HomeMy WebLinkAbout06-99 - Resolutions RESOLUTION NO. 06-99
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT
REVIEW DRC2006-00005,A REQUEST TO CONSTRUCT 4 INDUSTRIAL
BUILDINGS TOTALING 37,140 SQUARE FEET ON 2.2 ACRES OF LAND
IN THE GENERAL INDUSTRIAL DISTRICT(SUBAREA 14), LOCATED ON
THE WEST SIDE OF HYSSOP DRIVE, NORTH OF 6TH STREET AND
MAKING FINDINGS IN SUPPORT THEREOF - APN: 0229-271-31, 32
AND 37.
A. Recitals.
1. Williams Fox Group, filed an application for the approval of Development Review
DRC2006-00005, as described in the title of this Resolution. Hereinafter in this Resolution, the
subject Development Review request is referred to as "the application."
2. On the 25th day of October 2006, the Planning Commission of the City of Rancho
Cucamonga conducted a duly noticed public hearing to consider the application.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning
Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented, to this Commission during the
above-referenced public hearing on October 25, 2006, including written and oral staff reports,
together with public testimony, this Commission hereby specifically finds as follows:
a. The application applies to vacant property located on the west side of Hyssop
Drive, north of 6th Street; and
b. The property to the north of the subject site is currently under construction for a
similar industrial project. To the east of the site is the Southern California Edison utility corridor; to
the south is an existing industrial building; and to the west is the 1-15 Freeway; and
C. The application is in conjunction with the Tentative Parcel Map, a subdivision of
2.2 acres of land into four parcels; and
d. The project, together with the recommended conditions of approval, meets or
exceeds all minimum development standards for the City of Rancho Cucamonga; and
PLANNING COMMISSION RESOLUTION NO. 06-99
DRC2006-00005 —WILLIAM FOX GROUP
October 25, 2006
Page 2
e. The project will provide warehousing/distribution and manufacturing facilities for
industrial uses of incubator and start-up to moderate size, conveniently located relative to the
industrial area and regional circulation routes; and
f. The architectural design of the project incorporates stonework, reflective glazing,
plaster accents, and metal work. Each building has 360-degree architecture, thereby, meeting the
design goals of the Industrial Park District by providing a high-level of architectural design with
building entrances that are well articulated.
3. Based upon the substantial evidence presented to this Commission during the
above-referenced meeting and upon the specific findings of facts set forth in Paragraphs 1 and 2
above, this Commission hereby finds and concludes as follows:
a. The proposed project is consistent with the objectives of the General Plan; and
b. The proposed use is in accord with the objectives of the Development Code and
the purposes of the district in which the site is located; and
C. The proposed use is in compliance with each of the applicable provisions of the
Development Code; and
d. The proposed use, together with the conditions applicable thereto, will not be
detrimental to the public health, safety, or welfare or materially injurious to properties or
improvements in the vicinity.
4. The Planning Department staff has determined that the project is categorically exempt
from the requirements of the California Environmental Quality Act (CEQA) and the City's CEQA
Guidelines. The project qualifies under the Class 32 exemption under State CEQA Guidelines
Section 15332 (In-Fill Development) because the project is for a small scaled industrial in-fill
development. In addition, there is no substantial evidence that the project may have a significant
effect on the environment. The Planning Commission has reviewed the Planning Department's
determination of exemption, and based on its own independent judgment, concurs in the staffs
determination of exemption.
5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth
below and in the Standard Conditions, attached hereto and incorporated herein by this reference:
Planning Department
1) Tables, chairs,and shade shall be provided in each employee outdoor
eating area.
2) A uniform hardscape and design including seating benches and trash
receptacles shall be utilized and be compatible with the architectural
style of the buildings. Detailed designs shall be submitted for Planning
Department review and approval prior to the issuance of building
permits.
PLANNING COMMISSION RESOLUTION NO. 06-99
DRC2006-00005 —WILLIAM FOX GROUP
October 25, 2006
Page 3
Engineering Department
1) Provide a Water Quality Management Plan(WQMP),to the satisfaction
of the City Engineer. Information concerning the WQMP is online at:
www.swrcb.ca.gov/rwgcb8.htmi/sb_wgmp.html. On this website, refer
to the WQMP Guidance document for information on the WQMP. Use
the WQMP Attachments document to fill out the template electronically
and print to submit to the City.
2) Identify applicable Best Management Practices (BMPs)on the project
grading plan.
3) Complete processing Lot Line Adjustment No. 628 and have it
recorded. Also, record a new Grant Deed that includes the new legal
description after the lot line adjustment.
4) Hyssop Drive shall be constructed full width in accordance with City
"Industrial" standards including, but not limited to:
a) Provide all public street improvements including curb and gutter,
sidewalk on the west side, drainage facilities, streetlights, street
trees, etc., and install an off-set cul-de-sac.
b) Provide 5800 Lumen HPSV streetlights on Hyssop as required.
c) Provide R26(s) "NO STOPPING" signs, and other traffic signing
and striping, as required.
d) Install street trees along the project frontage per the City's Street
Tree Requirements Form development for this site.
5) Dedication shall be made of the rights-of-way to construct an offset
cul-de-sac terminus for Hyssop Drive at the north end of the project
site, consistent with Development Review DRC2005-00683.
a) Maintain the cul-de-sac clear of the current Southern California
Edison (SCE) power corridor right-of-way to the east.
6) The developer shall make a good faith effort to acquire any off-site
rights-of-way required to complete the cul-de-sac bulb on the property
to the north.
a) The developer may request reimbursement for permanent off-site
improvements from the adjacent property development.
7) Pay the in-lieu of construction fee for the future installation of freeway
landscaping along the 1-15 Freeway frontage of the project site.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
PLANNING COMMISSION RESOLUTION NO. 06-99
DRC2006-00005—WILLIAM FOX GROUP
October 25, 2006
Page 4
APPROVED AND ADOPTED THIS 25TH DAY OF OCTOBER 2006.
PLANNING COMMI ON OF THE CITY OF RANCHO CUCAMONGA
BY:
Pam Stew(
tew 17
hairman
ATTEST:
g. L4��j
Ja7rAICP,
R. Troyer, AICP, Se retary
es
I,JaiR.Troy Secretary of the Planning Commission of the City of Rancho Cucamonga,
do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and
adopted by the Planning Commission of the City of Rancho Cucamonga, ata regular meeting of the
Planning Commission held on the 25th day of October 2006, by the following vote-to-wit:
AYES: COMMISSIONERS: FLETCHER , MACIAS , McPHAIL , MUNOZ , STEWART '
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: NONE
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT#: DEVELOPMENT REVIEW DRC2006-00005
SUBJECT: CONSTRUCTION OF 4 INDUSTRIAL BUILDINGS TOTALLING 88,076 SQUARE FEET
APPLICANT: WILLIAM FOX GROUP
LOCATION: WEST SIDE OF HYSSOP DRIVE, NORTH OF 6TH STREET
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
A. General Requirements Completion Date
1. The applicant shall agree to defend at his sole expense any action brought against the City, its
agents,officers,or employees, because of the issuance of such approval,or in the alternative,to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or
employees, for any Court costs and attorney's fees which the City, its agents, officers;or
employees may be required by a court to pay as a result of such action. The City may,at its sole
discretion, participate at its own expense in the defense of any such action but such participation
shall not relieve applicant of his obligations under this condition.
2. Copies of the signed Planning Commission Resolution of Approval No. 06-99, Standard
Conditions, and all environmental mitigations shall be included on the plans (full size). The
sheet(s) are for information only to all parties involved in the construction/grading activities and
are not required to be wet sealed/stamped by a licensed Engineer/Architect.
B. Time Limits
1. Conditional Use Permit, Variance, or Development/Design Review approval shall expire if
building permits are not issued or approved use has not commenced within 5 years from the date
of approval. No extensions are allowed.
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which include
site plans,architectural elevations,exterior materials and colors,landscaping,sign program,and
grading on file in the Planning Department, the conditions contained herein, and Development
Code regulations.
SC-1-05 1
1:\PLANNINGTINALTLNGCOMM2006 Res&Stf Rpt\DRC2006-00005StdCond 10-25.doo
Project No.DRC2006-00005
' Completion Date
2. Prior to any use of the project site or business activity being commenced thereon,all Conditions
of Approval shall be completed to the satisfaction of the Planning Director.
3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and
State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be
submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety
Department to show compliance. The buildings shall be inspected for compliance prior to
occupancy.
4. Revised site plans and building elevations incorporating all Conditions of Approval shall be
submitted for Planning Director review and approval prior to the issuance of building permits.
5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved
use has commenced, whichever comes first.
6. Approval of this request shall not waive compliance with all sections of the Development Code,all
other applicable City Ordinances, and applicable Community or Specific Plans in effect at the
time of building permit issuance.
7. A detailed on-site lighting plan, including a photometric diagram,shall be reviewed and approved
by the Planning Director and Police Department (477-2800) prior to the issuance of building
permits. Such plan shall indicate style, illumination,location, height,and method of shielding so
as not to adversely affect adjacent properties.
8. Trash receptacle(s)are required and shall meet City standards. The final design, locations,and
the number of trash receptacles shall be subject to Planning Director review and approval prior to
the issuance of building permits.
9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be
located out of public view and adequately screened through the use of a combination of concrete
or masonry walls, berming, and/or landscaping to the satisfaction of the Planning Director. For
single-family residential developments, transformers shall be placed in underground vaults.
10. All building numbers and individual units shall be identified in a clear and concise manner,
including proper illumination.
D. Building Design
1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or
projections, shall be shielded from view and the sound buffered from adjacent properties and
streets as required by the Planning Department. Such screening shall be architecturally
integrated with the building design and constructed to the satisfaction of the Planning Director.
Details shall be included in building plans.
2. For commercial and industrial projects, paint roll-up doors and service doors to match main
building colors.
E. Parking and Vehicular Access (indicate details on building plans)
1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts
a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet
wide.
2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall
contain a 12-inch walk adjacent to the parking stall (including curb).
2
I:\PLANNING\FINAL\PLNGCOMM\2006 Res&Stf Rpt\DRC2006-00005StdCond 10-25.doc
Project No.DRC2006-00005
Completion Date
3. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided _/_/_
throughout the development to connect dwellings/units/buildings with open spaces/plazas/
recreational uses.
4. All parking spaces shall be double striped per City standards and all driveway aisles,entrances,
and exits shall be striped per City standards.
5. Motorcycle parking area shall be provided for commercial and office facilities with 25 or more
parking stalls. Developments with over 100 parking stalls shall provide motorcycle parking at the
rate of one percent. The area for motorcycle parking shall be a minimum of 56 square feet.
F. Trip Reduction
1. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily
residential projects of more than 10 units. Minimum spaces equal to five percent of the required
automobile parking spaces or three bicycle storage spaces,whichever is greater. After the first
50 bicycle storage spaces are provided,additional storage spaces required are 2.5 percent of the
required automobile parking spaces. Warehouse distribution uses shall provide bicycle storage
spaces at a rate of 2.5 percent of the required automobile parking spaces with a minimum of a
3-bike rack. In no case shall the total number of bicycle parking spaces required exceed 100.
Where this results in a fraction of 0.5 or greater, the number shall be rounded off to the higher
whole number.
2. Carpool and vanpool designated off-street parking close to the building shall be provided for
commercial, office, and industrial facilities at the rate of 10 percent of the total parking area. If
covered, the vertical clearance shall be no less than 9 feet.
3. Category 5 telephone cable or fiber optic cable shall be provided for office buildings and other
non-residential development.
4. For industrial projects with at least 40 car parking spaces, bicyclist-changing facilities shall be
provided to encourage bicycle commuting per the City of Rancho Cucamonga Bicycle
Transportation Plan adopted by City Council Resolution No.02-237. Accessible restrooms with
storage lockers for clothing and equipment shall be sufficient.
G. Landscaping
1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in
the case of residential development, shall be prepared by a licensed landscape architect and
submitted for Planning Director review and approval prior to the issuance of building permits or
prior final map approval in the case of a custom lot subdivision.
2. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within
commercial and office projects, shall be specimen size trees -24-inch box or larger.
3. Within parking lots,trees shall be planted at a rate of one 15-gallon tree for every three parking
stalls.
4. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one
tree per 30 linear feet of building.
5. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope,but less than 2:1
slope,shall be,at minimum, irrigated and landscaped with appropriate ground cover for erosion
control. Slope planting required by this section shall include a permanent irrigation system to be
installed by the developer prior to occupancy.
3
I:\PLANNINGTINAL\PLNGCOM10\2006 Res&Stf Rpt\DRC2006-00005StdCond 10-25.doc
Project No.DRC2006-00005
Completion Date
6. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater
slope shall be landscaped and irrigated for erosion control and to soften their appearance as
follows: one 15-gallon or larger size tree per each 150 sq.ft.of slope area, 1-gallon or larger size
shrub per each 100 sq.ft.of slope area,and appropriate ground cover. In addition,slope banks
in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or
larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in
staggered clusters to soften and vary slope plane. Slope planting required by this section shall
include a permanent irrigation system to be installed by the developer prior to occupancy.
7. For multi-family residential and non-residential development,property owners are responsible for
the continual maintenance of all landscaped areas on-site, as well as contiguous planted areas
within the public right-of-way. All landscaped areas shall be kept free from weeds and debris and
maintained in healthy and thriving condition,and shall receive regular pruning,fertilizing,mowing,
and trimming. Any damaged,dead,diseased,or decaying plant material shall be replaced within
30 days from the date of damage.
8. Landscaping and irrigation systems required to be installed within the public right-of-way on the
perimeter of this project area shall be continuously maintained by the developer.
9. All walls shall be provided with decorative treatment. If located in public maintenance areas,the
design shall be coordinated with the Engineering Department.
10. Tree maintenance criteria shall be developed and submitted for Planning Director review and
approval prior to issuance of building permits.These criteria shall encourage the natural growth
characteristics of the selected tree species.
11. Landscaping and irrigation shall be designed to conserve water through the principles of
Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code.
12. On projects which abut the 1-15 Freeway, the developer shall provide landscaping within the
freeway right-of-way along the boundary of this project or pay an in-lieu of construction cash
deposit. The landscape and irrigation plans shall be prepared in conformance with Caltrans and
City Standards through the City of Rancho Cucamonga. Plans shall be reviewed and approved
by the Planning Director and City Engineer. Landscape and irrigation shall be installed prior to
the release of occupancy of the project. If final approvals and/or installation are not complete at
that time, the City will accept a cash deposit for future landscaping of the Caltrans right-of-way.
H. Signs
1. The signs indicated on the submitted plans are conceptual only and not a part of this approval.
Any signs proposed for this development shall comply with the Sign Ordinance and shall require
separate application and approval by the Planning Department prior to installation of any signs.
2. A Uniform Sign Program for this development shall be submitted for Planning Director review and
approval prior to issuance of building permits.
I. Other Agencies
1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location
of mailboxes. Multi-family residential developments shall provide a solid overhead structure for
mailboxes with adequate lighting. The final location of the mailboxes and the design of the
overhead structure shall be subject to Planning Director review and approval prior to the issuance
of building permits.
4
11PLANNING\FINAL\PLNGC0MM\2006 Res&Stf Rpt\DRC2006-00005StdCond 10-25.doc
Project No. DRC2006-00005
Completion Date
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT,(909)477-2710,
FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S)
J. General Requirements
1. Submit five complete sets of plans including the following:
a. Site/Plot Plan;
b. Foundation Plan;
C. Ceiling, Floor, and Roof Framing Plan;
d. Ceiling and Roof Framing Plan;
e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size
of service entrance conductors, panel schedules, and single line diagrams;
f. Plumbing and Sewer Plans, including isometrics, underground diagrams,water and waste
diagram, sewer or septic system location, fixture units, gas piping, and heating and air
conditioning; and
g. Planning Department Project Number (SUBTPM17836 and DRC2006-00005) clearly
identified on the outside of all plans.
h. Separate permits are required for fencing and/or walls.
2. Submit two sets of structural calculations, energy conservation calculations, and a soils report.
Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal.
3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to
the City prior to permit issuance.
4. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the
Building and Safety Department.
K. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be
marked with the project file number(SUBTPM17836 and DRC2006-00005). The applicant shall
comply with the latest adopted California Codes, and all other applicable codes,ordinances,and
regulations in effect at the time of permit application. Contact the Building and Safety
Department for availability of the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new commercial or industrial development project or
major addition,the applicant shall pay development fees at the established rate. Such fees may
include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation
Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program
deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to
the Building and Safety Department prior to permits issuance.
3. The Building and Safety Official shall provide the street addresses after tract/parcel map
recordation and prior to issuance of building permits.
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday
through Saturday, with no construction on Sunday or holidays.
5
I:\PLANNINGTINAL\PLNGCOMM\2006 Res&Stf Rpt\DRC2006-00005StdCond 10-25.doc
Project No.DRC2006-00005
Completion Date
5. Construct trash enclosure(s) per City Standard (available at the Planning Department's public
counter).
L. New Structures
1. Provide compliance with the California Building Code (CBC) for property line clearances
considering use, area, and fire-resistiveness.
2. The project shall be designed to comply with the 2001 California Building Codes (CBC), the
California Fire Code, and with RCFPD Ordinances 15 and 39.
3. Provide compliance with the California Building Code for required occupancy separations.
4. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC
Section 1505.
5. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A
6. Openings in exterior walls shall be protected in accordance with CBC Table 5-A.
7. Provide the required restroom facilities per the CBC Appendix Chapter 29.
8. All exit components must comply with the requirements of CBC Chapter 10 (adjoining rooms,
rated corridors, door swings, separation of exits, etc.).
9. At the time of tenant improvement plan check submittal,additional requirements may be needed.
10. Clearly indicate on the plans compliance with ADA requirements for the disabled.
11. A registered architect must sign and stamp the plans.
M. Grading
1. Grading of the subject property shall be in accordance with California Building Code,City Grading
Standards, and accepted grading practices. The final grading plan shall be in substantial
conformance with the approved grading plan.
2. A soils report shall be prepared by a qualified engineer licensed by the State of California to _/_/_
perform such work.
3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the
time of application for grading plan check.
4. At the time of tenant improvement plan check submittal (for construction), additional
requirements may be required.
5. The final grading plan, appropriate certifications and compaction reports shall be completed,
submitted, and approved by the Building and Safety Official prior to the issuance of building
permits.
6. A separate grading plan check submittal is required for all new construction projects and for
existing buildings where improvements being proposed will generate 50 cubic yards or more of
combined cut and fill. The grading plan shall be prepared,stamped,and signed by a California
registered Civil Engineer.
6
I:\PLANNING\FINAL\PLNGCOMM\2006 Res&Stf Rpt\DRC2006-00005StdCond 10-25.doc
Project No.DRC2006-00005
Completion Date
N. Additional Requirements/Comments
1. Note on the title sheet that tenant improvement plans must be submitted for plan check and be
approved prior to construction. The applicant shall comply with the latest adopted California
Codes,and all other applicable codes,ordinances,and regulations in effect at the time of permit
application. Contact the Building and Safety Department if you have any questions about the
procedure at 909-477-2710.
APPLICANT SHALL CONTACT THE ENGINEERING DEPARTMENT, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
O. Dedication and Vehicular Access
1. Dedication shall be made of the following rights-of-way on the perimeter streets(measured from
street centerline):
33 total feet on Hyssop Drive.
2. Reciprocal access easements shall be provided ensuring access to all parcels by CC&Rs or by
deeds and shall be recorded concurrently with the map or prior to the issuance of building
permits, where no map is involved.
P. Street Improvements
1. Pursuant to City Council Resolution No.88-557,no person shall make connections from a source
of energy,fuel or power to any building service equipment which is regulated by technical codes
and for which a permit is required unless, in addition to any and all other codes, regulations and
ordinances, all improvements required by these conditions of development approval have been
completed and accepted by the City Council,except:that in developments containing more than
one building or unit, the development may have energy connections made to a percentage of
those buildings, or units proportionate to the completion of improvements as required by
conditions of approval of development. In no case shall more than 95 percent of the buildings or
units be connected to energy prior to completion and acceptance of all improvements required by
these conditions of approval of development.
2. Construct the following perimeter street improvements including, but not limited to:
Curb& A.C. Side- Drive Street Street Comm Median Bike
Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other
Hyssop Drive X X X X X X
Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement
reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk
shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be
provided for this item.
3. Improvement Plans and Construction:
a. Street improvementplans, including street trees,street lights,and intersection safety lights
on future signal poles, and traffic signal plans shall be prepared by a registered Civil
Engineer and shall be submitted to and approved by the City Engineer. Security shall be
posted and an agreement executed to the satisfaction of the City Engineer and the City
Attorney guaranteeing completion of the public and/or private street improvements,prior to
final map approval or the issuance of building permits, whichever occurs first.
7
I:\PLANNING\FINAL\PLNGC0MM\2006 Res&Stf Rpt\DRC2006-00005StdCond 10-25.doc
Project No.DRC2006-00005
Completion Date
b. Prior to any work being performed in public right-of-way, fees shall be paid and a
construction permit shall be obtained from the City Engineer's Office in addition to any
other permits required.
C. Pavement striping, marking,traffic signing,street name signing,traffic signal conduit,and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Signal conduit with pull boxes shall be installed with any new.construction or reconstruction
project along major or secondary streets and at intersections for future traffic signals and
interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside
of BCR, ECR, or any other locations approved by the City Engineer
Notes:
1) Pull boxes shall be No.6 at intersections and No.5 along streets,a maximum of 200
feet apart, unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch galvanized steel with pull rope or as specified.
e. Handicapped access ramps shall be installed on all corners of intersections per City _
Standards or as directed by the City Engineer.
f. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A cash
deposit shall be provided to cover the cost of grading and paving,which shall be refunded
upon completion of the construction to the satisfaction of the City Engineer.
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be
installed to City Standards, except for single family residential lots.
h. Street names shall be approved by the Planning Director prior to submittal for first plan
check.
4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in
accordance with the City's street tree program.
5. Install street trees per City street tree design guidelines and standards as follows. The completed
legend (box below) and construction notes shall appear on the title page of the street
improvement plans. Street improvement plans shall include a line item within the construction
legend stating: "Street trees shall be installed per the notes and legend on sheet_(typically
sheet 1)." Where public landscape plans are required, tree installation in those areas shall be
per the public landscape improvement plans.
The City Engineer reserves the right to adjust tree species based upon field conditions and other
variables. For additional information, contact the Project Engineer.
Min.
Grow
Street Name Botanical Name Common Name Space Spacing Size city.
Hyssop Drive Brachychiton populneus Bottle Tree 5 feet 25 feet o.c. 15-gal. Fill-in
Construction Notes for Street Trees:
1) All street trees are to be planted in accordance with City standard plans.
2) Prior to the commencement of any planting,an agronomic soils report shall be furnished to
the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil
amendments, as determined by the City inspector.
3) All street trees are subject to inspection and acceptance by the Engineering Department.
4) Street trees are to be planted per public improvement plans only.
8
(:\PLANNING\FINAL\PLNGC0MM\2006 Res&Sri Rpt\DRC2006-00005StdCond 10-25.doc
Project No.DRC2006-00005
Completion Date
Q. Public Maintenance Areas
1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting
Districts shall be filed with the City Engineer prior to final map approval or issuance of building
permits whichever occurs first. Formation costs shall be borne by the developer.
R. Utilities
1. Provide separate utility services to each parcel including sanitary sewerage system,water,gas,
electric power, telephone, and cable TV (all underground) in accordance with the Utility
Standards. Easements shall be provided as required.
2. The developer shall be responsible for the relocation of existing utilities as necessary.
3. Water and sewer plans shall be designed and constructed to meet the requirements of the
Cucamonga Valley Water District(CVW D), Rancho Cucamonga Fire Protection District,and the
Environmental Health Department of the County of San Bernardino. A letter of compliance from
the CVW D is required prior to final map approval or issuance of permits,whichever occurs first.
Such letter must have been issued by the water district within 90 days prior to final map approval
in the case of subdivision or prior to the issuance of permits in the case of all other residential
projects.
4. Approvals have not been secured from all utilities and other interested agencies involved.
Approval of the final parcel map will be subject to any requirements that may be received from
them.
S. General Requirements and Approvals
1. The separate parcels contained within the project boundaries shall be legally combined into one
parcel prior to issuance of building permits.
2. Permits shall be obtained from the following agencies for work within their right of-way:
Metropolitan Water District (MWD) and Caltrans.
3. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all
new streetlights for the first six months of operation,prior to final map approval or prior to building
permit issuance if no map is involved.
4. Prior to the issuance of building permits,a Diversion Deposit and related administrative fees shall
be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if
at least 50% of all wastes generated during construction and demolition are diverted from
landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to
the Engineering Department when the first building permit application is submitted to Building and
Safety. Form CD-2 shall be submitted to the Engineering Department within 60 days following
the completion of the construction and/or demolition project.
APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
T. Security Lighting
1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power.
These areas should be lighted from sunset to sunrise and on photo sensored cell.
9
I:\PLANNINGTINAL\PLNGCOMM\2006 Res&Stf Rpt\DRC2006-00005StdCond 10-25.doc
Project No.DRC2006-00005
Completion Date
2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with
direct lighting to be provided by all entryways. Lighting shall be consistent around the entire
development.
3. Lighting in exterior areas shall be in vandal-resistant fixtures.
U. Security Hardware
1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within
40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used.
2. All garage or rolling doors shall have slide bolts or some type of secondary locking devices.
3. All roof openings giving access to the building shall be secured with either iron bars,metal gates,
or alarmed.
V. Building Numbering
1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime
visibility.
2. Developer shall paint roof top numbers on one or more roofs of this development. They shall be
a minimum of three feet in length and two feet in width and of contrasting color to background.
The stencils for this purpose are on loan at the Rancho Cucamonga Police Department.
W. Alarm Systems
1. Install a burglar alarm system and a panic alarm if needed. Instructing management and
employees on the operation of the alarm system will reduce the amount of false alarms and in
turn save dollars and lives.
APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION
PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING
CONDITIONS:
SEE ATTACHED
10
IAPLANNINGTINALTLNGCOM2006 Res&Stf RptORC2006-00005StdCond 10-25.doc
Planning Standard Conditions Industrial (Master)
` Rancho Cucamonga Fire Protection District
Fire Construction Services
STANDARD CONDITIONS
September 26, 2006
Hyssop Subdivision
9037 Hyssop Drive
4 Industrial Buildings
SUBTPM17836 and DRC2006-00005
Building permits will not be issue for this project until the applicant records with the San
Bernardino County all the necessary easements related to the county flood control
district roadways.
THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT
The FICFPD Procedures & Standards which are referenced in this document can be access on the web
at http://www.ci.rancho-cucamonga.ca.us/fire/index.htm under the Fire Safety Department & Fire
Construction Services section. Search by article; the preceding number of the standard refers to the
article. Chose the appropriate article number then a drop down menu will appear, select the
corresponding standard.
FSC-1 Public and Private Water Supply .
1. Design guidelines for Fire Hydrants: The following provides design guidelines for the spacing and
location of fire hydrants:
a. The maximum distance between fire hydrants in commercial/industrial projects is 300 feet.
No portion of the exterior wall shall be located more than 150 feet from an approved fire
hydrant. For cul-de-sacs, the distance shall not exceed 100 feet.
b. The preferred locations for fire hydrants are:
i. At the entrance(s) to a commercial, industrial or residential project from the public
roadways.
ii. At intersections.
iii. On the right side of the street, whenever practical and possible.
iv. As required by the Fire Safety Department to meet operational needs of the Fire District.
V. A minimum of 40 feet from any building.
C. If any portion of a facility or building is located more than 150 feet from a public fire hydrant
measured on an approved route around the exterior of the facility or building, additional
private or public fire hydrants and mains capable of supplying the required fire flow shall be
provided.
d. Provide one fire hydrant for each 1,000 gpm of required fire flow or fraction thereof.
FSC-2 Fire Flow
1. The required minimum fire flow for this project, when automatic fire sprinklers are installed is
2,500 gallons per minute at a minimum residual pressure of 20-pounds per square inch. This flow
reflects a 50-percent reduction for the installation of an approved automatic fire sprinkler system in
accordance with NFPA 13 with central station monitoring. This requirement is made in accordance
with the California Fire Code Appendix III-A, as adopted by the Fire District Ordinances.
2. Public fire hydrants located within a 500-foot radius of the proposed project may be used to provide
the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent
property shall not be used to provide required fire flow.
3. Fire protection water plans are required for all projects that must extend the existing water supply to
or onto the site. Building permits will not be issued until fire protection water plans are
approved.
4. On all site plans to be submitted for review, show all fire hydrants located within 600 feet of the
proposed project site.
FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems
1. Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant shall submit
plans, specifications, and calculations for the fire sprinkler system underground supply piping.
Approval of the underground supply piping system must be obtained prior to submitting the
overhead fire sprinkler system plans.
FSC-4 Requirements for Automatic Fire Sprinkler Systems
Rancho Cucamonga Fire District Ordinance 15, the 2001 California Fire Code, and/or any other
applicable standards require an approved automatic fire sprinkler system to be installed in:
1. Commercial or industrial structures greater than 7,500 square feet.
2. Group "A" Occupancies.
3. "E" Occupancies with an occupant load of 50 or more persons.
4. All structures that do not meet Fire District access requirements (see Fire Access).
5. When required fire flow cannot be provided due to inadequate volume or pressure.
6. When the building access does not meet the requirements of the 2001 California Building Code
and the RCFPD Fire Department Access - Fire Lane Standard #9-7
2
7. When any applicable code or standard requires the structure to be sprinklered.
FSC-5 Fire Alarm System
1. The California Building Code, the RCFPD Fire Alarm Standard #10-6 and/or the California Fire
Code require a listed fire sprinkler monitoring Central Station Fire Alarm system. Plan check
approval and a building permit are required prior to the installation of the fire alarm system. Plans
and specifications shall be submitted to Fire Construction Services in accordance with RCFPD Fire
Alarm Standard #10-6.
FSC-6 Fire District Site Access
Fire District access roadways include public roads, streets and highways, as well as private roads,
streets drive aisles and/or designated fire lanes. Please reference the RCFPD Fire Department Access
Roadways Std #9-7.
1. Location of Access: All portions of the structures 1 s` story exterior wall shall be located within 150
feet of Fire District vehicle access, measure on an approved route around the exterior of the
building. Landscaped areas, unpaved changes in elevation, gates, and fences are deemed
obstructions.
2. Specifications for private Fire District access roadways per the RCFPD Standards are:
a. The minimum unobstructed width is 26 feet.
b. The maximum inside turn radius shall be 24 feet.
C. The minimum outside turn radius shall be 50 feet.
d. The minimum radius for cul-de-sacs is 45 feet.
e. The minimum vertical clearance is 14 feet, 6 inches.
f. At any private entry median, the minimum width of traffic lanes shall be 20 feet on each side.
g. The angle of departure and approach shall not exceed 9-degrees or 20 percent.
h. The maximum grade of the driving surface shall not exceed 12 percent.
i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW).
j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a minimum of
14 feet, 6 inches from the ground up. Vegetation shall not be allowed to obstruct Fire
Department apparatus.
3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be provided
as follows:
a. In buildings without high-piled storage, access shall be provided in accordance with the 2001
California Building Code, Fire and/or any other applicable standards.
3
b. In buildings with high-piled storage access doors shall be provided in each 100 lineal feet or
major fraction thereof, of the exterior wall that faces the required access roadways. When
railways are installed provisions shall be made to maintain Fire District access to all required
openings.
4. Access Walkways: Hardscaped access walkways shall be provided from the fire apparatus
access road to all required building exterior openings.
5. Commercial/Industrial Gates: Any gate installed across a Fire Department access road shall be
in accordance with Fire District Standard #9-2. The following design requirements apply:
a. Prior to the fabrication and installation of the gates, plans are required to be submitted to Fire
Construction Services (FCS) for approval. Upon the completion of the installation and before
placing the gates in service, inspection and final acceptance must be requested from FCS.
b. Gates must slide open horizontally or swing inward.
C. Gates may be motorized or manual.
d. When fully open, the minimum clearance dimension of drive access shall be 20 feet.
e. Manual gates must be equipped with a RCFPD lock available at the Fire Safety Office for
$20.00.
f. Motorized gates must open at the rate of 1 foot per second.
g. The motorized gate actuation mechanism must be equipped with a manual override device
and a fail-safe or battery backup feature to open the gate or release the locking Mechanism in
case of power failure or mechanical malfunction.
h. Motorized gates shall be equipped with a Knox override key switch. The switch must be
installed outside the gate in a visible and unobstructed location.
i. For motorized gates, a traffic loop device must be installed to allow exiting from the complex.
j. If traffic pre-emption devices (TPD) are to be installed, the device, location, and operation
must be approved by the Fire Chief prior to installation. Bi-directional or multiple sensors may
be required due to complexity of the various entry configurations.
6. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site plan
illustrating the proposed delineation that meets the minimum Fire District standards shall be
included in the architectural plans submitted to B&S for approval.
7. Approved Fire Department Access: Any approved mitigation measures must be clearly noted on
the site plan. A copy of the approved Alternative Method application, if applicable, must be
reproduced on the architectural plans submitted to B&S for plan review.
8. Roof Access: There shall be a means of fire department access from the exterior walls of the
buildings on to the roofs of all commercial, industrial, and multi-family residential structures with
roofs less than 75 feet above the level of the fire access road.
a. This access must be reachable by either fire department ground ladders or by an aerial
ladder.
4
b. A minimum of one ladder point with a fixed ladder shall be provided in buildings with
construction features, or high parapets that inhibit roof access.
C. The number of ladder points may be required to be increased, depending on the building size
and configuration.
d. Regardless of the parapet height or construction features the approved ladder point shall be
identified in accordance to the roof access standard.
e. Where the entire roof access is restricted by high parapet walls or other obstructions, a
permanently mounted access ladder is required.
f. Multiple access ladders may be required for larger buildings.
g. Ladder construction must be in accordance with the RCFPD Roof Access Standard 9-9
Appendix A and drawings 9-9a and 9-9b.
h. A site plan showing the locations of the roof ladder shall be submitted during plan check.
i. Ladder points shall face a fire access roadway(s).
FSC-10 Occupancy and Hazard Control Permits
Listed are those Fire Code permits commonly associated with the business operations and/or building
construction. Plan check submittal is required with the permit application for approval of the permit; field
inspection is required prior to permit issuance. General Use Permit shall be required for any activity or
operation not specifically described below, which in the judgment of the Fire Chief is likely to produce
conditions that may be hazardous to life or property.
• Aerosol Products Magnesium Working
• Application of Flammable Finishes Motor Vehicle Fuel-Dispensing Operation
• Automobile Wrecking Yards Open Burning
• Battery Systems Organic Coating
• Candles and open flames in public assemblies Ovens
• Cellulose Nitrate Powder Coating
• Compressed Gases Public Assembly
• Cryogenics Pyrotechnical Special Effects
• Dry Cleaning Plants Radioactive Materials
• Dust-Producing Processes and Operations Refrigeration Systems
• Explosive or Blasting Agents Repair Garages
• Flammable and Combustible Liquids Rubbish Handling Operations
• Fruit Ripening Plants Spraying or Dipping Operations
• Hazardous Materials Tents, Canopies and/or Air Supported
Structures
• High-Pile Combustible Storage (HPS) Tire Storage
• Liquefied Petroleum Gases Welding and Cutting Operations
• LPG or Gas Fuel Vehicles in Assembly Buildings Wood Products/Lumber Yards
5
FSC-11 Hazardous Materials— Submittal to the County of San Bernardino
The San Bernardino County Fire Department shall review your Business Emergency/Contingency Plan
for compliance with minimum standards. Contact the San Bernardino County Fire, Hazardous Materials
Division at (909) 387-4631 for forms and assistance. The County Fire Department is the Cal/EPA
Certified Unified Program Agency (CUPA) for the City of Rancho Cucamonga.
1. If the facility is a NEW business, a Certificate of Occupancy issued by Building & Safety will not be
finalized until the San Bernardino County Fire Department reviews your Business
Emergency/Contingency Plan. California Government Code, Section 65850.2 prohibits the City
from issuing a final Certificate of Occupancy unless the applicant has met or is meeting specific
hazardous materials disclosure requirements. A Risk Management Program (RMP) may also be
required if regulation substances are to be used or stored at the new facility.
2. Any business that operates on rented or leased property which is required to submit a Plan is also
required to submit a notice to the owner of the property in writing stating that the business is
subject to the Business Emergency/Contingency Plan mandates and has complied with the
provisions. The tenant must provide a copy of the Plan to the property owner within five working
days, if requested by the owner.
FSC-12 Hazardous Materials - Submittal to Fire Construction Services
Plans shall be submitted and approved prior to construction of buildings and/or the installation of
equipment designed to store, use or dispense hazardous materials in accordance with the
2001 California Building, Fire, Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances FD15 and
FD39 and other implemented and/or adopted standards.
FSC-13 Alternate Method Application
Fire Construction Services staff and the Fire Marshal will review all requests for alternate method, when
submitted. The request must be submitted on the Fire District "Application for Alternate Method" form
along with supporting documents and payment of the $92 review fee.
FCS-14 Map Recordation
1. RECIPROCAL AGREEMENTS for Fire Department Emergency Access and Water Supply are
required on this project. The project appears to be located on a property that is being subdivided.
The reciprocal agreement is required to be recorded between property owners and the Fire District.
The recorded agreement shall include a copy of the site plan. The Fire Construction Services shall
approve the agreement, prior to recordation. The agreement shall be recorded with the County of
San Bernardino, Recorders Office.
Reciprocal access agreement — Please provide a permanent access agreement between the
owners granting irrevocable and a non-exclusive easement, favoring the Fire District to gain access
to the subject property. The agreement shall include a statement that no obstruction, gate, fence,
building, or other structure shall be placed within the dedicated access, without Fire Department
approval. The agreement shall have provisions for emergency situations and the assessing of cost
recovery to the property by the Fire District.
6
Reciprocal water covenant — Please provide a permanent maintenance and service covenant
between the owners granting an irrevocable and non-exclusive easement, favoring the Fire District
for the purpose of accessing and maintaining the private water mains, valves and fire hydrants (fire
protection systems facilities in general). The covenant shall have provisions for emergency
situations and the assessing of cost recovery to the property by the fire District.
Chronological Summary of RCFPD Standard Conditions
PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to the
issuance of any building permits:
1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans,
specifications, flow test data, and calculations for the private water main system for review and
approval by the Fire District. Plans and installation shall comply with Fire District Standards.
Approval of the on-site (private) fire underground and water plans is required prior to any building
permit issuance for any structure on the site. Private on-site combination domestic and fire supply
system must be designed in accordance with RCFPD Standards # 9-4, #10-2 and #10-4. The
Building & Safety Department and Fire Construction Services will perform plan checks and
inspections.
All private on-site fire hydrants shall be installed, flushed and operable prior to delivering any
combustible framing materials to the site. Fire construction Services will inspect the installation,
witness hydrant flushing, and grant a clearance before lumber is dropped.
2. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the
locations of all new public fire hydrants for the review and approval by the Fire District and CCWD.
On the plan, show all existing fire hydrants within a 600-foot radius of the project. Please reference
the RCFPD Water Plan Submittal Procedure Standard.
All required public fire hydrants shall be installed, flushed and operable prior to delivering any
combustible framing materials to the site. CCWD personnel shall inspect the installation and
witness the hydrant flushing. Fire Construction Services shall inspect the site after acceptance of
the public water system by CCWD. Fire Construction Services must grant a clearance before
lumber is dropped.
3. Construction Access: The access roads must be paved in accordance with all the requirements
of the RCFPD Fire Lane Standard #9-7. All temporary utilities over access roads must be installed
at least 14 feet, 6 inches above the finished surface of the road.
4. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is responsible for
obtaining the fire flow information from CCWD and submitting the letter to Fire Construction
Services.
5. Easements and Reciprocal Agreements: All easements and agreements must be recorded with
the County of San Bernardino.
PRIOR TO THE RELEASE OF TEMPORARY POWER
The building construction must be substantially completed in accordance with Fire Construction Services'
"Temporary Power Release Checklist and Procedures."
7
PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following:
1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire
hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga .
Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers." On private property,
the markers shall be installed at the centerline of the fire access road, at each hydrant location.
2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in the
presence of Fire Construction Services, shall conduct a test of the most hydraulically remote
on-site fire hydrants. The underground fire line contractor, developer, and/or owner are responsible
for hiring the company to perform the test. A final test report shall be submitted to Fire
Construction Services verifying the fire flow available. The fire flow available must meet or exceed
the required fire flow in accordance with the California Fire Code.
3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler
system(s) shall be tested and accepted by Fire, Construction Services.
4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler
monitoring system must be tested and accepted by Fire Construction Services. The fire sprinkler
monitoring system shall be installed, tested, and operational immediately following the completion
of the fire sprinkler system (subject to the release of power).
5. Fire Suppression Systems and/or other special hazard protection systems shall be inspected,
tested, and accepted by Fire Construction Services before occupancy is granted and/or equipment
is placed in service.
6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm system
shall be installed, inspected, tested, and accepted by Fire Construction Services.
7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular gates must
be inspected, tested, and accepted in accordance with RCFPD Standards #9-1 or #9-2 by Fire
Construction Services.
8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access
roadways must be installed in accordance with the approved plans and acceptable to Fire
Construction Services.
The CC&R's, the reciprocal agreement and/or other approved documents shall be recorded and
contain an approved fire access roadway map with provisions that prohibit parking, specify the
method of enforcement and identifies who is responsible for the required annual inspections and the
maintenance of all required fire access roadways.
9. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and
multi-family buildings shall post the address with minimum 8-inch numbers on contrasting
background, visible from the street and electrically illuminated during periods of darkness. When
the building setback exceeds 200 feet from the public street, an additional non-illuminated 6-inch
minimum number address shall be provided at the property entrance. Larger address numbers will
be required on buildings located on wide streets or built with large setbacks in multi-tenant
commercial and industrial buildings. The suite designation numbers and/or letters shall be
provided on the front and back of all suites.
8
10. Hazardous Materials: Prior to the issuance of a Certificate of Occupancy, the applicant must
demonstrate (in writing from the County) that the facility has met or is meeting the Risk
Management Plan (RMP) or Business Emergency/Contingency Plan with the San Bernardino
County Fire Department, Hazardous Materials/Emergency Response and Enforcement Division.
The applicant must also obtain inspection and acceptance by Fire Construction Services.
11. Confidential Business Occupancy Information: The applicant shall complete the Rancho
Cucamonga Fire District "Confidential Business Occupancy Information" form. This form provides
contact information for Fire District use in the event of an emergency at the subject building or
property. This form must be presented to the Fire Construction Services Inspector.
12. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, an 8 1/2-inch by 11-inch
or 11-inch by 17-inch site plan of the site in accordance with RCFPD Standard #13-1 shall be
revised by the applicant to reflect the actual location of all devices and building features as required
in the standard. The site plan must be reviewed and accepted by the Fire Inspector.
9