HomeMy WebLinkAbout06-39 - Resolutions RESOLUTION NO. 06-39 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT REVIEW DRC2003-00637 FOR 206 CONDOMINIUM UNITS IN THE MIXED USE DISTRICT, LOCATED ON THE NORTH SIDE OF FOOTHILL BOULEVARD, BETWEEN RED HILL COUNTRY CLUB DRIVE AND THE SOUTHERN PACIFIC RAIL ROAD RIGHT-OF-WAY, AND MAKING FINDINGS IN SUPPORT THEREOF -APN: 0207-101-13, 31 AND 34. A. Recitals. 1. Charles Joseph Associates filed an application for Development Review DRC2003-00637, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Design Review request is referred to as "the application." 2. On the 12th day of April 2006, the Planning Commission of the City of Rancho Cucamonga held a meeting to consider the application. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing on April 12, 2006, including written and oral staff reports including public testimony, this Commission hereby specifically finds as follows: 3. The application applies to the property located on the north side of Foothill Boulevard, between Red Hill Country Club Drive and the Southern Pacific Rail Road Right-of-Way,with a street frontage of 560 feet and lot depth of 620 feet, and is presently improved with an abandoned water reservoir; and 4. Properties to the north are developed with condominiums and single-family homes designated Medium Residential (8-14 dwelling units per acre) and Low Residential (2-4 dwelling units per acre), respectively. South of Foothill Boulevard is designated Mixed Used and is developed with office and commercial uses. East of the site is the abandoned Southern Pacific Rail Road (future Regional Trail and possible future rail) and is designated Open Space. To the west is the Sycamore Inn Restaurant and is designated Mixed Use. Other properties to the west are Mixed Use land use and Office/Commercial to the southwest. The Red Hill Golf course is located northwest of the project site adjacent to the Medium Density residential development. 5. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1 and 2 above, this Commission hereby specifically finds and concludes as follows: PLANNING COMMISSION RESOLUTION NO. 06-39 DRC2003-00637 — CHARLES JOSEPH ASSOCIATES April 12, 2006 Page 2 a. Subject to the amendment of the Hillside Provisions of the General Plan the Mixed Use designated Project has demonstrated through the plans, Initial Study, and conditions of Approval that the proposed project is consistent with the objectives of the General Plan; and b. Subject to the amendment of the Hillside Provisions of the Development Code,the Mixed Use designated project has demonstrated through the plans, Initial Study,and Conditions of Approval that the proposed design is in accord with the objectives of the Development Code and the purposes of the district in which the site is located; and C. That the proposed design is in compliance with each of the applicable provisions of the Mixed Use designation and Hillside Regulations as recommended for amendment in the Development Code; and d. The Mixed Use designed project has demonstrated through the plans, Initial Study, and Conditions of Approval that the proposed design, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. 6. Based upon the facts and information contained in the proposed Mitigated Negative Declaration,together with all written and oral reports included for the environmental assessment for the application,the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and Monitoring Program attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. That the Mitigated Negative Declaration has been prepared in compliance with the California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared therefore reflect the independent judgment of the Planning Commission; and, further, this Commission has reviewed and considered the information contained in said Mitigated Negative Declaration with regard to the application. b. Although the Mitigated Negative Declaration identifies certain significant environmental effects that will result if the project is approved, all significant effects have been reduced to an acceptable level by imposition of mitigation measures on the project which are listed below as conditions of approval. C. Pursuant to the provisions of Section 753.5(c)of Title 14 of the California Code of Regulations, the Planning Commission finds as follows: In considering the record as a whole, the Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the proposed project will have potential for an adverse impact upon wildlife resources or the habitat upon which wildlife depends. Further, based upon the substantial evidence contained in the Mitigated Negative Declaration, the staff reports and exhibits, and the information provided to the Planning Commission during the public hearing, the Planning Commission hereby rebuts the presumption of adverse effect as set forth in Section 753.5(c-1-d)of Title 14 of the California Code of Regulations. 7. Based upon the findings and conclusions set forth in paragraphs 1 and 2 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. PLANNING COMMISSION RESOLUTION NO. 06-39 DRC2003-00637—CHARLES JOSEPH ASSOCIATES April 12, 2006 Page 3 Planning Department 1) Approval of Development Review DRC2003-00637 is granted contingent upon approval of Variance DRC2005-01061, Minor Development Review DRC2004-00826, General Plan Amendment DRC2004-00339, and Development Code Amendment DRC2004-00352. 2) Subject to the approval by the Planning Commission of Development Review DRC2003-00637 and all applicable conditions thereto. 3) Tree Removal Permit DRC2004-00082 is hereby approved subject to replacement planting per the mitigation measures. Engineering Department 1) Dedicate Lot B to the City. 2) Extend Master Plan Storm Drain Line III-1 from its current terminus south of Foothill Boulevard (south of the Pacific Electric RR trail) to Red Hill Country Club Drive, to the satisfaction of the City Engineer. Standard drainage fees for the site shall be credited to the cost of permanent master plan facilities, in accordance with City policy. The developer may request a reimbursement agreement to recover oversizing costs, in excess of fees,from future development within the same tributary area. If the developer fails to submit for said reimbursement agreement within six months of the public improvements being accepted by the City, all rights of the developer to reimbursement shall terminate. a) Construct private, on-site storm drains to collect all project runoff and discharges from adjacent properties and convey to the Master Plan Storm Drain. "Adjacent properties" include the redeveloped Sycamore Inn parking lot and other properties. b) Final drainage study shall also determine the need for local storm drain facilities in Foothill Boulevard to maintain Q10 10-foot dry lanes, Q25 under top-of-curb, and 0100 within right-of-way. c) The Master Plan Storm Drain shall allow for City access to manholes. Provide manholes at public-private junctions. 3) Proposed driveway entrance (street type) on Foothill Boulevard shall align with San Bernardino Road on the south side. 4) Provide a driveway aisle from Foothill Boulevard to the condo project with three lanes: one entry lane, 14 feet wide continuing to the condo project,and two outbound lanes, one 14 foot right-turn and one 11-foot for through/left-turn lane and to extend from the condo project to Foothill Boulevard. PLANNING COMMISSION RESOLUTION NO. 06-39 DRC2003-00637—CHARLES JOSEPH ASSOCIATES April 12, 2006 Page 4 5) Record an access easement across the Sycamore Inn property, from the signalized drive approach to the project entry, prior to final map approval. If not successful, re-design the project to take right-turn-only access to Foothill from its own frontage (no median break). 6) Driveway accent paving shall be located outside the ultimate rights-of-way. 7) Coordinate installation of Foothill Boulevard frontage improvements with the City project. 8) Modify the existing traffic signal at Foothill Boulevard and San Bernardino Road, as needed. 9) Foothill Boulevard Parkway improvements, including special streetlights, street trees, sidewalk, and median, shall conform to the Foothill Boulevard Districts guidelines outlined in the Development Code and the Route 66/Foothill Boulevard Visual Improvement Plan. 10) Make a contribution in-lieu of construction for the prorated share of the project for a future landscaped median on Foothill Boulevard. 11) On the Red Hill Country Club Drive frontage, install street improvements per the attached Standard Conditions, and per City standards,to the satisfaction of the City Engineer. Improvements shall extend from the project site north to join those south of Calle Carabe for pedestrian traffic. a) Vehicle access on Red Hill Country Club Drive shall be emergency access only (not an "Exit Only" access.) Drive approach shall be installed per Standard Drawing 105-C, with thicker concrete or reinforced sidewalk to meet Fire District standards. b) The curb-adjacent sidewalk shall have a minimum 6-foot width, per City standards. Install retaining walls as required. c) Provide 5,800 lumen streetlights along the frontage. 12) Parkways shall slope at 2 percent from 1 foot behind the sidewalk to the top of the curb, along all street frontages. 13) On-site terminus to drive aisle that ends at emergency access to Red Hill Country Club Drive shall be approved by the City Traffic Engineer. 14) Process a Lot Line Adjustment on the lot lines shared with the Sycamore Inn property so that they correspond with the proposed improvements and in particular, so that lot lines are at tops of slopes. PLANNING COMMISSION RESOLUTION NO. 06-39 DRC2003-00637 — CHARLES JOSEPH ASSOCIATES April 12, 2006 Page 5 15) Draining onto the Pacific Electric Rail Road trail and the public right-of-way fronting Foothill Boulevard is not approved. Provide private drainage facilities to direct flows to the Master Plan Storm Drain, including concrete ditch at the toe of the 2:1 slope along the property line. 16) The existing overhead utilities(telecommunications and electrical)from the project site to the south side of Foothill Boulevard and the overhead utilities from the project site to the pole 120 feet north of the site shall be undergrounded,priorto public improvement acceptance or occupancy, whichever occurs first. The developer may request a reimbursement agreement to recover one-half the City adopted cost for undergrounding from future development (or redevelopment) as it occurs on the opposite side of the street. If the developer fails to submit for said reimbursement agreement within six months of the public improvements being accepted by the City, all rights of the developer to reimbursement shall terminate. 17) The Water Quality Management Plan (WQMP) dated June 17, 2005, has been conceptually reviewed and the following items need to be completed: a) Section 1.2 - Provide permit numbers [List Tract, PMT# and W DID#] b) Section 2.1 - Provide source for Mill Creek (Hydrologic Unit No. 801.24) c) Section 3.2 - Check Section numbers for Section 3.2, 3.3, and 3.4. d) Section 3.2 - The City of Rancho Cucamonga Catch Basin Labeling Standard is: "Keep Gutters Clean For Those Down Stream." e) Section 3.2 - Roof Runoff Controls (SD-11): Provide source for comment that"Infiltration practices are not recommended in San Bernardino County due to potential impact to groundwater resources." f) Section 3.3 - Bacteria and Viruses should be a "yes" since they are expected/potential pollutants of concern. g) Section 4 - The City of Rancho Cucamonga Catch Basin Labeling Standard is: "Keep Gutters Clean For Those Down Stream." h) Section 6 - Notarize and record the City's "Memorandum of Agreement of Storm Water Quality Management Plan" (Copies are available at Engineering's front counter). PLANNING COMMISSION RESOLUTION NO. 06-39 DRC2003-00637—CHARLES JOSEPH ASSOCIATES April 12, 2006 Page 6 i) Plan Review - Locate proposed Best Management Practices (BMPs) on the Grading Plan. 18) Maintenance of BMPs identified in the WQMP shall be addressed in the project Covenants, Conditions, and Restriction (CC&Rs). Environmental Mitigation Air Quality 1) All construction equipment shall be maintained in good operating condition so as to reduce operational emissions. The contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers"specifications. Maintenance records shall be available at the construction site for City verification. 2) Prior to the issuance of any grading permits,the developer shall submit construction plans to the City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low-emission mobile construction equipment will be utilized,or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD), as well as City Planning staff. 3) All paints and coatings shall meet or exceed performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high-volume, low-pressure spray. 4) All asphalt shall meet or exceed performance standards noted in SCAQMD Rule 1108. 5) All construction equipment shall complywith SCAQMD Rules 402 and 403. Additionally, contractors shall include the following provisions: • Reestablish ground cover on the construction site through seeding and watering. • Pave or apply gravel to any on-site haul roads. • Phase grading to prevent the susceptibility of large areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in accordance with local ordinances and use sound engineering practices. PLANNING COMMISSION RESOLUTION NO. 06-39 DRC2003-00637— CHARLES JOSEPH ASSOCIATES April 12, 2006 Page 7 • Sweep streets according to a schedule established by the City if silt is carried over to adjacent public thoroughfares or occurs as a result of hauling. Timing may vary depending upon the time of year of construction. • Suspend grading operations during high winds(i.e.,wind speeds exceeding 25 mph) in accordance with Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils haul trucks or cover payloads using tarps or other suitable means. 6) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and Regional Water Quality Control Board [RWQCB])daily to reduce Fine Particulate Matter(PM10)emissions, in accordance with SCAQMD Rule 403. 7) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. 8) The construction contractor shall utilize electric or clean alternative fuel-powered equipment where feasible. 9) The construction contractor shall ensure that construction grading plans include a statement that work crews will shut off equipment when not in use. 10) All residential and commercial structures shall be required to incorporate high-efficiency/low-polluting heating, air conditioning, appliances, and water heaters. 11) All residential and commercial structures shall be required to incorporate thermal pane windows and weather-stripping. Biological Resources 1) In accordance with the Tree Preservation Ordinance, a tree preservation and replacement program based on the following priorities will be submitted and approved by the City Planner prior to the issuance of grading permits: 1) preserve-in-place healthy trees, 2) if trees cannot be preserved-in-place,then transplant elsewhere on-site, and as a last resort, 3) remove and replace with largest nursery grown stock available. Cultural Resources 1) If any paleontological resource (i.e. plant or animal fossils) are encountered before or during grading, the developer will retain a qualified paleontologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. The paleontologist shall submit a report of findings that will also provide PLANNING COMMISSION RESOLUTION NO. 06-39 DRC2003-00637—CHARLES JOSEPH ASSOCIATES April 12, 2006 Page 8 specific recommendations regarding further mitigation measures (i.e., paleontological monitoring)that may be appropriate. Where mitigation monitoring is appropriate,the program must include, but not be limited to, the following measures: • Enact interim measures to protect undesignated sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. • Consider establishing provisions to require incorporation of archaeological sites within new developments, using their special qualities as a theme or focal point. • Pursue educating the public about the area's archaeological heritage. • Propose mitigation measures and recommend conditions of approval to eliminate adverse project effects on significant, important, and unique prehistoric resources, following appropriate CEQA guidelines. • Prepare a technical resources management report,documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report, with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. 2) If any paleontological resource (i.e. plant or animal fossils) are encountered before or during grading, the developer will retain a qualified paleontologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures(i.e., paleontological monitoring)that may be appropriate. Where mitigation monitoring is appropriate,the program must include, but not be limited to, the following measures: • Assign a paleontological monitor, trained and equipped to allow the rapid removal of fossils with minimal construction delay, to the site full-time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared or graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Prepare, identify, and curate all recovered fossils for documentation in the summary report and transfer to an appropriate depository (i.e., San Bernardino County Museum). PLANNING COMMISSION RESOLUTION NO. 06-39 DRC2003-00637—CHARLES JOSEPH ASSOCIATES April 12, 2006 Page 9 Geology and Soils 1) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and RWQCB) daily to reduce (PM10) emissions, in accordance with SCAQMD Rule 403, or replanted with drought resistant landscaping as soon as possible. 2) Frontage public streets shall be swept according to a schedule established by the City to reduce PM10 emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon the time of year of construction. 3) Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PM10 emissions from the site during such episodes. 4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. 5) Fill slopes 30 feet or less in height should have a keyway toe(a special backfilled excavation, which is constructed beneath the toe area of a planned fill slope on sloping ground to improve the stability of the slope). Fill slopes greater than 30 feet in height should have a keyway width equal to one-half the slope height with a depth of 5 feet at the keyway toe. All keyways should be tilted a minimum of 2 percent towards the back of the keyway. 6) Backcuts for stabilized slopes 30 feet or less in height should be excavated at a 2:1 gradient. Backcuts for stabilized slopes greater than 30 feet in height can be excavated at gradients up to 1.5:1 provided the fill at the top of these slopes is at least 15 feet thick. All stabilized slopes should be constructed and drained in accordance with the specifications and details in Appendix H of the Geotechnical Investigation and Fault Study (specifications 5.50 thru 5.57). Adherence to these design specifications would ensure stable construction slopes. 7) For residences, setbacks from bottom outer edges of foundations, walls, etc. adjacent a top-of-slope should be setback from the slope face a horizontal distance of one-third the slope height under consideration in accordance with the 1997 Uniform Building Code. The horizontal distance should not be less than 5 feet. 8) Buildings adjacent the toe of a slope should be set back a horizontal distance equal to one-half the vertical height of the slope in accordance with the 1997 Uniform Building Code with minimum and maximum setbacks of 3 feet and 15 feet, respectively. 9) All slopes should be landscaped with drought resistant vegetation. A landscape architect should be consulted for recommendations on appropriate plant types and planting configuration. PLANNING COMMISSION RESOLUTION NO. 06-39 DRC2003-00637 —CHARLES JOSEPH ASSOCIATES April 12, 2006 Page 10 10) Interim measures should be considered to protect the slopes prior to the establishment of landscaping. These measures may include the utilization of geotechnical erosion fabrics or acceptable alternatives. 11) Drainage devices should be inspected and maintained at regular intervals and should not be obstructed. 12) The slopes should be periodically inspected for the presence of burrowing rodents. If an infestation of burrowing rodents is confirmed, they should be eliminated from the slopes. 13) Provisions should be made to interrupt automatic timing devices of irrigation systems during the rainy seasons. Hydrology and Water Quality Construction Activities: 1) Prior to issuance of grading permits, the permit applicant shall submit to Building Official for approval a Storm Water Pollution Prevention Plan (SWPPP) specifically identifying Best Management Practices (BMPs) that shall be used on-site to reduce pollutants during construction activities entering the storm drain system to the maximum extent practical. 2) An Erosion Control Plan shall be prepared, included in the Grading Plan,and implemented for the proposed project that identifies specific measures to control on-site and off-site erosion from the time of ground disturbing activities are initiated through completion of grading. This Erosion Control Plan shall include the following measures at a minimum: a) Specify the timing of grading and construction to minimize soil exposure to rainy periods experienced in southern California, and b) An inspection and maintenance program shall be included to ensure that any erosion which does occur either on-site or off-site as a result of this project will be corrected through a remediation or restoration program within a specified time frame. 3) During construction, temporary berms such as sandbags or gravel dikes must be used to prevent discharge of debris or sediment from the site when there is rainfall or other runoff. 4) During construction, to remove pollutants, street cleaning will be performed prior to storm events and after the use of water trucks to control dust in order to prevent discharge of debris or sediment from the site. 5) It shall be the hired contractor's responsibility to inspect and maintain all BMPs in good working order. Inspection and maintenance responsibility shall remain for the duration of the project. PLANNING COMMISSION RESOLUTION NO. 06-39 DRC2003-00637—CHARLES JOSEPH ASSOCIATES April 12, 2006 Page 11 Post-Construction Operational: 6) The developer shall implement the BMPs identified in the Water Quality Management Plan (WQMP) prepared by Hall and Foreman, Inc. dated May 2004 to reduce pollutants after construction entering the storm drain system to the maximum extent practical. 7) Landscaping plans shall include provisions for controlling and minimizing the use of fertilizers/pesticides/herbicides. Landscaped areas shall be monitored and maintained for at least two years to ensure adequate coverage and stable growth. Plans for these areas, including monitoring provisions for a minimum of two years, shall be submitted to the City for review and approval prior to the issuance of grading permits. 8) Prior to issuance of building permits, the applicant shall submit to the City Engineer for approval a WQMP, including a project description and identifying BMPs that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The WQMP shall identify the structural and 'non-structural measures consistent with the Guidelines for New Development and Redevelopment adopted by the City of Rancho Cucamonga in June 2004. 9) Prior to issuance of grading or paving permits, the applicant shall obtain a Notice of Intent(NOI)to comply with obtaining coverage under the NPDES General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Discharger's Identification Number) shall be submitted to the City Building Official for coverage under the NPDES General Construction Permit. Noise 1) Construction or grading shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. 2) Construction or grading noise levels shall not exceed the standards specified in Development Code Section 17.02.120-D, as measured at the property line. Developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times maybe required by the Planning Department. Said consultant shall report their findings to the Planning Department within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Planning Department. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. PLANNING COMMISSION RESOLUTION NO. 06-39 DRC2003-00637— CHARLES JOSEPH ASSOCIATES April 12, 2006 Page 12 3) The perimeter block wall shall be constructed as early as possible in the first phase. 4) Haul truck deliveries shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday ora national holiday. Additionally, if heavy trucks used for hauling would exceed 100 dailytrips (counting both to and from the construction site), then the developer shall prepare a Noise Mitigation Plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. 5) Once building plans are submitted for permits, an interior noise analysis shall be done for buildings in this project to determine the type of building materials to be used to ensure that buildings meet interior noise standards of 45dB CNEL. 6) Noise barriers should be constructed around the patios and balconies of the buildings along the southern portion of the project site, adjacent to Foothill Boulevard. The first floor patio barriers shall be 51/2 feet in height and the second and third floor balcony barriers shall be 5.0 feet in height. 8. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 12TH DAY OF APRIL 2006. PLANNING2M[SSION,,OF THE CITY OF RANCHO CUCAMONGA BY: PaChair ATTEST: Dan Coleman, Actind Secretary I, Dan Coleman, Acting Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 12th day of April 2006, by the following vote-to-wit: AYES: COMMISSIONERS: FLETCHER, MACIAS.,* MUNOZ, STEWART NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: NONE ABSTAIN: COMMISSIONERS: McPHAIL City of Rancho Cucamonga MITIGATION MONITORING PROGRAM Project File No.: General Plan Amendment DRC2004-00339, Development Code Amendment DRC2004-00352, Tentative Tract Map SUBTT16605, Development Review DRC2003-00637, Variance DRC2005-01061, and Minor Development Review DRC2004-00826. This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation measures identified in the Mitigated Negative Declaration for the above-listed project. This program has been prepared in compliance with State law to ensure that adopted mitigation measures are implemented (Section 21081.6 of the Public Resources Code). Program Components -This MMP contains the following elements: Conditions of approval that act as impact mitigation measures are recorded with the action and the procedure necessary to ensure compliance. The mitigation measure conditions of approval are contained in the adopted Resolution of Approval for the project. ' 1. A procedure of compliance and verification has been outlined for each action necessary.This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported. 2. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring progresses, changes to compliance procedures may be necessary based upon recommendations by those responsible for the program. Program Management -The MMP will be in place through all phases of the project. The project planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly and proper action is taken on each mitigation. Each City department shall ensure compliance of the conditions (mitigation) that relate to that department. Procedures -The following steps will be followed by the City of Rancho Cucamonga. A fee covering all costs and expenses, including any consultants' fees, incurred by the City in performing monitoring or reporting programs shall be charged to the applicant. 1. A MMP Reporting Form will be prepared for each potentially significant impact and its corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached hereto. This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported. All monitoring and reporting documentation will be kept in the project file with the department having the original authority for processing the project. Reports will be available from the City upon request at the following address: MITIGATION MONITORING PROGRAM DRC2004-00339, -00352\SUBTT16605\DRC2003-00637\DRC2005-01061\DRC2004-00826 April 12, 2006 Page 2 City of Rancho Cucamonga - Lead Agency Planning Department 10500 Civic Center Drive Rancho Cucamonga, CA 91730 2. Appropriate specialists will be retained if technical expertise beyond the City staffs is needed, as determined by the project planner or responsible City department, to monitor specific mitigation activities and provide appropriate written approvals to the project planner. 3. The project planner or responsible City department will approve, by signature and date, the completion of each action item that was identified on the MMP Reporting Form. After each measure is verified for compliance, no further action is required for the specific phase of development. 4. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off as completed by the project planner or responsible City department at the bottom of the MMP Reporting Form. 5. Unanticipated circumstances may arise requiring the refinement or addition of mitigation measures.The project planner is responsible for approving any such refinements or additions. An MMP Reporting Form will be completed by the project planner or responsible City department and a copy provided to the appropriate design, construction, or operational personnel. 6. The project planner or responsible City department has the authority to stop the work of construction contractors if compliance with any aspects of the MMP is not occurring after written notification has been issued. The project planner or responsible City department also has the authority to hold certificates of occupancies if compliance with a mitigation measure attached hereto is not occurring. The project planner or responsible City department has the authority to hold issuance of a business license until all mitigation measures are implemented. 7. Any conditions (mitigation) that require monitoring after project completion shall be the responsibility of the City of Rancho Cucamonga Planning Division. The Division shall require the applicant to post any necessary funds (or other forms of guarantee)with the City. These funds shall be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measure for the required period of time. 8. In those instances requiring long-term project monitoring, the applicant shall provide the City with a plan for monitoring the mitigation activities at the project site and reporting the monitoring results to the City. Said plan shall identify the reporter as an individual qualified to know whether the particular mitigation measure has been implemented. The monitoring/reporting plan shall conform to the City's MMP and shall be approved by the Community Development Director or City Planner prior to the issuance of building permits. MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III) Project File No.: GENERAL PLAN AMENDMENT DRC2004-00339, DEVELOPMENT CODE AMENDMENT DRC2004-00352 TENTATIVE TRACT SUBTT16605, DEVELOPMENT REVIEW DRC2003-00637 VARIANCE DRC2005-01061 MINOR DEVELOPMENT REVIEW DRC2004-00826 Applicant: CHARLES JOSEPH ASSOCIATES Initial Study Prepared by: Larry Henderson Date: March 8. 2006 ResponsibleMitigation Measures No./ of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-compliance Air Quality All construction equipment shall be maintained.in good CP C Review of plans A/C 2/4 operating condition so as to reduce operational emissions. The contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers' specifications. Maintenance records shall be available at the construction site for City verification. Prior to the issuance of any grading permits, the CP/BO C Review of plans C 2 developer shall submit construction plans to the City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low-emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD), as well as City Planning staff. All paints and coatings shall meet or exceed CP C Review of plans A/C 2/4 performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high-volume, low-pressure spray. All asphalt shall meet or exceed performance standards BO B Review of plans A/C 2 noted in SCAQMD Rule 1108. All construction equipment shall comply with SCAQMD BO C Review of plans A/C 2/4 Rules 402 and 403. Additionally, contractors shall include the following provisions: Reestablish ground cover on the construction site BO C Review of plans A/C 2/4 through seeding and watering. 1 of 10 Mitigation Measures No. Responsible . . Timing of Method of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Pave or apply gravel to any on-site haul roads. BO C Review of plans A/C 2/4 Phase grading to prevent the susceptibility of large BO C Review of plans A/C 2/4 areas to erosion over extended periods of time. Schedule activities to minimize the amounts of exposed BO C Review of plans A/C 2/4 excavated soil during and after the end of work periods. Dispose of surplus excavated material in accordance BO C Review of plans A 4 with local ordinances and use sound engineering practices. Sweep streets according to a schedule established by BO C During A 4 the City if silt is carried over to adjacent public construction thoroughfares or occurs as a result of hauling. Timing may vary depending upon the time of year of construction. Suspend grading operations during high winds(i.e.,wind BO C During A 4 speeds exceeding 25 mph)in accordance with Rule 403 construction requirements. Maintain a minimum 24-inch freeboard ratio on soils BO C During A 4 haul trucks or cover payloads using tarps or other Construction suitable means. The site shall be treated with water or other soil- BO C During A 4 stabilizing agent (approved by SCAQMD and Regional construction Water Quality Control Board [RWQCBj)daily to reduce Fine Particulate Matter(PM,o)emissions,in accordance with SCAQMD Rule 403. Chemical soil-stabilizers (approved by SCAQMD and BO C During A 4 RWQCB) shall be applied to all inactive construction construction areas that remain inactive for 96 hours or more to reduce PM,o emissions. The construction contractor shall utilize electric or clean BO C Review of plans A/C 4 alternative fuel-powered equipment where feasible. The construction contractor shall ensure that BO C Review of plans_ A/C 2/4 construction grading plans include a statement thatwork crews will shut off equipment when not in use. 2of10 Mitigation Measures No. Responsible g of Method . Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance All residential and commercial structures shall be BO C/D Review of plans C 2/4 required to incorporate high efficiency/low polluting heating,air conditioning,appliances,and water heaters. All residential and commercial structures shall be BO C/D Review of plans C 2/4 required to incorporate thermal pane windows and weather-stripping. Biological'Resources In accordance with the Tree Preservation Ordinance, a CP B/C A/C/D A/C 2/4 tree preservation and replacement program based on the following priorities will be submitted and approved by the City Planner prior to the issuance of grading permits: 1) preserve-in-place healthy trees, 2)if trees cannot be preserved-in-place, then transplant elsewhere on-site, and as a last resort, 3)remove and replace with largest nursery grown stock available. 'Cultural-Resources If any paleontological resource (i.e. plant or animal fossils) are encountered before or during grading, the developer will retain a qualified paleontologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures(i.e., paleontological monitoring)that may be appropriate. Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: Enact interim measures to protect undesignated sites CP/BO C Review of report A/D 3/4 from demolition or significant modification without an opportunity for the City to establish its archaeological value. Consider establishing provisions to require incorporation CP/BO C Review of report AID 3/4 of archaeological sites within new developments, using their special qualities as a theme or focal point. Pursue educating the public about the area's CP/BO C Review of report AID 3/4 archaeological heritage. 3of10 Mitigation Measures No.I Responsible of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Propose mitigation measures and recommend CP/BO C Review of report A/D 3/4 conditions of approval to eliminate adverse project effects on significant, important, and unique prehistoric resources,following appropriate CEQA guidelines. Prepare a technical resources management report, CP C Review of report A/D 3/4 documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report, with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. If any paleontological resource (i.e. plant or animal CP B Review of report A/D 4 fossils) are encountered before or during grading, the developer will retain a qualified paleontologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures(i.e., paleontological monitoring)that may be appropriate. Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: Assign a paleontological monitor,trained and equipped CP B Review of report A/D 4 to allow the rapid removal of fossils with minimal construction delay,to the site full-time during the interval of earth-disturbing activities. Should fossils be found within an area being cleared or BO B/C Review of report A/D 4 graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. Prepare, identify, and curate all recovered fossils for CP D Review of report D 3 documentation in the summary report and transfer to an appropriate depository (i.e., San Bernardino County Museum). 4of10 Mitigation Measures No. Responsible g of Method . ImplementingYerificationequencyVerification D Geology and Soils .- , The site shall be treated with water or other soil- BO C During A 4 stabilizing agent(approved by SCAQMD and RWQCB) construction daily to reduce Fine Particulate Matter(PM10)emissions, in accordance with SCAQMD Rule 403, or replanted with drought resistant landscaping as soon as possible. Frontage public streets shall be swept according to a BO C During A 4 schedule established by the City to reduce PM10 construction emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon the time of year of construction. Grading operations shall be suspended when wind BO C During A 4 speeds exceed 25 mph to minimize PM10 emissions construction from the site during such episodes. Chemical soil-stabilizers (approved by SCAQMD and BO C During A 4 RWQCB) shall be applied to all inactive construction construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. Fill slopes 30 feet or less in height should have a BO C During A 4 keyway toe (a special backfilled excavation, which is construction constructed beneath the toe area of a planned fill slope on sloping ground to improve the stability of the slope). Fill slopes greater than 30 feet in height should have a keyway width equal to one-half the slope height with a depth of 5 feet at the keyway toe. All keyways should be tilted a minimum of 2 percent towards the back.of the keyway. Backcuts for stabilized slopes 30 feet or less in height BO C During A 4 should be excavated at a 2:1 gradient. Backcuts for construction stabilized slopes greater than 30 feet in height can be excavated at gradients up to 1.5:1 provided the fill at the top of these slopes is at least 15 feet thick. All stabilized slopes should be constructed and drained in accordance with the specifications and details in Appendix H of the Geotechnical Investigation and Fault Study (specifications 5.50 thru 5.57). Adherence to these design specifications would ensure stable construction slopes. 5of10 Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance For residences, setbacks from bottom outer edges of BO C During A 4 foundations, walls, etc. adjacent a top-of-slope should construction be setback from the slope face a horizontal distance of one-third the slope height under consideration in accordance with the 1997 Uniform Building Code. The horizontal distance should not be less than 5 feet. Buildings adjacent the toe of a slope should be set back BO C During A 4 a horizontal distance equal to one-half the vertical height construction of the slope in accordance with the 1997 Uniform Building Code with minimum and maximum setbacks of 3 feet and 15 feet, respectively. All slopes should be landscaped with drought resistant BO/CP B Plan Check and A/C 2/3 vegetation. A landscape architect should be consulted During for recommendations on appropriate plant types and construction planting configuration. Interim measures should be considered to protect the BO/CP B/C Plan Check and A/C 2/3 slopes prior to the establishment of landscaping. These During measures may include the utilization of geotechnical construction erosion fabrics or acceptable alternatives. Drainage devices should be inspected and maintained BO C On-going A 3/4 at regular intervals and should not be obstructed. The slopes should be periodically inspected for the BO C On-going A 5 presence of burrowing rodents. If an infestation of burrowing rodents is confirmed, they should be eliminated from the slopes. Provisions should be made to interrupt automatic timing BO B C A 3 devices of irrigation systems during the rainy seasons. Hydrology and Water Quality Prior to issuance of grading permits,the permit applicant BO B/C/D Review of plans A/C 2/4 shall submit to Building Official for approval a Storm Water Pollution Prevention Plan (SWPPP) specifically identifying Best Management Practices (BMPs) that shall be used on-site to reduce pollutants during construction activities entering the storm drain system to the maximum extent practical. 6 of 10 Mitigation Measures No. I Responsible of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date /initials Non-Compliance An Erosion Control Plan shall be prepared, included in BO B/C/D Review of plans AIC 2l4 the Grading Plan, and implemented for the proposed project that identifies specific measures to control on- site and off-site erosion from the time of ground disturbing activities are initiated through completion of grading. This Erosion Control Plan shall include the following measures ata minimum: a)Specify the timing of grading and construction to minimize soil exposure to rainy periods experienced in southern California,and b) An inspection and maintenance program shall be included to ensure that any erosion which does occur either on-site or off-site as a result of this project will be corrected through a remediation or restoration program within a specified time frame. During construction, temporary berms such as BO B/C/D Review of plans A/C 2/4 sandbags or gravel dikes must be used to prevent discharge of debris or sediment from the site when there is rainfall or other runoff. During construction, to remove pollutants, street BO B/C/D Review of plans A/C 2/4 cleaning will be performed prior to storm events and after the use of water trucks to control dust in order to prevent discharge of debris or sediment from the site. It shall be the hired contractor's responsibility to inspect CE B/C/D Review of plans A/C 2/4 and maintain all BMPs in good working order. Inspection and maintenance responsibility shall remain for the duration of the project. The developer shall implement the BMPs identified in CE B/C/D Review of plans A/C 2/4 the Water Quality Management Plan(WQMP)prepared by Hall and Foreman, Inc. dated May 2004 to reduce pollutants after construction entering the storm drain system to the maximum extent practical. 7of10 Mitigation Measures No. Responsible of . . . VerificationImplementing Action for Monitoring Frequency Date/initials Non-Compliance Landscaping plans shall include provisions for BO B/C/D Review of plans A/C 2/4 controlling and minimizing the use of fertilizers/pesticides/herbicides. Landscaped areas shall be monitored and maintained for at least two years to ensure adequate coverage and stable growth. Plans for these areas, including monitoring provisions for a minimum of two years,shall be submitted to the City for review and approval prior to the issuance of grading permits. Prior to issuance of building permits, the applicant shall CE B/C/D Review of plans A/C 2/4 submit to the City Engineer for approval a WQMP, including a project description and identifying BMPs that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The WQMP shall identify the structural and non-structural measures consistent with the Guidelines for New Development and Redevelopment adopted by the City of Rancho Cucamonga in June 2004. Prior to issuance of grading or paving permits, the BO B/C/D Review of plans A/C 2/4 applicant shall obtain a Notice of Intent(NOI)to comply with obtaining coverage under the NPDES General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Discharger's Identification Number) shall be submitted to the City Building Official for coverage under the NPDES General Construction Permit. -Noise Construction or grading shall not take place between the BO C During A 4 hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction including Saturday, or at any time on Sunday or a national holiday. 8of10 Mitigation Measures No. Responsible g of Method . Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Construction or grading noise levels shall not exceed the BO C During A 4 standards specified in Development Code Section construction 17.02.120-D, as measured at the property line. Developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Planning Department. Said consultant shall report their findings to the Planning Department within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Planning Department. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. The perimeter block wall shall be constructed as early CP C During A A as possible in the first phase. construction Haul truck deliveries shall not take place between the PO/BO C During A 4/7 hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction including Saturday, or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips (counting both to and from the construction site),then the developer shall prepare a Noise Mitigation Plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. Once building plans are submitted for permits, an CP B Plan check C 2 interior noise analysis shall be done for buildings in this project to determine the type of building materials to be used to ensure that buildings meet interior noise standards of 45dB CNE . Noise barriers should be constructed around the patios CP B/D Plan check and A/C 2/3 and balconies of the buildings along the southern portion Final inspection of the project site, adjacent to Foothill Boulevard. The first floor patio barriers shall be 5 1/2 feet in height and the second and third floor balcony barriers shall be 5.0 feet in height. 9of10 Key to Checklist Abbreviations , ` o,Responsible PeSOlk` rMmotgio � a i Method ofzVerlficati4n N: a Sanctions L CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds FC-Fire Chief or designee 6-Revoke CUP 7-Citation 10 of 10 d COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT #: DEVELOPMENT REVIEW DRC2003-00637 SUBJECT: SYCAMORE VILLAS APPLICANT: CHARLES JOSEPH ASSOCIATES NORTHSIDE OF FOOTHILL BOULEVARD BETWEEN REDHILL COUNTRY CLUB DRIVE AND LOCATION: SOUTHERN PACIFIC RAILROAD ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents, officers, or employees, because of the issuance of such approval,or in the alternative,to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Copies of the signed Planning Commission Resolution of Approval No. 06-39, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. B. Time Limits 1. Conditional Use Permit, Variance, or Development/Design Review approval shall expire if building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans, architectural elevations,exterior materials and colors, landscaping,sign program, and grading on file in the Planning Department,the conditions contained herein, Development Code regulations, the Foothill Boulevard Specific Plan. 1 Project No. DRC2003-00637 Completion Date 2. Prior to any use of the project site or business activity being commenced thereon,all Conditions of Approval shall be completed to the satisfaction of the City Planner. 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Department to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for City Planner review and approval prior to the issuance of building permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.)or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code,all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 7. A detailed on-site lighting plan, including a photometric diagram,shall be reviewed and approved by the City Planner and Police Department(477-2800) prior to the issuance of building permits. Such plan shall indicate style, illumination, location, height,and method of shielding so as not to adversely affect adjacent properties. 8. If no centralized trash receptacles are provided,all trash pick-up shall be for individual units with all receptacles shielded from public view. 9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls,berm ing,and/or landscaping to the satisfaction of the City Planner. For single- family residential developments, transformers shall be placed in underground vaults. 10. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination. 11. All parkways, open areas, and landscaping shall be permanently maintained by the property owner,homeowners'association,or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for City Planner and City Engineer review and approved prior to the issuance of building permits. 12. The project contains a designated Historical Landmark. Any further modifications to the site including, but not limited to,exterior alterations and/or interior alterations which affect the exterior of the buildings or structures, removal of landmark trees,demolition,relocation,reconstruction of buildings or structures, or changes to the site, shall require a modification to the Historic Landmark Alteration Permit subject to Historic Preservation Commission review and approval. 13. The developer shall submit a construction access plan and schedule for the development of all lots for City Planner and City Engineer approval; including, but not limited to, public notice requirements,special street posting,phone listing for community concerns,hours of construction activity, dust control measures, and security fencing. 14. Access gates to the rear yards shall be constructed from a material more durable than wood gates. Acceptable materials include, but are not limited to, wrought iron and PVC. 15. For multiple family development, laundry facilities shall be provided as required by the Development Code. 16. For multiple family development,a minimum of 125 cubic feet of exterior lockable storage space shall be provided. 2 Project No. DRC2003-00637 Completion Date 17. For residential development, recreation area/facility shall be provided as required by the Development Code. 18. Where rock cobble is used, it shall be real river rock. Other stone veneers may be manufactured products. D. Building Design 1. An alternative energy system is required to provide domestic hot water for all dwelling units and for heating any swimming pool or spa, unless other alternative energy systems are demonstrated to be of equivalent capacity and efficiency. All swimming pools installed at the time of initial development shall be supplemented with solar heating. Details shall be included in the building plans and shall be submitted for City Planner review and approval prior to the issuance of building permits. 2. Standard patio cover plans for use by the Homeowner's Association shall be submitted for City Planner and Building Official review and approval prior to issuance of building permits. 3. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections, shall be shielded from view and the sound buffered from adjacent properties and streets as required by the Planning Department. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the City Planner. Details shall be included in building plans. E. Parking and Vehicular Access (indicate details on building plans) 1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet wide. 2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall contain a 12-inch walk adjacent to the parking stall (including curb). 3. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided throughout the development to connect dwellings/units/buildings with open spaces/plazas/ recreational uses. 4. All parking spaces shall be double striped per City standards and all driveway aisles,entrances, and exits shall be striped per City standards. 5. The Covenants,Conditions and Restrictions shall restrict the storage of recreational vehicles on this site unless they are the principal source of transportation for the owner and prohibit parking on interior circulation aisles other than in designated visitor parking areas. 6. Plans for any security gates shall be submitted for the City Planner, City Engineer, and Rancho Cucamonga Fire Protection District review and approval prior to issuance of building permits. For residential development,private gated entrances shall provide adequate turn-around space in front of the gate and a separate visitor lane with call box to avoid cars stacking into the public right-of-way. F. Trip Reduction 1. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily residential projects of more than 10 units. Minimum spaces equal to five percent of the required automobile parking spaces or three bicycle storage spaces,whichever is greater. After the first 50 bicycle storage spaces are provided,additional storage spaces required are 2.5 percent of the required automobile parking spaces. Warehouse distribution uses shall provide bicycle storage spaces at a rate of 2.5 percent of the required automobile parking spaces with a minimum of a 3-bike rack. In no case shall the total number of bicycle parking spaces required exceed 100. Where this results in a fraction of 0.5 or greater, the number shall be rounded off to the higher whole number. 3 Project No.DRC2003-00637 Completion Date G. Landscaping 1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for City Planner review and approval prior to the issuance of building permits or prior final map approval in the case of a custom lot subdivision. 2. Existing trees required to be preserved in place shall be protected with a construction barrier in accordance with the Municipal Code Section 19.08.110,and so noted on the grading plans. The location of those trees to be preserved in place and new locations for transplanted trees shall be shown on the detailed landscape plans. The applicant shall follow all of the arborist's recommendations regarding preservation, transplanting, and trimming methods. 3. A minimum of 45 trees per gross acre,comprised of the following sizes,shall be provided within the project: 0%-48-inch box or larger 10%-36-inch box or larger, 10%-24-inch box or larger, 80% - 15-gallon, and 0% - 5 gallon. 4. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking stalls. 5. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope,but less than 2:1 slope,shall be,at minimum, irrigated and landscaped with appropriate ground cover for erosion control. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 6. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater slope shall be landscaped and irrigated for erosion control and to soften their appearance as follows: one 15-gallon or larger size tree per each 150 sq.ft.of slope area, 1-gallon or larger size shrub per each 100 sq.ft.of slope area,and appropriate ground cover. In addition,slope banks in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in staggered clusters to soften and vary slope plane. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 7. For multi-family residential and non-residential development,property owners are responsible for the continual maintenance of all landscaped areas on-site,as well as contiguous planted areas within the public right-of-way. All landscaped areas shall be kept free from weeds and debris and maintained in healthy and thriving condition,and shall receive regular pruning,fertilizing,mowing, and trimming. Any damaged,dead,diseased,or decaying plant material shall be replaced within 30 days from the date of damage. 8. The final design of the perimeter parkways,walls,landscaping,and sidewalks shall be included in the required landscape plans and shall be subject to City Planner review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Department. 9. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 10. All walls shall be provided with decorative treatment. If located in public maintenance areas,the design shall be coordinated with the Engineering Department. 11. Tree maintenance criteria shall be developed and submitted for City Planner review and approval prior to issuance of building permits. These criteria shall encourage the natural growth characteristics of the selected tree species. 12. Landscaping and irrigation shall be designed to conserve water through the principles of Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code. 4 Project No. DRC2003-00637 Completion Date H. Signs 1. The signs indicated on the submitted plans are conceptual only and not a part of this approval. Any signs proposed for this development shall comply with the Sign Ordinance and shall require separate application and approval by the Planning Department prior to installation of any signs. 2. Directory monument sign(s)shall be provided for apartment,condominium,or town homes prior to occupancy and shall require separate application and approval by the Planning Department prior to issuance of building permits. I. Environmental 1. The developer shall provide each prospective buyer written notice of the City Adopted Special Studies Zone for the Red Hill Fault, in a standard format as determined by the City Planner,prior to accepting a cash deposit on any property. 2. Noise levels shall be monitored after construction to verify the adequacy of the mitigation measures. Noise levels shall be monitored by actual noise level readings taken on-and off-site. A final acoustical report shall be submitted for City Planner review and approval prior to final occupancy release. The final report shall also make recommendations as to additional mitigation measures to reduce noise levels to below City standards, such as, residential exterior noise levels to below 60 dBA and interior noise attenuation to below 45 dBA. 3. A final acoustical report shall be submitted for City Planner review and approval prior to the issuance of building permits. The final report shall discuss the level of interior noise attenuation to below 45 CNEL, the building materials and construction techniques provided, and if appropriate,verify the adequacy of the mitigation measures. The building plans will be checked for conformance with the mitigation measures contained in the final report. 4. The applicant shall submit certification from an acoustical engineer that all recommendations of the acoustical report were implemented in construction, including measurements of interior and exterior noise levels to document compliance with City standards. Certification shall be submitted to the Building &Safety Department prior to final occupancy release of the affected homes. 5. Mitigation measures are required for the project. The applicant is responsible for the cost of implementing said measures, including monitoring and reporting. Applicant shall be required to post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the amount of $495.00 prior to the issuance of building permits, guaranteeing satisfactory performance and completion of all mitigation measures. These funds maybe used by the Cityto retain consultants and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete all actions required by the approved environmental documents shall be considered grounds for forfeit. J. Other Agencies 1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location of mailboxes. Multi-family residential developments shall provide a solid overhead structure for mailboxes with adequate lighting. The final location of the mailboxes and the design of the overhead structure shall be subject to City Planner review and approval prior to the issuance of building permits. 5 Project No. DRC2003-00637 Completion Date APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT, (909)477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S) K. General Requirements 1. Submit five complete sets of plans including the following: a. Site/Plot Plan; b. Foundation Plan; C. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans(2 sets, detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; I. Plumbing and Sewer Plans, including isometrics, underground diagrams,water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Department Project Number (i.e., DRC2003-00637) clearly identified on the outside of all plans. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to the City prior to permit issuance. 4. Separate permits are required for fencing and/or walls. 5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the Building and Safety Department. 6. Developers wishing to participate in the Community Energy Efficiency Program (CEEP) can contact the Building and Safety Department staff for information and submittal requirements. L. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number(i.e., DRC2003-00637). The applicant shall comply with the latest adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Department for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new residential project or major addition,the applicant shall pay development fees at the established rate. Such fees may include,but are not limited to: City Beautification Fee, Park Fee, Drainage Fee,Transportation Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Department prior to permit issuance. 3. Prior to issuance of building permits for a new commercial or industrial development project or major addition,the applicant shall pay development fees at the established rate. Such fees may include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee,Transportation Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Department prior to permits issuance. 6 Project No. DRC2003-00637 Completion Date 4. Street addresses shall be provided by the Building and Safety Official after tract/parcel map recordation and prior to issuance of building permits. 5. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. 6. Construct trash enclosure(s) per City Standard (available at the Planning Department's public counter). 7. Submit pool plans to the County of San Bernardino's Environmental Health Services Department for approval. M. New Structures 1. Provide compliance with the California Building Code (CBC) for property line clearances considering use, area, and fire-resistiveness. 2. Provide compliance with the California Building Code for required occupancy separations. 3. Roofing material shall be installed per the manufacturer's "high wind" instructions. 4. Plans for food preparation areas shall be approved by County of San Bernardino Environmental Health Services prior to issuance of building permits. 5. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC Section 1505. 6. Provide draft stops in attics in line with common walls. 7. Roofing materials shall be Class "A." 8. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A 9. Openings in exterior walls shall be protected in accordance with CBC Table 5-A. 10. If the area of habitable space above the first floor exceeds 3,000 square feet, then the construction type shall be V-1 Hour minimum. 11. Walls and floors separating dwelling units in the same building shall be not less than 1-hour fire-resistive construction. 12. Provide smoke and heat venting in accordance with CBC Section 906. N. Grading 1. Grading of the subject property shall be in accordance with California Building Code,City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the time of application for grading plan check. 4. The final grading, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 7 Project No.DRC2003-00637 Completion Date 5. A separate grading plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The grading plan shall be prepared,stamped, and signed by a California registered Civil Engineer. APPLICANT SHALL CONTACT THE ENGINEERING DEPARTMENT, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: O. Dedication and Vehicular Access 1. Rights-of-way and easements shall be dedicated to the City for all interior public streets, community trails, public paseos,public landscape areas,street trees,traffic signal encroachment and maintenance, and public drainage facilities as shown on the plans and/or tentative map. Private easements for non-public facilities (cross-lot drainage, local feeder trails, etc.) shall be reserved as shown on the plans and/or tentative map. 2. Dedication shall be made of the following rights-of-way on the perimeter streets(measured from street centerline): 60 total feet on Foothill Boulevard, project site and Sycamore Inn frontage. 30 total feet on Red Hill Country Club Drive. 3. Vehicular access rights shall be dedicated to the City for the following streets, except for approved openings: Red Hill Country Club Drive. 4. Reciprocal access easements shall be provided ensuring access to all parcels by CC&Rs or by deeds and shall be recorded concurrently with the map or prior to the issuance of building permits, where no map is involved. 5. Reciprocal parking agreements for all parcels and maintenance agreements ensuring joint maintenance of all common roads, drives, or parking areas shall be provided by CC & R's or deeds and shall be recorded prior to, or concurrent with,the final parcel map. 6. All existing easements lying within future rights-of-way shall be quit-claimed or delineated on the final map. 7. Easements for public sidewalks and/or street trees placed outside the public right-of-way shall be dedicated to the City. 8. The developer shall make a good faith effort to acquire the required off-site property interests necessary to construct the required public improvements, and if he/she should fail to do so,the developer shall, at least 120 days prior to submittal of the final map for approval, enter into an agreement to complete the improvements pursuant to Government Code Sections 66462 and 66462.5 at such time as the City decides to acquire the property interests required for the improvements. Such agreement shall provide for payment by the developer of all costs incurred by the City if the City decides to acquire the off-site property interests required in connection with the subdivision. Security for a portion of these costs shall be in the form of a cash deposit in the amount given in an appraisal report obtained by the City,at developer's cost. The appraiser shall have been approved by the City prior to commencement of the appraisal. This condition applies in particular, but not limited to: Master Plan Storm Drain South of Foothill Boulevard. P. Street Improvements 1. All public improvements(interior streets,drainage facilities,community trails,paseos,landscaped areas, etc.) shown on the plans and/or tentative map shall be constructed to City Standards. Interior street improvements shall include, but are not limited to,curb and gutter,AC pavement, drive approaches, sidewalks, street lights, and street trees. 8 Project No.DRC2003-00637 Completion Date 2., Pursuant to City Council Resolution No.88-557,no person shall make connections from a source of energy,fuel or power to any building service equipment which is regulated by technical codes and for which a permit is required unless, in addition to any and all other codes, regulations and ordinances, all improvements required by these conditions of development approval have been completed and accepted by the City Council,except:that in developments containing more than one building or unit, the development may have energy connections made to a percentage of those buildings, or units proportionate to the completion of improvements as required by conditions of approval of development. In no case shall more than 95 percent of the buildings or units be connected to energy prior to completion and acceptance of all improvements required by these conditions of approval of development. 3. Construct the following perimeter street improvements including, but not limited to: Curb& AC. Side- Drive Street Street Comm Median Bike Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other Foothill Boulevard,project X X (c) (e) X X (d) (f) site and Sycamore Inn (g) Frontage (h) (i) Red Hill Country Club X X X X X X (g) Drive Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be provided for this item. (e)Street type. (f)ADA access ramps. (g) Necessary drainage facilities. (h) Depending on school district requirements, provide a bus bay foe westbound Foothill Boulevard east of drive entrance; dedicated additional right-of-way as necessary. (i) Modify traffic signal at Foothill Boulevard and San Bernardino Road. 4. Improvement Plans and Construction: a. Street improvement plans, including street trees,street lights,and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements,prior to final map approval or the issuance of building permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the City Engineer's Office in addition to any other permits required. C. Pavement striping,marking,traffic signing,street name signing,traffic signal conduit,and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer Notes: 1) Pull boxes shall be No.6 at intersections and No.5 along streets,a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2) Conduit shall be 3-inch galvanized steel with pull rope or as specified. e. Handicapped access ramps shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. 9 Project No.DRC2003-00637 Completion Date f. Existing City roads requiring construction shall remain open to traffic at all times with _/—J_ adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving,which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single family residential lots. h. Street names shall be approved by the City Planner prior to submittal for first plan check. 5. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. 6. Install street trees per City street tree design guidelines and standards as follows. The completed legend (box below) and construction notes shall appear on the title page of the street improvement plans. Street improvement plans shall include a line item within the construction legend stating: "Street trees shall be installed per the notes and legend on sheet_(typically sheet 1)." Where public landscape plans are required, tree installation in those areas shall be per the public landscape improvement plans. The City Engineer reserves the right to adjust tree species based upon field conditions and other variables. For additional information, contact the Project Engineer. Min. Grow Street Name Botanical Name Common Name Space Spacing Size city. Foothill Boulevard in Prunus X N.C.N. 3 ft. 20'0.C.informal 15 gal. Fill in R.O.W.and Median blireiana groupings not more than 25%of total frontage trees. Foothill Boulevard on- Platanus London Plane 8 ft. Space per on-site plans- 15 gal. site acerifolia Tree 30'0.C.suggested Red Hill Country Club Platanus London Plane 8ft. 30'0.C. 15 gal. Drive acenfolia Tree Construction Notes for Street Trees: 1) All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting,an agronomic soils report shall be furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector. 3) All street trees are subject to inspection and acceptance by the Engineering Department. 4) Street trees are to be planted per public improvement plans only. 7. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with adopted policy. On collector or larger streets, lines of sight shall be plotted for all project intersections, including driveways. Local residential street intersections and commercial or industrial driveways may have lines of sight plotted as required. Q. Public Maintenance Areas 1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the City Engineer prior to final map approval or issuance of building permits whichever occurs first. Formation costs shall be borne by the developer. 2. Parkway landscaping on the following street(s) shall conform to the results of the respective Beautification Master Plan: Foothill Boulevard R. Drainage and Flood Control 1. The project(or portions thereof) is located within a Flood Hazard Zone;therefore,flood protection measures shall be provided as certified by a registered Civil Engineer and approved by the City Engineer. 10 Project No.DRC2003-00637 Completion Date 2. It shall be the developer's responsibility to have the current FIRM Zone A designation removed _/_/_ from the project area. The developer shall provide drainage and/or flood protection facilities sufficient to obtain an unshaded "X" designation. The developer's engineer shall prepare all necessary reports, plans, and hydrologic/hydraulic calculations. A Conditional Letter of Map Revision (CLOMR) shall be obtained from FEMA prior to final map approval or issuance of building permits, whichever occurs first. A Letter of Map Revision (LOMB) shall be issued by FEMA prior to occupancy or improvement acceptance, whichever occurs first. 3. A final drainage study shall be submitted to and approved by the City Engineer prior to final map approval or the issuance of building permits,whichever occurs first. All drainage facilities shall be installed as required by the City Engineer. 4. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the property from adjacent areas. 5. Trees are prohibited within 5 feet of the outside diameter of any public storm drain pipe measured from the outer edge of a mature tree trunk. S. Utilities 1. The developer shall be responsible for the relocation of existing utilities as necessary. 2. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga Valley Water District(CVW D), Rancho Cucamonga Fire Protection District,and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CVW D is required prior to final map approval or issuance of permits,whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. 3. Approvals have not been secured from all utilities and other interested agencies involved. Approval of the final parcel map will be subject to any requirements that may be received from them. T. General Requirements and Approvals 1. The separate parcels contained within the project boundaries shall be legally combined into one parcel prior to issuance of building permits. 2. An easement for a joint use driveway shall be provided prior to final map approval or issuance of building permits, whichever occurs first, for: Entrance driveway on Foothill Boulevard. 3. Permits shall be obtained from the following agencies for work within their right of-way: San Bernardino Area Governments. 4. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all new streetlights for the first six months of operation, prior to final map approval or prior to building permit issuance if no map is involved. 5. Prior to the issuance of building permits,a Diversion Deposit and related administrative fees shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at least 50% of all wastes generated during construction and demolition are diverted from landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to the Engineering Department when the first building permit application is submitted to Building and Safety. Form CD-2 shall be submitted to the Engineering Department within 60 days following the completion of the construction and/or demolition project. 11 Project No.DRC2003-00637 Completion Date APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: U. Security Lighting 1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power. These areas should be lighted from sunset to sunrise and on photo sensored cell. 2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with direct lighting to be provided by all entryways. Lighting shall be consistent around the entire development. V. Security Hardware 1. A secondary locking device shall be installed on all sliding glass doors. 2. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within 40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used. 3. All garage or rolling doors shall have slide bolts or some type of secondary locking devices. 4. All roof openings giving access to the building shall be secured with either iron bars,metal gates, or alarmed. W. Security Fencing 1. All businesses or residential communities with security fencing and gates will provide the police with a keypad access and a unique code.The initial code is to be submitted to the Police Crime Prevention Unit along with plans. If this code is changed due to a change in personnel or for any other reason, the new code must be supplied to the Police via the 24-hour dispatch center at (909)941-1488 or by contacting the Crime Prevention Unit at(909)477-2800 extension 2474 or extension 2475. X. Windows 1. All sliding glass windows shall have secondary locking devices and should not be able to be lifted from frame or track in any manner. 2. Security/burglar bars are not recommended, particularly in residences, due to the delay or prevention of a speedy evacuation in case of fire. Y. Building Numbering 1. At the entrances of commercial or residential complexes, an illuminated map or directory of project shall be erected with vandal-resistant cover. North shall be at the top and so indicated. Sign shall be in compliance with Sign Ordinance, including an application for a Sign Permit and approval by the Planning Department. 2. All developments shall submit an 8'/2"x 11"sheet with the numbering pattern of all multi-tenant developments to the Police Department. APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED 12 RANCHO CUCAMONGA FIRE DISTRICT STANDARD CONDITIONS July 14, 2004 Charles Joseph & Associates Cameo/Sycamore Town Homes N/S foothill Blvd between San Bernardino & Baker DRC2003-00637 & SUBTT16605 MFR complex THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT. The public water supply must be tested by CVWD at the point of connection. The test must be conducted prior to the issuance of permits for the Commercial or Condominium buildings in the development. The water supply must meet or exceed the minimum fire flow requirement for the most demanding building. All Structures must be equipped with automatic fire sprinklers "thought-out" in accordance to NFPA 13. FSC-1 Public and Private Water Supply 1. Design guidelines for Fire Hydrants: The following provides design guidelines for the spacing and location of fire hydrants: a. The maximum distance between fire hydrants in commercial/industrial projects is 300-feet. No portion of the exterior wall shall be located more than 150-feet from an approved fire hydrant. For cul-de-sacs, the distance shall not exceed 100-feet. b. The maximum distance between fire hydrants in multi-family residential projects is 400-feet. No portion of the exterior wall shall be located more than 200-feet from an approved fire hydrant. For cul-de-sacs, the distance shall not exceed 150-feet. C. Fire hydrants are to be located. The preferred locations for fire hydrants are: i. At the entrance(s) to a commercial, industrial or residential project from the public roadways. ii. At intersections. iii. On the right side of the street, whenever practical and possible. iv. As required by the Fire Safety Division to meet operational needs of the Fire District. V. A minimum of forty-feet (40') from any building. d. If any portion of a facility or building is located more than 150-feet from a public fire hydrant measured on an approved route around the exterior of the facility or building, additional private or public fire hydrants and mains capable of supplying the required fire flow shall be provided. e. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof. FSC-2 Fire Flow 1. The required minimum fire flow for this project, when automatic fire sprinklers are installed is 1500 gallons per minute at a minimum residual pressure of 20-pounds per square inch. This flow reflects a 50-percent reduction for the installation of an approved automatic fire sprinkler system in accordance with NFPA 13 with central station monitoring. This requirement is made in accordance with the California Fire Code Appendix III-A, as adopted by the Fire District Ordinances. 2. Public fire hydrants located within a 500-foot radius of the proposed project may be used to provide the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent property shall not be used to provide required fire flow. 3. Fire protection water plans are required for all projects that must extend the existing water supply to or onto the site. Building permits will not be issued until fire protection water plans are approved. 4. On all site plans to be submitted for review, show all fire hydrants located within 600-feet of the proposed project site. .FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant shall submit plans, specifications and calculations for the fire sprinkler system underground supply piping. Approval of the underground supply piping system must be obtained prior to submitting the overhead fire sprinkler system plans. FSC-4 Requirement for an Automatic Fire Sprinkler Systems 1. Rancho Cucamonga Fire District Ordinance 15, the 2001 California Fire Code and the approved RCFPD alternative method require that all structures in this development be equipped with automatic fire sprinklers in accordance to NFPA 13 "Fully Sprinklered". FSC-5 Fire Alarm System 1. Per the approved alternative method all sprinkler systems in this development must be monitored by a listed central station fire alarm system. Refer to RCFPD Ordinances 15 and 39, the California Building Code, RCFPD Fire Alarm Standard #10-6 and/or the California Fire Code. 2. Prior to the installation of the fire alarm system, Fire Construction Services' approval and a building permit must be obtained. Plans and specifications shall be submitted to Fire Construction Services in accordance with RCFPD Fire Alarm Standard #10-6. 2 FSC-6 Fire District Site Access Fire District access roadways include public roads, streets and highways, as well as private roads, streets drive aisles and/or designated fire lanes. Please reference the RCFPD Fire Department Access — Fire Lanes Standard 9-7. 1. Location of Access: All portions of the structures 1s` story exterior wall shall be located within 150-feet of Fire District vehicle access, measure on an approved route around the exterior of the building. Landscaped areas, unpaved changes in elevation, gates and fences are deemed obstructions. 2. Specifications for private Fire District access roadways per the RCFPD Standards are: a. The minimum unobstructed width is 26-feet. b. The maximum inside turn radius shall be 24-feet. C. The minimum outside turn radius shall be 50-feet. d. The minimum radius for cul-de-sacs is 45-feet. e. The minimum vertical clearance is 14-feet, 6-inches. f. At any private entry median, the minimum width of traffic lanes shall be 20-feet on each side. g. The angle of departure and approach shall not exceed 9-degrees or 20 percent. h. The maximum grade of the driving surface shall not exceed 12%. i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW). j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a minimum of 14- feet, 6-inches from the ground up. Vegetation shall not be allowed to obstruct Fire Department apparatus. 3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be provided in accordance with the 2001 California Building Code, Fire and/or any other applicable standards. 4. Access Walkways: Hardscape access walkways shall be provided from the fire apparatus access road to all required building exterior openings. 5. Residential gates installed across Fire District access roads shall be installed in accordance with RCFPD Residential Gate Standard #9-1. The following design requirements apply: a. All automatic gates shall be provided with a Fire District approved, compatible traffic pre- emption device. The devices shall be digital. Analog devices are not acceptable. Devices shall be installed in accordance with the manufacturer's instructions and specifications. b. Vehicle access gates shall be provided with an approved Fire District Knox Key Switch. C. The key switch shall be located outside and immediately adjacent to the gate for use in the event that the traffic pre-emption device fails to operate. 3 d. A traffic loop device must be installed to allow exiting from the complex. e. The gate shall remain in the open position for not less than 20-minutes and shall automatically reset. 6. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site plan illustrating the proposed delineation that meets the minimum Fire District standards shall be included in the architectural plans submitted to B&S for approval. 7. Approved Fire Department Access: The approved mitigation measures must be clearly noted on the site plan. A copy of the approved Alternative Method application must be reproduced on the architectural plans submitted to B&S for plan review. FSC-10 Occupancy and Hazard Control Permits Listed are those Fire Code permits commonly associated with the business operations and/or building construction. Plan check submittal is required with the permit application for approval of the permit; field inspection is required prior to permit issuance. General Use Permit shall be required for any activity or operation not specifically described below, which in the judgment of the Fire Chief is likely to produce conditions that may be hazardous to life or property. • Public Assembly, LPG or Gas Fuel Vehicles in Assembly Buildings • Tents, Canopies and/or Air Supported Structures, Liquefied Petroleum Gases FSC-13 Alternate Method Application Fire Construction Services staff and the Fire Marshal will review all requests for alternate method, when submitted. The request must be submitted on the Fire District "Application for Alternate Method" form along with supporting documents and payment of the$92 review fee. FCS-14 Map Recordation 1. Reciprocal Access Agreement: The plan as submitted indicate that the required Fire Department access: a. Is located on property which is not under the control of the applicant; or b. Crosses a property line; or C. Is shared by multiple owners; or d. Is located on common space under the control of an owner's association Please provide a permanent access agreement granting irrevocable use of the property to the Fire District. The agreement shall include a statement that no obstruction, gate, fence, building or other structure shall be placed within the dedicated access without Fire District approval. The recorded agreement shall include a copy of the site plan. The agreement shall be presented to Fire Construction Services for review and approval, prior to recordation. The agreement shall be recorded with the Recorder's Office, County of San Bernardino. To assist Fire Construction Services in reviewing the agreement the following shall be included in the submittal: 4 a. The current title reports to provide a legal description and proof of ownership for all properties included in the agreement. b. The assessor's parcel numbers of each parcel subject to the agreement. C. A scaled site plan showing the path of the Fire District access, the width, turn radii and slope of roadway surface shall be provided. The access roadway shall comply with the requirements of the RCFPD Fire Lane Standard #9-7. 2. Reciprocal Water Covenant and Agreement: The plans as submitted indicate that a required private fire mains or appurtenances a. Pass through or are located on property not under the control of the applicant; or b. Crosses a property line; or C. Provide service to adjacent properties; or d. Is located on common space under the control of an owner's association; or e. Is shared by multiple owners. Please provide a permanent maintenance and service agreement between the owner for the private water mains, fire hydrants and fire protection equipment essential to the water supply. The agreement shall meet the form and content approved by the Rancho Cucamonga Fire District. The agreement shall be submitted to Fire Construction Services for review and approval, prior to recordation. The agreement shall be recorded within the Recorder's Office, County of San Bernardino. Chronological Summary of RCFPD Standard Conditions PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to the issuance of any building permits: 1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans, specifications, flow test data and calculations for the private water main system for review and approval by the Fire District. Plans and installation shall comply with Fire District Standards. Approval of the on-site (private) fire underground and water plans is required prior to any building permit issuance for any structure on the site. Private on-site combination domestic and fire supply system must be designed in accordance with RCFPD Standards # 9-4, #10-2 and #10-4. The Building & Safety Division and Fire Construction Services will perform plan checks and inspections. All private on-site fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. Fire construction Services will inspect the installation, witness hydrant flushing and grant a clearance before lumber is dropped. 2. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and CCWD. On the plan, show all existing fire hydrants within a 600-foot radius of the project. All required public fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. CCWD personnel shall inspect the installation and 5 witness the hydrant flushing. Fire Construction Services shall inspect the site after acceptance of the public water system by CCWD. Fire Construction Services must grant a clearance before lumber is dropped. 3. Construction Access: The access roads must be paved in accordance with all the requirements of the RCFPD Fire Lane Standard #9-7. All temporary utilities over access roads must be installed at least 14' 6" above the finished surface of the road. 4. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is responsible for obtaining the fire flow information from CCWD and submitting the letter to Fire Construction Services. 5. Easements and Reciprocal Agreements: All easements and agreements must be recorded with the County of San Bernardino. PRIOR TO THE RELEASE OF TEMPORARY POWER The building construction must be substantially completed in accordance with Fire Construction Services' "Temporary Power Release Checklist and Procedures". PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers". On private property, the markers shall be installed at the centerline of the fire access road, at each hydrant location. 2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in the presence of Fire Construction Services, shall conduct a test of the most hydraulically remote on- site fire hydrants. The underground fire line contractor, developer and/or owner are responsible for hiring the company to perform the test. A final test report shall be submitted to Fire Construction Services verifying the fire flow available. The fire flow available must meet or exceed the required fire flow in accordance with the California Fire Code. 3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler system(s) shall be tested and accepted by Fire Construction Services. 4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler monitoring system must be tested and accepted by Fire Construction Services. The fire sprinkler monitoring system shall be installed, tested and operational immediately following the completion of the fire sprinkler system (subject to the release of power). 5. Fire Suppression Systems and/or other special hazard protection systems shall be inspected, tested and accepted by Fire Construction Services before occupancy is granted and/or equipment is placed in service. 6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm system shall be installed, inspected, tested and accepted by Fire Construction Services. 7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular gates must be inspected, tested and accepted in accordance with RCFPD Standards #9-1 or #9-2 by Fire Construction Services. 6 8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access roadways must be installed in accordance with the approved plans and acceptable to Fire Construction Services. The CC&R's, the reciprocal agreement and/or other approved documents shall be recorded and contain an approved fire access roadway map with provisions that prohibit parking, specify the method of enforcement and identifies who is responsible for the required annual inspections and the maintenance of all required fire access roadways. 9. Address: Prior to the granting of occupancy, single-family dwellings shall post the address with minimum 4-inch numbers on a contrasting background. The numbers shall be internally or externally illuminated during periods of darkness. The numbers shall be visible from the street. When building setback from the public roadway exceeds 100-feet, additional 4-inch numbers shall be displayed at the property entry. 10. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and multi- family buildings shall post the address with minimum 8-inch numbers on contrasting background, visible from the street and electrically illuminated during periods of darkness. When the building setback exceeds 200 feet from the public street, an additional non-illuminated 6-inch minimum number address shall be provided at the property entrance. Larger address numbers will be required on buildings located on wide streets or built with large setbacks in multi-tenant commercial and industrial buildings. The suite designation numbers and/or letters shall be provided on the front and back of all suites. 11. Confidential Business Occupancy Information: The applicant shall complete the Rancho Cucamonga Fire District "Confidential Business Occupancy Information" form. This form provides contact information for Fire District use in the event of an emergency at the subject building or property. This form must be presented to the Fire Construction Services Inspector. 12. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, a 8 Y2" x 11" or 11" x 17" site plan of the site in accordance with RCFPD Standard #13-1 shall be revised by the applicant to reflect the actual location of all devices and building features as required in the standard. The site plan must be reviewed and accepted by the Fire Inspector. 7