HomeMy WebLinkAbout05-117 - Resolutions RESOLUTION NO. 05-117 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT REVIEW DRC2004-01178 TO DEVELOP SIX RESIDENTIAL CONDOMINIUM UNITS ON 1.11 ACRE OF LAND IN THE MEDIUM RESIDENTIAL DISTRICT(8-14 DWELLING UNITS PER ACRE), LOCATED AT 8631 ARROW ROUTE; AND MAKING FINDINGS IN SUPPORT THEREOF - APN: 0207-262-05. A. Recitals. 1. Bahman Sephernia submitted an application for the approval of Development Review DRC2004-01178, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Development Review request is referred to as "the application." 2. On the 14th day of December 2005, the Planning Commission of the City of Rancho Cucamonga conducted a meeting on the application and concluded said meeting on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above-referenced meeting on December 14, 2005, including written and oral staff reports, this Commission hereby specifically finds as follows: a. The application applies to the property located at 8631 Arrow Route with a street frontage of 167.58 feet and lot depth of 259.84 feet and is presently vacant; and b. The property to the north and south of the subject site are single-family residential, the property to the east is attached residential apartments,and the propertyto the west is residential condominiums; and C. The proposed use, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity; and d. The applicant conducted a neighborhood meeting on November 15,2004,to inform the surrounding neighborhood residents of the proposed project and to obtain feedback. Two residents attended the meeting and were generally accepting of the proposed project; and e. The proposed use is in close proximity to Los Amigos Elementary School and is consistent with the community goals. PLANNING COMMISSION RESOLUTION NO. 05-117 DRC2004-01178 — BAHMAN SEPHERNIA December 14, 2005 Page 2 f. The proposed density of eight units per acre is at the bottom of the range for the Medium Residential District (8-14 dwelling units per acre) because of the small property area. 3. Based upon the substantial evidence presented to this Commission during the above-referenced meeting and upon the specific findings of facts set forth in paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. The proposed project is consistent with the objectives of the General Plan; and b. The proposed use is in accord with the objectives of the Development Code and the purposes of the district in which the site is located; and C. The proposed use is in compliance with each of the applicable provisions of the Development Code; and d. The proposed use, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. 4. Based upon the facts and information contained in the proposed Mitigated Negative Declaration,together with all written and oral reports included for the environmental assessment for the application,the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and Monitoring Program attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. That the Mitigated Negative Declaration has been prepared in compliance with the California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared therefore reflect the independent judgment of the Planning Commission; and, further, this Commission has reviewed and considered the information contained in said Mitigated Negative Declaration with regard to the application. b. Although the Mitigated Negative Declaration identifies certain significant environmental effects that will result if the project is approved, all significant effects have been reduced to an acceptable level by imposition of mitigation measures on the project which are listed below as conditions of approval. C. Pursuant to the provisions of Section 753.5(c)of Title 14 of the California Code of Regulations, the Planning Commission finds as follows: In considering the record as a whole, the Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the proposed project will have potential for an adverse impact upon wildlife resources or the habitat upon which wildlife depends. Further, based upon the substantial evidence contained in the Mitigated Negative Declaration, the staff reports and exhibits, and the information provided to the Planning Commission during the public hearing, the Planning Commission hereby rebuts the presumption of adverse effect as set forth in Section 753.5(c-1-d)of Title 14 of the California Code of Regulations. PLANNING COMMISSION RESOLUTION NO. 05-117 DRC2004-01178— BAHMAN SEPHERNIA December 14, 2005 Page 3 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. Planning Department 1) All Conditions of Approval of Tentative Tract Map SUBTT16788 shall apply. 2) All perimeter walls along the project boundary shall be made of a decorative material, including a pre-cast concrete trim cap. 3) The applicant shall obtain written permission from the adjacent property owners for any off-site grading prior to issuance of Grading Permits. 4) Accent landscaping such as trees, berming, lighting, and shrubs shall be utilized on the south side of Arrow Route. 5) Outdoor amenities including a concrete table,seating area, and a built in barbeque are required to be installed prior to final occupancy. Building & Safety Department: 1) The project shall fully comply with accessibility requirements of 2001 CBC Chapter 11 A (Housing Accessibility). Engineering Department: 1) Construct Madrone Avenue frontage improvements per City "Local' standards, including property line adjacent sidewalk, (1)5800 Lumens HPSV street light, street trees and drive approach: a) The drive approach shall be a minimum of 30 feet wide per City Std. 101, Type C. The outermost edge of the approach shall be allowed to be at the projection of the south property line. The transition from 30 feet wide (drive approach) to 26 feet wide (driveway access) shall be done on-site. 2) Construct Arrow Route frontage improvements per City"Major Arterial' standards as required and including: a) Remove the existing abandoned drive approach and install curb and gutter. 3) - The existing overhead utilities (telecommunications and electrical) on the project side of Madrone Avenue shall be undergrounded from the first pole off-site the northerly project boundary to the first pole off-site PLANNING COMMISSION RESOLUTION NO. 05-117 DRC2004-01178 — BAHMAN SEPHERNIA December 14, 2005 Page 4 the southerly project boundary,prior to public improvement acceptance or occupancy whichever occurs first. All services crossing Arrow Route shall be undergrounded at the same time. However, undergrounding of such utilities is impractical at present because it is less than 300 feet, not undergrounded adjacent, and a concentration of services to others would be interrupted. Therefore, an in-lieu fee as contribution to the future undergrounding of the existing overhead utilities (telecommunications and electrical)on the project side shall be paid to the City prior to issuance of Building Permits. The fee shall be one-half the City adopted unit amount times the length from the center of Arrow Route to the southerly project boundary. 4) The existing overhead utilities (telecommunications and electrical) on the project side of Arrow Route shall be undergrounded from the first pole west of the westerly project boundary to the first pole off-site the southerly project boundary, priorto public improvement acceptance or occupancy whichever occurs first. 5) An in-lieu fee as contribution to the future undergrounding of the existing overhead utilities (telecommunications or electrical) on the opposite side of Arrow Route shall be paid to the City prior to map approval or issuance of Building Permits, whichever comes first. The fee shall be one-half the City adopted unit amount times the total distances from power poles to power poles. Submit an exhibit to indicate said existing poles including their distances. 6) Provide fair share contribution, in lieu of construction, of the 9th Street storm drain improvements. 7) Relocate the existing power poles to the satisfaction of the City Engineer if necessary. 8) The Water Quality Management Plan (WQMP) submitted with the Tentative Tract Map SUBTT16788 application has been reviewed and found to be substantially complete. Include the Best Management Practices (BMPs) identified in the plan on Grading Plans when submitted for technical plan check. Environmental Mitigation Air Quality 1) All construction equipment shall be maintained in good operating condition so as to reduce operational emissions. The contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers'specifications. Maintenance records shall be available at the construction site for City verification. PLANNING COMMISSION RESOLUTION NO. 05-117 DRC2004-01178 — BAHMAN SEPHERNIA December 14, 2005 Page 5 2) Prior to the issuance of any grading permits, developer shall submit construction plans to City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low-emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD) as well as City Planning staff. 3) All paints and coatings shall meet or exceed performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high-volume, low-pressure spray. 4) All asphalt shall meet or exceed performance standards noted in SCAQMD Rule 1108. 5) All construction equipment shall comply with SCAQMD Rules 402 and 403. Additionally, contractors shall include the following provisions: • Reestablish ground cover on the construction site through seeding and watering. • Pave or apply gravel to any on-site haul roads. • Phase grading to prevent the susceptibility of large areas to erosion over extended periods of time. Schedule activities to minimize the amounts of exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in accordance with local ordinances and use sound engineering practices. Sweep streets according to a schedule established by the City if silt is carried over to adjacent public thoroughfares or occurs as a result of hauling. Timing may vary depending upon the time of year of construction. • Suspend grading operations during high winds(i.e.,wind speeds exceeding 25 mph) in accordance with Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils haul trucks or cover payloads using tarps or other suitable means. 6) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and Regional Water Quality Control Board [RWQCB]) daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403. 7) Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. PLANNING COMMISSION RESOLUTION NO. 05-117 DRC2004-01178— BAHMAN SEPHERNIA December 14, 2005 Page 6 8) The construction contractor shall utilize electric or clean alternative fuel powered equipment where feasible. 9) The construction contractor shall ensure that construction-grading plans include a statement that work crews will shut off equipment when not in use. 10) All residential and commercial structures shall be required to incorporate high efficiency/low polluting heating, air conditioning, appliances and water heaters. 11) All residential and commercial structures shall be required to incorporate thermal pane windows and weather-stripping. Biological 1) Two Deodar Cedar Trees are recommended to be retained in place on-site. One California Pepper Tree is recommended to be relocated on site. All other trees shall be removed and replaced at a 1 to 1 ratio, with a minimum size of 15 feet in height. Cultural Resources 1) If any prehistoric archaeological resources are encountered before*or during grading, the developer will retain a qualified archaeologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: • Enact interim measures to protect undesignated sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. • Consider establishing provisions to require incorporation of archaeological sites within new developments, using their special qualities as a theme or focal point. • Pursue educating the public about the area's archaeological heritage. • Propose mitigation measures and recommend conditions of approval to eliminate adverse project effects on significant, important, and unique prehistoric resources, following appropriate CEQA guidelines. • Prepare a technical resources management report,documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report, with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. PLANNING COMMISSION RESOLUTION NO. 05-117 DRC2004-01178— BAHMAN SEPHERNIA December 14, 2005 Page 7 2) If any paleontological resource (i.e. plant or animal fossils) is encountered before or during grading, the developer shall retail a qualified paleontologist to conduct a preconstruction field survey of the project site. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures (i.e., paleontological monitoring) that may be appropriate. Where mitigation monitoring is appropriate,the program must include, but not be limited to, the following measures: • Assign a paleontological monitor, trained and equipped to allow the rapid removal of fossils with minimal construction delay, to the site full-time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared or graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Prepare, identify, and curate all recovered fossils for documentation in the summary report and transfer to an appropriate depository (i.e., San Bernardino County Museum). Geology and Soils 1) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and RWQCB)daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403 or replanted with drought resistant landscaping as soon as possible. 2) Frontage public streets shall be swept according to a schedule established by the City to reduce PM10 emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon the time of year of construction. 3) Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PM10 emissions from the site during such episodes. 4) Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM1p emissions. Hydrology and Water Quality 1) Structures to retain precipitation and runoff on-site shall be integrated into the design of the project where appropriate. Measures that may be used to minimize runoff and to enhance filtration include Dutch drains, pre-cast concrete lattice blocks and bricks,terraces,diversions, runoff spreaders, seepage pits, and recharge basins. PLANNING COMMISSION RESOLUTION NO. 05-117 DRC2004-01178 — BAHMAN SEPHERNIA December 14, 2005 Page 8 2) Prior to issuance of building permits, the applicant shall submit to the City Engineer for approval of a WQMP, including a project description and identifying BMPs that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The WQMP shall identify the structural and non-structural measures consistent with the Guidelines for New Development and Redevelopment adopted by the City of Rancho Cucamonga in June 2004. 3) Prior to issuance of grading or paving permits, applicant shall obtain a Notice of Intent (NOI) to comply with obtaining coverage under the National Pollution Discharge elimination System (NPDES) General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Dischargers Identification Number)shall be submitted to the City Building Official for coverage under the NPDES General Construction Permit. Noise 1) Construction or grading shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. 2) Construction or grading noise levels shall not exceed the standards specified in Development Code Section 17.02.120-D, as measured at the property line. The developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Building Official. Said consultant shall report their findings to the Building Official within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Building Official. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. 3) The perimeter block wall shall be constructed as early as possible in first phase. 4) Haul truck deliveries shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips(counting both to and from the construction site), then the developer shall prepare a noise mitigation plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. PLANNING COMMISSION RESOLUTION NO. 05-117 DRC2004-01178 — BAHMAN SEPHERNIA December 14, 2005 Page 9 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 14TH DAY OF DECEMBER 2005. PLANNING COM SS ON OF THE CITY OF RANCHO CUCAMONGA BY: Pam S art, Chairman ATTEST: Dan Coleman, Acting Secretary I, Dan Coleman, Acting Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 14th day of December 2005, by the following vote-to-wit: AYES: COMMISSIONERS: FLETCHER, MACIAS, McNIEL, McPHAIL, STEWART NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: NONE City of Rancho Cucamonga MITIGATED NEGATIVE DECLARATION The following Mitigated Negative Declaration is being circulated for public review in accordance with the California Environmental Quality Act Section 21091 and 21092 of the Public Resources Code. Project File No.: Environmental Assessment and Development Review DRC2004-01178 and Tentative Tract Map SUBTT16788 Public Review Period Closes: December 14, 2005 Project Name: Project Applicant: EGL INC. Project Location (also see attached map): Southeast Corner of Madrone Avenue and Arrow Route —APN: 0207-262-05 Project Description: A request to subdivide 1.11 gross acre of land into 6 lots for residential condominiums in the Medium Residential District (8-14 dwelling units per acre) and a request to develop six condominiums on .83 acre of land in the Medium Residential District(8-14 dwelling units per acre). Related Files: Tree Removal Permit DRC2004-01144. FINDING This is to advise that the City of Rancho Cucamonga,acting as the lead agency,has conducted an Initial Study to determine if the project may have a significant effect on the environment and is proposing this Mitigated Negative Declaration based upon the following finding: The Initial Study identified potentially significant effects but: ❑ Revisions in the project plans or proposals made or agreed to by the applicant before this proposed Mitigated Negative Declaration was released for public review would avoid the effects or mitigate the effects to a point where clearly no significant effects would occur, or ® There is no substantial evidence before the agency that the project, as revised, may have a significant effect on the environment. If adopted,the Mitigated Negative Declaration means that an Environmental Impact Report will not be required. Reasons to support this finding are included in the attached Initial Study. The project file and all related documents are available for review at the City of Rancho Cucamonga Planning Department at 10500 Civic Center Drive (909) 477-2750 or Fax (909)477-2847. NOTICE The public is invited to comment on the propose itigated egative Declaration during the review period. December 14, 2005 L�li✓ Date of Determination Adopted y City of Rancho Cucamonga MITIGATION MONITORING PROGRAM Project File No.: Tentative Tract Map SUBTT16788 and Development Review DRC2004-01178 This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation measures identified in the Mitigated Negative Declaration forthe above-listed project. This program has been prepared in compliance with State law to ensure that adopted mitigation measures are implemented (Section 21081.6 of the Public Resources Code). Program Components -This MMP contains the following elements: 1. Conditions of approval that act as impact mitigation measures are recorded with the action and the procedure necessary to ensure compliance.The mitigation measure conditions of approval are contained in the adopted Resolution of Approval for the project. 2. A procedure of compliance and verification has been outlined for each action necessary. This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported. 3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring progresses, changes to compliance procedures may be necessary based upon recommendations by those responsible for the program. Program Management -The MMP will be in place through all phases of the project. The project planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly and proper action is taken on each mitigation. Each City department shall ensure compliance of the conditions (mitigation) that relate to that department. Procedures -The following steps will be followed by the City of Rancho Cucamonga. 1. A fee covering all costs and expenses, including any consultants'fees, incurred by the City in performing monitoring or reporting programs shall be charged to the applicant. 2. A MMP Reporting Form will be prepared for each potentially significant impact and its corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached hereto. This procedure designates who will take action,what action will be taken and when,and to whom and when compliance will be reported. All monitoring and reporting documentation will be kept in the project file with the department having the original authority for processing the project. Reports will be available from the City upon request at the following address: City of Rancho Cucamonga - Lead Agency Planning Department 10500 Civic Center Drive Rancho Cucamonga, CA 91730 SUBTT16788 AND DRC2004-01178 EGL INC. AND BAHMAN SEPHERNIA December 14, 2005 Page 2 3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,as determined by the project planner or responsible City department,to monitor specific mitigation activities and provide appropriate written approvals to the project planner. 4. The project planner or responsible City department will approve, by signature and date, the completion of each action item that was identified on the MMP Reporting Form. After each measure is verified for compliance, no further action is required for the specific phase of development. 5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off as completed by the project planner or responsible City department at the bottom of the MMP Reporting Form. 6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation measures.The project planner is responsible for approving any such refinements or additions. An MMP Reporting Form will be completed bythe project planner or responsible Citydepartment and a copy provided to the appropriate design, construction, or operational personnel. 7. The project planner or responsible. City department has the authority to stop the work of construction contractors if compliance with any aspects of the MMP is not occurring afterwritten notification has been issued. The project planner or responsible City department also has the authority to hold certificates of occupancies if compliance with a mitigation measure attached hereto is not occurring.The project planner or responsible City department has the authorityto hold issuance of a business license until all mitigation measures are implemented. 8. Any conditions (mitigation) that require monitoring after project completion shall. be the responsibility of the City of Rancho Cucamonga Planning Department. The Department shall require the applicant to post any necessary funds (or other forms of guarantee) with the City. These funds shall be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measure for the required period of time. 9. In those instances requiring long-term project monitoring, the applicant shall provide the City with a plan for monitoring the mitigation activities at the project site and reporting the monitoring results to the City. Said plan shall identify the reporter as an individual qualified to know whether the particular mitigation measure has been implemented. The monitoring/reporting plan shall conform to the City's MMP and shall be approved by the Community Development Director or City Planner prior to the issuance of building permits. MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III) Project File No.: Tentative Tract Map SUBTT16788 and Development Review DRC2003-001178 Applicant: EGL Inc. and Bahman Sephernia Initial Study Prepared by: Emily Cameron, Associate Planner Date: November 7. 2005 MethodMitigation Measures No. Responsible Monitoring Timing of of Verif led Sanctions for Implementing Action for Monitoring Frequency Verification Verif ication Date/initials Non-Compliance Air Quality v All construction equipment shall be maintained in good CP C Review of Plans A/C 2/4 operating condition so as to reduce operational emissions. The contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers' specifications. Maintenance records shall be available at the construction site for City verification. Prior to the issuance of any grading permits, the CPEO C Review of Plans C 2 developer shall submit Construction Plans to the City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low-emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD) as well as City Planning staff. All paints and coatings shall meet or exceed CP C Review of Plans A/C 2/4 performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high-volume, low-pressure spray. All asphalt shall meet or exceed performance standards BO B Review of Plans A/C 2 noted in SCAQMD Rule 1108. All construction equipment shall comply with SCAQMD BO C Review of Plans A/C 2/4 Rules 402 and 403. Additionally, contractors shall include the following provisions: Reestablish ground cover on the construction site BO C Review of Plans A/C - 2/4 through seeding and watering. Pave or apply gravel to any on-site haul roads. BO C Review of Plans A/C 2/4 1 of 7 Mitigation Measures No. Responsible Monitoring Timing of Method of Verif led Sanctions for Implementing Action for Monitoring Frequency Verif ication Verification Date • Phase grading to prevent the susceptibility of large BO C Review of Plans A/C 2/4 areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of BO C Review of Plans A/C 2/4 exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in BO C Review of Plans A 4 accordance with local ordinances and use sound engineering practices. • Sweep streets according to a schedule established BO C During A 4 by the City if silt is carried over to adjacent public Construction thoroughfares or occurs as a result of hauling. Timing mayvary depending upon the time of year of construction. • Suspend grading operations during high winds(i.e., BO C During A 4 wind speeds exceeding 25 mph)in accordance with Construction Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils BO C During A 4 haul trucks or cover payloads using tarps or other Construction suitable means. The site shall be treated with water or other BO C During A/C 4 soil-stabilizing agent (approved by SCAQMD and Construction Regional Water Quality Control Board [RWQCB]) daily to reduce Fine Particulate Matter (PM10) emissions, in accordance with SCAQMD Rule 403. Chemical soil-stabilizers (approved by SCAQMD and BO C During A/C 4 RWQCB) shall be applied to all inactive construction Construction areas that remain inactive for 96 hours or more to reduce PM,a emissions. The construction contractor shall utilize electric or clean BO C Review of Plans A/C 4 alternative fuel-powered equipment where feasible. The construction contractor shall ensure that BO C Review of Plans A/C 2/4 construction grading plans include a statement that work crews will shut off equipment when not in use. All residential and commercial structures shall be BO C Review of Plans A 4 required to incorporate high-efficiency/low-polluting heating,air conditioning,appliances,and water heaters. 2 of 7 Mitigation Measures No.I Responsible Implementing Action for Monitoring Frequency Verif ication Verification Date/initials Non-Compliance All residential and commercial structures shall be CP C Review of Plans A/C 2/3 required to incorporate thermal pane windows and weather-stripping. .Biological," a a• �. 10 •,q , .r„". •.r - Two Decider Cedar trees are recommended to be CP C Review of Plans A/C 2/3 retained in place on-site. One California Pepper is recommended to be relocated on-site. All other trees shall be removed and replaced at a 1 to 1 ratio, with a minimum size of 15 feet in height. 4ltural Resources r i �iys s"3i y 4 R } wrt` fre�k1p,��� axt 4 �s R ti .1/. �.�, p { .f R•-n.i�.�,..:.uM AR •i .'. � b `� `�,i'r1.i " If any prehistoric archaeological resources are encountered before or during grading,the developer will retain a qualified archaeologist to monitor construction activities and to take appropriate measures to protector preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: • Enact interim measures to protect undesignated CPBO C Review of A/D 3/4 sites from demolition or significant modification Report without an opportunity for the City to establish its archaeological value. • Consider establishing provisions to require CP/BO C Review of A/D 3/4 incorporation of archaeological sites within new Report developments, using their special qualities as a theme or focal point. • Pursue educating the public about the area's CP/BO C Review of A/D 3/4 archaeological heritage. Report • Propose mitigation measures and recommend CP/BO C Review of A/D 3/4 conditions of approval to eliminate adverse project Report effects on significant, important, and unique prehistoric resources, following appropriate CEOA guidelines. 3 of 7 Mitigation Measures No./ Responsible Monitoring Timing of Method of Verif ied Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date • Prepare a technical resources management report, CP C Review of A/D 3/4 documenting the inventory, evaluation, and Report proposed mitigation of resources within the project area. Submit one copy of the completed report,with original illustrations to the San Bernardino County Archaeological Information Center for permanent archiving. If any paleontological resource(i.e.plant or animal fossil) CP B Review of A/D 4 are encountered before or during grading,the developer Report shall retain a qualified paleontologist to conduct a preconstruction field survey of the project site. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures (i.e., paleontological monitoring) that may be appropriate.Where mitigation monitoring is appropriate,the program must include,but not be limited to, the following measures: Assign a paleontological monitor, trained and CP B Review of A/D 4 equipped to allow the rapid removal of fossils with Report minimal construction delay, to the site full-time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared BO B/C Review of A/D 4 or graded, divert earth-disturbing activities Report elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Prepare,identify,and curate all recovered fossils for CP D Review of D 3 documentation in the summary report and transfer to Report an appropriate depository (i.e., San Bernardino County Museum). �C'-�o yy��01�� y 63 r �` "' � w � a• �. n r § f � t k The site shall be treated with water or other BO C During A 4 soil-stabilizing agent (approved by SCAQMD and Construction RWQCB)daily to reduce PM10 emissions,in accordance with SCAQMD Rule 403 or re-planted with drought resistant landscaping as soon as possible 4of7 Mitigation • Responsible Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Frontage public streets shall be swept according to a BO C During A 4 schedule established by the City to reduce PM,o Construction emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon the time of year of construction. Grading operations shall be suspended when wind BO C During A 4 speeds exceed 25 mph to minimize PM10 emissions Construction from the site during such episodes. Chemical soil-stabilizers (approved by SCAQMD and BO/CE C During A 4 RWQCB) shall be applied to all inactive construction Construction areas that remain inactive for 96 hours or more to reduce PM,o emissions. „z Nydrology,and Water Quality Structures to retain precipitation and runoff on-site shall BO/CE C Review of Plans A/C 4 be integrated into the design of the project where During appropriate. Measures that may be used to minimize Construction runoff and to enhance infiltration include Dutch drains, pre-cast concrete lattice blocks and bricks, terraces, diversions,runoff spreaders,seepage pits,and recharge basins. Prior to issuance of building permits,the applicant shall CE B/C/D Review of Plans A/C 2/4 submit to the City Engineer for approval of a Water Quality Management Plan (WQMP), including a project description and identifying Best Management Practices (BMPs)that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The WQMP shall identify the structural and non-structural measures consistent with the Guidelines for New Development and Redevelopment adopted by the City of Rancho Cucamonga in June 2004. 5of7 Mitigation Measures No. Responsible Monitoring Timing of Method of Verif led Sanctions for Implementing Action for Monitoring Frequency Verif ication Verification Date/Initials Prior to issuance of grading or paving permits, the CE B/C/D Review of Plans A/C 2/4 applicant shall submit to the City Engineer a Notice of Intent(NOI)to comply with obtaining coverage under the National Pollutant Discharge Elimination System (NPDES) General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained(i.e.,a copy of the Waste Discharger's Identification Number) shall be submitted to the City Engineer for coverage under the NPDES General Construction Permit. N ` S. _w} oise Construction or grading shall not take place between the BO C During A/C 2/4 hours of 8:00 p.m. and 6:30 a.m. on weekdays, Construction including Saturday, or at any time on Sunday or a national holiday. Construction or grading noise levels shall not exceed the BO C During A/C 2/4 standards specified in Development Code Section Construction 17.02.120-D, as measured at the property line. The developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Building Official. Said consultant shall report their findings to the Building Official within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Building Official. If noise levels exceed the above standards,then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. The perimeter block wall shall be constructed as early CP C During A 4 as possible in first phase. Construction 6 of 7 - Mitigation Measures No.I Responsible Monitoring Timing of Method of Verif led Sanctions for Implementing Action for Monitoring Frequency Verif ication Verification Date/initials Non-Compliance Haul truck deliveries shall not take place between the CP C During A 4 hours of 8:00 p.m. and 6:30 a.m. on weekdays, Construction including Saturday, or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips (counting both to and from the construction site),then the developer shall prepare a Noise Mitigation Plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. Key to Checklist Abbreviations _. Responsible Person' "; -• ' ,Monitoring'Fiequency ., ;Method of Veriflcatlon' �:' •'°" '� - Sanctions Coo-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map CP-City Planner or designee B-Prior To Construction - B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds FC-Fire Chief or designee 6-Revoke CUP 7-Citation - 7of7 COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT#: DRC2004-01178 SUBJECT: DESIGN REVIEW FOR SIX CONDOMINIUM UNITS APPLICANT: BAHMAN SEPHRERNIA LOCATION: SOUTHEAST CORNER OF MADRONE AVENUE AND ARROW ROUTE—APN: 0207-262-05 ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements completion Dace 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents,officers,or employees, because of the issuance of such approval,or in the alternative,to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may,at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Copies of the signed Planning Commission Resolution of Approval No. 05-117, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. B. Time Limits 1. Development/Design Review approval shall expire if building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans,architectural elevations, exterior materials and colors, landscaping,sign program,and grading on file in the Planning Department,the conditions contained herein, Development Code regulations. SC-1-05 1 Project No.DRC2004-01176 Completion Date 2. Prior to any use of the project site or business activity being commenced thereon,all Conditions of Approval shall be completed to the satisfaction of the City Planner. 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Department to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for City Planner review and approval prior to the issuance of building permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code,all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 7. A detailed on-site lighting plan, including a photometric diagram,shall be reviewed and approved by the City Planner and Police Department (477-2800) prior to the issuance of building permits. Such plan shall indicate style, illumination, location, height, and method of shielding so as not to adversely affect adjacent properties. 8. If no centralized trash receptacles are provided,all trash pick-up shall be for individual units with all receptacles shielded from public view. 9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming,and/or landscaping to the satisfaction of the City Planner. For single- family residential developments, transformers shall be placed in underground vaults. 10. Street names shall be submitted for City Planner review and approval in accordance with the adopted Street Naming Policy prior to approval of the final map. 11. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination. 12. The Covenants, Conditions, and Restrictions (CC&Rs) and Articles of Incorporation of the Homeowners' Association are subject to the approval of the Planning and Engineering Departments and the City Attorney. They shall be recorded concurrently with the Final Map or prior to the issuance of building permits, whichever occurs first. A recorded copy shall be provided to the City Engineer. The Homeowners' Association shall submit to the Planning Department a list of the name and address of their officers on or before January 1 of each and every year and whenever said information changes. 13. All parkways, open areas, and landscaping shall be permanently maintained by the property owner, homeowners'association,or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for City Planner and City Engineer review and approved prior to the issuance of building permits. 14. Six-foot decorative block walls shall be constructed along the project perimeter. If a double wall condition would result, the developer shall make a good faith effort to work with the adjoining property owners to provide a single wall. Developer shall notify, by mail, all contiguous property owner at least 30 days prior to the removal of any existing walls/ fences along the project's perimeter. SC-1-05 2 Project No.DRC2004-01178 completion Date 15. Construct block walls between homes(i.e.,along interior side and rear property lines),rather than wood fencing for permanence, durability, and design consistency. 16. For multiple family development,a minimum of 125 cubic feet of exterior lockable storage space _ shall be provided. 17. For residential development, recreation area/facility shall be provided as required by the Development Code. D. Building Design 1. Standard patio cover plans for use by the Homeowner's Association shall be submitted for City Planner and Building Official review and approval prior to issuance of building permits. 2. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections, shall be shielded from view and the sound buffered from adjacent properties and streets as required by the Planning Department. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the City Planner. Details shall be included in building plans. E. Parking and Vehicular Access (indicate details on building plans) 1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet wide. 2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall contain a 12-inch walk adjacent to the parking stall (including curb). 3. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided throughout the development to connect dwellings/units/buildings with open spaces/plazas/ recreational uses. 4. All parking spaces shall be double striped per City standards and all driveway aisles,entrances, and exits shall be striped per City standards. 5. All units shall be provided with garage door openers if driveways are less than 18 feet in depth from back of sidewalk. 6. The Covenants,Conditions and Restrictions shall restrict the storage of recreational vehicles on this site unless they are the principal source of transportation for the owner and prohibit parking on interior circulation aisles other than in designated visitor parking areas. 7. Plans for any security gates shall be submitted for the City Planner, City Engineer, and Rancho Cucamonga Fire Protection District review and approval prior to issuance of building permits. For residential development,private gated entrances shall provide adequate turn-around space in front of the gate and a separate visitor lane with call box to avoid cars stacking into the public right-of-way. F. Landscaping 1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for City Planner review and approval prior to the issuance of building permits or prior final map approval in the case of a custom lot subdivision. 2. Existing trees required to be preserved in place shall be protected with a construction barrier in accordance with the Municipal Code Section 19.08.110,and so noted on the grading plans. The location of those trees to be preserved in place and new locations for transplanted trees shall be SC-1-05 3 Project No.DRC2004-01178 Completion Date shown on the detailed landscape plans. The applicant shall fallow all of the arborist's recommendations regarding preservation, transplanting, and trimming methods. 3. A minimum of 45 trees per gross acre,comprised of the following sizes,shall be provided within the project: 0%-48-inch box or larger 10%-36-inch box or larger, 10%-24-inch box or larger, 80% - 15-gallon, and 0% - 5 gallon. 4. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one tree per 30 linear feet of building. 5. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope, but less than 2:1 slope,shall be,at minimum, irrigated and landscaped with appropriate ground cover for erosion control. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 6. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater slope shall be landscaped and irrigated for erosion control and to soften their appearance as follows: one 15-gallon or larger size tree per each 150 sq.ft.of slope area, 1-gallon or larger size shrub per each 100 sq.ft. of slope area,and appropriate ground cover. In addition,slope banks in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in staggered clusters to soften and vary slope plane. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 7. For single-family residential development, all slope planting and irrigation shall be continuously maintained in a healthy and thriving condition by the developer until each individual unit is sold and occupied by the buyer. Prior to releasing occupancy for those units, an inspection shall be conducted by the Planning Department to determine that they are in satisfactory condition. 8. Front yard and corner side yard landscaping and irrigation shall be required per the Development Code. This requirement shall be in addition to the required street trees and slope planting. 9. The final design of the perimeter parkways,walls, landscaping,and sidewalks shall be included in the required landscape plans and shall be subject to City Planner review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Department. 10. Special landscape features such as mounding, alluvial rock, specimen size trees, meandering sidewalks (with horizontal change), and intensified landscaping, is required along Arrow Route. 11. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 12. All walls shall be provided with decorative treatment. If located in public maintenance areas,the design shall be coordinated with the Engineering Department. 13. Landscaping and irrigation shall be designed to conserve water through the principles of Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code. G. Signs 1. The signs indicated on the submitted plans are conceptual only and not a part of this approval. Any signs proposed for this development shall comply with the Sign Ordinance and shall require separate application and approval by the Planning Department prior to installation of any signs. SC-1-05 4 Project No.DRC2004-01178 Completion Date H. Environmental 1. Noise levels shall be monitored after construction to verify the adequacy of the mitigation measures. Noise levels shall be monitored by actual noise level readings taken on-and off-site. A final acoustical report shall be submitted for City Planner review and approval prior to final occupancy release. The final report shall also make recommendations as to additional mitigation measures to reduce noise levels to below City standards, such as, residential exterior noise levels to below 60 dBA and interior noise attenuation to below 45 dBA. 2. A final acoustical report shall be submitted for City Planner review and approval prior to the issuance of building permits. The final report shall discuss the level of interior noise attenuation to below 45 CNEL, the building materials and construction techniques provided, and if appropriate,verify the adequacy of the mitigation measures. The building plans will be checked for conformance with the mitigation measures contained in the final report. 3. The applicant shall submit certification from an acoustical engineer that all recommendations of the acoustical report were implemented in construction, including measurements of interior and exterior noise levels to document compliance with City standards. Certification shall be submitted to the Building & Safety Department prior to final occupancy release of the affected homes. 4. Mitigation measures are required for the project. The applicant is responsible for the cost of implementing said measures, including monitoring and reporting. Applicant shall be required to post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the amount of$495 prior to the issuance of building permits,guaranteeing satisfactory performance and completion of all mitigation measures. These funds may be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete all actions required by the approved environmental documents shall be considered grounds for forfeit. I. Other Agencies 1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location of mailboxes. Multi-family residential developments shall provide a solid overhead structure for mailboxes with adequate lighting. The final location of the mailboxes and the design of the overhead structure shall be subject to City Planner review and approval prior to the issuance of building permits. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT, (909)477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S) J. General Requirements 1. Submit five complete sets of plans including the following: a. Site/Plot Plan; b. Foundation Plan; C. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; SC-1-05 5 Project No.DRC2004-01178 Completion Date f. Plumbing and Sewer Plans, including isometrics, underground diagrams,water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Department Project Number (i.e., DRC2004-01178) clearly identified on the outside of all plans. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to the City prior to permit issuance. 4. Separate permits are required for fencing and/or walls. K. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number(i.e., DRC2001-00001). The applicant shall comply with the latest adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Department for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new residential project or major addition,the applicant shall pay development fees at the established rate. Such fees may include,but are not limited to: City Beautification Fee, Park Fee, Drainage Fee,Transportation Development Fee, Permit and Plan Check Fees, Construction and Demolition Diversion Program deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Department prior to permit issuance. 3. Prior to issuance of building permits for a new commercial or industrial development project or major addition,the applicant shall pay development fees at the established rate. Such fees may include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Department prior to permits issuance. 4. Street addresses shall be provided by the Building and Safety Official after tract/parcel map recordation and prior to issuance of building permits. 5. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. 6. Construct trash enclosure(s) per City Standard (available at the Planning Department's public counter). 7. Submit pool plans to the County of San Bernardino's Environmental Health Services Department for approval. L. New Structures 1. Provide compliance with the California Building Code (CBC) for property line clearances considering use, area, and fire-resistiveness. 2. Provide compliance with the California Building Code for required occupancy separations. 3. Roofing material shall be installed per the manufacturer's "high wind" instructions. 4. Provide draft stops in attics in line with common walls. SC-1-05 6 Project No.DRC2004-01178 Completion Date 5. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A 6. Openings in exterior walls shall be protected in accordance with CBC Table 5-A. 7. If the area of habitable space above the first floor exceeds 3,000 square feet, then the construction type shall be V-1 Hour minimum. 8. Walls and floors separating dwelling units in the same building shall be not less than 1-hour fire-resistive construction. M. Grading 1. Grading of the subject property shall be in accordancewith California Building Code,City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the time of application for grading plan check. 4. The final grading, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 5. A separate grading plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The grading plan shall be prepared,stamped, and signed by a California registered Civil Engineer. APPLICANT SHALL CONTACT THE ENGINEERING DEPARTMENT, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: N. Dedication and Vehicular Access 1. Rights-of-way and easements shall be dedicated to the City for all interior public streets, community trails, public paseos, public landscape areas,street trees,traffic signal encroachment and maintenance, and public drainage facilities as shown on the plans and/or tentative map. Private easements for non-public facilities (cross-lot drainage, local feeder trails, etc.) shall be reserved as shown on the plans and/or tentative map. 2. Dedication shall be made of the following rights-of-way on the perimeter streets(measured from street centerline): 30 total feet on Madrone Avenue 50 total feet on Arrow Route 3. Corner property line cutoffs shall be dedicated per City Standards. 4. Reciprocal parking agreements for all parcels and maintenance agreements ensuring joint _/_/_ maintenance of all common roads, drives, or parking areas shall be provided by CC & R's or deeds and shall be recorded prior to, or concurrent with, the final parcel map. 5. Private drainage easements for cross-lot drainage shall be provided and shall be delineated or noted on the final map. SC-1-05 7 Project No.DRC2004-01178 Completion Date O. Street Improvements 1. Pursuant to City Council Resolution No.88-557, no person shall make connections from a source of energy,fuel or power to any building service equipment which is regulated by technical codes and for which a permit is required unless, in addition to any and all other codes, regulations and ordinances, all improvements required by these conditions of development approval have been completed and accepted by the City Council,except:that in developments containing more than one building or unit, the development may have energy connections made to a percentage of those buildings, or units proportionate to the completion of improvements as required by conditions of approval of development. In no case shall more than 95 percent of the buildings or units be connected to energy prior to completion and acceptance of all improvements required by these conditions of approval of development. 2. Construct the following perimeter street improvements including, but not limited to: Curb 8 A.C. Side- Drive Street Street Comm Median Bike Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other Arrow Route X I X X X Madrone Avenue X X X I X X Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be provided for this item. 3. Improvement Plans and Construction: a. Street improvement plans,including street trees,street lights,and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements,prior to final map approval or the issuance of building permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the City Engineer's Office in addition to any other permits required. C. Pavement striping, marking,traffic signing,street name signing,traffic signal conduit,and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer Notes: 1) Pull boxes shall be No.6 at intersections and No.5 along streets,a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2) Conduit shall be 3-inch galvanized steel with pull rope or as specified. e. Handicapped access ramps shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. SC-1-05 8 Project No.DRC2004-01178 Completion Date I. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving,which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single family residential lots. h. Street names shall be approved by the City Planner prior to submittal for first plan check. 4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. 5. Install street trees per City street tree design guidelines and standards as follows. The completed legend (box below) and construction notes shall appear on the title page of the street improvement plans. Street improvement plans shall include a line item within the construction legend stating: "Street trees shall be installed per the notes and legend on sheet—(typically sheet 1)." Where public landscape plans are required, tree installation in those areas shall be per the public landscape improvement plans. The City Engineer reserves the right to adjust tree species based upon field conditions and other variables. For additional information, contact the Project Engineer. Min. Grow Street Name Botanical Name Common Name Space Spacing Size City. Arrow Route Liquidamber NCN 8' 25' 15 gal styraciflua O.C. "Palo Alto" Madrone Avenue Pinus canariensis Canary Island Pine 8' 25' 15 gal O.C. Construction Notes for Street Trees: 1) All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting,an agronomic soils report shall be furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector. 3) All street trees are subject to inspection and acceptance by the Engineering Department. 4) Street trees are to be planted per public improvement plans only. 6. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with adopted policy. On collector or larger streets, lines of sight shall be plotted for all project intersections, including driveways. Local residential street intersections and commercial or industrial driveways may have lines of sight plotted as required. P. Public Maintenance Areas 1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the City Engineer prior to final map approval or issuance of building permits whichever occurs first. Formation costs shall be borne by the developer. Q. Drainage and Flood Control 1. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the property from adjacent areas. SC-1-05 9 Project No.DRC2004-01178 Completion Date R. Utilities 1. Provide separate utility services to each parcel including sanitary sewerage system,water, gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 2. The developer shall be responsible for the relocation of existing utilities as necessary. 3. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga Valley Water District(CVW D), Rancho Cucamonga Fire Protection District,and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CVW D is required prior to final map approval or issuance of permits,whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. 4. Approvals have not been secured from all utilities and other interested agencies involved. Approval of the final parcel map will be subject to any requirements that may be received from them. S. General Requirements and Approvals 1. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all new streetlights for the first six months of operation, prior to final map approval or prior to building permit issuance if no map is involved. 2. Prior to the issuance of building permits,a Diversion Deposit and related administrative fees shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at least 50% of all wastes generated during construction and demolition are diverted from landfills, and appropriate documentation is provided to the City. Form CD-1 shall be submitted to the Engineering Department when the first building permit application is submitted to Building and Safety. Form CD-2 shall be submitted to the Engineering Department within 60 days following the completion of the construction and/or demolition project. APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: T. Security Lighting 1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power. These areas should be lighted from sunset to sunrise and on photo sensored cell. 2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with direct lighting to be provided by all entryways. Lighting shall be consistent around the entire development. 3. Lighting in exterior areas shall be in vandal-resistant fixtures. U. Security Hardware 1. A secondary locking device shall be installed on all sliding glass doors. 2. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within 40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used. 3. All garage or rolling doors shall have slide bolts or some type of secondary locking devices. SC-1-05 10 Project No.DRC2004-01178 Completion Date V. Windows 1. All sliding glass windows shall have secondary locking devices and should not be able to be lifted from frame or track in any manner. W. Building Numbering 1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime visibility. APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED SC-1-05 11 RANCHO CUCAMONGA FIRE DISTRICT STANDARD CONDITIONS December 16, 2004 Arrow & Madrona Subdivision (6) SFR SUBTT16788 & DRC2004-01178 THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT. FSC-1 Public and Private Water Supply 1. Design guidelines for Fire Hydrants: The following provides design guidelines for the spacing and location of fire hydrants: a. The maximum distance between fire hydrants in single-family residential projects is 500-feet. No portion of the exterior wall facing the addressed street shall be more than 250-feet from an approved fire hydrant. For cul-de-sacs, the distance shall not exceed 200-feet. b. Fire hydrants are to be located. The preferred locations for fire hydrants are: i. At the entrance(s) to a commercial, industrial or residential project from the public roadways. ii. At intersections. iii. On the right side of the street, whenever practical and possible. iv. As required by the Fire Safety Division to meet operational needs of the Fire District. V. A minimum of forty-feet (40') from any building. FSC-2 Fire Flow 1. The required fire flow for this project is 2000 gallons per minute at a minimum residual pressure of 20-pounds per square inch. This requirement is made in accordance with Fire Code Appendix III-A, as adopted by the Fire District Ordinances. 2. Public fire hydrants located within a 500-foot radius of the proposed project may be used to provide the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent property shall not be used to provide required fire flow. 3. Fire protection water plans are required for all projects that must extend the existing water supply to or onto the site. Building permits will not be issued until fire protection water plans are approved. 3. Fire protection water plans are required for all projects that must extend the existing water supply to or onto the site. Building permits will not be issued until fire protection water plans are approved. 4. On all site plans to be submitted for review, show all fire hydrants located within 600-feet of the proposed project site. FSC-4 Requirement for an Automatic Fire Sprinkler Systems Rancho Cucamonga Fire District Ordinance 15, the 2001 California Fire Code and/or any other applicable standards require an approved automatic fire sprinkler system to be installed in: 1. All structures that do not meet Fire District access requirements (see Fire Access). 2. When required fire flow cannot be provided due to inadequate volume or pressure. FSC-6 Fire District Site Access Fire District access roadways include public roads, streets and highways, as well as private roads, streets drive aisles and/or designated fire lanes. Please reference the RCFPD Fire Department Access— Fire Lanes Standard 9-7. 1. Specifications for private Fire District access roadways per the RCFPD Standards are: a. The minimum unobstructed width is 26-feet. b. The maximum inside turn radius shall be 20-feet. C. The minimum outside turn radius shall be 46-feet. d. The minimum radius for cul-de-sacs is 45-feet. e. The minimum vertical clearance is 14-feet, 6-inches. f. At any private entry median, the minimum width of traffic lanes shall be 20-feet on each side. g. The angle of departure and approach shall not exceed 9-degrees or 20 percent. h. The maximum grade of the driving surface shall not exceed 12%. i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW). j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a minimum of 14-feet, 6-inches from the ground up. Vegetation shall not be allowed to obstruct Fire Department apparatus. 2. Residential gates installed across Fire District access roads shall be installed in accordance with RCFPD Residential Gate Standard #9-1. The following design requirements apply: a. All automatic gates shall be provided with a Fire District approved, compatible traffic pre-emption device. The devices shall be digital. Analog devices are not 2 acceptable. Devices shall be installed in accordance with the manufacturer's instructions and specifications. b. Vehicle access gates shall be provided with an approved Fire District Knox Key Switch. C. The key switch shall be located outside and immediately adjacent to the gate for use in the event that the traffic pre-emption device fails to operate. d. A traffic loop device must be installed to allow exiting from the complex. e. The gate shall remain in the open position for not less than 20-minutes and shall automatically reset. 3. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site plan illustrating the proposed delineation that meets the minimum Fire District standards shall be included in the architectural plans submitted to B&S for approval. 4. Approved Fire Department Access: Any approved mitigation measures must be clearly noted on the site plan. A copy of the approved Alternative Method application, if applicable, must be reproduced on the architectural plans submitted to B&S for plan review. FSC-9 Single-family Residential Sales Model homes require approved Fire District vehicle access and water supply from a public or private water main system before construction. FSC-13 Alternate Method Application Fire Construction Services staff and the Fire Marshal will review all requests for alternate method, when submitted. The request must be submitted on the Fire District "Application for Alternate Method" form along with supporting documents and payment of the $92 review fee. FCS-14 Map Recordation RECIPROCAL AGREEMENTS for Fire Department Emergency Access and Water Supply are required on this project. The project appears to be located on a common property. A reciprocal agreement is required to be recorded between property owners. Reciprocal access agreement — Please provide a permanent access agreement between the owners granting irrevocable and a non-exclusive easement, favoring the Fire District to gain access to the subject property. The agreement shall include a statement that no obstruction, gate, fence, building or other structure shall be placed within the dedicated access, without Fire Department approval. The agreement shall have provisions for emergency situations and the assessing of cost recovery to the property by the fire District. Reciprocal water covenant — Please provide a permanent maintenance and service covenant between the owners granting an irrevocable and non-exclusive easement, favoring the Fire District for the purpose of accessing and maintaining the private water mains, valves and fire hydrants (fire protection systems facilities in general). The covenant shall have provisions for emergency situations and the assessing of cost recovery to the property by the fire District. The agreement shall be recorded with the County of San Bernardino Recorders Office. The Fire Construction Services Unit shall approve the agreement prior to recordation. The recorded agreement shall include a copy of the site plan. The agreement shall be recorded with the 3 County of San Bernardino, Recorders Office. The Fire Construction Services Unit shall approve the agreement, prior to recordation. Chronological Summary of RCFPD Standard Conditions PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to the issuance of any building permits: 1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans, specifications, flow test data and calculations for the private water main system for review and approval by the Fire District. Plans and installation shall comply with Fire District Standards. Approval of the on-site (private) fire underground and water plans is required prior to any building permit issuance for any structure on the site. Private on-site combination domestic and fire supply system must be designed in accordance with RCFPD Standards # 9-4, #10-2 and #10-4. The Building & Safety Division and Fire Construction Services will perform plan checks and inspections. 2. All private on-site fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. Fire construction Services will inspect the installation, witness hydrant flushing and grant a clearance before lumber is dropped. 3. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and CCWD. On the plan, show all existing fire hydrants within a 600-foot radius of the project. Please reference the RCFPD Water Plan Submittal Procedure Standard # 9-8. 4. All required public fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. CCWD personnel shall inspect the installation and witness the hydrant flushing. Fire Construction Services shall inspect the site after acceptance of the public water system by CCWD. Fire Construction Services must grant a clearance before lumber is dropped. 5. Construction Access: The access roads must be paved in accordance with all the requirements of the RCFPD Fire Lane Standard #9-7. All temporary utilities over access roads must be installed at least 14' 6" above the finished surface of the road. 6. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is responsible for obtaining the fire flow information from CCWD and submitting the letter to Fire Construction Services. 7. Easements and Reciprocal Agreements: All easements and agreements must be recorded with the County of San Bernardino. 8. Annexation: The project must be annexed into the community facility district 85-1 before grading or building permits may be issued. 4 PRIOR TO THE RELEASE OF TEMPORARY POWER The building construction must be substantially completed in accordance with Fire Construction Services' "Temporary Power Release Checklist and Procedures". PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers". On private property, the markers shall be installed at the centerline of the fire access road, at each hydrant location. 2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in the presence of Fire Construction Services, shall conduct a test of the most hydraulically remote on-site fire hydrants. The underground fire line contractor, developer and/or owner are responsible for hiring the company to perform the test. A final test report shall be submitted to Fire Construction Services verifying the fire flow available. The fire flow available must meet or exceed the required fire flow in accordance with the California Fire Code. 3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler system(s) shall be tested and accepted by Fire Construction Services. 4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler monitoring system must be tested and accepted by Fire Construction Services. The fire sprinkler monitoring system shall be installed, tested and operational immediately following the completion of the fire sprinkler system (subject to the release of power). 5. Fire Suppression Systems and/or other special hazard protection systems shall be inspected, tested and accepted by Fire Construction Services before occupancy is granted and/or equipment is placed in service. 6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm system shall be installed, inspected, tested and accepted by Fire Construction Services. 7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular gates must be inspected, tested and accepted in accordance with RCFPD Standards #9-1 or#9-2 by Fire Construction Services. 8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access roadways must be installed in accordance with the approved plans and acceptable to Fire Construction Services. 9. The CC&R's, the reciprocal agreement and/or other approved documents shall be recorded and contain an approved fire access roadway map with provisions that prohibit parking, specify the method of enforcement and identifies who is responsible for the required annual inspections and the maintenance of all required fire access roadways. 10. Address: Prior to the granting of occupancy, single-family dwellings shall post the address with minimum 4-inch numbers on a contrasting background. The numbers shall be internally or externally illuminated during periods of darkness. The numbers shall be visible from the street. When building setback from the public roadway exceeds 100-feet, additional 4-inch numbers shall be displayed at the property entry. 5 11. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and multi-family buildings shall post the address with minimum 8-inch numbers on contrasting background, visible from the street and electrically illuminated during periods of darkness. When the building setback exceeds 200 feet from the public street, an additional non- illuminated 6-inch minimum number address shall be provided at the property entrance. Larger address numbers will be required on buildings located on wide streets or built with large setbacks in multi-tenant commercial and industrial buildings. The suite designation numbers and/or letters shall be provided on the front and back of all suites. 12. Hazardous Materials: Prior to the issuance of a Certificate of Occupancy, the applicant must demonstrate (in writing from the County) that the facility has met or is meeting the Risk Management Plan (RMP) or Business Emergency/Contingency Plan with the San Bernardino County Fire Department, Hazardous Materials/Emergency Response and Enforcement Division. The applicant must also obtain inspection and acceptance by Fire Construction Services. 13. Confidential Business Occupancy Information: The applicant shall complete the Rancho Cucamonga Fire District "Confidential Business Occupancy Information" form. This form provides contact information for Fire District use in the event of an emergency at the subject building or property. This form must be presented to the Fire Construction Services Inspector. 6