ordinances. 2. Public fire hydrants located within a 500-foot radius of the proposed project may be used to provide the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent property shall not be used to provide required fire flow. 3. Fire protection water plans are required for all projects that must extend the existing water supply to or onto the site. Building permits will not be issued until fire protection water plans are approved. 4. On all site plans to be submitted for review, show all fire hydrants located within 600-feet of the proposed project site. FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems 1. Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant shall submit plans, specifications and calculations for the fire sprinkler system underground supply piping. Approval of the underground supply piping system must be obtained prior to submitting the overhead fire sprinkler system plans. FSC-4 Requirement for an Automatic Fire Sprinkler Systems Rancho Cucamonga Fire District Ordinance 15, the 2001 California Fire Code and/or any other applicable standards require an approved automatic fire sprinkler system to be installed in: 1. Commercial or industrial structures greater than 7,500 square feet. 2. Group "A" Occupancies. 3. "E" Occupancies with an occupant load of 50 or more persons. 4. All structures that do not meet Fire District access requirements (see Fire Access). 5. When required fire flow cannot be provided due to inadequate volume or pressure. 6. When the building access does not meet the requirements of the 2001 California Building Code and the RCFPD Fire Department Access - Fire Lane Standard #9-7 7. When any applicable code or standard requires the structure to be sprinklered. FSC-5 Fire Alarm System 1. The California Building Code, the RCFPD Fire Alarm Standard #10-6 and/or the California Fire Code require a listed fire sprinkler monitoring Central Station Fire Alarm system. Plan check approval and a building permit are required Prior to the installation of the fire alarm system. Plans and specifications shall be submitted to Fire Construction Services in accordance with RCFPD Fire Alarm Standard #10-6. FSC-6 Fire District Site Access Fire District access roadways include public roads, streets and highways, as well as private roads, streets drive aisles and/or designated fire lanes. Please reference the RCFPD Fire Department Access Roadways Std 49-7. 1. Location of Access: All portions of the structures 1s' story exterior wall shall be located within 150-feet of Fire District vehicle access, measure on an approved route around the exterior of the building. Landscaped areas, unpaved changes in elevation, gates and fences are deemed obstructions. 2. Specifications for private Fire District access roadways per the RCFPD Standards are: a. The minimum unobstructed width is 26-feet. b. The maximum inside turn radius shall be 24-feet. C. The minimum outside turn radius shall be 50-feet. d. The minimum radius for cul-de-sacs is 45-feet. e. The minimum vertical clearance is 14-feet, 6-inches. f. At any private entry median, the minimum width of traffic lanes shall be 20-feet on each side. g. The angle of departure and approach shall not exceed 9-degrees or 20 percent. h. The maximum grade of the driving surface shall not exceed 12%. i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW). j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a minimum of 14-feet, 6-inches from the ground up. Vegetation shall not be allowed to obstruct Fire Department apparatus. 3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be provided as follows: a. In buildings without high-piled storage, access shall be provided in accordance with the 2001 California Building Code, Fire and/or any other applicable standards. b. In buildings with high-piled storage access doors shall be provided in each 100 lineal feet or major fraction thereof, of the exterior wall that faces the required access roadways. When railways are installed provisions shall be made to maintain Fire District access to all required openings. 4. Access Walkways: Hardscaped access walkways shall be provided from the fire apparatus access road to all required building exterior openings. 5. Commercial/Industrial Gates: Any gate installed across a Fire Department access road shall be in accordance with Fire District Standard #9-2. The following design requirements apply: a. Prior to the fabrication and installation of the gates, plans are required to be submitted to Fire Construction Services (FCS) for approval. Upon the completion of the installation and before placing the gates in service, inspection and final acceptance must be requested from FCS. b. Gates must slide open horizontally or swing inward. 3 C. Gates may be motorized or manual. d. When fully open, the minimum clearance dimension of drive access shall be 20 feet. e. Manual gates must be equipped with a RCFPD lock available at the Fire Safety Office for $20.00. f. Motorized gates must open at the rate of one-foot per second. g. The motorized gate actuation mechanism must be equipped with a manual override device and a fail-safe or battery backup feature to open the gate or release the locking Mechanism in case of power failure or mechanical malfunction. h. Motorized gates shall be equipped with a Knox override key switch. The switch must be installed outside the gate in a visible and unobstructed location. i. For motorized gates, a traffic loop device must be installed to allow exiting from the complex. j. If traffic pre-emption devices (TPD) are to be installed, the device, location and operation must be approved by the Fire Chief prior to installation. Bi-directional or multiple sensors may be required due to complexity of the various entry configurations. 6. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site plan illustrating the proposed delineation that meets the minimum Fire District standards shall be included in the architectural plans submitted to B&S for approval. 7. Approved Fire Department Access: Any approved mitigation measures must be clearly noted on the site plan. A copy of the approved Alternative Method application, if applicable, must be reproduced on the architectural plans submitted to B&S for plan review. FSC-10 Occupancy and Hazard Control Permits Listed are those Fire Code permits commonly associated with the business operations and/or building construction. Plan check submittal is required with the permit application for approval of the permit; field inspection is required prior to permit issuance. General Use Permit shall be required for any activity or operation not specifically described below, which in the judgment of the Fire Chief is likely to produce conditions that may be hazardous to life or property. • Aerosol Products Magnesium Working • Application of Flammable Finishes Motor Vehicle Fuel-Dispensing Operation • Automobile Wrecking Yards Open Burning • Battery Systems Organic Coating • Candles and open flames in public assemblies Ovens • Cellulose Nitrate Powder Coating • Compressed Gases Public Assembly • Cryogenics Pyrotechnical Special Effects 4 • Dry Cleaning Plants Radioactive Materials • Dust-Producing Processes and Operations Refrigeration Systems • Explosive or Blasting Agents Repair Garages • Flammable and Combustible Liquids Rubbish Handling Operations • Fruit Ripening Plants Spraying or Dipping Operations • Hazardous Materials Tents, Canopies and/or Air Supported Structures • High-Pile Combustible Storage (HPS) Tire Storage • Liquefied Petroleum Gases Welding and Cutting Operations • LPG or Gas Fuel Vehicles in Assembly Buildings Wood Products/Lumber Yards FSC-11 Hazardous Materials— Submittal to the County of San Bernardino The San Bernardino County Fire Department shall review your Business Emergency/Contingency Plan for compliance with minimum standards. Contact the San Bernardino County Fire, Hazardous Materials Division at (909) 387-4631 for forms and assistance. The County Fire Department is the Cal/EPA Certified Unified Program Agency (CUPA) for the City of Rancho Cucamonga. 1. If the facility is a NEW business, a Certificate of Occupancy issued by Building & Safety will not be finalized until the San Bernardino County Fire Department reviews your Business Emergency/Contingency Plan. California Government Code, Section 65850.2 prohibits the City from issuing a final Certificate of Occupancy unless the applicant has met or is meeting specific hazardous materials disclosure requirements. A Risk Management Program (RMP) may also be required if regulation substances are to be used or stored at the new facility. 2. Any business that operates on rented or leased property which is required to submit a Plan, is also required to submit a notice to the owner of the property in writing stating that the business is subject to the Business Emergency/Contingency Plan mandates and has complied with the provisions: The tenant must provide a copy of the Plan to the property owner within five (5) working days, if requested by the owner. FSC-12 Hazardous Materials - Submittal to Fire Construction Services Plans shall be submitted and approved prior to construction of buildings and/or the installation of equipment designed to store, use or dispense hazardous materials in accordance with the 2001 California Building, Fire, Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances FD15 and FD39 and other implemented and/or adopted standards. FSC-13 Alternate Method Application Fire Construction Services staff and the Fire Marshal will review all requests for alternate method, when submitted. The request must be submitted on the Fire District "Application for Alternate Method" form along with supporting documents and payment of the $92 review fee. FCS-14 Map Recordation 1. Reciprocal Access Agreement: The plan as submitted indicate that the required Fire Department access: a. Is located on property which is not under the control of the applicant; or b. Crosses a property line; or c. Is shared by multiple owners; or d. Is located on common space under the control of an owner's association Please provide a permanent access agreement granting irrevocable use of the property to the Fire District. The agreement shall include a statement that no obstruction, gate, fence, building or other structure shall be placed within the dedicated access without Fire District approval. The recorded agreement shall include a copy of the site plan. The agreement shall be presented to Fire Construction Services for review and approval, prior to recordation. The agreement shall be recorded with the Recorder's Office, County of San Bernardino. To assist Fire Construction Services in reviewing the agreement the following shall be included in the submittal: a. The current title reports to provide a legal description and proof of ownership for all properties included in the agreement. b. The assessor's parcel numbers of each parcel subject to the agreement. C. A scaled site plan showing the path of the Fire District access, the width, turn radii and slope of roadway surface shall be provided. The access roadway shall comply with the requirements of the RCFPD Fire Lane Standard #9-7. 2. Reciprocal Water Covenant and Agreement: The plans as submitted indicate that a required private fire mains or appurtenances a. Pass through or are located on property not under the control of the applicant; or b. Crosses a property line; or C. Provide service to adjacent properties; or d. Is located on common space under the control of an owner's association; or e. Is shared by multiple owners. Please provide a permanent maintenance and service agreement between the owner for the private water mains, fire hydrants and fire protection equipment essential to the water 6 supply. The agreement shall meet the form and content approved by the Rancho Cucamonga Fire District. The agreement shall be submitted to Fire Construction Services for review and approval, prior to recordation. The agreement shall be recorded within the Recorder's Office, County of San Bernardino. FCS-15 Annexation of the parcel map: Annexation of the parcel map into the Community Facilities District #85-1 or #88-1 is required prior to the issuance of grading or building permits. Chronological Summary of RCFPD Standard Conditions PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to the issuance of any building permits: 1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans, specifications, flow test data and calculations for the private water main system for review and approval by the Fire District. Plans and installation shall comply with Fire District Standards. Approval of the on-site (private) fire underground and water plans is required prior to any building permit issuance for any structure on the site. Private on-site combination domestic and fire supply system must be designed in accordance with RCFPD Standards # 9-4, #10-2 and #10-4. The Building & Safety Division and Fire Construction Services will perform plan checks and inspections. 2. All private on-site fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. Fire construction Services will inspect the installation, witness hydrant flushing and grant a clearance before lumber is dropped. 3. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and CCWD. On the plan, show all existing fire hydrants within a 600-foot radius of the project. Please reference the RCFPD Water Plan Submittal Procedure Standard. 4. All required public fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. CCWD personnel shall inspect the installation and witness the hydrant flushing. Fire Construction Services shall inspect the site after acceptance of the public water system by CCWD. Fire Construction Services must grant a clearance before lumber is dropped. 5. Construction Access: The access roads must be paved in accordance with all the requirements of the RCFPD Fire Lane Standard #9-7. All temporary utilities over access roads must be installed at least 14' 6" above the finished surface of the road. 6. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is responsible for obtaining the fire flow information from CCWD and submitting the letter to Fire Construction Services. 7. Easements and Reciprocal Agreements: All easements and agreements must be recorded with the County of San Bernardino. 7 PRIOR TO THE RELEASE OF TEMPORARY POWER The building construction must be substantially completed in accordance with Fire Construction Services' "Temporary Power Release Checklist and Procedures". PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers". On private property, the markers shall be installed at the centerline of the fire access road, at each hydrant location. 2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in the presence of Fire Construction Services, shall conduct a test of the most hydraulically remote on-site fire hydrants. The underground fire line contractor, developer and/or owner are responsible for hiring the company to perform the test. A final test report shall be submitted to Fire Construction Services verifying the fire flow available. The fire flow available must meet or exceed the required fire flow in accordance with the California Fire Code. 3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler system(s) shall be tested and accepted by Fire Construction Services. 4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler monitoring system must be tested and accepted by Fire Construction Services. The fire sprinkler monitoring system shall be installed, tested and operational immediately following the completion of the fire sprinkler system (subject to the release of power). 5. Fire Suppression Systems and/or other special hazard protection systems shall be inspected, tested and accepted by Fire Construction Services before occupancy is granted and/or equipment is placed in service. 6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm system shall be installed, inspected, tested and accepted by Fire Construction Services. 7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular gates must be inspected, tested and accepted in accordance with RCFPD Standards #9-1 or #9-2 by Fire Construction Services. 8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access roadways must be installed in accordance with the approved plans and acceptable to Fire Construction Services. 9. The CC&R's, the reciprocal agreement and/or other approved documents shall be recorded and contain an approved fire access roadway map with provisions that prohibit parking, specify the method of enforcement and identifies who is responsible for the required annual inspections and the maintenance of all required fire access roadways. 10. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and multi-family buildings shall post the address with minimum 8-inch numbers on contrasting background, visible from the street and electrically illuminated during periods of darkness. When the building setback exceeds 200 feet from the public street, an additional non- illuminated 6-inch minimum number address shall be provided at the property entrance. S Larger address numbers will be required on buildings located on wide streets or built with large setbacks in multi-tenant commercial and industrial buildings. The suite designation numbers and/or letters shall be provided on the front and back of all suites. 11. Hazardous Materials: Prior to the issuance of a Certificate of Occupancy, the applicant must demonstrate (in writing from the County) that the facility has met or is meeting the Risk Management Plan (RMP) or Business Emergency/Contingency Plan with the San Bernardino County Fire Department, Hazardous Materials/Emergency Response and Enforcement Division. The applicant must also obtain inspection and acceptance by Fire Construction Services. 12. Confidential Business Occupancy Information: The applicant shall complete the Rancho Cucamonga Fire District "Confidential Business Occupancy Information" form. This form provides contact information for Fire District use in the event of an emergency at the subject building or property. This form must be presented to the Fire Construction Services Inspector. 1. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, a 8 Y2" x 11" or 11" x 17" site plan of the site in accordance with RCFPD Standard #13-1 shall be revised by the applicant to reflect the actual location of all devices and building features as required in the standard. The site plan must be reviewed and accepted by the Fire Inspector. 9