HomeMy WebLinkAbout06-17 - Resolutions RESOLUTION NO. 06-17
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA,APPROVING CONDITIONAL USE
PERMIT DRC2005-00704 TO CONSTRUCT A RECREATIONAL VEHICLE
STORAGE FACILITY COMPRISED OF THREE BUILDINGS CONSISTING
OF APPROXIMATELY 196 UNITS WITH AN OVERALL AREA OF ABOUT
124,000 SQUARE FEET INCLUDING A CARETAKER'S RESIDENCE OF
ABOUT 2,000 SQUARE FEET (INCLUDING GARAGE) ON A PARCEL OF
ABOUT 222,000 SQUARE FEET (ABOUT 5 ACRES) IN THE GENERAL
INDUSTRIAL DISTRICT (SUBAREA 2), LOCATED ON THE WEST SIDE
OF HELLMAN AVENUE, 500 FEET SOUTH OF ARROW ROUTE; AND
MAKING FINDINGS IN SUPPORT THEREOF -APN: 0209-012-07.
A. Recitals.
1. ARE Architects filed an application for approval of Conditional Use Permit
DRC2005-00704, as described in the title of this Resolution. Hereinafter in this Resolution, the
subject Development Review request is referred to as "the application."
2. On 22nd day of March 2006, the Planning Commission of the City of Rancho
Cucamonga held a public hearing on the application and concluded said hearing on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning
Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing on March 22,2006, including written and oral staff reports,together
with public testimony, this Commission hereby specifically finds as follows:
a. The application applies to the development of a recreational vehicle storage facility
comprised of three buildings subdivided into about 196 units with a combined floor area of about
124,000 square feet and caretaker's residence of about 2,000 square feet on a property of about
222,000 square feet (about 5 acres), located on the west side of Hellman Avenue, about 500 feet
south of Arrow Route, in the General Industrial District, Subarea 2; and
b. The caretaker's residence will be located on the second floor above the managers
office/customer service area and a two-car garage;
C. The properties to the east are improved with industrial development and a legally
non-conforming residence; the property to the west is vacant; and the properties to the north and
south are partially improved with industrial development (the remainder are vacant). The nearest
residence, a legally non-conforming use (land is zoned industrial), is approximately 200 feet to the
northeast across Hellman Avenue; and
PLANNING COMMISSION RESOLUTION NO. 06-17
DRC2005-00704 —ARE ASSOCIATES
March 22, 2006
Page 2
d. The properties to the north, west, and east are zoned General Industrial District
(Subarea 3), and the properties to the south are zoned General Industrial District(Subarea 2); and
e. The subject property has a street frontage along Hellman Avenue of 292 feet,and
overall depth of about 760 feet (east-west); and
f. The subject site is vacant. Most of the vegetation on the subject site has been
removed because of previous "grubbing" activity; and
g. One point of primary access and one point of emergency access, at the southeast
and northeast corners of the site, respectively, will be provided from Hellman Avenue; and
3. Based upon the substantial evidence presented to this Commission during the
above-referenced meeting, including written and oral staff reports, this Commission hereby
specifically finds and concludes as follows:
a. That the proposed project is consistent with the objectives of the General Plan and
development Code; and
b. That the proposed design is in accord with the objectives of the Development Code
and the purposes of the district in which the site is located; and
C. That the proposed design is in compliance with each of the applicable provisions of
the Development Code; and
d. That the proposed design, together with the conditions applicable thereto,will not
be detrimental to the public health, safety, or welfare or materially injurious to properties or
improvements in the vicinity.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration, together with all written and oral reports included for the environmental assessment for
the application,the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and
Mitigation Monitoring Program attached hereto, and incorporated herein by this reference, based
upon the findings as follows:
a. That the Mitigated Negative Declaration has been prepared in compliance with the
California Environmental Quality Act(CEQA)of 1970,as amended, and the State CEQA guidelines
promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared
therefore reflect the independent judgment of the Planning Commission; and, further, this
Commission has reviewed and considered the information contained in said Mitigated Negative
Declaration with regard to the application.
b. Although the Mitigated Negative Declaration identifies certain significant
environmental effects that will result if the project is approved, all significant effects have been
reduced to an acceptable level by imposition of mitigation measures on the project which are listed
below as conditions of approval.
PLANNING COMMISSION RESOLUTION NO. 06-17
DRC2005-00704 —ARE ASSOCIATES
March 22, 2006
Page 3
C. Pursuant to the provisions of Section 753.5(c)of Title 14 of the California Code of
Regulations, the Planning Commission finds as follows: In considering the record as a whole, the
Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the
proposed project will have potential for an adverse impact upon wildlife resources or the habitat
upon which wildlife depends. Further, based upon the substantial evidence contained in the
Mitigated Negative Declaration, the staff reports and exhibits, and the information provided to the
Planning Commission during the public hearing, the Planning Commission hereby rebuts the
presumption of adverse effect as set forth in Section 753.5(c-1-d)of Title 14 of the California Code
of Regulations.
5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth
below and in the Standard Conditions, attached hereto and incorporated herein by this reference.
Planning Department
1) Approval is for the construction of a recreation vehicle storage facility,a
manager's office/customer service area, and a caretaker's residence
with a combined floor area of about 124,000 square feet.
2) Regular business hours shall be limited to 6:00 a.m.to 7:00 p.m.,daily.
Occasional access by customers during non-business hours is
permitted provided that access shall be restricted by the security gate
and monitored by the on-site caretaker.
3) On the first 30 feet of the north elevation of Building B and south
elevation of Building D, and the east elevation of Buildings A, B,and D,
increase the height of the split-face block base to match Building F.
4) The base of the tower structure shall be finished with real river rock.
5) Provide decorative paving at the entry area to the office.
6) Change the material of the entry arch and lattice structures from wood
to metal for long-term durability and to reduce maintenance costs.
Also, increase the size of the trellis members and their supporting
braces that have been attached to the buildings. The final size and
design of these features is subject to City Planner review and approval.
7) Delete the metal trellis from the north and south elevations and use
trees at these locations.
8) Provide a continuous cornice on the first 30 feet of Buildings A, B, and
D, and the east elevation of Buildings A, B, and D.
9) The green color of all gates and storage unit doors shall match, as
closely as possible, a copper patina. A sample of the actual material
and color shall be submitted for review and approval by the City
Planner.
PLANNING COMMISSION RESOLUTION NO. 06-17
DRC2005-00704 —ARE ASSOCIATES
March 22, 2006
Page 4
10) The output surface (face) of all lamp heads on wall-mounted light
fixtures and the light standards shall be parallel to the ground in order
to eliminate glare and minimize lighting on adjacent properties. The
maximum height of light standards including the base, measured from
the finished surface, is 18 feet (the height of the shortest building).
11) All roof-and ground-mounted equipment shall be completely screened
from view from surrounding properties and the public right-of-way.
Screening shall be architecturally compatible with the proposed
building. The location of Southern California Edison transformer(s)
shall be shown on the plans submitted for Building and Safety
Department plan check.
12) Downspouts shall not be visible from the exterior on any of the building
elevations. All downspouts shall be routed through the interior of the
building.
13) The maximum height of any wall or fence in this development district is
8 feet. Chain link fencing is not permitted; perimeter walls/fences shall
be constructed of wrought iron, concrete block, tilt-up concrete panels,
or equivalent, as approved by the City Planner.
14) A minimum of three parking stalls shall be provided for use by the
customers in addition to the 2-car garage required for the caretaker's
residence.
15) Parking stalls shall have a minimum width of 9 feet and a minimum
depth of 18 feet (1-foot overhang into landscaped areas is permitted).
16) Outdoor storage is not permitted.
17) Decorative paving shall be provided at the primary entrance to the site,
behind the public right-of-way. The decorative paved area shall have a
minimum depth of 35 feet and width equal to that of the driveway.
18) Landscaping provided shall be consistent with the standards described
in Section 17.30.040.E of the Development Code. Detailed Landscape
and Irrigation Plans shall be submitted, at the time of plan check,to the
Planning Department for review and approval. The Detailed
Landscape and Irrigation Plans must be approved by the City Planner
prior to the issuance of building permits.
19) All landscaping shall be installed prior to release for occupancy.
Engineering Department
1) Developmentwill be required to install all missing public improvements
along the full frontage on Hellman Avenue, or replace as needed,
including, but not limited to, curb and gutter, install new street
pavement section and/or cold plane and overlay paving to the
centerline of the street, drive approaches,sidewalk,three 9500 Lumen
PLANNING COMMISSION RESOLUTION NO. 06-17
DRC2005-00704 —ARE ASSOCIATES
March 22, 2006
Page 5
HPSV street lights, curbside drainage outlet(s), traffic striping and
signage including R26(s)"NO STOPPING"signs, and street trees. All
the public improvements shall be in accordance with the City's
"Secondary Arterial" Street Design Standards.
a) Remove existing unused drive approaches and replace with new
curb and gutter, sidewalk, new drive approach, and/or street
trees, as required.
b) Install a curb or wall behind the sidewalk per approved final
drainage report.
c) Install drive approaches for site access and for fire emergency
access per City Standard Drawing No. 101,Type C, minimum 35
feet wide. Fire access drive approach shall also be to the
satisfaction of the Fire District.
2) Provide a final drainage report to determine the height of flood
protection measures to contain Q100 within Hellman Avenue right-of-
way. Curb or wall shall join flood protection features to the north and
south of this site and wrap drive approaches as needed to prevent Q1oo
in public street from entering private property.
a) If water flow impacts a landscaped parkway,the velocity shall not
exceed 3fps. A Q100 which exceeds that velocity shall be
confined to hard surfaced areas. In any street, the product of
depth at the curb times the flow velocity shall not exceed 6.
3) An in-lieu fee as contribution to the future undergrounding of the
existing overhead utilities (telecommunications and electrical, expect
for the 66kV electrical) on the opposite side of Hellman Avenue shall
be paid to the City prior to the issuance of building.permits. The fee
shall be one-half the City adopted unit amount times the length of the
project frontage.
4) Provide a Water Quality Management Plan (WQMP),to the satisfaction
of the City Engineer, and identify applicable Best Management
Practices (BMPs) on the Grading Plan. The WQMP dated November
2005 has been reviewed and the following items need to be completed:
a) Section 1.2-Provide permit numbers (List Tract or Parcel Map#,
DRC#, PMT#, and WDID#).
b) Section 1.4 - Describe and identify the watershed(s) that the
project lies within.
c) Section 2.1 - Complete this section (Guidance pages are
available at the Engineering Department's front counter).
PLANNING COMMISSION RESOLUTION NO. 06-17
DRC2005-00704 —ARE ASSOCIATES
March 22, 2006
Page 6
d) Section 2.2 - Previous responses for Section 2.2.1 were
acceptable.
e) Section 3.2-Provide more detailed Implementation Descriptions
for BMPs incorporated in the plan.
f) Section 3.3 - All responses should be a "yes" since there are
either expected or potential pollutants of concern.
g) Section 3.4.1 - Provide calculation for IBMP (#A3) and use the
result to calculate #A4.
h) Section 4-Provide O&M description and schedule for all Source
Control, Site Design, and Treatment Control BMPs (including
SD-12 and SD-13).
i) Section 6 - Notarize and record the City's "Memorandum of
Agreement of Storm Water Quality Management Plan" (Copies
available at the Engineering Department's front counter). Delete
the Vehicle Washing Area unless there is one on-site.
j) Plan Review- Locate proposed BMPs on the Grading Plan.
Environmental Mitigation
Aesthetics
1) A detailed on-site Lighting Plan, including a photometric diagram,shall
be reviewed and approved by the City Planner prior to the issuance of
Building Permits. Such plan shall indicate style, illumination, location,
height, and method of shielding so as not to adversely affect adjacent
properties.
Air Quality
1) All construction equipment shall be maintained in good operating
condition so as to reduce operational emissions. The contractor shall
ensure that all construction equipment is being properly serviced and
maintained as per man ufacturers'specifications. Maintenance records
shall be available at the construction site for City verification.
2) Prior to the issuance of any Grading Permits, developer shall submit
construction plans to City denoting the proposed schedule and
projected equipment use. Construction contractors shall provide
evidence that low emission mobile construction equipment will be
utilized,or that their use was investigated and found to be infeasible for
the project. Contractors shall also conform to any construction
measures imposed bythe South Coast Air Quality Management District
(SCAQMD) as well as City Planning Staff.
PLANNING COMMISSION RESOLUTION NO. 06-17
DRC2005-00704—ARE ASSOCIATES
March 22, 2006
Page 7
3) All paints and coatings shall meet or exceed performance standards
noted in SCAQMD Rule 1113. Paints and coatings shall be applied
either by hand or high-volume, low-pressure spray.
4) All asphalt shall meet or exceed performance standards noted in
SCAQMD Rule 1108.
5) All construction equipment shall comply with SCAQMD Rules 402 and
403. Additionally, contractors shall include the following provisions:
• Reestablish ground cover on the construction site through
seeding and watering.
• Pave or apply gravel to any on-site haul roads.
• Phase grading to prevent the susceptibility of large areas to
erosion over extended periods of time.
• Schedule activities to minimize the amounts of exposed
excavated soil during and after the end of work periods.
• Dispose of surplus excavated material in accordance with local
ordinances and use sound engineering practices.
• Sweep streets according to a schedule established by the City if
silt is carried over to adjacent public thoroughfares or occurs as a
result of hauling. Timing may vary depending upon the time of
year of construction.
• Suspend grading operations during high winds (i.e.,wind speeds
exceeding 25 mph) in accordance with Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils haul trucks
or cover payloads using tarps or other suitable means.
6) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and Regional Water Quality Control Board
[RWQCB])daily to reduce Fine Particulate Matter(PM10)emissions, in
accordance with SCAQMD Rule 403.
7) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall
be applied to all inactive construction areas that remain inactive for 96
hours or more to reduce PM10 emissions.
8) The construction contractor shall utilize electric or clean alternative fuel
powered equipment where feasible.
9) The construction contractor shall ensure that Construction-Grading
Plans include a statement that work crews will shut off equipment when
not in use.
PLANNING COMMISSION RESOLUTION NO. 06-17
DRC2005-00704 —ARE ASSOCIATES
March 22, 2006
Page 8
10) All industrial and commercial facilities shall post signs requiring that
trucks shall not be left idling for prolonged periods (i.e., in excess of 10
minutes).
11) All residential and commercial structures shall be required to
incorporate thermal pane windows and weather-stripping.
Cultural Resources
1) If any prehistoric archaeological resources are encountered before or
during grading, the developer will retain a qualified archaeologist to
monitor construction activities,to take appropriate measures to protect
or preserve them for study. With the assistance of the archaeologist,
the City of Rancho Cucamonga will:
• Enact interim measures to protect undesignated sites from
demolition or significant modification without an opportunity for
the City to establish its archaeological value.
• Consider establishing provisions to require incorporation of
archaeological sites within new developments, using their special
qualities as a theme or focal point.
• Pursue educating the public about the area's archaeological
heritage.
• Propose mitigation measures and recommend conditions of
approval to eliminate adverse project effects on significant,
important, and unique prehistoric resources, following
appropriate California Environmental Quality Act (CEQA)
guidelines.
• Prepare a technical resources management report,documenting
the inventory, evaluation, and proposed mitigation of resources
within the project area. Submit one copy of the completed report
with original illustrations, to the San Bernardino County
Archaeological Information Center for permanent archiving.
2) If any paleontological resource (i.e. plant or animal fossils) are
encountered before or during grading, the developer will retain a
qualified paleontologist to monitor construction activities, to take
appropriate measures to protect or preserve them for study. The
paleontologist shall submit a report of findings that will also provide
specific recommendations regarding further mitigation measures (i.e.,
paleontological monitoring)that may be appropriate. Where mitigation
monitoring is appropriate, the program must include, but not be limited
to, the following measures:
• Assign a paleontological monitor, trained and equipped to allow
the rapid removal of fossils with minimal construction delay, to
the site full-time during the interval of earth-disturbing activities.
PLANNING COMMISSION RESOLUTION NO. 06-17
DRC2005-00704 —ARE ASSOCIATES
March 22, 2006
Page 9
• Should fossils be found within an area being cleared or graded,
divert earth-disturbing activities elsewhere until the monitor has
completed salvage. If construction personnel make the
discovery, the grading contractor should immediately divert
construction and notify the monitor of the find.
• Prepare, identify, and curate all recovered fossils for
documentation in the summary report and transfer to an
appropriate depository (i.e., San Bernardino County Museum).
Geology and Soils
1) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and RWQCB)daily to reduce PM10 emissions,
in accordance with SCAQMD Rule 403 or re-planted with drought
resistant landscaping as soon as possible.
2) Frontage public streets shall be swept according to a schedule
established by the City to reduce PM10 emissions associated with
vehicle tracking of soil off-site. Timing may vary depending upon the
time of year of construction.
3) Grading operations shall be suspended when wind speeds exceed
25 mph to minimize PM10 emissions from the site during such
episodes.
4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall
be applied to all inactive construction areas that remain inactive for 96
hours or more to reduce PM10 emissions.
Hydrology and Water Quality
Construction Activities:
1) Prior to issuance of Grading Permits, the permit applicant shall submit
to Building Official for approval, Storm Water Pollution Prevention Plan
(SWPPP)specifically identifying Best Management Practices (BMPs)
that shall be used on-site to reduce pollutants during construction
activities entering the storm drain system to the maximum extent
practical.
2) An Erosion Control Plan shall be prepared, included in Grading Plan,
and implemented for the proposed project that identifies specific
measures to control on-site and off-site erosion from the time ground
disturbing activities are initiated through completion of grading. This
Erosion Control Plan shall include the following measures at a
minimum: a) Specify the timing of grading and construction to
minimize soil exposure to rainy periods experienced in southern
California, and b) An inspection and maintenance program shall be
included to ensure that any erosion which does occur either on-site or
off-site as a result of this project will be corrected through a
remediation or restoration program within a specified time frame.
PLANNING COMMISSION RESOLUTION NO. 06-17
DRC2005-00704 —ARE ASSOCIATES
March 22, 2006
Page 10
3) During construction, temporary berms such as sandbags or gravel
dikes must be used to prevent discharge of debris orsedimentfrom the
site when there is rainfall or other runoff.
4) During construction, to remove pollutants, street cleaning will be
performed prior to storm events and after the use of water trucks to
control dust in order to prevent discharge of debris or sediment from
the site.
Post-Construction Operational:
5) The developer shall implement the BMPs identified in the Water
Quality Management Plan prepared by Gilbert Engineering in
November 2005, to reduce pollutants after construction entering the
storm drain system to the maximum extent practical.
6) Landscaping Plans shall include provisions for controlling and
minimizing the use of fertilizers/pesticides/herbicides. Landscaped
areas shall be monitored and maintained for at least two years to
ensure adequate coverage and stable growth. Plans for these areas,
including monitoring provisions for a minimum of two years, shall be
submitted to the City for review and approval prior to the issuance of
Grading Permits.
7) Prior to issuance of Building Permits, the applicant shall submit to the
City Engineer for approval of a Water Quality Management Plan
(WQMP), including a project description and identifying Best
Management Practices (BMPs) that will be used on-site to reduce
pollutants into the storm drain system to the maximum extent
practicable. The WQMP shall identify the structural and non-structural
measures consistent with the Guidelines for New Development and
Redevelopment adopted by the City of Rancho Cucamonga in June
2004.
8) Prior to issuance of Grading or Paving Permits, applicant shall obtain a
Notice of Intent.(NOI) to comply with obtaining coverage under the
National Pollutant Discharge Elimination System (NPDES) General
Construction Storm Water Permit from the State Water Resources
Control Board. Evidence that this has been obtained (i.e., a copy of
the Waste Discharger's Identification Number)shall be submitted to the
City Building Official for coverage under the NPDES General
Construction Permit.
Noise
1) Construction or grading shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday.
2) Construction or grading noise levels shall not exceed the standards
specified in Development Code Section 17.02.120-D, as measured at
the property line. Developer shall hire a consultant to perform weekly
PLANNING COMMISSION RESOLUTION NO. 06-17
DRC2005-00704 —ARE ASSOCIATES
March 22, 2006
Page 11
noise level monitoring as specified in Development Code Section
17.02.120. Monitoring at other times may be required by the Building
Official. Said consultant shall report their findings to the Building
Official within 24 hours; however, if noise levels exceed the above
standards, then the consultant shall immediately notify the Building
Official. If noise levels exceed the above standards, then construction
activities shall be reduced in intensity to a level of compliance with
above noise standards or halted.
3) Haul truck deliveries shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday. Additionally, if heavy trucks used
for hauling would exceed 100 daily trips (counting both to and from the
construction site), then the developer shall prepare a Noise Mitigation
Plan denoting any construction traffic haul routes. To the extent
feasible, the Plan shall denote haul routes that do not pass sensitive
land uses or residential dwellings.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 22ND DAY OF MARCH 2006.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY:
Pam Stew rt, Chairman
ATTEST:
Larry . H n erson, Acting Secre a
I, Larry J. Henderson, Acting Secretary of the Planning Commission of the City of Rancho
Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced,
passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular
meeting of the Planning Commission held on the 22nd day of March 2006, by the following vote-to-
wit:
AYES: COMMISSIONERS: FLETCHER, MCPHAIL, STEWART
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: MACIAS, MUNOZ
City of Rancho Cucamonga
MITIGATED NEGATIVE DECLARATION
The following Mitigated Negative Declaration is being circulated for public review in accordance with
the California Environmental Quality Act Section 21091 and 21092 of the Public Resources Code.
Project File No.: Conditional Use Permit DRC2005-00704
Public Review Period Closes: March 22, 2006
Project Name: Project Applicant: ARE Associates
25422 Trabuco Road,Suite 105-A
Lake Forest, Ca 92630
Project Location(also see attached map): Located in the General Industrial District(Subarea 2)
at the west side of Hellman Avenue, 500 feet south of Arrow Route—APN: 0209-012-07.
Project Description: A proposal to construct a recreational vehicle(RV)storage facility comprised
of 3 buildings subdivided into 196 units, with an overall area of about 127,700 square feet, with a
caretaker's residence of about 2,000 square feet (including garage) on a parcel of about 222,000
square feet (about 5 acres).
FINDING
This is to advise that the City of Rancho Cucamonga,acting as the lead agency,has conducted an
Initial Study to determine if the project may have a significant effect on the environment and is
proposing this Mitigated Negative Declaration based upon the following finding:
The Initial Study identified potentially significant effects but:
(1) Revisions in the project plans or proposals made or agreed to by the applicant before this
proposed Mitigated Negative Declaration was released for public review would avoid the
effects or mitigate the effects to a point where clearly no significant effects would occur, and
(2) There is no substantial evidence before the agency that the project, as revised, may have a
significant effect on the environment.
If adopted,the Mitigated Negative Declaration means that an Environmental Impact Report will not
be required. The factual and analytical basis for this finding is included in the attached Initial
Study. The project file and all related documents are available for review at the City of Rancho 1
Cucamonga Planning Department at 10500 Civic Center Drive (909)477-2750 or Fax (909) 477-
2847.
NOTICE
The public is invited to comment on the proposed Mitigated Negative Declaration during the
review period.
March 22, 2006
Date of Determination Adopted By
City of Rancho Cucamonga
MITIGATION MONITORING
PROGRAM
Project File No.: Conditional Use Permit DRC2005-00704—ARE Associates
This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation
measures identified in the Mitigated Negative Declaration forthe above-listed project. This program
has been prepared in compliance with State law to ensure that adopted mitigation measures are
implemented (Section 21081.6 of the Public Resources Code).
Program Components -This MMP contains the following elements:
1. Conditions of approval that act as impact mitigation measures are recorded with the action and
the procedure necessary to ensure compliance.The mitigation measure conditions of approval
are contained in the adopted Resolution of Approval for the project.
2. A procedure of compliance and verification has been outlined for each action necessary. This
procedure designates who will take action, what action will be taken and when, and to whom
and when compliance will be reported.
3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring
progresses, changes to compliance procedures may be necessary based upon
recommendations by those responsible for the program.
Program Management - The MMP will be in place through all phases of the project. The project
planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project
planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly
and proper action is taken on each mitigation. Each City department shall ensure compliance of the
conditions (mitigation) that relate to that department.
Procedures -The following steps will be followed by the City of Rancho Cucamonga.
1. A fee covering all costs and expenses, including any consultants' fees, incurred by the City in
performing monitoring or reporting programs shall be charged to the applicant.
2. A MMP Reporting Form will be prepared for each potentially significant impact and its
corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached
hereto. This procedure designates who will take action,what action will be taken and when,and
to whom and when compliance will be reported. All monitoring and reporting documentation will
be kept in the project file with the department having the original authority for processing the
project. Reports will be available from the City upon request at the following address:
City of Rancho Cucamonga - Lead Agency
Planning Department
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
Mitigation Monitoring Program
DRC2005-00704—ARE ASSOCIATES
Page 2
3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,as
determined by the project planner or responsible City department, to monitor specific mitigation
activities and provide appropriate written approvals to the project planner.
4. The project planner or responsible City department will approve, by signature and date, the
completion of each action item that was identified on the MMP Reporting Form. After each
measure is verified for compliance, no further action is required for the specific phase of
development.
5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off
as completed by the project planner or responsible City department at the bottom of the MMP
Reporting Form.
6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation
measures.The project planner is responsible for approving any such refinements or additions.
An MMP Reporting Form will be completed by the project planner or responsible City department
and a copy provided to the appropriate design, construction, or operational personnel.
7. The project planner or responsible City department has the authority to stop the work of
construction contractors if compliance with any aspects of the MMP is not occurring after written
notification has been issued. The project planner or responsible City department also has the
authority to hold certificates of occupancies if compliance with a mitigation measure attached
hereto is not occurring. The project planner or responsible City department has the authority to
hold issuance of a business license until all mitigation measures are implemented.
8. Any conditions (mitigation) that require monitoring after project completion shall be the
responsibility of the City of Rancho Cucamonga Planning Division.The Division shall require the
applicant to post any necessary funds (or other forms of guarantee)with the City. These funds
shall be used by the City to retain consultants and/or pay for City staff time to monitor and report
on the mitigation measure for the required period of time.
9. In those instances requiring long-term project monitoring, the applicant shall provide the City
with a plan for monitoring the mitigation activities at the project site and reporting the monitoring
results to the City. Said plan shall identify the reporter as an individual qualified to know whether
the particular mitigation measure has been implemented. The monitoring/reporting plan shall
conform to the City's MMP and shall be approved by the Community Development Director or
City Planner prior to the issuance of building permits.
MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III)
Project File No.: Conditional Use Permit DRC2005-00704 - Applicant: ARE Associates
Initial Study Prepared by: Mike Smith, Assistant Planner Date: February 2, 2006
ResponsibleMitigation Measures No.
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-compliance
Aesthetics
A detailed on-site Lighting Plan, including a photometric CP C Review of plans A/C 2/4
diagram, shall be reviewed and approved by the City
Planner prior to the issuance of Building Permits. Such
plan shall indicate style, illumination, location, height,
and method of shielding so as not to adversely affect
adjacent properties.
Air Quality
All construction equipment shall be maintained in good CP C Review of plans A/C 2/4
operating condition so as to reduce operational
emissions. Contractor shall ensure that all construction
equipment is being properly serviced and maintained as
per manufacturers'specifications. Maintenance records
shall be available at the construction site for City
verification.
Prior to the issuance of any Grading Permits,developer CP/BO C Review of plans C 2
shall submit construction plans to City denoting the
proposed schedule and projected equipment use.
Construction contractors shall provide evidence that low
emission mobile construction equipment will be utilized,
or that their use was investigated and found to be
infeasible for the project. Contractors shall also conform
to any construction measures imposed by the South
Coast Air Quality Management District (SCAQMD) as
well as City Planning Staff.
All paints and coatings shall meet or exceed CP C Review of plans A/C 2/4
performance standards noted in SCAQMD Rule 1113.
Paints and coatings shall be applied either by hand or
high-volume, low-pressure spray.
1 of 8
Mitigation Measures No. Responsible
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
All asphalt shall meet or exceed performance standards BO B Review of plans A/C 2
noted in SCAQMD Rule 1108.
All construction equipment shall comply with SCAQMD BO C Review of plans A/C 2/4
Rules 402 and 403. Additionally, contractors shall
include the following provisions:
• Reestablish ground cover on the construction site BO C Review of plans A/C 2/4
through seeding and watering.
• Pave or apply gravel to any on-site haul roads. BO C. Review of plans A/C 2/4
• Phase grading to prevent the susceptibility of large BO C Review of plans A/C 2/4
areas to erosion over extended periods of time.
• Schedule activities to minimize the amounts of BO C Review of plans A/C 2/4
exposed excavated soil during and after the end of
work periods.
• Dispose of surplus excavated material in BO C Review of plans A 4
accordance with local ordinances and use sound
engineering practices.
• Sweep streets according to a schedule established BO C During A 4
by the City if silt is carried over to adjacent public construction
thoroughfares or occurs as a result of hauling.
Timing may vary depending upon the time of year of
construction.
• Suspend grading operations during high winds (i.e., BO C During A 4
wind speeds exceeding 25 mph) in accordance with construction
SCAQMD Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils BO C During A 4
haul trucks or cover payloads using tarps or other Construction
suitable means.
The site shall be treated with water or other soil- BO C During A 4
stabilizing agent (approved by SCAQMD and Regional construction
Water Quality Control Board [RWQCB)) daily to reduce
Fine Particulate Matter(PM,o)emissions,in accordance
with SCAQMD Rule 403.
2 of 8
Mitigation Measures No. Responsible
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Chemical soil-stabilizers (approved by SCAQMD and BO C During A 4
RWQCB) shall be applied to all inactive construction construction
areas that remain inactive for 96 hours or more to
reduce PM,o emissions.
The construction contractor shall utilize electric or clean BO C Review of plans A/C 4
alternative fuel powered equipment where feasible.
The construction contractor shall ensure that BO C Review of plans A/C 2/4
construction-grading plans include a statement that work
crews will shut off equipment when not in use.
All industrial and commercial facilities shall post signs BO C Review of plans A 4
requiring that trucks shall not be left idling for prolonged
periods (i.e., in excess of 10 minutes).
All residential and commercial structures shall be BO C/D Review of plans C 2/4
required to incorporate thermal pane windows and
weather-stripping.
Cultural Resources
If any prehistoric archaeological resources are
encountered before or during grading,the developer will
retain a qualified archaeologist to monitor construction
activities, to take appropriate measures to protect or
preserve them for study. With the assistance of the
archaeologist, the City of Rancho Cucamonga will:
• Enact interim measures to protect undesignated CP/BO C Review of report A/D 3/4
sites from demolition or significant modification
without an opportunity for the City to establish its
archaeological value.
• Consider establishing provisions to require CP/BO C Review of report A/D 3/4
incorporation of archaeological sites within new
developments, using their special qualities as a
theme or focal point.
Pursue educating the public about the area's CP/BO C Review of report A/D 3/4
archaeological heritage.
3 of 8
Mitigation Measures No./ Responsible
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
• Propose mitigation measures and recommend CP/BO C Review of report A/D 3/4
conditions of approval to eliminate adverse project
effects on significant, important, and unique
prehistoric resources, following appropriate
California Environmental Quality Act (CEQA)
guidelines.
Prepare a technical resources management report, CP C Review of report A/D 3/4
documenting the inventory, evaluation, and
proposed mitigation of resources within the project
area. Submit one copy of the completed report,with
original illustrations, to the San Bernardino County
Archaeological Information Center for permanent
archiving.
If any paleontological resource (i.e. plant or animal CP B Review of report A/D 4
fossils) are encountered before or during grading, the
developer will retain a qualified paleontologist to monitor
construction activities, to take appropriate measures to
protect or preserve them for study. The paleontologist
shall submit a report of findings that will also provide
specific recommendations regarding further mitigation
measures (i.e., paleontological monitoring)that may be
appropriate. Where mitigation monitoring is appropriate,
the program must include, but not be limited to, the
following measures:
• Assign a paleontological monitor, trained and CP B Review of report A/D 4
equipped to allow the rapid removal of fossils with
minimal construction delay, to the site full-time
during the interval of earth-disturbing activities.
Should fossils be found within an area being cleared BO B/C Review of report A/D 4
or graded, divert earth-disturbing activities
elsewhere until the monitor has completed salvage.
If construction personnel make the discovery, the
grading contractor should immediately divert
construction and notify the monitor of the find:
4 of 8
Mitigation Measures No. Responsible • of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
• Prepare, identify,and curate all recovered fossils for CP D Review of report D 3
documentation in the summary report and transfer to
an appropriate depository (i.e., San Bernardino
County Museum).
Geology and Soils
The site shall be treated with water or other BO C During A 4
soil-stabilizing agent (approved by SCAQMD and construction
RWQCB)dailyto reduce PM10 emissions, in accordance
with SCAQMD Rule 403 or re-planted with drought
resistant landscaping as soon as possible.
Frontage public streets shall be swept according to a BO C During A 4
schedule established by the City to reduce PM,o construction
emissions associated with vehicle tracking of soil
off-site. Timing may vary depending upon the time of
year of construction.
Grading operations shall be suspended when wind BO C During A 4
speeds exceed 25 mph to minimize PM10 emissions construction
from the site during such episodes.
Chemical soil stabilizers (approved by SCAQMD and BO C During A 4
RWQCB) shall be applied to all inactive construction construction
areas that remain inactive for 96 hours or more to
reduce PM,o emissions.
Hydrology and Water Quality
Prior to issuance of Grading Permits, the permit BO B/C/D Review of plans A/C 2/4
applicant shall submit to Building Official for approval,
Storm Water Pollution Prevention Plan (SWPPP)
specifically identifying Best Management Practices
(BMPs) that shall be used on-site to reduce pollutants
during construction activities entering the storm drain
system to the maximum extent practical.
5 of 8
Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification
Date/initials Non-Compliance
An Erosion Control Plan shall be prepared, included in BO B/C/D Review of plans A/C 2/4
Grading Plan, and implemented for the proposed project
that identifies specific measures to control on-site and
off-site erosion from the time ground disturbing activities
are initiated through completion of grading. This
Erosion Control Plan shall include the following
measures at a minimum: a) Specify the timing of
grading and construction to minimize soil exposure to
rainy periods experienced in Southern California,and b)
An inspection and maintenance program shall be
included to ensure that any erosion which does occur
either on-site or off-site as a result of this project will be
corrected through a remediation or restoration program
within a specified time frame.
During construction, temporary berms such as BO B/C/D Review of plans A/C 2/4
sandbags or gravel dikes must be used to prevent
discharge of debris or sediment from the site when there
is rainfall or other runoff.
During construction, to remove pollutants, street BO B/C/D Review of plans A/C 2/4
cleaning will be performed prior to storm events and
after the use of water trucks to control dust in order to
prevent discharge of debris or sediment from the site.
Insert other specific BMPs from WQMP CE B/C/D Review of plans A/C 2/4
The developer shall implement the BMPs identified in CE B/C/D Review of plans A/C 2/4
the Water Quality Management Plan prepared by Gilbert
Engineering in November 2005) to reduce pollutants
after construction entering the storm drain system to the
maximum extent practical.
Landscaping Plans shall include provisions for BO B/C/D Review of plans A/C 2/4
controlling and minimizing the use of
fertilizers/pesticides/herbicides. Landscaped areas shall
be monitored and maintained for at least two years to
ensure adequate coverage and stable growth. Plans for
these areas, including monitoring provisions for a
minimum of two years,shall be submitted to the City for
review and approval prior to the issuance of Grading
Permits.
6 of 8
Mitigation Measures No./ Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Prior to issuance of Building Permits,the applicant shall CE B/C/D Review of plans A/C 2/4
submit to the City Engineer for approval of a Water
Quality Management Plan (WQMP), including a project
description and identifying Best Management Practices
(BMPs)that will be used on-site to reduce pollutants into
the storm drain system to the maximum extent
practicable. The WQMP shall identify the structural and
non-structural measures consistent with the Guidelines
for New Development and Redevelopment adopted by
the City of Rancho Cucamonga in June 2004.
Prior to issuance of Grading or Paving Permits, BO B/C/D Review of plans A/C 2/4
applicant shall obtain a Notice of Intent(NOI)to comply
with obtaining coverage under the National Pollutant
Discharge Elimination System (NPDES) General
Construction Storm Water Permit from the State Water
Resources Control Board. Evidence that this has been
obtained (i.e., a copy of the Waste Discharger's
Identification Number) shall be submitted to the City
Building Official for coverage under the NPDES General
Construction Permit.
Noise
Construction or grading shall not take place between the BO C During A 4
hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction
including Saturday, or at any time on Sunday or a
national holiday.
7 of 8
Mitigation Measures No. Responsible
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Construction or grading noise levels shall not exceed the BO C During A 4
standards specified in Development Code Section construction
17.02.120-D, as measured at the property line.
Developer shall hire a consultant to perform weekly
noise level monitoring as specified in Development
Code Section 17.02.120. Monitoring at other times may
be required by the Building Official. Said consultant
shall report their findings to the Building Official within 24
hours; however, if noise levels exceed the above
standards, then the consultant shall immediately notify
the Building Official. If noise levels exceed the above
standards, then construction activities shall be reduced
in intensity to a level of compliance with above noise
standards or halted.
Haul truck deliveries shall not take place between the PO/BO C During A 4/7
hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction
including Saturday, or at any time on Sunday or a
national holiday. Additionally, if heavy trucks used for
hauling would exceed 100 daily trips (counting both to
and from the construction site),then the developer shall
prepare a noise mitigation plan denoting any
construction traffic haul routes. To the extent feasible,
the plan shall denote haul routes that do not pass
sensitive land uses or residential dwellings.
Key to Checklist Abbreviations
Responsible Person Monitoring Frequency Method of Verification Sanctions
CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map
CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit
CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy
So-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order
PO- Police Captain or designee E-Operating 5-Retain Deposit or Bonds
FC-Fire Chief or designee 6-Revoke CUP
7-Citation
i:\planning\final\ceqa\mmchklst-rev1-05final.doc
8 of 8
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT#: CONDITIONAL USE PERMIT DRC2005-00704
SUBJECT: CONDITIONAL USE PERMIT
APPLICANT: ARE ASSOCIATES
WEST SIDE OF HELLMAN AVENUE, 500 FEET SOUTH OF ARROW ROUTE -
LOCATION: APN: 0209-012-07
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
A. General Requirements Completion Date
1. The applicant shall agree to defend at his sole expense any action brought against the City, its
agents,officers,or employees, because of the issuance of such approval,or in the alternative,to
relinquish such approval: The applicant shall reimburse the City, its agents, officers, or
employees, for any Court costs and attorney's fees which the City, its agents, officers, or
employees may be required by a court to pay as a result of such action. The City may,at its sole
discretion, participate at its own expense in the defense of any such action but such participation
shall not relieve applicant of his obligations under this condition.
2. Copies of the signed Planning Commission Resolution of Approval No. 06-17, Standard
Conditions, and all environmental mitigations shall be included on the plans (full size). The
sheet(s)are for information only to all parties involved in the construction/grading activities and
are not required to be wet sealed/stamped by a licensed Engineer/Architect.
B. Time Limits
1. Conditional Use Permit approval shall expire if building permits are not issued or approved use
has not commenced within 5 years from the date of approval. No extensions are allowed.
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which include
site plans,architectural elevations,exterior materials and colors,landscaping,sign program,and
grading on file in the Planning Department, the conditions contained herein, and Development
Code regulations.
2. Prior to any use of the project site or business activity being commenced thereon,all Conditions
of Approval shall be completed to the satisfaction of the City Planner.
1
Project No. DRC2005-00704
Completion Date
3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and
State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be
submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety
Department to show compliance. The buildings shall be inspected for compliance prior to
occupancy.
4. Revised site plans and building elevations incorporating all Conditions of Approval shall be
submitted for City Planner review and approval prior to the issuance of building permits.
5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.)or prior to final map approval in the case of a custom lot subdivision, or approved
use has commenced, whichever comes first.
6. Approval of this request shall not waive compliance with all sections of the Development Code,all
other applicable City Ordinances, and applicable Community or Specific Plans in effect at the
time of building permit issuance.
7. A detailed on-site lighting plan, including a photometric diagram, shall be reviewed and approved
by the City Planner and Police Department(477-2800)prior to the issuance of building permits.
Such plan shall indicate style, illumination, location, height,and method of shielding so as not to
adversely affect adjacent properties.
8. Trash receptacle(s)are required and shall meet City standards. The final design, locations,and
the number of trash receptacles shall be subject to City Planner review and approval prior to the
issuance of building permits.
9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be
located out of public view and adequately screened through the use of a combination of concrete
or masonry walls, berming,and/or landscaping to the satisfaction of the City Planner. For single-
family residential developments, transformers shall be placed in underground vaults.
10. All building numbers and individual units shall be identified in a clear and concise manner,
including proper illumination.
11. Where rock cobble is used, it shall be real river rock. Other stone veneers may be manufactured
products.
D. Building Design
1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or
projections, shall be shielded from view and the sound buffered from adjacent properties and
streets as required by the Planning Department. Such screening shall be architecturally
integrated with the building design and constructed to the satisfaction of the City Planner. Details
shall be included in building plans.
E. Parking and Vehicular Access (indicate details on building plans)
1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts
a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet
wide.
2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall
contain a 12-inch walk adjacent to the parking stall (including curb).
3. All parking spaces shall be double striped per City standards and all driveway aisles,entrances,
and exits shall be striped per City standards.
2
Project No. DRC2005-00704
Completion Date
4. Plans for any security gates shall be submitted for the City Planner, City Engineer, and Rancho
Cucamonga Fire Protection District review and approval prior to issuance of building permits.
For residential development,private gated entrances shall provide adequate turn-around space
in front of the gate and a separate visitor lane with call box to avoid cars stacking into the public
right-of-way.
F. Landscaping
1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in _/_/_
the case of residential development, shall be prepared by a licensed landscape architect and
submitted for City Planner review and approval prior to the issuance of building permits or prior
final map approval in the case of a custom lot subdivision.
2. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within
commercial and office projects, shall be specimen size trees -24-inch box or larger.
3. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking
stalls.
4. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one
tree per 30 linear feet of building.
5. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope, but less than 2:1
slope,shall be, at minimum, irrigated and landscaped with appropriate ground cover for erosion
control. Slope planting required by this section shall include a permanent irrigation system to be
installed by the developer prior to occupancy.
6. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater
slope shall be landscaped and irrigated for erosion control and to soften their appearance as
follows: one 15-gallon or larger size tree per each 150 sq.ft,of slope area, 1-gallon or larger size
shrub per each 100 sq.ft.of slope area,and appropriate ground cover. In addition, slope banks
in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or
larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in
staggered clusters to soften and vary slope plane. Slope planting required by this section shall
include a permanent irrigation system to be installed by the developer prior to occupancy.
7. For multi-family residential and non-residential development,property owners are responsible for
the continual maintenance of all landscaped areas on-site, as well as contiguous planted areas
within the public right-of-way. All landscaped areas shall be kept free from weeds and debris and
maintained in healthy and thriving condition,and shall receive regular pruning,fertilizing,mowing,
and trimming. Any damaged,dead,diseased,or decaying plant material shall be replaced within
30 days from the date of damage.
8. The final design of the perimeter parkways,walls,landscaping,and sidewalks shall be included in
the required landscape plans and shall be subject to City Planner review and approval and
coordinated for consistency with any parkway landscaping plan which may be required by the
Engineering Department.
9. Special landscape features such as mounding, alluvial rock, specimen size trees, meandering
sidewalks (with horizontal change), and intensified landscaping.
10. Landscaping and irrigation systems required to be installed within the public right-of-way on the
perimeter of this project area shall be continuously maintained by the developer.
11. Landscaping and irrigation shall be designed to conserve water through the principles of
Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code.
3
Project No.DRC2005-00704
Completion Date
G. Signs
1. The signs indicated on the submitted plans are conceptual only and not a part of this approval.
Any signs proposed for this development shall comply with the Sign Ordinance and shall require
separate application and approval by the Planning Department prior to installation of any signs.
H. Environmental
1. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures, including monitoring and reporting. Applicant shall be required to
post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the
amount of $495.00 prior to the issuance of building permits, guaranteeing satisfactory
performance and completion of all mitigation measures. These funds maybe used by the City to
retain consultants and/or pay for City staff time to monitor and report on the mitigation measures.
Failure to complete all actions required by the approved environmental documents shall be
considered grounds for forfeit.
I. Other Agencies
1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location
of mailboxes. Multi-family residential developments shall provide a solid overhead structure for
mailboxes with adequate lighting. The final location of the mailboxes and the design of the
overhead structure shall be subject to City Planner review and approval prior to the issuance of
building permits.
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT, (909)477-2710,
FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
J. General Requirements
1. Submit five complete sets of plans including the following:
a. Site/Plot Plan;
b. Foundation Plan;
C. Floor Plan;
d. Ceiling and Roof Framing Plan;
e. Electrical Plans(2 sets, detached)including the size of the main switch, number and size
of service entrance conductors, panel schedules, and single line diagrams;
f. Plumbing and Sewer Plans, including isometrics,underground diagrams,water and waste
diagram, sewer or septic system location, fixture units, gas piping, and heating and air
conditioning; and
g. Planning Department Project Number(DRC2005-00704)clearly identified on the outside of
all plans.
2. Submit two sets of structural calculations, energy conservation calculations, and a soils report.
Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal.
3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to
the City prior to permit issuance.
4. Separate permits are required for fencing and/or walls.
4
Project No. DRC2005-00704
Completion Date
5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the
Building and Safety Department.
K. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be
marked with the project file number(i.e., DRC2005-00704). The applicant shall comply with the
latest adopted California Codes, and all other applicable codes, ordinances, and regulations in
effect at the time of permit application. Contact the Building and Safety Department for
availability of the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new commercial or industrial development project or
major addition,the applicant shall pay development fees at the established rate. Such fees may
include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation
Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program
deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to
the Building and Safety Department prior to permits issuance.
3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map
recordation and prior to issuance of building permits.
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday
through Saturday, with no construction on Sunday or holidays.
5. Construct trash enclosure(s) per City Standard (available at the Planning Department's public
counter).
L. New Structures
1. Provide compliance with the California Building Code (CBC) for property line clearances
considering use, area, and fire-resistiveness.
2. Provide compliance with the California Building Code for required occupancy separations.
3. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC
Section 1505.
4. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A
5. Openings in exterior walls shall be protected in accordance with CBC Table 5-A.
M. Grading
1. Grading of the subject property shall be in accordance with California Building Code,City Grading
Standards, and accepted grading practices. The final grading plan shall be in substantial
conformance with the approved grading plan.
2. A soils report shall be prepared by a qualified engineer licensed by the State of California to
perform such work.
3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the
time of application for grading plan check.
4. The final grading, appropriate certifications and compaction reports shall be completed,
submitted, and approved by the Building and Safety Official prior to the issuance of building
permits.
5
Project No. DRC2005-00704
Completion Date
5. A separate grading plan check submittal is required for all new construction projects and for
existing buildings where improvements being proposed will generate 50 cubic yards or more of
combined cut and fill. The grading plan shall be prepared, stamped,and signed by a California
registered Civil Engineer.
APPLICANT SHALL CONTACT THE ENGINEERING DEPARTMENT, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
N. Dedication and Vehicular Access
1. Easements for public sidewalks and/or street trees placed outside the public right-of-way shall be
dedicated to the City.
O. Street Improvements
1. Pursuant to City Council Resolution No.88-557,no person shall make connections from a source
of energy,fuel or power to any building service equipment which is regulated by technical codes
and for which a permit is required unless, in addition to any and all other codes, regulations and
ordinances, all improvements required by these conditions of development approval have been
completed and accepted by the City Council, except:that in developments containing more than
one building or unit, the development may have energy connections made to a percentage of
those buildings, or units proportionate to the completion of improvements as required by
conditions of approval of development. In no case shall more than 95 percent of the buildings or
units be connected to energy prior to completion and acceptance of all improvements required by
these conditions of approval of development.
2. Construct the following perimeter street improvements including, but not limited to:
Curb& A.C. Side- Drive Street Street Comm Median Bike
Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other
Hellman Avenue X (b) X X X X (e)(t)(g)
Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement
reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk
shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be
provided for this item. (e) Fire access entry by the Fire District and Building Department. (f)
Traffic signing and striping. (g) Curb wall and other floor protection facilities.
3. Improvement Plans and Construction:
a. Street improvement plans, including street trees,street lights,and intersection safety lights _/_/_
on future signal poles, and traffic signal plans shall be prepared by a registered Civil
Engineer and shall be submitted to and approved by the City Engineer. Security shall be
posted and an agreement executed to the satisfaction of the City Engineer and the City
Attorney guaranteeing completion of the public and/or private street improvements,prior to
final map approval or the issuance of building permits, whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a
construction permit shall be obtained from the City Engineer's Office in addition to any
other permits required.
C. Pavement striping,marking,traffic signing, street name signing,traffic signal conduit,and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction
project along major or secondary streets and at intersections for future traffic signals and
interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside
of BCR, ECR, or any other locations approved by the City Engineer
6
Project No. DRC2005-00704
Completion Date
Notes:
1) . Pull boxes shall be No.6 at intersections and No.5 along streets,a maximum of 200
feet apart, unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch galvanized steel with pull rope or as specified.
e. Handicapped access ramps shall be installed on all corners of intersections per City
Standards or as directed by the City Engineer.
f. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A cash
deposit shall be provided to cover the cost of grading and paving,which shall be refunded
upon completion of the construction to the satisfaction of the City Engineer.
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be
installed to City Standards, except for single family residential lots.
h. Street names shall be approved by the City Planner prior to submittal for first plan check.
4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in
accordance with the City's street tree program.
5. Install street trees per City street tree design guidelines and standards as follows. The completed
legend (box below) and construction notes shall appear on the title page of the street
improvement plans. Street improvement plans shall include a line item within the construction
legend stating: "Street trees shall be installed per the notes and legend on sheet_(typically
sheet 1)." Where public landscape plans are required, tree installation in those areas shall be
per the public landscape improvement plans.
The City Engineer reserves the right to adjust tree species based upon field conditions and other
variables. For additional information, contact the Project Engineer.
Min.
Grow
Street Name Botanical Name Common Name Space Spacing Size Qty.
Hellman Avenue Eucalyptus polyanthemos Silver Dollar Gum 5 ft. 30 ft.o.c. 5-gal. Fill-in
Under utilities Lagerstroemia indica Crape Myrtle Hybrid— 3 ft. 20 ft.o.c. 24-box
"Tuscarora" Pink
Construction Notes for Street Trees:
1) All street trees are to be planted in accordance with City standard plans.
2) Prior to the commencement of any planting, an agronomic soils report shall be furnished to
the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil
amendments, as determined by the City inspector.
3) All street trees are subject to inspection and acceptance by the Engineering Department.
4) Street trees are to be planted per public improvement plans only.
6. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with
adopted policy. On collector or larger streets, lines of sight shall be plotted for all project
intersections, including driveways. Local residential street intersections and commercial or
industrial driveways may have lines of sight plotted as required.
P. Public Maintenance Areas
1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting
Districts shall be filed with the City Engineer prior to final map approval or issuance of building
permits whichever occurs first. Formation costs shall be borne by the developer.
7
Project No.DRC2005-00704
Completion Date
Q. Drainage and Flood Control
1. The project(or portions thereof)is located within a Flood Hazard Zone;therefore,flood protection
measures shall be provided as certified by a registered Civil Engineer and approved by the City
Engineer.
2. A final drainage study shall be submitted to and approved by the City Engineer prior to final map
approval or the issuance of building permits,whichever occurs first. All drainage facilities shall
be installed as required by the City Engineer.
R. Utilities
1. Provide separate utility services to each parcel including sanitary sewerage system,water, gas,
electric power, telephone, and cable TV (all underground) in accordance with the Utility
Standards. Easements shall be provided as required.
2.. The developer shall be responsible for the relocation of existing utilities as necessary.
3. Water and sewer plans shall be designed and constructed to meet the requirements of the
Cucamonga Valley Water District(CVW D), Rancho Cucamonga Fire Protection District,and the
Environmental Health Department of the County of San Bernardino. A letter of compliance from
the CVW D is required prior to final map approval or issuance of permits,whichever occurs first.
Such letter must have been issued by the water district within 90 days prior to final map approval
in the case of subdivision or prior to the issuance of permits in the case of all other residential
projects.
4. Approvals have not been secured from all utilities and other interested agencies involved.
Approval of the final parcel map will be subject to any requirements that may be received from
them.
S. General Requirements and Approvals
1. A non-refundable deposit shall be paid to the City, covering the estimated operating costs for all
new streetlights for the first six months of operation,prior to final map approval or prior to building
permit issuance if no map is involved.
2. Prior to the issuance of building permits,a Diversion Deposit and related administrative fees shall
be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if
at least 50% of all wastes generated during construction and demolition are diverted from
landfills, and appropriate documentation is provided to the City. Form CD-1 shall be submitted to
the Engineering Department when the first building permit application is submitted to Building and
Safety. Form CD-2 shall be submitted to the Engineering Department within 60 days following
the completion of the construction and/or demolition project.
APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
T. Security Lighting
1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power.
These areas should be lighted from sunset to sunrise and on photo sensored cell.
2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with
direct lighting to be provided by all entryways. Lighting shall be consistent around the entire
development.
3. Lighting in exterior areas shall be in vandal-resistant fixtures.
8
Project No.DRC2005-00704
Completion Date
U. Security Hardware
1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within
40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used.
2. All garage or rolling doors shall have slide bolts or some type of secondary locking devices.
3. All roof openings giving access to the building shall be secured with either iron bars,metal gates,
or alarmed.
V. Security Fencing
1. All businesses or residential communities with security fencing and gates will provide the police
with a keypad access and a unique code.The initial code is to be submitted to the Police Crime
Prevention Unit along with plans. If this code is changed due to a change in personnel or for any
other reason, the new code must be supplied to the Police via the 24-hour dispatch center at
(909)941-1488 or by contacting the Crime Prevention Unit at(909)477-2800 extension 2474 or
extension 2475.
W. Windows
1. All sliding glass windows shall have secondary locking devices and should not be able to be lifted
from frame or track in any manner.
2. Storefront windows shall be visible to passing pedestrians and traffic.
3. Security glazing is recommended on storefront windows to resist window smashes and impede
entry to burglars.
X. Building Numbering
1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime
visibility.
2. Developer shall paint roof top numbers on one or more roofs of this development. They shall be
a minimum of three feet in length and two feet in width and of contrasting color to background.
The stencils for this purpose are on loan at the Rancho Cucamonga Police Department.
3. At the entrances of commercial or residential complexes, an illuminated map or directory of
project shall be erected with vandal-resistant cover. North shall be at the top and so indicated.
Sign shall be in compliance with Sign Ordinance, including an application for a Sign Permit and
approval by the Planning Department.
4. All developments shall submit an 8 Yz'x 11"sheet with the numbering pattern of all multi-tenant
developments to the Police Department.
Y. Alarm Systems
1. Install a burglar alarm system and a panic alarm if needed. Instructing management and
employees on the operation of the alarm system will reduce the amount of false alarms and in
turn save dollars and lives.
2. Alarm companies shall be provided with the 24-hour Sheriffs dispatch number: (909)941-1488.
APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION
PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING
CONDITIONS:
SEE ATTACHED
9
Rancho Cucamonga Fire Protection District
Fire Construction Services
STANDARD CONDITIONS
November 21, 2005
Hellman Ave RV Storage
SWC Hellman Ave & Arrow Rte
DRC2005-00704
THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT.
FSC-1 Public and Private Water Supply
I. Design guidelines for Fire Hydrants: The following provides design guidelines for the spacing and location
of fire hydrants:
a. The maximum distance between fire hydrants in commercial/industrial projects is 300-feet. No portion
of the exterior wall shall be located more than 150-feet from an approved fire hydrant. For cul-de-
sacs, the distance shall not exceed 100-feet.
b. Fire hydrants are to be located. The preferred locations for fire hydrants are:
1. At the entrance(s) to a commercial, industrial or residential project from the public roadways.
2. At intersections.
3. On the right side of the street, whenever practical and possible.
4. As required by the Fire Safety Division to meet operational needs of the Fire District.
5. A minimum of forty-feet (40') from any building.
c. If any portion of a facility or building is located more than 150-feet from a public fire hydrant
measured on an approved route around the exterior of the facility or building, additional private or
public fire hydrants and mains capable of supplying the required fire flow shall be provided.
d. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof.
FSC-2 Fire Flow
I. The required minimum fire flow for this project, when automatic fire sprinklers are installed is 2,500
gallons per minute at a minimum residual pressure of 20-pounds per square inch. This flow reflects a 50-
percent reduction for the installation of an approved automatic fire sprinkler system in accordance with
NFPA 13 with central station monitoring. This requirement is made in accordance with the California Fire
Code Appendix III-A, as adopted by the Fire District Ordinances.
2. Public fire hydrants located within a 500-foot radius of the proposed project may be used to provide the
required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent property
shall not be used to provide required fire flow.
3. Firewater plans are required for all projects that must extend the existing water supply to or onto the site.
Building permits will not be issued until fire protection water plans are approved.
4. On all site plans to be submitted for review, show all fire hydrants located within 600-feet of the proposed
project site.
FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems
1. Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant shall submit plans,
specifications and calculations for the fire sprinkler system underground supply piping. Approval of the
underground supply piping system must be obtained prior to submitting the overhead fire sprinkler system
plans.
FSC-4 Requirement for an Automatic Fire Sprinkler Systems
Rancho Cucamonga Fire District Ordinance 15, the 2001 California Fire Code and/or any other applicable
standards require an approved automatic fire sprinkler system to be installed in:
1. Commercial or industrial structures greater than 7,500 square feet.
2. When buildings do not meet the requirements of the 2001 California Building Code and the RCFPD Fire
Department Access - Fire Lane Standard 9-7
3. When any applicable code or standard requires the structure to be sprinklered.
FSC-5 Fire Alarm System
1. Prior to installation of the building's fire alarm system, Fire Construction Services' approval and a building
permit must be obtained. Plans and specifications shall be submitted to Fire Construction Services in
accordance with RCFPD Fire Alarm Standard #10-6.
2. Based on the number of sprinkler heads; the sprinkler system is required to monitored by a listed central
station fire alarm system.
FSC-6 Fire District Site Access
Fire District access roadways include public roads, streets and highways, as well as private roads, streets drive
aisles and/or designated fire lanes. Please reference the RCFPD Fire Lanes Standard 9-7
1. Location of Access: All portions of the structures 151 story exterior wall shall be located within 150-feet of
Fire District vehicle access, measure on an approved route around the exterior of the building. Landscaped
areas, unpaved changes in elevation, gates and fences are deemed obstructions.
2. Specifications for private Fire District access roadways per the RCFPD Standards are:
a. The minimum unobstructed width is 26-feet.
b. The maximum inside turn radius shall be 20-feet.
c. The minimum outside tum radius shall be 46-feet.
d. The minimum radius for cul-de-sacs is 45-feet.
e. The minimum vertical clearance is 14-feet, 6-inches.
f. At any private entry median, the minimum width of traffic lanes shall be 20-feet on each side.
g. The angle of departure and approach shall not exceed 9-degrees or 20 percent.
h. The maximum grade of the driving surface shall not exceed 12%.
i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW).
j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a minimum of 14-feet, 6-
inches from the ground up. Vegetation shall not be allowed to obstruct Fire Department apparatus.
3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be provided as
follows:
a. In buildings without high-piled storage, access shall be provided in accordance with the 2001
California Building Code, Fire and/or any other applicable standards.
b. In buildings with high-piled storage access doors shall be provided in each 100 lineal feet or major
fraction thereof, of the exterior wall that faces the required access roadways. When railways are
installed provisions shall be made to maintain Fire District access to all required openings.
4. Access Walkways: Hardscaped access walkways shall be provided from the fire apparatus access road to
all required building exterior openings.
5. Commercial/Industrial Gates: Any gate installed across a Fire Department access road shall be in
accordance with Fire District Standard #9-2. The following design requirements apply:
a. Prior to the fabrication and installation of the gates, plans are required to be submitted to Fire
Construction Services (FCS) for approval. Upon the completion of the installation and before placing
the gates in service, inspection and final acceptance must be requested from FCS.
b. Gates must slide open horizontally or swing inward.
c. Gates may be motorized or manual.
2
d. When fully open, the minimum clearance dimension of drive access shall be 20 feet.
e. Manual gates must be equipped with a RCFPD lock available at the Fire Safety Office for$20.00.
f Motorized gates must open at the rate of one-foot per second.
g. The motorized gate actuation mechanism must be equipped with a manual override device and a fail-
safe or battery backup feature to open the gate or release the locking Mechanism in case of power
failure or mechanical malfunction.
h. Motorized gates shall be equipped with a Knox override key switch. The switch must be installed
outside the gate in a visible and unobstructed location.
i. For motorized gates, a traffic loop device must be installed to allow exiting from the complex.
j. If traffic pre-emption devices (TPD) are to be installed, the device, location and operation must be
approved by the Fire Chief prior to installation. Bi-directional or multiple sensors may be required due
to complexity of the various entry configurations.
6. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site plan illustrating
the proposed delineation that meets the minimum Fire District standards shall be included in the
architectural plans submitted to B&S for approval.
7. Approved Fire Department Access: Any approved mitigation measures must be clearly noted on the site
plan. A copy of the approved Alternative Method application, if applicable, must be reproduced on the
architectural plans submitted to B&S for plan review.
FSC-10 Occupancy and Hazard Control Permits
Listed are those Fire Code permits commonly associated with the business operations and/or building
construction. Plan check submittal is required with the permit application for approval of the permit; field
inspection is required prior to permit issuance. General Use Permit shall be required for any activity or
operation not specifically described below, which in the judgment of the Fire Chief is likely to produce
conditions that may be hazardous to life or property.
• Compressed Gases
• Cryogenics
• Flammable and Combustible Liquids
• Hazardous Materials
• Tents, Canopies and/or Air Supported Structures
• Liquefied Petroleum Gases
• LPG or Gas Fuel Vehicles in Assembly Buildings
FSC-12 Hazardous Materials - Submittal to Fire Construction Services
Plans shall be submitted and approved prior to construction of buildings and/or the installation of equipment
designed to store, use or dispense hazardous materials in accordance with the 2001 California Building, Fire,
Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances FD15 and FD39 and other implemented and/or
adopted standards.
FSC-13 Alternate Method Application
Fire Construction Services staff and the Fire Marshal will review all requests for alternate method, when
submitted. The request must be submitted on the Fire District "Application for Alternate Method" form along
with supporting documents and payment of the $92 review fee.
FCS-15 Annexation of the parcel map: Annexation of the parcel map into the Community Facilities District
#85-1 or#88-1 is required prior to the issuance of grading or building permits.
Chronological Summary of RCFPD Standard Conditions
PRIOR TO ISSUANCE OF BUILDING PERMITS —Please complete the following prior to the issuance
of any building permits:
3
1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans, specifications, flow
test data and calculations for the private water main system for review and approval by the Fire District.
Plans and installation shall comply with Fire District Standards. Approval of the on-site (private) fire
underground and water plans is required prior to any building permit issuance for any structure on the site.
Private on-site combination domestic and fire supply system must be designed in accordance with RCFPD
Standards # 9-4, #10-2 and #10-4. The Building & Safety Division and Fire Construction Services will
perform plan checks and inspections.
All private on-site fire hydrants shall be installed, flushed and operable prior to delivering any combustible
framing materials to the site. Fire construction Services will inspect the installation, witness hydrant
flushing and grant a clearance before lumber is dropped:
2. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the locations
of all new public fire hydrants for the review and approval by the Fire District and CCWD. On the plan,
show all existing fire hydrants within a 600-foot radius of the project. Please reference the RCFPD Water
Plan Submittal Procedure Standard 9-8.
All required public fire hydrants shall be installed, flushed and operable prior to delivering any
combustible framing materials to the site. CCWD personnel shall inspect the installation and witness the
hydrant flushing. Fire Construction Services shall inspect the site after acceptance of the public water
system by CCWD. Fire Construction Services must grant a clearance before lumber is dropped.
3. Construction Access: The access roads must be paved in accordance with all the requirements of the
RCFPD Fire Lane Standard #9-7. All temporary utilities over access roads must be installed at least 14' 6"
above the finished surface of the road.
4. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is responsible for
obtaining the fire flow information from CCWD and submitting the letter to Fire Construction Services.
PRIOR TO THE RELEASE OF TEMPORARY POWER
The building construction must be substantially completed in accordance with Fire Construction Services'
"Temporary Power Release Checklist and Procedures".
PRIOR TO OCCUPANCY OR FINAL INSPECTION—Please complete the following:
1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire
hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga Engineering
Standard Plan 134, "Installation of Reflective Hydrant Markers". On private property, the markers shall be
installed at the centerline of the fire access road, at each hydrant location.
2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in the presence
of Fire Construction Services, shall conduct a test of the most hydraulically remote on-site fire hydrants.
The underground fire line contractor, developer and/or owner are responsible for hiring the company to
perform the test. A final test report shall be submitted to Fire Construction Services verifying the fire flow
available. The fire flow available must meet or exceed the required fire flow in accordance with the
California Fire Code.
3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler system(s)
shall be tested and accepted by Fire Construction Services.
4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler
monitoring system must be tested and accepted by Fire Construction Services. The fire sprinkler
monitoring system shall be installed, tested and operational immediately following the completion of the
fire sprinkler system (subject to the release of power).
5. Fire Suppression Systems and/or other special hazard protection systems shall be inspected, tested and
accepted by Fire Construction Services before occupancy is granted and/or equipment is placed in service.
6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm system shall be
installed, inspected, tested and accepted by Fire Construction Services.
4
7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular gates must be
inspected, tested and accepted in accordance with RCFPD Standards #9-1 or#9-2 by Fire Construction
Services.
8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access roadways
must be installed in accordance with the approved plans and acceptable to Fire Construction Services.
The CC&R's, the reciprocal agreement and/or other approved documents shall be recorded and contain an
approved fire access roadway map with provisions that prohibit parking, specify the method of
enforcement and identifies who is responsible for the required annual inspections and the maintenance of
all required fire access roadways.
9. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and multi-family
buildings shall post the address with minimum 8-inch numbers on contrasting background, visible from the
street and electrically illuminated during periods of darkness. When the building setback exceeds 200 feet
from the public street, an additional non-illuminated 6-inch minimum number address shall be provided at
the property entrance. Larger address numbers will be required on buildings located on wide streets or
built with large setbacks in multi-tenant commercial and industrial buildings. The suite designation
numbers and/or letters shall be provided on the front and back of all suites.
10. Hazardous Materials: Prior to the issuance of a Certificate of Occupancy, the applicant must demonstrate
(in writing from the County) that the facility has met or is meeting the Risk Management Plan (RMP) or
Business Emergency/Contingency Plan with the San Bernardino County Fire Department, Hazardous
Materials/Emergency Response and Enforcement Division. The applicant must also obtain inspection and
acceptance by Fire Construction Services.
11. Confidential Business Occupancy Information: The applicant shall complete the Rancho Cucamonga
Fire District "Confidential Business Occupancy Information" form. This form provides contact information
for Fire District use in the event of an emergency at the subject building or property. This form must be
presented to the Fire Construction Services Inspector.
12. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, a 8 ''/1" x 11" or 11" x 17" site
plan of the site in accordance with RCFPD Standard #13-1 shall be revised by the applicant to reflect the
actual location of all devices and building features as required in the standard. The site plan must be
reviewed and accepted by the Fire Inspector.