HomeMy WebLinkAbout05-110 - Resolutions RESOLUTION NO. 05-110
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING TENTATIVE
PARCEL MAP SUBTPM17303, A SIX PARCEL SUBDIVISION OF LAND
CONTAINING 13 UNITS FOR INDUSTRIAL AND COMMERCIAL
CONDOMINIUM PURPOSES ON PARCELS 1, 2, 3, 4, AND 5 ON 11.70
ACRES OF LAND IN THE INDUSTRIAL PARK DISTRICT (SUBAREA 6)
WITHIN THE HAVEN AVENUE OVERLAY DISTRICT, LOCATED AT THE
NORTHWEST CORNER OF HAVEN AVENUE AND 4TH STREET; AND
MAKING FINDINGS IN SUPPORT THEREOF — APN: 0210-391-01
THROUGH 08 AND 0210-381-22 AND 23.
A. Recitals.
1. Charles Joseph Associates filed an application for the approval of Tentative Parcel Map
SUBTPM17303, as described in the title of this Resolution. Hereinafter in this Resolution, the
subject Tentative Parcel Map request is referred to as "the application."
2. On the 9th day of November 2005, the Planning Commission of the City of Rancho
Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing
on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning
Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing on November 9, 2005, including written and oral staff reports,
together with public testimony, this Commission hereby specifically finds as follows:
a. The application applies to ten vacant parcels located at the northwest corner of 4th
Street and Haven Avenue, totaling 11.70 acres; and
b. The property to the north of the subject site is developed with an office building and
is zoned Industrial Park; the property to the east, across Haven Avenue, is vacant and is zoned
Industrial Park; the property to the south is vacant and is located in the City of Ontario and zoned
future Mixed Use Specific Plan; and the property to the west is developed with an office building and
is zoned Industrial Park; and
C. The application proposes the subdivision of an 11.70-acre site into six parcels
ranging in size from .25 acre to 5.95 acres. All parcel sizes are permitted since the project site is
part of a master plan and the project site is consistent with the goals and objectives of the Haven
Overlay District by providing an office park development that promotes a high employment density
with shared points of access; and
PLANNING COMMISSION RESOLUTION NO. 05-110
SUBTPM17303 — CHARLES JOSEPH ASSOCIATES
November 9, 2005
Page 2
d. The application, in conjunction with Development Review DRC2005-00458,
proposes the development of a master plan consisting of a hotel, two office buildings, one
freestanding restaurant building, and two commercial buildings; and
e. The subdivision,togetherwith the recommended conditions of approval, complies
with all minimum development standards for the City of Rancho Cucamonga.
3. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1
and 2 above, this Commission hereby finds and concludes as follows:
a. That the tentative parcel map is consistent with the General Plan, Development
Code, and any applicable specific plans; and
b. The design or improvements of the tentative parcel map is consistent with the
General Plan, Development Code, and any applicable specific plans; and
C. The site is physically suitable for the type of development proposed; and
d. The design of the subdivision is not likely to cause substantial environmental
damage and avoidable injury to humans and wildlife or their habitat; and
e. The tentative parcel map is not likely to cause serious public health problems; and
f. The design of the tentative parcel map will not conflict with any easement acquired
by the public at large, now of record, for access through or use of the property within the proposed
subdivision.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration, together with all written and oral reports included for the environmental assessment for
the application,the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and
Monitoring Program attached hereto, and incorporated herein by this reference, based upon the
findings as follows:
a. That the Mitigated Negative Declaration has been prepared in compliance with the
California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines
promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared
therefore reflect the independent judgment of the Planning Commission; and, further, this
Commission has reviewed and considered the information contained in said Mitigated Negative
Declaration with regard to the application.
b. Although the Mitigated Negative Declaration identifies certain significant
environmental effects that will result if the project is approved, all significant effects have been
reduced to an acceptable level by imposition of mitigation measures on the project,which are listed
below as conditions of approval.
C. Pursuant to the provisions of Section 753.5(c) of Title 14 of the California Code of
Regulations, the Planning Commission finds as follows: In considering the record as a whole, the
Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the
PLANNING COMMISSION RESOLUTION NO. 05-110
SUBTPM17303—CHARLES JOSEPH ASSOCIATES
November 9, 2005
Page 3
proposed project will have potential for an adverse impact upon wildlife resources or the habitat
upon which wildlife depends. Further, based upon the substantial evidence contained in the
Mitigated Negative Declaration, the staff reports and exhibits, and the information provided to the
Planning Commission during the public hearing, the Planning Commission hereby rebuts the
presumption of adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code
of Regulations.
5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth
below and in the Standard Conditions, attached hereto and incorporated herein by this reference.
Planning Department
1) All conditions of approval for Development Review DRC2005-00458
shall apply.
2) Approval is for a six parcel subdivision of land containing 13 units for
industrial and commercial condominium purposes on Parcels 1, 2, 3,4
and 5.
3) Covenants, Conditions, and Restrictions (CC&Rs) shall be prepared
(or amended)to address such issues as reciprocal ingress and egress,
reciprocal parking, property maintenance standards and landscaping
standards, and adherence to the Uniform Sign Program in order to
ensure coordinated long term maintenance of the project. The CC&Rs
shall be reviewed and approved by the Planning Commission and the
City Attorney prior to map recordation.
Engineering Department
1) In accordance with City "Major Divided Arterial' standards, 4th Street
shall be improved including curb and gutter, sidewalk, 16,000 Lumens
HPSV street lights, street trees, access ramps, drive approaches, and
traffic R26 signs and striping, as required:
a) Drive approaches shall be in accordance with City Standard
No.101 Type C, a minimum of 35 feet wide.
b) Conduit and pertinent structures for a fiber optic cable link shall
be installed, to the satisfaction of the City Engineer.
c) Provide a westbound busbay per City Standard No.119 on 4th
Street, west of Haven Avenue (between the power poles).
d) Street requires curvilinear sidewalk. Sidewalk easement allowing
the sidewalk to meander, even along right-turn lanes, shall be
provided to the satisfaction of the City Engineer. Parkways shall
slope 2 percent from the top of curb to one foot behind the
sidewalk.
PLANNING COMMISSION RESOLUTION NO. 05-110
SUBTPM17303— CHARLES JOSEPH ASSOCIATES
November 9, 2005
Page 4
e) Provide a westbound bike lane along 4th Street frontage.
f) Protect existing traffic signal equipment in Haven Avenue and
Center Avenue, as required.
g) The status of existing a.c. pavement for possible repairs along
the 4th Street frontage shall be reviewed during plan check.
h) Restripe 4th Street with a double yellow painted median to
prohibit left turn movements.
2) Haven Avenue shall be improved in accordance with City "Major
Divided Arterial"standards, as required and including: Midblock:7-foot
half median, 13 feet, 11 feet, 16 feet = 47 feet; Intersection: 2-foot
median, 11 feet left lane, 11 feet, 11 feet, 11 feet, 14 feet right lane =
60 feet.
a) Protect curb and gutter, and provide curvilinear sidewalk, 16,000
Lumens HPSV street lights, street trees, access ramps, drive
approaches, traffic signs and striping, as required:
b) Drive approaches shall be in accordance with City Standard
Drawing No.101 Type C, a minimum of 35 feet wide.
c) Provide right turn/deceleration lanes for Haven Avenue driveways
(minimum 150 feet) and at 4th Street.
d) Provide a southbound busbay on Haven Avenue, south of
Trademark Street.
e) Conduit and pertinent structures for a fiber optic cable link shall
be installed, to the satisfaction of the City Engineer.
f) Protect existing traffic signal equipment in Haven Avenue and 4th
Street, as required.
g) Provide "Bike Lanes" on Haven Avenue.
h) The minimum stacking on Haven Avenue and 4th Street is 50
feet (distance from street face of curb to nearest edge of a
parking stall perpendicular to the drive aisle).
3) Center Avenue, Commerce Center Drive and Trademark Street
frontage improvements to be in accordance with City 'Industrial
Collector" standards including sidewalk, 5800 Lumens HPSV street
lights, street trees, drive approaches, traffic signs and striping, as
required:
a) Drive approaches shall be in accordance with City Standard
Drawing. No.101 Type C, a minimum of 35 feet wide.
PLANNING COMMISSION RESOLUTION NO. 05-110
SUBTPM17303 — CHARLES JOSEPH ASSOCIATES
November 9, 2005
Page 5
b) Easements for public sidewalks and/or street trees placed
outside the public right-of-way shall be dedicated to the City.
c) Protect existing traffic signing and striping and R26(s) signs and
repair or replace, as required.
4) The existing overhead utilities (telecommunications and electrical,
except for the 66 KV electrical) on the project side of 4th Street shall be
undergrounded from the first pole west of Haven Avenue to the first
pole west of Center Avenue, prior to public improvement acceptance or
occupancy, whichever occurs first. The developer may request a
reimbursement agreement to recover one-half the City adopted cost for
undergrounding from future development as it occurs on the opposite
side of the street. If the developer fails to submit for said
reimbursement agreement within six months of the public
improvements being accepted by the City, all rights of the developer to
reimbursement shall terminate.
5) The existing overhead utilities (telecommunications and electrical,
except for the 66 KV electrical) on the project side of Haven Avenue
shall be undergrounded from the first pole north of Trademark Streetto
the first pole south of 4th Street, prior to public improvement
acceptance or occupancy, whichever occurs first. The developer may
request a reimbursement agreement to recover one-half the City
adopted cost for undergrounding from future development as it occurs
on the opposite side of the street. If the developer fails to submit for
said reimbursement agreement within six months of the public
improvements being accepted by the City, all rights of the developer to
reimbursement shall terminate
6) Provide a traffic signal at the intersection of Haven Avenue and
Trademark Street. The developer may request reimbursement to
recover the costs via Transportation Fee Credit/Reimbursement
Agreement.
7) The City gateway monumentation shown on the Master Site Plan shall
be installed per the City's General Plan, to the satisfaction of the City
Engineer. Said gateway monumentation shall be similar to the existing
monumentation at the northeast corner of Haven Avenue and 4th
Street.
8) A contribution in-lieu of construction for the future median island in 4th
Street shall be paid to the City prior to issuance of building permits or
Final Parcel Map approval, whichever comes first. The amount of
contribution shall be one-half the cost of the median times the length of
the project frontage.
9) The Water Quality Management Plan (WQMP) submitted with the
tentative map application has been reviewed and found to be
PLANNING COMMISSION RESOLUTION NO. 05-110
SUBTPM17303 — CHARLES JOSEPH ASSOCIATES
November 9, 2005
Page 6
substantially complete. Include the Best Management Practices
(BMPs) identified in the plan on the Grading Plans when submitted for
technical plan check.
Environmental Mitigation
Air Quality
1) All construction equipment shall be maintained in good operating
condition so as to reduce operational emissions. Contractor shall
ensure that all construction equipment is being properly serviced and
maintained as per manufacturers'specifications. Maintenance records
shall be available at the construction-site for City verification.
2) Prior to the issuance of any grading permits, developer shall submit
construction plans to City denoting the proposed schedule and
projected equipment use. Construction contractors shall provide
evidence that low emission mobile construction equipment will be
utilized, or that their use was investigated and found to be infeasible for
the project. Contractors shall also conform to any construction
measures imposed bythe South Coast Air Quality Management District
(SCAQMD) as well as City Planning Staff.
3) All paints and coatings shall meet or exceed performance standards
noted in SCAQMD Rule 1113. Paints and coatings shall be applied
either by hand or high-volume, low-pressure spray.
4) All asphalt shall meet or exceed performance standards noted in
SCAQMD Rule 1108.
5) All construction equipment shall comply with SCAQMD Rules 402 and
403. Additionally, contractors shall include the following provisions:
• Reestablish ground cover on the construction-site through
seeding and watering.
• Pave or apply gravel to any on-site haul roads.
• Phase grading to prevent the susceptibility of large areas to
erosion over extended periods of time.
• Schedule activities to minimize the amounts of exposed
excavated soil during and after the end of work periods.
• Dispose of surplus excavated material in accordance with local
ordinances and use sound engineering practices.
• Sweep streets according to a schedule established by the City if
silt is carried over to adjacent public thoroughfares or occurs as a
result of hauling. Timing may vary depending upon the time of
year of construction.
• Suspend grading operations during high winds(i.e.,wind speeds
exceeding 25 mph) in accordance with Rule 403 requirements.
PLANNING COMMISSION RESOLUTION NO. 05-110
SUBTPM17303— CHARLES JOSEPH ASSOCIATES
November 9, 2005
Page 7
• Maintain a minimum 24-inch freeboard ratio on soils haul trucks
or cover payloads using tarps or other suitable means.
6) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and Regional Water Quality Control Board
[RWQCB]) daily to reduce PM10 emissions, in accordance with
SCAQMD Rule 403.
7) Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be
applied to all inactive construction areas that remain inactive for 96
hours or more to reduce PM10 emissions.
8) The construction contractor shall utilize electric or clean alternative fuel
powered equipment where feasible.
9) The construction contractor shall ensure that construction-grading
plans include a statement that work crews will shut off equipment when
not in use.
10) All industrial and commercial facilities shall post signs requiring that
trucks shall not be left idling for prolonged periods (i.e., in excess of 10
minutes).
11) All industrial and commercial facilities shall designate preferential
parking for vanpools.
12) All industrial and commercial site tenants with 50 or more employees
shall be required to post both bus and Metrolink schedules in
conspicuous areas.
13) All industrial and commercial site tenants with 50 or more employees
shall be required to configure their operating schedules around the
Metrolink schedule to the extent reasonably feasible.
14) All residential and commercial structures shall be required to
incorporate high-efficiency/low-polluting heating, air conditioning,
appliances, and water heaters.
15) All residential and commercial structures shall be required to
incorporate thermal pane windows and weather-stripping.
Cultural Resources
1) If any prehistoric archaeological resources are encountered before or
during grading, the developer will retain a qualified archaeologist to
monitor construction activities,to take appropriate measures to protect
or preserve them for study. With the assistance of the archaeologist,
the City of Rancho Cucamonga will:
PLANNING COMMISSION RESOLUTION NO. 05-110
SUBTPM17303 — CHARLES JOSEPH ASSOCIATES
November 9, 2005
Page 8
• Enact interim measures to protect undesignated sites from
demolition or significant modification without an opportunity for
the City to establish its archaeological value.
• Consider establishing provisions to require incorporation of
archaeological sites within new developments, using theirspecial
qualities as a theme or focal point.
• Pursue educating the public about the area's archaeological
heritage.
• Propose mitigation measures and recommend conditions of
approval to eliminate adverse project effects on significant,
important, and unique prehistoric resources, following
appropriate CEQA guidelines.
• Prepare a technical resources management report, documenting
the inventory, evaluation, and proposed mitigation of resources
within the project area. Submit one copy of the completed report
with original illustrations, to the San Bernardino County
Archaeological Information Center for permanent archiving.
2) If any paleontological resource (i.e. plant or animal fossils) is
encountered before or during grading, the developer will retain a
qualified paleontologist to monitor construction activities, to take
appropriate measures to protect or preserve them for study. The
paleontologist shall submit a report of findings that will also provide
specific recommendations regarding further mitigation measures (i.e.,
paleontological monitoring)that may be appropriate. Where mitigation
monitoring is appropriate, the program must include, but not be limited
to, the following measures:
• Assign a paleontological monitor, trained and equipped to allow
the rapid removal of fossils with minimal construction delay, to
the site full-time during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared or graded,
divert earth-disturbing activities elsewhere until the monitor has
completed salvage. If construction personnel make the
discovery, the grading contractor should immediately divert
construction and notify the monitor of the find.
• Prepare, identify, and curate all recovered fossils for
documentation in the summary report and transfer to an
appropriate depository (i.e., San Bernardino County Museum).
• Submit summary report to City of Rancho Cucamonga. Transfer
collected specimens with a copy of the report to San Bernardino
County Museum.
PLANNING COMMISSION RESOLUTION NO. 05-110
SUSTPM17303 — CHARLES JOSEPH ASSOCIATES
November 9, 2005
Page 9
Geology and Soils
1) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and RWQCB)daily to reduce PM10 emissions,
in accordance with SCAQMD Rule 403 or re-planted with drought
resistant landscaping as soon as possible.
2) Frontage public streets shall be swept according to a schedule
established by the City to reduce PM10 emissions associated with
vehicle tracking of soil off-site. Timing may vary depending upon the
time of year of construction.
3) Grading operations shall be suspended when wind speeds exceed
25 mph to minimize PM10 emissions from the site during such
episodes.
4) Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be
applied to all inactive construction areas that remain inactive for 96
hours or more to reduce PM10 emissions.
Hydrology and Water Quality
1) Prior to issuance of grading permits, the permit applicant shall submit
to Building Official for approval, Storm Water Pollution Prevention Plan
(SWPPP) specifically identifying Best Management Practices (BMPs)
that shall be used on-site to reduce pollutants during construction
activities entering the storm drain system to the maximum extent
practical.
2) An erosion control plan shall be prepared, included in grading plan,
and implemented for the proposed project that identifies specific
measures to control on-site and off-site erosion from the time ground
disturbing activities are initiated through completion of grading. This
erosion control plan shall include the following measures at a
minimum: a) Specify the timing of grading and construction to
minimize soil exposure to rainy periods experienced in southern
California, and b) An inspection and maintenance program shall be
included to ensure that any erosion which does occur either on-site or
off-site as a result of this project will be corrected through a
remediation or restoration program within a specified time frame.
3) During construction, temporary berms such as sandbags or gravel
dikes must be used to prevent discharge of debris or sediment from the
site when there is rainfall or other runoff.
4) During construction, to remove pollutants, street cleaning will be
performed prior to storm events and after the use of water trucks to
control dust in order to prevent discharge of debris or sediment from
the site.
PLANNING COMMISSION RESOLUTION NO. 05-110
SUBTPM17303 — CHARLES JOSEPH ASSOCIATES
November 9, 2005
Page 10
5) The developer shall implement the BMPs identified in the Water
Quality Management Plan prepared by Thomsen Engineering, July
2005 to reduce pollutants after construction entering the storm drain
system to the maximum extent practical.
6) Landscaping plans shall include provisions for controlling and
minimizing the use of fertilizers/pesticides/herbicides. Landscaped
areas shall be monitored and maintained for at least two years to
ensure adequate coverage and stable growth. Plans for these areas,
including monitoring provisions for a minimum of two years, shall be
submitted to the City for review and approval prior to the issuance of
grading permits.
7) Drainage has been directed to landscape areas for percolation before
pick-up in storm drains.
8) Prior to issuance of building permits, the applicant shall submit to the
City Engineer for approval of a Water Quality Management Plan
(WQMP), including a project description and identifying Best
Management Practices (BMPs) that will be used on-site to reduce
pollutants into the storm drain system to the maximum extent
practicable. The WQMP shall identify the structural and non-structural
measures consistent with the Guidelines for New Development and
Redevelopment adopted by the City of Rancho Cucamonga in June
2004.
9) Prior to issuance of grading or paving permits, applicant shall obtain a
Notice of Intent (NOI) to comply with obtaining coverage under the
National Pollutant Discharge Elimination System (NPDES) General
Construction Storm Water Permit from the State Water Resources
Control Board. Evidence that this has been obtained (i.e., a copy of
the Waste Discharger's Identification Number)shall be submitted to the
City Building Official for coverage under the NPDES General
Construction Permit.
Noise
1) Exterior: A 6-foot high sound attenuation barrier shall be constructed
around the entire perimeter of the pool area at hotel.
2) Interior: A final acoustical report shall be submitted for City Planner
review and approval prior to the issuance of building permits. The final
report shall discuss the level of interior noise attenuation to below 60
dBA,the building materials and construction techniques required. The
building plans will be checked for conformance with the mitigation
measures contained in the final report.
3) Construction or grading shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday.
PLANNING COMMISSION RESOLUTION NO. 05-110
SUBTPM17303— CHARLES JOSEPH ASSOCIATES
November 9, 2005
Page 11
4) Construction or grading noise levels shall not exceed the standards
specified in Development Code Section 17.02.120-D, as measured at
the property line. The developer shall hire a consultant to perform
weekly noise level monitoring as specified in Development Code
Section 17.02.120. Monitoring at other times may be required by the
Building Official. Said consultant shall report their findings to the
Building Official within 24 hours; however, if noise levels exceed the
above standards, then the consultant shall immediately notify the
Building Official. If noise levels exceed the above standards, then
construction activities shall be reduced in intensity to a level of
compliance
5) Haul truck deliveries shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday. Additionally, if heavy trucks used
for hauling would exceed 100 daily trips (counting both to and from the
construction site), then the developer shall prepare a noise mitigation
plan denoting any construction traffic haul routes. To the extent
feasible, the plan shall denote haul routes that do not pass sensitive
land uses or residential dwellings.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 9TH DAY OF NOVEMBER 2005.
PLANN;�7
MMISSION OF THE CITY OF RANCHO CUCAMONGA
BY: I
Paewart, Chairman
ATTEST:
Dan Coleman, Acting Secretary
I, Dan Coleman, Acting Secretary of the Planning Commission of the City of Rancho Cucamonga,
do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and
adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the
Planning Commission held on the 9th day of November 2005, by the following vote-to-wit:
AYES: COMMISSIONERS: FLETCHER, McNIEL, McPHAIL, STEWART
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: MACIAS
City of Rancho Cucamonga
\ MITIGATION MONITORING
PROGRAM
Project File No.: Tentative Parcel Map SUBTPM17303, Development Review DRC2005-00458,
and Variance DRC2005-00830
This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation
measures identified in the Mitigated Negative Declaration for the above-listed project. This program
has been prepared in compliance with State law to ensure that adopted mitigation measures are
implemented (Section 21081.6 of the Public Resources Code).
Program Components - This MMP contains the following elements:
1. Conditions of approval that act as impact mitigation measures are recorded with the action and
the procedure necessary to ensure compliance.The mitigation measure conditions of approval
are contained in the adopted Resolution of Approval for the project.
2. A procedure of compliance and verification has been outlined for each action necessary. This
procedure designates who will take action, what action will be taken and when, and to whom
and when compliance will be reported.
3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring
progresses, changes to compliance procedures may be necessary based upon
recommendations by those responsible for the program.
Program Management - The MMP will be in-place through all phases of the project. The project
planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project
planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly
and proper action is taken on each mitigation. Each City department shall ensure compliance of the
conditions (mitigation) that relate to that department. ,
Procedures - The following steps will be followed by the City of Rancho Cucamonga.
1. A fee covering all costs and expenses, including any consultants' fees, incurred by the City in
performing monitoring or reporting programs shall be charged to the applicant.
2. A MMP Reporting Form will be prepared for each potentially significant impact and its
corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached
hereto. This procedure designates who will take action, what action will be taken and when,and
to whom and when compliance will be reported. All monitoring and reporting documentation will
be kept in the project file with the department having the original authority for processing the
project. Reports will be available from the City upon request at the following address:
City of Rancho Cucamonga - Lead Agency
(Planning Department)
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
Mitigation Monitoring Program
SUBTPM17303, DRC2005-00458, and DRC2005-00830
Page 2
3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,as
determined by the project planner or responsible City department,to monitor specific mitigation
activities and provide appropriate written approvals to the project planner.
4. The project planner or responsible City department will approve, by signature and date, the
completion of each action item that was identified on the MMP Reporting Form. After each
measure is verified for compliance, no further action is required for the specific phase of
development.
5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off
as completed by the project planner or responsible City department at the bottom of the MMP
Reporting Form.
6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation
measures. The project planner is responsible for approving any such refinements or additions.
An MMP Reporting Form will be completed bythe project planneror responsible Citydepartment
and a copy provided to the appropriate design, construction, or operational personnel.
7. The project planner or responsible City department has the authority to stop the work of
construction contractors if compliance with any aspects of the MMP is not occurring after written
notification has been issued. The project planner or responsible City department also has the
authority to hold certificates of occupancies if compliance with a mitigation measure attached
hereto is not occurring.The project planner or responsible City department has the authority to
hold issuance of a business license until all mitigation measures are implemented.
8. Any conditions (mitigation) that require monitoring after project completion shall be the
responsibility of the City of Rancho Cucamonga Planning Division.The Division shall require the
applicant to post any necessary funds (or other forms of guarantee)with the City. These funds
shall be used by the City to retain consultants and/or pay for City staff time to monitor and report
on the mitigation measure for the required period of time.
9. In those instances requiring long-term project monitoring, the applicant shall provide the City
with a plan for monitoring the mitigation activities at the project site and reporting the monitoring
results to the City. Said plan shall identify the reporter as an individual qualified to know whether
the particular mitigation measure has been implemented. The monitoring/reporting plan shall
conform to the City's MMP and shall be approved by the Community Development Director or
City Planner prior to the issuance of building permits.
MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III)
Project File No.: Tentative Parcel Map SUBTPM17303, Development Review DRC2005-00458, and Variance DRC2005-00830
Applicant: The Hileman Company
Initial Study Prepared by: Donald Granger Date: September 7, 2005
Mitigation Measures No./ Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Air Quality
All construction equipment shall be maintained in good CP C Review of plans A/C 2/4
operating condition so as to reduce operational
emissions. Contractor shall ensure that all construction
equipment is being properly serviced and maintained as
per manufacturers'specifications. Maintenance records
shall be available at the construction site for City
verification.
Prior to the issuance of any grading permits, developer CP/BO C Review of plans C 2
shall submit construction plans to City denoting the
proposed schedule and projected equipment use.
Construction contractors shall provide evidence that low
emission mobile construction equipment will be utilized,
or that their use was investigated and found to be
infeasible for the project. Contractors shall also conform
to any construction measures imposed by the South
Coast Air Quality Management District (SCAQMD) as
well as City Planning Staff.
All paints and coatings shall meet or exceed CP C Review of plans A/C 2/4
performance standards noted in SCAQMD Rule 1113.
Paints and coatings shall be applied either by hand or
high-volume, low-pressure spray.
All asphalt shall meet or exceed performance standards BO B Review of plans A/C 2
noted in SCAQMD Rule 1108.
All construction equipment shall comply with SCAQMD BO C Review of plans A/C 2/4
Rules 402 and 403. Additionally, contractors shall
include the following provisions:
1 of 9
Mitigation Measures No./ Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
• Reestablish ground cover on the construction site BO C Review of plans A/C 2/4
through seeding and watering.
• Pave or apply gravel to any on-site haul roads. BO C Review of plans A/C 2/4
• Phase grading to prevent the susceptibility of large BO C Review of plans A/C 2/4
areas to erosion over extended periods of time.
• Schedule activities to minimize the amounts of BO C Review of plans A/C 2/4
exposed excavated soil during and after the end of
work periods.
• Dispose of surplus excavated material in BO C Review of plans A 4
accordance with local ordinances and use sound
engineering practices.
• Sweep streets according to a schedule established BO C During A 4
by the City if silt is carried over to adjacent public construction
thoroughfares or occurs as a result of hauling.
Timing may vary depending upon the time of year of
construction.
• Suspend grading operations during high winds (i.e., BO C During A 4
wind speeds exceeding 25 mph) in accordance with construction
SCAQMD Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils BO C During A 4
haul trucks or cover payloads using tarps or other Construction
suitable means.
The site shall be treated with water or other soil- BO C During A 4
stabilizing agent (approved by SCAQMD and Regional construction
Water Quality Control Board [RWQCB]) daily to reduce
PM10 emissions,in accordance with SCAQMD Rule 403.
Chemical soil stabilizers (approved by SCAQMD and BO C During A 4
RWQCB) shall be applied to all inactive construction construction
areas that remain inactive for 96 hours or more to
reduce PM,o emissions.
The construction contractor shall utilize electric or clean BO C Review of plans A/C 4
alternative fuel powered equipment where feasible.
2 of 9
Mitigation Measures No. Responsible of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
The construction contractor shall ensure that BO C Review of plans A/C 2/4
construction-grading plans include a statement that work
crews will shut off equipment when not in use.
All industrial and commercial facilities shall post signs BO C Review of plans A 4
requiring that trucks shall not be left idling for prolonged
periods (i.e., in excess of 10 minutes).
All industrial and commercial facilities shall designate CP C Review of plans A/C 2/3
preferential parking for vanpools.
All industrial and commercial site tenants with 50 or CP C Review of plans D 2/3
more employees shall be required to post both bus and
Metrolink schedules in conspicuous areas.
All industrial and commercial site tenants with 50 or CP C Review of plans D 2/3
more employees shall be required to configure their
operating schedules around the Metrolink schedule to
the extent reasonably feasible.
All residential and commercial structures shall be BO C/D Review of plans C 2/4
required to incorporate high-efficiency/low-polluting
heating,air conditioning,appliances,and water heaters.
All residential and commercial structures shall be BO C/D Review of plans C 2/4
required to incorporate thermal pane windows and
weather-stripping.
Cultural Resources
If any prehistoric archaeological resources are
encountered before or during grading,the developer will
retain a qualified archaeologist to monitor construction
activities, to take appropriate measures to protect or
preserve them for study. With the assistance of the
archaeologist, the City of Rancho Cucamonga will:
Enact interim measures to protect undesignated CP/BO C Review of report A/D 3/4
sites from demolition or significant modification
without an opportunity for the City to establish its
archaeological value.
3 of 9
Mitigation Measures No./ Responsible Monitoring Timing of of Verif led Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
• Consider establishing provisions to require CP/BO C Review of report A/D 3/4
incorporation of archaeological sites within new
developments, using their special qualities as a
theme or focal point.
Pursue educating the public about the area's CP/BO C Review of report A/D 3/4
archaeological heritage.
Propose mitigation measures and recommend CP/BO C Review of report A/D 3/4
conditions of approval to eliminate adverse project
effects on significant, important, and unique
prehistoric resources, following appropriate CEQA
guidelines.
• Prepare a technical resources management report, CP C Review of report A/D 3/4
documenting the inventory, evaluation, and
proposed mitigation of resources within the project
area. Submit one copy of the completed report,with
original illustrations, to the San Bernardino County
Archaeological Information Center for permanent
archiving.
If any paleontological resource (i.e. plant or animal CP B Review of report A/D 4
fossils) are encountered before or during grading, the
developer will retain a qualified paleontologist to monitor
construction activities, to take appropriate measures to
protect or preserve them for study. The paleontologist
shall submit a report of findings that will also provide
specific recommendations regarding further mitigation
measures (i.e., paleontological monitoring) that may be
appropriate. Where mitigation monitoring is appropriate,
the program must include, but not be limited to, the
following measures:
Assign a paleontological monitor, trained and CP B Review of report A/D 4
equipped to allow the rapid removal of fossils with
minimal construction delay, to the site full-time
during the interval of earth-disturbing activities.
4 of 9
Mitigation Measures No. Responsible Monitoring of Method of Verif led Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Should fossils be found within an area being cleared BO B/C Review of report A/D 4
or graded, divert earth-disturbing activities
elsewhere until the monitor has completed salvage.
If construction personnel make the discovery, the
grading contractor should immediately divert
construction and notify the monitor of the find.
• Prepare, identify,and curate all recovered fossils for CP D Review of report D 3
documentation in the summary report and transfer to
an appropriate depository (i.e., San Bernardino
County Museum).
Submit summary report to City of Rancho CP C Review of report A/D 3/4
Cucamonga. Transfer collected specimens with a
copy of the report to San Bernardino County
Museum.
Geology and Soils
The site shall be treated with water or other soil- BO C During A 4
stabilizing agent(approved by SCAQMD and RWQCB) construction
daily to reduce PM,o emissions, in accordance with
SCAQMD Rule 403 or re-planted with drought resistant
landscaping as soon as possible.
Frontage public streets shall be swept according to a BO C During A 4
schedule established by the City to reduce PM,o construction
emissions associated with vehicle tracking of soil
off-site. Timing may vary depending upon time of year
of construction.
Grading operations shall be suspended when wind BO C During A 4
speeds exceed 25 mph to minimize PM,p emissions construction
from the site during such episodes.
Chemical soil stabilizers (approved by SCAQMD and BO C During A 4
RWQCB) shall be applied to all inactive construction construction
areas that remain inactive for 96 hours or more to
reduce PM,o emissions.
5 of 9
Hydrology and Water Quality
Prior to issuance of grading permits,the permit applicant BO B/C/D Review of plans A/C 2/4
shall submit to Building Official for approval, Storm
Water Pollution Prevention Plan (SWPPP) specifically
identifying Best Management Practices (BMPs) that
shall be used on-site to reduce pollutants during
construction activities entering the storm drain system to
the maximum extent practical.
An erosion control plan shall be prepared, included in BO B/C/D Review of plans A/C 2/4
grading plan, and implemented for the proposed project
that identifies specific measures to control on-site and
off-site erosion from the time ground disturbing activities
are initiated through completion of grading. This erosion
control plan shall include the following measures at a
minimum: a) Specify the timing of grading and
construction to minimize soil exposure to rainy periods
experienced in Southern California,and b)An inspection
and maintenance program shall be included to ensure
that any erosion which does occur either on-site or off-
site as a result of this project will be corrected through a
remediation or restoration program within a specified
time frame.
During construction, temporary berms such as BO B/C/D Review of plans A/C 2/4
sandbags or gravel dikes must be used to prevent
discharge of debris or sediment from the site when there
is rainfall or other runoff.
During construction, to remove pollutants, street BO B/C/D Review of plans A/C 2/4
cleaning will be performed prior to storm events and
after the use of water trucks to control dust in order to
prevent discharge of debris or sediment from the site.
The developer shall implement the BMPs identified in CE B/C/D Review of plans A/C 2/4
the Water Quality Management Plan prepared by
Thomsen Engineering, July 2005 to reduce pollutants
after construction entering the storm drain system to the
maximum extent practical.
6 of 9
Landscaping plans shall include provisions for BO B/C/D Review of plans A/C 2/4
controlling and minimizing the use of
fertilizers/pesticides/herbicides. Landscaped areas shall
be monitored and maintained for at least two years to
ensure adequate coverage and stable growth. Plans for
these areas, including monitoring provisions for a
minimum of two years, shall be submitted to the City for
review and approval prior to the issuance of grading
permits.
Drainage has been directed to landscape areas for CE B/C/D Review of plans A/C 2/4
percolation before pick-up in storm drains.
Prior to issuance of building permits,the applicant shall CE B/C/D Review of plans A/C 2/4
submit to the City Engineer for approval of a Water
Quality Management Plan (WQMP), including a project
description and identifying Best Management Practices
(BMPs)that will be used on-site to reduce pollutants into
the storm drain system to the maximum extent
practicable. The WQMP shall identify the structural and
non-structural measures consistent with the Guidelines
for New Development and Redevelopment adopted by
the City of Rancho Cucamonga in June 2004.
Prior to issuance of grading or paving permits,applicant BO B/C/D Review of plans A/C 2/4
shall obtain a Notice of Intent (NOI) to comply with
obtaining coverage under the National Pollutant
Discharge Elimination System (NPDES) General
Construction Storm Water Permit from the State Water
Resources Control Board. Evidence that this has been
obtained (i.e., a copy of the Waste Discharger's
Identification Number) shall be submitted to the City
Building Official for coverage under the NPDES General
Construction Permit.
Noise
Exterior:A 6-foot high sound attenuation barrier shall be CP C During A A
constructed around the entire perimeter of the pool area construction
at hotel.
7 of 9
Interior: A final acoustical report shall be submitted for CP C During A A
City Planner review and approval prior to the issuance of construction
building permits. The final report shall discuss the level
of interior noise attenuation to below 60 dBA, the
building materials and construction techniques required.
The building plans will be checked for conformance with
the mitigation measures contained in the final report.
Construction or grading shall not take place between the BO C During A 4
hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction
including Saturday, or at any time on Sunday or a
national holiday.
Construction or grading noise levels shall not exceed the BO C During A 4
standards specified in Development Code Section construction
17.02.120-D, as measured at the property line. The
developer shall hire a consultant to perform weekly
noise level monitoring as specified in Development
Code Section 17.02.120. Monitoring at other times may
be required by the Building Official. Said consultant
shall report their findings to the Building Official within 24
hours; however, if noise levels exceed the above
standards, then the consultant shall immediately notify
the Building Official. If noise levels exceed the above
standards,then construction activities shall be reduced
in intensity to a level of compliance with above noise
standards or halted.
Haul truck deliveries shall not take place between the PO/BO C During A 4R
hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction
including Saturday, or at any time on Sunday or a
national holiday. Additionally, if heavy trucks used for
hauling would exceed 100 daily trips (counting both to
and from the construction site),then the developer shall
prepare a noise mitigation plan denoting any
construction traffic haul routes. To the extent feasible,
the plan shall denote haul routes that do not pass
sensitive land uses or residential dwellings.
8 of 9
Key to Checklist Abbreviations
Responsible Person Monitoring Frequency Method of Verification Sanctions
CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map
CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit
CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy
BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order
PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds
FC-Fire Chief or designee 6-Revoke CUP
7-Citation
i:\planning\final\cega\mmchklst-rev1-05final.doc
9 of 9
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT#: TENTATIVE PARCEL MAP SUBTPM17303
SUBJECT: SUBDIVISION OF SIX PARCELS
APPLICANT: CHARLES JOSEPH ASSOCIATES
LOCATION: NORTHWEST CORNER OF HAVEN AVENUE AND 4TH STREET
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
A. General Requirements Completion Date
1. The applicant shall agree to defend at his sole expense any action brought against the City, its
agents,officers,or employees, because of the issuance of such approval,or in the alternative,to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or
employees, for any Court costs and attorney's fees which the City, its agents, officers, or
employees may be required by a court to pay as a result of such action. The City may,at its sole
discretion, participate at its own expense in the defense of any such action but such participation
shall not relieve applicant of his obligations under this condition.
2. Approval of Tentative Parcel No. SUBTPM17303 is granted subject to the approval
DRC2005-00458.
B. Time Limits
1. This tentative tract map or tentative parcel map shall expire, unless extended by the Planning
Commission, unless a complete final map is filed with the City Engineer within 3 years from the
date of the approval.
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which include
site plans,architectural elevations,exterior materials and colors,landscaping,sign program,and
grading on file in the Planning Department, the conditions contained herein, and Development
Code regulations.
2. . Prior to any use of the project site or business activity being commenced thereon,all Conditions _/—j_
of Approval shall be completed to the satisfaction of the City Planner.
1
Project No.SUSTPM17303
Completion Date
3. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved
use has commenced, whichever comes first.
4. Approval of this request shall not waive compliance with all sections of the Development Code,all
other applicable City Ordinances, and applicable Community or Specific Plans in effect at the
time of building permit issuance.
5. The Covenants, Conditions, and Restrictions (CC&Rs) and Articles of Incorporation of the
Homeowners' Association are subject to the approval of the Planning and Engineering
Departments and the City Attorney. They shall be recorded concurrently with the Final Map or
prior to the issuance of building permits, whichever occurs first. A recorded copy shall be
provided to the City Engineer. The Homeowners' Association shall submit to the Planning
Department a list of the name and address of their officers on or before January 1 of each and
every year and whenever said information changes.
D. Environmental
1. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures, including monitoring and reporting. Applicant shall be required to
post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the
amount of $49.9 nn nrinr to the issuance of building permits, guaranteeing satisfactory
performance and completion of all mitigation measures. These funds maybe used bythe City to
retain consultants and/or pay for City staff time to monitor and report on the mitigation measures.
Failure to complete all actions required by the approved environmental documents shall be
considered grounds for forfeit.
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT,(909)477-2710,
FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
E. General Requirements
1. Submit five complete sets of plans including the following:
a. Site/Plot Plan;
b. Foundation Plan;
C. Floor Plan;
d. Ceiling and Roof Framing Plan;
e. Electrical Plans (2 sets,detached) including the size of the main switch, number and size
of service entrance conductors, panel schedules, and single line diagrams;
f. Plumbing and Sewer Plans,including isometrics, underground diagrams,water and waste
diagram, sewer or septic system location, fixture units, gas piping, and heating and air
conditioning; and
g. Planning Department Project Number (i.e., SUBTPM17303) clearly identified on the
outside of all plans.
2. Submit two sets of structural calculations, energy conservation calculations, and a soils report.
Architect's/Engineer's stamp and "wet"signature are required prior to plan check submittal.
2
Project No.SUBTPM17303
Completion Date
3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to
the City prior to permit issuance.
4. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the
Building and Safety Department.
F. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be
marked with the project file number (i.e., SUBTPM17303). The applicant shall comply with the
latest adopted California Codes, and all other applicable codes, ordinances, and regulations in
effect at the time of permit application. Contact the Building and Safety Department for
availability of the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new commercial or industrial development project or _/_/_
major addition,the applicant shall pay development fees at the established rate. Such fees may
include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation
Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program
deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to
the Building and Safety Department prior to permits issuance.
3. The Building and Safety Official shall provide the street addresses after tract/parcel map
recordation and prior to issuance of building permits.
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday
through Saturday, with no construction on Sunday or holidays.
5. Construct trash enclosure(s) per City Standard (available at the Planning Department's public
counter).
G. New Structures
1. Provide compliance with the California Building Code (CBC) for property line clearances
considering use, area, and fire-resistiveness.
2. The project shall be designed to comply with the 2001 California Building Codes, the California
Fire Code and with RCFPD Ordinances 15 & 39.
3. Provide compliance with the California Building Code for required occupancy separations.
4. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC
Section 1505.
.5. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A.
6. Openings in exterior walls shall be protected in accordance with CBC Table 5-A.
7. Provide the required restroom facilities per the CBC Appendix Chapter 29.
8. All exit components must comply with the requirements of CBC Chapter 10 (adjoining rooms,
rated corridors, door swings, separation of exits, etc.).
9. At the time of tenant improvement plan check submittal (for construction), additional
requirements may be required.
10. Clearly indicate on the plans compliance with ADA requirements for the disabled.
11. A registered architect must sign and stamp the plans.
3
Project No.SUBTPM17303
Completion Date
H. Grading
1. Grading of the subject property shall be in accordance with California Building Code,City Grading
Standards, and accepted grading practices. The final grading plan shall be in substantial
conformance with the approved grading plan.
2. A soils report shall be prepared by a qualified engineer licensed by the State of California to
perform such work.
3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the
time of application for grading plan check.
4. At the time of tenant improvement plan check submittal(or construction),additional requirements
may be required.
5. The final Grading Plan, appropriate certifications and compaction reports shall be completed,
submitted, and approved by the Building and Safety Official prior to the issuance of building
permits.
6. A separate grading plan check submittal is required for all new construction projects and for
existing buildings where improvements being proposed will generate 50 cubic yards or more of
combined cut and fill. The grading plan shall be prepared,stamped, and signed by a California
registered Civil Engineer.
Note that on title sheet that tenant improvement plans must be submitted for plan check and be
approved prior to construction. The applicant shall comply with the latest adopted California Codes,
and all other applicable codes, ordinances, and regulations in effect at the time of permit application.
Contact the Building and Safety Department if you have any questions about the procedure at
(909) 477-2710.
APPLICANT SHALL CONTACT THE ENGINEERING DEPARTMENT, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
I. Dedication and Vehicular Access
1. Dedication shall be made of the following rights-of-way on the perimeter streets(measured from
street centerline):
33 total feet on Center Avenue.
33 total feet on Commerce Center Drive.
33 total feet on Trademark Street.
2. Corner property line cutoffs shall be dedicated per City Standards.
3. Reciprocal access easements shall be provided ensuring access to all parcels by CC&Rs or by _/_/_
deeds and shall be recorded concurrently with the map.
4. Reciprocal parking agreements for all parcels and maintenance agreements ensuring joint
maintenance of all common roads, drives, or parking areas shall be provided by CC & R's or
deeds and shall be recorded prior to, or concurrent with, the final parcel map.
5. Private drainage easements for cross-lot drainage shall be provided and shall be delineated or
noted on the final map.
6. All existing easements lying within future rights-of-way shall be quit-claimed or delineated on the
final map.
7. Easements for public sidewalks and/or street trees placed outside the public right-of-way shall be
dedicated to the City.
4
Project No.SUBTPM17303
completion Date
8. Additional street right-of-way shall be dedicated along right turn lanes,to provide a minimum of 7
feet measured from the face of curbs.
J. Street Improvements
1. Pursuant to City Council Resolution No.88-557,no person shall make connections from a source
of energy,fuel or power to any building service equipment which is regulated by technical codes
and for which a permit is required unless, in addition to any and all other codes, regulations and
ordinances, all improvements required by these conditions of development approval have been
completed and accepted by the City Council,except:that in developments containing more than
one building or unit, the development may have energy connections made to a percentage of
those buildings, or units proportionate to the completion of improvements as required by
conditions of approval of development. In no case shall more than 95 percent of the buildings or
units be connected to energy prior to completion and acceptance of all improvements required by
these conditions of approval of development.
2. Construct the following perimeter street improvements including, but not limited to:
Curb 8 A.C. Side- Drive Street Street Comm Median Bike
Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other
4th Street X X (c) X X X (b),(e)
(f)
Haven Avenue X X (c) X X X
Center Avenue X X X X
Commerce Center Drive X X X X
Trademark Street X X X X
Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement
reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk
shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be
provided for this item. (e) Bike lane. (f) Bus bay.
3. Improvement Plans and Construction:
a. Street improvement plans, including street trees,street lights,and intersection safety lights
on future signal poles, and traffic signal plans shall be prepared by a registered Civil
Engineer and shall be submitted to and approved by the City Engineer. Security shall be
posted and an agreement executed to the satisfaction of the City Engineer and the City
Attorney guaranteeing completion of the public and/or private street improvements,prior to
final map approval or the issuance of building permits, whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a
construction permit shall be obtained from the City Engineer's Office in addition to any
other permits required.
C. Pavement striping, marking,traffic signing,street name signing,traffic signal conduit,and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction
project along major or secondary streets and at intersections for future traffic signals and
interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside
of BCR, ECR, or any other locations approved by the City Engineer
5
Project No.SUBTPM17303
Completion Date
Notes:
1) Pull boxes shall be No.6 at intersections and No. 5 along streets,a maximum of 200
feet apart, unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch galvanized steel with pull rope or as specified.
e. Handicapped access ramps shall be installed on all corners of intersections per City
Standards or as directed by the City Engineer.
f. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A cash
deposit shall be provided to cover the cost of grading and paving,which shall be refunded
upon completion of the construction to the satisfaction of the City Engineer.
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be
installed to City Standards, except for single family.residential lots.
h. Street names shall be approved by the City Planner prior to submittal for first plan check.
4. Provide a minimum of 3-inch conduit for future fiber optic use on all streets with connection
through the parkway to each lot or parcel (fiber-to-the curb, FTTC). The size, placement, and
location of the conduit shall be shown on the Street Improvement Plans and subject to City
Engineer review and approval prior to issuance of building permits or final map approval,
whichever comes first.
5. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in
accordance with the City's street tree program.
6
Project No.SUBTPM17303
Completion Date
6. Install street trees per City street tree design guidelines and standards as follows. The completed
legend (box below) and construction notes shall appear on the title page of the street
improvement plans. Street improvement plans shall include a line item within the construction
legend stating: "Street trees shall be installed per the notes and legend on sheet_(typically
sheet 1)." Where public landscape plans are required, tree installation in those areas shall be
per the public landscape improvement plans.
The City Engineer reserves the right to adjust tree species based upon field conditions and other
variables. For additional information, contact the Project Engineer.
Min.
Grow
Street Name Botanical Name Common Name Space Spacing Size City.
HAVEN AVENUE
FOREGROUND
P.A.8 feet or greater, Magnolia grandiflora NCN 8 ft. 60 ft.o.c.intentionally 15-gal. Fill-In
generally in front of 'Majestic Beauty" spaced this far apart
sidewalk
P.A.less than 8 feet Magnolia grandiflora NCN
"St. Mary" 3 ft. 20 ft.o.c. 15-gal.
Primary tree in masses, Brachychiton Bottle Tree 8 ft. 25 ft.o.c.-Informal— 15-gal.
mainly behind sidewalk populneus if maintained by City
4TH STREET
Foreground trees Platanus acerifolia London Plane Tree 8 ft. 30 ft.maximum- 15-gal.
approximately 60% "Blood good" Informal
Background trees Pinus canariensis Canary Island Pine 8 ft. 25 ft.maximum 15-gal.
approximately 40% Informal
Accent Lagerstroemia indica Crape Myrtle 3 ft. 20 ft. maximum 24-inch
"Muskogee" box
CENTER AVENUE Brachychiton populneus Bottle Tree 5 ft. 25 ft.o.c. 15-gal.
TRADEMARKPKWY
P.A.8 feet or greater Platanus acerifolia Landon Plane Tree 8 ft. 30 ft,o.c. 15-gal.
P.A.less than 8 ft. Prunus blireiana NCN 3 ft. 20 ft.o.c. 15-gal.
COMMERCE Magnolia grandiflora NCN 3 ft. 20 ft.o.c. 15-gal.
CENTER "St.Mary"
Construction Notes for Street Trees:
1) All street trees are to be planted in accordance with City standard plans.
2) Prior to the commencement of any planting,an agronomic soils report shall be furnished to
the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil
amendments, as determined by the City inspector.
3) All street trees are subject to inspection and acceptance by the Engineering Department.
4) Street trees are to be planted per public improvement plans only.
7. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with
adopted policy. On collector or larger streets, lines of sight shall be plotted for all project
intersections, including driveways. Local residential street intersections and commercial or
industrial driveways may have lines of sight plotted as required.
7
Project No. SUBTPM17303
Completion Date
K. Public Maintenance Areas
1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting
Districts shall be filed with the City Engineer prior to final map approval or issuance of building
permits whichever occurs first. Formation costs shall be borne by the developer.
2. Parkway landscaping on the following street(s) shall conform to the results of the respective
Beautification Master Plan: 4th Street and Haven Avenue.
L. Drainage and Flood Control
1. A final drainage study shall be submitted to and approved by the City Engineer prior to final map
approval or the issuance of building permits, whichever occurs first. All drainage facilities shall
be installed as required by the City Engineer.
M. Improvement Completion
1. If the required public improvements are not completed prior to approval of the final parcel map,
an improvement security accompanied by an agreement executed bythe Developer and the City
will be required for: 4th Street, Haven Avenue,Trademark Street,Commerce Center Drive,and
Center Avenue: curb/gutter,a.c. pavement,street lights,drive approaches, bus bays,sidewalk,
street trees, bike lanes, undergrounding of existing overhead utilities, and traffic signal.
N. Utilities
1. Provide separate utility services to each parcel including sanitary sewerage system,water,gas,
electric power, telephone, and cable TV (all underground) in accordance with the Utility
Standards. Easements shall be provided as required.
2. The developer shall be responsible for the relocation of existing utilities as necessary.
3. Water and sewer plans shall be designed and constructed to meet the requirements of the
Cucamonga Valley Water District(CVW D), Rancho Cucamonga Fire Protection District,and the
Environmental Health Department of the County of San Bernardino. A letter of compliance from
the CVW D is required prior to final map approval or issuance of permits,whichever occurs first.
Such letter must have been issued by the water district within 90 days prior to final map approval
in the case of subdivision or prior to the issuance of permits in the case of all other residential
projects.
4. Approvals have not been secured from all utilities and other interested agencies involved.
Approval of the final parcel map will be subject to any requirements that may be received from
them.
O. General Requirements and Approvals
1. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all
new streetlights for the first six months of operation, prior to final map approval orpriorto building
permit issuance if no map is involved.
2. Prior to the issuance of building permits,a Diversion Deposit and related administrative fees shall
be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if
at least 50% of all wastes generated during construction and demolition are diverted from
landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to
the Engineering Department when the first building permit application is submitted to Building and
Safety. Form CD-2 shall be submitted to the Engineering Department within 60 days following ,
the completion of the construction and/or demolition project.
8
Project No.SUBTPM17303
Completion Date
APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION
PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING
CONDITIONS:
SEE ATTACHED
9
aRancho Cucamonga Community Development
Building & Safety
COMM ERCIAUINDUSTRIAL STANDARD CONDITIONS
June 7, 2005
Haven Park
Charles Joseph &Associates
SUBI PM17303
NOTE: Any revisions may void these requirements and necessitate additional review.
A. New Structures
1 . Provide compliance with the California Building Code (CBC) for property line
clearances considering use, area, and fire-resistive construction.
2. The project shall be designed to comply with the 2001 California Building Codes
(CBC), the California Fire Code and with RCFPD Ordinances 15 & 39.
3. Provide compliance with the California Building Code for required occupancy
separations.
4. Provide draft stops in attic areas, not exceed 3,000 square feet, in accordance with
CBC Section 1505.
5. Exterior walls shall be constructed of the required fire rating in accordance with CBC
Table 5-A.
6. Openings in exterior walls shall be protected in accordance with CBC Table 5-A.
7. Provide the required restroom facilities per the CBC Appendix chapter 29.
8. All exit components must comply with the requirements of CBC Chapter 10
(adjoining rooms, rated corridors, door swings, separation of exits, etc.).
9. At the time of tenant improvement plan check submittal (for construction) additional
requirements may be required.
10. Clearly indicate on the plans compliance with ADA requirements for the disabled.
11. A register architect must sign and stamp the plans.
B. General Requirements
1 . Submit five conceptual sets of plans including the following:
a. Site/Plot Plan
b. Floor Plan
Page 1 of 3
c. Foundation Plan
d. Ceiling and Roof Framing Plan
e. Electrical Plans (2 sets, detached) including the size of main switch, number and
size of service entrance conductors, panel schedules, and single line diagrams.
f. Plumbing and Sewer Plans, including isometrics, underground diagrams, water
and waste diagram, sewer or septic system location, fixture units, gas piping, and
heating and air conditioning.
g. Planning Division CUP Tracking Number must be clearly noted on the Title Sheet
of the plans.
In. Separate permits are required for fencing and/or walls.
i. All sheets must be marked: NOT FOR CONSTRUCTION.
2. Submit two sets of structural calculations, energy conservation calculations, and a
soils report. Architect's/Engineer's stamp and "wet" signature are required prior to
plan check submittal.
3. Contractors must show proof of State and City licenses and Workers' Compensation
coverage to the City prior to permit issuance.
4. Business shall not open for operation prior to posting the Certificate of Occupancy
issued by the Building and Safety Division.
C. Site Development
1 . Plans shall be submitted for plan check and approved prior to construction. All plans
shall be marked with the project file number (i.e., DRC2003-00110 and
SUBTPM16125). The applicant shall comply with the latest adopted California
Codes, and all other applicable codes, ordinances, and regulations in effect at the
time of permit application. Contact the Building and Safety Division for availability of
the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new commercial or industrial development
project or major addition, the applicant shall pay development fees at the established
rate. Such fees may include, but are not limited to: City Beautification Fee, Park
Fee, Drainage Fee, Transportation Development Fee, Permit and Plan Check Fees,
and School Fees. Applicant shall provide a copy of the school fees receipt to the
Building and Safety Division prior to permit issuance.
3. The Building and Safety Official shall provide the street addresses after tract/parcel
map recordation and prior to issuance of building permits.
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m.
Monday through Saturday, with no construction on Sunday or holidays.
5. Construct trash enclosure(s) per City Standard (available at the Planning Division's
public counter).
D. Grading
1 . Grading of the subject property shall be in accordance with California Building Code,
City Grading Standards, and accepted grading practices. The final Grading Plan
shall be in substantial conformance with the approved Grading Plan.
Page 2 of 3
2. A soils report shall be prepared by a qualified Engineer licensed by the State of
California to perform such work.
3. A geological report shall be prepared by a qualified Engineer or Geologist and
submitted at the time of application for grading plan check.
4. At the time of tenant improvement plan check submittal (for construction) additional
requirements may be required.
5. The final Grading Plan, appropriate certifications and compaction reports shall be
completed, submitted, and approved by the Building and Safety Official prior to the
issuance of building permits.
6. A separate grading plan check submittal is required for all new construction projects
and for existing buildings where improvements being proposed will generate 50
cubic yards or more of combined cut and fill. The Grading Plan shall be prepared,
stamped, and signed by a California registered Civil Engineer.
Note on title sheet that tenant improvement plans must be submitted for plan check and be
approved prior to construction. The applicant shall comply with the latest adopted California
Codes, and all other applicable codes, ordinances, and regulations in effect at the time of
permit application. Contact the Building and Safety Division if you have any questions about
the procedure at 909-477-2710.
1
Page 3 of 3
Planning Standard Conditions Commercial (Master)
Rancho Cucamonga Fire Protection District
Fire Construction Services
STANDARD CONDITIONS
August 22, 2005—Amended on November 9, 2005
Haven Park
Hotel, Office & Retail Development
Haven Avenue & 4th Street
SUBTPM17303 & DRC2005-00458
THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS
PROJECT.
Charles Joseph Associates (CJA) as the applicant for the project has requested in writing
consideration by Fire Construction Services (FCS), the Building and Safety Department (B&S)
and Rancho Cucamonga Fire Protection District (RCFPD) regarding building features and site
access issues, which the submittal team was not able to provide in the time line allotted by CJA
to meet their goals.
1. The total building height of the structure excluding the tower must be limited to 50'
measured from the surrounding grade to the highest peak of the roof(for structures without
basements). The adjustments to the height of the building must be made before any further
technical review.
2. Site access for structures (4) stories and higher must meet the requirements of Appendix I-
B in the RCFPD Ordinance 39 for ladder access. The deficiencies in the site design are a
lack of a 20' wide operational concrete or grassy area on two sides of the buildings and the
obstructions (trees) to these sides of the building, which exceed five feet in height. FCS &
RCFPD has met with Donald Granger of RC Planning Department to discuss the issues
regarding the placement of trees on two 40' sections of the west and south elevations as
well as the entire north elevation. The conclusion of the discussion is to eliminate any tree
along the two 40' sections on the west and east elevations, to plant the required trees on the
north elevations in between the windows and limit these trees to dwarf species. The
placement of light standards must also meet the Ordinance requirements.
3. Further design of the site must allow adequate space on the north elevation to allow the
RCFPD firefighters to place ground ladders on the building at a 65% inclination to reach the
third floor windows plus a 4' to 6' space between the ground ladder and the parked vehicles.
4. The project coordinator must work with Planning Department and FCS to achieve a design
that is acceptable to the Planning Commission that meets the safety criteria of the RCFPD.
Fire Conditions Based on The "Fire Response Time" policy.
1. Installation of automatic fire sprinklers throughout.
2. The property owner shall meet with the Fire Chief for the purpose of developing a voluntary
program for the installation of Automated External Defibrillators (AED's) on each floor of a
structure in an approved location.
3. The property owner/landlord shall meet with the Fire Chief for the purpose of developing a
voluntary program to provide CPR/AED training to the tenants on an annual basis as
approved by the Fire District.
4. Annexation to Community Facilities District 85-1 or 88-1 as determined by the Fire District.
FSC-1 Public and Private Water Supply
1. Design guidelines for Fire Hydrants: The following provides design guidelines for the spacing and
location of fire hydrants:
a. The maximum distance between fire hydrants in commercial/industrial projects is 300-feet.
No portion of the exterior wall shall be located more than 150-feet from an approved fire
hydrant. For cul-de-sacs, the distance shall not exceed 100-feet.
b. Fire hydrants are to be located. The preferred locations for fire hydrants are:
i. At the entrance(s) to a commercial, industrial or residential project from the public
roadways.
ii. At intersections.
iii. On the right side of the street, whenever practical and possible.
iv. As required by the Fire Safety Department to meet operational needs of the Fire District.
V. A minimum of forty-feet (40') from any building.
C. If any portion of a facility or building is located more than 150-feet from a public fire hydrant
measured on an approved route around the exterior of the facility or building, additional
private or public fire hydrants and mains capable of supplying the required fire flow shall be
provided.
d. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof.
FSC-2 Fire Flow
1. The required minimum fire flow for this project, when automatic fire sprinklers are installed is 2,625
gallons per minute at a minimum residual pressure of 20-pounds per square inch. This flow reflects
a 50-percent reduction for the installation of an approved automatic fire sprinkler system in
accordance with NFPA 13 with central station monitoring. This requirement is made in accordance
with the California Fire Code Appendix III-A, as adopted by the Fire District Ordinances.
2
3. Fire protection water plans are required for all projects that must extend the existing water supply to
or onto the site. Building permits will not be issued until public fire protection water plans
are approved.
4. On all site plans to be submitted for review, show all fire hydrants located within 600-feet of the
proposed project site.
FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems
1. Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant shall submit
plans, specifications and calculations for the fire sprinkler system underground supply piping.
Approval of the underground supply piping system must be obtained prior to submitting the
overhead fire sprinkler system plans.
FSC-4 Requirement for an Automatic Fire Sprinkler Systems
Rancho Cucamonga Fire District Ordinance 15 & 39 Appendix I-B, RCFPD Standard 10-5, the 2001
California Fire Code and/or any other applicable standards require an approved automatic fire sprinkler
system to be installed in:
1. Commercial or industrial structures greater than 7,500 square feet.
2. Assembly and Educational Occupancy Buildings.
3. "All structures that do not meet Fire District access requirements (see Fire Access).
4. When required fire flow cannot be provided due to inadequate volume or pressure.
5. When buildings do not meet the requirements of the 2001 California Building Code and the RCFPD
Fire Department Access - Fire Lane Standard 9-7.
6. The hotel building must be fully sprinklered in accordance to NFPA 13 a 13R system is not
permitted. Standpipes must be installed in the staircases and must be in place before the
construction of the fourth floor.
FSC-5 Fire Alarm System
1. RCFPD Ordinance 15, based on use or floor area (or by other adopted codes or standards)
requires an automatic and/or manual fire alarm system. Refer to RCFPD Ordinances 15 and 39,
the California Building Code, RCFPD Fire Alarm Standard #10-6 and/or the California Fire Code.
2. Prior to any removal, remodel, modification and/or additions to the building or suite's fire alarm
system, Fire Construction Services' approval and a building permit must be obtained. Plans and
specifications shall be submitted to Fire Construction Services in accordance with RCFPD Fire
Alarm Standard #10-6.
3. Based on the number of sprinkler heads; the sprinkler system is required to monitored by a listed
central station fire alarm system.
3
FSC-6 Fire District Site Access
Fire District access roadways include public roads, streets and highways, as well as private roads,
streets drive aisles and/or designated fire lanes. Please reference the RCFPD Fire�Lanes Standard 9-7
1. Location of Access: All portions of the structures 151 story exterior wall shall be located within
150-feet of Fire District vehicle access, measure on an approved route around the exterior of the
building. Landscaped areas, unpaved changes in elevation, gates and fences are deemed
obstructions.
2. Specifications for private Fire District access roadways per the RCFPD Standards are:
a. The minimum unobstructed width is 26-feet.
b. The maximum inside turn radius shall be 20-feet.
C. The minimum outside turn radius shall be 46-feet.
d. RCFPD Ordinance 39 requirements for ladder access is required for the Hotel Building
please reference Appendix I-B of the ordinance.
e. The minimum radius for cul-de-sacs is 45-feet.
f. The minimum vertical clearance is 14-feet, 6-inches.
g. At any private entry median, the minimum width of traffic lanes shall be 20-feet on each side.
h. The angle of departure and approach shall not exceed 9-degrees or 20 percent.
i. The maximum grade of the driving surface shall not exceed 12%.
j. Support a minimum load of 70,000 pounds gross vehicle weight (GVW).
k. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a minimum of 14-
feet, 6-inches from the ground up. Vegetation shall not be allowed to obstruct Fire
Department apparatus.
3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be provided
as follows:
a. In buildings without high-piled storage, access shall be provided in accordance with the 2001
California Building Code, Fire and/or any other applicable standards.
b. In buildings with high-piled storage access doors shall be provided in each 100 lineal feet or
major fraction thereof, of the exterior wall that faces the required access roadways. When
railways are installed provisions shall be made to maintain Fire District access to all required
openings.
4. Access Walkways: Hardscaped access walkways shall be provided from the fire apparatus
access road to all required building exterior openings.
5. Commercial/Industrial Gates: Any gate installed across a Fire Department access road shall be
in accordance with Fire District Standard #9-2. The following design requirements apply:
4
a. Prior to the fabrication and installation of the gates, plans are required to be submitted to Fire
Construction Services (FCS) for approval. Upon the completion of the installation and before
placing the gates in service, inspection and final acceptance must be requested from FCS.
b. Gates must slide open horizontally or swing inward.
C. Gates may be motorized or manual.
d. When fully open, the minimum clearance dimension of drive access shall be 20 feet.
e. Manual gates must be equipped with a RCFPD lock available at the Fire Safety Office for
$20.00.
f. Motorized gates must open at the rate of one-foot per second.
g. The motorized gate actuation mechanism must be equipped with a manual override device
and a fail-safe or battery backup feature to open the gate or release the locking Mechanism in
case of power failure or mechanical malfunction.
h. Motorized gates shall be equipped with a Knox override key switch. The switch must be
installed outside the gate in a visible and unobstructed location.
i. For motorized gates, a traffic loop device must be installed to allow exiting from the complex.
j. If traffic pre-emption devices (TPD) are to be installed, the device, location and operation
must be approved by the Fire Chief prior to installation. Bi-directional or multiple sensors may
be required due to complexity of the various entry configurations.
6. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site plan
illustrating the proposed delineation that meets the minimum Fire District standards shall be
included in the architectural plans submitted to B&S for approval.
7. Approved Fire Department Access: Any approved mitigation measures must be clearly noted on
the site plan. A copy of the approved Alternative Method application, if applicable, must be
reproduced on the architectural plans submitted to B&S for plan review.
FSC-10 Occupancy and Hazard Control Permits
Listed are those Fire Code permits commonly associated with the business operations and/or building
construction. Plan check submittal is required with the permit application for approval of the permit; field
inspection is required prior to permit issuance. General Use Permit shall be required for any activity or
operation not specifically described below, which in the judgment of the Fire Chief is likely to produce
conditions that may be hazardous to life or property.
• Battery Systems
• Candles and open flames in public assemblies
• Compressed Gases
• Public Assembly
• Cryogenics
• Dry Cleaning Plants
• Refrigeration Systems
5
• Repair Garages
• Flammable and Combustible Liquids
• Spraying or Dipping Operations
• Hazardous Materials
• Tents, Canopies and/or Air Supported Structures
• Liquefied Petroleum Gases
• LPG or Gas Fuel Vehicles in Assembly Buildings
FSC-11 Hazardous Materials— Submittal to the County of San Bernardino
The San Bernardino County Fire Department shall review your Business Emergency/Contingency Plan
for compliance with minimum standards. Contact the San Bernardino County Fire, Hazardous Materials
Division at (909) 387-4631 for forms and assistance. The County Fire Department is the Cal/EPA
Certified Unified Program Agency (CUPA) for the City of Rancho Cucamonga.
1. If the facility is a NEW business, a Certificate of Occupancy issued by Building & Safety will not be
finalized until the San Bernardino County Fire Department reviews your Business
Emergency/Contingency Plan. California Government Code, Section 65850.2 prohibits the City
from issuing a final Certificate of Occupancy unless the applicant has met or is meeting specific
hazardous materials disclosure requirements. A Risk Management Program (RMP) may also be
required if regulation substances are to be used or stored at the new facility.
2. Any business that operates on rented or leased property which is required to submit a Plan, is also
required to submit a notice to the owner of the property in writing stating that the business is
subject to the Business Emergency/Contingency Plan mandates and has complied with the
provisions. The tenant must provide a copy of the Plan to the property owner within five (5)
working days, if requested by the owner.
FSC-12 Hazardous Materials - Submittal to Fire Construction Services
Plans shall be submitted and approved prior to construction of buildings and/or the installation of
equipment designed to store, use or dispense hazardous materials in accordance with the 2001
California Building, Fire, Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances FD15 and FD39
and other implemented and/or adopted standards.
FSC-13 Alternate Method Application
Fire Construction Services staff and the Fire Marshal will review all requests for alternate method, when
submitted. The request must be submitted on the Fire District "Application for Alternate Method" form
along with supporting documents and payment of the $92 review fee.
FCS-14 Map Recordation
1. Reciprocal Access Agreement: The plan as submitted indicate that the required Fire Department
access:
a. Is located on property which is not under the control of the applicant; or
b. Crosses a property line; or
6
C. Is shared by multiple owners; or
d. Is located on common space under the control of an owner's association
Please provide a permanent access agreement granting irrevocable use of the property to the Fire
District. The agreement shall include a statement that no obstruction, gate, fence, building or other
structure shall be placed within the dedicated access without Fire District approval. The recorded
agreement shall include a copy of the site plan. The agreement shall be presented to Fire
Construction Services for review and approval, prior to recordation. The agreement shall be
recorded with the Recorder's Office, County of San Bernardino.
To assist Fire Construction Services in reviewing the agreement the following shall be included in
the submittal:
a. The current title reports to provide a legal description and proof of ownership for all properties
included in the agreement.
b. The assessor's parcel numbers of each parcel subject to the agreement.
C. A scaled site plan showing the path of the Fire District access, the width, turn radii and slope
of roadway surface shall be provided. The access roadway shall comply with the
requirements of the RCFPD Fire Lane Standard #9-7.
2. Reciprocal Water Covenant and Agreement: The plans as submitted indicate that a required
private fire mains or appurtenances
a. Pass through or are located on property not under the control of the applicant; or
b. Crosses a property line; or
C. Provide service to adjacent properties; or
d. Is located on common space under the control of an owner's association; or
e. Is shared by multiple owners.
Please provide a permanent maintenance and service agreement between the owner for the
private water mains, fire hydrants and fire protection equipment essential to the water supply. The
agreement shall meet the form and content approved by the Rancho Cucamonga Fire District. The
agreement shall be submitted to Fire Construction Services for review and approval, prior to
recordation. The agreement shall be recorded within the Recorder's Office, County of San
Bernardino.
Chronoloqical Summary of RCFPD Standard Conditions
PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to the
issuance of any building permits:
1. Private Water Supply (Fire) Systems: , The applicant shall submit construction plans,
specifications, flow test data and calculations for the private water main system for review and
approval by the Fire District. Plans and installation shall comply with Fire District Standards.
Approval of the on-site (private) fire underground and water plans is required prior to any building
7
permit issuance for any structure on the site. Private on-site combination domestic and fire supply
system must be designed in accordance with RCFPD Standards # 9-4, #10-2 and #10-4. The
Building & Safety Department and Fire Construction Services will perform plan checks and
inspections.
All private on-site fire hydrants shall be installed, flushed and operable prior to delivering any
combustible framing materials to the site. Fire construction Services will inspect the installation,
witness hydrant flushing and grant a clearance before lumber is dropped.
2. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the
locations of all new public fire hydrants for the review and approval by the Fire District and CCWD.
On the plan, show all existing fire hydrants within a 600-foot radius of the project. Please reference
the RCFPD Water Plan Submittal Procedure Standard 9-8.
All required public fire hydrants shall be installed, flushed and operable prior to delivering any
combustible framing materials to the site. CCWD personnel shall inspect the installation and
witness the hydrant flushing. Fire Construction Services shall inspect the site after acceptance of
the public water system by CCWD. Fire Construction Services must grant a clearance before
lumber is dropped.
3. Construction Access: The access roads must be paved in accordance with all the requirements
of the RCFPD Fire Lane Standard #9-7 and Ordinance 39 Appendix I-B. All temporary utilities over
access roads must be installed at least 14' 6" above the finished surface of the road and must not
interfere with ladder rescue for low-rise buildings.
4. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is responsible for
obtaining the fire flow information from CCWD and submitting the letter to Fire Construction
Services.
5. Easements and Reciprocal Agreements: All easements and agreements must be recorded with
the County of San Bernardino.
PRIOR TO THE RELEASE OF TEMPORARY POWER
The building construction must be substantially completed in accordance with Fire Construction Services'
"Temporary Power Release Checklist and Procedures".
PRIOR TO OCCUPANCY OR FINAL INSPECTION - Please complete the
following:
1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire
hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga
Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers". On private property,
the markers shall be installed at the centerline of the fire access road, at each hydrant location.
2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in the
presence of Fire Construction Services, shall conduct a test of the most hydraulically remote on-
site fire hydrants. The underground fire line contractor, developer and/or owner are responsible for
hiring the company to perform the test. A final test report shall be submitted to Fire Construction
Services verifying the fire flow available. The fire flow available must meet or exceed the required
fire flow in accordance with the California Fire Code.
8
3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler
system(s) shall be tested and accepted by Fire Construction Services.
4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler
monitoring system must be tested and accepted by Fire Construction Services. The fire sprinkler
monitoring system shall be installed, tested and operational immediately following the completion of
the fire sprinkler system (subject to the release of power).
5. Fire Suppression Systems and/or other special hazard protection systems shall be inspected,
tested and accepted by Fire Construction Services before occupancy is granted and/or equipment
is placed in service.
6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm system
shall be installed, inspected, tested and accepted by Fire Construction Services.
7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular gates must
be inspected, tested and accepted in accordance with RCFPD Standards #9-1 or #9-2 by Fire
Construction Services.
8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access
roadways must be installed in accordance with the approved plans and acceptable to Fire
Construction Services.
The CC&R's, the reciprocal agreement and/or other approved documents shall be recorded and
contain an approved fire access roadway map with provisions that prohibit parking, specify the
method of enforcement and identifies who is responsible for the required annual inspections and
the maintenance of all required fire access roadways.
9. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and multi-
family buildings shall post the address with minimum 8-inch numbers on contrasting background,
visible from the street and electrically illuminated during periods of darkness. When the building
setback exceeds 200 feet from the public street, an additional non-illuminated 6-inch minimum
number address shall be provided at the property entrance. Larger address numbers will be
required on buildings located on wide streets or built with large setbacks in multi-tenant commercial
and industrial buildings. The suite designation numbers and/or letters shall be provided on the front
and back of all suites.
10. Hazardous Materials: Prior to the issuance of a Certificate of Occupancy, the applicant must
demonstrate (in writing from the County) that the facility has met or is meeting the Risk
Management Plan (RMP) or Business Emergency/Contingency Plan with the San Bernardino
County Fire Department, Hazardous Materials/Emergency Response and Enforcement Division.
The applicant must also obtain inspection and acceptance by Fire Construction Services.
11. Confidential Business Occupancy Information: The applicant shall complete the Rancho
Cucamonga Fire District "Confidential Business Occupancy Information" form. This form provides
contact information for Fire District use in the event of an emergency at the subject building or
property. This form must be presented to the Fire Construction Services Inspector.
12. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, a 8 Y2" x 11" or 11" x 17"
site plan of the site in accordance with RCFPD Standard #13-1 shall be revised by the applicant to
reflect the actual location of all devices and building features as required in the standard. The site
plan must be reviewed and accepted by the Fire Inspector.
9
l
- City of Rancho Cucamonga
MITIGATED NEGATIVE DECLARATION
The following Mitigated Negative Declaration is being circulated for public review in accordance with
the California Environmental Quality Act Section 21091 and 21092 of the Public Resources Code.
Project File No.: Tentative Parcel Map SUBTPM17303 and Development Review DRC2005-00458
Public Review Period Closes: November 9, 2005
Project Name: Project Applicant: Charles Joseph Associates
Project Location(also see attached map): Located at the northwest corner of Haven Avenue and
4th Street—APN: 0210-391-01 through 08 and 0210-381-22 and 23.
Project Description: A request to subdivide 11.70 acres of land into 6 parcels for industrial and
commercial purposes and for the development of a master plan for an office and commercial center
consisting of a 113 room hotel, one restaurant pad building totaling 7,600 square feet, tow 3-story
office buildings totaling 146,896 square feet and two commercial buildings totaling 21,200 square
feet in the Industrial Park District (Subarea 6), within the Haven Avenue Overlay District.
FINDING
This is to advise that the City of Rancho Cucamonga,acting as the lead agency,has conducted an
Initial Study to determine if the project may have a significant effect on the environment and is
proposing this Mitigated Negative Declaration based upon the following finding:
The Initial Study identified potentially significant effects but:
(1) Revisions in the project plans or proposals made or agreed to by the applicant before this
proposed Mitigated Negative Declaration was released for public review would avoid the
effects or mitigate the effects to a point where clearly no significant effects would occur, and
(2) There is no substantial evidence before the agency that the project, as revised, may have a
significant effect on the environment.
If adopted,the Mitigated Negative Declaration means that an Environmental Impact Reportwill not
be required. The factual and analytical basis for this finding is included in the attached Initial
Study. The project file and all related documents are available for review at the City of Rancho
Cucamonga Planning Department at 10500 Civic Center Drive (909) 477-2750 or Fax
(909) 477-2847.
NOTICE
The public is invited to comment on the proposed Mitigated Negative Declaration during the
review period.
November 9, 2005
Date of Determination Adopte