HomeMy WebLinkAbout06-07 - Resolutions RESOLUTION NO. 06-07
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA,CALIFORNIA,APPROVING TENTATIVE TRACT
MAP SUBTT16867, A REQUEST TO SUBDIVIDE 8.9 GROSS ACRES OF
LAND INTO 12 RESIDENTIAL LOTS IN THE VERY LOW RESIDENTIAL
DISTRICT IN THE ETIWANDA SPECIFIC PLAN AREA, LOCATED WEST
OF ETIWANDA AVENUE, IMMEDIATELY NORTH OF THE 1-210
FREEWAY, AND MAKING FINDINGS IN SUPPORT THEREOF -
APN: 0225-171-19.
A. Recitals.
1. Steve Schapel on behalf of Etco Development, Inc.filed an application for the approval
of Tentative Tract Map SUBTT16867,as described in the title of this Resolution. Hereinafter in this
Resolution, the subject Tentative Tract Map request is referred to as "the application."
2. On January 11 and on January25,2006,the Planning Commission of the City of Rancho
Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing
on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning
Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearings on January 11 and on January25,2006, including written and oral
staff reports, together with public testimony, this Commission hereby specifically finds as follows:
a. The application applies to property located west of Etiwanda Avenue, immediately
north of the 1-210 Freeway, with a street frontage of approximately 302 feet and lot depth of 1,120
feet, and is presently vacant; and
b. The properties to the north and west are developed with single-family residences,
the property to the south consists of the 1-210 Freeway, the property to the east is Etiwanda Avenue;
and
C. The application proposes to subdivide 8.9 gross acres into 12 residential lots;and
d. The development is proposed to include the development of one single-family
residence on each lot; and
e. The proposed lots range in size from 20,079 to 38,267 square feet,with an average
lot size of 25,416 square feet. The Etiwanda Specific Plan standard is minimum 20,000 square feet
and an average of 25,000 square feet. The properties to the north, east, and west are developed
with single-family residences and are approximately 20,000 to 25,000 square feet in lot area.
PLANNING COMMISSION RESOLUTION NO. 06-07
SUBTT16867 - ETCO DEVELOPMENT INC.
January 25, 2006
Page 2
3. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1
and 2 above, this Commission hereby specifically finds and concludes as follows:
a. That the proposed project is consistent with the objectives of the General Plan;and
b. That the proposed design is in accord with the objectives of the Development Code
and the purposes of the district in which the site is located; and
C. That the proposed design is in compliance with each of the applicable provisions of
the Development Code; and
d. That the proposed design, together with the conditions applicable thereto, will not
be detrimental to the public health, safety, or welfare or materially injurious to properties or
improvements in the vicinity.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration,together with all written and oral reports included for the environmental assessment for
the application, the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and
Monitoring Program attached hereto, and incorporated herein by this reference, based upon the
findings as follows:
a. That the Mitigated Negative Declaration has been prepared in compliance with the
California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines
promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared
therefore reflect the independent judgment of the Planning Commission; and, further, this
Commission has reviewed and considered the information contained in said Mitigated Negative
Declaration with regard to the application.
b. Although the Mitigated Negative Declaration identifies certain significant
environmental effects that will result if the project is approved, all significant effects have been
reduced to an acceptable level by imposition of mitigation measures on the project which are listed
below as conditions of approval.
C. Pursuant to the provisions of Section 753.5(c) of Title 14 of the California Code of
Regulations, the Planning Commission finds as follows: In considering the record as a whole, the
Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the
proposed project will have potential for an adverse impact upon wildlife resources or the habitat
upon which wildlife depends. Further, based upon the substantial evidence contained in the
Mitigated Negative Declaration, the staff reports and exhibits, and the information provided to the
Planning Commission during the public hearing, the Planning Commission hereby rebuts the
presumption of adverse effect as set forth in Section 753.5(c-1-d)of Title 14 of the California Code
of Regulations.
5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above,
this.Commission hereby approves the application subject to each and every condition set forth
below and in the Standard Conditions, attached hereto and incorporated herein by this reference.
PLANNING COMMISSION RESOLUTION NO. 06-07
SUBTT16867 - ETCO DEVELOPMENT INC.
January 25, 2006
Page 3
Planning Department
1) Approval of Tentative Tract Map SUBTT16867 is subject to the
approval of Variance DRC2004-01285.
2) Streetscape along Etiwanda Avenue shall be designed per the
Etiwanda Specific Plan.
3) The developer shall provide each prospective buyer written notice of
the adjacent 1-210 Freeway. The standard format for the written notice
shall be submitted for City Planner review and approval, prior to
issuance of Building Permits. The written notice shall be signed bythe
prospective buyer prior to the acceptance of a*cash deposit on the
property.
Engineering Department _
1) Vintage Drive is a designated "Collector" Street in the City General
Plan (44 feet curb to curb; 66 feet wide right-of-way).
a) Join existing Vintage Drive in Tract Map No.14120-3 on the west
end and align with Arapaho Road, across Etiwanda Avenue, on
the east end.
b) Provide curb, gutter, pavement, property line adjacent sidewalk,
5800 Lumen HPSV streetlights,traffic signing and striping,street
trees, drainage facilities, etc. on both sides of Vintage Drive.
c) Planning Commission has approved direct access to Vintage
Drive. Circular or hammerhead driveway designs will be required
on each lot. Prevent all possible backing out into Vintage Drive.
2) Etiwanda Avenue, as designated in the Etiwanda Specific Plan, is an
88-foot wide right-of-way. Match the existing west curb face alignment
and provide a 13-foot wide landscape parkway plus a 7-foot wide bike
lane adjacent to the right-of-way line (total 20 feet from curb face), per
Figure 5-24 of the Etiwanda Specific Plan.
a) Provide the following public improvements: cobble curb on
corner returns to Vintage Drive, gutters, street pavement, 7-foot
wide property line adjacent bike lane/sidewalk, access ramps,
9500 Lumen HPSV streetlights, signing, striping including R26
"No Stopping" signs, street trees, and, if necessary, provide
drainage and storm drain facilities to connect with the existing
storm drain in Etiwanda Avenue.
b) Street tree planting at the Vintage Drive/Etiwanda Avenue
intersection shall be consistent with the neighborhood entry
concept per Figure 5-12 of the Etiwanda Specific Plan, to the
satisfaction of the City Engineer.
PLANNING COMMISSION RESOLUTION NO. 06-07
SUBTT16867 - ETCO DEVELOPMENT INC.
January 25, 2006
Page 4
c) No direct driveway access to Etiwanda Avenue, however,
provides Caltrans access approach to the existing service road.
3) Prior to the issuance of building permits, all "Engineering Fees"
including a Diversion Deposit and related administrative fees shall be
paid. The Diversion Deposit and administrative fees are for the
Construction and Demolition Diversion Program. The deposit is fully
refundable if at least 50 percent of all wastes generated during
construction and demolition are diverted from landfills,and appropriate
documentation is provided to the City. Form CD-1 shall be submitted
to the Engineering Department when the first building permit
application is submitted to the Building and Safety Department.
Form CD-2 shall be submitted to the Engineering Department within
60 days following the completion of the construction and/or demolition
project.
4) Development within the Etiwanda/San Sevaine Drainage Area is
responsible for the City's adopted drainage fee (master plan and
regional) as well as reimbursement to other development, or the City,
for oversizing of drainage facilities as determined by the City Engineer.
5) Install private landscaping and irrigation systems in the parkway on
Etiwanda Avenue side yards of Lots 11 and 12 prior to Public
Improvements being accepted by the City.
6) The developer has proposed a Homeowners Association (HOA) to
maintain the north side of Vintage Drive. A lettered lot is preferable to
an easement on Lot 12, but either way, the limits of maintenance
responsibility should be delineated. The HOA will also maintain private
facilities and Best Management Practices (BMPs) identified in the
Water Quality Management Plan (WQMP). Maintenance of BMPs
identified in the WQMP shall be addressed in the project CC&Rs.
Clarify responsibilities of individual homeowners and HOA with respect
to trails, private drainage facilities, and BMPs.
7) Provide a letterfrom Caltrans that states draining through theirfacilities
is acceptable and that the developed flows from this tract may be
conveyed through that system. The proposed Conceptual Grading
Plan indicates a private storm drain connection from the private trail
gutter to an existing Caltrans trapezoidal channel with a 36-inch storm
drain outlet. The City will not maintain this private drainage facility.
Maintenance shall be addressed in the Homeowners Association
Covenants, Conditions, and Restrictions (CC&Rs). Also, show and
explain how Caltrans will have access to maintain their facilities. Show
the location and label existing or proposed drive approach to serve the
existing Caltrans service access road. Absent of Caltrans approval,
the project drainage facility should discharge to Etiwanda Avenue and,
in that case, new drainage/storm drain system will need to be
submitted.
PLANNING COMMISSION RESOLUTION NO. 06-07
SUBTT16867 - ETCO DEVELOPMENT INC.
January 25, 2006
Page 5
Environmental Mitigation
Air Quality
1) All construction equipment shall be maintained in good operating
condition so as to reduce operational emissions. The contractor shall
ensure that all construction equipment is being properly serviced and
maintained as per manufacturers'specifications. Maintenance records
shall be available at the construction site for City verification.
2) Prior to the issuance of any grading permits, developer shall submit
construction plans to City denoting the proposed schedule and
projected equipment use. Construction contractors shall provide
evidence that low- emission mobile construction equipment will be
utilized,or that their use was investigated and found to be infeasible for
the project. Contractors shall also conform to any construction
measures imposed by the South Coast Air Quality Management District
(SCAQMD) as well as City Planning Staff.
3) All paints and coatings shall meet or exceed performance standards
noted in SCAQMD Rule 1113. Paints and coatings shall be applied
either by hand or high- volume, low-pressure spray.
4) All asphalt shall meet or exceed performance standards noted in
SCAQMD Rule 1108.
5) All construction equipment shall comply with SCAQMD Rules 402 and
403. Additionally, contractors shall include the following provisions:
• Reestablish ground cover on the construction site through
seeding and watering.
• Pave or apply gravel to any on-site haul roads.
• Phase grading to prevent the susceptibility of large areas to
erosion over extended periods of time.
• Schedule activities to minimize the amounts of exposed
excavated soil during and after the end of work periods.
• Dispose of surplus excavated material in accordance with local
ordinances and use sound engineering practices.
• Sweep streets according to a schedule established by the City if
silt is carried over to adjacent public thoroughfares or occurs as a
result of hauling. Timing may vary depending upon the time of
year of construction.
PLANNING COMMISSION RESOLUTION NO. 06-07
SUBTT16867 - ETCO DEVELOPMENT INC.
January 25, 2006
Page 6
• Suspend grading operations during high winds(i.e.,wind speeds
exceeding 25 mph) in accordance with Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils haul trucks
or cover payloads using tarps or other suitable means.
6) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and Regional Water Quality Control Board
[RWQCB])daily to reduce Fine Particulate Matter(PM,o)emissions, in
accordance with SCAQMD Rule 403.
7) Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be
applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PM10 emissions.
8) The construction contractor shall utilize electric or clean alternative fuel
powered equipment where feasible.
9) The construction contractor shall ensure that construction-grading
plans include a statement that work crews will shut off equipment when
not in use.
10) All residential structures shall be required to incorporate. high
efficiency/low polluting heating,air conditioning,appliances,andwater
heaters.
11) All residential structures shall be required to incorporate thermal pane
windows and weather-stripping.
Cultural Resources
1) If any prehistoric archaeological resources are encountered before or
during grading, the developer will retain a qualified archaeologist to
monitor construction activities,to take appropriate measures to protect
or preserve them for study. With the assistance of the archaeologist,
the City of Rancho Cucamonga will:
• Enact interim measures to protect undesignated sites from
demolition or significant modification without an opportunity for
the City to establish its archaeological value.
• Consider establishing provisions to require incorporation of
archaeological sites within new developments, using their special
qualities as a theme or focal point.
• Pursue educating the public about the area's archaeological
heritage.
PLANNING COMMISSION RESOLUTION NO. 06-07
SUBTT16867 - ETCO DEVELOPMENT INC.
January 25, 2006
Page 7
• Propose mitigation measures and recommend conditions of
approval to eliminate adverse project effects on significant,
important, and unique prehistoric resources, following
appropriate CEQA guidelines.
• Prepare a technical resources management report,documenting
the inventory, evaluation, and proposed mitigation of resources
within the project area. Submit one copy of the completed report
with original illustrations, to the San Bernardino County
Archaeological Information Center for permanent archiving.
2) If any paleontological resource (i.e. plant or animal fossils) are
encountered before or during grading, the developer will retain a
qualified paleontologist to monitor construction activities, to take
appropriate measures to protect or preserve them for study. The
paleontologist shall submit a report of findings that will also provide
specific recommendations regarding further mitigation measures
(i.e., paleontological monitoring) that may be appropriate. Where
mitigation monitoring is appropriate,the program must include, but not
be limited to, the following measures:
• Assign a paleontological monitor, trained and equipped to allow
the rapid removal of fossils with minimal construction delay, to
the site full-time during the interval of earth-disturbing activities.
• Should fossils be found within an area being cleared or graded,
divert earth-disturbing activities elsewhere until the monitor has
completed salvage. If construction personnel make the
discovery, the grading contractor should immediately divert
construction and notify the monitor of the find.
• Prepare, identify, and curate all recovered fossils for
documentation in the summary report and transfer to an
appropriate depository (i.e., San Bernardino County Museum).
• Submit summary report to City of Rancho Cucamonga. Transfer
collected specimens with a copy of the report to San Bernardino
County Museum.
Geology and Soils
1) The site shall be treated with water or other soil-stabilizing agent
(approved bySCAQMD and RWQCB)daily to reduce PM10emissions,
in accordance with SCAQMD Rule 403 or re-planted with drought
resistant landscaping as soon as possible.
PLANNING COMMISSION RESOLUTION NO. 06-07
SUBTT16867 - ETCO DEVELOPMENT INC.
January 25, 2006
Page 8
2) Frontage public streets shall be swept according to a schedule
established by the City to reduce PM10 emissions associated with
vehicle tracking of soil off-site. Timing may vary depending upon the
time of year of construction.
3) Grading operations shall be suspended when wind speeds exceed
25 mph to minimize PM10 emissions from the site during such
episodes.
4) Chemical soil stabilizers(approved by SCAQMD and RW QCB)shall be
applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PM10 emissions.
Hydrology and Water Quality
1) Prior to issuance of Grading Permits,the permit applicant shall submit
to Building Official for approval, Storm Water Pollution Prevention Plan
(SW PPP) specifically identifying Best Management Practices (BMPs)
that shall be used on-site to reduce pollutants during construction
activities entering the storm drain system to the maximum extent
practical.
2) An Erosion Control Plan shall be prepared, included in Grading Plan,
and implemented for the proposed project that identifies specific
measures to control on-site and off-site erosion from the time ground
disturbing activities are initiated through completion of grading. This
erosion control plan shall include the following measures at a
minimum: a) Specify the timing of grading and construction to
minimize soil exposure to rainy periods experienced in southern
California, and b) An inspection and maintenance program shall be
included to ensure that any erosion which does occur either on-site or
off-site as a result of this project will be corrected through a
remediation or restoration program within a specified time frame.
3) During construction, temporary berms such as sandbags or gravel
dikes must be used to prevent discharge of debris or sediment from the
site when there is rainfall or other runoff.
4) During construction, to remove pollutants, street cleaning will be
performed prior to storm events and after the use of water trucks to
control dust in order to prevent discharge of debris or sediment from
the site.
5) The developer shall implement the BMPs identified in the Water
Quality Management Plan prepared by SP Consulting Group to reduce
pollutants after construction entering the storm drain system to the
maximum extent practical.
PLANNING COMMISSION RESOLUTION NO. 06-07
SUBTT16867 - ETCO DEVELOPMENT INC.
January 25, 2006
Page 9
6) Landscaping plans shall include provisions for controlling and
minimizing the use of fertilizers/pesticides/herbicides. Landscaped
areas shall be monitored and maintained for at least two years to
ensure adequate coverage and stable growth. Plans for these areas,
including monitoring provisions for a minimum of two years, shall be
submitted to the City for review and approval prior to the issuance of
Grading Permits.
7) Practical information materials will be provided to the first
residents/occupants/tenants. These materials shall include general
housekeeping practices that contribute to protection of stormwater
quality, and BMPs that eliminate or reduce pollution during property
improvements (concrete work, pool installation, etc). These materials
will be made available by the City of Rancho Cucamonga Planning
Department. The developer shall request these materials in writing at
least 30 days prior to intended distribution and shall then be
responsible for their distribution at the time of occupancy of prospective
residences.
8) If a homeowner's association is formed, conditions, covenants, and
restrictions shall be required for the purpose of water quality protection.
Alternatively, use restrictions may be developed by building operator
through lease terms, or other mechanisms. Pesticide application in
common areas must be performed by an applicator certified by the
California Department of Pesticide Regulation.
9) Sites must be designed to contain and infiltrate roof runoff, or direct
roof runoff to vegetative swales or buffer areas.
10) Irrigation methods should be utilized to minimize runoff of excess
irrigation water across impervious surfaces and into the stormwater
conveyance system. Such measures include employing rain-triggered
shutoff devices to eliminate or reduce irrigation during and immediately
after precipitation, using mulches (such as wood chips) to minimize
sediment in runoff and to maintain soil infiltration capacity, and
coordinating design of the irrigation system and landscape to minimize
overspray and runoff. Irrigation systems should consider the use of
flow reducers or shutoff valves triggered by a pressure drop to control
water loss in the event of broken sprinkler heads or water supply lines.
Water conservation devices such as programmable irrigation timers
and soil moisture sensors should also be considered.
11) Project plans shall include Source-Control BMPs to decrease the
potential for erosion of slopes and/or channels, consistent with local
codes and ordinances, and with approval of all agencies with
jurisdiction (e.g.USACOE, RWQCB,and CDFG). The following design
principles shall be considered, and implemented where determined to
be applicable and feasible by the City of Rancho Cucamonga:
PLANNING COMMISSION RESOLUTION NO. 06-07
SUBTT16867 - ETCO DEVELOPMENT INC.
January 25, 2006
Page 10
• Convey runoff safely from the tops of slopes.
• Avoid disturbing steep or unstable slopes.
• Avoid disturbing natural channels.
• Install permanent stabilization of BMPs on disturbed slopes as
quickly as possible.
• Vegetate slopes with native or drought-tolerant vegetation.
• Control and treat flows in landscaping and/or other controls prior
to reaching natural drainage systems.
• Install permanent stabilization BMPs in channel crossings as
quickly as possible, and ensure that increases in runoff velocity
and frequency caused by the project do not excessively erode
the channel.
• Install energy dissipaters, such as riprap, at the outlets of new
storm drains, culverts, conduits or channels that enter unlined
channels in accordance with applicable specifications to
minimize erosion. Energy dissipaters shall be installed in such a
way as to minimize impacts to receiving waters.
• On-site conveyance channels should be lined,where appropriate,
to reduce erosion caused by increased flow velocity due to
increases in tributary impervious area. The first choice for linings
should be grass or some other vegetative surface, since these
materials not only reduce runoff velocities, but also provide water
quality benefits from filtration and infiltration. If velocities in the
channel are large enough to erode grass or other vegetative
linings, riprap, concrete soil cement, or geo-grid stabilization may
be substituted or used in combination with grass or other
vegetation stabilization.
• Other design principles that are comparable and equally
effective.
12) Signage such as notices regarding discharge prohibitions at storm
drain inlets to eliminate or reduce dumping and littering are required.
The phrase "No Dumping — Flows to Creek," or an equally effective
phrase as approved by the NPDES General Committee, must be
stenciled on catch basins (inlets) to alert the public as to the
destination of pollutants discharged into storm drains. This signage
must be maintained and a party responsible for maintenance should be
identified in the WQMP.
PLANNING COMMISSION RESOLUTION NO. 06-07
SUBTT16867 - ETCO DEVELOPMENT INC.
January 25, 2006
Page 11
13) A pervious (porous)surface such as grass, modular pavers,or porous
asphalt or concrete, must be used where appropriate (light vehicle
loading areas) to reduce runoff.
14) Materials used to reduce potential sources of pollutants in stormwater
runoff by eliminating compounds that can leach into runoff and
reducing the need for pesticides, paints, and other materials are
encouraged to be used.
15) Prior to issuance of Building Permits, the applicant shall submit to the
City Engineer for approval of a Water Quality Management Plan
(WQMP), including a project description and identifying Best
Management Practices (BMPs) that will be used on-site to reduce
pollutants into the storm drain system to the maximum extent
practicable. The WQMP shall identifythe structural and non-structural
measures consistent with the Guidelines for New Development and
Redevelopment adopted by the City of Rancho Cucamonga in June
2004.
16) Prior to issuance of Grading or Paving Permits, applicant shall obtain a
Notice of Intent (NOI) to comply with obtaining coverage under the
National Pollutant Discharge Elimination System (NPDES) General
Construction Storm Water Permit from the State Water Resources
Control Board. Evidence that this has been obtained (i.e., a copy of
the Waste Discharger's Identification Number)shall be submitted to the
City Building Official for coverage under the NPDES General
Construction Permit.
Noise
1) Construct sound attenuation barriers along the south tract boundary
per the recommendations of the Noise Impact Study(Gordon Bricken
and Associates, September 16, 2005). This sound barrier shall be
constructed as early as possible during construction of this project.
Walls heights greater than 8 feet shall require approval of a variance
application.
2) Once building plans are submitted to the Planning Department, an
Acoustical Analysis shall be prepared to determine the building
mitigation required to meet the 45 dBA CNEL interior noise standard.
3) Construction or grading shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday.
4) Construction or grading noise levels shall not exceed the standards
specified in Development Code Section 17.02.120-D, as measured at
the property line. The developer shall hire a consultant to perform
PLANNING COMMISSION RESOLUTION NO. 06-07
SUBTT16867 - ETCO DEVELOPMENT INC.
January 25, 2006
Page 12
weekly noise level monitoring as specified in Development Code
Section 17.02.120. Monitoring at other times may be required by the
Building Official. Said consultant shall report their findings to the
Building Official within 24 hours; however, if noise levels exceed the
above standards, then the consultant shall immediately notify the
Building Official. If noise levels exceed the above standards, then
construction activities shall be reduced in intensity to a level of
compliance with above noise standards or halted.
5) The perimeter block wall shall be constructed as early as possible in
first phase.
6) Haul truck deliveries shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday. Additionally, if heavy trucks used
for hauling would exceed 100 daily trips (counting both to and from the
construction site), then the developer shall prepare a noise mitigation
plan denoting any construction traffic haul routes. To the extent
feasible, the plan shall denote haul routes that do not pass sensitive
land uses or residential dwellings.
APPROVED AND ADOPTED THIS 25TH DAY OF JANUARY 2006.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY:
Rich Macias, Vice Chairman
ATTEST:
Dan Coleman, Acting Secretary
I, Dan Coleman, Acting Secretary of the Planning Commission of the City of Rancho Cucamonga,
do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and
adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the
Planning Commission held on the 25th day of January 2006, by the following vote-to-wit:
AYES: COMMISSIONERS: FLETCHER, MACIAS , McNIEL, McPHAIL
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: STEWART
City of Rancho Cucamonga
MITIGATION MONITORING
PROGRAM
Project File No.: Tentative Tract Map SUBTT16867
This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation
measures identified in the Mitigated Negative Declaration for the above-listed project. This program
has been prepared in compliance with State law to ensure that adopted mitigation measures are
implemented (Section 21081.6 of the Public Resources Code).
Program Components - This MMP contains the following elements:
1. Conditions of approval that act as impact mitigation measures are recorded with the action and
the procedure necessary to ensure compliance. The mitigation measure conditions of approval
are contained in the adopted Resolution of Approval for the project.
2. A procedure of compliance and verification has been outlined for each action necessary. This
procedure designates who will take action, what action will be taken and when, and to whom
and when compliance will be reported.
3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring
progresses, changes to compliance procedures may be necessary based upon
recommendations by those responsible for the program.
Program Management - The MMP will be in place through all phases of the project. The project
planner, assigned by the City Planner, shall coordinate enforcement of the MMP.The project planner
oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly and
proper action is taken on each mitigation. Each City department shall ensure compliance of the
conditions (mitigation) that relate to that department.
Procedures - The following steps will be followed by the City of Rancho Cucamonga.
1. A fee covering all costs and expenses, including any consultants' fees, incurred by the City in
performing monitoring or reporting programs shall be charged to the applicant.
2. A MMP Reporting Form will be prepared for each potentially significant impact and its
corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached
hereto. This procedure designates who will take action, what action will be taken and when,
and to whom and when compliance will be reported. All monitoring and reporting
documentation will be kept in the project file with the department having the original authority
for processing the project. Reports will be available from the City upon request at the following
address:
City of Rancho Cucamonga - Lead Agency
Planning Department
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
Mitigation Monitoring Program
SUBTT16867
Page 2
3. Appropriate specialists will be retained if technical expertise beyond the City staffs is needed,
as determined by the project planner or responsible City department, to monitor specific
mitigation activities and provide appropriate written approvals to the project planner.
4. The project planner or responsible City department will approve, by signature and date, the
completion of each action item that was identified on the MMP Reporting Form. After each
measure is verified for compliance, no further action is required for the specific phase of
development.
5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off
as completed by the project planner or responsible City department at the bottom of the MMP
Reporting Form.
6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation
measures.The project planner is responsible for approving any such refinements oradditions.
An MMP Reporting Form will be completed by the project planner or responsible City
department and a copy provided to the appropriate design, construction, or operational
personnel.
7. The project planner or responsible City department has the authority to stop the work of
construction contractors if compliance with any aspects of the MMP is not occurring after
written notification has been issued. The project planner or responsible City department also
has the authority to hold certificates of occupancies if compliance with a mitigation measure
attached hereto is not occurring. The project planner or responsible City department has the
authority to hold issuance of a business license until all mitigation measures are implemented.
8. Any conditions (mitigation) that require monitoring after project completion shall be the
responsibility of the City of Rancho Cucamonga Planning Division. The Division shall require
the applicant to post any necessary funds (or other forms of guarantee)with the City. These
funds shall be used by the City to retain consultants and/or pay for City staff time to monitor
and report on the mitigation measure for the required period of time.
9. In those instances requiring long-term project monitoring, the applicant shall provide the City
with a plan for monitoring the mitigation activities at the project site and reporting the
monitoring results to the City. Said plan shall identify the reporter as an individual qualified to
know whether the particular mitigation measure has been implemented. The
monitoring/reporting plan shall conform to the City's MMP and shall be approved by the
Community Development Director or City Planner prior to the issuance of building permits.
MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III)
Project File No.: Tentative Tract Map SUBTT16867 Applicant: Steve Schapel IETCO Development, Inc.)
Initial Study Prepared by: Rozalvnne Thompson Date: October 17. 2006
MethodMitigation Measures No. I Responsible Monitoring Timing of of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/Initials Non-Compliance
Air Quality
All construction equipment shall be maintained in CP C Review of plans A/C 2/4
good operating condition so as to reduce operational
emissions. The contractor shall ensure that all
construction equipment is being properly serviced and
maintained as per manufacturers' specifications.
Maintenance records shall be available at the
construction site for City verification.
Prior to the issuance of any grading permits, the CP/BO C Review of plans C 2
developer shall submit construction plans to the City
denoting the proposed schedule and projected
equipment use. Construction contractors shall
provide evidence that low-emission mobile
construction equipment will be utilized, or that their
use was investigated and found to be infeasible for
the project. Contractors shall also conform to any
construction measures imposed by the South Coast
Air Quality Management District (SCAQMD) as well
as City Planning Staff.
All paints and coatings shall meet or exceed CP C Review of plans A/C 2/4
performance standards noted in SCAQMD Rule 1113.
Paints and coatings shall be applied either by hand or
high-volume, low-pressure spray.
All asphalt shall meet or exceed performance BO B Review of plans A/C 2
standards noted in SCAQMD Rule 1108.
All construction equipment shall comply with BO C Review of plans A/C 2/4
SCAQMD Rules 402 and 403. Additionally,
contractors shall include the following provisions:
• Reestablish ground cover on the construction site BO C Review of plans A/C 2/4
through seeding and watering.
• Pave or apply gravel to any on-site haul roads. BO C Review of plans A/C 2/4
1 of 11
Mitigation Measures No. 1 Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date /initials Non-Compliance
• Phase grading to prevent the susceptibility of BO C Review of plans A/C 2/4
large areas to erosion over extended periods of
time.
• Schedule activities to minimize the amounts of BO C Review of plans A/C 2/4
exposed excavated soil during and after the end
of work periods.
• Dispose of surplus excavated material in BO C Review of plans A 4
accordance with local ordinances and use sound
engineering practices.
• Sweep streets according to a schedule BO C During A 4
established by the City if sift is carried over to construction
adjacent public thoroughfares or occurs as a
result of hauling. Timing may vary depending
upon the time of year of construction.
• Suspend grading operations during high winds BO C During A 4
(i.e., wind speeds exceeding 25 mph) in construction
accordance with Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on BO C During A 4
soils haul trucks or cover payloads using tarps or Construction
other suitable means.
The site shall be treated with water or other BO C During A 4
soil-stabilizing agent (approved by SCAQMD and construction
Regional Water Quality Control Board [RWQCB])
daily to reduce PM10 emissions, in accordance with
SCAQMD Rule 403.
Chemical soil-stabilizers (approved by SCAQMD and BO C During A 4
RWQCB) shall be applied to all inactive construction construction
areas that remain inactive for 96.hours or more to
reduce PM10 emissions.
The construction contractor shall utilize electric or BO C During A/C 4
clean alternative fuel-powered equipment where construction
feasible.
The construction contractor shall ensure that BO C Review of plans A/C 2/4
construction grading plans include a statement that
work crews will shut off equipment when not in use.
2of11
Mitigation Measures No./ Responsible Monitoring Timing of Method of Verified Sanctions for —1
Implementing Action for Monitoring Frequency Verification Verification Date /Initials Non-Compliance
All residential and commercial structures shall be BO C/D Review of plans C 2/4
required to incorporate high-efficiency/low-polluting
heating, air conditioning, appliances, and water
heaters.
All residential and commercial structures shall be BO C/D Review of plans C 2/4
required to incorporate thermal pane windows and
weather-stripping.
Cultural Resources
If any prehistoric archaeological resources are CP/BO C Review of report A/D 3/4
encountered before or during grading, the developer
will retain a qualified archaeologist to monitor
construction activities, to take appropriate measures
to protect or preserve them for study. With the
assistance of the archaeologist, the City of Rancho
Cucamonga will:
• Enact interim measures to protect undesignated CP/BO C Review of report A/D 3/4
sites from demolition or significant modification
without an opportunity for the City to establish its
archaeological value.
• Consider establishing provisions to require CP/BO C Review of report A/D 3/4
incorporation of archaeological sites within new
developments, using their special qualities as a
theme or focal point.
• Pursue educating the public about the area's CP/BO C Review of report A/D 3/4
archaeological heritage.
• Propose mitigation measures and recommend CP/BO C Review of report A/D 3/4
conditions of approval to eliminate adverse project
effects on significant, important, and unique
prehistoric resources, following appropriate CEQA
guidelines.
• Prepare a technical resources management CP C Review of report A/D 3/4
report, documenting the inventory, evaluation, and
proposed mitigation of resources within the project
area. Submit one copy of the completed report,
with original illustrations, to the San Bernardino
County Archaeological Information Center for
permanent archiving.
3of11
Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification D. Non-Compliance
If any paleontological resource (i.e. plant or animal CP B/C Review of report A/D 4
fossils) are encountered before or during grading, the
developer will retain a qualified paleontologist to
monitor construction activities, to take appropriate
measures to protect or preserve them for study. The
paleontologist shall submit a report of findings that will
also provide specific recommendations regarding
further mitigation measures (.e., paleontological
monitoring) that may be appropriate. Where
mitigation monitoring is appropriate, the program must
include, but not be limited to, the following measures:
• Assign a paleontological monitor, trained and CP B Review of report A/D 4
equipped to allow the rapid removal of fossils with
minimal construction delay, to the site full-time
during the interval of earth-disturbing activities.
• Should fossils be found within an area being CP/BO B/C Review of report A/D 4
cleared or graded, divert earth-disturbing activities
elsewhere until the monitor has completed
salvage. If construction personnel make the
discovery, the grading contractor should
immediately divert construction and notify the
monitor of the find.
• Prepare, identify, and curate all recovered fossils BO B/C Review of report A/D 4
for documentation in the summary report and
transfer to an appropriate depository (.e.,
San Bernardino County Museum).
• Submit a summary report to the City of Rancho CP D Review of report D 3
Cucamonga. Transfer collected specimens with a
copy of the report to the San Bernardino County
Museum.
Geology and Soils
The site shall be treated with water or other BO C During A 4
soil-stabilizing agent (approved by SCAQMD and construction
RWQCB) daily to reduce PMIO emissions, in
accordance with SCAQMD Rule 403 or re-planted
with drought resistant landscaping as soon as
possible.
4of11
Mitigation Measures No. i Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date
Frontage public streets shall be swept according to a CE C During A 4
schedule established by the City to reduce PM,o construction
emissions associated with vehicle tracking of soil
off-site. Timing may vary depending upon the time of
year of construction.
Grading operations shall be suspended when wind BO C During A 4
speeds exceed 25 mph to minimize PM10 emissions construction
from the site during such episodes.
Chemical soil-stabilizers (approved by SCAQMD and BO C During A 4
RWQCB) shall be applied to all inactive construction construction
areas that remain inactive for 96 hours or more to
reduce PM10 emissions.
Hydrology and Water Quality
Prior to issuance of grading permits, the permit BO B/C/D Review of plans A/C 2/4
applicant shall submit to Building Official for approval,
Storm Water Pollution Prevention Plan (SWPPP)
specifically identifying Best Management Practices
(BMPs) that shall be used on-site to reduce pollutants
during construction activities entering the storm drain
system to the maximum extent practical.
An Erosion Control Plan shall be prepared, included BO B/C/D Review of plans A/C 2/4
in Grading Plan, and implemented for the proposed
project that identifies specific measures to control
on-site and off-site erosion from the time ground
disturbing activities are initiated through completion of
grading. This Erosion Control Plan shall include the
following measures at a minimum: a) Specify the
timing of grading and construction to minimize soil
exposure to rainy periods experienced in southern
California, and b) An inspection and maintenance
program shall be included to ensure that any erosion
which does occur either on-site or off-site as a result
of this project will be corrected through a remediation
or restoration program within a specified time frame.
During construction, temporary berms such as CP/BO/CE C Review of plans A/C 2/4
sandbags or gravel dikes must be used to prevent
discharge of debris or sediment from the site when
there is rainfall or other runoff.
5of11
Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date /initials NOn-Compliance
During construction, to remove pollutants, street CP/BO/CE C Review of plans A/C 2/4
cleaning will be performed prior to storm events and
after the use of water trucks to control dust in order to
prevent discharge of debris or sediment from the site.
The developer shall implement the BMPs identified in CE C Review of report A/C 2/4
the Water Quality Management Plan prepared by SP
Consulting Group to reduce pollutants after
construction entering the storm drain system to the
maximum extent practical.
Landscaping plans shall include provisions for CP/CE/BO B/C/D Review of plans A/C 2/4
controlling and minimizing the use of
fertilizers/pesbcides/herbicides. Landscaped areas
shall be monitored and maintained for at least two
years to ensure adequate coverage and stable
growth. Plans for these areas, including monitoring
provisions for a minimum of two years, shall be
submitted to the City for review and approval prior to
the issuance of Grading Permits.
Practical information materials will be provided to the BO B/C/D Review of plans A/C 2/4
first residents/occupants/tenants. These materials
shall include general housekeeping practices that
contribute to protection of storrnwater quality, and
BMPs that eliminate or reduce pollution during
property improvements (concrete work, pool
installation, etc). These materials will be made
available by the City of Rancho Cucamonga Planning
Department. The developer shall request these
materials in writing at least 30 days prior to intended
distribution and shall then be responsible for their
distribution at the time of occupancy of prospective
residences.
If a homeowner's association is formed, conditions, CE D Upon B 7
covenants, and restrictions shall be required for the Occupancy
purpose of water quality protection. Alternatively, use
restrictions may be developed by building operator
through lease terms, or other mechanisms. Pesticide
application in common areas must be performed by
an applicator certified by the California Department of
Pesticide Regulation.
6of11
Mitigation Measures No. I Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date /initials Non-Compliance
Sites must be designed to contain and infiltrate roof BO/CE B/C/D Review of plans A/C 2/4
runoff, or direct roof runoff to vegetative swales or
buffer areas.
Irrigation methods should be utilized to minimize BO/CE B/C/D Review of plans A/C 2/4
runoff of excess irrigation water across impervious
surfaces and into the stormwater conveyance system..
Such measures include employing rain-triggered
shutoff devices to eliminate or reduce irrigation during
and immediately after precipitation, using mulches
(such as wood chips) to minimize sediment in runoff
and to maintain soil infiltration capacity, and
coordinating design of the irrigation system and
landscape to minimize overspray and runoff.
Irrigation systems should consider the use of flow
reducers or shutoff valves triggered by a pressure
drop to control water loss in the event of broken
sprinkler heads or water supply lines. Water
conservation devices such as programmable irrigation
timers and soil moisture sensors should also be
considered.
Project plans shall include Source-Control BMPs to CE B/C/D Review of plans A/C 2/4
decrease the potential for erosion of slopes and/or
channels, consistent with local codes and ordinances,
and with approval of all agencies with jurisdiction (e.g
USACOE, RWQCB, and CDFG). The following
design principles shall be considered, and
implemented where determined to be applicable and
feasible by the City of Rancho Cucamonga:
Convey runoff safely from the tops of slopes. CE B/C/D Review of plans A/C 2/4
Avoid disturbing natural channels. CE B/C/D Review of plans A/C 2/4
Install permanent stabilization of BMPs on disturbed CE B/C/D Review of plans A/C 2/4
slopes as quickly as possible.
Vegetate slopes with native or drought-tolerant CE B/C/D Review of plans A/C 2/4
vegetation.
Control and treat flows in landscaping and/or other CE B/C/D Review of plans I A/C 214
controls prior to reaching natural drainage systems.
7of11
Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Venfication Date
Install permanent stabilization BMPs in channel CE B/C/D Review of plans A/C 2/4
crossings as quickly as possible, and ensure that
increases in runoff velocity and frequency caused by
the project do not excessively erode the channel.
Install energy dissipaters, such as riprap, at the CE B/C/D Review of plans A/C 2/4
outlets of new storm drains, culverts, conduits or
channels that enter unlined channels in accordance
with applicable specifications to minimize erosion.
Energy dissipaters shall be installed in such a way as
to minimize impacts to receiving waters.
On-site conveyance channels should be lined, where CE B/C/D Review of plans A/C 2/4
appropriate, to reduce erosion caused by increased
flow velocity due to increases in tributary impervious
area. The first choice for linings should be grass or
some other vegetative surface, since these materials
not only reduce runoff velocities, but also provide
water quality benefits from filtration and infiltration. If
velocities in the channel are large enough to erode
grass or other vegetative linings, riprap, concrete soil
cement, or geo-grid stabilization may be substituted
or used in combination with grass or other vegetation
stabilization.
Other design principles that are comparable and CE B/C/D Review of plans A/C 2/4
equally effective.
Signage such as notices regarding discharge CE B/C/D Review of plans A/C 2/4
prohibitions at storm drain inlets to eliminate or
reduce dumping and littering are required. The
phrase"No Dumping — Flows to Creek," or an
equally effective phrase as approved by the NPDES
General Committee, must be stenciled on catch
basins(inlets)to alert the public as to the
destination of pollutants discharged into storm drains.
This signage must be maintained and a party
responsible for maintenance should be identified in
the WQMP.
8of11
A pervious (porous) surface such as grass, modular CE B/C/D Review of plans A/C 2/4
pavers, or porous asphalt or concrete, must be used
where appropriate (light vehicle loading areas) to
reduce runoff.
Materials used to reduce potential sources of BO B/C/D Review of plans A/C 2/4
pollutants in stormwater runoff by eliminating
compounds that can leach into runoff and reducing
the need for pesticides, paints, and other materials
are encouraged to be used.
Prior to issuance of Building Permits, the applicant CE B/C/D Review of plans A/C 2/4
shall submit to the City Engineer for approval of a
Water Quality Management Plan (WQMP), including a
project description and identifying Best Management
Practices (BMPs) that will be used on-site to reduce
pollutants into the storm drain system to the maximum
extent practicable. The WQMP shall identify the
structural and non-structural measures consistent with
the Guidelines for New Development and
Redevelopment adopted by the City of Rancho
Cucamonga in June 2004.
Prior to issuance of Grading or Paving Permits, BO B/C/D Review of plans A/C 2/4
applicant shall obtain a Notice of Intent (NOI) to
comply with obtaining coverage under the National
Pollutant Discharge Elimination System (NPDES)
General Construction Storm Water Permit from the
State Water Resources Control Board. Evidence that
this has been obtained (i.e., a copy of the Waste
Discharger's Identification Number) shall be submitted
to the City Building Official for coverage under the
NPDES General Construction Permit.
Noise
Construct sound attenuation barriers along the south BO B/C/D Review of plans A/C 2/4
tract boundary per the recommendations of the Noise
Impact Study (Gordon Bricken and Associates,
September 16, 2005). This sound barrier shall be
constructed as early as possible during construction
of this project. Walls heights greater than 8 feet shall
require approval of a variance application.
9of11
Once building plans are submitted to the Planning CP/BO B/C/D Review of plans A/C 2/4
Department, an Acoustical Analysis shall be prepared
to determine the building mitigation required to meet
the 45 dBA CNEL interior noise standard.
Construction or grading shall not take place between BO C During A 4
the hours of 8:00 p.m. and 6:30 a.m. on weekdays, Construction
including Saturday, or at any time on Sunday or a
national holiday.
Construction or grading noise levels shall not exceed BO C During A 4
the standards specified in Development Code Section construction
17.02.120-D, as measured at the property line. The
developer shall hire a consultant to perform weekly
noise level monitoring as specified in Development
Code Section 17.02.120. Monitoring at other times
may be required by the Building Official. Said
consultant shall report their findings to the Building
Official within 24 hours; however, if noise levels
exceed the above standards, then the consultant shall
immediately notify the Building Official. If noise levels
exceed the above standards, then construction
activities shall be reduced in intensity to a level of
compliance with above noise standards or halted.
The perimeter block wall shall be constructed as early CP/BO C During A 3/4
as possible in first phase. construction
Haul truck deliveries shall not take place between the POGO C During A 417
hours of 8:00 p.m. and 6:30 a.m. on weekdays, Construction
including Saturday, or at any time on Sunday or a
national holiday. Additionally, if heavy trucks used for
hauling would exceed 100 daily trips (counting both to
and from the construction site), then the developer
shall prepare a noise mitigation plan denoting any
construction traffic haul routes. To the extent
feasible, the plan shall denote haul routes that do not
pass sensitive land uses or residential dwellings.
10 of 11
Key to Checklist Abbreviations
Responsible Person Monitoring Frequency Method of Verification Sanctions
CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map
CP-City Planner or designee B- Prior To Construction B—Other Agency Permit/Approval 2-Withhold Grading or Building Permit
CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy
BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order
PO-Police Captain or designee E-Operating 5- Retain Deposit or Bonds
FC-Fire Chief or designee 6- Revoke CUP
7-Citation
11 of 11
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT#: TENTATIVE TRACT MAP SUBTT16867
SUBJECT: TENTATIVE TRACT MAP
APPLICANT: ETCO DEVELOPMENT INC.
LOCATION: NORTHWEST CORNER OF ETIWANDA AVENUE AND 1-210 FREEWAY
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
A. General Requirements Completion Date
1. The applicant shall agree to defend at his sole expense any action brought against the City, its
agents,officers,or employees, because of the issuance of such approval,or in the alternative,to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or
employees, for any Court costs and attorney's fees which the City, its agents, officers, or
employees may be required by a court to pay as a result of such action. The City may,at its sole
discretion,participate at its own expense in the defense of any such action but such participation
shall not relieve applicant of his obligations under this condition.
2. Approval of Tentative Tract Map SUBTT16867 is granted subject to the approval of Variance
DRC2004-01285.
B. Time Limits
1. This tentative tract map or tentative parcel map shall expire, unless extended by the Planning
Commission, unless a complete final map is filed with the City Engineer within 3 years from the
date of the approval.
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which include
site plans,architectural elevations,exterior materials and colors, landscaping,sign program,and
grading on file in the Planning Department,the conditions contained herein, Development Code
regulations, and the Etiwanda Specific Plan.
2. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved
use has commenced, whichever comes first.
1
Project No. SUBTT16867
Completion Date
3. Approval of this request shall not waive compliance with all sections of the Development Code,all
other applicable City Ordinances, and applicable Community or Specific Plans in effect at the
time of building permit issuance.
4. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be
located out of public view and adequately screened through the use of a combination of concrete
or masonry walls,berm ing,and/or landscaping to the satisfaction of the City Planner. For single-
family residential developments, transformers shall be placed in underground vaults.
5. A detailed plan indicating trail widths, maximum slopes, physical conditions, fencing, and weed
control, in accordance with City Master Trail drawings,shall be submitted for City Planner review
and approval prior to approval and recordation of the Final Tract Map and prior to approval of
street improvement and grading plans. Developer shall upgrade and construct all trails,including
fencing and drainage devices, in conjunction with street improvements.
a. Local Feeder Trails (i.e., private equestrian easements) shall, at a minimum, be fenced
with two-rail,4-inch lodgepole"peeler"logs to define both sides of the easement;however,
developer may upgrade to an alternate fence material.
b. Local Feeder Trail entrances shall also provide access for service vehicles, such as
veterinarians or hay deliveries, including a 12-foot minimum drive approach. Entrance
shall be gated provided that equestrian access is maintained through step-throughs.
C. Local Feeder Trail grades shall not exceed 0.5% at the downstream end of a trail for a
distance of 25 feet behind the public right-of-way line to prohibit trail debris from reaching
the street. Drainage devices may be required by the Building Official
d. Provide a 24-foot by 24-foot corral area in the rear yard. Grade access from corral to trail
with a maximum slope of 5:1 and a minimum width of 10 feet.
e. For single family residential development within the Equestrian/Rural Overlay District, at
least one model home shall be provided with a constructed 24-foot by 24-foot corral with
appropriate fencing.
6. The Covenants, Conditions, and Restrictions (CC&Rs)shall not prohibit the keeping the equine
animals where zoning requirements for the keeping of said animals have been met. Individual lot
owners in subdivisions shall have the option of keeping said animals without the necessity of
appealing to boards of directors of homeowners' associations for amendments to the CC&Rs.
7. The Covenants, Conditions, and Restrictions (CC&Rs) and Articles of Incorporation of the
Homeowners' Association are subject to the approval of the Planning and Engineering
Departments and the City Attorney. They shall be recorded concurrently with the Final Map or
prior to the issuance of building permits, whichever occurs first. A recorded copy shall be
provided to the City Engineer. The Homeowners' Association shall submit to the Planning
Department a list of the name and address of their officers on or before January 1 of each and
every year and whenever said information changes.
D. Parking and Vehicular Access (indicate details on building plans)
1. Multiple car garage driveways shall be tapered down to a standard two-car width at street.
E. Landscaping
1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in
the case of residential development, shall be prepared by a licensed landscape architect and
submitted for City Planner review and approval prior to the issuance of building permits or prior
final map approval in the case of a custom lot subdivision.
2
Project No. SUBTT16867
Completion Date
2. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope, but less than 2:1
slope,shall be,at minimum, irrigated and landscaped with appropriate ground cover for erosion
control. Slope planting required by this section shall include a permanent irrigation system to be
installed by the developer prior to occupancy.
3. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater
slope shall be landscaped and irrigated for erosion control and to soften their appearance as
follows: one 15-gallon or larger size tree per each 150 sq.ft.of slope area, 1-gallon or larger size
shrub per each 100 sq.ft.of slope area,and appropriate ground cover. In addition,slope banks
in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or
larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in
staggered clusters to soften and vary slope plane. Slope planting required by this section shall
include a permanent irrigation system to be installed by the developer prior to occupancy.
4. For single-family residential development, all slope planting and irrigation shall be continuously
maintained in a healthy and thriving condition by the developer until each individual unit is sold
and occupied by the buyer. Prior to releasing occupancy for those units, an inspection shall be
conducted by the Planning Department to determine that they are in satisfactory condition.
5. New windrow planting of Eucalyptus Maculata (Spotted Gum) is required at a ratio of 50 linear
feet per acre. The size,spacing,staking,and irrigation of these trees shall comply with the City's
Tree Preservation Ordinance (RCMC 19.08.100) and Etiwanda Specific Plan.
F. Signs
1. The signs indicated on the submitted plans are conceptual only and not a part of this approval.
Any signs proposed for this development shall comply with the Sign Ordinance and shall require
separate application and approval by the Planning Department prior to installation of any signs.
G. Environmental
1. The developer shall provide each prospective buyer written notice of the 210 and 1-15 Freeways
in a standard format as determined by the City Planner,prior to accepting a cash deposit on any
property.
2. Noise levels shall be monitored after construction to verify the adequacy of the mitigation
measures. Noise levels shall be monitored by actual noise level readings taken on-and off-site.
A final acoustical report shall be submitted for City Planner review and approval prior to final
occupancy release. The final report shall also make recommendations as to additional mitigation
measures to reduce noise levels to below City standards, such as, residential exterior noise
levels to below 60 dBA and interior noise attenuation to below 45 dBA.
3. A final acoustical report shall be submitted for City Planner review and approval prior to the
issuance of building permits. The final report shall discuss the level of interior noise attenuation
to below 45 CNEL, the building materials and construction techniques provided, and if
appropriate,verify the adequacy of the mitigation measures. The building plans will be checked
for conformance with the mitigation measures contained in the final report.
4. The applicant shall submit certification from an acoustical engineer that all recommendations of
the acoustical report were implemented in construction, including measurements of interior and
exterior noise levels to document compliance with City standards. Certification shall be
submitted to the Building & Safety Department prior to final occupancy release of the affected
homes.
5. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures, including monitoring and reporting. Applicant shall be required to
post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the
amount of $495.00 prior to the issuance of building permits, guaranteeing satisfactory
performance and completion of all mitigation measures. These funds may be used by the City to
retain consultants and/or pay for City staff time to monitor and report on the mitigation measures.
Failure to complete all actions required by the approved environmental documents shall be
considered grounds for forfeit.
3
Project No. SUBTT16867
Completion Date
6. In those instances requiring long term monitoring(i.e.)beyond final certificate of occupancy),the
applicant shall provide a written monitoring and reporting program to the City Planner prior to
issuance of building permits. Said program shall identify the reporter as an individual qualified to
know whether the particular mitigation measure has been implemented.
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT,(909)477-2710,
FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
H. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be
marked with the project file number (i.e., SUBTT16867). The applicant shall comply with the
latest adopted California Codes, and all other applicable codes, ordinances, and regulations in
effect at the time of permit application. Contact the Building and Safety Department for
.availability of the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new residential project or major addition,the applicant
shall pay development fees at the established rate. Such fees may include,but are not limited to:
City Beautification Fee, Park Fee, Drainage Fee,Transportation Development Fee, Permit and
Plan Check Fees,Construction and Demolition Diversion Program deposit and fees and School
Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety
Department prior to permit issuance.
3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map
recordation and prior to issuance of building permits.
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday
through Saturday, with no construction on Sunday or holidays.
I. Grading
1. Grading of the subject property shall be in accordance with California Building Code,City Grading
Standards, and accepted grading practices. The final grading plan shall be in substantial
conformance with the approved grading plan.
2. A soils report shall be prepared by a qualified engineer licensed by the State of California to
perform such work.
3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the
time of application for grading plan check.
4. The final grading, appropriate certifications and compaction reports shall be completed,
submitted, and approved by the Building and Safety Official prior to the issuance of building
permits.
5. If developed as a custom-lot subdivision, the following requirements shall be met:
a. Surety shall be posted and an agreement executed guaranteeing completion of all on-site
drainage facilities necessary for dewatering all parcels to the satisfaction of the Building
and Safety Official prior to final map approval and prior to the issuance of grading permits.
b. Appropriate easements for safe disposal of drainage water that are conducted onto or over
adjacent parcels, are to be delineated and recorded to the satisfaction of the Building and
Safety Official prior to the issuance of grading and building permits.
4
Project No. SUBTT16867
completion Date
C. On-site drainage improvements, necessary for dewatering and protecting the subdivided
properties, are to be installed prior to issuance of building permits for construction upon
any parcel that may be subject to drainage flows entering, leaving, or within a parcel
relative to which a building permit is requested.
d. Final grading plans for each parcel are to be submitted to the Building and Safety
Department for approval prior to the issuance of grading and building permits(this may be
on an incremental or composite basis).
e. All slope banks in excess of 5 feet in vertical height shall be seeded with native grasses or
planted with ground cover for erosion control upon completion of grading or some other
alternative method of erosion control shall be completed to the satisfaction of the Building
and Safety Official. In addition, a permanent irrigation system shall be provided. This
requirement does not release the applicant/developer from compliance with the slope
planting requirements of Section 17.08.040 of the Development Code.
6. A separate grading plan check submittal is required for all new construction projects and for
existing buildings where improvements being proposed will generate 50 cubic yards or more of
combined cut and fill. The grading plan shall be prepared,stamped,and signed by a California
registered Civil Engineer.
APPLICANT SHALL CONTACT THE ENGINEERING DEPARTMENT, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
J. Dedication and Vehicular Access
1. Dedication shall be made of the following rights-of-way on the perimeter streets(measured from
street centerline):
33 total feet on Vintage Drive (full widening =66 feet). _/�_
44 total feet on Etiwanda Avenue.
2. Corner property line cutoffs shall be dedicated per City Standards.
3. Private drainage easements for cross-lot drainage shall be provided and shall be delineated or
noted on the final map.
4. All existing easements lying within future rights-of-way shall be quit-claimed or delineated on the
final map.
K. Street Improvements
1. All public improvements(interior streets,drainage facilities,communitytrails,paseos,landscaped
areas, etc.) shown on the plans and/or tentative map shall be constructed to City Standards.
Interior street improvements shall include, but are not limited to,curb and gutter,AC pavement,
drive approaches, sidewalks, street lights, and street trees.
2. Pursuant to City Council Resolution No.88-557,no person shall make connections from a source
of energy,fuel or power to any building service equipment which is regulated by technical codes
and for which a permit is required unless, in addition to any and all other codes, regulations and
ordinances,all improvements required by these conditions of development approval have been
completed and accepted by the City Council,except:that in developments containing more than
one building or unit, the development may have energy connections made to a percentage of
those buildings, or units proportionate to the completion of improvements as required by
conditions of approval of development. In no case shall more than 95 percent of the buildings or
units be connected to energy prior to completion and acceptance of all improvements required by
these conditions of approval of development.
5
Project No. SUBTT16867
Completion Date
3. Construct the following perimeter street improvements including, but not limited to:
Curb& A.C. Side- Drive Street Street Comm Median Bike
Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other
Vintage Drive X X X X X
Etiwanda Avenue (f) X X X X (e)
Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement
reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk
shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be
provided for this item. (e) Entry concept per the Etiwanda Specific Plan Figure 5-12. (f) Cobble
curb and gutter.
4. Improvement Plans and Construction:
a. Street improvement plans, including street trees,street lights,and intersection safety lights
on future signal poles, and traffic signal plans shall be prepared by a registered Civil
Engineer and shall be submitted to and approved by the City Engineer. Security shall be
posted and an agreement executed to the satisfaction of the City Engineer and the City
Attorney guaranteeing completion of the public and/or private street improvements,priorto
final map approval or the issuance of building permits, whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a
construction permit shall be obtained from the City Engineer's Office in addition to any
other permits required.
C. Pavement striping, marking,traffic signing,street name signing,traffic signal conduit,and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction
project along major or secondary streets and at intersections for future traffic signals and
interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside
of BCR, ECR, or any other locations approved by the City Engineer
Notes:
1) Pull boxes shall be No.6 at intersections and No.5 along streets,a maximum of 200
feet apart, unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch galvanized steel with pull rope or as specified.
e. Handicapped access ramps shall be installed on all corners of intersections per City
Standards or as directed by the City Engineer.
f. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A cash
deposit shall be provided to cover the cost of grading and paving,which shall be refunded
upon completion of the construction to the satisfaction of the City Engineer.
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be
installed to City Standards, except for single family residential lots.
h. Street names shall be approved by the City Planner prior to submittal for first plan check.
5. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in
accordance with the City's street tree program.
6
Project No. SUBTT16867
Completion Date
6. Install street trees per City street tree design guidelines and standards as follows. The completed
legend (box below) and construction notes shall appear on the title page of the street
improvement plans. Street improvement plans shall include a line item within the construction
legend stating: "Street trees shall be installed per the notes and legend on sheet_(typically
sheet 1)." Where public landscape plans are required, tree installation in those areas shall be
per the public landscape improvement plans.
The City Engineer reserves the right to adjust tree species based upon field conditions and other
variables. For additional information, contact the Project Engineer.
Min.
Grow
Street Name Botanical Name Common Name Space Spacing Size Dty.
Etiwanda Avenue
North of Foothill Boulevard Eucalyptus camaldulensis Red Gum 8 ft. 30 ft.o.c. 5-gal. Fill-in
Specific Plan dictates species
despite parkway width
Vintage Drive Platanus acerifolia London Plane Tree 8 ft. 30 ft.o.c. 15-gal.
Construction Notes for Street Trees:
1) All street trees are to be planted in accordance with City standard plans.
2) Prior to the commencement of any planting,an agronomic soils report shall be furnished to
the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil
amendments, as determined by the City inspector.
3) All street trees are subject to inspection and acceptance by the Engineering Department.
4) Street trees are to be planted per public improvement plans only.
7. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with
adopted policy. On collector or larger streets, lines of sight shall be plotted for all project
intersections, including driveways. Local residential street intersections and commercial or
industrial driveways may have lines of sight plotted as required.
L. Public Maintenance Areas
1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting
Districts shall be filed with the City Engineer prior to final map approval or issuance of building
permits whichever occurs first. Formation costs shall be borne by the developer.
M. Utilities
1. Provide separate utility services to each parcel including sanitary sewerage system,water,gas,
electric power, telephone, and cable TV (all underground) in accordance with the Utility
Standards. Easements shall be provided as required.
2. The developer shall be responsible for the relocation of existing utilities as necessary.
3. Water and sewer plans shall be designed and constructed to meet the requirements of the
Cucamonga Valley Water District(CVW D), Rancho Cucamonga Fire Protection District,and the
Environmental Health Department of the County of San Bernardino. A letter of compliance from
the CVW D is required prior to final map approval or issuance of permits,whichever occurs first.
Such letter must have been issued by the water district within 90 days prior to final map approval
in the case of subdivision or prior to the issuance of permits in the case of all other residential
projects.
7
Project No. SUBTT16867
Completion Date
4. Approvals have not been secured from all utilities and other interested agencies involved.
Approval of the final parcel map will be subject to any requirements that may be received from
them.
N. General Requirements and Approvals .
1. Etiwanda/San Sevaine Area Regional Mainline,Secondary Regional,and Master Plan Drainage
Fees shall be paid prior to final map approval or prior to building permit issuance if no map is
involved.
2. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all
new streetlights for the first six months of operation, prior to final map approval or prior to building
permit issuance if no map is involved.
3. Prior to the issuance of building permits,a Diversion Deposit and related administrative fees shall
be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if
at least 50% of all wastes generated during construction and demolition are diverted from
landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to
the Engineering Department when the first building permit application is submitted to Building and
Safety. Form CD-2 shall be submitted to the Engineering Department within 60 days following
the completion of the construction and/or demolition project.
APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION
PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING
CONDITIONS:
SEE ATTACHED
8
Rancho Cucamonga Fire Protection District
Fire Construction Services
STANDARD CONDITIONS
November 1, 2005
ETCO Investments Subdivision
Vintage West of Etiwanda Avenue
SUBTT16867 and DRC2004-00667
THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT.
FSC-1 Public and Private Water Supply
1. Design guidelines for Fire Hydrants: The following provides design guidelines for the spacing and
location of fire hydrants:
a. The maximum distance between fire hydrants in single-family residential projects is 500 feet.
No portion of the exterior wall facing the addressed street shall be more than 250 feet from an
approved fire hydrant. For cul-de-sacs, the distance shall not exceed 200 feet.
b. Fire hydrants are to be located. The preferred locations for fire hydrants are:
i. At the entrance(s) to a commercial, industrial or residential project from the public
roadways.
ii. At intersections.
iii. On the right side of the street, whenever practical and possible.
iv. As required by the Fire Safety Division to meet operational needs of the Fire District.
V. A minimum of 40 feet from any building.
FSC-2 Fire Flow
1. The required fire flow for this project is 2,000 gallons per minute at a minimum residual pressure of
20-pounds per square inch. This requirement is made in accordance with Fire Code Appendix
III-A, as adopted by the Fire District Ordinances.
2. Public fire hydrants located within a 500-foot radius of the proposed project may be used to provide
the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent
property shall not be used to provide required fire flow.
3. Firewater plans are required for all projects that must extend the existing water supply to or onto
the site. Building permits will not be issued until fire protection water plans are approved.
4. On all site plans to be submitted for review, show all fire hydrants located within 600 feet of the
proposed project site.
FSC-6 Fire District Site Access
Fire District access roadways include public roads, streets and highways.
Chronological Summary of RCFPD Standard Conditions
PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to the
issuance of any building permits:
1. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the
locations of all new public fire hydrants for the review and approval by the Fire District and CCWD.
On the plan, show all existing fire hydrants within a 600-foot radius of the project. Please reference
the RCFPD Water Plan Submittal Procedure Standard#9-8.
All required public fire hydrants shall be installed, flushed and operable prior to delivering any
combustible framing materials to the site. CCWD personnel shall inspect the installation and
witness the hydrant flushing. Fire Construction Services shall inspect the site after acceptance of
the public water system by CCWD. Fire Construction Services must grant a clearance before
lumber is dropped.
2. Construction Access: The access roads must be paved in accordance with all the requirements
of the RCFPD Fire lane Standard #9-7. All temporary utilities over access roads must be installed
at least 14 feet 6 inches above the finished surface of the road.
3. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is responsible for
obtaining the fire flow information from CCWD and submitting the letter to Fire Construction
Services,
PRIOR TO THE RELEASE OF TEMPORARY POWER
The building construction must be substantially completed in accordance with Fire Construction Services'
"Temporary Power Release Checklist and Procedures".
PRIOR TO OCCUPANCY OR FINAL INSPECTION—Please complete the following:
1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire
hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga
Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers". On private property,
the markers shall be installed at the centerline of the fire access road, at each hydrant location.
2
2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in the
presence of Fire Construction Services, shall conduct a test of the most hydraulically remote on-
site fire hydrants. The underground fire line contractor, developer and/or owner are responsible for
hiring the company to perform the test. A final test report shall be submitted to Fire Construction
Services verifying the fire flow available. The fire flow available must meet or exceed the required
fire flow in accordance with the California Fire Code.
3. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access
roadways must be installed in accordance with the approved plans and acceptable to Fire
Construction Services.
The CC&R's, the reciprocal agreement and/or other approved documents shall be recorded and
contain an approved fire access roadway map with provisions that prohibit parking, specify the
method of enforcement and identifies who is responsible for the required annual inspections and
the maintenance of all required fire access roadways.
4. Address: Prior to the granting of occupancy, single-family dwellings shall post the address with
minimum 4-inch numbers on a contrasting background. The numbers shall be internally or
externally illuminated during periods of darkness. The numbers shall be visible from the street.
When building setback from the public roadway exceeds 100 feet, additional 4-inch numbers shall
be displayed at the property entry.
5. Confidential Business Occupancy Information: The applicant shall complete the Rancho
Cucamonga Fire District "Confidential Business Occupancy Information" form. This form provides
contact information for Fire District use in the event of an emergency at the subject building or
property. This form must be presented to the Fire Construction Services Inspector.
3
z
City of Rancho Cucamonga
MITIGATED NEGATIVE DECLARATION
The following Mitigated Negative Declaration is being circulated for public review in accordance with
the California Environmental Quality Act Section 21091 and 21092 of the Public Resources Code.
Project File No.: Tentative Tract Map SUBTT16867
Public Review Period Closes: December 14, 2005
Project Name: Project Applicant: Etco Development, Inc.
1351 Pomona Road, Suite 210
Corona, CA 92882
Project Location (also see attached map): Located within the Very Low Residential District on the
north side of the 1-210 freeway and on the west side of Etiwanda Avenue—APN: 0225-171-19.
Project Description: A subdivision of 8.9 gross acres of land into 12 residential lots in the Very
Low Residential District(.1 to 2 dwelling units per acre) of the Etiwanda Specific Plan. Related File:
Variance DRC2004-01285.
FINDING
This is to advise that the City of Rancho Cucamonga,acting as the lead agency,has conducted an
Initial Study to determine if the project may have a significant effect on the environment and is
proposing this Mitigated Negative Declaration based upon the following finding:
The Initial Study identified potentially significant effects but:
(1) Revisions in the project plans or proposals made or agreed to by the applicant before this
proposed Mitigated Negative Declaration was released for public review would avoid the
effects or mitigate the effects to a point where clearly no significant effects would occur, and
(2) There is no substantial evidence before the agency that the project, as revised, may have a
significant effect on the environment.
If adopted,the Mitigated Negative Declaration means that an Environmental Impact Reportwill not
be required. The factual and analytical basis for this finding is included in the attached Initial
Study. The project file and all related documents are available for review at the City of Rancho
Cucamonga Planning Department at 10500 Civic Center Drive (909) 477-2750 or Fax (909) 477-
2847.
NOTICE
The public is invited to comment on the proposed Mitigated Negative Declaration during the
review period.
January 25, 2006
Date of Determination Adopted By