RESOLUTION NO. 06-22
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA,APPROVING TENTATIVE TRACT
MAP SUBTT17435, A REQUEST TO SUBDIVIDE 14.77 GROSS ACRES
OF LAND INTO 10 NUMBERED LOTS AND 2 LETTERED LOTS FOR THE
SALE OF 135 RESIDENTIAL CONDOMINIUM UNITS IN THE FLOOD
CONTROL DISTRICT(MIXED USE DISTRICT PROPOSED),LOCATED ON
THE SOUTH SIDE OF CHURCH STREET, BETWEEN CENTER AVENUE
AND HAVEN AVENUE;AND MAKING FINDINGS IN SUPPORT THEREOF
-APN: 1077-401-35 AND 36.
A. Recitals.
1. Pitassi Architects, Inc. filed an application for the approval of Tentative Tract Map
SUBTT17435, as described in the title of this Resolution. Hereinafter in this Resolution,the subject
Tentative Tract Map SUBTT17435 request is referred to as "the application."
2. On April 12, 2006, the Planning Commission of the City of Rancho Cucamonga
conducted a duly noticed public hearing on the application and concluded said hearing on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning
Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing on April 12, 2006, including written and oral staff reports,together
with public testimony, this Commission hereby specifically finds as follows:
a. The application applies to the property located on the south side of Church Street,
between Center Avenue and Haven Avenue, with a street frontage of 463 feet on Haven Avenue
and lot depth of 1,234 feet along Church Avenue and is presently improved with an abandoned
retention basin; and;
b. The property to the north of the subject site is designated Low Density Residential
and is developed single-family residential; the property to the west is designated Low Density
Residential and is developed single-family residential; the property to the east is designated Office
Space and is vacant; and the property to the south is designated Industrial Park and is Office and
Institutional (CVWD Equipment Maintenance Yard) Industrial Park.
3. Based upon the substantial evidence presented to this Commission during the
above-referenced public hearing and upon the specific findings of facts set forth in paragraphs 1
and 2 above, this Commission hereby finds and concludes as follows:
PLANNING COMMISSION RESOLUTION NO. 06-22
TENTATIVE TRACT MAP SUBTT17435 - PITASSI ARCHITECTS, INC
April 12, 2006
Page 2
a. That Tentative Tract Map SUBTT17435 is consistent with the General Plan,
Development Code, and any applicable specific plans; and
b. The design or improvements of Tentative Tract Map SUBTT17435 is consistent
with the General Plan, Development Code, and any applicable specific plans; and
C. The site is physically suitable for the type of development proposed; and
d. The design of the subdivision is not likely to cause substantial environmental
damage and avoidable injury to humans and wildlife or their habitat; and
e. Tentative Tract Map SUBTT17435 is not likely to cause serious public health
problems; and
f. The design of Tentative Tract Map SUBTT17435 will not conflict with any easement
acquired by the public at large, now of record, for access through or use of the property within the
proposed subdivision.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration,together with all written and oral reports included for the environmental assessment for
the application,the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and
Monitoring Program attached hereto, and incorporated herein by this reference, based upon the
findings as follows:
a. That the Mitigated Negative Declaration has been prepared in compliance with the
California Environmental Quality Act(CEQA)of 1970, as amended, and the State CEQA guidelines
promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared,
therefore, reflect the independent judgment of the Planning Commission; and, further, this
Commission has reviewed and considered the information contained in said Mitigated Negative
Declaration with regard to the application.
b. Although the Mitigated Negative Declaration identifies certain significant
environmental effects that will result if the project is approved, all significant effects have been
reduced to an acceptable level by imposition of mitigation measures on the project which are listed
below as conditions of approval.
C. Pursuant to the provisions of Section 753.5(c) of Title 14 of the California Code of
Regulations, the Planning Commission finds as follows: In considering the record as a whole, the
Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the
proposed project will have potential for an adverse impact upon wildlife resources or the habitat
upon which wildlife depends. Further, based upon the substantial evidence contained in the
Mitigated Negative Declaration, the staff reports and exhibits, and the information provided to the
Planning Commission during the public hearing, the Planning Commission hereby rebuts the
presumption of adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code
of Regulations.
5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth
below and in the Standard Conditions, attached hereto and incorporated herein by this reference.
PLANNING COMMISSION RESOLUTION NO. 06-22
TENTATIVE TRACT MAP SUBTT17435 - PITASSI ARCHITECTS, INC
April 12, 2006
Page 3
Planning Department
1) Approval of Tentative Tract Map SUBTT17435 is granted subject to
approval and adoption by the City Council of the City of Rancho
Cucamonga of General Plan Amendment DRC2004-01197 and
Development District Amendment DRC2005-00001.
Engineering Department
1) Haven Avenue frontage improvements to be in accordance with City
"Major Divided Highway" standards as required and including:
(7 1/2-foot median, 12 feet, 11 feet, 11 feet thru lanes, 5-foot bike lane
and 11-foot bus bay south of Church Street or 7 1/2 -foot median, 13
feet, 11 feet, 11 feet thru lanes, 5-foot bike lane mid-block).
a) Provide a bus bay/deceleration/right-turn lane on Haven Avenue
to entrance.
b) Revise traffic signing and striping and protect R26(s) "No
Stopping" signs along Haven Avenue, as required.
c) Protect or provide additional Traffic Signal equipment, as
required and in accordance with Focused Traffic Study.
2) Church Street frontage improvements to be in accordance with City
"Secondary" standards as required and including:
a) Provide curb and gutter, sidewalk, 9500 Lumens HPSV street
lights, street trees, and drive approach as required.
b) Provide traffic signing and striping and protect R26(s) "No
Stopping" signs along Church Street as required.
c) Re--stripe Church Street to provide left turn pockets at project
entrances at Marine and Cartilla Avenues.
d) Protect or replace existing Traffic Signal equipment as required.
3) Center Avenue frontage improvements to be in accordance with City
"Collector" standards as required and including:
a) Provide curb and gutter, sidewalk, 5800 Lumens HPSV street
lights and street trees, as required.
b) Protect R26 "No Parking" signs along Center Avenue, as
required.
c) Revise traffic signing and striping, as required.
d) No residential driveways to Center Avenue-
PLANNING COMMISSION RESOLUTION NO. 06-22
TENTATIVE TRACT MAP SUBTT17435 - PITASSI ARCHITECTS, INC
April 12, 2006
Page 4
4) An in-lieu fee as contribution to the future undergrounding of the
existing overhead utilities (telecommunications and electrical, except
for the 66 KV electrical) on the opposite side of Church Street shall be
paid to the City prior to map approval or issuance of Building Permits,
whichever comes first. The fee shall be one-half the City adopted unit
amount times the length of the project frontage from the center of
Church Street and Haven Avenue to the center of Church Street and
Center Avenue.
5) All service utility lines crossing Church Street shall be undergrounded.
6) Provide a 25-foot wide public storm drain easement for the proposed
storm drain. Provide a blanket access easement over the remainder
parcel for City maintenance crews to access manholes. Also provide a
private storm drain easement for that portion of storm drain that serves
Tentative Tract Map SUBTT17435 over the remainder parcel.
7) Dedicate vehicle restriction rights to the City except at location
approved with the Development Site Plan.
8) BMPs proposed in the Water Quality Management Plan must be
reviewed and approved by the City Engineer.
9) As required by the City Engineer, install and/or coordinate with City
capital improvement project the installation of public improvements
along the north side of Church Street from Cornell Court to easterly
boundary of Church Street Park. Improvements may include, but are
not limited to, curb and gutter, street pavement, sidewalk, drive
approaches, street lights, and any private improvements to restore
adjacent properties. Also install traffic signal for the intersection of
Church Street and Center Avenue. All improvements are eligible for
Transportation fee credit and or reimbursement.
Environmental Mitigation
Air Quality
1) All construction equipment shall be maintained in good operating
condition so as to reduce operational emissions. Contractor shall
ensure that all construction equipment is being properly serviced and
maintained as per manufacturers'specifications. Maintenance records
shall be available at the construction site for City verification.
2) Prior to the issuance of any grading permits, developer shall submit
construction plans to City denoting the proposed schedule and
projected equipment use. Construction contractors shall provide
evidence that low emission mobile construction equipment will be
utilized, or that their use was investigated and found to be infeasible for
the project. Contractors shall also conform to any construction
PLANNING COMMISSION RESOLUTION NO. 06-22
TENTATIVE TRACT MAP SUBTT17435 - PITASSI ARCHITECTS, INC
April 12, 2006
Page 5
measures imposed by the South Coast Air Quality Management District
(SCAQMD) as well as City Planning Staff.
3) All paints and coatings shall meet or exceed performance standards
noted in SCAQMD Rule 1113. Paints and coatings shall be applied
either by hand or high volume, low-pressure spray.
4) All asphalt shall meet or exceed performance standards noted in
SCAQMD Rule 1108.
5) All construction equipment shall complywith SCAQMD Rules 402 and
403. Additionally, contractors shall include the following provisions:
• Reestablish ground cover on the construction site through
seeding and watering.
• Pave or apply gravel to any on-site haul roads.
• Phase grading to prevent the susceptibility of large areas to
erosion over extended periods of time.
• Schedule activities to minimize the amounts of exposed
excavated soil during and after the end of work periods.
• Dispose of surplus excavated material in accordance with local
ordinances and use sound engineering practices.
• Sweep streets according to a schedule established by the City if
silt is carried over to adjacent public thoroughfares or occurs as a
result of hauling. Timing may vary depending upon time of year
of construction.
• Suspend grading operations during high winds(i.e.,wind speeds
exceeding 25 mph) in accordance with Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils haul trucks
or cover payloads using tarps or other suitable means.
6) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and Regional Water Quality Control Board
[RWQCB]) daily to reduce PM10 emissions, in accordance with
SCAQMD Rule 403). .
7) Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be
applied to all inactive construction areas that remain inactive for 96
hours or more to reduce PM10 emissions.
8) The construction contractor shall utilize electric or clean alternative fuel
powered equipment where feasible.
9) The construction contractor shall ensure that construction-grading
plans include a statement that work crews will shut off equipment when
not in use.
PLANNING COMMISSION RESOLUTION NO. 06-22
TENTATIVE TRACT MAP SUBTT17435 - PITASSI ARCHITECTS, INC
April 12, 2006
Page 6
10) All industrial and commercial facilities shall post signs requiring that
trucks shall not be left idling for prolonged periods (i.e., in excess of 10
minutes).
11) All industrial and commercial facilities shall designate preferential
parking for vanpools.
12) All industrial and commercial site tenants with 50 or more employees
shall be required to post both bus and Metrolink schedules in
conspicuous areas.
13) All industrial and commercial site tenants with 50 or more employees
shall be required to configure their operating schedules around the
Metrolink schedule to the extent reasonably feasible.
14) All residential and commercial structures shall be required to
incorporate high efficiency/low polluting heating, air conditioning,
appliances, and water heaters.
15) All residential and commercial structures shall be required to
incorporate thermal pane windows and weather-stripping.
Biological Resources
1) Prior to the commencement of project grading, the project applicant
shall submit evidence to the City that all permit requirements mandated
by the U.S. Army Corps of Engineers, the California Department of
Fish and Game, and/or the Regional Water Quality Control Board,
Santa Ana Region, have been satisfied.
Geology and Soils
1) The site shall be treated with water or other soil-stabilizing agent
(approved by SCAQMD and RWQCB)daily to reduce PM10 emissions,
in accordance with SCAQMD Rule 403 or re-planted with drought
resistant landscaping as soon as possible.
2) Frontage public streets shall be swept according to a schedule
established by the City to reduce PM10 emissions associated with
vehicle tracking of soil off-site. Timing may vary depending upon time
of year of construction.
3) Grading operations shall be suspended when wind speeds exceed
25 mph to minimize PM10 emissions from the site during such
episodes.
4) Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be
applied to all inactive construction areas that remain inactive for 96
hours or more to reduce PM10 emissions.
PLANNING COMMISSION RESOLUTION NO. 06-22
TENTATIVE TRACT MAP SUBTT17435 - PITASSI ARCHITECTS, INC
April 12, 2006
Page 7
Hydrology and Water
1) Prior to issuance of grading permits, the permit applicant shall submit
to Building Official for approval, Storm Water Pollution Prevention Plan
(SWPPP) specifically identifying Best Management Practices (BMPs)
that shall be used on-site to reduce pollutants during construction
activities entering the storm drain system to the maximum extent
practical.
2) An erosion control plan shall be prepared, included in grading plan,
and implemented for the proposed project that identifies specific
measures to control on-site and off-site erosion from the time ground
disturbing activities are initiated through completion of grading. This
erosion control plan shall include the following measures at a
minimum: a) Specify the timing of grading and construction to
minimize soil exposure to rainy periods experienced in southern
California, and b) An inspection and maintenance program shall be
included to ensure that any erosion which does occur either on-site or
off-site as a resultof this project will be corrected through a
remediation or restoration program within a specified time frame.
3) During construction, temporary berms such as sandbags or gravel
dikes must be used to prevent discharge of debris or sediment from the
site when there is rainfall or other runoff.
4) During construction, to remove pollutants, street cleaning will be
performed prior to storm events and after the use of water trucks to
control dust in order to prevent discharge of debris or sediment from
the site.
Post-Construction Operational:
5) The developer shall implement the BMPs identified in the Water
Quality Management Plan to reduce pollutants after construction
entering the storm drain system to the maximum extent practical.
6) Landscaping plans shall include provisions for controlling and
minimizing the use of fertilizers/pesticides/herbicides. Landscaped
areas shall be monitored and maintained for at least two years to
ensure adequate coverage and stable growth. Plans for these areas,
including monitoring provisions for a minimum of two years, shall be
submitted to the City for review and approval prior to the issuance of
grading permits.
7) Prior to issuance of building permits, the applicant shall submit to the
City Engineer for approval of a Water Quality Management Plan
(WQMP), including a project description and identifying Best
Management Practices (BMPs) that will be used on-site to reduce
pollutants into the storm drain system to the maximum extent
PLANNING COMMISSION RESOLUTION NO. 06-22
TENTATIVE TRACT MAP SUBTT17435 - PITASSI ARCHITECTS, INC
April 12, 2006
Page 8
practicable. The WQMP shall identify the structural and non-structural
measures consistent with the Guidelines for New Development and
Redevelopment adopted by the City of Rancho Cucamonga in
June 2004.
8) Prior to issuance of grading or paving permits, applicant shall obtain a
Notice of Intent (NOI) to comply with obtaining coverage under the
National Pollutant Discharge Elimination System (NPDES) General
Construction Storm Water Permit from the State Water Resources
Control Board. Evidence that this has been obtained (i.e., a copy of
the Waste Discharger's Identification Number)shall be submitted to the
City Building Official for coverage under the NPDES General
Construction Permit.
Noise
1) Construction or grading shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday.
2) Construction or grading noise levels shall not exceed the standards
specified in Development Code Section 17.02.120-D, as measured at
the property line. Developer shall hire a consultant to perform weekly
noise level monitoring as specified in Development Code Section
17.02.120. Monitoring at other times may be required by the Building
Official. Said consultant shall report their findings to the Building
Official within 24 hours; however, if noise levels exceed the above
standards, then the consultant shall immediately notify the Building
Official. If noise levels exceed the above standards,then construction
activities shall be reduced in intensity to a level of compliance with
above noise standards or halted.
3) The perimeter block wall shall be constructed as early as possible in
the first phase.
4) Haul truck deliveries shall not take place between the hours of
8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any
time on Sunday or a national holiday. Additionally, if heavy trucks used
for hauling would exceed 100 daily trips (counting both to and from the
construction site), then the developer shall prepare a noise mitigation
plan denoting any construction traffic haul routes. To the extent
feasible, the plan shall denote haul routes that do not pass sensitive
land uses or residential dwellings.
Operational Noise
5) Minimum sound wall height required for a ground-floor backyard/patio
is 8 feet for the following buildings along Church Street: Buildings 1,2,
3, 4, 20, and 21.
PLANNING COMMISSION RESOLUTION NO. 06-22
TENTATIVE TRACT MAP SUBTT17435 - PITASSI ARCHITECTS, INC
April 12, 2006
Page 9
6) A 5-foot sound wall is recommended for balconies associated with the
following buildings along Church Street that are directly exposed to
Church Street traffic: Buildings 1, 2, 3, 4, 20, and 21. Balconies
outside of 500 feet from the Church Street centerline or those that are
blocked by the intervening structures (including those on the sides of
the building facing away from Church Street) do not need balcony
walls.
7) Bedrooms in Buildings 1, 2, 3, 4, 20, and 21 that are within 382 feet of
the Church Street centerline and directly exposed to traffic require a
mechanical ventilation system, such as an air-conditioning system.
8) Bedrooms in Buildings 4 through 7 that are within 792 feet of the
Haven Avenue centerline and directly exposed to the traffic require a
mechanical ventilation system, such as an air-conditioning system.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 12TH DAY OF APRIL, 2006.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY: �
Pam Stew t, Chairman
ATTEST:
Dan Coleman, Acting Secretary
I, Dan Coleman, Acting Secretary of the Planning Commission of the City of Rancho Cucamonga,
do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and
adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the
Planning Commission held on the 12th day of April 2006, by the following vote-to-wit:
AYES: COMMISSIONERS: FLETCHER, MACIAS, MUNOZ, STEWART
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: NONE
ABSTAIN: COMMISSIONERS: McPHAIL
City of Rancho Cucamonga
MITIGATION MONITORING
PROGRAM
Project File No.: General Plan Amendment DRC2004-01197; Development District Amendment
DRC2005-00001;Tentative Tract Map SUBTT17435; Development Review DRC2005-00071,and
SUBTPM17466.
This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation
measures identified in the Mitigated Negative Declaration for the above-listed project. This program
has been prepared in compliance with State law to ensure that adopted mitigation measures are
implemented (Section 21081.6 of the Public Resources Code).
Program Components -This MMP contains the following elements:
1. Conditions of approval that act as impact mitigation measures are recorded with the action and
the procedure necessary to ensure compliance.The mitigation measure conditions of approval
are contained in the adopted Resolution of Approval for the project.
2. A procedure of compliance and verification has been outlined for each action necessary. This
procedure designates who will take action, what action will be taken and when, and to whom
and when compliance will be reported.
3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring
progresses, changes to compliance procedures may be necessary based upon
recommendations by those responsible for the program.
Program Management - The MMP will be in place through all phases of the project. The project
planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project
planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly
and proper action is taken on each mitigation. Each City department shall ensure compliance of the
conditions (mitigation)that relate to that department.
Procedures -The following steps will be followed by the City of Rancho Cucamonga.
1. A fee covering all costs and expenses, including any consultants' fees, incurred by the City in
performing monitoring or reporting programs shall be charged to the applicant.
2. A MMP Reporting Form will be prepared for each potentially significant impact and its
corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached
hereto. This procedure designates who will take action,what action will betaken and when,and
to whom and when compliance will be reported. All monitoring and reporting documentation will
be kept in the project file with the department having the original authority for processing the
project. Reports will be available from the City upon request at the following address:
City of Rancho Cucamonga -Lead Agency
Planning Department
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
Mitigation Monitoring Program
General Plan Amendment DRC2004-01197; Development District Amendment DRC2005-00001;
Tract Map Subtt17435; Development Review DRC2005-00071, and SUBTPM17460.
Page 2
3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,as
determined by the project planner or responsible City department,to monitor specific mitigation
activities and provide appropriate written approvals to the project planner.
4. The project planner or responsible City department will approve, by signature and date, the
completion of each action item that was identified on the MMP Reporting Form. After each
measure is verified for compliance, no further action is required for the specific phase of
development.
5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off
as completed by the project planner or responsible City department at the bottom of the MMP
Reporting Form.
6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation
measures.The project planner is responsible for approving any such refinements or additions.
An MMP Reporting Form will be completed bythe project planner or responsible City department
and a copy provided to the appropriate design, construction, or operational personnel.
7. The project planner or responsible City department has the authority to stop the work of
construction contractors if compliance with any aspects of the MMP is not occurring after written
notification has been issued. The project planner or responsible City department also has the
authority to hold certificates of occupancies if compliance with a mitigation measure attached
hereto is not occurring.The project planner or responsible City department has the authority to
hold issuance of a business license until all mitigation measures are implemented.
8. Any conditions (mitigation) that require monitoring after project completion shall be the
responsibility of the City of Rancho Cucamonga Planning Division.The Division shall require the
applicant to post any necessary funds (or other forms of guarantee)with the City. These funds
shall be used by the City to retain consultants and/or pay for City staff time to monitor and report
on the mitigation measure for the required period of time.
9. In those instances requiring long-term project monitoring, the applicant shall provide the City
with a plan for monitoring the mitigation activities at the project site and reporting the monitoring
results to the City. Said plan shall identify the reporter as an individual qualified to know whether
the particular mitigation measure has been implemented. The monitoring/reporting plan shall
conform to the City's MMP and shall be approved by the Community Development Director or
City Planner prior to the issuance of building permits.
MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III)
Project File No.: General Plan Amendment DRC2004-01197 Tentative Tract Map SUBTT17435, Design Review DRC2005-00071, and
Development District Amendment DRC2005-00001
Applicant: Pitassi Architects
Initial Study Prepared by: L. J. Henderson AICP, Principal PlannerDate: February 14, 2006
Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Date/initials Non-Compliance
All construction equipment shall be maintained in good CP C Review of plans A/C 2/4
operating condition so as to reduce operational
emissions. Contractor shall ensure that all construction
equipment is being properly serviced and maintained as
per manufacturers'specifications. Maintenance records
shall be available at the construction site for City
verification.
Prior to the issuance of any grading permits, the CP/BO C Review of plans C 2
developer shall submit Construction Plans to the City
denoting the proposed schedule and projected
equipment use. Construction contractors shall provide
evidence that low-emission mobile construction
equipment will be utilized, or that their use was
investigated and found to be infeasible for the project.
Contractors shall also conform to any constFuction
measures imposed by the South Coast Air Quality
Management District (SCAQMD) as well as City
Planning staff.
All paints and coatings shall meet or exceed CP C Review of plans A/C 2/4
performance standards noted in SCAQMD Rule 1113.
Paints and coatings shall be applied either by hand or
high-volume, low-pressure spray.
All asphalt shall meet or exceed performance standards BO B Review of plans A/C 2
noted in SCAQMD Rule 1108.
1 of 8
Mitigation Measures No. Responsible g of Method .
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
All construction equipment shall comply with SCAQMD BO C Review of plans A/C 2/4
Rules 402 and 403. Additionally? contractors shall
include the following provisions:
• Reestablish ground cover on the construction site BO C Review of plans A/C 2/4
through seeding and watering.
• Pave or apply gravel to any on-site haul roads. BO C Review of plans A/C 2/4
• Phase grading to prevent the susceptibility of large BO C Review of plans A/C 2/4
areas to erosion over extended periods of time.
• Schedule activities to minimize the amounts of BO C Review of plans A/C 2/4
exposed excavated soil during and after the end of
work periods.
• Dispose of surplus excavated material in BO C Review of plans A 4
accordance with local ordinances and use sound
engineering practices.
• Sweep streets according to a schedule established BO C During A 4
by the City if silt is carried over to adjacent public construction
thoroughfares or occurs as a result of hauling.
Timing may vary depending upon time of year of
construction.
• Suspend grading operations during high winds(i.e., BO C During A 4
wind speeds exceeding 25 mph)in accordance with construction
SCAQMD Rule 403 requirements.
• Maintain a minimum 24-inch freeboard ratio on soils BO C During A 4
haul trucks or cover payloads using tarps or other Construction
suitable means.
The site shall be treated with water or other BO C During A 4
soil-stabilizing agent (approved by SCAQMD and construction
Regional Water Quality Control Board [RWQCB])daily
to reduce Particulate Matter (PM10) emissions, in
accordance with SCAQMD Rule 403.
Chemical soil stabilizers (approved by SCAQMD and BO C During A 4
RWQCB) shall be applied to all inactive construction construction
areas that remain inactive for 96 hours or more to
reduce PMIO emissions.
2of8
Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
The construction contractor shall utilize electric or clean BO C Review of plans A/C 4
alternative fuel-powered equipment where feasible.
The construction contractor shall ensure that BO C Review of plans A/C 2/4
construction-grading plans include a statement that work
crews will shut off equipment when not in use.
All industrial and commercial facilities shall post signs BO C Review of plans A 4
requiring that trucks shall not be left idling for prolonged
periods (i.e., in excess of 10 minutes).
All industrial and commercial facilities shall designate CP C Review of plans A/C 2/3
preferential parking for vanpools.
All industrial and commercial site tenants with 50 or CP C Review of plans D 2/3
more employees shall be required to post both bus and
Metrolink schedules in conspicuous areas.
All industrial and commercial site tenants with 50 or CP C Review of plans D 2/3
more employees shall be required to configure their
operating schedules around the Metrolink schedule to
the extent reasonably feasible.
All residential and commercial structures shall be BO C/D Review of plans C 2/4
required to incorporate high efficiency/low polluting
heating,air conditioning,appliances,and water heaters.
All residential and commercial structures shall be BO C/D Review of plans C 2/4
required to incorporate thermal pane windows and
weather-stripping.
Biological:Resources;
Prior to the commencement of project grading, the CP/BO C Review of plans C 2
project applicant shall submit evidence to the City that
all permit requirements mandated by the U.S. Army
Corps of Engineers, the California Department of Fish
and Game, and/or the Regional Water Quality Control
Board, Santa Ana Region, have been satisfied.
3of8
Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Geoand€Soils -s - _ _ = a
logyF _
The site shall be treated with water or other BO C During A 4
soil-stabilizing agent (approved by SCAQMD and construction
RWQCB)daily to reduce PM,o emissions,in accordance
with SCAQMD Rule 403 or re-planted with drought
resistant landscaping as soon as possible.
Frontage public streets shall be swept according to a BO C During A 4
schedule established by the City to reduce PM10 construction
emissions associated with vehicle tracking of soil
off-site. Timing may vary depending upon time of year
of construction.
Grading operations shall be suspended when wind BO C During A 4
speeds exceed 25 mph to minimize PM10 emissions construction
from the site during such episodes.
Chemical soil-stabilizers (approved by SCAQMD and BO C During A 4
RWQCB) shall be applied to all inactive construction construction
areas that remain inactive for 96 hours or more to
reduce PM10 emissions.
Hydrology and WaterQualitq
Prior to issuance of grading permits,the permit applicant BO B/C/D Review of plans A/C 2/4
shall submit to Building Official for approval, Storm
Water Pollution Prevention Plan (SWPPP) specifically
identifying Best Management Practices (BMPs) that
shall be used on-site to reduce pollutants during
construction activities entering the storm drain system to
the maximum extent practical.
4of8
Mitigation Measures No. Responsible of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date /initials Non-Compliance
An Erosion Control Plan shall be prepared, included in BO B/C/D Review of plans A/C 2/4
the Grading Plan, and implemented for the proposed
project that identifies specific measures to control on-
site and off-site erosion from the time ground disturbing
activities are initiated through completion of grading.
This Erosion Control Plan shall include the following
measures at a minimum: a) Specify the timing of
grading and construction to minimize soil exposure to
rainy periods experienced in Southern California,and b)
An inspection and maintenance program shall be
included to ensure that any erosion which does occur
either on-site or off-site as a result of this project will be
corrected through a remediation or restoration program
within a specified time frame.
During construction, temporary berms such as BO B/C/D Review of plans A/C 2/4
sandbags or gravel dikes must be used to prevent
discharge of debris or sediment from the site when there
is rainfall or other runoff.
During construction, to remove pollutants, street BO B/C/D Review of plans A/C 2/4
cleaning will be performed prior to storm events and
after the use of water trucks to control dust in order to
prevent discharge of debris or sediment from the site.
Insert other specific BMPs from WQMP CE B/C/D Review of plans A/C 2/4
The developer shall implement the BMPs identified in CE B/C/D Review of plans A/C 2/4
the Water Quality Management Plan prepared by
(name/date) to reduce pollutants after construction
entering the storm drain system to the maximum extent
practical.
5of8
Mitigation Measures No. Responsible g of Method .
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Landscaping plans shall include provisions for BO B/C/D Review of plans A/C 2/4
controlling and minimizing the use of
fertilizers/pesticides/herbicides. Landscaped areas shall
be monitored and maintained for at least two years to
ensure adequate coverage and stable growth. Plans for
these areas, including monitoring provisions for a
minimum of two years, shall be submitted to the City for
review and approval prior to the issuance of grading
permits.
Prior to issuance of building permits,the applicant shall CE B/C/D Review of plans A/C 2/4
submit to the City Engineer for approval of a Water
Quality Management Plan(WQMP), including a project
description and identifying Best Management Practices
(BMPs)that will be used on-site to reduce pollutants into
the storm drain system to the maximum extent
practicable. The WQMP shall identify the structural and
non-structural measures consistent with the Guidelines
for New Development and Redevelopment adopted by
the City of Rancho Cucamonga in June 2004.
Prior to issuance of grading or paving permits,applicant BO B/C/D Review of plans A/C 2/4
shall obtain a Notice of Intent (NOI) to comply with
obtaining coverage under the National Pollutant
Discharge Elimination System (NPDES) General
Construction Storm Water Permit from the State Water
Resources Control Board. Evidence that this has been
obtained (i.e., a copy of the Waste Discharger's
Identification Number) shall be submitted to the City
Building Official for coverage under the NPDES General
Construction Permit.
Noise w
Construction or grading shall not take place between the BO C During A 4
hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction
including Saturday, or at any time on Sunday or a
national holiday.
6 of 8
Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
Construction or grading noise levels shall not exceed the BO C During A 4
standards specified in Development Code Section construction
17.02.120-D, as measured at the property line.
Developer shall hire a consultant to perform weekly
noise level monitoring as specified in Development
Code Section 17.02.120. Monitoring at other times may
be required by the Building Official. Said consultant
shall report their findings to the Building Official within 24
hours; however, if noise levels exceed the above
standards, then the consultant shall immediately notify
the Building Official. If noise levels exceed the above
standards,then construction activities shall be reduced
in intensity to a level of compliance with above noise
standards or halted.
The perimeter block wall shall be constructed as early CP C During A A
as possible in the first phase. construction
Haul truck deliveries shall not take place between the PO/BO C During A 4/7
hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction
including Saturday, or at any time on Sunday or a
national holiday. Additionally, if heavy trucks used for
hauling would exceed 100 daily trips (counting both to
and from the construction site),then the developer shall '
prepare a noise mitigation plan denoting any
construction traffic haul routes. To the extent feasible,
the plan shall denote haul routes that do not pass
sensitive land uses or residential dwellings.
Minimum sound wall height required for a ground-floor CP/BO C Review of plans C 2
backyard/patio is 8 feet for the following buildings along
Church Street: Buildings 1, 2, 3, 4, 20 and 21.
A 5-foot sound wall is recommended for balconies CP/BO C Review of plans C 2
associated with the following buildings along Church
Avenue that are directly exposed to Church Avenue
traffic: Buildings 1,2,3,4,20 and 21. Balconies outside
of 500 feet from the Church Avenue centerline or those
that are blocked by the intervening structures(including
those on the sides of the building facing away from
Church Street)do not need balcony walls.
7 of 8
Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for
Implementing Action for'Monitoring Frequency Verification Verification Date/initials Non-Compliance
Bedrooms in Buildings 1, 2, 3, 4, 20, and 21 that are CP/BO C Review of plans C 2
within 382 feet of the Church Street centerline and
directly exposed to traffic require a mechanical
ventilation system, such as an air-conditioning system.
Bedrooms in Buildings 4 through 7 that are within 792 CP/BO C Review of plans C 2
feet of the Haven Avenue centerline and directly
exposed to the traffic require a mechanical ventilation
system, such as an air-conditioning system.
Key to Checklist Abbreviations
_Responsible.Person — :w Monitoring Frequency- -Method of Verificationx= Sanctions_=
CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map
CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit
CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy
BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order
PO-Police Captain or designee E-Operating 5-Retain Depositor Bonds
FC-Fire Chief or designee 6-Revok!CU P
7-Citation
i:\planning\larry\haven and church\final subttl7435 mmchklsl-rev8-8-05final.doc
8 of 8
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT M SUBTT17435
SUBJECT: TENTATIVE TRACT MAP
APPLICANT: PITASSI ARCHITECTS, INC.
LOCATION: HAVEN AVENUE AND CHURCH STREET-APN: 1077-401-35 AND 36.
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANTSHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
A. General Requirements Completion Dace
1. The applicant shall agree to defend at his sole expense any action brought against the City, its
agents,officers, or employees, because of the issuance of such approval,or in the alternative,to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or
employees, for any Court costs and attorney's fees which the City, its agents, officers, or
employees may be required by a court to pay as a result of such action. The City may,at its sole
discretion, participate at its own expense in the defense of any such action but such participation
shall not relieve applicant of his obligations under this condition.
2. Approval of Tentative Tract No. SUBTT17435 is granted subject to the approval of
DRC2004-01197, DRC2005-00001 and DRC2005-00071.
B. Time Limits
1. This tentative tract map or tentative parcel map shall expire, unless extended by the Planning
Commission, unless a complete final map is filed with the City Engineer within 3 years from the
date of the approval.
C. Site Development
1. Street names shall be submitted for City Planner review and approval in accordance with the
adopted Street Naming Policy prior to approval of the final map.
2. The Covenants, Conditions, and Restrictions (CCBRs) and Articles of Incorporation of the
Homeowners' Association are subject to the approval of the Planning and Engineering
Departments and the City Attorney. They shall be recorded concurrently with the Final Map or
prior to the issuance of building permits, whichever occurs first. A recorded copy shall be
provided to the City Engineer. The Homeowners' Association shall submit to the Planning
SC-1-05 1
Project No.SUBTT17435
Completion Date
Department a list of the name and address of their officers on or before January 1 of each and
every year and whenever said information changes.
D. Parking and Vehicular Access (indicate details on building plans)
1. The Covenants, Conditions and Restrictions shall restrict the storage of recreational vehicles on
this site unless they are the principal source of transportation for the owner and prohibit parking
on interior circulation aisles other than in designated visitor parking areas.
E. Environmental
1. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures, including monitoring and reporting. Applicant shall be required to
post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the
amount of$495 prior to the issuance of building permits,guaranteeing satisfactory performance
and completion of all mitigation measures. These funds may be used by the City to retain
consultants and/or pay for City staff time to monitor and report on the mitigation measures.
Failure to complete all actions required by the approved environmental documents shall be
considered grounds for forfeit.
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT, (909)477-2710,
FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
F. Site Development
1. Prior to issuance of building permits for a new residential project or major addition,the applicant
shall pay development fees at the established rate. Such fees may include, but are not limited to:
City Beautification Fee, Park Fee, Drainage Fee,Transportation Development Fee, Permit and
Plan Check Fees, Construction and Demolition Diversion Program deposit and fees and School
Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety
Department prior to permit issuance.
2. Street addresses shall be provided by the Building and Safety Official after tract/parcel map
recordation and prior to issuance of building permits.
APPLICANT SHALL CONTACT THE ENGINEERING DEPARTMENT, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
G. Dedication and Vehicular Access
1. Dedication shall be made of the following rights-of-way on the perimeter streets(measured from
street centerline):
44 total feet on Church Street
33 total feet on Center Avenue
2. Corner property line cutoffs shall be dedicated per City Standards.
3. Vehicular access rights shall be dedicated to the City for the following streets, except for _/_/_
approved openings: Center Avenue, Church Street, and Haven Avenue.
4. Reciprocal access easements shall be provided ensuring access to all parcels by CC&Rs or by
deeds and shall be recorded concurrently with the map or prior to the issuance of building
permits, where no map is involved.
SC-1-05
2
Project No.SUBTT17435
Completion Date
5. Reciprocal parking agreements for all parcels and maintenance agreements ensuring joint
maintenance of all common roads, drives, or parking areas shall be provided by CC & R's or
deeds and shall be recorded prior to, or concurrent with, the final parcel map.
6. All existing easements lying within future rights-of-way shall be quit-claimed or delineated on the
final map.
7. Easements for public sidewalks and/or street trees placed outside the public right-of-way shall be
dedicated to the City.
8. Additional street right-of-way shall be dedicated along right turn lanes,to provide a minimum of 7
feet measured from the face of curbs.
9. The developer shall make a good faith effort to acquire the required off-site property interests
necessary to construct the required public improvements, and if he/she should fail to do so,the
developer shall, at least 120 days prior to submittal of the final map for approval, enter into an
agreement to complete the improvements pursuant to Government Code Sections 66462 and
66462.5 at such time as the City decides to acquire the property interests required for the
improvements. Such agreement shall provide for payment by the developer of all costs incurred
by the City if the City decides to acquire the off-site property interests required in connection with
the subdivision. Security for a portion of these costs shall be in the form of a cash deposit in the
amount given in an appraisal report obtained by the City,at developer's cost. The appraiser shall
have been approved by the City prior to commencement of the appraisal. This condition applies
in particular,but not limited to: Church Street from Cornell Court to easterly boundary of Church
Street Park. All expenses incurred by the developer, including all public improvements, shall be
reimbursed through the Citv's transportation fee program.
H. Street Improvements
1. Pursuant to City Council Resolution No.88-557,no person shall make connections from a source
of energy,fuel or power to any building service equipment which is regulated by technical codes
and for which a permit is required unless, in addition to any and all other codes,regulations and
ordinances, all improvements required by these conditions of development approval have been
completed and accepted by the City Council,except:that in developments containing more than
one building or unit, the development may have energy connections made to a percentage of
those buildings, or units proportionate to the completion of improvements as required by
conditions of approval of development. In no case shall more than 95 percent of the buildings or
units be connected to energy prior to completion and acceptance of all improvements required by
these conditions of approval of development.
2. Construct the following perimeter street improvements including, but not limited to:
Curb& A.C. Side- Drive Street Street Comm Median Bike
Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other
Haven Avenue X X C X X X X (e)
Church Street X X X X X X
Center Avenue X X X X X X
Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement
reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk
shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be
provided for this item. (e) Bus Bay.
3. Improvement Plans and Construction:
a. Street improvement plans,including street trees,street lights,and intersection safety lights
on future signal poles, and traffic signal plans shall be prepared by a registered Civil
Engineer and shall be submitted to and approved by the City Engineer. Security shall be
SC-1-05
3
Project No.SUBTT17435
Completion Date
posted and an agreement executed to the satisfaction of the City Engineer and the City
Attorney guaranteeing completion of the public and/or private street improvements,prior to
final map approval or the issuance of building permits, whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a
construction permit shall be obtained from the City Engineer's Office in addition to any
other permits required.
C. Pavement striping,marking,traffic signing,street name signing,traffic signal conduit,and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
d.. Signal conduit with pull boxes shall be installed with any new construction or reconstruction
project along major or secondary streets and at intersections for future traffic signals and
interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside
of BCR, ECR, or any other locations approved by the City Engineer
Notes:
1) Pull boxes shall be No.6 at intersections and No. 5 along streets,a maximum of 200
feet apart, unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch galvanized steel with pull rope or as specified.
e. Handicapped access ramps shall be installed on all corners of intersections per City
Standards or as directed by the City Engineer.
f. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A cash
deposit shall be provided to cover the cost of grading and paving,which shall be refunded
upon completion of the construction to the satisfaction of the City Engineer.
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be
installed to City Standards, except for single family residential lots.
h. Street names shall be approved by the City Planner prior to submittal for first plan check.
4. . Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in
accordance with the City's street tree program.
SC-1-05
4
Project No.SUBTT17435
Completion Date
5. Install street trees per City street tree design guidelines and standards as follows. The completed
legend (box below) and construction notes shall appear on the title page of the street
improvement plans. Street improvement plans shall include a line item within the construction
legend stating: "Street trees shall be installed per the notes and legend on sheet--(typically
sheet 1)." Where public landscape plans are required, tree installation in those areas shall be
per the public landscape improvement plans.
The City Engineer reserves the right to adjust tree species based upon field conditions and other
variables. For additional information, contact the Project Engineer.
Min.
Grow
Street Name Botanical Name Common Name Space Spacing Size oty.
Center Avenue Brachychiton popuheus Bottle Tree 5' 25'0.C. 15 Gal Fill
in
Church Street
P.A.8'or greater Magnolia grandiflora NCN 8' 30'0.0 15
'Samuel Sommer
P.A.Less than 8' Magnolia grandiflora NCN 3' 20'0.C.. 15 Gal
Sl. Mary'
Haven Avenue
Foreground
P.A.8'or greater Magnolia grandiflora NCN 8' 60'O.C. 15 Gal
Generally in front of 'Majestic Beauty' Intentionally
sidewalk spaced this
far apart
P.A.less than 8' Magnolia grandiflora NCN 3' 20'0.C. 15 Gal
'St.Mary'
Primary tree in Brachychiton populneus Bottle Tree 8' 260.C. 15 Gal
masses,mainly informal if
behind sidewalk maintained
by City
r Construction Notes for Street Trees:
1) All street trees are to be planted in accordance with City standard plans.
2) Prior to the commencement of any planting,an agronomic soils report shall be furnished to
the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil
amendments, as determined by the City inspector.
3) All street trees are subject to inspection and acceptance by the Engineering Department.
4) Street trees are to be planted per public improvement plans only.
6. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with
adopted policy. On collector or larger streets, lines of sight shall be plotted for all project
intersections, including driveways. Local residential street intersections and commercial or
industrial driveways may have lines of sight plotted as required.
I. Public Maintenance Areas
1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting
Districts shall be filed with the City Engineer prior to final map approval or issuance of building
permits whichever occurs first. Formation costs shall be borne by the developer.
2. Parkway landscaping on the following street(s) shall conform to the results of the respective
Beautification Master Plan Haven Avenue.
SC-1-05
5
Project No.SUBTT17435
Completion Date
J. Drainage and Flood Control
1. The project(or portions thereof)is located within a Flood Hazard Zone;therefore,flood protection
measures shall be provided as certified by a registered Civil Engineer and approved by the City
Engineer.
2. It shall be the developer's responsibility to have the current FIRM Zone A designation removed
from the project area. The developer shall provide drainage and/or flood protection facilities
sufficient to obtain an unshaded "X" designation. The developer's engineer shall prepare all
necessary reports, plans, and hydrologic/hydraulic calculations. A Conditional Letter of Map
Revision (CLOMR) shall be obtained from FEMA prior to final map approval or issuance of
building permits, whichever occurs first. A Letter of Map Revision (LOMR) shall be issued by
FEMA prior to occupancy or improvement acceptance, whichever occurs first.
3. A final drainage study shall be submitted to and approved by the City Engineer prior to final map
approval or the issuance of building permits, whichever occurs first. All drainage facilities shall
be installed as required by the City Engineer.
4. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the
property from adjacent areas.
5. A permit from the San Bernardino County Flood Control District is required for work"within its
right-of-way.
K. Utilities
1. Provide separate utility services to each parcel including sanitary sewerage system,water,gas,
electric power, telephone, and cable TV (all underground) in accordance with the Utility
Standards. Easements shall be provided as required.
2. The developer shall be responsible for the relocation of existing utilities as necessary.-
3. Water and sewer plans shall be designed and constructed to meet'the requirements of the
Cucamonga Valley Water District(CVWD), Rancho Cucamonga Fire Protection District,and the
Environmental Health Department of the County of San Bernardino. A letter of compliance from
the CVW D is required prior to final map approval or issuance of permits,whichever occurs first.
Such letter must have been issued by the water district within 90 days prior to final map approval
in the case of subdivision or prior to the issuance of permits in the case of all other residential
projects.
4. Approvals have not been secured from all utilities and other interested agencies involved.
Approval of the final parcel map will be subject to any requirements that may be received from
them.
L. General Requirements and Approvals
1. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all
new streetlights for the first six months of operation,prior to final map approval or prior to building
permit issuance if no map is involved.
2. Prior to the issuance of building permits,a Diversion Deposit and related administrative fees shall
be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if
at least 50% of all wastes generated during construction and demolition are diverted from
landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to
the Engineering Department when the first building permit application is submitted to Building and
Safety. Form CD-2 shall be submitted to the Engineering Department within 60 days following
the completion of the construction and/or demolition project.
SC-1-05
6
Project No.SUBTT17435
Completion Date
APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION
PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING
CONDITIONS:
SEE ATTACHED
SC-1-05
7
Rancho Cucamonga Fire Protection
I i District
-- Fire Construction Services
STANDARD CONDITIONS
September 8, 2005
Church & Haven MFR Subdivision
Multi-Family Tentative Tract & Design Review
SUBTT17435 & DRC2005-00071
THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT.
FSC-1 Public and Private Water Supply
1. Design guidelines for Fire Hydrants: The following provides design guidelines for the
spacing and location of fire hydrants:
a. The maximum distance between fire hydrants in commercial/industrial projects is
300-feet. No portion of the exterior wall shall be located more than 150-feet from an
approved fire hydrant. For cul-de-sacs, the distance shall not exceed 100-feet.
b. The maximum distance between fire hydrants in multi-family residential projects is
400-feet. No portion of the exterior wall shall be located more than 200-feet from an
approved fire hydrant. For cul-de-sacs, the distance shall not exceed 150-feet.
c. The maximum distance between fire hydrants in single-family residential projects is
500-feet. No portion of the exterior wall facing the addressed street shall be more
than 250-feet from an approved fire hydrant. For cul-de-sacs, the distance shall not
exceed 200-feet.
d. For single-family residential projects in the designated Hazardous Fire Area, the
maximum distance between fire hydrants is 400-feet. No portion of the exterior wall
facing the addressed street shall be more than 200-feet from an approved fire
hydrant. For cul-de-sacs, the distance shall not exceed 150-feet.
e. Fire hydrants are to be located. The preferred locations for fire hydrants are:
i. At the entrance(s) to a commercial, industrial or residential project from the
public roadways.
ii. At intersections.
iii. On the right side of the street, whenever practical and possible.
iv. As required by the Fire Safety Division to meet operational needs of the Fire
District.
iv. As required by the Fire Safety Division to meet operational needs of the Fire
District.
V. A minimum of forty-feet (40 feet) from any building.
f. If any portion of a facility or building is located more than 150-feet from a public fire
hydrant measured on an approved route around the exterior of the facility or building,
additional private or public fire hydrants and mains capable of supplying the required
fire flow shall be provided.
g. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof.
FSC-2 Fire Flow
1. The required minimum fire flow for this project, when automatic fire sprinklers are installed
is 1,500 gallons per minute at a minimum residual pressure of 20-pounds per square inch.
This flow reflects a 50-percent reduction for the installation of an approved automatic fire
sprinkler system in accordance with NFPA 13 or 13R with central station monitoring. This
requirement is made in accordance with the California Fire Code Appendix III-A, as
adopted by the Fire District Ordinances.
2. The required minimum fire flow for structures located in the designated hazardous fire
area shall be not less than 1,750 gpm at 20-psi residual. For structures in excess of
36,000 square feet use CFC Table A-III-A-1.
3. Public fire hydrants located within a 500-foot radius of the proposed project may be used
to provide the required fire flow subject to Fire District review and approval. Private fire
hydrants on adjacent property shall not be used to provide required fire flow.
4. Firewater plans are required for all projects that must extend the existing water supply to
or onto the site. Building permits will not be issued until firewater plans are
approved.
5. On all site plans to be submitted for review, show all fire hydrants located within 600-feet
of the proposed project site.
FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems
1. Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant
shall submit plans, specifications and calculations for the fire sprinkler system
underground supply piping. Approval of the underground supply piping system must be
obtained prior to submitting the overhead fire sprinkler system plans.
FSC4 Requirement for an Automatic Fire Sprinkler Systems
Rancho Cucamonga Fire District Ordinance 15, the 2001 California Fire Code and/or any other
applicable standards require an approved automatic fire sprinkler system to be installed in:
1. Multifamily structures greater than 7,500 square feet.
2. Multi-family residential structures in excess of 4 units.
3. All structures that do not meet Fire District access requirements (see Fire Access).
2
4. When required fire flow cannot be provided due to inadequate volume or pressure.
5. When the building access does not meet the requirements of the 2001 California Building
Code and the RCFPD Fire Department Access - Fire Lane Standard #F191.10.20.
6. When any applicable code or standard requires the structure to be sprinklered.
FSC-5 Fire Alarm System
1. RCFPD Ordinance 15, based on use or floor area (or by other adopted codes or
standards) requires an automatic and/or manual fire alarm system. Refer to RCFPD
Ordinances 15 and 39, the California Building Code, RCFPD Fire Alarm Standard #10-6
and/or the California Fire Code.
2. Prior to the installation of the fire alarm system, Fire Construction Services' approval and a
building permit must be obtained. Pians and specifications shall be submitted to Fire
Construction Services in accordance with RCFPD Fire Alarm Standard #10-6.
FSC-6 Fire District Site Access
Fire District access roadways include public roads, streets and highways, as well as private
roads, streets drive aisles and/or designated fire lanes. Please reference the RCFPD Fire
Department Access— Fire Lanes Standard #F191.10.200.
1. Location of Access: All portions of the structures 1s` story exterior wall shall be located
within 150-feet of Fire District vehicle access, measure on an approved route around the
exterior of the building. Landscaped areas, unpaved changes in elevation, gates and
fences are deemed obstructions.
2. Specifications for private Fire District access roadways per the RCFPD Standards
are:
a. The minimum unobstructed width is 26-feet.
b. The maximum inside turn radius shall be 24-feet.
C. The minimum outside turn radius shall be 50-feet.
d. The minimum radius for cul-de-sacs is 45-feet.
e. The minimum vertical clearance is 14-feet, 6-inches.
f. At any private entry median, the minimum width of traffic lanes shall be 20-feet on
each side.
g. The angle of departure and approach shall not exceed 9-degrees or 20 percent.
h. The maximum grade of the driving surface shall not exceed 12%.
i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW).
3
j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a
minimum of 14-feet, 6-inches from the ground up. Vegetation shall not be allowed to
obstruct Fire Department apparatus.
3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be
provided in accordance with the 2001 California Building Code, Fire and/or any other
applicable standards.
4. Access Walkways: Hardscaped access walkways shall be provided from the fire
apparatus access road to all required building exterior openings.
5. Residential gates installed across Fire District access roads shall be installed in
accordance with RCFPD Residential Gate Standard #9-1. The following design
requirements apply:
a. Prior to the fabrication and installation of the gates, plans are required to be
submitted to Fire Construction Services (FCS) for approval. Upon the completion of
the installation and before placing the gates in service, inspection and final
acceptance must be requested from FCS.
b. Gates must slide open horizontally or swing inward.
C. Gates may be motorized or manual.
d. When fully open, the minimum clearance dimension of drive access shall be 20 feet.
e. Manual gates must be equipped with a RCFPD lock available at the Fire Safety
Office for$20.00.
f. Motorized gates must open at the rate of one-foot per second.
g. The motorized gate actuation mechanism must be equipped with a manual override
device and a fail-safe or battery backup feature to open the gate or release the
locking Mechanism in case of power failure or mechanical malfunction.
h. Motorized gates shall be equipped with a Knox override key switch. The switch must
be installed outside the gate in a visible and unobstructed location.
i. For motorized gates, a traffic loop device must be installed to allow exiting from the
complex. If traffic pre-emption devices (TPD) are to be installed, the device, location
and operation must be approved by the Fire Chief prior to installation. Bi-directional
or multiple sensors may be required due to complexity of the various entry
configurations.
6. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site
plan illustrating the proposed delineation that meets the minimum Fire District standards
shall be included in the architectural plans submitted to B&S for approval.
7. Approved Fire Department Access: Any approved mitigation measures must be clearly
noted on the site plan. A copy of the approved Alternative Method application, if
applicable, must be reproduced on the architectural plans submitted to B&S for plan
review.
4
FSC-10 Occupancy and Hazard Control Permits
Listed are those Fire Code permits commonly associated with the business operations and/or
building construction. Plan check submittal is required with the permit application for approval
of the permit; field inspection is required prior to permit issuance. General Use Permit shall be
required for any activity or operation not specifically described below, which in the judgment of
the Fire Chief is likely to produce conditions that may be hazardous to life or property.
Compressed Gases Public Assembly
Cryogenics LPG or Gas Fuel Vehicles in Assembly Buildings
Flammable and Combustible Liquids Welding and Cutting Operations
Hazardous Materials Tents, Canopies and/or Air Supported Structures
Liquefied Petroleum Gases
FSC-11 Hazardous Materials—Submittal to the County of San Bernardino
The San Bernardino County Fire Department shall review your Business
Emergency/Contingency Plan for compliance with minimum standards. Contact the San
Bernardino County Fire, Hazardous Materials Division at (909) 387-4631 for forms and
assistance. The County Fire Department is the Cal/EPA Certified Unified Program Agency
(CUPA)for the City of Rancho Cucamonga.
1. If the facility is a NEW business, a Certificate of Occupancy issued by Building & Safety
will not be finalized until the San Bernardino County Fire Department reviews your
Business Emergency/Contingency Plan. California Government Code, Section 65850.2
prohibits the City from issuing a final Certificate of Occupancy unless the applicant has
met or is meeting specific hazardous materials disclosure requirements. A Risk
Management Program (RMP) may also be required if regulation substances are to be
used or stored at the new facility.
2. ' Any business that operates on rented or leased property which is required to submit a
Plan, is also required to submit a notice to the owner of the property in writing stating that
the business is subject to the Business Emergency/Contingency Plan mandates and has
complied with the provisions. The tenant must provide a copy of the Plan to the property
owner within five (5) working days, if requested by the owner.
FSC-12 Hazardous Materials -Submittal to Fire Construction Services
Pians shall be submitted and approved prior to construction of buildings and/or the installation of
equipment designed to store, use or dispense hazardous materials in accordance with the 2001
California Building, Fire, Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances'FD15 and
FD39 and other implemented and/or adopted standards.
FSC-13 Alternate Method Application
Fire Construction Services staff and the Fire Marshal will review all requests for alternate
method, when submitted. The request must be submitted on the Fire District "Application for
Alternate Method"form along with supporting documents and payment of the $92 review fee.
FCS-14 Map Recordation
1. Reciprocal Access Agreement: The plan as submitted indicate that the required Fire
Department access:
5
a. Is located on property which is not under the control of the applicant; or
b. Crosses a property line; or
C. Is shared by multiple owners; or
d. Is located on common space under the control of an owner's association
Please provide a permanent access agreement granting irrevocable use of the property to
the Fire District. The agreement shall include a statement that no obstruction, gate, fence,
building or other structure shall be placed within the dedicated access without Fire District
approval. The recorded agreement shall include a copy of the site plan. The agreement
shall be presented to Fire Construction Services for review and approval, prior to
recordation. The agreement shall be recorded with the Recorder's Office, County of San
Bernardino.
To assist Fire Construction Services in reviewing the agreement the following shall be
included in the submittal:
a. The current title reports to provide a legal description and proof of ownership for all
properties included in the agreement.
b. The assessor's parcel numbers of each parcel subject to the agreement.
C. A scaled site plan showing the path of the Fire District access, the width, turn radii
and slope of roadway surface shall be provided. The access roadway shall comply
with the requirements of the RCFPD Fire Lane Standard #9-7.
2. Reciprocal Water Covenant and Agreement: The plans as submitted indicate that a
required private fire mains or appurtenances
a. Pass through or are located on property not under the control of the applicant; or
b. Crosses a property line; or
C. Provide service to adjacent properties; or
d. Is located on common space under the control of an owner's association; or
e. Is shared by multiple owners.
Please provide a permanent maintenance and service agreement between the owner for
the private water mains, fire hydrants and fire protection equipment essential to the water
supply. The agreement shall meet the form and content approved by the Rancho
Cucamonga Fire District. The agreement shall be submitted to Fire Construction Services
for review and approval, prior to recordation. The agreement shall be recorded within the
Recorder's Office, County of San Bernardino.
FCS-15 Annexation of the parcel map: Annexation of the parcel map into the Community .
Facilities District #85-1 or#88-1 is required prior to the issuance of grading or building permits.
6
Chronological Summary of RCFPD Standard
Conditions
PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to
the issuance of any building permits:
1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans,
specifications, flow test data and calculations for the private water main system for review
and approval by the Fire District. Plans and installation shall comply with Fire District
Standards. Approval of the on-site (private) fire underground and water plans is required
prior to any building permit issuance for any structure on the site. Private on-site
combination domestic and fire supply system must be designed in accordance with
RCFPD Standards #9-4, #10-2 and #10-4. The Building & Safety Division and Fire
Construction Services will perform plan checks and inspections.
All private on-site fire hydrants shall be installed, flushed and operable prior to delivering
any combustible framing materials to the site. Fire construction Services will inspect the
installation, witness hydrant flushing and grant a clearance before lumber is dropped.
2. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan
showing the locations of all new public fire hydrants for the review and approval by the
Fire District and CCWD. On the plan, show all existing fire hydrants within a 600-foot
radius of the project. All required public fire hydrants shall be installed, flushed and
operable prior to delivering any combustible framing materials to the site. CCWD
personnel shall inspect the installation and witness the hydrant flushing. Fire Construction
Services shall inspect the site after acceptance of the public water system by CCWD. Fire
Construction Services must grant a clearance before lumber is dropped.
3. Construction Access: The access roads must be paved in accordance with all the
requirements of the RCFPD Fire Lane Standard #9-7. All temporary utilities over access
roads must be installed at least 14' 6" above the finished surface of the road.
4. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is
responsible for obtaining the fire flow information from CCWD and submitting the letter to
Fire Construction Services.
5. Easements and Reciprocal Agreements: All easements and agreements must be
recorded with the County of San Bernardino.
PRIOR TO THE RELEASE OF TEMPORARY POWER
The building construction must be substantially completed in accordance with Fire Construction
Services' 'Temporary Power Release Checklist and Procedures".
PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following:
1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker
indicating the fire hydrant location on the street or driveway in accordance with the City of
Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant
Markers". On private property, the markers shall be installed at the centerline of the fire
access road, at each hydrant location.
2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler
contractor, in the presence of Fire Construction Services, shall conduct a test of the most
hydraulically remote on-site fire hydrants. The underground fire line contractor, developer
and/or owner are responsible for hiring the company to perform the test. A final test
report shall be submitted to Fire Construction Services verifying the fire flow available.
The fire flow available must meet or exceed the required fire flow in accordance with the
California Fire Code.
3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire
sprinkler system(s) shall be tested and accepted by Fire Construction Services.
4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire
sprinkler monitoring system must be tested and accepted by Fire Construction Services.
The fire sprinkler monitoring system shall be installed, tested and operational immediately
following the completion of the fire sprinkler system (subject to the release of power).
5. Fire Suppression Systems and/or other special hazard protection systems shall be
inspected, tested and accepted by Fire Construction Services before occupancy is granted
and/or equipment is placed in service.
6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm
system shall be installed, inspected, tested and accepted by Fire Construction Services.
7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular
gates must be inspected, tested and accepted in accordance with RCFPD Standards #9-1
or#9-2 by Fire Construction Services.
8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire
access roadways must be installed in accordance with the approved plans and acceptable
to Fire Construction Services.
9. The CC&R's, the reciprocal agreement and/or other approved documents shall-be
recorded and contain an approved fire access roadway map with provisions that prohibit
parking, specify the method of enforcement and identifies who is responsible for the
required annual inspections and the maintenance of all required fire access roadways.
10. Address: Prior to the granting of occupancy, single-family dwellings shall post the
address with minimum 4-inch numbers on a contrasting background. The numbers shall
be internally or externally illuminated during periods of darkness. The numbers shall be
visible from the street. When building setback from the public roadway exceeds 100-feet,
additional 4-inch numbers shall be displayed at the property entry.
11. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and
multi-family buildings shall post the address with minimum 8-inch numbers on contrasting
background, visible from the street and electrically illuminated during periods of darkness.
When the building setback exceeds 200 feet from the public street, an additional non-
illuminated 6-inch minimum number address shall be provided at the property entrance.
Larger address numbers will be required on buildings located on wide streets or built with
large setbacks in multi-tenant commercial and industrial buildings. The suite designation
numbers and/or letters shall be provided on the front and back of all suites.
12. Fuel Modification: Please refer to RCFPD Summary of Fire Hazardous Area
requirements.
8
13. Hazardous Materials: Prior to the issuance of a Certificate of Occupancy, the applicant
must demonstrate (in writing from the County) that the facility has met or is meeting the
Risk Management Plan (RMP) or Business Emergency/Contingency Plan with the San
Bernardino County Fire Department, Hazardous Materials/Emergency Response and
Enforcement Division. The applicant must also obtain inspection and acceptance by Fire
Construction Services.
1. Confidential Business Occupancy Information: The applicant shall complete the
Rancho Cucamonga Fire District"Confidential Business Occupancy Information"form. This
form provides contact information for Fire District use in the event of an emergency at the
subject building or property. This form must be presented to the Fire Construction Services
Inspector.
2. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, a 8 %' x 11" or 11"
x 17" site plan of the site in accordance with RCFPD Standard #13-1 shall be revised by the
applicant to reflect the actual location of all devices and building features as required in the
standard. The site plan must be reviewed and accepted by the Fire Inspector.
9
4
City of Rancho Cucamonga
MITIGATED NEGATIVE DECLARATION
The following Mitigated Negative Declaration is being circulated forpublic review In accordance with
the California Environmental Quality Act Section 21091 and 21092 of the Public Resources Code.
Project File No.: General Plan Amendment DRC2004-01197; Development District Amendment
DRC2005-00001;Tentative Tract Map SUBTT17435; Development Review DRC2005-00071,and
SUBTPM17460.
Public Review Period Closes: March 22, 2006
Project Name: Project Applicant: Pitassi Architects, Inc.
Project Location (also see attached map): Located on the south side of Church Street between
Center Avenue and Haven Avenue-APN: 1077-401-35 and 36.
Project Description: To Amend The General Plan Land Use Map From Open Space-Flood
Control/Utility Corridor to Mixed Use with a Master Plan designation, amending the Parks And
Recreation chapter, and the Flood Hazards chapter,forthe development of 9 single-family detached
residences, 126 multi-family residential units (14.77 Acres), and 2 office buildings 0.66 Acres) of
one and two story design totaling 44,782 square feet on a total net site area of 14.31 acres, located
on the south side of Church Street, between Center Avenue and Haven Avenue. The project also
includes an amendment to the Development District map changing the Flood Control zoning
designation to Mixed Use as well as a request to subdivide the 14.77 gross acres of land into 10
numbered lots, and two lettered lots, for the sale of the residential condominium units and for the
development review of those units and single family residences.
FINDING
This is to advise that the City of Rancho Cucamonga,acting as the lead agency,has conducted an
Initial Study to determine if the project may have a significant effect on the environment and is
proposing this Mitigated Negative Declaration based upon the following finding:
The Initial Study identified potentially significant effects but:
(1) Revisions in the project plans or proposals made or agreed to by the applicant before this
proposed Mitigated Negative Declaration was released for public review would avoid the
effects or mitigate the effects to a point where clearly no significant effects would occur, and
(2) There is no substantial evidence before the agency that the project, as revised, may have a
significant effect on the environment.
If adopted,the Mitigated Negative Declaration means that an Environmental Impact Report will not be
required. The factual and analytical basis forthis finding is included in the attached Initial Study. The
project file and all related documents are available for review at the City of Rancho Cucamonga
Planning Department at 10500 Civic Center Drive (909)477-2750 or Fax (909) 477-2847.
NOTICE
The public Is invited to comment on the proposed Mitigated Negative Declaration during the
review period.