HomeMy WebLinkAbout06-05 - Resolutions RESOLUTION NO. 06-05
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT
REVIEW DRC2004-00268,A REQUEST TO DEVELOP 99 CONDOMINIUMS
ON 9.68 ACRES OF LAND IN THE MEDIUM RESIDENTIAL DISTRICT(8-14
DWELLING UNITS PER ACRE), LOCATED ON THE NORTH SIDE OF
FOOTHILL BOULEVARD, EAST OF ETIWANDAAVENUE IN THE MEDIUM
RESIDENTIAL (8-14 DWELLING UNITS PER ACRE) DISTRICT, AND
MAKING FINDINGS IN SUPPORT THEREOF -APN: 1100-161-04.
A. Recitals.
1. Lewis Investment Company filed an application for the approval of Development Review
DRC2004-00268, as described in the title of this Resolution. Hereinafter in this Resolution, the
subject Development Review request is referred to as "the application."
2. On the 11th day of January 2006, the Planning Commission of the City of Rancho
Cucamonga conducted a meeting on the application and concluded said meeting on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning
Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the
above-referenced meeting on January 11, 2006, including written and oral staff reports, together
with public testimony, this Commission hereby specifically finds as follows:
a. The application applies to the property located on north side of Foothill Boulevard,
east of Etiwanda Avenue, with a street frontage of 815 feet and lot depth of 537.77 feet, and is
presently unimproved; and
b. the property to the north of the subject site is designated Medium Residential
(8-14 dwelling units) and is developed with apartments; and
C. the property to the west is designated Community Commercial and is vacant,
underutilized with some single-family residences and commercial uses; and
d. the property to the east is designated Office and is vacant with Utility Overhead
Power Lines and temporary Flood Water Retention Basin; and
e. the property to the south is designated Low density (2-4 dwelling units per acre),
and General Commercial and is Single-Family Residential, Low density(2-4 dwelling units per acre),
and vacant.
PLANNING COMMISSION RESOLUTION NO. 06-05
DRC2004-00268 - LEWIS INVESTMENT CO.
January 11, 2006
Page 2
3. Based upon the substantial evidence presented to this Commission during the
above-referenced meeting and upon the specific findings of facts set forth in Paragraphs 1 and 2
above, this Commission hereby finds and concludes as follows:
a. The proposed project is consistent with the objectives of the General Plan; and
b. The proposed use is in accord with the objectives of the Development Code and
the purposes of the district in which the site is located; and
C. The proposed use is in compliance with each of the applicable provisions of the
Development Code; and
d. The proposed use, together with the conditions applicable thereto, will not be
detrimental to the public health, safety, or welfare or materially injurious to properties or
improvements in the vicinity.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration, togetherwith all written and oral reports included for the environmental assessment for
the application, the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and
Monitoring Program attached hereto, and incorporated herein by this reference, based upon the
findings as follows:
a. That the Mitigated Negative Declaration has been prepared in compliance with the
California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines
promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared
therefore reflect the independent judgment of the Planning Commission; and, further, this
Commission has reviewed and considered the information contained in said Mitigated Negative
Declaration with regard to the application.
b. That, based upon the changes and alterations which have been incorporated into
the proposed project, no significant adverse environmental effects will occur.
C. Pursuant to the provisions of Section 753.5(c) of Title 14 of the California Code of
Regulations, the Planning Commission finds as follows: In considering the record as a whole, the
Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the
proposed project will have potential for an adverse impact upon wildlife resources or the habitat
upon which wildlife depends. Further, based upon the substantial evidence contained in the
Mitigated Negative Declaration, the staff reports and exhibits, and the information provided to the
Planning Commission during the public hearing, the Planning Commission hereby rebuts the
presumption of adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code
of Regulations.
5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth
below and in the Standard Conditions, attached hereto and incorporated herein by this reference.
PLANNING COMMISSION RESOLUTION NO. 06-05
DRC2004-00268 - LEWIS INVESTMENT CO.
January 11, 2006
Page 3
Planning Department
1) All future purchasers shall be advised through written disclosure bythe
developer in a manner approved by the City Planner and City Attorney
of the Master Plan layout of adjacent Commercial and Office uses.
Engineering Department
1) Foothill Boulevard shall be improved in accordance with City's "Major
Divided Highway" standards as required and including:
a) Provide curb and gutter, curvilinear sidewalk, 9500 Lumens
HPSV street lights, street trees, curbside drain outlets, R26(s)
"No Stopping" signs and asphalt pavement, as required.
b) Provide a bus bay at the northwest corner of Foothill Boulevard
and Cornwall Avenue.
c) Provide a westbound deceleration right-turn lane on Foothill
Boulevard at Cornwall Avenue.
d) Relocate the existing 66 kV power poles to the satisfaction of the
City Engineer.
e) Provide master plan access to the "Not-A-Part" property to the
east to Cornwall Avenue cul-de-sac and Foothill Boulevard.
f) Proposed gated entrances are to be in accordance with City's
"Residential Project Gated Entrance Design Guide" standard.
g) Revise traffic signing and striping, as required.
2) The Cornwall Avenue cul-de-sac shall be improved in accordance with
"Local Street" standards as required and including:
a) Provide curb and gutter, sidewalk, 9500 Lumens HPSV street
lights, street trees, R26(s) "No Stopping" signs and asphalt
pavement, as required.
b) Provide access along the east of Cornwall Avenue to
"Not-A-Part" property to the east.
3) The Foothill Boulevard frontage shall be designed in accordance with
the City adopted Foothill Boulevard Historic Route 66 Visual
Improvement Plan including street lights. This designates a"Suburban
Parkway Enhancement Area" at the southwest corner of the project
site, featuring colored pavement emblazoned with the Route 66 logo,
special sidewalk treatment, artwork and a historic post, and a cable
roadway safety barrier. Said enhancement area shall be maintained by
the developer and shall be included in the CC & R's.
PLANNING COMMISSION RESOLUTION NO. 06-05
DRC2004-00268 - LEWIS INVESTMENT CO.
January 11, 2006
Page 4
4) An in-lieu fee as contribution to the future undergrounding of the
existing overhead utilities (telecommunications and electrical, except
for the 66 kV electrical) on the opposite of Foothill Boulevard shall be
paid to the City prior to issuance of building permits. The fee shall be
one-half the City adopted unit amount times the length of the project
frontage.
5) Install a traffic signal at the intersection of Foothill Boulevard and
Cornwall Avenue. The developer shall receive credit against, and
reimbursement costs in excess of, the Transportation Development
Fee in conformance with City Policy. If the developer fails to submit for
said reimbursement agreement within six months of the public
improvements being accepted by the City, all rights of the developer to
reimbursement shall terminate.
6) The existing Foothill Boulevard median island east of Etiwanda Avenue
shall be extended and landscaped to Cornwall Avenue per City
Standards,to the satisfaction of the City Engineer. The developer may
request a reimbursement agreement to recover one-half the City
adopted cost for median landscaping from future development as it
occurs on parcels to the west and on the opposite side of the street. If
the developer fails to submit said reimbursement agreement within six
months of the landscape improvements being accepted by the City, all
rights of the developer to reimbursement shall terminate.
7) Metropolitan Water District shall approve all plans that impact their
easement including utilities, storm drain, slopes, street trees, and
landscaping. A note shall be included on all pertinent plans requiring
Metropolitan Water District Operations Maintenance Branch to be
notified two working days prior to starting any work in the vicinity of
their easement.
8) A permit shall be obtained from Metropolitan Water District for any
work within their right-of-way, including grading.
a) Obtain written comments from Metropolitan Water District
regarding the site design restrictions within their easement.
9) Etiwanda/San Sevaine Area Regional Mainline, Secondary Regional
and Master Plan Drainage Fees shall be paid prior to final map
approval or building permit issuance, whichever comes first.
10) Flow increases as a result of development shall be mitigated by
enlarging Etiwanda/San Sevaine Area Interim Master Plan No. 6
adjacent to the east.
a) The developer who installed the basin is eligible for
reimbursement to recover proportionate cost of the land and
ultimate basin related facilities (outlet, etc.). Prior to recordation
of the map, provide for a fair share cost for use of the land.
PLANNING COMMISSION RESOLUTION NO. 06-05
DRC2004-00268 - LEWIS INVESTMENT CO.
January 11, 2006
Page 5
b) The interim basin to the east is private property. Obtain an
easement for installation of private storm drain facilities being
proposed by this development.
11) The proposed private on-site storm drain system needs to work with
both the interim basin and ultimate public storm drain systems. In the
interim, private storm drain outlet to the bottom of the basin, notthe top
of the spillway.
12) Prior to grading permit issuance, Best Management Practices (BMPs)
identified in the Water Quality Management Plan (WQMP) shall be
shown on the Grading Plan.
13) Maintenance of BMPs identified in the WQMP shall be addressed in
the project CC&Rs.
14) Final Tract Map 16882 shall be approved and recorded, prior to
approval of any building permits.
Environmental Mitigation Measures
Air Quality
1) All construction equipment shall be maintained in good operating
condition so as to reduce operational emissions. The contractor shall
ensure that all construction equipment is being properly serviced and
maintained as per manufacturers'specifications. Maintenance records
shall be available at the construction site for City verification.
2) Prior to the issuance of any Grading Permits, the developer shall
submit Construction Plans to the City denoting the proposed schedule
and projected equipment use. Construction contractors shall provide
evidence that low-emission mobile construction equipment will be
utilized, or that their use was investigated and found to be infeasible for
the project. Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality Management District
(SCAQMD) as well as City Planning staff.
3) All paints and coatings shall meet or exceed performance standards
noted in SCAQMD Rule 1113. Paints and coatings shall be applied
either by hand or high-volume, low-pressure spray.
4) All asphalt shall meet or exceed performance standards noted in
SCAQMD Rule 1108.
5) All construction equipment shall comply with SCAQMD Rules 402 and
403. Additionally, contractors shall include the following provisions:
• Reestablish ground cover on the construction site through
seeding and watering.
• Pave or apply gravel to any on-site haul roads.
PLANNING COMMISSION RESOLUTION NO. 06-05
DRC2004-00268 - LEWIS INVESTMENT CO.
January 11, 2006
Page 6
• Phase grading to prevent the susceptibility of large areas to
erosion over extended periods of time.
• Schedule activities to minimize the amounts of exposed
excavated soil during and after the end of work periods.
• Dispose of surplus excavated material in accordance with local
ordinances and use sound engineering practices.
• Sweep streets according to a schedule established by the City if
silt is carried over to adjacent public thoroughfares or occurs as a
result of hauling. Timing may vary depending upon the time of
year of construction.
• Suspend grading operations during high winds (i.e.,wind speeds
exceeding 25 mph) in accordance with Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils haul trucks
or cover payloads using tarps or other suitable means.
6) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and Regional Water Quality Control Board
[RWQCB]) daily to reduce Particulate Matter (PM10) emissions, in
accordance with SCAQMD Rule 403.
7) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall
be applied to all inactive construction areas that remain inactive for 96
hours or more to reduce PM10 emissions.
8) The construction contractor shall utilize electric or clean alternative
fuel-powered equipment where feasible.
9) The construction contractor shall ensure that Construction Grading
Plans include a statement that work crews will shut off equipment when
not in use.
10) All residential and commercial structures shall be required to
incorporate high-efficiency/low-polluting heating, air conditioning,
appliances, and water heaters.
11) All residential and commercial structures shall be required to
incorporate thermal pane windows and weather-stripping.
Cultural Resources
1) If any prehistoric archaeological resources are encountered before or
during grading, the developer will retain a qualified archaeologist to
monitor construction activities,to take appropriate measures to protect
or preserve them for study. With the assistance of the archaeologist,
the City of Rancho Cucamonga will:
PLANNING COMMISSION RESOLUTION NO. 06-05
DRC2004-00268 - LEWIS INVESTMENT CO.
January 11, 2006
Page 7
• Enact interim measures to protect undesignated sites from
demolition or significant modification without an opportunity for
the City to establish its archaeological value.
• Consider establishing provisions to require incorporation of
archaeological sites within new developments, using their special
qualities as a theme or focal point.
• Pursue educating the public about the area's archaeological
heritage.
Propose mitigation measures and recommend Conditions of
Approval to eliminate adverse project effects on significant,
important, and unique prehistoric resources, following
appropriate CEQA guidelines.
• Prepare a technical resources management report, documenting
the inventory, evaluation, and proposed mitigation of resources
within the project area. Submit one copy of the completed report
with original illustrations, to the San Bernardino County
Archaeological Information Center for permanent archiving.
2) If any paleontological resource (i.e. plant or animal fossils) are
encountered before or during grading, the developer will retain a
qualified paleontologist to monitor construction activities, to take
appropriate measures to protect or preserve them for study. The
paleontologist shall submit a report of findings that will also provide
specific recommendations regarding further mitigation measures (i.e.,
paleontological monitoring)that may be appropriate. Where mitigation
monitoring is appropriate, the program must include, but not be limited
to, the following measures:
• Assign a paleontological monitor, trained and equipped to allow
the rapid removal of fossils with minimal construction delay, to
the site full-time during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared or graded,
divert earth-disturbing activities elsewhere until the monitor has
completed salvage. If construction personnel make the
discovery, the grading contractor should immediately divert
construction and notify the monitor of the find.
• Submit a summary report to the City of Rancho Cucamonga.
Transfer collected specimens with a copy of the reportto the San
Bernardino County Museum.
Geology and Soils
1) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and RWQCB)daily to reduce PM10 emissions,
in accordance with SCAQMD Rule 403 or re-planted with drought
resistant landscaping as soon as possible.
PLANNING COMMISSION RESOLUTION NO. 06-05
DRC2004-00268 - LEWIS INVESTMENT CO.
January 11, 2006
Page 8 -
2) Frontage public streets shall be swept according to a schedule
established by the City to reduce PM10 emissions associated with
vehicle tracking of soil off-site. Timing may vary depending upon the
time of year of construction.
3) Grading operations shall be suspended when wind speeds exceed
25 mph to minimize PM10 emissions from the site during such
episodes.
4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall
be applied to all inactive construction areas that remain inactive for 96
hours or more to reduce PM10 emissions.
Hydrology and Water
1) Prior to issuance of Grading Permits, the permit applicant shall submit
to the Building Official for approval a Storm Water Pollution Prevention
Plan (SWPPP) specifically identifying Best Management Practices
(BMPs) that shall be used on-site to reduce pollutants during
construction activities entering the storm drain system to the maximum
extent practical.
2) An Erosion Control Plan shall be prepared, included in the Grading
Plan, and implemented for the proposed project that identifies specific
measures to control on-site and off-site erosion from the time ground
disturbing activities are initiated through completion of grading. This
Erosion Control Plan shall include the following measures at a
minimum: a) Specify the timing of grading and construction to
minimize soil exposure to rainy periods experienced in Southern
California, and b) An inspection and maintenance program shall be
included to ensure that any erosion which does occur either on-site or
off-site as a result of this project will be corrected through a
remediation or restoration program within a specified time frame.
3) During construction, temporary berms such as sandbags or gravel
dikes must be used to prevent discharge of debris or sediment from the
site when there is rainfall or other runoff.
4) During construction, to remove pollutants, street cleaning will be
performed prior to storm events and after the use of water trucks to
control dust in order to prevent discharge of debris or sediment from
the site.
5) The developer shall implement the BMPs identified in the Water
Quality Management Plan (WQMP) prepared by Madole and
Associates, dated January 14, 2005, to reduce pollutants after
construction entering the storm drain system to the maximum extent
practical.
PLANNING COMMISSION RESOLUTION NO. 06-05
DRC2004-00268 - LEWIS INVESTMENT CO.
January 11, 2006
Page 9
6) Landscaping Plans shall include provisions for controlling and
minimizing the use of fertilizers/pesticides/herbicides. Landscaped
areas shall be monitored and maintained for at least two years to
ensure adequate coverage and stable growth. Plans for these areas,
including monitoring provisions for a minimum of two years, shall be
submitted to the City for review and approval prior to the issuance of
Grading Permits.
7) Prior to issuance of Building Permits, the applicant shall submit to the
City Engineer for approval of a WQMP, including a project description
and identifying BMPs that will be used on-site to reduce pollutants into
the storm drain system to the maximum extent practicable. The
WQMP shall identify the structural and non-structural measures
consistent with the Guidelines for New Development and
Redevelopment adopted by the City of Rancho Cucamonga in June
2004.
8) Prior to issuance of Grading or Paving Permits, the applicant shall
obtain a Notice of Intent(NOI)to comply with obtaining coverage under
the National Pollutant Discharge Elimination System(NPDES)General
Construction Storm Water Permit from the State Water Resources
Control Board. Evidence that this has been obtained (i.e., a copy of
the Waste Discharger's Identification Number)shall be submitted to the
City Building Official for coverage under the NPDES General
Construction Permit.
Noise
1) A 12-foot sound wall along the southern boundary of the project along
Foothill Boulevard is required unless staff and the City's noise
consultant determine that a shorter wall is sufficient to mitigate the
noise impacts. This sound wall can consist of berms and concrete
masonry units.
2) A sound wall along the western boundary of the project with height
gradually decreasing from 12 feet near Foothill Boulevard to 8 feet near
the internal driveway is required.
3) An air conditioning system for all dwelling units with direct line-of-sight
to Foothill Boulevard traffic is required.
4) Building fagade enhancements or upgrades, such as double-paned
windows with a minimum sound transmission class (STC) of STC-32,
are required for all dwelling units in the southern most row of buildings
along Foothill Boulevard.
5) A 5-foot sound wall along the southern balcony perimeter is required
for all dwelling units in the southernmost row of buildings with balconies
exposed to Foothill Boulevard traffic. The sound wall can be
constructed with a combination of wood and plexiglass, with no gaps.
PLANNING COMMISSION RESOLUTION NO. 06-05
DRC2004-00268 - LEWIS INVESTMENT CO.
January 11, 2006
Page 10
6) Construction or grading shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday.
7) Construction or grading noise levels shall not exceed the standards
specified in Development Code Section 17.02.120-D, as measured at
the property line. The developer shall hire a consultant to perform
weekly noise level monitoring as specified in Development Code
Section 17.02.120. Monitoring at other times may be required by the
Building Official. Said consultant shall report their findings to the
Building Official within 24 hours; however, if noise levels exceed the
above standards, then the consultant shall immediately notify the
Building Official. If noise levels exceed the above standards, then
construction activities shall be reduced in intensity to a level of
compliance with above noise standards or halted.
8) The perimeter block wall shall be constructed as early as possible in
first phase.
9) Haul truck deliveries shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday. Additionally, if heavy trucks used
for hauling would exceed 100 daily trips(counting both to and from the
construction site), then the developer shall prepare a Noise Mitigation
Plan denoting any construction traffic haul routes. To the extent
feasible, the plan shall denote haul routes that do not pass sensitive
land uses or residential dwellings.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 11TH DAY OF JANUARY 2006.
PLANNING C MISSION OF THE CITY OF RANCHO CUCAMONGA
BY:
Paly-Ste art, Chair n
ATTEST: �� "el's—�Oa���
Dan Coleman, Acting Secretary
I, Dan Coleman, Acting Secretary of the Planning Commission of the City of Rancho Cucamonga,
do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and
adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the
Planning Commission held on the 11th day of January 2006, by the following vote-to-wit:
AYES: COMMISSIONERS: FLETCHER, McPHAIL, STEWART
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: MACIAS , McNIEL
- City of Rancho Cucamonga
MITIGATED NEGATIVE DECLARATION
The following Mitigated Negative Declaration is being circulated for public review in accordance with
the California Environmental Quality Act Section 21091 and 21092 of the Public Resources Code.
Project File No.: General Plan Amendment DRC2004-00269, Development District Amendment
DRC2004-00270,Tentative Tract Map SUBTT16882, and Development Review DRC2004-00268.
Public Review Period Closes: January 11, 2006
Project Name: Project Applicant: Lewis Investment Company
Project Location(also see attached map): Located within the Community Commercial Land Use
Designation of Foothill Boulevard Districts on the north side of Foothill Boulevard, east of Etiwanda
Avenue —APN: 1100-161-04.
Project Description: A request to change the land use and zoning designation from Community
Commercial to Medium Residential (8-14 dwelling units per acre) on 9.68 acres for a seven
numbered and two lettered lot subdivision for 99 condominiums.
FINDING
This is to advise that the City of Rancho Cucamonga,acting as the lead agency,has conducted an
Initial Study to determine if the project may have a significant effect on the environment and is
proposing this Mitigated Negative Declaration based upon the following finding:
The Initial Study identified potentially significant effects but:
(1) Revisions in the project plans or proposals made or agreed to by the applicant before this
proposed Mitigated Negative Declaration was released for public review would avoid the
effects or mitigate the effects to a point where clearly no significant effects would occur, and
(2) There is no substantial evidence before the agency that the project, as revised, may have a
significant effect on the environment.
If adopted,the Mitigated Negative Declaration means that an Environmental Impact Report will not
be required. The factual and analytical basis for this finding is included in the attached Initial
Study. The project file and all related documents are available for review at the City of Rancho
Cucamonga Planning Department at 10500 Civic Center Drive (909) 477-2750 or Fax
(909) 477-2847.
NOTICE
The public is invited to comment on the proposed Mitigated Negative Declaration during the
review period.
January 11, 2006
Date of Determination Adopted B
City of Rancho Cucamonga
MITIGATION MONITORING
PROGRAM
Project File No.: General Plan Amendment DRC2004-00269, Development District Amendment
DRC2004-00270,Tentative Tract Map SUBTT16882, and Development Review DRC2004-00268
This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation
measures identified in the Mitigated Negative Declaration forthe above-listed project. This program
has been prepared in compliance with State law to ensure that adopted mitigation measures are
implemented (Section 21081.6 of the Public Resources Code).
Program Components- This MMP contains the following elements:
1. Conditions of approval that act as impact mitigation measures are recorded with the action and
the procedure necessary to ensure compliance.The mitigation measure conditions of approval
are contained in the adopted Resolution of Approval for the project.
2. A procedure of compliance and verification has been outlined for each action necessary. This
procedure designates who will take action, what action will be taken and when, and to whom
and when compliance will be reported.
3. The MMP has been designed to provide.focused, yet flexible guidelines. As monitoring
progresses, changes to compliance procedures may be necessary based upon
recommendations by those responsible for the program.
Program Management - The MMP will be in place through all phases of the project. The project
planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project
planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly
and proper action is taken on each mitigation. Each City department shall ensure compliance of the
conditions (mitigation) that relate to that department.
Procedures - The following steps will be followed by the City of Rancho Cucamonga.
1. A fee covering all costs and expenses, including any consultants' fees, incurred by the City in
performing monitoring or reporting programs shall be charged to the applicant.
2. A MMP Reporting Form will be prepared for each potentially significant impact and its
corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached
hereto. This procedure designates who will take action,what action will be taken and when,and
to whom and when compliance will be reported. All monitoring and reporting documentation will
be kept in the project file with the department having the original authority for processing the
project. Reports will be available from the City upon request at the following address:
City of Rancho Cucamonga - Lead Agency
Planning Division
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
DRC2004-00269, DRC2004-00270, SUBTT16882, AND DRC2004-00268
LEWIS INVESTMENT COMPANY
Page 2
3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,as
determined by the project planner or responsible City department,to monitor specific mitigation
activities and provide appropriate written approvals to the project planner.
4. The project planner or responsible City department will approve, by signature and date, the
completion of each action item that was identified on the MMP Reporting Form. After each
measure is verified for compliance, no further action is required for the specific phase of
development.
5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off
as completed by the project planner or responsible City department at the bottom of the MMP
Reporting Form..
6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation
measures. The project planner is responsible for approving any such refinements or additions.
An MMP Reporting Form will be completed bythe project planner or responsible City department
and a copy provided to the appropriate design, construction, or operational personnel.
7. The project planner or responsible City department has the authority to stop the work of
construction contractors if compliance with any aspects of the MMP is not occurring after written
notification has been issued. The project planner or responsible City department also has the
authority to hold certificates of occupancies if compliance with a mitigation measure attached
hereto is not occurring.The project planner or responsible City department has the authority to
hold issuance of a business license until all mitigation measures are implemented.
8. Any conditions (mitigation) that require monitoring after project completion shall be the
responsibility of the City of Rancho Cucamonga Planning Division.The Division shall require the
applicant to post any necessary funds (or other forms of guarantee)with the City. These funds
shall be used by the City to retain consultants and/or pay for City staff time to monitor and report
on the mitigation measure for the required period of time.
9. In those instances requiring long-term project monitoring, the applicant shall provide the.City
with a plan for monitoring the mitigation activities at the project site and reporting the monitoring
results to the City. Said plan shall identify the reporter as an individual qualified to know whether
the particular mitigation measure has been implemented. The monitoring/reporting plan shall
conform to the City's MMP and shall be approved by the Community Development Director or
City Planner prior to the issuance of building permits.
MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III)
Project File No.: DRC2004-00269, DRC2004-00270, SUBTT16882, and DRC2004-00268 Applicant: LEWIS INVESTMENT COMPANY
Initial Study Prepared by: L. J. Henderson, AICP, Principal Planner Date: August 9, 2006
ResponsibleMitigation Measures No. of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Air Quality
All construction equipment shall be maintained in good CP C Review of plans A/C 2/4
operating condition so as to reduce operational
emissions. The contractor shall ensure that all
construction equipment is being properly serviced and
maintained as per manufacturers' specifications.
Maintenance records shall be available at the
construction site for City verification.
Prior to the issuance of any Grading Permits, the CP/BO C Review of plans C 2
developer shall submit Construction Plans to the City
denoting the proposed schedule and projected
equipment use. Construction contractors shall provide
evidence that low-emission mobile construction
equipment will be utilized, or that their use was
investigated and found to be infeasible for the project.
Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality
Management District (SCAQMD) as well as City
Planning staff.
All paints and coatings shall meet or exceed CP C Review of plans A/C 2/4
performance standards noted in SCAQMD Rule 1113.
Paints and coatings shall be applied either by hand or
high-volume, low-pressure spray.
All asphalt shall meet or exceed performance standards BO B Review of plans A/C 2
noted in SCAQMD Rule 1108.
All construction equipment shall comply with SCAQMD BO C Review of plans A/C 2/4
Rules 402 and 403. Additionally, contractors shall
include the following provisions:
Reestablish ground cover on the construction site BO C Review of plans A/C 2/4
through seeding and watering.
1 of 8
Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
• Pave or apply gravel to any on-site haul roads. BO C Review of plans A/C 2/4
• Phase grading to prevent the susceptibility of large BO C Review of plans A/C 2/4
areas to erosion over extended periods of time.
• Schedule activities to minimize the amounts of BO C Review of plans A/C 2/4
exposed excavated soil during and after the end of
work periods.
• Dispose of surplus excavated material in BO C Review of plans A 4
accordance with local ordinances and use sound
engineering practices.
• Sweep streets according to a schedule established BO C During A 4
by the City if silt is carried over to adjacent public construction
thoroughfares or occurs as a result of hauling.
Timing may vary depending upon the time of year of
construction.
• Suspend grading operations during high winds(i.e., BO C During A 4
wind speeds exceeding 25 mph)in accordance with construction
SCAQMD Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils BO C During A 4
haul trucks or cover payloads using tarps or other Construction
suitable means.
The site shall be treated with water or other BO C During A 4
soil-stabilizing agent (approved by SCAQMD and construction
Regional Water Quality Control Board [RWQCB]) daily
to reduce Particulate Matter (PM10) emissions, in
accordance with SCAQMD Rule 403.
Chemical soil-stabilizers (approved by SCAQMD and BO C During A 4
RWQCB) shall be applied to all inactive construction construction
areas that remain inactive for 96 hours or more to
reduce PM10 emissions.
The construction contractor shall utilize electric or clean BO C Review of plans A/C 4
alternative fuel-powered equipment where feasible.
The construction contractor shall ensure that BO C Review of plans A/C 2/4
Construction Grading Plans include a statement that
work crews will shut off equipment when not in use.
2 of 8
Mitigation . . of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
All residential and commercial structures shall be BO C/D Review of plans C 2/4
required to incorporate high-efficiency/low-polluting
heating,air conditioning,appliances,and water heaters.
All residential and commercial structures shall be BO C/D Review of plans C 2/4
required to incorporate thermal pane windows and
weather-stripping.
Cultural Resources
If any prehistoric archaeological resources are
encountered before orduring grading,the developerwill
retain a qualified archaeologist to monitor construction
activities, to take appropriate measures to protect or
preserve them for study. With the assistance of the
archaeologist, the City of Rancho Cucamonga will:
Enact interim measures to protect undesignated CP/BO C Review of report A/D 3/4
sites from demolition or significant modification
without an opportunity for the City to establish its
archaeological value.
• Consider establishing provisions to require CP/BO C Review of report A/D 3/4
incorporation of archaeological sites within new
developments, using their special qualities as a
theme or focal point.
• Pursue educating the public about the area's CP/BO C Review of report A/D 3/4
archaeological heritage.
Propose mitigation measures and recommend CP/BO C Review of report A/D 3/4
Conditions of Approval to eliminate adverse project
effects on significant, important, and unique
prehistoric resources, following appropriate CEQA
guidelines.
• Prepare a technical resources management report, CP C Review of report A/D 3/4
documenting the inventory, evaluation, and
proposed mitigation of resources within the project
area. Submit one copy of the completed report,with
original illustrations, to the San Bernardino County
Archaeological Information Center for permanent
archiving.
3 of 8
Mitigation Measures No. Responsible g of Method .
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
If any paleontological resource (i.e. plant or animal CP B Review of report A/D 4
fossils) are encountered before or during grading, the
developerwill retain a qualified paleontologist to monitor
construction activities, to take appropriate measures to
protect or preserve them for study. The paleontologist
shall submit a report of findings that will also provide
specific recommendations regarding further mitigation
measures(i.e., paleontological monitoring)that may be
appropriate. Where mitigation monitoring is appropriate,
the program must include, but not be limited to, the
following measures.
• Assign a paleontological monitor, trained and CP B Review of report A/D 4
equipped to allow the rapid removal of fossils with
minimal construction delay, to the site full-time
during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared BO BSC Review of report AID 4
or graded, divert earth-disturbing activities
elsewhere until the monitor has completed salvage.
If construction personnel make the discovery, the
grading contractor should immediately divert
construction and notify the monitor of the find.
• Submit a summary report to the City of Rancho CP D Review of report D 3
Cucamonga. Transfer collected specimens with a
copy of the report to the San Bernardino County
Museum.
Geology and Soils
The site shall be treated with water or other BO C During A 4
soil-stabilizing agent (approved by SCAQMD and construction
RWQCB)daily to reduce PM,o emissions, in accordance
with SCAQMD Rule 403 or re-planted with drought
resistant landscaping as soon as possible.
Frontage public streets shall be swept according to a BO C During A 4
schedule established by the City to reduce PM,o construction
emissions associated with vehicle tracking of soil
off-site. Timing may vary depending upon the time of
year of construction.
4 of 8
Mitigation Measures No. I Responsible g of Method .
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Grading operations shall be suspended when wind BO C During A 4
speeds exceed 25 mph to minimize PM10 emissions construction
from the site during such episodes.
Chemical soil-stabilizers (approved by SCAQMD and BO C During A 4
RWQCB) shall be applied to all inactive construction construction
areas that remain inactive for 96 hours or more to
reduce PM10 emissions.
Hydrology and Water Quality
Prior to issuance of Grading Permits, the permit BO B/C/D Review of plans A/C 2/4
applicant shall submit to Building Official for approval a
Storm Water Pollution Prevention Plan (SWPPP)
specifically identifying Best Management Practices
(BMPs) that shall be used on-site to reduce pollutants
during construction activities entering the storm drain
system to the maximum extent practical.
An Erosion Control Plan shall be prepared, included in BO B/C/D Review of plans A/C 2/4
Grading Plan,and implemented for the proposed project
that identifies specific measures to control on-site and
off-site erosion from the time ground disturbing activities
are initiated through completion of grading. This
Erosion Control Plan shall include the following
measures at a minimum: a) Specify the timing of
grading and construction to minimize soil exposure to
rainy periods experienced in Southern California,and b)
An inspection and maintenance program shall be
included to ensure that any erosion which does occur
either on-site or off-site as a result of this project will be
corrected through a remediation or restoration program
within a specified time frame.
During construction, temporary berms such as BO B/C/D Review of plans A/C 2/4
sandbags or gravel dikes must be used to prevent
discharge of debris or sediment from the site when there
is rainfall or other runoff.
During construction, to remove pollutants, street BO B/C/D Review of plans A/C 2/4
cleaning will be performed prior to storm events and
after the use of water trucks to control dust in order to
prevent discharge of debris or sediment from the site.
5of8
Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance developer shall implement the BMPs identified in CE B/C/D Review of plans A/C 2/4
the Water Quality Management Plan(WQMP)prepared
by Madole and Associates, dated January 14, 2005, to
reduce pollutants after construction entering the storm
drain system to the maximum extent practical.
Landscaping Plans shall include provisions for BO B/C/D Review of plans A/C 2/4
controlling and minimizing the use of
fertilizers/pesticides/herbicides. Landscaped areas shall
be monitored and maintained for at least two years to
ensure adequate coverage and stable growth. Plans for
these areas, including monitoring provisions for a
minimum of two years,shall be submitted to the City for
review and approval prior to the issuance of Grading
Permits.
Prior to issuance of Building Permits,the applicant shall CE B/C/D Review of plans A/C 2/4
submit to the City Engineer for approval of a WQMP,
including a project description and identifying BMPs that
will be used on-site to reduce pollutants into the storm
drain system to the maximum extent practicable. The
WQMP shall identify the structural and non-structural
measures consistent with the Guidelines for New
Development and Redevelopment adopted by the City of
Rancho Cucamonga in June 2004.
Prior to issuance of Grading or Paving Permits, the BO B/C/D Review of plans A/C 2/4
applicant shall obtain a Notice of Intent(NOI)to comply
with obtaining coverage under the National Pollutant
Discharge Elimination System (NPDES) General
Construction Storm Water Permit from the State Water
Resources Control Board. Evidence that this has been
obtained (i.e., a copy of the Waste Discharger's
Identification Number) shall be submitted to the City
Building Official for coverage under the NPDES General
Construction Permit.
6 of 8
Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Noise
A 12-foot sound wall along the southern boundary of the CP/BO BC Review of Plans CA 2/4
project along Foothill Boulevard is required unless staff
and the City's noise consultant determine that a shorter
wall is sufficient to mitigate the noise impacts. This
sound wall can consist of berms and concrete masonry
units.
A sound wall along the western boundary of the project CP/BO BC Review of Plans CA 2/4
with height gradually decreasing from 12 feet near
Foothill Boulevard to 8 feet near the internal driveway is
required.
An air conditioning system for all dwelling units with CP/BO BC Review of Plans CA 2/4
direct line-of-sight to Foothill Boulevard traffic is
required.
Building fagade enhancements or upgrades, such as CP/BO BC Review of Plans CA 2/4
double-paned windows with a minimum sound
transmission class(STC)of STC-32, are required for all
dwelling units in the southern most row of buildings
along Foothill Boulevard.
A 5-foot sound wall along along the southern balcony CP/BO BC Review of Plans CA 2/4
perimeter is required for all dwelling units in the
southernmost row of buildings with balconies exposed to
Foothill Boulevard traffic. The sound wall can be
constructed with a combination of wood and plexiglass,
with no gaps.
Construction or grading shall not take place between the BO C During A 4
hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction
including Saturday, or at any time on Sunday or a
national holiday.
7 of 8
Mitigation Measures No. Responsible g of Method .
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Construction or grading noise levels shall not exceed the BO C During A 4
standards specified in Development Code Section construction
17.02.120-D, as measured at the property line. The
developer shall hire a consultant to perform weekly
noise level monitoring as specified in Development
Code Section 17.02.120. Monitoring at other times may
be required by the Building Official. Said consultant
shall report their findings to the Building Official within 24
hours; however, if noise levels exceed the above
standards, then the consultant shall immediately notify
the Building Official. If noise levels exceed the above
standards, then construction activities shall be reduced
in intensity to a level of compliance with above noise
standards or halted.
The perimeter block wall shall be constructed as early CP C During A 4/7
as possible in the first phase. construction
Haul truck deliveries shall not take place between the PO/BO C During A 4/7
hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction
including Saturday, or at any time on Sunday or a
national holiday. Additionally, if heavy trucks used for
hauling would exceed 100 daily trips (counting both to
and from the construction site), then the developer shall
prepare a Noise Mitigation Plan denoting any
construction traffic haul routes. To the extent feasible,
the plan shall denote haul routes that do not pass
sensitive land uses or residential dwellings.
Key to Checklist Abbreviations
Responsible Person Monitoring Frequency Method of Verification Sanctions
CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map
CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit
CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy
BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order
PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds
FC-Fire Chief or designee6-Revoke CUP
7-Citation
8 of 8
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT#: DEVELOPMENT REVIEW DRC2004-00268
SUBJECT: AMADOR ROUTE 66 PROJECT
APPLICANT: LEWIS INVESTMENTS COMPANY
LOCATION: NORTH SIDE OF FOOTHILL, EAST OF ETIWANDA AVENUE
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
A. General Requirements Completion Date
1. The applicant shall agree to defend at his sole expense any action brought against the City, its _/_/_
agents,officers,or employees, because of the issuance of such approval,or in the alternative,to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or
employees, for any Court costs and attorney's fees which the City, its agents, officers, or
employees may be required by a court to pay as a result of such action. The City may,at its sole
discretion,participate at its own expense in the defense of any such action but such participation
shall not relieve applicant of his obligations under this condition.
2. Approval of Development Review DRC2004-00268 is granted subject to the approval of General
Plan Amendment DRC2004-00269, Development District Amendment DRC2004-00270,
Development Review DRC2004-00268, and Tentative Tract Map SUBTT16882.
3. Copies of the signed Planning Commission Resolution of Approval No. 06-05, Standard
Conditions, and all environmental mitigations shall be included on the plans (full size). The
sheet(s) are for information only to all parties involved in the construction/grading activities and
are not required to be wet sealed/stamped by a licensed Engineer/Architect.
B. Time Limits
1. Development/Design Review approval shall expire if building permits are not issued or approved
use has not commenced within 5 years from the date of approval. No extensions are allowed.
1
Project No.DRC2004-00268
Completion Date
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which include
site plans,architectural elevations,exterior materials and colors,landscaping,sign program,and
grading on file in the Planning Department,the conditions contained herein, Development Code
regulations,the Etiwanda Specific Plan,and the Foothill Boulevard Route 66 Improvement Plan.
2. Prior to any use of the project site or business activity being commenced thereon,all Conditions
of Approval shall be completed to the satisfaction of the City Planner.
3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and
State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be
submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety
Department to show compliance. The buildings shall be inspected for compliance prior to
occupancy.
4. Revised site plans and building elevations incorporating all Conditions of Approval shall be
submitted for City Planner review and approval prior to the issuance of building permits.
5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved
use has commenced, whichever comes first.
6. Approval of this request shall not waive compliance with all sections of the Development Code,all
other applicable City Ordinances, and applicable Community or Specific Plans in effect at the
time of building permit issuance.
7. A detailed on-site lighting plan, including a photometric diagram,shall be reviewed and approved
by the City Planner and Police Department(477-2800) prior to the issuance of building permits.
Such plan shall indicate style, illumination, location, height,and method of shielding so as not to
adversely affect adjacent properties.
8. If no centralized trash receptacles are provided,all trash pick-up shall be for individual units with
all receptacles shielded from public view.
9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be
located out of public view and adequately screened through the use of a combination of concrete
or masonry walls,berming, and/or landscaping to the satisfaction of the City Planner. For single-
family residential developments,transformers shall be placed in underground vaults.
10. All building numbers and individual units shall be identified in a clear and concise manner,
including proper illumination.
11. The Covenants, Conditions, and Restrictions (CC&Rs) and Articles of Incorporation of the
Homeowners' Association are subject to the approval of the Planning and Engineering
Departments and the City Attorney. They shall be recorded concurrently with the Final Map or
prior to the issuance of building permits, whichever occurs first. A recorded copy shall be
provided to the City Engineer. The Homeowners' Association shall submit to the Planning
Department a list of the name and address of their officers on or before January 1 of each and
every year and whenever said information changes.
12. All parkways, open areas, and landscaping shall be permanently maintained by the property
owner,homeowners'association,or other means acceptable to the City. Proof of this landscape
maintenance shall be submitted for City Planner and City Engineer review and approved prior to
the issuance of building permits.
13. Six-foot decorative block walls shall be constructed along the project perimeter. If a double wall
condition would result, the developer shall make a good faith effort to work with the adjoining
property owners to provide a single wall. Developer shall notify, by mail,all contiguous property
owner at least 30 days prior to the removal of any existing walls/ fences along the project's
perimeter.
2
Project No.DRC2004-00268
Completion Date
14. For residential development, return walls and corner side walls shall be decorative masonry.
15. For multiple family development, laundry facilities shall be provided as required by the
Development Code.
16. For multiple family development,a minimum of 125 cubic feet of exterior lockable storage space
shall be provided.
17. For residential development, recreation area/facility shall be provided as required by the
Development Code.
18. Where rock cobble is used, it shall be real river rock. Other stone veneers may be manufactured
products.
D. Building Design
1. Standard patio cover plans for use by the Homeowner's Association shall be submitted for City
Planner and Building Official review and approval prior to issuance of building permits.
2. All roof appurtenances, including air conditioners and other roof mounted equipment and/or
projections, shall be shielded from view and the sound buffered from adjacent properties and
streets as required by the Planning Department. Such screening shall be architecturally
integrated with the building design and constructed to the satisfaction of the City Planner. Details
shall be included in building plans.
3. For all residential development,provide conduit from each unit/lot and a pull box to connect to the
street. Provide interior structured wiring for each house/building with minimum Category 5
copper wire, Radio Grade 6 coaxial cable, and a central distribution panel, prior to release of
occupancy(fiber-to-the building, FTTB). Plans shall be submitted for City Planner and Building
Official review and approval prior to issuance of building permits.
E. Parking and Vehicular Access (indicate details on building plans)
1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts
a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet
wide.
2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall
contain a 12-inch walk adjacent to the parking stall (including curb).
3. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided
throughout the development to connect dwellings/units/buildings with open spaces/plazas/
recreational uses.
4. All parking spaces shall be double striped per City standards and all driveway aisles,entrances,
and exits shall be striped per City standards.
5. All units shall be provided with garage door openers if driveways are less than 18 feet in depth
from back of sidewalk.
6. The Covenants,Conditions and Restrictions shall restrict the storage of recreational vehicles on
this site unless they are the principal source of transportation for the owner and prohibit parking
on interior circulation aisles other than in designated visitor parking areas.
7. Plans for any security gates shall be submitted for the City Planner, City Engineer, and Rancho
Cucamonga Fire Protection District review and approval prior to issuance of building permits.
For residential development, private gated entrances shall provide adequate turn-around space
in front of the gate and a separate visitor lane with call box to avoid cars stacking into the public
right-of-way.
3
Project No.DRC2004-00268
Completion Date
F. Trip Reduction
1. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily
residential projects of more than 10 units. Minimum spaces equal to five percent of the required
automobile parking spaces or three bicycle storage spaces,whichever is greater. After the first
50 bicycle storage spaces are provided,additional storage spaces required are 2.5 percent of the
required automobile parking spaces. Warehouse distribution uses shall provide bicycle storage
spaces at a rate of 2.5 percent of the required automobile parking spaces with a minimum of a
3-bike rack. In no case shall the total number of bicycle parking spaces required exceed 100.
Where this results in a fraction of 0.5 or greater, the number shall be rounded off to the higher
whole number.
2. Transit improvements such as bus shelters, bus pullouts, and bus pads shall be provided. Bus
shelters shall also include a bench, a trash receptacle, and an adjoining bike rack (minimum 3
capacity)on a concrete pad. Bus shelter shall be located outside public right-of-wayand shall be
privately maintained.
G. Landscaping
1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in
the case of residential development, shall be prepared by a licensed landscape architect and
submitted for City Planner review and approval prior to the issuance of building permits or prior
final map approval in the case of a custom lot subdivision.
2. A minimum of 45 trees per gross acre,comprised of the following sizes,shall be provided within
the project: 0%-48-inch box or larger 10%-36-inch box or larger, 10%-24-inch box or larger,
80% - 15-gallon, and 0%-5 gallon.
3. Within parking lots,trees shall be planted at a rate of one 15-gallon tree for every three parking
stalls.
4. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one
tree per 30 linear feet of building.
5. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope,but less than 2:1
slope,shall be,at minimum, irrigated and landscaped with appropriate ground cover for erosion
control. Slope planting required by this section shall include a permanent irrigation system to be
installed by the developer prior to occupancy.
6. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater
slope shall be landscaped and irrigated for erosion control and to soften their appearance as
follows: one 15-gallon or larger size tree per each 150 sq.ft.of slope area, 1-gallon or larger size
shrub per each 100 sq.ft.of slope area,and appropriate ground cover. In addition,slope banks
in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or
larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in
staggered clusters to soften and vary slope plane. Slope planting required by this section shall
include a permanent irrigation system to be installed by the developer prior to occupancy.
7. For multi-family residential and non-residential development,property owners are responsible for
the continual maintenance of all landscaped areas on-site,as well as contiguous planted areas
within the public right-of-way. All landscaped areas shall be kept free from weeds and debris and
maintained in healthy and thriving condition,and shall receive regular pruning,fertilizing,mowing,
and trimming. Any damaged,dead,diseased,or decaying plant material shall be replaced within
30 days from the date of damage.
8. The final design of the perimeter parkways,walls,landscaping,and sidewalks shall be included in
the required landscape plans and shall be subject to City Planner review and approval and
coordinated for consistency with any parkway landscaping plan which may be required by the
Engineering Department.
4
Project No.DRC2004-00268
Completion Date
9. Special landscape features such as mounding, alluvial rock, specimen size trees, meandering
sidewalks (with horizontal change), and intensified landscaping, is required along Foothill
Boulevard..
10. Landscaping and irrigation systems required to be installed within the public right-of-way on the
perimeter of this project area shall be continuously maintained by the developer.
11. All walls shall be provided with decorative treatment. If located in public maintenance areas,the
design shall be coordinated with the Engineering Department.
12. Tree maintenance criteria shall be developed and submitted for City Planner review and approval
prior to issuance of building permits. These criteria shall encourage the natural growth
characteristics of the selected tree species.
13. Landscaping and irrigation shall be designed to conserve water through the principles of
Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code.
H. Signs
1. The signs indicated on the submitted plans are conceptual only and not a part of this approval.
Any signs proposed for this development shall comply with the Sign Ordinance and shall require
separate application and approval by the Planning Department prior to installation of any signs.
2. Directory monument sign(s)shall be provided for apartment,condominium,or town homes prior
to occupancy and shall require separate application and approval by the Planning Department
prior to issuance of building permits.
I. Environmental
1. The developer shall provide each prospective buyer written notice of the Interstate 15 Freeway in
a standard format as determined by the City Planner, prior to accepting a cash deposit on any
property.
2. Noise levels shall be monitored after construction to verify the adequacy of the mitigation
measures. Noise levels shall be monitored by actual noise level readings taken on-and off-site.
A final acoustical report shall be submitted for City Planner review and approval prior to final
occupancy release. The final report shall also make recommendations as to additional mitigation
measures to reduce noise levels to below City standards, such as, residential exterior noise
levels to below 60 dBA and interior noise attenuation to below 45 dBA.
3. A final acoustical report shall be submitted for City Planner review and approval prior to the
issuance of building permits. The final report shall discuss the level of interior noise attenuation
to below 45 CNEL, the building materials and construction techniques provided, and if
appropriate,verify the adequacy of the mitigation measures. The building plans will be checked
for conformance with the mitigation measures contained in the final report.
4. The applicant shall submit certification from an acoustical engineer that all recommendations of
the acoustical report were implemented in construction, including measurements of interior and
exterior noise levels to document compliance with City standards. Certification shall be
submitted to the Building & Safety Department prior to final occupancy release of the affected
homes.
5. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures, including monitoring and reporting. Applicant shall be required to
post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the
amount of$495 prior to the issuance of building permits,guaranteeing satisfactory performance
and completion of all mitigation measures. These funds may be used by the City to retain
consultants and/or pay for City staff time to monitor and report on the mitigation measures.
Failure to complete all actions required by the approved environmental documents shall be
considered grounds for forfeit.
5
Project No.DRC2004-00268
Completion Date
J. Other Agencies
1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location
of mailboxes. Multi-family residential developments shall provide a solid overhead structure for
mailboxes with adequate lighting. The final location of the mailboxes and the design of the
overhead structure shall be subject to City Planner review and approval prior to the issuance of
building permits.
APPLICANT SHALL CONTACTTHE BUILDING AND SAFETY DEPARTMENT,(909)477-2710,
FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
K. General Requirements
1. Submit five complete sets of plans including the following:
a. Site/Plot Plan;
J. Foundation Plan;
C. Floor Plan;
d. Ceiling and Roof Framing Plan;
e. Electrical Plans(2 sets,detached) including the size of the main switch, number and size
of service entrance conductors, panel schedules, and single line diagrams;
f. Plumbing and Sewer Plans, including isometrics, underground diagrams,water and waste
diagram, sewer or septic system location, fixture units, gas piping, and heating and air
conditioning; and
g. Planning Department Project Number (i.e., DRC2004-00268) clearly identified on the
outside of all plans.
2. Submit two sets of structural calculations, energy conservation calculations, and a soils report.
Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal.
3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to
the City prior to permit issuance.
4. Separate permits are required for fencing and/or walls.
L. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be
marked with the project file number(i.e:, DRC2004-00268). The applicant shall comply with the
latest adopted California Codes, and all other applicable codes, ordinances, and regulations in
effect at the time of permit application. Contact the Building and Safety Department for
availability of the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new residential project or major addition,the applicant
shall pay development fees at the established rate. Such fees may include,but are not limited to:
City Beautification Fee, Park Fee, Drainage Fee,Transportation Development Fee, Permit and
Plan Check Fees,Construction and Demolition Diversion Program deposit and fees and School
Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety
Department prior to permit issuance.
3. The Building and Safety Official shall provide street addresses after tract/parcel map recordation
and prior to issuance of building permits.
6
Project No.DRC2004-00268
Completion Date
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday
through Saturday, with no construction on Sunday or holidays.
5. Construct trash enclosure(s) per City Standard (available at the Planning Department's public
counter).
6. Submit pool plans to the County of San Bernardino's Environmental Health Services Department
for approval.
M. New Structures
1. Provide compliance with the California Building Code (CBC) for property line clearances
considering use, area, and fire-resistiveness.
2. Provide compliance with the California Building Code for required occupancy separations.
3. Roofing material shall be installed per the manufacturer's "high wind" instructions.
4. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC
Section 1505.
5. Provide draft stops in attics in line with common walls.
6. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A
7. Openings in exterior walls shall be protected in accordance with CBC Table 5-A.
8. If the area of habitable space above the first floor exceeds 3,000 square feet, then the
construction type shall be V-1 Hour minimum.
9. Walls and floors separating dwelling units in the same building shall be not less than 1-hour
fire-resistive construction.
N. Grading
1. Grading of the subject property shall be in accordance with California Building Code,City Grading
Standards, and accepted grading practices. The final grading plan shall be in substantial
conformance with the approved grading plan.
2. A soils report shall be prepared by a qualified engineer licensed by the State of California to
perform such work.
3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the
time of application for grading plan check.
4. The final grading, appropriate certifications and compaction reports shall be completed,
submitted, and approved by the Building and Safety Official prior to the issuance of building
permits.
5. A separate grading plan check submittal is required for all new construction projects and for _J_/_
existing buildings where improvements being proposed will generate 50 cubic yards or more of
combined cut and fill. The grading plan shall be prepared,stamped, and signed by a California
registered Civil Engineer.
O. Additional Requirements/Comments
1. The project shall fully comply with accessibility requirements of 2001 California Building Code _/_J_
Chapter 11A (Housing Accessibility).
7
Project No.DRC2004-00268
Completion Date
APPLICANT SHALL CONTACT THE ENGINEERING DEPARTMENT, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
P. Dedication and Vehicular Access
1. Dedication shall be made of the following rights-of-way on the perimeter streets(measured from
street centerline):
60 total feet on Foothill Boulevard
2. Corner property line cutoffs shall be dedicated per City Standards.
3. Reciprocal access easements shall be provided ensuring access to all parcels by CC&Rs or by
deeds and shall be recorded concurrently with the map or prior to the issuance of building
permits, where no map is involved.
4. Reciprocal parking agreements for all parcels and maintenance agreements ensuring joint _ 1_/_
maintenance of all common roads, drives, or parking areas shall be provided by CC & R's or
deeds and shall be recorded prior to, or concurrent with, the final parcel map.
5. All existing easements lying within future rights-of-way shall be quit-claimed or delineated on the
final map.
6. Easements for public sidewalks and/or street trees placed outside the public right-of-way shall be
dedicated to the City.
7. Additional street right-of-way shall be dedicated along right turn lanes,to provide a minimum of 7
feet measured from the face of curbs.
Q. Street Improvements
1. Pursuant to City Council Resolution No.88-557,no person shall make connections from a source
of energy,fuel or power to any building service equipment which is regulated by technical codes
and for which a permit is required unless, in addition to any and all other codes, regulations and
ordinances, all improvements required by these conditions of development approval have been
completed and accepted by the City Council,except:that in developments containing more than
one building or unit, the development may have energy connections made to a percentage of
those buildings, or units proportionate to the completion of improvements as required by
conditions of approval of development. In no case shall more than 95 percent of the buildings or
units be connected to energy prior to completion and acceptance of all improvements required by
these conditions of approval of development.
2. Construct the following perimeter street improvements including, but not limited to:
Curb& A-C. Side- Drive Street Street Comm Median Bike
Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other
Foothill Boulevard X X (c) X X X (a) (b)
Cornwall Avenue X X X X X X
Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement
reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk
shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be
provided for this item.
3. Improvement Plans and Construction:
a. Street improvement plans, including street trees,street lights,and intersection safety lights
on future signal poles, and traffic signal plans shall be prepared by a registered Civil
Engineer and shall be submitted to and approved by the City Engineer. Security shall be
posted and an agreement executed to the satisfaction of the City Engineer and the City
Attorney guaranteeing completion of the public and/or private street improvements,prior to
8
Project No.DRC2004-00268
Completion Date
final map approval or the issuance of building permits, whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a
construction permit shall be obtained from the City Engineer's Office in addition to any
other permits required.
C. Pavement striping, marking,traffic signing,street name signing,traffic signal conduit,and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction
project along major or secondary streets and at intersections for future traffic signals and
interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside
of BCR, ECR, or any other locations approved by the City Engineer
Notes:
1) Pull boxes shall be No.6 at intersections and No.5 along streets,a maximum of 200
feet apart, unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch galvanized steel with pull rope or as specified.
e. Handicapped access ramps shall be installed on all corners of intersections per City
Standards or as directed by the City Engineer.
f. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A cash
deposit shall be provided to cover the cost of grading and paving,which shall be refunded
upon completion of the construction to the satisfaction of the City Engineer.
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be
installed to City Standards, except for single family residential lots.
h. Street names shall be approved by the City Planner prior to submittal for first plan check.
4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in
accordance with the City's street tree program.
9
Project No.DRC2004-00268
Completion Date
5. Install street trees per City street tree design guidelines and standards as follows. The completed
legend (box below) and construction notes shall appear on the title page of the street
improvement plans. Street improvement plans shall include a line item within the construction
legend stating: "Street trees shall be installed per the notes and legend on sheet_(typically
sheet 1)." Where public landscape plans are required, tree installation in those areas shall be
per the public landscape improvement plans.
The City Engineer reserves the right to adjust tree species based upon field conditions and other
variables. For additional information, contact the Project Engineer.
Min.
Grow
Street Name Botanical Name Common Name Space Spacing Size Oty.
Foothill Boulevard Rhus lancea African Sumac 5 ft. 20 ft.o.c. 15-gal. Fill In
Non activity centers Informal
primarily in R.O.W. Groupings
Not more than
25% of total
frontage trees
Non activity centers Platanus acerifolia London Plane Tree 8 ft. Sapce per on-site 15-gal.
on-site plans — 30 ft. o.c.
suggested
Construction Notes for Street Trees:
1) All street trees are to be planted in accordance with City standard plans.
2) Prior to the commencement of any planting,an agronomic soils report shall be furnished to
the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil
amendments, as determined by the City inspector.
3) All street trees are subject to inspection and acceptance by the Engineering Department.
4) Street trees are to be planted per public improvement plans only.
R. Public Maintenance Areas
1. A separate set of landscape and irrigation plans per Engineering Public Works Standards shall
be submitted to the City Engineer for review and approval prior to final map approval or issuance
of building permits, whichever occurs first. The following landscaped parkways, medians,
paseos, easements, trails or other areas shall be annexed into the Landscape Maintenance
District: Foothill Boulevard.
2. Public landscape areas are required to incorporate substantial areas(40%)of mortared cobble or
other acceptable non-irrigated surfaces.
3. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting
Districts shall be filed with the City Engineer prior to final map approval or issuance of building
permits whichever occurs first. Formation costs shall be borne by the developer.
4. All required public landscaping and irrigation systems shall be continuously maintained by the
developer until accepted by the City.
S. Drainage and Flood Control
1. A final drainage study shall be submitted to and approved by the City Engineer prior to final map
approval or the issuance of building permits,whichever occurs first. All drainage facilities shall
be installed as required by the City Engineer.
2. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the
property from adjacent areas.
10
Project No.DRC2004-00268
Completion Date
T. Utilities
1. Provide separate utility services to each parcel including sanitary sewerage system,water, gas,
electric power, telephone, and cable TV (all underground) in accordance with the Utility
Standards. Easements shall be provided as required.
2. The developer shall be responsible for the relocation of existing utilities as necessary.
3. Water and sewer plans shall be designed and constructed to meet the requirements of the
Cucamonga Valley Water District(CVW D), Rancho Cucamonga Fire Protection District,and the
Environmental Health Department of the County of San Bernardino. A letter of compliance from
the CVW D is required prior to final map approval or issuance of permits,whichever occurs first.
Such letter must have been issued by the water district within 90 days prior to final map approval
in the case of subdivision or prior to the issuance of permits in the case of all other residential
- projects.
4. Approvals have not been secured from all utilities and other interested agencies involved.
Approval of the final parcel map will be subject to any requirements that may be received from
them.
U. General Requirements and Approvals
1. Etiwanda/San Sevaine Area Regional Mainline,Secondary Regional,and Master Plan Drainage
Fees shall be paid prior to final map approval or prior to building permit issuance if no map is
involved.
2. Permits shall be obtained from the following agencies for work within their right of-way:
Metropolitan Water District—Foothill Boulevard.
3. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all
new streetlights for the first six months of operation,prior to final map approval or prior to building
.permit issuance if no map is involved.
4. Prior to the issuance of building permits,a Diversion Deposit and related administrative fees shall
be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if
at least 50% of all wastes generated during construction and demolition are diverted from
landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to
the Engineering Department when the first building permit application is submitted to Building and
Safety. Form CD-2 shall be submitted to the Engineering Department within 60 days following
the completion of the construction and/or demolition project.
APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
V. Security Lighting
1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power. _/___J_
These areas should be lighted from sunset to sunrise and on photo sensored cell.
2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with
direct lighting to be provided by all entryways. Lighting shall be consistent around the entire
development.
3. Lighting in exterior areas shall be in vandal-resistant fixtures.
W. Security Hardware
1. A secondary locking device shall be installed on all sliding glass doors.
2. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within
40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used.
11
Project No.DRC2004-00268
Completion Date
3. All garage or rolling doors shall have slide bolts or some type of secondary locking devices.
X. Security Fencing
1. All businesses or residential communities with security fencing and gates will provide the police
with a keypad access and a unique code.The initial code is to be submitted to the Police Crime
Prevention Unit along with plans. If this code is changed due to a change in personnel or for any
other reason, the new code must be supplied to the Police via the 24-hour dispatch center at
(909)941-1488 or by contacting the Crime Prevention Unit at(909)477-2800 extension 2474 or
extension 2475.
Y. Windows
1. All sliding glass windows shall have secondary locking devices and should not be able to be lifted
from frame or track in any manner.
Z. Building Numbering
1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime
visibility.
2. At the entrances of commercial or residential complexes, an illuminated map or directory of
project shall be erected with vandal-resistant cover. North shall be at the top and so indicated.
Sign shall be in compliance with Sign Ordinance, including an application for a Sign Permit and
approval by the Planning Department.
3. All developments shall submit an 8 1/2"x 11"sheet with the numbering pattern of all multi-tenant
developments to the Police Department.
APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION
PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING
CONDITIONS:
SEE ATTACHED
12
Rancho Cucamonga Fire Protection District
Fire Construction Services
STANDARD CONDITIONS
June 9, 2005
Lewis Investment Co.
Tract 16882
SUBTT16882 & DRC2004-00268, 269, 270
THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT.
FSC-1 Public and Private Water Supply
1. Design guidelines for Fire Hydrants: The following provides design guidelines for the spacing and
location of fire hydrants: (Also see RCFPD Standard #9-8)
a. The maximum distance between fire hydrants in commercial/industrial projects is 300 feet.
No portion of the exterior wall shall be located more than 150 feet from an approved fire
hydrant. For cul-de-sacs, the distance shall not exceed 100 feet.
b. The maximum distance between fire hydrants in multi-family residential projects is 400 feet.
No portion of the exterior wall shall be located more than 200 feet from an approved fire
hydrant. For cul-de-sacs, the distance shall not exceed 150 feet.
C. The maximum distance between fire hydrants in single-family residential projects is 500 feet.
No portion of the exterior wall facing the addressed street shall be more than 250 feet from an
approved fire hydrant. For cul-de-sacs, the distance shall not exceed 200 feet.
d. For single-family residential projects in the designated Hazardous Fire Area, the maximum
distance between fire hydrants is 400 feet. No portion of the exterior wall facing the
addressed street shall be more than 200 feet from an approved fire hydrant. For cul-de-sacs,
the distance shall not exceed 150 feet.
e. Fire hydrants are to be located. The preferred locations for fire hydrants are:
i. At the entrance(s) to a commercial, industrial or residential project from the public
roadways.
ii. At intersections.
iii. On the right side of the street, whenever practical and possible.
iv. As required by the Fire Safety Division to meet operational needs of the Fire District.
V. A minimum of forty feet (40') from any building.
1
f. If any portion of a facility or building is located more than 150 feet from a public fire hydrant
measured on an approved route around the exterior of the facility or building, additional
private or public fire hydrants and mains capable of supplying the required fire flow shall be
provided.
g. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof.
FSC-2 Fire Flow
1. The required fire flow for this project will be determined when the size and type of buildings is
known. This requirement is made in accordance with Fire Code Appendix III-A, as adopted by the
Fire District Ordinances.
2. The required minimum fire flow for this project, when automatic fire sprinklers are installed will be
determined when the size and type of buildings is known. This flow will reflect a 50-percent
reduction for the installation of an approved automatic fire sprinkler system in accordance with
NFPA 13 or 13R with central station monitoring. This requirement is made in accordance with the
California Fire Code Appendix III-A, as adopted by the Fire District Ordinances.
3. The required minimum fire flow for structures located in the designated hazardous fire area shall be
not less than 1,750 gpm at 20-psi residual. For structures in excess of 36,000 square feet use CFC
Table A-III-A-1.
4. Public fire hydrants located within a 500-foot radius of the proposed project may be used to provide
the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent
property shall not be used to provide required fire flow.
5. Firewater plans are required for all projects that must extend the existing water supply to or onto
the site. Building permits will not be issued until firewater plans are approved.
6. On all site plans to be submitted for review, show all fire hydrants located within 600 feet of the
proposed project site.
FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems
1. Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant shall submit
plans, specifications and calculations for the fire sprinkler system underground supply piping.
Approval of the underground supply piping system must be obtained prior to submitting the
overhead fire sprinkler system plans.
FSC-4 Requirement for an Automatic Fire Sprinkler Systems
Rancho Cucamonga Fire District Ordinance 15, the 2001 California Fire Code and/or any other
applicable standards require an approved automatic fire sprinkler system to be installed in:
1. Multifamily structures greater than 7,500 square feet.
2. Multi-family residential structures in excess of 4 units.
3. All structures that do not meet Fire District access requirements (see Fire Access).
4. When required fire flow cannot be provided due to inadequate volume or pressure.
2
5. When the building access does not meet the requirements of the 2001 California Building Code
and the RCFPD Fire Department Access - Fire Lane Standard #9-7.
6. When any applicable code or standard requires the structure to be sprinklered.
FSC-5 Fire Alarm System
1. RCFPD Ordinance 15, based on use or floor area (or by other adopted codes or standards)
requires an automatic and/or manual fire alarm system. Refer to RCFPD Ordinances 15 and 39,
the California Building Code, RCFPD Fire Alarm Standard #10-6 and/or the California Fire Code.
2. Prior to the installation of the fire alarm system, Fire Construction Services' approval and a building
permit must be obtained. Plans and specifications shall be submitted to Fire Construction Services
in accordance with RCFPD Fire Alarm Standard #10-6.
FSC-6 Fire District Site Access
Fire District access roadways include public roads, streets and highways, as well as private roads,
streets drive aisles and/or designated fire lanes. Please reference the RCFPD Fire Department Access
— Fire Lanes Standard #F191.10.200.
1. Location of Access: All portions of the structures 1 s' story exterior wall shall be located within 150
feet of Fire District vehicle access, measure on an approved route around the exterior of the
building. Landscaped areas, unpaved changes in elevation, gates and fences are deemed
obstructions.
2. Specifications for private Fire District access roadways per the RCFPD Standards are:
a. The minimum unobstructed width is 26 feet.
b. The maximum inside turn radius shall be 24 feet.
c. The minimum outside turn radius shall be 50 feet.
d. The minimum radius for cul-de-sacs is 45 feet.
e. The minimum vertical clearance is 14 feet, 6 inches.
f. At any private entry median, the minimum width of traffic lanes shall be 20 feet on each side.
g. The angle of departure and approach shall not exceed 9-degrees or 20 percent.
h. The maximum grade of the driving surface shall not exceed 12%.
i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW).
j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a minimum of
14 feet, 6 inches from the ground up. Vegetation shall not be allowed to obstruct Fire
Department apparatus.
3
3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be provided
in accordance with the 2001 California Building Code, Fire and/or any other applicable standards.
4. Access Walkways: Hardscaped access walkways shall be provided from the fire apparatus
access road to all required building exterior openings.
5. Residential gates installed across Fire District access roads shall be installed in accordance with
RCFPD Residential Gate Standard #9-1. The following design requirements apply:
a. Prior to the fabrication and installation of the gates, plans are required to be submitted to Fire
Construction Services (FCS) for approval. Upon the completion of the installation and before
placing the gates in service, inspection and final acceptance must be requested from FCS.
b. Gates must slide open horizontally or swing inward.
C. Gates may be motorized or manual.
d. When fully open, the minimum clearance dimension of drive access shall be 20 feet.
e. Manual gates must be equipped with a RCFPD lock available at the Fire Safety Office for
$20.00.
f. Motorized gates must open at the rate of one-foot per second.
g. The motorized gate actuation mechanism must be equipped with a manual override device
and a fail-safe or battery backup feature to open the gate or release the locking Mechanism in
case of power failure or mechanical malfunction.
h. Motorized gates shall be equipped with a Knox override key switch. The switch must be
installed outside the gate in a visible and unobstructed location.
i. For motorized gates, a traffic loop device must be installed to allow exiting from the complex.
If traffic pre-emption devices (TPD) are to be installed, the device, location and operation
must be approved by the Fire Chief prior to installation. Bi-directional or multiple sensors may
be required due to complexity of the various entry configurations.
6. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site plan
illustrating the proposed delineation that meets the minimum Fire District standards shall be
included in the architectural plans submitted to B&S for approval.
7. Approved Fire Department Access: Any approved mitigation measures must be clearly noted on
the site plan. A copy of the approved Alternative Method application, if applicable, must be
reproduced on the architectural plans submitted to B&S for plan review.
FSC-10 Occupancy and Hazard Control Permits
Listed are those Fire Code permits commonly associated with the business operations and/or building
construction. Plan check submittal is required with the permit application for approval of the permit; field
inspection is required prior to permit issuance. General Use Permit shall be required for any activity or
operation not specifically described below, which in the judgment of the Fire Chief is likely to produce
conditions that may be hazardous to life or property.
4
Compressed Gases Public Assembly
Cryogenics LPG or Gas Fuel Vehicles in Assembly Buildings
Flammable and Combustible Liquids Welding and Cutting Operations
Hazardous Materials Tents, Canopies and/or Air Supported Structures
Liquefied Petroleum Gases
FSC-11 Hazardous Materials—Submittal to the County of San Bernardino
The San Bernardino County Fire Department shall review your Business Emergency/Contingency Plan
for compliance with minimum standards. Contact the San Bernardino County Fire, Hazardous Materials
Division at (909) 387-4631 for forms and assistance. The County Fire Department is the Cal/EPA
Certified Unified Program Agency (CUPA) for the City of Rancho Cucamonga.
1. If the facility is a NEW business, a Certificate of Occupancy issued by Building & Safety will not be
finalized until the San Bernardino County Fire Department reviews your Business
Emergency/Contingency Plan. California Government Code, Section 65850.2 prohibits the City
from issuing a final Certificate of Occupancy unless the applicant has met or is meeting specific
hazardous materials disclosure requirements. A Risk Management Program (RMP) may also be
required if regulation substances are to be used or stored at the new facility.
2. Any business that operates on rented or leased property which is required to submit a Plan, is also
required to submit a notice to the owner of the property in writing stating that the business is
subject to the Business Emergency/Contingency Plan mandates and has complied with the
provisions. The tenant must provide a copy of the Plan to the property owner within five (5)
working days, if requested by the owner.
FSC-12 Hazardous Materials- Submittal to Fire Construction Services
Plans shall be submitted and approved prior to construction of buildings and/or the installation of
equipment designed to store, use or dispense hazardous materials in accordance with the 2001
California Building, Fire, Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances FD15 and FD39
and other implemented and/or adopted standards.
FSC-13 Alternate Method Application
Fire Construction Services staff and the Fire Marshal will review all requests for alternate method, when
submitted. The request must be submitted on the Fire District "Application for Alternate Method" form
along with supporting documents and payment of the $92 review fee.
FCS-14 Map Recordation
1. Reciprocal Access Agreement: The plan as submitted indicate that the required Fire Department
access:
a. Is located on property which is not under the control of the applicant; or
5
b. Crosses a property line; or
C. Is shared by multiple owners; or
d. Is located on common space under the control of an owner's association
Please provide a permanent access agreement granting irrevocable use of the property to the Fire
District. The agreement shall include a statement that no obstruction, gate, fence, building or other
structure shall be placed within the dedicated access without Fire District approval. The recorded
agreement shall include a copy of the site plan. The agreement shall be presented to Fire
Construction Services for review and approval, prior to recordation. The agreement shall be
recorded with the Recorder's Office, County of San Bernardino.
To assist Fire Construction Services in reviewing the agreement the following shall be included in
the submittal:
a. The current title reports to provide a legal description and proof of ownership for all properties
included in the agreement.
b. The assessor's parcel numbers of each parcel subject to the agreement.
C. A scaled site plan showing the path of the Fire District access, the width, turn radii and slope
of roadway surface shall be provided. The access roadway shall comply with the
requirements of the RCFPD Fire Lane Standard #9-7.
2. Reciprocal Water Covenant and Agreement:. The plans as submitted indicate that a required
private fire mains or appurtenances
a. Pass through or are located on property not under the control of the applicant; or
b. Crosses a property line; or
C. Provide service to adjacent properties; or
d. Is located on common space under the control of an owner's association; or
e. Is shared by multiple owners.
Please provide a permanent maintenance and service agreement between the owner for the
private water mains, fire hydrants and fire protection equipment essential to the water supply. The
agreement shall meet the form and content approved by the Rancho Cucamonga Fire District. The
agreement shall be submitted to Fire Construction Services for review and approval, prior to
recordation. The agreement shall be recorded within the Recorder's Office, County of San
Bernardino.
FCS-15 Annexation of the parcel map: Annexation of the parcel map into the Community Facilities
District #85-1 or#88-1 is required prior to the issuance of grading or building permits.
6
Chronological Summary of RCFPD Standard Conditions
PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to the
issuance of any building permits:
1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans,
specifications, flow test data and calculations for the private water main system for review and
approval by the Fire District. Plans and installation shall comply with Fire District Standards.
Approval of the on-site (private) fire underground and water plans is required prior to any building
permit issuance for any structure on the site. Private on-site combination domestic and fire supply
system must be designed in accordance with RCFPD Standards # 9-4, #10-2 and #10-4. The
Building & Safety Division and Fire Construction Services will perform plan checks and inspections.
All private on-site fire hydrants shall be installed, flushed and operable prior to delivering any
combustible framing materials to the site. Fire construction Services will inspect the installation,
witness hydrant flushing and grant a clearance before lumber is dropped.
2. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the
locations of all new public fire hydrants for the review and approval by the Fire District and CCWD.
On the plan, show all existing fire hydrants within a 600-foot radius of the project. All required
public fire hydrants shall be installed, flushed and operable prior to delivering any combustible
framing materials to the site. CCWD personnel shall inspect the installation and witness the
hydrant flushing. Fire Construction Services shall inspect the site after acceptance of the public
water system by CCWD. Fire Construction Services must grant a clearance before lumber is
dropped.
3. Construction Access: The access roads must be paved in accordance with all the requirements
of the RCFPD Fire Lane Standard #9-7. All temporary utilities over access roads must be installed
at least 14' 6" above the finished surface of the road.
4. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is responsible for
obtaining the fire flow information from CCWD and submitting the letter to Fire Construction
Services.
5. Easements and Reciprocal Agreements: All easements and agreements must be recorded with
the County of San Bernardino.
PRIOR TO THE RELEASE OF TEMPORARY POWER
The building construction must be substantially completed in accordance with Fire Construction Services'
"Temporary Power Release Checklist and Procedures".
PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following:
1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire
hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga
Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers". On private property,
the markers shall be installed at the centerline of the fire access road, at each hydrant location.
7
2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in the
presence of Fire Construction Services, shall conduct a test of the most hydraulically remote on-
site fire hydrants. The underground fire line contractor, developer and/or owner are responsible for
hiring the company to perform the test. A final test report shall be submitted to Fire Construction
Services verifying the fire flow available. The fire flow available must meet or exceed the required
fire flow in accordance with the California Fire Code.
3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler
system(s) shall be tested and accepted by Fire Construction Services.
4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler
monitoring system must be tested and accepted by Fire Construction Services. The fire sprinkler
monitoring system shall be installed, tested and operational immediately following the completion of
the fire sprinkler system (subject to the release of power).
5. Fire Suppression Systems and/or other special hazard protection systems shall be inspected,
tested and accepted by Fire Construction Services before occupancy is granted and/or equipment
is placed in service.
6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm system
shall be installed, inspected, tested and accepted by Fire Construction Services.
7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular gates must
be inspected, tested and accepted in accordance with RCFPD Standards #9-1 or #9-2 by Fire
Construction Services.
8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access
roadways must be installed in accordance with the approved plans and acceptable to Fire
Construction Services.
The CC&R's, the reciprocal agreement and/or other approved documents shall be recorded and
contain an approved fire access roadway map with provisions that prohibit parking, specify the
method of enforcement and identifies who is responsible for the required annual inspections and
the maintenance of all required fire access roadways.
9. Address: Prior to the granting of occupancy, single-family dwellings shall post the address with
minimum 4-inch numbers on a contrasting background. The numbers shall be internally or
externally illuminated during periods of darkness. The numbers shall be visible from the street.
When building setback from the public roadway exceeds 100 feet, additional 4-inch numbers shall
be displayed at the property entry.
10. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and multi-
family buildings shall post the address with minimum 8-inch numbers on contrasting background,
visible from the street and electrically illuminated during periods of darkness. When the building
setback exceeds 200 feet from the public street, an additional non-illuminated 6-inch minimum
number address shall be provided at the property entrance. Larger address numbers will be
required on buildings located on wide streets or built with large setbacks in multi-tenant commercial
and industrial buildings. The suite designation numbers and/or letters shall be provided on the front
and back of all suites.
11. Fuel Modification: Please refer to RCFPD Summary of Fire Hazardous Area requirements.
8
12. Hazardous Materials: Prior to the issuance of a Certificate of Occupancy, the applicant must
demonstrate (in writing from the County) that the facility has met or is meeting the Risk
Management Plan (RMP) or Business Emergency/Contingency Plan with the San Bernardino
County Fire Department, Hazardous Materials/Emergency Response and Enforcement Division.
The applicant must also obtain inspection and acceptance by Fire Construction Services.
13. Confidential Business Occupancy Information: The applicant shall complete the Rancho
Cucamonga Fire District "Confidential Business Occupancy Information" form. This form provides
contact information for Fire District use in the event of an emergency at the subject building or
property. This form must be presented to the Fire Construction Services Inspector.
14. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, a 8 1/2" x 11" or 11" x 17"
site plan of the site in accordance with RCFPD Standard #13-1 shall be revised by the applicant to
reflect the actual location of all devices and building features as required in the standard. The site
plan must be reviewed and accepted by the Fire Inspector.
9