HomeMy WebLinkAbout06-47 - Resolutions RESOLUTION NO. 06-47
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT
REVIEW DRC2005-00287 - A REQUEST TO DEVELOP TWO NEW
BUILDINGS TOTALING 21,846 SQUARE FEET ON 1.8 ACRE OF LAND IN
THE COMMERCIAL OFFICE ZONE WITHIN AN ACTIVITY CENTER OF
THE FOOTHILL BOULEVARD SPECIFIC PLAN (SUBAREA 3), LOCATED
AT 10165 FOOTHILL BOULEVARD, EAST OF HERMOSA AVENUE; AND
MAKING FINDINGS IN SUPPORT THEREOF -APN: 0208-331-30.
A. Recitals.
1. Dr. Mojabe filed an application for the approval of Development Review
DRC2005-00287, as described in the title of this Resolution. Hereinafter in this Resolution, the
subject Development Review request is referred to as "the application."
2. On the 12th day of April 2006, the Planning Commission of the City of Rancho
Cucamonga conducted a meeting on the application and concluded said meeting on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning
Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the
above referenced public hearing on April 12, 2006, including written and oral staff reports, this
Commission hereby specifically finds as follows:
a. The application applies to the vacant property located at 10165 Foothill Boulevard
with a street frontage of 238.73 feet and lot depth of 307.52 feet and is presently improved with curb
and gutter; and
b. The property to the north of the subject site is developed with existing commercial
buildings;the property to the south consists of existing single-family residences;the property to the
east is developed with existing commercial buildings;and the property to the west is developed with
existing commercial buildings; and
C. The application proposes the construction of a 21,846 square foot building with
20,540 square feet of office and 1,300 square feet of fast food, all permitted uses in the Commercial
Office District; and
d. The project,together with the recommended conditions of approval,complies with
all development standards for the City of Rancho Cucamonga; and
PLANNING COMMISSION RESOLUTION NO. 06-47
DEVELOPMENT REVIEW DRC2005-00287
April 12, 2006
Page 2
e. The architectural design of the project incorporates stucco and veneer stone.The
building meets the design goals of the Community Office District by providing a high-level of
architectural design with a building that has two primary materials and a variety of exterior colors that
provide visual interest to the wall planes.
f. The project incorporates the required Foothill Boulevard Specific Plan elements.
3. Based upon the substantial evidence presented to this Commission during the
above-referenced meeting and upon the specific findings of facts set forth in paragraphs 1 and 2
above, this Commission hereby finds and concludes as follows:
a. The proposed project is consistent with the objectives of the General Plan; and
b. The proposed use is in accord with the objectives of the Development Code and
the purposes of the district in which the site is located; and
C. The proposed use is in compliance with each of the applicable provisions of the
Development Code; and
d. The proposed use, together with the conditions applicable thereto, will not be
detrimental to the public health, safety, or welfare or materially injurious to properties or
improvements in the vicinity.
4. The proposed project is exemptfrom CEQA under categorical exemptions section 15332
In-Fill Development Projects.
Planning Department
1) The applicant shall install all design elements required by Route 66
Visual Improvement Plan at this location.
2) Broad canopy trees shall be used to shade all parking areas. Final
plant species shall be subject to City Planner review and approval.
3) All retaining walls shall be split-face or decorative block to match the
building.
4) Any modifications to the existing property line walls shall be submitted
and reviewed by the City Planner prior to construction.
5) All Foothill Districts and Activity Center elements shall be completed
prior to occupancy.
6) The applicant should make a good faith effort to obtain a second point
of access by connecting to the adjoining BC Cafe site at their
southwest corner. This would relieve pressure from the "split'shared
access with Kindercare pre-school, allow left-turn access to
PLANNING COMMISSION RESOLUTION NO. 06-47
DEVELOPMENT REVIEW DRC2005-00287
April 12, 2006
Page 3
Foothill Boulevard via Hermosa Avenue, and allow westbound
motorists to avoid making a U-turn to enter the site.
Engineering Department
1) The Foothill Boulevard Activity Center parkway improvements,
including street trees and sidewalk, shall conform to the Foothill
Boulevard Districts guidelines outlined in the Development Code and
Foothill Boulevard Historic Route 66 Visual Improvement Plan.
2) The parkways shall slope at 2 percent from the top of curb to 1 foot
behind the sidewalk along all street frontages.
3) The first 6 feet of driveway behind the public right-of-way shall slope no
more than 6 percent.
4) The sumps in the private storm drain system shall be designed for
Q100, and the pond depth can be no greater than 12 inches in
automobile parking areas (18 inches in truck parking areas).
5) An in-lieu fee as contribution to the future undergrounding of the
existing overhead utilities (telecommunications and electrical, except
for the 66 kV electrical)on the opposite side of Foothill Boulevard shall
be paid to the City prior to the issuance of Building permits. The fee
shall be one-half the City adopted unit amount times the length of the
project frontage.
6) Prior to the issuance of Building Permits, the applicant shall pay
Development Fees at the rates adopted by the City Council,which are
currently estimated as:
a) Transportation Development Fee: $5,487 per thousand square
feet (Effective July 18, 2005).
b) General City Drainage Fee: $16,190 per acre (Effective January
15, 2006).
7) Public improvement plans shall be 90 percent complete prior to the
issuance of Grading Permits. Public improvement plans shall be 100
percent complete, signed by the City Engineer, and an improvement
agreement and bonds executed by the developer, prior to Building
Permit issuance.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
PLANNING COMMISSION RESOLUTION NO. 06-47
DEVELOPMENT REVIEW DRC2005-00287
April 12, 2006
Page 4
APPROVED AND ADOPTED THIS 12TH DAY OF APRIL 2006.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY:
— �g�
11 Pam Sto art, Chairman
ATTEST:
Dan Coleman, Acting Secretary
I, Dan Coleman, Acting Secretary of the Planning Commission of the City of Rancho Cucamonga,
do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and
adopted by the Planning Commission of the City of Rancho Cucamonga,at a regular meeting of the
Planning Commission held on the 12th day of April 2006, by the following vote-to-wit:
AYES: COMMISSIONERS: FLETCHER, MACIAS, McPHAIL, MUNOZ, STEWART
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: NONE
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT#: DEVELOPMENT REVIEW DRC2005-00287
SUBJECT: DEVELOPMENT REVIEW FOR TWO NEW BUILDINGS WITH AN ACTIVITY CENTER
APPLICANT: DR. ROCKY MOJABE
LOCATION: 10165 FOOTHILL BOULEVARD —APN: 0208-331-30
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
A. General Requirements Completion Date
1. The applicant shall agree to defend at his sole expense any action brought against the City, its
agents,officers,or employees,because of the issuance of such approval,or in the alternative,to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or
employees, for any Court costs and attorney's fees which the City, its agents, officers, or
employees may be required by a court to pay as a result of such action. The City may,at its sole
discretion, participate at its own expense in the defense of any such action but such participation
shall not relieve applicant of his obligations under this condition.
2. Copies of the signed Planning Commission Resolution of Approval No. 06-47, Standard
Conditions, and all environmental mitigations shall be included on the plans (full size). The
sheet(s)are for information only to all parties involved in the construction/grading activities and
are not required to be wet sealed/stamped by a licensed Engineer/Architect.
B. Time Limits
1. Conditional Use Permit, Variance, or Development/Design Review approval shall expire if
building permits are not issued or approved use has not commenced within 5 years from the date
of approval. No extensions are allowed.
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which include
site plans,architectural elevations,exterior materials and colors,landscaping,sign program,and
grading on file in the Planning Department,the conditions contained herein, Development Code
regulations, the Foothill Boulevard Specific Plan, and the Community Plan.
SC-1-05 1
Project No.DRC2005-00287
Completion Date
2. Prior to any use of the project site or business activity being commenced thereon,all Conditions
of Approval shall be completed to the satisfaction of the City Planner.
3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and
State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be
submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety
Department to show compliance. The buildings shall be inspected for compliance prior to
occupancy.
4. Revised site plans and building elevations incorporating all Conditions of Approval shall be
submitted for City Planner review and approval prior to the issuance of building permits.
5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.)or prior to final map approval in the case of a custom lot subdivision, or approved
use has commenced, whichever comes first.
6. Approval of this request shall not waive compliance with all sections of the Development Code,all
other applicable City Ordinances, and applicable Community or Specific Plans in effect at the
time of building permit issuance.
7. A detailed on-site lighting plan, including a photometric diagram,shall be reviewed and approved
by the City Planner and Police Department(477-2800) prior to the issuance of building permits.
Such plan shall indicate style, illumination, location,height,and method of shielding so as not to
adversely affect adjacent properties.
8. Trash receptacle(s)are required and shall meet City standards. The final design, locations,and
the number of trash receptacles shall be subject to City Planner review and approval prior to the
issuance of building permits.
9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be
located out of public view and adequately screened through the use of a combination of concrete
or masonry walls,berming,and/or landscaping to the satisfaction of the City Planner. For single-
family residential developments, transformers shall be placed in underground vaults.
10. All building numbers and individual units shall be identified in a clear and concise manner,
including proper illumination.
D. Shopping Centers
1. The Master Plan is approved in concept only. Future development for(each building pad/parcel)
shall be subject to separate Development/Design Review process for Planning Commission
approval. Modifications to the Shopping Center Master Plan shall be subject to Planning
Commission approval.
2. A uniform hardscape and street furniture design including seating benches, trash receptacles,
free-standing potted plants, bike racks, light bollards, etc., shall be utilized and be compatible
with the architectural style. Detailed designs shall be submitted for Planning Department review
and approval prior to the issuance of building permits.
3. Graffiti shall be removed within 72 hours.
4. The entire site shall be kept free from trash and debris at all times and in no event shall trash and
debris remain for more than 24 hours.
5. Signs shall be conveniently posted for"no overnight parking" and for "employee parking only."
6. All operations and businesses shall be conducted to comply with the following standards which
shall be incorporated into the lease agreements for all tenants:
SC-1-05
2
Project No. DRC2005-00287
Completion Date
a. Noise Level - All commercial activities shall not create any noise that would exceed an
exterior noise level of 60 dB during the hours of 10 p.m. until 7 a.m. and 65 dB during the
hours of 7 a.m. until 10 p.m.
b. Loading and Unloading-No person shall cause the loading,unloading,opening,closing,or
other handling of boxes, crates, containers, building materials, garbage cans, or other
similar objects between the hours of 10 p.m.and 7 a.m. unless otherwise specified herein,
in a manner which would cause a noise disturbance to a residential area.
7. The lighting fixture design shall compliment the architectural program. It shall include the plaza
area lighting fixtures, building lighting fixtures (exterior), and parking lot lighting fixtures.
8. Any outdoor vending machines shall be recessed into the building faces and shall not extend into
the pedestrian walkways. The design details shall be reviewed and approved by the City Planner
prior to the issuance of building permits.
E. Building Design
1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or
projections, shall be shielded from view and the sound buffered from adjacent properties and
streets as required by the Planning Department. Such screening shall be architecturally
integrated with the building design and constructed to the satisfaction of the City Planner. Details
shall be included in building plans.
2. For commercial and industrial projects, paint roll-up doors and service doors to match main
building colors.
F. Parking and Vehicular Access (indicate details on building plans)
1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts
a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet
wide.
2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall
contain a 12-inch walk adjacent to the parking stall (including curb).
3. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided
throughout the development to connect dwellings/units/buildings with open spaces/plazas/
recreational uses.
4. All parking spaces shall be double striped per City standards and all driveway aisles,entrances,
and exits shall be striped per City standards.
5. Handicap accessible stalls shall be provided for commercial and office facilities with 25 or more
parking stalls. Designate two percent or one stall; whichever is greater, of the total number of
stalls for use by the handicapped.
6. Motorcycle parking area shall be provided for commercial and office facilities with 25 or more
parking stalls. Developments with over 100 parking stalls shall provide motorcycle parking at the
rate of one percent. The area for motorcycle parking shall be a minimum of 56 square feet.
SC-1-05
3
Project No.DRC2005-00287
Completion Date
G. Trip Reduction
1. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily
residential projects of more than 10 units. Minimum spaces equal to five percent of the required
automobile parking spaces or three bicycle storage spaces,whichever is greater. After the first
50 bicycle storage spaces are provided,additional storage spaces required are 2.5 percent of the
required automobile parking spaces. Warehouse distribution uses shall provide bicycle storage
spaces at a rate of 2.5 percent of the required automobile parking spaces with a minimum of a
3-bike rack. In no case shall the total number of bicycle parking spaces required exceed 100.
Where this results in a fraction of 0.5 or greater, the number shall be rounded off to the higher
whole number.
2. Carpool and vanpool designated off-street parking close to the building shall be provided for
commercial, office, and industrial facilities at the rate of 10 percent of the total parking area. If
covered, the vertical clearance shall be no less than 9 feet.
H. Landscaping
1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in
the case of residential development, shall be prepared by a licensed landscape architect and
submitted for City Planner review and approval prior to the issuance of building permits or prior
final map approval in the case of a custom lot subdivision.
2. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within
commercial and office projects, shall be specimen size trees - 24-inch box or larger.
3. Within parking lots,trees shall be planted at a rate of one 15-gallon tree for every three parking
stalls.
4. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one
tree per 30 linear feet of building.
5. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope,but less than 2:1 --- _/_
slope,shall be, at minimum, irrigated and landscaped with appropriate ground cover for erosion
control. Slope planting required by this section shall include a permanent irrigation system to be
installed by the developer prior to occupancy.
6. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater
slope shall be landscaped and irrigated for erosion control and to soften their appearance as
follows: one 15-gallon or larger size tree per each 150 sq.ft.of slope area, 1-gallon or larger size
shrub per each 100 sq.ft.of slope area,and appropriate ground cover. In addition,slope banks
in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or
larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in
staggered clusters to soften and vary slope plane. Slope planting required by this section shall
include a permanent irrigation system to be installed by the developer prior to occupancy.
7. For multi-family residential and non-residential development,property owners are responsible for
the continual maintenance of all landscaped areas on-site, as well as contiguous planted areas
within the public right-of-way. All landscaped areas shall be kept free from weeds and debris and
maintained in healthy and thriving condition,and shall receive regular pruning,fertilizing,mowing,
and trimming. Any damaged,dead,diseased,or decaying plant material shall be replaced within
30 days from the date of damage.
8. The final design of the perimeter parkways,walls,landscaping,and sidewalks shall be included in
the required landscape plans and shall be subject to City Planner review and approval and
coordinated for consistency with any parkway landscaping plan which may be required by the
Engineering Department.
SC-1-05
4
Project No.DRC2005-00287
Completion Date
9. Special landscape features such as mounding, alluvial rock, specimen size trees, meandering
sidewalks (with horizontal change), and intensified landscaping, is required along Foothill
Boulevard.
10. Landscaping and irrigation systems required to be installed within the public right-of-way on the
perimeter of this project area shall be continuously maintained by the developer.
11. All walls shall be provided with decorative treatment. If located in public maintenance areas,the
design shall be coordinated with the Engineering Department.
12. Landscaping and irrigation shall be designed to conserve water through the principles of
Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code.
I. Signs
1. All of the signs are conceptual only and not a part of this approval. Any signs proposed for this _/_ J_
development shall comply with the Sign Ordinance and shall require separate application and
approval by the Planning Department prior to installation of any signs.
2. A Uniform Sign Program for this development shall be submitted for City Planner review and
approval prior to issuance of building permits.
J. Environmental
1. A final acoustical report shall be submitted for City Planner review and approval prior to the
issuance of building permits. The final report shall discuss the level of interior noise attenuation
to below 45 CNEL, the building materials and construction techniques provided, and if
appropriate,verify the adequacy of the mitigation measures. The building plans will be checked
for conformance with the mitigation measures contained in the final report.
2. The applicant shall submit certification from an acoustical engineer that all recommendations of
the acoustical report were implemented in construction, including measurements of interior and
exterior noise levels to document compliance with City standards. Certification shall be
submitted to the Building & Safety Department prior to final occupancy release of the affected
homes.
K. Other Agencies
1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location
of mailboxes. Multi-family residential developments shall provide a solid overhead structure for
mailboxes with adequate lighting. The final location of the mailboxes and the design of the
overhead structure shall be subject to City Planner review and approval prior to the issuance of
building permits.
APPLICANT SHALL CONTACTTHE BUILDING AND SAFETY DEPARTMENT,(909)477-2710,
FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
L. General Requirements
1. Submit five conceptual sets of plans including the following:
a. Site/Plot Plan;
b. Foundation Plan;
C. Ceiling, Floor, and Roof Framing Plan.
SC-1-05
5
Project No. DRC2005-00287
Completion Date
d. Floor Plan;
e. Electrical Plans (2 sets,detached) including the size of the main switch, number and size
of service entrance conductors, panel schedules, and single line diagrams;
f. Plumbing and Sewer Plans,including isometrics,underground diagrams,water and waste
diagram, sewer or septic system location, fixture units, gas piping, and heating and air
conditioning; and
g. Planning Department Project Number (i.e., DRC2005-00287) clearly identified on the
outside of all plans.
2. Submit two sets of structural calculations, energy conservation calculations, and a soils report.
Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal.
3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to _/_/_
the City prior to permit issuance.
4. Separate permits are required for fencing and/or walls.
5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the
Building and Safety Department.
M. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be
marked with the project file number(i.e., DRC2005-00278). The applicant shall comply with the
latest adopted California Codes, and all other applicable codes, ordinances, and regulations in
effect at the time of permit application. Contact the Building and Safety Department for
availability of the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new residential project or major addition,the applicant
shall pay development fees at the established rate. Such fees may include,but are not limited to:
City Beautification Fee, Park Fee, Drainage Fee,Transportation Development Fee, Permit and
Plan Check Fees, Construction and Demolition Diversion Program deposit and fees and School
Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety
Department prior to permit issuance.
3. The Building and Safety Official shall provide the street addresses after tract/parcel map
recordation and prior to issuance of building permits..
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday
through Saturday, with no construction on Sunday or holidays.
5. Construct trash enclosure(s) per City Standard (available at the Planning Department's public
counter).
N. New Structures
1. Provide compliance with the California Building Code (CBC) for property line clearances
considering use, area, and fire-resistiveness.
2. The project shall be designed to comply with the 2001 California Building Codes (CBC), the
California Fire Code and with RCFPD Ordinances 15 and 39.
3. Provide compliance with the California Building Code for required occupancy separations.
4. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC
Section 1505.
SC-1-05
6
Project No. DRC2005-00287
Completion Date
5. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A
6. Openings in exterior walls shall be protected in accordance with CBC Table 5-A.
7. Provide the required restroom facilities per the CBC Appendix Chapter 29
8. All exit components must comply with the requirements of CBC Chapter 10 (adjoining rooms,
rated corridors, door swings, separation of exits, etc.).
9. At the time of tenant improvement plan check submittal(for construction)additional requirements
may be required.
10. Clearly indicate on the plans compliance with ADA requirements for the disabled.
11. A registered architect must sign and stamp the plans.
O. Grading
1. Grading of the subject property shall be in accordance with California Building Code,City Grading
Standards, and accepted grading practices. The final grading plan shall be in substantial
conformance with the approved grading plan.
2. A soils report shall be prepared by a qualified engineer licensed by the State of California to
perform such work.
3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the
time of application for grading plan check.
4. The final grading, appropriate certifications and compaction reports shall be completed,
submitted, and approved by the Building and Safety Official prior to the issuance of building
permits.
5. A separate grading plan check submittal is required for all new construction projects and for –_J–_L—
existing buildings where improvements being proposed will generate 50 cubic yards or more of
combined cut and fill. The grading plan shall be prepared, stamped, and signed by a California
registered Civil Engineer.
Note on the title sheet that tenant improvement plans must be submitted for plan check and be
approved prior to construction. The applicant shall comply with the latest adopted California Codes,
and all other applicable codes, ordinances, and regulations in effect at the time of permit application.
Contact the Building and Safety Department if you have any questions about the procedure at (909)
477-2710.
APPLICANT SHALL CONTACT THE ENGINEERING DEPARTMENT, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
P. Dedication and Vehicular Access
1. Easements for public sidewalks and/or street trees placed outside the public right-of-way shall be
dedicated to the City.
Q. Street Improvements
1. All public improvements(interior streets,drainage facilities,community trails,paseos, landscaped
areas, etc.) shown on the plans and/or tentative map shall be constructed to City Standards.
Interior street improvements shall include, but are not limited to,curb and gutter,AC pavement,
drive approaches, sidewalks, street lights, and street trees.
SC-1-05
7
Project No. DRC2005-00287
Completion Date
2. Pursuant to City Council Resolution No.88-557,no person shall make connections from a source
of energy,fuel or power to any building service equipment which is regulated by technical codes
and for which a permit is required unless, in addition to any and all other codes, regulations and
ordinances, all improvements required by these conditions of development approval have been
completed and accepted by the City Council,except:that in developments containing more than
one building or unit, the development may have energy connections made to a percentage of
those buildings, or units proportionate to the completion of improvements as required by
conditions of approval of development. In no case shall more than 95 percent of the buildings or
units be connected to energy prior to completion and acceptance of all improvements required by
these conditions of approval of development.
3. Construct the following perimeter street improvements including, but not limited to:
Curb& A.C. Side- Drive Street Street Comm Median Bike
Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other
Foothill Boulevard (c) X 2 X
Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement
reconstruction and overlays will be determined during plan check. '(c) If so marked, sidewalk
shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be J
provided for this item.
4. Improvement Plans and Construction:
a. Street improvement plans, including street trees,street lights,and intersection safety lights
on future signal poles, and traffic signal plans shall be prepared by a registered Civil
Engineer and shall be submitted to and approved by the City Engineer. Security shall be
posted and an agreement executed to the satisfaction of the City Engineer and the City
Attorney guaranteeing completion of the public and/or private street improvements,prior to
final map approval or the issuance of building permits, whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a
construction permit shall be obtained from the City Engineer's Office in addition to any
other permits required.
C. Pavement striping,marking,traffic signing,street name signing,traffic signal conduit,and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction
project along major or secondary streets and at intersections for future traffic signals and
interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside
of BCR, ECR, or any other locations approved by the City Engineer
Notes:
1) Pull boxes shall be No.6 at intersections and No.5 along streets,a maximum of 200
feet apart, unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch galvanized steel with pull rope or as specified.
e. Handicapped access ramps shall be installed on all corners of intersections per City
Standards or as directed by the City Engineer.
I. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A cash
deposit shall be provided to cover the cost of grading and paving,which shall be refunded
upon completion of the construction to the satisfaction of the City Engineer.
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be
installed to City Standards, except for single family residential lots.
SC-1-05
8
Project No. DRC2005-00287
Completion Date
h. Street names shall be approved by the City Planner prior to submittal for first plan check.
5. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in
accordance with the City's street tree program.
6. Install street trees per City street tree design guidelines and standards as follows. The completed
legend (box below) and construction notes shall appear on the title page of the street
improvement plans. Street improvement plans shall include a line item within the construction
legend stating: "Street trees shall be installed per the notes and legend on sheet_(typically
sheet 1)." Where public landscape plans are required, tree installation in those areas shall be
per the public landscape improvement plans.
The City Engineer reserves the right to adjust tree species based upon field conditions and other
variables. For additional information, contact the Project Engineer.
Min.
Grow
Street Name Botanical Name Common Name Space Spacing Size oty.
Foothill Boulevard Prunus blireiana NCN 3' 20'0.C. 15 Gal Fill
Accent Tree Informal In
groupings
not more
than 25%
of total
frontage
trees
Platanus racemosa California Sycamore 8' 35'O.C. 15 Gal
Informal
groupings
Platanus acerifolia London Plane Tree 8' 30'0.C. 15 Gal
Informal
groupings
Construction Notes for Street Trees:
1) Street trees are to be planted per public improvement plans only.
7. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with
adopted policy. On collector or larger streets, lines of sight shall be plotted for all project
intersections, including driveways. Local residential street intersections and commercial or
industrial driveways may have lines of sight plotted as required.
R. Public Maintenance Areas
1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting
Districts shall be filed with the City Engineer prior to final map approval or issuance of building
permits whichever occurs first. Formation costs shall be borne by the developer.
2. Parkway landscaping on the following street(s) shall conform to the results of the respective
Beautification Master Plan Foothill Boulevard.
S. General Requirements and Approvals
1. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all
new streetlights for the first six months of operation, prior to final map approval or priorto building
permit issuance if no map is involved.
SC-1-05
9
Project No.DRC2005-00287
Completion Date
2. Prior to the issuance of building permits, a Diversion Deposit and related administrative fees shall
be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if
at least 50% of all wastes generated during construction and demolition are diverted from
landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to
the Engineering Department when the first building permit application is submitted to Building and
Safety. Form CD-2 shall be submitted to the Engineering Department within 60 days following
the completion of the construction and/or demolition project.
APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION
PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING
CONDITIONS:
SEE ATTACHED
SC-1-05
10
Rancho Cucamonga Fire Protection
District
Fire Construction Services
STANDARD CONDITIONS
October 5, 2005
Dr. Mojabe Commercial Center
(2) Two Story Retail Buildings
DRC2005-00287
THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT.
The RCFPD Procedures & Standards which are referenced in this document can be access on
the web at htto://www.ci.rancho-cucamonga.ca.us/fire/index.htm under the Fire Safety Division
& Fire Construction Services section. Search by article; the preceding number of the standard
refers to the article. Chose the appropriate article number then a drop down menu will appear,
select the corresponding standard.
FSC-1 Public and Private Water Supply
1. Design guidelines for Fire Hydrants: The following provides design guidelines for the
spacing and location of fire hydrants:
a. The maximum distance between fire hydrants in commercial/industrial projects is
300-feet. No portion of the exterior wall shall be located more than 150-feet from an
approved fire hydrant. For cul-de-sacs, the distance shall not exceed 100-feet.
b. Fire hydrants are to be located. The preferred locations for fire hydrants are:
i. At the entrance(s) to a commercial, industrial or residential project from the
public roadways.
ii. At intersections.
iii. On the right side of the street, whenever practical and possible.
iv. As required by the Fire Safety Division to meet operational needs of the Fire
District.
V. A minimum of forty-feet (40') from any building.
C. If any portion of a facility or building is located more than 150-feet from a public fire
hydrant measured on an approved route around the exterior of the facility or building,
additional private or public fire hydrants and mains capable of supplying the required
fire flow shall be provided.
d. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof.
FSC-2 Fire Flow
1. The required minimum fire flow for this project, when automatic fire sprinklers are installed
is 1,500 gallons per minute at a minimum residual pressure of 20-pounds per square inch.
This flow reflects a 50-percent reduction for the installation of an approved automatic fire
sprinkler system in accordance with NFPA 13 with central station monitoring. This
requirement is made in accordance with the California Fire Code Appendix III-A, as
adopted by the Fire District Ordinances.
2. Public fire hydrants located within a 500-foot radius of the proposed project may be used
to provide the required fire flow subject to Fire District review and approval. Private fire
hydrants on adjacent property shall not be used to provide required fire flow.
3. Firewater plans are required for all projects that must extend the existing water supply to
or onto the site. Building permits will not be issued until firewater plans are
approved.
4. On all site plans to be submitted for review, show all fire hydrants located within 600-feet
of the proposed project site.
FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems
1. Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant
shall submit plans, specifications and calculations for the fire sprinkler system
underground supply piping. Approval of the underground supply piping system must be
obtained prior to submitting the overhead fire sprinkler system plans.
FSC-4 Requirement for an Automatic Fire Sprinkler Systems
Rancho Cucamonga Fire District Ordinance 15, the 2001 California Fire Code and/or any other
applicable standards require an approved automatic fire sprinkler system to be installed in:
1. Commercial or industrial structures greater than 7,500 square feet.
2. Assembly and Educational Occupancy Buildings.
3. "All structures that do not meet Fire District access requirements (see Fire Access).
4. When required fire flow cannot be provided due to inadequate volume or pressure.
5. When buildings do not meet the requirements of the 2001 California Building Code and
the RCFPD Fire Department Access - Fire Lane Standard 9-7
6. When any applicable code or standard requires the structure to be sprinklered.
FSC-5 Fire Alarm System
1. RCFPD Ordinance 15, based on use or floor area (or by other adopted codes or
standards) requires an automatic and/or manual fire alarm system. Refer to RCFPD
Ordinances 15 and 39, the California Building Code, RCFPD Fire Alarm Standard #10-6
and/or the California Fire Code.
2. Prior to any removal, remodel, modification and/or additions to the building or suite's fire
alarm system, Fire Construction Services' approval and a building permit must be
2
obtained. Plans and specifications shall be submitted to Fire Construction Services in
accordance with RCFPD Fire Alarm Standard #10-6.
3. Based on the number of sprinkler heads; the sprinkler system is required to monitored by
a listed central station fire alarm system.
FSC-6 Fire District Site Access
Fire District access roadways include public roads, streets and highways, as well as private
roads, streets drive aisles and/or designated fire lanes. Please reference the RCFPD Fire
Lanes Standard 9-7
1. Location of Access: All portions of the structures 1st story exterior wall shall be located
within 150-feet of Fire District vehicle access, measure on an approved route around the
exterior of the building. Landscaped areas, unpaved changes in elevation, gates and
fences are deemed obstructions.
2. Specifications for private Fire District access roadways per the RCFPD Standards
are:
a. The minimum unobstructed width is 26-feet.
b. The maximum inside turn radius shall be 20-feet.
C. The minimum outside turn radius shall be 46-feet.
d. The minimum radius for cul-de-sacs is 45-feet.
e. The minimum vertical clearance is 14-feet, 6-inches.
f. At any private entry median, the minimum width of traffic lanes shall be 20-feet on
each side.
g. The angle of departure and approach shall not exceed 9-degrees or 20 percent.
h. The maximum grade of the driving surface shall not exceed 12%.
i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW).
j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a
minimum of 14-feet, 6-inches from the ground up. Vegetation shall not be allowed to
obstruct Fire Department apparatus.
1
3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be
provided as follows:
a. In buildings without high-piled storage, access shall be provided in accordance with
the 2001 California Building Code, Fire and/or any other applicable standards.
b. In buildings with high-piled storage access doors shall be provided in each 100 lineal
feet or major fraction thereof, of the exterior wall that faces the required access
roadways. When railways are installed provisions shall be made to maintain Fire
District access to all required openings.
3
4. Access Walkways: Hardscaped access walkways shall be provided from the fire
apparatus access road to all required building exterior openings.
5. Commercial/Industrial Gates: Any gate installed across a Fire Department access road
shall be in accordance with Fire District Standard #9-2. The following design requirements
apply:
a. Prior to the fabrication and installation of the gates, plans are required to be
submitted to Fire Construction Services (FCS) for approval. Upon the completion of
the installation and before placing the gates in service, inspection and final
acceptance must be requested from FCS.
b. Gates must slide open horizontally or swing inward.
c. Gates may be motorized or manual.
d. When fully open, the minimum clearance dimension of drive access shall be 20 feet.
e. Manual gates must be equipped with a RCFPD lock available at the Fire Safety
Office for$20.00.
f. Motorized gates must open at the rate of one-foot per second.
g. The motorized gate actuation mechanism must be equipped with a manual override
device and a fail-safe or battery backup feature to open the gate or release the
locking Mechanism in case of power failure or mechanical malfunction.
h. Motorized gates shall be equipped with a Knox override key switch. The switch must
be installed outside the gate in a visible and unobstructed location.
i. For motorized gates, a traffic loop device must be installed to allow exiting from the
complex.
j. If traffic pre-emption devices (TPD) are to be installed, the device, location and
operation must be approved by the Fire Chief prior to installation. Bi-directional or
multiple sensors may be required due to complexity of the various entry
configurations.
6. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site
plan illustrating the proposed delineation that meets the minimum Fire District standards
shall be included in the architectural plans submitted to B&S for approval.
7. Approved Fire Department Access: Any approved mitigation measures must be clearly
noted on the site plan. A copy of the approved Alternative Method application, if
applicable, must be reproduced on the architectural plans submitted to B&S for plan
review.
8. Roof Access: There shall be a means of fire department access from the exterior walls
of the buildings on to the roofs of all commercial, industrial and multi-family residential
structures with roofs less than 75' above the level of the fire access road.
a. This access must be reachable by either fire department ground ladders or by an
aerial ladder.
4
b. A minimum of one ladder point with a fixed ladder shall be provided in buildings with
construction features, or high parapets that inhibit roof access.
c. The number of ladder points may be required to be increased, depending on the
building size and configuration.
d. Regardless of the parapet height or construction features the approved ladder point
shall be identified in accordance to the roof access standard.
e. Where the entire roof access is restricted by high parapet walls or other obstructions,
a permanently mounted access ladder is required.
f. Multiple access ladders may be required for larger buildings.
g. Ladder construction must be in accordance with the RCFPD Roof Access Standard
9-9 Appendix A and drawings 9-9a and 9-9b.
h. A site plan showing the locations of the roof ladder shall be submitted during plan
check.
i. Ladder points shall face a fire access roadway(s).
FSC-10 Occupancy and Hazard Control Permits
Listed are those Fire Code permits commonly associated with the business operations and/or
building construction. Plan check submittal is required with the permit application for approval
of the permit; field inspection is required prior to permit issuance. General Use Permit shall be
required for any activity or operation not specifically described below, which in the judgment of
the Fire Chief is likely to produce conditions that may be hazardous to life or property.
• Battery Systems
• Candles and open flames in public assemblies
• Compressed Gases
• Public Assembly
• Cryogenics
• Dry Cleaning Plants
• Refrigeration Systems
• Repair Garages
• Flammable and Combustible Liquids
• Spraying or Dipping Operations
• Hazardous Materials
• Tents, Canopies and/or Air Supported Structures
• Liquefied Petroleum Gases
• LPG or Gas Fuel Vehicles in Assembly Buildings
5
FSC-11 Hazardous Materials— Submittal to the County of San Bernardino
The San Bernardino County Fire Department shall review your Business
Emergency/Contingency Plan for compliance with minimum standards. Contact the San
Bernardino County Fire, Hazardous Materials Division at (909) 387-4631 for forms and
assistance. The County Fire Department is the Cal/EPA Certified Unified Program Agency
(CU PA) for the City of Rancho Cucamonga.
1. If the facility is a NEW business, a Certificate of Occupancy issued by Building & Safety
will not be finalized until the San Bernardino County Fire Department reviews your
Business Emergency/Contingency Plan. California Government Code, Section 65850.2
prohibits the City from issuing a final Certificate of Occupancy unless the applicant has
met or is meeting specific hazardous materials disclosure requirements. A Risk
Management Program (RMP) may also be required if regulation substances are to be
used or stored at the new facility.
2. Any business that operates on rented or leased property which is required to submit a
Plan, is also required to submit a notice to the owner of the property in writing stating that
the business is subject to the Business Emergency/Contingency Plan mandates and has
complied with the provisions. The tenant must provide a copy of the Plan to the property
owner within five (5) working days, if requested by the owner.
FSC-12 Hazardous Materials- Submittal to Fire Construction Services
Plans shall be submitted and approved prior to construction of buildings and/or the installation of
equipment designed to store, use or dispense hazardous materials in accordance with the 2001
California Building, Fire, Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances FD15 and
FD39 and other implemented and/or adopted standards.
FSC-13 Alternate Method Application
Fire Construction Services staff and the Fire Marshal will review all requests for alternate
method, when submitted. The request must be submitted on the Fire District "Application for
Alternate Method" form along with supporting documents and payment of the $92 review fee.
FCS-14 Map Recordation
1. RECIPROCAL AGREEMENTS for Fire Department Emergency Access and Water Supply
are required on this project. The project appears to be located on a property that is being
subdivided. The reciprocal agreement is required to be recorded between property
owners and the Fire District. The recorded agreement shall include a copy of the site
plan. The Fire Construction Services shall approve the agreement, prior to recordation.
The agreement shall be recorded with the County of San Bernardino, Recorders Office.
Reciprocal access agreement— Please provide a permanent access agreement between
the owners granting irrevocable and a non-exclusive easement, favoring the Fire District to
gain access to the subject property. The agreement shall include a statement that no
obstruction, gate, fence, building or other structure shall be placed within the dedicated
access, .without Fire Department approval. The agreement shall have provisions for
emergency situations and the assessing of cost recovery to the property by the fire District.
Reciprocal water covenant — Please provide a permanent maintenance and service
covenant between the owners granting an irrevocable and non-exclusive easement,
favoring the Fire District for the purpose of accessing and maintaining the private water
6
mains, valves and fire hydrants (fire protection systems facilities in general). The covenant
shall have provisions for emergency situations and the assessing of cost recovery to the
property by the fire District.
FCS-15 Annexation of the parcel map: Annexation of the parcel map into the Community
Facilities District #85-1 or #88-1 is required prior to the issuance of grading or building permits.
Chronological Summary of RCFPD Standard
Conditions
PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to
the issuance of any building permits:
1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans,
specifications, flow test data and calculations for the private water main system for review
and approval by the Fire District. Plans and installation shall comply with Fire District
Standards. Approval of the on-site (private) fire underground and water plans is required
prior to any building permit issuance for any structure on the site. Private on-site
combination domestic and fire supply system must be designed in accordance with
RCFPD Standards # 9-4, #10-2 and #10-4. The Building & Safety Division and Fire
Construction Services will perform plan checks and inspections.
All private on-site fire hydrants shall be installed, flushed and operable prior to delivering
any combustible framing materials to the site. Fire construction Services will inspect the
installation, witness hydrant flushing and grant a clearance before lumber is dropped.
2. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan
showing the locations of all new public fire hydrants for the review and approval by the
Fire District and CCWD. On the plan, show all existing fire hydrants within a 600-foot
radius of the project. Please reference the RCFPD Water Plan Submittal Procedure
Standard 9-8.
All required public fire hydrants shall be installed, flushed and operable prior to delivering
any combustible framing materials to the site. CCWD personnel shall inspect the
installation and witness the hydrant flushing. Fire Construction Services shall inspect the
site after acceptance of the public water system by CCWD. Fire Construction Services
must grant a clearance before lumber is dropped.
3. Construction Access: The access roads must be paved in accordance with all the
requirements of the RCFPD Fire Lane Standard #9-7. All temporary utilities over access
roads must be installed at least 14' 6" above the finished surface of the road.
4. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is
responsible for obtaining the fire flow information from CCWD and submitting the letter to
Fire Construction Services.
5. Easements and Reciprocal Agreements: All easements and agreements must be
recorded with the County of San Bernardino.
PRIOR TO THE RELEASE OF TEMPORARY POWER
The building construction must be substantially completed in accordance with Fire Construction
Services' "Temporary Power Release Checklist and Procedures".
7
PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following:
1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker
indicating the fire hydrant location on the street or driveway in accordance with the City of
Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant
Markers". On private property, the markers shall be installed at the centerline of the fire
access road, at each hydrant location.
2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler
contractor, in the presence of Fire Construction Services, shall conduct a test of the most
hydraulically remote on-site fire hydrants. The underground fire line contractor, developer
and/or owner are responsible for hiring the company to perform the test. A final test
report shall be submitted to Fire Construction Services verifying the fire flow available.
The fire flow available must meet or exceed the required fire flow in accordance with the
California Fire Code.
3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire
sprinkler system(s) shall be tested and accepted by Fire Construction Services.
4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire
sprinkler monitoring system must be tested and accepted by Fire Construction Services.
The fire sprinkler monitoring system shall be installed, tested and operational immediately
following the completion of the fire sprinkler system (subject to the release of power).
5. Fire Suppression Systems and/or other special hazard protection systems shall be
inspected, tested and accepted by Fire Construction Services before occupancy is granted
and/or equipment is placed in service.
6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm
system shall be installed, inspected, tested and accepted by Fire Construction Services.
7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular
gates must be inspected, tested and accepted in accordance with RCFPD Standards #9-1
or #9-2 by Fire Construction Services.
8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire
access roadways must be installed in accordance with the approved plans and acceptable
to Fire Construction Services.
9. The CC&R's, the reciprocal agreement and/or other approved documents shall be
recorded and contain an approved fire access roadway map with provisions that prohibit
parking, specify the method of enforcement and identifies who is responsible for the
required annual inspections and the maintenance of all required fire access roadways.
10. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and
multi-family buildings shall post the address with minimum 8-inch numbers on contrasting
background, visible from the street and electrically illuminated during periods of darkness.
When the building setback exceeds 200 feet from the public street, an additional non-
illuminated 6-inch minimum number address shall be provided at the property entrance.
Larger address numbers will be required on buildings located on wide streets or built with
large setbacks in multi-tenant commercial and industrial buildings. The suite designation
numbers and/or letters shall be provided on the front and back of all suites.
11. Hazardous Materials: Prior to the issuance of a Certificate of Occupancy, the applicant
must demonstrate (in writing from the County) that the facility has met or is meeting the
8
Risk Management Plan (RMP) or Business Emergency/Contingency Plan with the San
Bernardino County Fire Department, Hazardous Materials/Emergency Response and
Enforcement Division. The applicant must also obtain inspection and acceptance by Fire
Construction Services.
12. Confidential Business Occupancy Information: The applicant shall complete the
Rancho Cucamonga Fire District "Confidential Business Occupancy Information" form.
This form provides contact information for Fire District use in the event of an emergency at
the subject building or property. This form must be presented to the Fire Construction
Services Inspector.
13. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, a 8 '/2" x 11" or
11" x 17' site plan of the site in accordance with RCFPD Standard #13-1 shall be revised
by the applicant to reflect the actual location of all devices and building features as
required in the standard. The site plan must be reviewed and accepted by the Fire
Inspector.
9