HomeMy WebLinkAbout06-69 - Resolutions RESOLUTION NO. 06-69
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT
REVIEW NO. DRC2006-00340, THE DESIGN REVIEW FOR TENTATIVE
PARCEL MAP NO.SUBTPM15588, LOCATED AT THE END OF
LAUREL TREE DRIVE IN THE LOW RESIDENTIAL DISTRICT
(2-4 DWELLING UNITS PER ACRE), AND MAKING FINDINGS IN
SUPPORT THEREOF -APN: 0226-102-13
A. Recitals.
1. Pulte Homes Corporation filed an application for the Development Review
DRC2006-00340, as described in the title of this Resolution. Hereinafter in this Resolution, the
subject Development Review request is referred to as "the application."
2. On the 26th day of July 2006, the Planning Commission of the City of Rancho
Cucamonga held a meeting to consider the application.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning
Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part
A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the
above-referenced meeting on July 26, 2006, including written and oral staff reports,this Commission
hereby specifically finds as follows:
a. The application applies to the property located at Laurel Tree Drive, with a street
frontage of approximately 104 feet and lot depth of approximately 165 feet, and is presently vacant
with temporary model home parking; and
b. The properties to the north, east, south, and west of the subject site are Single-
Family Residential; and
C. All parking requirements are met; and
d. No variances are requested as a part of this application; and
e. This subdivision includes one-story house designs that are similar to those
approved as part of Development Review DRC2004-00491 in the abutting development.
3. Based upon the substantial evidence presented to this Commission during the
above-referenced meeting and upon the specific findings of facts set forth in Paragraphs 1 and 2
above, this Commission hereby specifically finds and concludes as follows:
a. That the proposed project is consistent with the objectives of the General Plan; and
b. That the proposed design is in accord with the objectives of the Development Code
and the purposes of the district in which the site is located; and
PLANNING COMMISSION RESOLUTION NO. 06-69
DRC2006-00340 — PULTE HOMES
July 26, 2006
Page 2
C. That the proposed design is in compliance with each of the applicable provisions of
the Development Code; and
d. That the proposed design, together with the conditions applicable thereto, will not
be detrimental to the public health, safety, or welfare or materially injurious to the properties or
improvements in the vicinity.
4. The Planning Department staff has determined that the project is categorically exempt from
the requirements of the California Environmental Quality Act (CEQA) and the City's CEQA
Guidelines. The project qualifies under the Class 15 exemption under State CEQA Guidelines
Section 15332, Infill Development, because the project is less than five acres and is consistent with
the General Plan and Etiwanda Specific Plan. In addition, there is no substantial evidence that the
project may have a significant effect on the environment. The Planning Commission has reviewed
the Planning Department's determination of exemption, and based on its own independent
judgment, concurs in the staffs determination of exemption.
5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above,this
Commission hereby approves the application subject to each and every condition set forth below
and in the Standard Conditions, attached hereto and incorporated herein by this reference.
Planning Department
1) All applicable conditions for Tentative Tract Map SUBTPM15588 shall
apply.
Engineering Department
1) All applicable conditions for Tentative Tract Map SUBTPM15588 shall
apply.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 26TH DAY OF JULY 2006.
PLANNING C ISSION OF THE CITY OF RANCHO CUCAMONGA
BY:
Pam art, Chairman
ATTEST: R _
J4bs R. Troyer, AICP, Se retary
I, James R. Troyer,AICP, Secretary of the Planning Commission of the City of Rancho Cucamonga,
do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and
adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the
Planning Commission held on the 26th day of July 2006, by the following vote-to-wit:
AYES: COMMISSIONERS: FLETCHER, McPHAIL, MUNOZ, STEWART
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: MACIAS
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT #: DESIGN REVIEW DRC2006-00340
SUBJECT: TWO LOT SUBDIVISION WITH TWO SINGLE-FAMILY RESIDENTS
APPLICANT: PULTE HOMES CORPORATION
LOCATION: EAST END OF LAUREL TREE DRIVE AT WILSON AVENUE
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
A. General Requirements Completion Date
1. The applicant shall agree to defend at his sole expense any action brought against the City,
its agents, officers, or employees, because of the issuance of such approval, or in the
alternative, to relinquish such approval. The applicant shall reimburse the City, its agents,
officers, or employees, for any Court costs and attorney's fees which the City, its agents,
officers, or employees may be required by a court to pay as a result of such action. The City
may, at its sole discretion, participate at its own expense in the defense of any such action
but such participation shall not relieve applicant of his obligations under this condition.
2. Copies of the signed Planning Commission Resolution of Approval No. 06-69, Standard
Conditions, and all environmental mitigations shall be included on the plans (full size). The
sheet(s) are for information only to all parties involved in the construction/grading activities
and are not required to be wet sealed/stamped by a licensed Engineer/Architect.
B. Time Limits
1. This tentative tract map or tentative parcel map shall expire, unless extended by the Planning
Commission, unless a complete final map is filed with the City Engineer within 3 years from
the date of the approval.
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which
include site plans, architectural elevations, exterior materials and colors, landscaping, sign
program, and grading on file in the Planning Department, the conditions contained herein,
and development Code regulations.
SC-1-05 1
1APLANNINGTINAUPLNGCOMM2006 Res&Stf RptORC2006-00340SWCond 7-26.doo
Project No.DRC2006-00340
Completion Date
2. Prior to any use of the project site or business activity being commenced thereon, all
Conditions of Approval shall be completed to the satisfaction of the City Planner.
3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code
and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall
be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety
Department to show compliance. The buildings shall be inspected for compliance prior to
occupancy.
4. Revised site plans and building elevations incorporating all Conditions of Approval shall be
submitted for City Planner review and approval prior to the issuance of building permits.
5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.) or prior to final map approval in the case of a custom lot subdivision, or
approved use has commenced, whichever comes first.
6. Approval of this request shall not waive compliance with all sections of the Development
Code, all other applicable City Ordinances, and applicable Community or Specific Plans in
effect at the time of building permit issuance.
7. If no centralized trash receptacles are provided, all trash pick-up shall be for individual units
with all receptacles shielded from public view.
8. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall
be located out of public view and adequately screened through the use of a combination of
concrete or masonry walls, berming, and/or landscaping to the satisfaction of the City
Planner. For single-family residential developments, transformers shall be placed in
underground vaults.
9. All building numbers and individual units shall be identified in a clear and concise manner,
including proper illumination.
10. The Covenants, Conditions, and Restrictions (CC&Rs) and Articles of Incorporation of the
Homeowners' Association are subject to the approval of the Planning and Engineering
Departments and the City Attorney. They shall be recorded concurrently with the Final Map
or prior to the issuance of building permits, whichever occurs first. A recorded copy shall be
provided to the City Engineer. The Homeowners' Association shall submit to the Planning
Department a list of the name and address of their officers on or before January 1 of each
and every year and whenever said information changes.
11. All parkways, open areas, and landscaping shall be permanently maintained by the property
owner, homeowners' association, or other means acceptable to the City. Proof of this
landscape maintenance shall be submitted for City Planner and City Engineer review and
approved prior to the issuance of building permits.
12. The developer shall submit a construction access plan and schedule for the development of
all lots for City Planner and City Engineer approval; including, but not limited to, public notice
requirements, special street posting, phone listing for community concerns, hours of
construction activity, dust control measures, and security fencing.
13. Six-foot decorative block walls shall be constructed along the project perimeter. If a double
wall condition would result, the developer shall make a good faith effort to work with the
adjoining property owners to provide a single wall. Developer shall notify, by mail, all
contiguous property owner at least 30 days prior to the removal of any existing walls/fences
along the project's perimeter.
14. Construct block walls between homes (i.e., along interior side and rear property lines), rather
than wood fencing for permanence, durability, and design consistency.
2
I:\PLANNING\FINAL\PLNGCOMM\2006 Res& Stf Rpt\DRC2006-00340StdCond 7-26.doo
Project No.DRC2006-00340
Completion Date
15. Access gates to the rear yards shall be constructed from a material more durable than wood
gates. Acceptable materials include, but are not limited to, wrought iron and PVC.
16. For residential development, return walls and corner side walls shall be decorative masonry.
17. Where rock cobble is used, it shall be real river rock. Other stone veneers may be
manufactured products.
D. Landscaping
1. A detailed landscape and irrigation plan, including slope planting and model home
landscaping in the case of residential development,' shall be prepared by a licensed
landscape architect and submitted for City Planner review and approval prior to the issuance
of building permits or prior final map approval in the case of a custom lot subdivision.
2. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope, but less than
2:1 slope, shall be, at minimum, irrigated and landscaped with appropriate ground cover for
erosion control. Slope planting required by this section shall include a permanent irrigation
system to be installed by the developer prior to occupancy.
3. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or
greater slope shall be landscaped and irrigated for erosion control and to soften their
appearance as follows: one 15-gallon or larger size tree per each 150 sq. ft. of slope area,
1-gallon or larger size shrub per each 100 sq. ft, of slope area, and appropriate ground
cover. In addition, slope banks in excess of 8 feet in vertical height and 2:1 or greater slope
shall also include one 5-gallon or larger size tree per each 250 sq. ft. of slope area. Trees
and shrubs shall be planted in staggered clusters to soften and vary slope plane. Slope
planting required by this section shall include a permanent irrigation system to be installed by
the developer prior to occupancy.
4. For single-family residential development, all slope planting and irrigation shall be
continuously maintained in a healthy and thriving condition by the developer until each
individual unit is sold and occupied by the buyer. Prior to releasing occupancy for those
units, an inspection shall be conducted by the Planning Department to determine that they
are in satisfactory condition.
5. Front yard and corner side yard landscaping and irrigation shall be required per the
Development Code. This requirement shall be in addition to the required street trees and
slope planting.
6. The final design of the perimeter parkways, walls, landscaping, and sidewalks shall be
included in the required landscape plans and shall be subject to City Planner review and
approval and coordinated for consistency with any parkway landscaping plan which may be
required by the Engineering Department.
7. All walls shall be provided with decorative treatment. If located in public maintenance areas,
the design shall be coordinated with the Engineering Department.
8. New windrow planting of Eucalyptus Maculata (Spotted Gum) is required at a ratio of 50
linear feet per acre. The size, spacing, staking, and irrigation of these trees shall comply with
the City's Tree Preservation Ordinance (RCMC 19.08.100).
3
I:\PLANNING\FINAL\PLNGC0MM\2006 Res& Stf Rpt\DRC2006-00340StdCond 7-26.doc
Project No.DRC2006-00340
Completion Date
5. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday
through Saturday, with no construction on Sunday or holidays.
G. New Structures
1. Provide compliance with the California Building Code (CBC) for property line clearances
considering use, area, and fire-resistiveness.
2. Provide compliance with the California Building Code for required occupancy separations.
3. Roofing material shall be installed per the manufacturer's "high wind" instructions.
H. Grading
1. Grading of the subject property shall be in accordance with California Building Code, City
Grading Standards, and accepted grading practices. The final grading plan shall be in
substantial conformance with the approved grading plan.
2. A soils report shall be prepared by a qualified engineer licensed by the State of California to
perform such work.
3. A geological report shall be prepared by a qualified engineer or geologist and submitted at
the time of application for grading plan check.
4. The final grading plan, appropriate certifications and compaction reports shall be completed,
submitted, and approved by the Building and Safety Official prior to the issuance of building
permits.
5. A separate grading plan check submittal is required for all new construction projects and for
existing buildings where improvements being proposed will generate 50 cubic yards or more
of combined cut and fill. The grading plan shall be prepared, stamped, and signed by a
California registered Civil Engineer.
5
(:\PLANNING\FINAL\PLNGC0MM\2006 Res&Stf Rpt\DRC2006-00340StdCond 7-26.doc
Project No. DRC2006-00340
Completion Date
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT,
(909) 477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
E. General Requirements
1. Submit five complete sets of plans including the following:
a. Site/Plot Plan;
b. Foundation Plan;
C. Floor Plan;
d. Ceiling and Roof Framing Plan;
e. Electrical Plans (2 sets, detached) including the size of the main switch, number and
size of service entrance conductors, panel schedules, and single line diagrams;
f. Plumbing and Sewer Plans, including isometrics, underground diagrams, water and
waste diagram, sewer or septic system location, fixture units, gas piping, and heating
and air conditioning; and
g. Planning Department Project Number DRC2006-00340 clearly identified on the outside
of all plans.
2. Submit two sets of structural calculations, energy conservation calculations, and a soils
report. Architect's/Engineer's stamp and "wet" signature are required prior to plan check
submittal.
3. Contractors must show proof of State and City licenses and Workers' Compensation
coverage to the City prior to permit issuance.
4. Separate permits are required for fencing and/or walls.
F. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be
marked with the project file number DRC2006-00340. The applicant shall comply with the
latest adopted California Codes, and all other applicable codes, ordinances, and regulations
in effect at the time of permit application. Contact the Building and Safety Department for
availability of.the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new residential project or major addition, the
applicant shall pay development fees at the established rate. Such fees may include, but are
not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation Development
Fee, Permit and Plan Check Fees, Construction and Demolition Diversion Program deposit
and fees and School Fees. Applicant shall provide a copy of the school fees receipt to the
Building and Safety Department prior to permit issuance.
3. The Building and Safety Official shall provide street addresses after tract/parcel map
recordation and prior issuance of building permits.
4. For projects using septic tank facilities, written certification of acceptability, including all _/—J_
supportive information, shall be obtained from the San Bernardino County Department of
Environmental Health and submitted to the Building Official prior to the issuance of Septic
Tank Permits, and prior to issuance of building permits.
4
I:\PLANNING\FINAL\PLNGCOMM\2006 Res& Stf Rpt\DRC2006-00340StdCond 7-26.doc
Planning Standard Conditions SFR (master)
Rancho Cucamonga Fire Protection District
Z.
Fire Construction Services
STANDARD CONDITIONS
May 17, 2006
Rancho Summit
Two SFR Parcels
Laurel Tree Drive
East of Wardman Bullock Road South Side of Wilson Avenue
PM 15588 parcels 1 and 2
DRC2006-00340
THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT.
FSC-2 Fire Flow
1. The required fire.flow for this project is 1500 gallons per minute at a minimum residual pressure of
20-pounds per square inch. This requirement is made in accordance with Fire Code Appendix
III-A, as adopted by the Fire District Ordinances. For structures in excess of 3,600 square feet use
CFC Table A-III-A-1.
2. On all site plans to be submitted for review, show all fire hydrants located within 600-feet of the
proposed project site.
Please complete the following prior to the issuance of any Building Permits:
1. Fire Flow: A current fire flow letter from CCW D must be received. The applicant is responsible for
obtaining the fire flow information from CCWD and submitting the letter to Fire Construction
Services.
2. Address: Note on the plans that prior to the granting of occupancy, single-family dwellings shall
post the address with minimum 4-inch numbers on a contrasting background. The numbers shall
be internally or externally illuminated during periods of darkness. The numbers shall be visible
from the street. When building setback from the public roadway exceeds 100-feet, additional
4-inch numbers shall be displayed at the property entry.