Loading...
HomeMy WebLinkAbout05-106 - Resolutions RESOLUTION NO. 05-106 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING TENTATIVE PARCEL MAP SUBTPM17609, A REQUEST TO MERGE 5 SEPARATE PARCELS INTO ONE SINGLE PARCEL FOR FUTURE COMMERCIAL DEVELOPMENT IN THE VICTORIA GARDENS LIFESTYLE CENTER IN THE MIXED USE DISTRICT OF THE VICTORIA COMMUNITY PLAN, LOCATED AT THE SOUTHEAST CORNER OF CHURCH STREET AND VICTORIA GARDENS LANE; AND MAKING FINDINGS IN SUPPORT THEREOF - APN: 0227-211-39, 40, 41, 42 & 43. A. Recitals. 1. Forest City Development filed an application for the approval of Tentative Parcel Map SUBTPM17609, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Tentative Parcel Map request is referred to as "the application." 2. On the 9th day of November 2005, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above- referenced public hearing on November 9, 2005, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a. The application applies to an undeveloped triangular shaped property located on the southeast corner of Church Street and Victoria Gardens Lane, with a street frontage of approximately 1,070 feet on Church Street, approximately 1,395 feet on Victoria Gardens Lane,and approximately 1,666 feet along Interstate 15; and b. The application permits the merger of five existing separate properties into one single parcel of sufficient size to meet minimum Code requirements to accommodate anticipated future development; and C. The merger, together with the recommended conditions of approval, meets development standards for the City of Rancho Cucamonga. 3. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing and upon the specific findings of facts set forth in paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: PLANNING COMMISSION RESOLUTION NO. 05-106 SUBTPM17609 — FOREST CITY DEVELOPMENT November 9, 2005 Page 2 a. The Tentative Parcel Map is consistent with the General Plan, Development Code, and any applicable specific plans; and b. The design or improvements of the Tentative Parcel Map is consistent with the General Plan, Development Code, and any applicable specific plans; and C. The application is associated with the future commercial retail development of the subject site that is consistent with the Victoria Gardens Master Plan; and d. New street improvements associated with the approval of the parcel map and subsequent development of the property will complete and enhance the appearance of Church Street and Victoria Gardens Lane; and e. The design of the subdivision is not likely to cause substantial environmental damage and avoidable injury to humans and wildlife or their habitat; and f. The will not cause public health problems; and g. The design of the Tentative Parcel Map will not conflict with any easement acquired by the public at large, now of record, for access through or use of the property within the proposed subdivision. 4. The Commission hereby finds and determines that the project identified in this Resolution is within the scope of the project reviewed in an Environmental Impact Report (EIR) (State Clearinghouse No. 20010301028) prepared for Development Agreement 01-02, Victoria Community Plan Amendment 01-01, and Tentative Parcel Map SUBTT15716. Said EIR was certified by the City Council on February 20, 2002, and no additional environmental review for the discretionary actions mentioned in this notice is required pursuant to Public Resources Code Section 21166. 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference: Planning Department 1) The final Parcel Map 17609 shall be approved and recorded prior to issuance of building permits. Engineering Department 1) All pertinent conditions per TPM15716 and the Development Agreement shall apply. 2) Church Street frontage improvements shall be protected in place or replaced as required. 3) Victoria Park Lane frontage improvements shall be protected in place or replaced as required. PLANNING COMMISSION RESOLUTION NO. 05-106 SUBTPM17609— FOREST CITY DEVELOPMENT November 9, 2005 Page 3 4) Line of Sight designs shall be provided for all project intersections, including major driveways, on the Grading and Landscape Plans. 5) Provide a Drainage Study with the grading plan submittal to mitigate the on-site and offsite flows. 6) Provide a minimum 35-foot wide driveway along Church Street and Victoria Park Lane. 7) The driveway onto Victoria Gardens Lane shall align with Northmain Street. 8) The driveway onto Church Street shall align with Iron Horse Place. 9) Modify the Traffic Signal at Victoria Gardens Lane and the proposed driveway/Northmain Street to provide a protected/permissive left tum arrows for the Eastbound and Westbound directions. 10) A non-refundable deposit shall be paid to the City, covering the estimated cost of operating any additional streetlights during the first six months of operation, prior to building permit issuance. 11) A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the City Engineer, prior to issuance of building permits. 12) Prior to the issuance of building permits, a Diversion Deposit and related administrative fees shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at least 50 percent of all wastes generated during construction and demolition are diverted from landfills, and appropriate documentation is provided to the City. Form CD-1 shall be submitted to the Engineering Division when the first Building Permit application is submitted to Building and Safety. Form CD-2 shall be submitted to the Engineering Division within 60 days following the completion of the construction and/or demolition project. 13) Submit a Water Quality Plan that follows current WQMP templates/guidance and regulations set forth by the Santa Ana Regional Water Quality Control Board (RWQCB). Access the following website for an updated San Bernardino County Water Quality Management Plan(WQMP)for New Development and,Redevelopment Projects:http://www.swrcb.ca.gov/rwgcb8/htmVsb_wgmplhtmi. This site provides Guidance and Templates that can be filled out electronically and printed. Adhere to these guidelines and use the templates provided. Also, include the BMP's identified in the plan on Grading Plans when submitted for plan check. 14) The Developer shall offer all newly constructed electrical distribution facilities for dedication to the Rancho Cucamonga Municipal Utility and PLANNING COMMISSION RESOLUTION NO. 05-106 SUSTPM17609— FOREST CITY DEVELOPMENT November 9, 2005 Page 4 requiring all such developments to be served electrical service by the Rancho Cucamonga Municipal Utility. 15) The Final Parcel Map shall include the following statement: "Pursuant to the provisions of Section 66411.1 of the Subdivision Map Act, notice is hereby given that the following improvements are required prior to development of Parcel 1 of this map: Curb cuts for access driveways, traffic signal activator loops for the east leg of North Main Street at Victoria Gardens Lane, curb and gutter removals, street trees, and re-striping all in accordance with City of Rancho Cucamonga Planning Resolution No. 05-106 dated November 9, 2005. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 9TH DAY OF NOVEMBER 2005. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY:— �z Pam Stew , Chairm ATTEST: C~ u Dan Coleman, Acting Secretary I, Dan Coleman,Acting Secretary of the Planning Commission of the City of Rancho Cucamonga,do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 9th day of November 2005, by the following vote-to-wit: AYES: COMMISSIONERS: FLETCHER, McNIEL, McPHAIL, STEWART NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: MACIAS COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT#: SUBTPM17609 SUBJECT: TENTATIVE PARCEL MAP APPLICANT: FOREST CITY DEVELOPMENT LOCATION: S/E CORNER OF VICTORIA GARDENS LANE AND CHURCH STREET ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents,officers, or employees, because of the issuance of such approval,or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Approval of Tentative Parcel Map No. 17609 is granted subject to the approval of 11/09/05. 3. Copies of the signed Planning Commission Resolution of Approval No. 05-106, Standard _1 1 Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s)are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. APPLICANT SHALL CONTACT THE ENGINEERING DEPARTMENT, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: B. Dedication and Vehicular Access 1. Comer property line cutoffs shall be dedicated per City Standards. _t 1 2. All existing easements lying within future rights-of-way shall be quit-claimed ordelineated on the _1 final map. SC-1-05 1 Project No.SUBTPM17609 Completion Date 3. Easements for public sidewalks and/or street trees placed outside the public right-of-way shall be dedicated to the City. C. Street Improvements 1. Construct the following perimeter street improvements including, but not limited to: Curb& A-C. Side- Drive Street Street Comm Median Bike Street Name Gutter Pvml walk Appr. Lights Trees Trail Island Trail Other Victoria Gardens X X X Church Street X X X 2. Improvement Plans and Construction: a. Street improvement plans,including street trees,street lights,and intersection safetylights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements,prior to final map approval or the issuance of building permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the City Engineer's Office in addition to any other permits required. C. Pavement striping, marking,traffic signing,street name signing,traffic signal conduit,and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations'approved by the City Engineer Notes: 1) Pull boxes shall be No.6 at intersections and No. 5 along streets,a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2) Conduit shall be 3-inch galvanized steel with pull rope or as specified. e. Handicapped access ramps shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. Acash deposit shall be provided to cover the cost of grading and paving,which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single family residential lots. h. Street names shall be approved by the City Planner prior to submittal for first plan check. 3. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. SC-1-05 2 i:\planning\final\pingcomm\subtpm17609stdcond 11-9.doc Project No.SUBTPM176M Completion Date D. Public Maintenance Areas 1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the City Engineer prior to final map approval or issuance of building permits whichever occurs first. Formation costs shall be bome by the developer. E. Drainage and Flood Control 1. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the _/ /_ property from adjacent areas. F. Improvement Completion 1. If the required public improvements are not completed priorto approval of the final parcel map, an improvement certificate shall be placed upon the final parcel map, stating that they will be completed upon development for: Parcel 1. G. Utilities 1. Provide separate utility services to each parcel including sanitary sewerage system,water,gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 2. The developer shall be responsible for the relocation of existing utilities as necessary. 3. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga Valley Water District(CVWD), Rancho Cucamonga Fire Protection District,and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CVWD is required prior to final map approval or issuance of permits,whicheveroccurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. 4. Approvals have not been secured from all utilities and other interested agencies involved. Approval of the final parcel map will be subject to any requirements that may be received from them. H. General Requirements and Approvals 1. The separate parcels contained within the project boundaries shall be legally combined into one parcel prior to issuance of building permits. 2. Prior to the issuance of building permits, a Diversion Deposit and related administrative fees shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at least 50% of all wastes generated during construction and demolition are diverted from landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to the Engineering Department when the first building permit application is submitted to Building and Safety. Form CD-2 shall be submitted to the Engineering Department within 60 days following the completion of the construction and/or demolition project. APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED SC-1-05 3 i:\planning\final\pingcomm\subtpml7609stdcond 11-9.doc Rancho Cucamonga Community Development Building & Safety COMMERCIAL/INDUSTRIAL STANDARD CONDITIONS November 1, 2005 Bass Pro Shops N/E Church & Victoria Gardens Lane a' DRC2005-00723 NOTE: Any revisions may void these requirements and necessitate additional review. The Building Official prior to plan check submittal must approve the type of construction of the building based on 2001 California Building Code. A. New Structures 1. Provide compliance with the California Building Code (CBC) for property line clearances considering use, area, and fire-resistive construction. 2. The project shall be designed to comply with the 2001 California Building Codes (CBC), the California Fire Code and with RCFPD Ordinances 15 & 39. 3. Provide compliance with the California Building Code for required occupancy separations. 4. Provide draft stops in attic areas; not exceed 3,000 square feet, in accordance with CBC Section 1505. 5. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A. 6. Openings in exterior walls shall be protected in accordance with CBC Table 5-A. 7. Provide the required restroom facilities per the CBC Appendix chapter 29. 8. All exit components must comply with the requirements of CBC Chapter 10 (adjoining rooms, rated corridors, door swings, separation of exits, etc.). 9. At the time of tenant improvement plan check submittal (for construction) additional requirements may be required. 10. Clearly indicate on the plans compliance with ADA requirements for the disabled. 11. A register architect must sign and stamp the plans. B. General Requirements 1. Submit five conceptual sets of plans including the following: Page 1 of 3 a. Site/Plot Plan b. Floor Plan c. Foundation Plan d. Ceiling and Roof Framing Plan e. Electrical Plans (2 sets, detached) including the size of main switch, number and size of service entrance conductors, panel schedules, and single line diagrams. f. Plumbing and Sewer Plans, including isometrics, underground diagrams, water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning. g. Planning Division CUP Tracking Number must be clearly noted on the Title Sheet of the plans. h. Separate permits are required for fencing and/or walls. i. All sheets must be marked: NOT FOR CONSTRUCTION. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers' Compensation coverage to the City prior to permit issuance. 4. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the Building and Safety Division. C. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number (i.e., DRC2003-00110 and SUBTPM16125). The applicant shall comply with the latest adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Division for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new commercial or industrial development project or major addition, the applicant shall pay development fees at the established rate. Such fees may include, but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation Development Fee, Permit and Plan Check Fees, and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Division prior to permit issuance. 3. The Building and Safety Official shall provide the street addresses after tract/parcel map recordation and prior to issuance of building permits. 4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. 5. Construct trash enclosure(s) per City Standard (available at the Planning Division's public counter). Page 2 of 3 D. Grading 1. Grading of the subject property shall be in accordance with California Building Code, City Grading Standards, and accepted grading practices. The final Grading Plan shall be in substantial conformance with the approved Grading Plan. 2. A soils report shall be prepared by a qualified Engineer licensed by the State of California to perform such work. 3. A geological report shall be prepared by a qualified Engineer or Geologist and submitted at the time of application for grading plan check. 4. At the time of tenant improvement plan check submittal (for construction) additional requirements may be required. 5. The final Grading Plan, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 6. A separate grading plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The Grading Plan shall be prepared, stamped, and signed by a California registered Civil Engineer. Note on title sheet that tenant improvement plans must be submitted for plan check and be approved prior to construction. The applicant shall comply with the latest adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Division if you have any questions about the procedure at 909-477-2710. Page 3 of 3 Rancho Cucamonga Fire Protection District Fire Construction Services STANDARD CONDITIONS November 1, 2005 Bass Pro Shops N/E Church & Victoria Gardens Lane DRC2005-00723 THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT. 1. The Building Official prior to plan check submittal must approve the type of construction of the building based on 2001 California Building Code. 2. A fire flow letter from CVWD is required to be submitted to FCS before plan check submittal. 3. The fire department access plans must be submitted for review and approval before November 10, 2005. FSC-1 Public arid Private Water Supply I. Design guidelines for Fire Hydrants: The following provides design guidelines for the spacing and location of fire hydrants: a. The maximum distance between fire hydrants in commercial/industrial projects is 300-feet. No portion of the exterior wall shall be located more than 150-feet from an approved fire hydrant. For cul-de-sacs, the distance shall not exceed 100-feet. b. Fire hydrants are to be located. The preferred locations for fire hydrants are: I. At the entrance(s) to a commercial, industrial or residential project from the public roadways. 2. At intersections. 3. On the right side of the street, whenever practical and possible. 4. As required by the Fire Safety Division to meet operational needs of the Fire District. 5. A minimum of forty-feet (40') from any building. f. If any portion of a facility or building is located more than 150-feet from a public fire hydrant measured on an approved route around the exterior of the facility or building, additional private or public fire hydrants and mains capable of supplying the required fire flow shall be provided. g. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof. FSC-2 Fire Flow I. The required minimum fire flow for this project, when automatic fire sprinklers are installed is 4,000 gallons per minute at a minimum residual pressure of 20-pounds per square inch. This flow reflects a 50-percent reduction for the installation of an approved automatic fire sprinkler system in accordance with NFPA 13 with central station monitoring. This requirement is made in accordance with the California Fire Code Appendix III-A, as adopted by the Fire District Ordinances. 3. Public fire hydrants located within a 500-foot radius of the proposed project may be used to provide the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent property shall not be used to provide required fire flow. 4. Firewater plans are required for all projects that must extend the existing water supply to or onto the site. Building permits will not be issued until firewater plans are approved. 5. On all site plans to be submitted for review, show all fire hydrants located within 600-feet of the proposed project site. FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems 1. Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant shall submit plans, specifications and calculations for the fire sprinkler system underground supply piping. Approval of the underground supply piping system must be obtained prior to submitting the overhead fire sprinkler system plans. FSC-4 Requirement for an Automatic Fire Sprinkler Systems Rancho Cucamonga Fire District Ordinance 15, the 2001 California Fire Code and/or any other applicable standards require an approved automatic fire sprinkler system to be installed in: 1. Commercial or industrial structures greater than 7,500 square feet. FSC-5 Fire Alarm System 1. RCFPD Ordinance 15, based on use or floor area (or by other adopted codes or standards) requires an automatic and/or manual fire alarm system. Refer to RCFPD Ordinances 15 and 39, the California Building Code, RCFPD Fire Alarm Standard #10-6 and/or the California Fire Code. 2. Prior to installation of the building fire alarm system, Fire Construction Services' approval and a building permit must be obtained. Plans and specifications shall be submitted to Fire Construction Services in accordance with RCFPD Fire Alarm Standard #10-6. 3. Based on the number of sprinkler heads; the sprinkler system is required to monitored by a listed central station fire alarm system. FSC-6 Fire District Site Access Fire District access roadways include public roads, streets and highways, as well as private roads, streets drive aisles and/or designated fire lanes. Please reference the RCFPD Fire Lanes Standard 9-7 1. Location of Access: All portions of the structures 1st story exterior wall shall be located within 150- feet of Fire District vehicle access, measure on an approved route around the exterior of the building. Landscaped areas, unpaved changes in elevation, gates and fences are deemed obstructions. 2. Specifications for private Fire District access roadways per the RCFPD Standards are: a. The minimum unobstructed width is 26-feet. b. The maximum inside turn radius shall be 20-feet. c. The minimum outside turn radius shall be 46-feet. d. The minimum radius for cul-de-sacs is 45-feet. e. The minimum vertical clearance is 14-feet, 6-inches. f. At any private entry median, the minimum width of traffic lanes shall be 20-feet on each side. g. The angle of departure and approach shall not exceed 9-degrees or 20 percent. h. The maximum grade of the driving surface shall not exceed 12%. i. Support a minimum load of 70,000 pounds gross vehicle weight (GVVV). j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a minimum of 14- feet, 6-inches from the ground up. Vegetation shall not be allowed to obstruct Fire Department apparatus. 3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be provided as follows: 2 a. In buildings without high-piled storage, access shall be provided in accordance with the 2001 California Building Code, Fire and/or any other applicable standards. b. In buildings with high-piled storage access doors shall be provided in each 100 lineal feet or major fraction thereof, of the exterior wall that faces the required access roadways. When railways are installed provisions shall be made to maintain Fire District access to all required openings. 4. Access Walkways: Hardscaped access walkways shall be provided from the fire apparatus access road to all required building exterior openings. 5. Commercial/Industrial Gates: Any gate installed across a Fire Department access road shall be in accordance with Fire District Standard #9-2. The following design requirements apply: a. Prior to the fabrication and installation of the gates, plans are required to be submitted to Fire Construction Services (FCS) for approval. Upon the completion of the installation and before placing the gates in service, inspection and final acceptance must be requested from FCS. b. Gates must slide open horizontally or swing inward. c. Gates may be motorized or manual. d. When fully open, the minimum clearance dimension of drive access shall be 20 feet. e. Manual gates must be equipped with a RCFPD lock available at the Fire Safety Office for $20.00. f. Motorized gates must open at the rate of one-foot per second. g. The motorized gate actuation mechanism must be equipped with a manual override device and a fail-safe or battery backup feature to open the gate or release the locking Mechanism in case of power failure or mechanical malfunction. h. Motorized gates shall be equipped with a Knox override key switch. The switch must be installed outside the gate in a visible and unobstructed location. i. For motorized gates, a traffic loop device must be installed to allow exiting from the complex. j. If traffic pre-emption devices (TPD) are to be installed, the device, location and operation must be approved by the Fire Chief prior to installation. Bi-directional or multiple sensors may be required due to complexity of the various entry configurations. 6. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site plan illustrating the proposed delineation that meets the minimum Fire District standards shall be included in the architectural plans submitted to B&S for approval. 7. Approved Fire Department Access: Any approved mitigation measures must be clearly noted on the site plan. A copy of the approved Alternative Method application, if applicable, must be reproduced on the architectural plans submitted to B&S for plan review. FSC-10 Occupancy and Hazard Control Permits Listed are those Fire Code permits commonly associated with the business operations and/or building construction. Plan check submittal is required with the permit application for approval of the permit; field inspection is required prior to permit issuance. General Use Permit shall be required for any activity or operation not specifically described below, which in the judgment of the Fire Chief is likely to produce conditions that may be hazardous to life orproperty. Y • Battery Systems • Candies and open flames in public assemblies • Compressed Gases • Public Assembly • Cryogenics • Dry Cleaning Plants • Refrigeration Systems • Repair Garages 3 • Flammable and Combustible Liquids • Spraying or Dipping Operations • Hazardous Materials • Tents, Canopies and/or Air Supported Structures • Liquefied Petroleum Gases • LPG or Gas Fuel Vehicles in Assembly Buildings FSC-11 Hazardous Materials— Submittal to the County of San Bernardino The San Bernardino County Fire Department shall review your Business Emergency/Contingency Plan for compliance with minimum standards. Contact the San Bernardino County Fire, Hazardous Materials Division at (909) 387-4631 for forms and assistance. The County Fire Department is the Cal/EPA Certified Unified Program Agency (CUPA) for the City of Rancho Cucamonga. 1. If the facility is a NEW business, a Certificate of Occupancy issued by Building & Safety will not be finalized until the San Bernardino County Fire Department reviews your Business Emergency/Contingency Plan. California Government Code, Section 65850.2 prohibits the City from issuing a final Certificate of Occupancy unless the applicant has met or is meeting specific hazardous materials disclosure requirements. A Risk Management Program (RMP) may also be required if regulation substances are to be used or stored at the new facility. 2. Any business that operates on rented or leased property which is required to submit a Plan, is also required to submit a notice to the owner of the property in writing stating that the business is subject to the Business Emergency/Contingency Plan mandates and has complied with the provisions. The tenant must provide a copy of the Plan to the property owner within five (5) working days, if requested by the owner. FSC-12 Hazardous Materials - Submittal to Fire Construction Services Plans shall be submitted and approved prior to construction of buildings and/or the installation of equipment designed to store, use or dispense hazardous materials in accordance with the 2001 California Building, Fire, Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances FD15 and F039 and other implemented and/or adopted standards. FSC-13 Alternate Method Application Fire Construction Services staff and the Fire Marshal will review all requests for alternate method, when submitted. The request must be submitted on the Fire District "Application for Alternate Method" form along with supporting documents and payment of the $92 review fee. Chronological Summary of RCFPD Standard Conditions PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to the issuance of any building permits: 1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans, specifications, flow test data and calculations for the private water main system for review and approval by the Fire District. Plans and installation shall comply with Fire District Standards. Approval of the on-site (private) fire underground and water plans is required prior to any building permit issuance for any structure on the site. Private on-site combination domestic and fire supply system must be designed in accordance with RCFPD Standards #9-8. The Building & Safety Division and Fire Construction Services will perform plan checks and inspections. All private on-site fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. Fire construction Services will inspect the installation, witness hydrant flushing and grant a clearance before lumber is dropped. 4 2. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and CCWD. On the plan, show all existing fire hydrants within a 600-foot radius of the project. Please reference the RCFPD Water Plan Submittal Procedure Standard 9-8. All required public fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. CCWD personnel shall inspect the installation and witness the hydrant flushing. Fire Construction Services shall inspect the site after acceptance of the public water system by CCWD. Fire Construction Services must grant a clearance before lumber is dropped. 3. Construction Access: The access roads must be paved in accordance with all the requirements of the RCFPD Fire Lane Standard #9-7. All temporary utilities over access roads must be installed at least 14' 6" above the finished surface of the road. 4. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is responsible for obtaining the fire flow information from CCWD and submitting the letter to Fire Construction Services. PRIOR TO THE RELEASE OF TEMPORARY POWER The building construction must be substantially completed in accordance with Fire Construction Services' "Temporary Power Release Checklist and Procedures". PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers". On private property, the markers shall be installed at the centerline of the fire access road, at each hydrant location. 2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in the presence of Fire Construction Services, shall conduct a test of the most hydraulically remote on-site fire hydrants. The underground fire line contractor, developer and/or owner are responsible for hiring the company to perform the test. A final test report shall be submitted to Fire Construction Services verifying the fire flow available. The fire flow available must meet or exceed the required fire flow in accordance with the California Fire Code. 3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler system(s) shall be tested and accepted by Fire Construction Services. 4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler monitoring system must be tested and accepted by Fire Construction Services. The fire sprinkler monitoring system shall be installed, tested and operational immediately following the completion of the fire sprinkler system (subject to the release of power). 5. Fire Suppression Systems and/or other special hazard protection systems shall be inspected, tested and accepted by Fire Construction Services before occupancy is granted and/or equipment is placed in service. 6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm system shall be installed, inspected, tested and accepted by Fire Construction Services. 7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular gates must be inspected, tested and accepted in accordance with RCFPD Standards #9-1 or #9-2 by Fire Construction Services. 8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access roadways must be installed in accordance with the approved plans and acceptable to Fire Construction Services. 5 9. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and multi-family buildings shall post the address with minimum 12-inch numbers on contrasting background, visible from the street and electrically illuminated during periods of darkness. When the building setback exceeds 200 feet from the public street, an additional non-illuminated 6-inch minimum number address shall be provided at the property entrance. Larger address numbers will be required on buildings located on wide streets or built with large setbacks in multi-tenant commercial and industrial buildings. The suite designation numbers and/or letters shall be provided on the front and back of all suites. 10. Hazardous Materials: Prior to the issuance of a Certificate of Occupancy, the applicant must demonstrate (in writing from the County) that the facility has met or is meeting the Risk Management Plan (RMP) or Business Emergency/Contingency Plan with the San Bernardino County Fire Department, Hazardous Materials/Emergency Response and Enforcement Division. The applicant must also obtain inspection and acceptance by Fire Construction Services. 11. Confidential Business Occupancy Information: The applicant shall complete the Rancho Cucamonga Fire District "Confidential Business Occupancy Information" form. This form provides contact information for Fire District use in the event of an emergency at the subject building or property. This form must be presented to the Fire Construction Services Inspector. 12. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, a 8 '/" x 11" or 11" x 17" site plan of the site in accordance with RCFPD Standard #13-1 shall be revised by the applicant to reflect the actual location of all devices and building features as required in the standard. The site plan must be reviewed and accepted by the Fire Inspector. 6